A. Wilke Studios - 1450 S. New Wilke Rd. - T1569
Special use Permit for Hotel, Variations
VII. OTHER BUSINESS
VIII.ADJOURNMENT
Persons with disabilities requiring auxiliary aids or services, such as an
American Sign Language interpreter or written materials in accessible
formats, should contact David Robb, Disability Services Coordinator, at 33 S.
Arlington Heights Road, Arlington Heights, Illinois 60005, (847)368-5793
(Voice), (847)368-5980 (Fax) or drobb@vah.com.
Item: Wilke Studios - 1450 S. New Wilke Rd. - T1569
Department: Planning & Community Development
Requested Action
1. A Special Use Permit to allow a hotel.
Variations Required
1. A variation from Chapter 28, Section 3.2-108, Hotel, to allow a hotel with
more than 5% of its suites to have kitchens.
Recommendation
The Staff Development Committee is generally supportive of the proposed hotel,
however, further details from the petitioner are needed before a formal
recommendation can be rendered. The petitioner should address the following
items in their formal application to the Plan Commission.
1. Provide a written justification to support proposed Special Use Permit as per
the following criteria outlined in the Zoning Ordinance:
• That said special use is deemed necessary for the public convenience at this
location.
• That such case will not, under the circumstances of the particular case, be
detrimental to the health, safety, morals or general welfare of persons residing or
working in the vicinity.
• That the proposed use will comply with the regulations and conditions
specified in this ordinance for such use, and with the stipulations and conditions
made a part of the authorization granted by the Village Board of Trustees.
2. Provide a written justification for the proposed variation based on the
following hardship criteria outlined in the Zoning Ordinance:
• The property in question cannot yield a reasonable return if permitted to be
used only under the conditions allowed by the regulations in that zone.
• The plight of the owner is due to unique circumstances.
• The variation, if granted, will not alter the essential character of the locality.
3. Engineering plans and details, including a fire-truck auto turn exhibit, shall be
required as part of the formal review process.
4. A market assessment shall be required to demonstrate a need for this type and
size development at this location.
5. A code compliant Landscape Plan shall be required
6. Design Commission review shall be required prior to a formal hearing of the
Plan Commission.
7. A detailed traffic and parking study from a Certified Traffic engineer that
assesses access (location, design, and Level of Service), on-site circulation, trip
generation and distribution, parking, and impacts to public streets shall be
required.
8. These are just preliminary comments only and should not be relied upon as
identification of the only major issues. The Staff Development Committee
reserves the right to change its position on issues upon submittal of a formal
application and detailed review.
ATTACHMENTS:
Description Type
Staff Report Board or Commission Report
Aerial Exhibits
Existing Floor Plan Exhibits
Proposed Floor Plan Exhibits
Plat of Survey Exhibits
Executive Summary Correspondence
Conceptual Architecture Example - 1 Exhibits
Conceptual Architecture Example - 2 Exhibits
Conceptual Architecture Example - 3 Exhibits
VILLAGE OF ARLINGTON HEIGHTS Temp File Number: T1569
Project Title: Wilke Studios
Address: 1450 S. New Wilke Rd.
PIN: 08-08-401-030
To: Plat and Subdivision Committee
Prepared By: Sam Hubbard
Meeting Date: March 8, 2017
Date prepared: March 3, 2017
Petitioner: Ravi Parikh
Address: 1111 Plaza Dr. – Suite 421
Schaumburg, IL 60173
Existing Zoning: B-1: Limited Retail
Business District, and B-2: General Business
District
SURROUNDING LAND USES
Direction Existing Existing Use Comprehensive Plan
Zoning
North R-6 Surrey Park Condominiums Multi-Family Moderate Density Multi-Family
Development
South B-2 Mobil Gas Station Commercial
East B-2 Citgo Gas Station Commercial
West B-2, R-6 Surrey Park Condominiums Multi-Family Commercial, Moderate Density Multi-Family
Development, Penang Malaysian Cuisine
Requested Action:
1. A Special Use Permit to allow a hotel.
Variations Required:
1. A variation from Chapter 28, Section 3.2-108, Hotel, to allow a hotel with more than 5% of its suites to have kitchens.
Page 1 of 3
Project Background:
The subject property is a single lot comprising a total of approximately 15,200 square feet (0.34 acres), with an existing two story
building with approximately 7,700 sq. ft. of floor area. There are two office tenants that currently occupy the building. The subject
property is located within the B-2, General Business District. Access to the site comes from two driveway entrances off of New
Wilke Rd. The parking area and drive aisle has a circular layout and wraps around the building, containing space for 21 parking
stalls.
The applicant has proposed the purchase and rehab of the building to allow the conversion of the structure to a 12-room long term
stay hotel that would provide “corporate housing” for individuals staying temporarily within the community. Typical leases would
range from 3-6 months and could occasionally stretch to a year. The target tenant would be business professionals that are on
temporary work assignments within the community, such as software engineers, insurance adjusters, and other corporate
professionals. Average rental rates would be between $1,500 and $3,000 per month, fluctuating based on seasonal market factors.
Each unit would have a bedroom, bathroom, and kitchen. Other than for occasional property maintenance, no staff would be onsite.
Zoning and Comprehensive Plan
Based on the information provided, Staff has determined that the land use falls under the definition of a hotel, which is defined as:
“A building primarily designed for transient occupancy containing lodging rooms or suites accessible from a common hall or
entrance, providing living, sleeping and bathroom facilities. No more than five percent of the suites shall be provided with kitchen
facilities. A central kitchen, meeting rooms, and recreation rooms may also be provided.” According to the Permitted Use Table
outlined in the Village’s Zoning Ordinance, a hotel requires a Special Use Permit within the B-2 zoning district.
To proceed forward, the Plan Commission must review and the Village Board must approve two primary zoning actions. The first
action is a Special Use Permit to allow a hotel. As part of the Special Use Permit review process, the petitioner must provide written
justification demonstrating compliance with the following standards of approval:
1. That said special use is deemed necessary for the public convenience at this location.
2. That such case will not, under the circumstances of the particular case, be detrimental to the health, safety, morals
or general welfare of persons residing or working in the vicinity.
3. That the proposed use will comply with the regulations and conditions specified in this ordinance for such use, and
with the stipulations and conditions made a part of the authorization granted by the Village Board of Trustees.
In order to substantiate the need for this type of facility, a market study that analyzes current market demand for this type of use
would be required as part of the Plan Commission review process.
Since each suite would contain a kitchen, a Variation to allow 100% of the suites to have a kitchen is required. Therefore, the
applicant must provide a written justification based on the following hardship criteria:
The property in question cannot yield a reasonable return if per mitted to be used only under the conditions allowed
by the regulations in that zone.
The plight of the owner is due to unique circumstances.
The variation, if granted, will not alter the essential character of the locality.
When more detailed plans are received, additional Variations may be identified.
Site, Building, and Landscaping
The applicant has not proposed any major alterations to the site and would like to utilize the existing parking lot and site layout.
Staff notes that the parking lot is not currently striped, does not contain curbs, has a dumpster with no enclosure, and does not
likely conform to the required parking lot landscape requirements. If this project is to move forward, depending on the scope of the
proposed work, additional site upgrades may be required. At a minimum, landscaping should be added along the north and western
property lines to buffer the proposed use from the surrounding residential properties in this area and a dumpster enclosure should
be constructed to screen the existing dumpster.
While the present site layout does not likely allow ingress and subsequent egress of a fire truck without requiring the fire truck to
back up, since the applicant is not proposing to remove and/or significantly alter the current building footprint, the Fire Department
may be able to work with the existing layout provided the building is brought up to current Building Code requirements for sprinklers
Page 2 of 3
and a fire alarm system. It is unknown to what extent the current structure conforms to Building Code standards for a hotel, and the
Building Department will have to analyze whether the proposed hotel is classified as a residential/housing use or a commercial use
as per the Building Code. If the building is determined to fall within the residential/housing classification, an elevator may not be
required. However, if the building is determined to fall under a commercial use classification, an elevator may be required.
Furthermore, depending on the size and flow of the existing water main, an increase in the size of the water main may be triggered
by the development. The applicant is encouraged to reach out to both the Engineering Department and Building Department to
understand potential Building Code and infrastructure implications of the proposed facility.
The applicant has indicated that significant upgrades would be made to the exterior of the structure and has provided a sample of
the proposed architecture that he envisions for the building. Staff notes that a Design Commission review will be required prior to
any appearance before the Plan Commission.
Traffic and Parking
According to Chapter 28, Section 6.12, Traffic Engineering Approval, any Special Use Permit larger than 5,000 square feet in size
that requires Plan Commission review is required to provide a traffic and parking study from a Certified Traffic Engineer. This study
needs to assess access (location, design, and Level of Service), on-site circulation, trip generation and distribution, parking, and
impacts to public streets. Per the hotel parking requirements, one parking space is required for each room. As there would be only
12 rooms and 21 parking spaces are provided on the site, the proposed hotel would comply with parking regulations.
RECOMMENDATION
The Staff Development Committee is generally supportive of the proposed hotel, however, further details from the petitioner are
needed before a formal recommendation can be rendered. The petitioner should address the following items in their formal
application to the Plan Commission.
1. Provide a written justification to support proposed Special Use Permit as per the following criteria outlined in the Zoning
Ordinance:
That said special use is deemed necessary for the public convenience at this location.
That such case will not, under the circumstances of the particular case, be detrimental to the health, safety,
morals or general welfare of persons residing or working in the vicinity.
That the proposed use will comply with the regulations and conditions specified in this ordinance for such use,
and with the stipulations and conditions made a part of the authorization granted by the Village Board of
Trustees.
2. Provide a written justification for the proposed variation based on the following hardship criteria outlined in the Zoning
Ordinance:
The property in question cannot yield a reasonable return if per mitted to be used only under the conditions
allowed by the regulations in that zone.
The plight of the owner is due to unique circumstances.
The variation, if granted, will not alter the essential character of the locality.
3. Engineering plans and details, including a fire-truck auto turn exhibit, shall be required as part of the formal review process.
4. A market assessment shall be required to demonstrate a need for this type and size development at this location.
5. A code compliant Landscape Plan shall be required
6. Design Commission review shall be required prior to a formal hearing of the Plan Commission.
7. A detailed traffic and parking study from a Certified Traffic engineer that assesses access (location, design, and Level of
Service), on-site circulation, trip generation and distribution, parking, and impacts to public streets shall be required.
8. These are just preliminary comments only and should not be relied upon as identification of the only major issues. The Staff
Development Committee reserves the right to change its position on issues upon submittal of a formal application and detailed
review.
________________________________________ February 3, 2017
Bill Enright, Deputy Director of Planning and Community Development
Cc: Randy Recklaus, Village Manager
All Department Heads
Temp File 1569
Page 3 of 3
1450 S. New Wilke (B-2)
June 13, 2016 1:2,257
0 0.0175 0.035 0.07 mi
0 0.03 0.06 0.12 km
Village of Arlington Heights GIS
Copyright 2013
352110
COPYRIGHT 2010 TINAGLIA ARCHITECTS, INC.
Executive Summary
Wilke Studios
1450 New Wilke Road
Arlington Heights, IL 60025
Proposed by:
Ravi Parikh
Build Out Group, LLC
1111 Plaza Drive
Ste 421
Schaumburg, IL 60173
Project Summary
Build Out Group LLC (hereafter known as BOG) would like to acquire and redevelop the office building located at
1450 New Wilke Road, Arlington Heights. BOG believes the property would be better utilized as furnished studios
apartments, catering to corporate travelers visiting near by Central Business Districts.
Subject Property
The building is +/-7700 sq ft. and currently has 2 tenants occupying 1200sq, ft. as of 2/1/2017. 2017 pro forma
indicates a $30,000.00 loss. The current property resides on +/-13000 sq. ft. the property is land locked. A
Mobil Gas Station to the South and Apartments to the north and west of the building with Wilke Road to the
east.
The current owners are out of state and are not interested in putting in any money into the property; they are
getting below market rents due to the deteriorating condition and functionally obsolete design.
Proposed
A conversion would require a complete gut rehab of the interior with a fresh contemporary design and condo quality
finishes. The exterior would feature a new contemporary design.
Opportunity
We feel that there is an underserved market for quality corporate housing in the Northwest Chicago land area. The
Village of Arlington Heights stands to benefit by seeing an increase of Real Estate Property tax and Hotel Occupancy
tax. BOG would collect and remit all taxes to the Village.
In addition, the property would present a better perception for those visiting the village from Algonquin Road. We
would be enhancing the curb appeal by redoing the exterior with a modern look and landscaping.
Marketing
Our target client would be corporate professionals, such as software engineers and insurance adjusters, which we
have existing relationships.
We would also be utilize Online Travel Agents and market to the local representatives for our local businesses.
Based on my experience, the typical contracted engineer would typically receive a 3 or 6 month contract which can
be up to one year. The 3-6 month contract would be the average lease range. The average monthly rent rate would
be between the range of $1,500.00-3,000.00($50.00-100.00/ night) . Rental rates will be adjusted based on seasonal
and market factors.
About Us
Ravi Parikh has been involved with the hospitality business for 11 years. He has managed and operated 2 small
limited service properties each with 53 and 64 units. In addition, he currently manages a portfolio of residential real
estate.
General Contractor: TBD
Architect : David Rawlings, D L Rawlings, Inc.
Design: TBD