Plat and Subdivision Committee
Regular MeetingArlington Heights, IL · November 30, 2016
Agenda
Village of Arlington Heights
Plat and Subdivision Committee
Community Room, 3rd Floor
Arlington Heights Village Hall
33 S. Arlington Heights Road
Arlington Heights, IL 60005
November 30, 2016
6:00 PM
I. CALL TO ORDER
II. ROLL CALL
III. APPROVAL OF MINUTES
IV. REPORTS
V. OLD BUSINESS
VI. NEW BUSINESS
A. Windsor School Addition - 1315 E. Miner St. - T1573
Amendment to Special Use Ordinance
VII. OTHER BUSINESS
VIII.ADJOURNMENT
Persons with disabilities requiring auxiliary aids or services, such as an
American Sign Language interpreter or written materials in accessible
formats, should contact David Robb, Disability Services Coordinator, at 33 S.
Arlington Heights Road, Arlington Heights, Illinois 60005, (847)368-5793
(Voice), (847)368-5980 (Fax) or drobb@vah.com.
Item: Windsor School - 1315 E. Miner St. - T1573
Department: Planning & Community Development
Requested Action
Amendment to Special Use Ordinance #90-082 to allow an addition to the
existing Elementary School.
Variations Identified
1. Variation from Section 5.1-3.6 to decrease the required exterior side yard
setback from 40’ to 12.9’ for the existing building.
2. Variation from Section 11.4-4 to reduce the required on-site parking.
Recommendation
The Staff Development Committee reviewed the proposed request and supports
the proposed Special Use Permit and Variations, subject to the following:
1. A neighborhood meeting shall be held prior to the Plan Commission hearing. A
summary of said meeting shall be provided to staff no less than one week prior
to the Plan Commission hearing date.
2. A traffic and parking study from a certified Traffic Engineer shall be required
and needs to assess access, on-site circulation, parking, trip generation, drop-
off/pick-up operations, and impacts to adjacent roadways. The traffic study
should analyze and identify solutions to the current drop-off/pick-up operations,
including the potential for a dedicated drop-off/pick-up lane.
3. The School District should coordinate the removal of the recreational field
with the Park District.
4. A Design Commission application shall be required.
5. These are preliminary comments only and should not be relied upon as
identification of the only major issues. The Staff Development Committee
reserves the right to change its position on issues upon submittal of a formal
application and detailed review.
ATTACHMENTS:
Description Type
Staff Report Board or Commission Report
Aerial Exhibits
Plat of Survey Exhibits
Location Map Exhibits
Site Plan Exhibits
Floor Plans Exhibits
Roof Plan Exhibits
Elevations Exhibits
Windsor School Addition, Temporary File 1573
STAFF DEVELOPMENT COMMITTEE REPORT
To: Plat and Subdivision Committee
Prepared By: Sam Hubbard, Development Planner
Meeting Date: November 30, 2016
Date Prepared: November 22, 2016
Project Title: Windsor School Addition
Address: 1315 E. Miner St.
BACKGROUND INFORMATION
Petitioner: Don Hanson
Address: 350 W Ontario St – Suite 200
Chicago, IL 60654
Existing Zoning: R-3, One Family Dwelling District
Requested Action:
Amendment to Special Use Ordinance #90-082 to allow an addition to the existing Elementary School.
Variations Identified:
Variation from Section 5.1-3.6 to decrease the required exterior side yard setback from 40’ to 12.9’ for the existing building.
Variation from Section 11.4-4 to reduce the required on-site parking.
Subject Site
NORTH
Surrounding Properties:
Direction Zoning Existing Use Comprehensive Plan
R-3, One Family Dwelling District Single Family Homes Single Family Detached
North
R-3, One Family Dwelling District Single Family Homes Single-Family Detached
South
Page 1 of 4
Windsor School Addition, Temporary File 1573
R-3, One Family Dwelling District Single Family homes Single Family Detached,
East
R-3, One Family Dwelling District Miner School Parks
West
Background:
The subject property is approximately 7.53 acres in size and contains the Windsor Elementary School and associated recreational
areas to the west of the school building. Windsor School is one of seven elementary schools operated by District 25 and has a
current enrollment of 509 students. Enrollment is expected to increase in the future, with future capacity estimated at 518 students.
The school has two temporary classrooms housed in a trailer on the west side of the building, which trailer would be removed upon
completion of the proposed building addition. Windsor School is also home to two district-wide special education programs for
students in grades K-5.
The proposed project involves the expansion of the southern wing of the school, which would create six new classrooms, three new
offices, and new bathroom facilities. The existing gym would also be expanded to the west, and new storage areas and receiving
areas would be created. The parking lot along the western side of the site would be reoriented, which will cause the removal of one
of the recreational fields that currently exists in this area, and a new curb cut along Miner Street has been proposed. Additionally,
the asphalt play area along the south of the building will be relocated to the west side of the proposed addition, and the play area
on the southern end of the site will be removed and replaced at a slightly smaller size. There is no bussing to Windsor School and
this will not be changed as a result of the proposed addition.
In 1990, the Windsor School was approved for a Special Use Permit to allow the existing elementary school, which was done in
conjunction with a building expansion that was completed at that time.
Zoning and Comprehensive Plan
The subject property is within the R-3, One Family Dwelling District, and all schools within the R-3 District are required to obtain a
Special Use Permit. As indicated above, the subject property was granted a Special Use Permit to allow the existing elementary
school via Ordinance #90-082. In order to allow the proposed expansion, Ordinance #90-082 must be amended.
The Village's Comprehensive Plan designates the future use of the subject property as “Schools”. The proposed Special Use
amendment is therefore consistent with the Comprehensive Plan.
Site Plan, Building and Landscaping
As part of the formal review process, the applicant will be required to provide detailed site information relative to all bulk
requirements, such as the existing and proposed F.A.R., building lot coverage, and impervious surface coverage. Although
preliminary analysis indicates that the site will comply with these regulations, formal plans detailing compliance will be required.
The existing gymnasium stands at 24 feet in height and the proposed addition to the gym will maintain this height. The single-story
classroom addition is proposed at 14’8” in height. The R-3 District allows maximum building heights of 25’, and therefore the
proposed work conforms to all height regulations. Staff notes that this project must proceed to the Design Commission for their
review and approval of the building architecture and landscaping.
The current school building is non-conforming relative to the exterior side yard setback along Windsor Street, where code requires a
40’ setback and the existing building is setback 12.92’ from the side yard property line. Therefore, in conjunction with the proposed
building addition, staff is recommending that this existing non-conformity be formally approved via a Variation. As the proposed
setback variation is an existing condition, staff supports approval. Based on a preliminary analysis, the proposed building addition
will conform to all setback and additional bulk restrictions. However, upon comprehensive review of the detailed plans, additional
variations may be identified.
A code-compliant photometric plan and landscape plan will be required as part of the Plan Commission submittal. If any trees are
proposed for removal, a tree preservation plan will be required. The petitioner will need to work with staff to preserve and/or
relocate as many of the existing mature trees as possible.
Page 2 of 4
Windsor School Addition, Temporary File 1573
As part of the Plan Commission process, the petitioner will be required to provide justification for the requested Variation per the
approval criteria as summarized below:
The property in question cannot yield a reasonable return if per mitted to be used only under the conditions
allowed by the regulations in that zone.
The plight of the owner is due to unique circumstances.
The variation, if granted, will not alter the essential character of the locality.
Finally, staff recommends that the petitioner hold a neighborhood meeting prior to the Plan Commission hearing to introduce the
project to the surrounding neighbors to understand what concerns they may have. Additionally, the School District should
coordinate with the Park District on the elimination of the recreational field west of the gymnasium addition to help mitigate any
impact that this removal will have for Park District programing.
Traffic & Parking
Elementary schools are required to provide two parking spaces per employee plus one parking space per classroom. As part of the
formal submittal, the applicant shall provide information relative to number of classrooms and number of teachers (both existing and
future). Additionally, the applicant shall provide information relative to the number of existing parking spaces located on the subject
property, which is not clearly indicated on the plat of survey. It is unknown exactly how many spaces exist on the site since the
parking lot overlaps onto and is shared with the Miner School parking lot. A cursory analysis shows about 89 existing parking
spaces on the subject property, and the reconfigured parking lot will provide 92 parking spaces with 3 handicap spaces. Staff notes
that parking lots that provide 76-100 parking spaces are required to have 4 handicap parking spaces, and therefore an additional
handicap parking space is required. Finally, staff notes that Ordinance 90-082 granted a parking Variation to allow 83 parking
spaces on the subject property, and this Variation will have to be amended to reflect the proposed changes to the parking lot.
As indicated above, bussing to Windsor School is not provided and therefore all students either walk or bike to and from school or
are dropped off/picked up by parents with cars. Staff is aware of traffic issues related to the existing drop-off and pick-up operations,
and believe the proposed addition and changes to the parking lot are an opportunity to improve upon these issues. A detailed traffic
and parking analysis that evaluates the existing and proposed parking demands as well as drop-off and pick-up operations will be
required as part of the formal submittal. The School District may want to analyze the viability of a dedicated drop-off/pick-up lane
which may help to alleviate some of the congestion and traffic during arrival and dismissal.
RECOMMENDATION
The Staff Development Committee reviewed the proposed request and supports the proposed Amendment to Ordinance #90-082
and the proposed setback Variation, subject to the following:
1. A neighborhood meeting shall be held prior to the Plan Commission hearing. A summary of said meeting shall be provided to
staff no less than one week prior to the Plan Commission hearing date.
2. A traffic and parking study from a certified Traffic Engineer shall be required, which study needs to assess access, on-site
circulation, parking, trip generation, drop-off/pick-up operations, and impacts to adjacent roadways. The traffic study should
analyze and identify solutions to the current drop-off/pick-up operations, including the potential for a dedicated drop-off/pick-up
lane.
3. The School District should coordinate the removal of the recreational field with the Park District.
4. A Design Commission application shall be required.
5. These are preliminary comments only and should not be relied upon as identification of the only major issues. The Staff
Development Committee reserves the right to change its position on issues upon submittal of a formal application and detailed
review.
________________________________________ November 22, 2016
Bill Enright, Deputy Director of Planning and Community Development
Cc: Randy Recklaus, Village Manager
Page 3 of 4
Windsor School Addition, Temporary File 1573
All Department Heads
Temp File 1573
Page 4 of 4
Windsor School - Aerial
November 21, 2016 1:2,257
0 0.0175 0.035 0.07 mi
0 0.03 0.06 0.12 km
Village of Arlington Heights GIS
Copyright 2013
250 FT.
PROPERTY LINE
COURTYARD
ADDITION
PROPERTY LINE ADDITION
PROPERTY LINE
250 FT. ADDITION
ADDITION
250 FT.
PROPERTY LINE
250 FT.
N
SUBJECT PROPERTY MAP
WINDSOR ELEMENTARY SCHOOL ADDITION AND RENOVATIONS
1315 E. Miner Street, Arlington Heights, IL 60004
STR Partners LLC
350 West Ontario Street | Suite 200 ARLINGTON HEIGHTS SCHOOL DISTRICT 25
Chicago IL 60654
www.strpartners.com 11/2/16
MINER STREET
25'-0" PROPERTY LINE
SIDE
YARD
SETBACK
92 PARKING SPACES + 3 H.C.
DRIVE
WINDSOR
NEW
NEW TRASH
ELECTRICAL ENCLOSURE
PROPERTY LINE PROPERTY LINE
TRANSFORMER
EXISTING WINDSOR
GYM SCHOOL
ADDITION
NEW
CHILLER
53.69 FEET CHILLER SCREEN WALL
SIDE YARD
SETBACK
REMOVE MODULAR
CLASSROOMS 53.69 FEET
SIDE YARD
ASPHALT SETBACK
SURFACE
PLAY AREA
CLASSROOM
ADDITION
RUBBER
SURFACE
PLAY AREA
N
30'-0"
SITE PLAN
SIDE 1 0 8' 16' 32'
SITE PLAN
SCALE: 1" = 30'
YARD
PROPERTY LINE SETBACK
WINDSOR ELEMENTARY SCHOOL ADDITION AND RENOVATIONS
1315 E. Miner Street, Arlington Heights, IL 60004
STR Partners LLC
350 West Ontario Street | Suite 200 ARLINGTON HEIGHTS SCHOOL DISTRICT 25
Chicago IL 60654
www.strpartners.com 11/2/16
OFFICE LITERACY LITERACY
120B 120C 120D
OFFICE
120A
VEST
LOUNGE COPY
CLASSROOM CLASSROOM CLASSROOM SP ED
105 107 STOR
110 112 114 118
116 LIBRARY
TOILET 120
STOR MECH 118A
106 108
CORRIDOR
PRINCIPAL 003
OFFICE T T
104 103B 103A
CORRIDOR COMPUTER
NURSE SP ED
002 LAB
101 CLASSROOM CLASSROOM 117
ASSIST TOILETTOILET 120G
111 113 CONFERENCE
PRINCIPAL 115A 115B IT/TEC
STOR 120E
OFFICE T 120F
102 009 119A
FRONT SP ED MECH
OFFICE 119 122B
BOILER
100
122
CORR
004
VEST GIFTED MECH
121 122A
CONF. COURTYARD T LITERACY
165 121A 124
SPEECH/
LANGUAGE STAIR
ADDITION
125 ST-001
STAGE
ART
140A
CLASSROOM
164
COMMONS
CLASSROOM CLASSROOM
140
127 126
CORR
MUSIC 005
CLASSROOM
STAIR ST003 162
STOR. STOR. STOR. STOR
168 167 166 162A
RECEIVING/
OFFICE
169 CORRIDOR
011
CLASSROOM CLASSROOM
129 128
TRASH TOILET TOILET
ENCLOSURE FOOD 135B 135A
SERVICE CLASSROOM CLASSROOM CORR
142 146 143 007
GYM T
CORRIDOR 134B
OFFICE STOR T
006
160A 134 134A
GYMNASIUM ELEV
160 CORRIDOR EQUIP
MECH/ 008 132
STORAGE STAIR
GYM 147 CLASSROOM CLASSROOM ST-002 KINDERGARTEN KINDERGARTEN
STORAGE 148 145 CLASSROOM CLASSROOM
160B 131 130
ELECTRICAL
149
TOILET
151A CLASSROOM
150
TOILET
ADDITION
CHILLER
ENCLOSURE 151B
CLASSROOM CORRIDOR CLASSROOM
153 009 152
ESL/ SP ED
VEST 154
ADDITION
CLASSROOM CLASSROOM BOYS GIRLS COPY CLASSROOM
155 156 172 174 180 182
ADDITION WOMENS MEN I.D.F.
176 178 184
OFFICE/
MEETING CORRIDOR VEST
170 010 010A
CLASSROOM OFFICE OFFICE CLASSROOM CLASSROOM CLASSROOM CLASSROOM
171 MEETING MEETING 177 179 181 183
173 175
N
FIRST FLOOR PLAN
1 0 8' 16' 32'
FIRST FLOOR PLAN
SCALE: 1" = 20'
WINDSOR ELEMENTARY SCHOOL ADDITION AND RENOVATIONS
1315 E. Miner Street, Arlington Heights, IL 60004
STR Partners LLC
350 West Ontario Street | Suite 200 ARLINGTON HEIGHTS SCHOOL DISTRICT 25
Chicago IL 60654
www.strpartners.com 11/2/16
EXISTING
ROOF TO
EXISTING REMAIN
ROOF TO
REMAIN
EXISTING
CHILLER SCREEN
TO REMAIN
EXISTING ENTRY CANOPY ROOF TO EXISTING
REMAIN ROOF TO
EXISTING
REMAIN
CHILLER
TO REMAIN
OPEN TO
COURTYARD
BELOW
STAIR
ST-001
EXISTING
ROOF TO CLASSROOM CLASSROOM
REMAIN 227 226
DN
MECH
211
CLASSROOM CLASSROOM
229 CORR 228
010
GIRLS TOIL. BOYS TOIL.
OPEN TO 233A 233B
FOOD SERV. EXISTING J.C.
BELOW ROOF TO 235C
REMAIN
OPEN TO SM. GROUP
GYM BELOW CORRIDOR J.C. TOIL. 235
011 235B 235A
OPEN TO
MECH. ELECT.
NEW ROOF 236
BELOW
OVER
GYM OFFICE STAIR
& STORAGE ST-02 CLASSROOM CLASSROOM
231 230
SM. GROUP
OPEN TO 232
ELECT.
BELOW
EXISTING
ROOF TO
REMAIN
NEW
CLASSROOM
ADDITION
ROOF
N
SECOND FLOOR PLAN
1 0 8' 16' 32'
SECOND FLOOR PLAN
SCALE: 1" = 20'
WINDSOR ELEMENTARY SCHOOL ADDITION AND RENOVATIONS
1315 E. Miner Street, Arlington Heights, IL 60004
STR Partners LLC
350 West Ontario Street | Suite 200 ARLINGTON HEIGHTS SCHOOL DISTRICT 25
Chicago IL 60654
www.strpartners.com 11/2/16
EXISTING EXISTING
EXISTING
ROOF TO ROOF TO
ROOF TO
REMAIN REMAIN
REMAIN
EXISTING EXPANSION JOINT
EXISTING
CHILLER SCREEN
TO REMAIN
EXISTING EXISTING
ROOF TO ROOF TO
REMAIN REMAIN
EXISTING
CHILLER
TO REMAIN
EXISTING
ROOF TO
REMAIN
R.D. O.D.
ROOF RIDGE
NEW
R.D.
LOW
O.D.
ROOF
O.D.
SLOPE STL. = EXISTING
R.D. ROOF TO
SLOPE STL. = 1/4" PER FOOT 1/4" PER FOOT
REMAIN
EXISTING
NEW GYM/ EXISTING ROOF SLOPE ROOF TO
MECH. REMAIN
ROOF
EXISTING EXPANSION JOINT
EXISTING ROOF
HATCH TO
R.D. REMAIN
SLOPE STL. EXISTING
R.D. EXISTING ROOF TO
= 1/4" PER SLOPE STL. = 1/4" PER FOOT
O.D. O.D.
FOOT GYM/MECH. REMAIN
ROOF TO
REMAIN
NEW
ROOF RIDGE
GYM
STOR. &
OFFICE
ROOF
EXISTING ROOF SLOPE
SLOPE STL.
= 1/4" PER
FOOT SLOPE STL. = 1/4" PER FOOT
O.D.
O.D.
R.D. R.D. EXISTING EXPANSION JOINT
EXISTING EXPANSION JOINT
EXISTING
ROOF TO
REMAIN
O.D. O.D.
R.D. R.D.
EXPANSION JOINT
SLOPE STL. = SLOPE STL. =
1/4" PER FOOT 1/4" PER FOOT
NEW CLASSROOM
WING ROOF
EXPANSION JOINT
SLOPE STL. = SLOPE STL. = SLOPE STL. = SLOPE STL. =
1/4" PER FOOT 1/4" PER FOOT 1/4" PER FOOT 1/4" PER FOOT
R.D. R.D.
R.D. O.D. O.D. R.D.
O.D. O.D.
B/DECK @ L.P. = +12'-0" B/DECK @ L.P. = +12'-0"
N
ROOF PLAN 0 8' 16' 32'
1
ROOF PLAN
SCALE: 1" = 20'
WINDSOR ELEMENTARY SCHOOL ADDITION AND RENOVATIONS
1315 E. Miner Street, Arlington Heights, IL 60004
STR Partners LLC
350 West Ontario Street | Suite 200 ARLINGTON HEIGHTS SCHOOL DISTRICT 25
Chicago IL 60654
www.strpartners.com 11/2/16
DARK BRONZE COPING
TO MATCH EXISTING
NOTE:
FACE BRICK-2
FACE BRICK-1 FACE BRICK 1: MATCHING EXISTING
FACE BRICK-2 RED BRICK
T/MASONRY AT CLASSROOM FACE BRICK 2: MATCHING EXISTING
ELEV +14'-8" LIGHT GREY BRICK
T/EXISTING & NEW 1ST FLR. SLAB
ELEV ±0"
NEW DARK BRONZE ALUM.
DARK BRONZE ALUM. WINDOW
WINDOW SYSTEM TO MATCH
SYSTEM TO MATCH EXISTING
EXISTING
LIMESTONE SILL
EAST ELEVATION
5 SCALE: 1" = 20'
DARK BRONZE COPING
TO MATCH EXISTING
LIMESTONE FASCIA
FACE BRICK-1 DARK BRONZE ALUM. WINDOW
SYSTEM TO MATCH EXISTING
FACE BRICK-2
T/MASONRY AT GYM FACE BRICK-2
DARK BRONZE COPING
ELEV +24'-0" TO MATCH EXISTING FACE BRICK-1
T/MASONRY AT CLASSROOM
ELEV +14'-8" WINDSOR SCHOOL
T/EXISTING & NEW 1ST FLR. SLAB
ELEV ±0"
NEW WINDOW TO MATCH EXISTING FACEBRICK-2, TRASH SCREEN WALL FACEBRICK-2, CHILLER SCREEN WALL LIMESTONE SILL
CHAINLINK FENCE/GATE W/SLATS
WEST ELEVATION
4 SCALE: 1" = 20'
DARK BRONZE COPING
TO MATCH EXISTING
DARK BRONZE COPING DARK BRONZE ALUM. WINDOW
FACE BRICK-1 LIMESTONE FASCIA TO MATCH EXISTING FACE BRICK-1 SYSTEM TO MATCH EXISTING FACE BRICK-2
T/MASONRY AT GYM
ELEV +24'-0" FACE BRICK-2
T/MASONRY AT CLASSROOM
ELEV +14'-8"
T/EXISTING & NEW 1ST FLR. SLAB
ELEV ±0"
FACEBRICK-2, CHILLER SCREEN WALL LIMESTONE SILL
SOUTH ELEVATION
3 SCALE: 1" = 20'
FACE BRICK-1 DARK BRONZE COPING
TO MATCH EXISTING
FACE BRICK-2 DARK BRONZE COPING
LIMESTONE FASCIA TO MATCH EXISTING DARK BRONZE
T/MASONRY AT GYM ALUM. WINDOW
FACE BRICK-1 SYSTEM TO MATCH
ELEV +24'-0"
EXISTING
FACE BRICK-2
T/MASONRY AT CLASSROOM T/MASONRY AT CLASSROOM
ELEV +14'-8" ELEV +14'-8"
CLASSROOM
CLASSROOM CORR. CLASSROOM
T/EXISTING & NEW 1ST FLR. SLAB T/EXISTING & NEW 1ST FLR. SLAB
ELEV ±0" ELEV ±0"
FACE BRICK-2, TRASH SCREEN WALL LIMESTONE SILL
DARK BRONZE POWDER COAT STL.
LOUVER GATES AT TRASH ENCLOSURE
NORTH ELEVATION AT GYM NORTH CLASSROOM ELEVATION 0 8' 16' 32'
2 SCALE: 1" = 20'
1 SCALE: 1" = 20'
BUILDING ELEVATIONS
WINDSOR ELEMENTARY SCHOOL ADDITION AND RENOVATIONS
1315 E. Miner Street, Arlington Heights, IL 60004
STR Partners LLC
350 West Ontario Street | Suite 200 ARLINGTON HEIGHTS SCHOOL DISTRICT 25
Chicago IL 60654
www.strpartners.com 11/2/16