Development Review Board
Regular MeetingBurlington, VT · May 5, 2026
Agenda
Development Review Board
Tuesday, May 5, 2026, 5:00 PM
645 Pine Street, Front Conference Room or Remote on Zoom:
Please click the link below to join the webinar:
Zoom: https://us02web.zoom.us/j/83225696227?pwd=SGQ0bTdnS000Wkc3c2J4WWw1dzMxUT09
Webinar ID: 832 2569 6227
Passcode: 969186
Telephone: US +1 929 205 6099 or +1 301 715 8592 or +1 312 626 6799 or +1 669 900 6833 or +1 253 215 8782
or +1 346 248 7799
1. Agenda
2. Communications
3. Minutes
4. Consent
4.1.
ZP-26-141; 212 Intervale Avenue (RM, Ward 2) Burlington Housing Authority / BHA Riverside Ave Apts
/ Kelley Newell
Conditional use to add an additional pupil to early learning center. (Project Manager, Scott Gustin)
5. Public Hearing
5.1.
ZAP-26-4; 88 Lafountain Street (RM, Ward 2) SWB, LLC / Michael Alvanos
Appeal of administrative denial of ZP-26-78 for the after-the-fact installation of gravel for driveway.
(Project Manager, Scott Gustin)
5.2.
ZP-22-199; 51 Elmwood Avenue (RH, Ward 3) City DPW / Samantha Dunn
Time extension request of ZP-22-199 for the establishment of temporary emergency shelter. (Project
Manager, Scott Gustin)
5.3.
ZP-26-122; 118 Dale Road (RL, Ward 4) Maria Gould / Evan Gould
Proposed establishment of a spa home occupation. (Project Manager, Kirk Dressing)
6. Certificate of Appropriateness
6.1.
ZP-26-67 / ZP-26-68; 180 / 266 Queen City Park Road (E-LM, Ward 5) Burton Corporation / Will Feltus
Proposed installation, conveyance, and treatment of stormwater improvements across 180 Queen City
Park Road and 266 Queen City Park Road with associated site and utility improvements. (Project
Manager, Kirk Dressing)
7. Adjournment
8. Informational and Non-Discrimination Statements
8.1.
Plans may be viewed upon request by contacting the Department of Permitting & Inspections between the hours of 8:00 a.m. and 4:30
p.m. Participation in the DRB proceeding is a prerequisite to the right to take any subsequent appeal. Please note that ANYTHING
submitted to the Zoning office is considered public and cannot be kept confidential. This may not be the final order in which items will
be heard. Please view final Agenda, at www.burlingtonvt.gov/dpi/drb/agendas or the office notice board, one week before the hearing
for the order in which items will be heard.
The City of Burlington will not tolerate unlawful harassment or discrimination on the basis of political or religious affiliation, race, color,
national origin, place of birth, ancestry, age, sex, sexual orientation, gender identity, marital status, veteran status, disability, HIV positive
status, crime victim status or genetic information. The City is also committed to providing proper access to services, facilities, and
employment opportunities. For accessibility information or alternative formats, please contact Human Resources Department at (802) 540-
2505.
Packet
Development Review Board
Tuesday, May 5, 2026, 5:00 PM
645 Pine Street, Front Conference Room or Remote on Zoom:
Please click the link below to join the webinar:
Zoom: https://us02web.zoom.us/j/83225696227?pwd=SGQ0bTdnS000Wkc3c2J4WWw1dzMxUT09
Webinar ID: 832 2569 6227
Passcode: 969186
Telephone: US +1 929 205 6099 or +1 301 715 8592 or +1 312 626 6799 or +1 669 900 6833 or +1 253 215 8782
or +1 346 248 7799
1. Agenda
2. Communications
3. Minutes
4. Consent
4.1.
ZP-26-141; 212 Intervale Avenue (RM, Ward 2) Burlington Housing Authority / BHA Riverside Ave Apts
/ Kelley Newell
Conditional use to add an additional pupil to early learning center. (Project Manager, Scott Gustin)
5. Public Hearing
5.1.
ZAP-26-4; 88 Lafountain Street (RM, Ward 2) SWB, LLC / Michael Alvanos
Appeal of administrative denial of ZP-26-78 for the after-the-fact installation of gravel for driveway.
(Project Manager, Scott Gustin)
5.2.
ZP-22-199; 51 Elmwood Avenue (RH, Ward 3) City DPW / Samantha Dunn
Time extension request of ZP-22-199 for the establishment of temporary emergency shelter. (Project
Manager, Scott Gustin)
5.3.
ZP-26-122; 118 Dale Road (RL, Ward 4) Maria Gould / Evan Gould
Proposed establishment of a spa home occupation. (Project Manager, Kirk Dressing)
6. Certificate of Appropriateness
Page 1 of 68
6.1.
ZP-26-67 / ZP-26-68; 180 / 266 Queen City Park Road (E-LM, Ward 5) Burton Corporation / Will Feltus
Proposed installation, conveyance, and treatment of stormwater improvements across 180 Queen City
Park Road and 266 Queen City Park Road with associated site and utility improvements. (Project
Manager, Kirk Dressing)
7. Adjournment
8. Informational and Non-Discrimination Statements
8.1.
Plans may be viewed upon request by contacting the Department of Permitting & Inspections between the hours of 8:00 a.m. and 4:30
p.m. Participation in the DRB proceeding is a prerequisite to the right to take any subsequent appeal. Please note that ANYTHING
submitted to the Zoning office is considered public and cannot be kept confidential. This may not be the final order in which items will
be heard. Please view final Agenda, at www.burlingtonvt.gov/dpi/drb/agendas or the office notice board, one week before the hearing
for the order in which items will be heard.
The City of Burlington will not tolerate unlawful harassment or discrimination on the basis of political or religious affiliation, race, color,
national origin, place of birth, ancestry, age, sex, sexual orientation, gender identity, marital status, veteran status, disability, HIV positive
status, crime victim status or genetic information. The City is also committed to providing proper access to services, facilities, and
employment opportunities. For accessibility information or alternative formats, please contact Human Resources Department at (802) 540-
2505.
Page 2 of 68
Department of Permitting & Inspections William Ward, Director
Scott Gustin, AICP, CFM, Principal Planner
Zoning Division Mary O’Neil, AICP, Principal Planner
645 Pine Street Kirk Dressing, Associate Planner
Burlington, VT 05401 Joseph Cava, Planning Technician
Telephone: (802) 865-7188 Collin Naheedy, Code Compliance Officer
TO: Development Review Board
FROM: Scott Gustin
DATE: May 5, 2026
RE: 19-0745CU; 669 Riverside Avenue
======================================================================
Note: These are staff comments only; decisions on projects are made by the Development
Review Board, which may approve, deny, table or modify any project. THE APPLICANT
OR REPRESENTATIVE MUST ATTEND THE MEETING.
Zone: RM Ward: 2C
Owner/Applicant: Burlington Housing Authority / Kelley Newell
Request: Expand existing daycare capacity by two children (up to 25).
Applicable Regulations:
Article 3 (Applications and Reviews), Article 4 (Maps & Districts), Article 5 (Citywide General
Regulations)
Background Information:
The applicant is seeking approval to increase capacity of an existing daycare. The daycare was
approved in May 2019 for a total of 23 children. Presently, there are 24 children at the daycare,
and capacity for another (up to 25) is sought. No other changes to the use, building, or site are
proposed. As daycare is a conditional use in this district, conditional use review is required for the
expansion.
Previous zoning actions for this property are noted below.
5/19/19, Approval for daycare use within renovated building
4/25/19, Approval for building and site renovations
7/10/15, Approval to replace exterior entry doors
7/18/14, Approval for site work related to adjacent property
10/8/10, Approval to replace wooden clapboard with fiber cement board
7/16/10, Approval to construct shed and pavilion
6/16/09, Approval for addition to maintenance building
7/10/97, Approval to install storage sheds
2/27/92, Approval to construct exterior stair towers on the residential buildings
11/26/91, Approval to install concrete steps and handicap access ramp
8/22/91, Approval for replacement siding
Recommendation: Consent approval as per, and subject to, the following findings and
conditions:
I. Findings
Page 3 of 68
Article 3: Applications and Reviews
Part 3, Impact Fees:
Sec. 3.3.1, Applicability
Impact fees, if any, associated with the expansion will be determined by the Department of Public
Works, Technical Services and Water Resources Divisions. (Affirmative finding as conditioned)
Part 5, Conditional Use & Major Impact Review:
Section 3.5.6 (a) Conditional Use Review Standards
Approval shall be granted only if the DRB, after public notice and public hearing, determines that
the proposed conditional use and associated development shall not result in an undue adverse
effect on each of the following general standards:
1. Existing or planned public utilities, facilities or services are capable of supporting the proposed
use in addition to the existing uses in the area;
The property is served by municipal utilities. Sufficient water and sewer service are available.
The increase in children at the daycare may require a State of Vermont wastewater permit. The
applicant is advised to inquire with VT DEC as to wastewater permit requirements. (Affirmative
finding as conditioned)
2. The character of the area affected as defined by the purpose or purposes of the zoning
district(s) within which the project is located, and specifically stated policies and standards of
the municipal development plan;
The property is located within the Residential – Medium Intensity zone. This zone is intended
primarily for medium density residential development in the form of single-family detached
dwellings and attached multi-family apartments. The property reflects this intent and contains a
sizeable residential development with a number of multifamily apartment buildings. A handful of
nonresidential uses are allowed in this zone. Daycare is one of them, and minimal expansion is
proposed. (Affirmative finding)
3. The proposed use will not have nuisance impacts from noise, odor, dust, heat, and vibrations
greater than typically generated by other permitted uses in the same zoning district;
The proposed daycare expansion is not expected to generate nuisance impacts from noise, odor,
dust, and the like that may be more typically associated with industrial uses. (Affirmative
finding)
4. The transportation system is capable of supporting the proposed use in addition to the existing
uses in the area. Evaluation factors include street designations and capacity; level of service
and other performance measures; access to arterial roadways; connectivity; transit
availability; parking and access; impacts on pedestrian, bicycle and transit circulation; safety
for all modes; and adequate transportation demand management strategies;
No traffic analysis has been provided or is required for this application. The original application
noted that drop-offs will take place around 8:30 AM – around the time of the morning peak hour.
Pick-ups will take place midafternoon around 2:30 PM, well before the PM peak hour. No
changes are proposed. The proposed expansion is not expected to perceptibly impact traffic
generation. (Affirmative finding)
ZP-26-141 pg. 2 of 5
Page 4 of 68
and,
5. The utilization of renewable energy resources;
No renewable energy utilization is included in this proposal. Future incorporation is not precluded
by the minimal daycare expansion. (Affirmative finding)
and,
6. Any standards or factors set forth in existing City bylaws and city and state ordinances;
It is the applicant’s responsibility to comply with other applicable city and state bylaws and
ordinances.
(b) Major Impact Review Standards
(Not applicable)
(c) Conditions of Approval:
In addition to imposing conditions of approval necessary to satisfy the General Standards
specified in (a) or (b) above, the DRB may also impose additional conditions of approval relative
to any of the following:
1. Mitigation measures, including but not limited to screening, landscaping, where necessary to
reduce noise and glare and to maintain the property in a character in keeping with the
surrounding area.
Mitigation measures related to screening and landscaping are unnecessary, as no site or exterior
building alterations are proposed. (Affirmative finding)
2. Time limits for construction.
No construction is included in this application. (Affirmative finding)
3. Hours of operation and/or construction to reduce the impacts on surrounding properties.
The approved days and hours of operation are Monday – Friday from 8:30 AM – 2:30 PM. No
changes are proposed. (Affirmative finding)
4. That any future enlargement or alteration of the use return for review to the DRB to permit the
specifying of new conditions; and,
Any future enlargement or alteration will be reviewed under the zoning regulations in effect at that
time.
5. Such additional reasonable performance standards, conditions and safeguards, as it may deem
necessary to implement the purposes of this chapter and the zoning regulations.
See the recommended conditions.
Article 4: Maps & Districts
Sec. 4.4.5, Residential Districts:
(a) Purpose
(2) Residential Medium Intensity (RM)
ZP-26-141 pg. 3 of 5
Page 5 of 68
As noted previously, the subject property is located within the Residential – Medium Density zone.
This zone is intended primarily for medium density residential development in the form of single-
family detached dwellings and attached multi-family apartments. Several non-residential uses,
such as daycares, are allowed via conditional use. (Affirmative finding)
(b) Dimensional Standards & Density
(Not applicable)
(c) Permitted & Conditional Uses
A large daycare is a conditional use in the RM zone. Its expansion requires conditional use
review. (Affirmative finding)
(d) District Specific Regulations
Not applicable.
Article 5: Citywide General Regulations
Sec. 5.2.3, Lot Coverage Requirements
See Sec. 4.4.5 (b).
Sec. 5.2.4, Buildable Area Calculation
See Sec. 4.4.5 (b).
Sec. 5.2.5, Setbacks
See Sec. 4.4.5 (b).
Sec. 5.2.6, Building Height Limits
See Sec. 4.4.5 (b).
Sec. 5.2.7, Density and Intensity of Development Calculations
See Sec. 4.4.5 (b).
Part 4: Special Use Regulations
Sec. 5.4.1, Small and Large Day Care Centers and Small and Large Preschools
(a) No playground equipment shall be located within a front yard;
No changes to the previously approved playground are proposed. (Affirmative finding)
(b) Reserved;
(c) The site plan review shall insure adequate and safe drop-off and pick-up space is provided
and that traffic problems are not created;
No changes to the previously approved parking and circulation for the daycare are proposed or
needed. (Affirmative finding)
(d) Any additions, signage, or site improvements shall be residential in character;
(Not applicable)
(e) The facility shall be licensed by the State of Vermont;
ZP-26-141 pg. 4 of 5
Page 6 of 68
This requirement was conditioned with the original zoning permit. Expansion of the daycare may
necessitate licensure update with the state. (Affirmative finding as conditioned)
(f) No more than on residential unit may be converted for the creation of a single small day care
center, large day care center…, and;
(Not applicable)
(g) The neighborhood is not overburdened with other small day care centers, large daycare
centers…
(Not applicable)
Sec. 5.5.1, Nuisance Regulations
Nothing in the proposal appears to constitute a nuisance under this criterion. (Affirmative finding)
II. Conditions of Approval
1. Prior to release of the zoning permit, impact fees may be due as determined by the
Water Resources Division and the Technical Services Division of the Department of Public
Works based on water and wastewater flows and peak hour vehicle trip ends, respectively.
2. The applicant shall obtain daycare licensure for the expansion as may be required by the
State of Vermont.
3. A State of Vermont wastewater permit may be required.
4. Standard Conditions 1-15.
ZP-26-141 pg. 5 of 5
Page 7 of 68
From: Kelley Newell <
Sent: Tuesday, April 7, 2026 4:33 PM
To: Scott Gustin
Subject: RE: follow up for 212 Intervale
Hi Scott,
Thank you for getting back to me. Here is the written statement:
Champlain Valley Head Start (CVHS) has operated the Riverside Early Learning Center at 212 Intervale
Avenue in Burlington since 2020. We currently serve 16 pre-school children and 8 toddlers at this site. In
addition, CVHS has early learning centers in New Haven, St Albans, the New North End of Burlington and
Winooski. Our federal regulations require that we maintain a 97% enrollment rate across the programs,
and if we are unable to do so, we are put on an enrollment plan. As populations and needs shift in the
state, we are finding it challenging to maintain the needed enrollment numbers at our more rural centers,
while often carrying a waitlist for services in the Burlington and Winooski areas. We are hoping to
increase capacity at these more populated centers to address both the needs of the communities we
serve, while maintaining our required enrollment numbers. The addition of one pre-school child at the
Riverside Early Learning Center will not affect the running hours or the days of operation.
Thank you!
Kelley
Kelley Newell
Program Resources & Compliance Coordinator, Champlain Valley Head Start
255 South Champlain Street, Suite 10
Burlington, VT 05401
Phon
0
Fax:
Page 8 of 68
Page 9 of 68
Page 10 of 68
Brad Rabinowitz
Burlington Development Review Board AJ LaRosa
Austin Hart
149 Church Street, City Hall Alexandra Zipparo
Burlington, VT 05401 Geoffrey Hand
www.burlingtonvt.gov/PZ/Boards/Development-Review-Board Zoraya Hightower
Phone: (802) 865-7188 Springer Harris
Fax (802) 865-7195 Jim Drummond (Alt.)
Ravi Venkataraman (Alt)
Burlington Development Review Board
Findings of Fact
Deliberative Hearing Tuesday, May 21, 2019
In RE: 19-0745CU; 669 Riverside Avenue (Ward 2C, RM) (Tax Lot No. 040-2-078-000)
Owner/Applicant: Burlington Housing Authority / Donna Church
Request: Convert maintenance garage to a daycare.
Members Present:
Brad Rabinowitz
Austin Hart
Ali Zipparo
Springer Harris
Geoff Hand
Evidence Presented:
The Board examined the materials submitted in support of this request.
I. FINDINGS
Background Information:
The applicant is seeking approval to establish a daycare in place of an existing maintenance
garage. The subject building received separate zoning permit approval for the physical changes
associated with this conversion. This conditional use application is just for the daycare use. The
proposed daycare will contain up to 23 children and, therefore, qualifies as a “large daycare” per
Appendix A – Use Table – All Zoning Districts.
Previous zoning actions for this property are noted below.
4/25/19, Approval for building and site renovations
7/10/15, Approval to replace exterior entry doors
7/18/14, Approval for site work related to adjacent property
10/8/10, Approval to replace wooden clapboard with fiber cement board
7/16/10, Approval to construct shed and pavilion
6/16/09, Approval for addition to maintenance building
7/10/97, Approval to install storage sheds
2/27/92, Approval to construct exterior stair towers on the residential buildings
11/26/91, Approval to install concrete steps and handicap access ramp
Page 11 of 68
8/22/91, Approval for replacement siding
Article 3: Applications and Reviews
Part 3, Impact Fees:
Sec. 3.3.2, Applicability
The conversion of the maintenance garage to conditioned space for daycare use triggers the
requirement of impact fees. Impact fees will be paid based on the converted gross floor area of
the building. Credit will be given for the existing maintenance space. (Affirmative finding as
conditioned)
Part 5, Conditional Use & Major Impact Review:
Section 3.5.6 (a) Conditional Use Review Standards
Approval shall be granted only if the DRB, after public notice and public hearing, determines
that the proposed conditional use and associated development shall not result in an undue
adverse effect on each of the following general standards:
1. Existing or planned public utilities, facilities or services are capable of supporting the
proposed use in addition to the existing uses in the area;
The property is served by municipal utilities. Sufficient water and sewer service are available.
The conversion to a daycare will likely require a State of Vermont wastewater permit. The
applicant is advised to inquire with VT DEC as to wastewater permit requirements.
(Affirmative finding as conditioned)
2. The character of the area affected as defined by the purpose or purposes of the zoning
district(s) within which the project is located, and specifically stated policies and standards
of the municipal development plan;
The property is located within the Residential – Medium Density zone. This zone is intended
primarily for medium density residential development in the form of single-family detached
dwellings and attached multi-family apartments. The property reflects this intent and contains a
sizeable residential development with a number of multifamily apartment buildings. A handful
of nonresidential uses are allowed in this zone. Daycare is one of them. (Affirmative finding)
3. The proposed use will not have nuisance impacts from noise, odor, dust, heat, and vibrations
greater than typically generated by other permitted uses in the same zoning district;
The proposed daycare use is not expected to generate nuisance impacts from noise, odor, dust,
and the like that may be more typically associated with industrial uses. (Affirmative finding)
4. The transportation system is capable of supporting the proposed use in addition to the
existing uses in the area. Evaluation factors include street designations and capacity; level of
service and other performance measures; access to arterial roadways; connectivity; transit
availability; parking and access; impacts on pedestrian, bicycle and transit circulation;
safety for all modes; and adequate transportation demand management strategies;
19-0745CU Minutes/FOF pg. 2 of 6
Page 12 of 68
No traffic analysis has been provided or is required for this application. Drop-offs will take
place around 8:30 AM – around the time of the morning peak hour. Pick-ups will take place
midafternoon around 2:30 PM, well before the PM peak hour. With a total of 23 children,
overall traffic impacts are expected to be proportionally modest. (Affirmative finding)
and,
5. The utilization of renewable energy resources;
No renewable energy utilization is included in this proposal. Future incorporation is not
precluded by the seasonal use. (Affirmative finding)
and,
6. Any standards or factors set forth in existing City bylaws and city and state ordinances;
It is the applicant’s responsibility to comply with other applicable city and state bylaws and
ordinances.
(b) Major Impact Review Standards
Not applicable.
(c) Conditions of Approval:
In addition to imposing conditions of approval necessary to satisfy the General Standards
specified in (a) or (b) above, the DRB may also impose additional conditions of approval relative
to any of the following:
1. Mitigation measures, including but not limited to screening, landscaping, where necessary to
reduce noise and glare and to maintain the property in a character in keeping with the
surrounding area.
Mitigation measures related to screening and landscaping are unnecessary for this daycare use.
(Affirmative finding)
2. Time limits for construction.
No construction is included in this application. (Affirmative finding)
3. Hours of operation and/or construction to reduce the impacts on surrounding properties.
The proposed days and hours of operation are Monday – Friday from 8:30 AM – 2:30 PM.
These hours avoid early morning and late night disturbances to the nearby residences and are
acceptable. (Affirmative finding)
4. That any future enlargement or alteration of the use return for review to the DRB to permit the
specifying of new conditions; and,
Any future enlargement or alteration will be reviewed under the zoning regulations in effect at
that time.
5. Such additional reasonable performance standards, conditions and safeguards, as it may
deem necessary to implement the purposes of this chapter and the zoning regulations.
19-0745CU Minutes/FOF pg. 3 of 6
Page 13 of 68
See the recommended conditions.
Article 4: Maps & Districts
Sec. 4.4.5, Residential Districts:
(a) Purpose
(3) Residential Medium Density (RM)
As noted previously, the subject property is located within the Residential – Medium Density
zone. This zone is intended primarily for medium density residential development in the form of
single-family detached dwellings and attached multi-family apartments. Several non-residential
uses, such as daycares, are allowed via conditional use. (Affirmative finding)
(b) Dimensional Standards & Density
Not applicable.
(c) Permitted & Conditional Uses
A large daycare is a conditional use in the RM zone. (Affirmative finding)
(d) District Specific Regulations
Not applicable.
Article 5: Citywide General Regulations
Sec. 5.2.3, Lot Coverage Requirements
See Sec. 4.4.5 (b).
Sec. 5.2.4, Buildable Area Calculation
See Sec. 4.4.5 (b).
Sec. 5.2.5, Setbacks
See Sec. 4.4.5 (b).
Sec. 5.2.6, Building Height Limits
See Sec. 4.4.5 (b).
Sec. 5.2.7, Density and Intensity of Development Calculations
See Sec. 4.4.5 (b).
Part 4: Special Use Regulations
Sec. 5.4.1, Small and Large Day Care Centers and Small and Large Preschools
(a) No playground equipment shall be located within a front yard;
The site plan approved under separate zoning permit depicts a fenced play area that extends into
the front yard. No equipment is noted. Given the location of the existing building, the built-out
condition of the property, and its status as a corner lot, there is no other place for a play area. If
any equipment is proposed, it must be set behind the front yard setback. (Affirmative finding as
conditioned)
(b) Reserved;
19-0745CU Minutes/FOF pg. 4 of 6
Page 14 of 68
(c) The site plan review shall insure adequate and safe drop-off and pick-up space is provided
and that traffic problems are not created;
Parking for the proposed daycare will be accommodated on existing pavement near the building.
Most spaces exist. Several new spaces will be striped on existing asphalt. There is sufficient
onsite parking and circulation for the daycare. (Affirmative finding)
(d) Any additions, signage, or site improvements shall be residential in character;
Site and building renovations have been permitted separately. The changes are consistent with
the overall character of this residential property. (Affirmative finding)
(e) The facility shall be licensed by the State of Vermont;
This requirement will be a condition of zoning permit approval. (Affirmative finding as
conditioned)
(f) No more than on residential unit may be converted for the creation of a single small day care
center, large day care center…, and;
(Not applicable)
(g) The neighborhood is not overburdened with other small day care centers, large daycare
centers…
Pertinent records show just one daycare center in the neighborhood. Typically, there is a dearth
of daycare centers rather than a surplus. Such is the case here. (Affirmative finding)
Sec. 5.5.1, Nuisance Regulations
Nothing in the proposal appears to constitute a nuisance under this criterion. (Affirmative
finding)
Article 8: Parking
Sec. 8.1.8, Minimum Off-Street Parking Requirements
The proposed daycare is located in the shared use parking district. As such, the minimum off-
street parking requirement is 1 parking space per 2 employees, plus 1 space for every 5 children.
In this case, there will be 8 employees and 23 children. A total of 9 parking spaces are required.
The current parking requirement for the property is 54 parking spaces. A total of 68 off-street
parking spaces exist. The new daycare will increase the onsite parking requirement to 63 spaces.
(Affirmative finding)
II. MINUTES
The meeting minutes will be distributed separately upon review and approval by the
Development Review Board.
III. MOTION
Motion: Austin Hart
19-0745CU Minutes/FOF pg. 5 of 6
Page 15 of 68
I move that the Board grant conditional use approval for a change in use from maintenance
garage to a large daycare at 669 Riverside Avenue based on the findings in Section I above and
subject to the following conditions:
1. Prior to release of the zoning permit, impact fees based on the converted square footage
of the building shall be paid to the Department of Planning & Zoning.
2. The applicant shall obtain daycare licensure as required by the State of Vermont.
3. Playground equipment, if proposed, shall be located behind the front yard setback.
4. A State of Vermont wastewater permit may be required.
5. Standard Conditions 1-15.
Seconded: Geoff Hand
Vote: 5-0-0, motion carried
Dated at Burlington, Vermont, this ___ day of May, 2019
Respectfully Submitted,
_______________________________________
Brad Rabinowitz, Development Review Board Chair
Please note that an interested person may appeal a decision of the Development Review
Board to the Vermont Superior Court Environmental Division. (Zoning Ordinance Article
17, Section 17.1.7, Appeals of Development Review Board Decisions: An interested person
may appeal a decision of the Development Review Board to the Vermont Superior Court
Environmental Division. The appeal shall be taken in such a manner as the supreme court
may by rule provide for appeals from state agencies governed by Sections 801 through 816
of Title 3). The Court rules may require that such an appeal be commenced within Thirty
(30) days of the Board’s decision.
19-0745CU Minutes/FOF pg. 6 of 6
Page 16 of 68
Department of Permitting & Inspections William Ward, Director
Scott Gustin, AICP, CFM, Principal Planner
Zoning Division Mary O’Neil, AICP, Principal Planner
645 Pine Street Kirk Dressing, Associate Planner
Burlington, VT 05401 Joseph Cava, Permit Technician
Telephone:(802) 865-7188 Collin Naheedy, Code Compliance Officer
(802) 865-7195 (FAX)
TO: Development Review Board
FROM: Scott Gustin
DATE: May 5, 2026
RE: ZAP-26-4; 88 Lafountain Street
======================================================================
The appellant has requested deferral of this item to the May 19, 2026 Development Review Board
meeting due to a scheduling conflict. Staff is amenable to this request.
Page 17 of 68
Department of Permitting & Inspections William Ward, Director
Scott Gustin, AICP, CFM, Principal Planner
Zoning Division Mary O’Neil, AICP, Principal Planner
645 Pine Street Kirk Dressing, Associate Planner
Burlington, VT 05401 Joseph Cava, Permit Technician
Telephone:(802) 865-7188 Collin Naheedy, Code Compliance Officer
TO: Development Review Board
FROM: Scott Gustin
DATE: May 5, 2026
RE: ZP-22-199; 51 Elmwood Avenue
======================================================================
Note: These are staff comments only; decisions on projects are made by the Development
Review Board, which may approve, deny, table or modify any project. THE APPLICANT
OR REPRESENTATIVE MUST ATTEND THE MEETING.
Zone: RH Ward: 3
Owner/Applicant: City of Burlington / CEDO
Request: Second one-year time extension for emergency shelter including 30 shelter pods,
community resource center, and bathhouse.
Applicable Regulations:
Article 3 (Applications, Permits, & Project Reviews)
Background Information:
The applicant is requesting a second 1-year time extension for zoning permit ZP-22-199, which
was granted to establish a temporary emergency shelter on the subject property for a period of 3
years. An initial 1-year time extension was granted by the DRB just about a year ago in May 2025.
The shelter includes 30 pods, a community resource center, and a bathhouse. The shelter has been
in operation for close to four years now, and the applicants seek to extend the permit for an
additional year.
The state statute affecting emergency shelters has changed since the original zoning permit
approval in June, 2022. The so-called “HOME Act” of 2023 included emergency shelters under
the provisions of 24 VSA, Sec. 4413 and limits zoning review to the same standards as for schools,
places of worship, state properties, etc. The Act also specifically precludes regulating the daily or
seasonal hours of operation of emergency shelters. No changes to the project are included in this
time extension request.
Previous zoning actions for this property are as follows:
10/25/24, Approval of fence installation
12/1/23, Approval to remove limitation on duration of stays, per new state statute
4/21/23, Approval to install a storage shed
6/22/22, Approval of emergency shelter
Recommendation: Approval as per, and subject to, the following findings and conditions:
.
I. Findings
Page 18 of 68
Article 3: Applications, Permits, and Project Reviews
Sec. 3.2.9, Zoning Permits
(d) Time Limits on Zoning Permits:
This section allows applicants 1 year to initiate work on their approved project and an additional 2
years (for a total of 3) to complete their project. Provision is made for up to two 1-year time
extensions to either start or complete the project. Approval of a time extension is predicated on
making the request prior to expiration of the zoning permit and continuing compliance with
applicable zoning standards.
In this case, the work was completed within the first year as required. The zoning permit approval
was expressly issued for just 3 years per condition 5. This same condition allowed for time
extension per Sec. 3.2.9 (d) Time Limits on Zoning Permits, of the Comprehensive Development
Ordinance. An initial 1-year time extension was requested and approved in May 2025. A second,
and final, 1-year time extension is requested now. The applicant submitted the zoning permit time
extension request prior to expiration of the permit as required.
No changes to the project are proposed, and the emergency shelter use remains permissible. A
second, and final, 1-year time extension may be granted. (Affirmative finding)
II. Conditions of Approval
1. Approval of zoning permit ZP-22-199 is extended by 1 additional year (for a total of 5
years) beyond the original approval date of June 22, 2022.
2. No further time extensions can be approved.
ZP-22-199 pg. 2 of 2
Page 19 of 68
ZONING ANALYSIS
RESIDENTIAL HIGH DENSITY - (RH)
SETBACK REQUIREMENT PROPOSED 8/30/2022
FRONT YARD SETBACK - AVG OF 2 ADJ. LOTS (0') 5.5' AT COMMUNITY RESOURCE BUILDING ZP-22-199
11' AT SOUTH ABUTTER
0' AT NORTH ABUTTER SG
AVERAGE = ~5.5'
SIDE YARD SETBACK - 10% OR AVG OF 2 ADJ. LOTS 5' AT COMMUNITY RESOURCE BUILDING
0' AT SOUTH ABUTTER 7.5' AT SHELTERS
15' AT NORTH ABUTTER EXISTING 6' CHAIN LINK FENCE
AVERAGE = ~7.5' -FULL LENGTH OF NORTH,
REAR YARD SETBACK - 25% OF LOT DEPTH 7.5' AT SHELTERS - ACCESSORY STRUCTURES As Amended SOUTH AND WEST BOUNDARIES
-SEE DETAILS FOR INFO ON
SOUTH LOT LINE = 206'-7" SCREENING ELEMENTS
NORTH LOT LINE = 211'-8"
AVERAGE = 209' WOOD PRIVACY FENCE
25% OF 209' = 52'-3"
5'-0"
PROPOSED
7'-6" SIDE
SNOW STORAGE
SNOW STORAGE PROPOSED YARD
CRC
PLANTER
SNOW STORAGE SIDE YARD
SNOW STORAGE
7'-6" 7'-6" SHELTERS W
BATH
10'-6"
TYP.
10'-0" TYP. 10'-6" MECH W
TYP. 10'-0"
6'-0" W
PALLET
6'-0" 10'-0"
6'-0" 10'-0"
PALLET PALLET PALLET
10'-0"
PALLET
PALLET PALLET
PALLET
DW
REF.
23'-3"
6'-0" 6'-0" 6'-0"
6'-0"
6'-0"
TYP.
6" CAST IRON POTABL
23'-3"
6'-0" 6'-0"
PALLET
3'-0"
6'-0" TYP.
PALLET PALLET PALLET
PALLET
L-2
PALLET
PLANTER
PERSON
PALLET
L-2 L-2
PALLET
RAMP
6'-7 3/8"
COMPOSITE DECK
PLANTER GATE
6'-0" PLANTER PLANTER
10'-0" RAMP
TYP. 21'-3"
21'-3" 10'-0"
12'-0"
21'-3" 10'-0"
SNOW STORAGE 10'-0"
3'-7 3/8" EMERGENCY
27'-11"
14'-0"
E WATER
ACCESS GATE EMERGENCY ACCESS
EMERGENCY ACCESS
52'-3"
TBACK REMOVE EXISTING MEDIAN EXISTING
D R E AR YARD SE
REQUIRE BUILDIN S
G -PATCH AND PAVE TO FLUSH
PRINCIPAL SITE LIGHT
113'-5"
OUT WITH ADJACENT PAVING (7) LOOP BIKE RACKS
SNOW STORAGE
1'-1" EXISTING
SITE LIGHT RAISED BED 4 YARD 6 5'-6"
PLANTERS DUMPSTER REQUIRED
FRONT YARD
29'-8 1/2"
UPENDTHIS SETBACK
PLANTER 22'-7 1/2"
SOLID WOOD TRASH ENCLOSURE
6'-0" 7'-7 1/2" 2'-1" DN
-SEE DETAIL
12'-0" 5
21'-3" 4 YARD
21'-7 1/2" 10'-0" COMPOSITE DECK
DUMPSTER
21'-7 1/2" 7'-3"
7'-7 1/2" 10'-0"
MECH
RAMP
PALLET
4
EXISTING CATCH L-2 (2) 9'x18' "MANAGED" PARKING
PLANTER
6'-0"
BASIN, TYP. L-2 SPACES
6'-0" PLANTER
PALLET - ADA PALLET - ADA
10'-0"
(4) 9'x18' PARKING SPACES
UNDERGROUND ELECTRICAL L-2
L-2
15" X 24" COMBINED
3
CONDUIT TO SERVE SHELTERS UPENDTHIS
UPENDTHIS 6'-0"
6'-0"
6'-0" STORM
EXISTING
PLANTER
DN
6'-0" 22'-7 1/2"
PALLET - ADA
2
PALLET - ADA
L-2
UPENDTHIS
L-2
UPENDTHIS
PALLET
PLANTER
PALLET PALLET
PLANTER
12'-0"
6'-0"
10'-0" 7'-6"
PALLET
6'-0"
SEWER BENEATH EL
6'-0" 7'-3" WOOD PRIVACY FENCE
PROPOSED
1
10'-0"
OUTDOOR SNOW SIDE YARD
STORAGE STORAGE SHELTERS
2'-3" WOOD PRIVACY FENCE
SNOW STORAGE
SNOW STORAGE
SNOW STORAGE
MWOOD AVENUE
206'-7"
SITE PLAN
Scale: 1" = 10'-0"
0 10 15 20 FT
Duncan
51 ELMWOOD AVENUE Wisniewski
A RCH I TECTURE
DATE: 08.26.2022
DRAWN: SJB, EAM
BURLINGTON , VERMONT COPYRIGHT © 2022 ALL RIGHTS RESERVED
DUNCAN • WISNIEWSKI ARCHITECTURE
255 SOUTH CHAMPLAIN STREET
BURLINGTON, VERMONT 05401 L1-1.3
A Professional Corporation
T: 802.864.6693
Page 20 of 68
WOOD FENCE
WOOD FENCE, AVAILABLE BY
LOCAL FENCE COMPANY TO
MATCH OR BE SIMILAR TO
DETAIL ON RIGHT. MATERIALS
SHALL BE CEDAR BOARDS WITH
PRESSURE TREATED POSTS. 6 1/8" LEVEL GRADE SLOPED GRADE WOOD FINISH:
BEVEL TOP OF POST TO
BASE DETAIL TO BE CONFIRMED DRAIN *NATURAL
BY OWNER/CONTRACTOR BASED 2x8 PRESSURE TREATED
6'-0"
ON EXISTING SITE CONDITIONS RAILS
AND DESIRED STRENGTH, FENCING SHALL BE EITHER
1x6 CEDAR OR 1x6
HEIGHT TO MATCH EXISTING SYNTHETIC BOARDS 2'-4"
CHAIN LINK FENCE.
6x6 PRESSURE TREATED
FENCE POST 5'-10"
6'-0"
ASPHALT TOP COAT
SEE ELEVATIONS, SLIGHT VARIATION @ GATES
2'-4"
6" OF WASHED RIVER ROCK
DRIP EDGE, ENCOMPASSED
IN FILTER FABRIC w/ METAL
EDGING
2"
GATES EXISTING GROUND
SURFACE VARIES
NATURAL CEDAR GATES TO COMPACTED CRUSHED
STONE, ENCOMPASSED BY
1'-6" FENCE ELEVATION
MATCH THE FENCE, VEHICULAR FILTER FABRIC Scale: 1/2" = 1'-0"
GATES TO BE OPERATED BY ON
CONCRETE FOOTING, +/-14" 5'-0" 5'-6"
SITE STAFF OR EMERGENCY IN DIAMETER, POURED BACK @ VEHICLE GATE CONFIRM WIDTH W/ PUBLIC SAFETY BACK @ PEDESTRIAN GATE GATE HARDWARE (PER PAIR):
PERSONNEL ONLY VIA KNOX BOX AROUND POST BASE
KEY. 3'-0" QTY PRODUCT DESCRIPTION
# 8312-54SP 24" BPPCG CENTRAL
PROVIDE (2) 4" LONG, EYE DOUBLE STRAP*
PARTIALLY EMBEDDED,
LAG BOLTS PER SIDE 4'-7 3/4" # 8801-08P 8" LONG BPPCG
THREADED
UNDISTURBED EARTH 3'-0" ADJUSTABLE PIN
8"
5'-3 1/4"
# 5000-36SP 36" LONG BPPCG
8" OF COMPACTED 5'-10" CANE BOLT w/
CRUSHED STONE LOCKING RETAINER
+/-14"
# 5000-12SP 12" LONG BPPCG
SLIDE BOLT w/ LATCH
& SURFACE KEEP
*IT MAY BE POSSIBLE TO USE SMALLER
STRAPS (ESP. FOR BOTTOM HINGE),
IF DETERMINED BY FENCE/GATE BUILDER.
WOOD POST DETAIL GATE ELEVATION
2 LAYERS OF 2x8 PT FRAMING
Scale: 1/2" = 1'-0" Scale: 1/2" = 1'-0"
EXAMPLE OF 'CUP' COLORS AVAILABLE CHAIN FENCE
EXISTING METAL CHAIN LINK
TERMINAL POST
FENCE @ 6FT TALL TO BE FIT UP
WITH NATURAL BAMBOO TOP RAIL EXISTING CHAIN LINK FENCE, PATTERN OF
FENCING AND DECORATIVE CUP BAMBOO SLAT AND CUP TREATMENT TO
VARY IN LOCATION AND OPENESS
PATTERN. OPENNESS TO STRETCHER BAR
REGULATE TRANSPARENCY AND
SECURITY WITH INTEGRATED
VISUAL ART.
6'-0"
TIE WIRES
HOOK BOLTS
NOTE: LINE POSTS
SPACING VARIES
CHAIN DETAIL
Scale: 1/2" = 1'-0"
PLANTER
OLLE OR VEGO GALVANIZED
NEIGHBORHOOD DIAGRAM
RAISED GARDEN BED W/ CHAIN FENCE
DRAINAGE PLACED ON EXISTING STOOP
POD STOOP
POD COMMUNITY
STOOP STOOP
STOOP
POD POD
ASPHALT WITH CRUSHED STONE STOOP
POD STOOP
POD STOOP
POD
ALLEY
POD
CENTER
OR PEBBLES AT BASE & ALLEY
ALLEY STOOP POD POD STOOP
STOOP STOOP
STOOP
POD POD
STOOP
SURROUND, REFER TO PLANS STOOP
POD DN
STOOP
POD POD
POD DN
FOR QUANTITY AND LOCATIONS.
VEGETATION MAY INCLUDE STREET GATE
6'-0"
EXISTING
CHAIN FENC
FLOWERING TREES WITH SPACE PLANTS TO BE SITE LIGHT
DRIVE
DETERMINED 3'-6" 6'-0"
DRIVE
STOOP
EXISTING
AT THE PERIMETER FOR
DRIVE TRASH
POD SITE LIGHT 4 YARD
DRIVE
GATE
6
DUMPSTER
MULCH OR SEASONAL
ADDITIONAL SEASONAL PLANTS YARD
YARD YARD DN
4 YARD
5
STOOP
DUMPSTER
ANNUALS OR VEGETABLES. E POD
BATHHOUSE
SOIL 4 (2) 9'x18' "MANAGED" PARKING
2'-0"
SPACES
STOOP STOOP
PARKING
FILTER FABRIC POD POD
STOOP
1'-5" STOOP
(4) 9'x18' PARKING SPACES
PARK
POD POD
STOOP STOOP
3
POD
DRAINAGE MATERIAL
POD
POD
ALLEY DN
EXISTING
STORM
2" ALLEY STOOP POD POD STOOP
2
STOOP
STONE BASE
STOOP
POD POD
STOOP
POD POD STOOP
PATH 1
WOOD
CHAIN FENCE FENCE
PLANTER DETAIL PLANTER PLAN
Scale: 1/2" = 1'-0" Scale: 1/2" = 1'-0"
Duncan
43 ELMWOOD AVENUE Wisniewski
A RCH I TECTURE
DATE: 05.05.2022
DRAWN: SJB
BURLINGTON , VERMONT COPYRIGHT © 2022 ALL RIGHTS RESERVED
DUNCAN • WISNIEWSKI ARCHITECTURE
255 SOUTH CHAMPLAIN STREET
BURLINGTON, VERMONT 05401 L2.1
A Professional Corporation
T: 802.864.6693
Page 21 of 68
TYPE A
Project Catalog # Type A
Prepared by Notes Date
HLB6
6" LED Lens Downlight with Remote Driver /
Junction Box
Typical Applications
Residential
Product Certification
Interactive Menu
• Order Information page 2
• Photometric Data page 2
Refer to ENERGY STAR® Certified Products List.
• Control Solutions Can be used to comply with California Title 24 High Efficacy requirements.
Certified to California Appliance Efficiency Database under JA8.
• Connected Systems
• Product Warranty Product Features
Top Product Features
• Direct mount (does not require recessed housing or junction box)
• Delivers up to 1,150 lumens; Achieves L70 at 50,000 hours in IC and non-IC applications
• 2700K, 3000K, 3500K, 4000K and 5000K field selectable CCT; 3000K and 4000K fixed CCT
• 90 CRI (min), R9 50 and color accuracy within 4 SDCM
• Wet location listed for showers and protected ceilings; Available in 120V or 120-277V
Dimensional and Mounting Details
HLB6ROTMW
6-1/8"
[155.58mm] Oversized trim
cutout .47"
8.86"
[11.9mm] [225mm]
4.18" max. ceiling cutout
[106.3mm]
Ø 5.02" .12"
[127.6mm] [3.05mm]
6.7" [170.07mm] 6.8" [172.72mm]
3.87"
[98.2mm]
2.86" wire length
[72.74mm] 10"
3.16" [254mm]
[80.29mm] wire length
1.66" 4.92"
[42.15mm]
6.42" [125mm]
(HLB4069FS1EMW only) [163mm]
Ø.20" 1.66"
[5mm] [42.15mm]
Ø.47" 6.5" [165mm]
5.7"
[144.5mm] [12mm]
PS518048EN page 1
Page 22 of 68
January 28, 2020 2:17 PM
HLB6 Series
Order Information
SAMPLE ORDER NUMBER: HLB6099FS1EMWR
Models Lumens CRI / CCT Driver Finish Packaging
Models Lumens CRI / CCT Driver Finish Packaging
HLB6 = 6-Inch LED lens 09 = 900 lumens (nominal) 930 = 90 CRI minimum, 3000K CCT 1E = 120V 60Hz, LE & TE phase MW = matte white flange R = recyclable 4-color unit carton suitable for
downlight with remote 940 = 90 CRI minimum, 4000K CCT cut 5% dimming point of purchase merchandising display
driver / junction box 9FS = 90 CRI minimum, field selectable E010 = 120-277V, 0-10V 5%
2700K, 3000K, 3500K, 4000K or dimming (1)
5000K CCT
Notes Notes Notes Notes Notes Notes
(1) E010 driver is only available in FS
color temperature.
Accessories
Accessories
HL6RSMF = 6” round and square mounting frame Extension Cable | Dedicated Driver/Jbox
HLB6ROTMW = 6” round oversized trim, matte white HLB06EC – 6 ft. extension cable
HLB12EC – 12 ft. extension cable
Designer Trims HLB20EC – 20 ft. extension cable
HLB6RTRMMW = 6” round decorative overlay, matte white
HLB6RTRMSN = 6” round decorative overlay, satin nickel Extension Cable | seleCCTable Driver/Jbox
HLB6RTRMTBZ = 6” round decorative overlay, tuscan bronze HLB06FSEC – 6 ft. extension cable
HLB12FSEC – 12 ft. extension cable
HLB20FSEC – 20 ft. extension cable
Photometric Data
HLB6099FS1EMWR-3000K Color Metric Summary - 3000K Product Specifications
Luminaire lumens 1061
Rf = 90.9
Input watts 16 TM-30-15
Rg = 100.7 PRODUCT
LER (LPW) 66.3
Ra = 94.1 SPECIFICATIONS
0-180 1.31 CRI/CIE
R9 = 68.5 110°
Spacing Lumens 1061
90-270 1.31
Criteria CCT - Range of 2700K- 5000K
Diagonal 1.41 Watts 14.2
Beam angle (degrees) 112.2
Lumens Per Watt (Efficacy) 74.7
Field angle (degrees) 161.3
Color Accuracy (CRI) 92
Zonal lumen Lumens % Lumens
0-30 294 27.7 Light Color (CCT) 3000K
Correlated Color Temperature (CCT)
0-40 486 45.8
0-60 851 80.2
warm white soft white bright white
0-90 1061 100
2700K 3000K 4500K 6500K
HLB4 4-inch CCT Lumens Power (W) LPW
3000K 992.3 13.6 73.4
Fixed CCT
4000K 1057.7 13.6 78.0
2700K 1037.3 16.0 64.8
3000K 1061.0 16.0 66.3
* Tested in accordance with IES LM63. Field results may vary. Field
3500K 1078.9 16.0 67.4
Selectable CCT
4000K 1094.9 16.0 68.4
5000K 1103.4 16.0 69.0
PS518048EN page 2
Page 23 of 68
January 28, 2020 2:17 PM
HLB6 Series
Energy Data
Lumens 900 Series
Input Voltage 120V
Input Current 132 (mA)
Input Power 16.0 (W)
Efficiency 66 (LPW)
Inrush (A) 2.1 A @ 14mS
THD ≤ 20%
PF ≥ 0.90
T Ambient -30° - +40°C
Sound Rating ≤ 22 dba
Product Specifications
Housing Remote Driver/Junction Box Optical Mounting Frame
• Die-cast aluminum mounting frame with integral • Pre-galvanized steel driver/junction box with captive • Pre-galvanized steel mounting frame locates fixture
flange provides passive thermal cooling hinged junction box cover fittings during electrical rough-in and provides
• Achieves L70 at 50,000 hours in IC and non-IC • Listed for six #12 AWG 90° C splice conductors: two cutout guidance for drywall contractor
applications in, two out plus two ground • Provides attachment of remote driver/junction box
• High impact diffuse lens provides shielding to the • Two 1⁄2" conduit pry-outs
light guide minimizing pixilation • Two Slide-N-Side™ non-metallic (NM) wire traps Compliance
allows wiring outside the box • cULus Certified type IC suitable for direct contact
Gasket • Accepts NM cable types: 14-2, 14-3, 12-2, 12-3 (U.S.) with air permeable insulation
• Closed cell gasket achieves restrictive airflow and and 14-2, 14-3, 12-2 (Canadian) • Not recommended for use in direct contact
wet location listing without additional gaskets or • Three 4-port push wire nuts with clear caps for quick with spray foam insulation (reference NEMA
caulking and reliable mains voltage connections LSD57-2013)
• Integral mounting holes facilitate direct mounting to • Wet location listed and IP44 ingress protection
Optics • Airtight per ASTM-E283-04
building structure or mounting frame
• Precision acrylic light guide organizes source flux • Suitable for use in clothes closets when installed
into wide distribution with 1.4 spacing criteria, useful in accordance with the NEC 410.16 spacing
Driver
for general area illumination requirements
• Available in 120V or 120-277V, providing noise free
LED Array operation • EMI/RFI emissions per FCC 47CFR Part 15
• Continuous flicker-free dimming down to 5% with consumer limits
• Plurality of mid power LED’s provides a uniform
source with high efficiency and long life select dimmers • Contains no mercury or lead and RoHS compliant
• 90 CRI minimum; R9 greater than 50 provides high • Plenum rated inline electrical quick connect provides • Photometric testing in accordance with IES
color rendering low voltage connection to fixture fitting, CMP/FT6 LM-79-08
rated • Lumen maintenance projections in accordance with
• Fixed 3000K and 4000K CCT color temperatures;
color accuracy within 3 SDCM IES LM-80-08 and TM-21-11
Installation • State of California Title 24 high efficacy
• Optional field selectable color temperature, select • Can be installed in 1/2" to 1-1/4" thick ceilings
2700K, 3000K, 3500K, 4000K or 5000K CCT; color • LED compliance under JA8, reference Modernized
accuracy within 4 SDCM • Cutout utilizes standard round hole saw sizes; Appliance Efficiency Database System (MAEDBS)
cutout template provided for 2016 JA8 High Efficacy Lighting
• Meets ENERGY STAR® color angular uniformity
requirements; Deviation is less than 0.006 u' v' • Heat treated springs hold fixture fitting securely in • ENERGY STAR® certified (reference “Certified Light
the ceiling eliminating light leak Fixtures” database)
• Housing is less than 1⁄2" thick and can span a 2"
nominal framing member Warranty
• Can be removed from below the ceiling for service • Five-year limited warranty
or replacement
Cooper Lighting Solutions © 2020 Cooper Lighting Solutions
1121 Highway 74 South All Rights Reserved.
Peachtree City, GA 30269
P: 770-486-4800 Specifications and dimensions PS518048EN page 3
www.cooperlighting.com subject to change without notice. Page 24 of 68
January 28, 2020 2:17 PM
TYPE B
SLIM17FA15ADJ
Project: Type:
Prepared By: Date:
Driver Info LED Info
Type Constant Current Watts 15W
120V 0.13A Color
3000K/4000K/5000K
208V 0.07A Temp
240V 0.06A Color
Color: Bronze Weight: 3.0 lbs 70 CRI
Accuracy
277V 0.05A
L70
Input Watts 14.2/14/14.2W 100,000 Hours
Lifespan
Lumens 1761/1904/1852
124/136.2/130.3
Efficacy
lm/W
Technical Specifications
Field Adjustability LED Characteristics Construction
Field Adjustable: LEDs: IP Rating:
Color temperature selectable by 3000K, 4000K Long-life, high-efficiency, surface-mount LEDs Ingress protection rating of IP65 for dust and
and 5000K water
Electrical
Compliance Cold Weather Starting:
Driver:
UL Listed: Minimum starting temperature is -40°C (-40°F)
Constant Current, Class 2, 120-277V, 50/60 Hz,
Suitable for wet locations 120V: 0.13A, 208V: 0.07A, 240V: 0.06A, 277V: Maximum Ambient Temperature:
0.05A Suitable for use in up to 50°C (122°F)
IESNA LM-79 & IESNA LM-80 Testing:
Dimming Driver: Housing:
RAB LED luminaires and LED components have
been tested by an independent laboratory in Driver includes dimming control wiring for 0-10V Precision die-cast aluminum housing and door
accordance with IESNA LM-79 and LM-80. dimming systems. Requires separate 0-10V DC frame
dimming circuit. Dims down to 10%.
DLC Listed:
Photocell:
This product is listed by Design Lights
Consortium (DLC) as an ultra-efficient premium 120-277V Integrated button photocell included.
product that qualifies for the highest tier of Photocell is compatible with 120V-277V.
rebates from DLC Member Utilities. Designed to
Note:
meet DLC 5.1 requirements.
DLC Product Code: PL0MVJOV62Q3 All values are typical (tolerance +/- 10%)
Performance
Lifespan:
100,000-Hour LED lifespan based on IES LM-80
results and TM-21 calculations
Need help? Tech help line: (888) 722-1000 Email: custserv@rablighting.com Website: www.rablighting.com
Copyright © 2021 RAB Lighting All Rights Reserved Note: Specifications are subject to change at any time without notice
Page 1 of 2
Page 25 of 68
SLIM17FA15ADJ
Technical Specifications (continued)
Construction Finish: Buy American Act Compliance:
Lens: Formulated for high durability and long-lasting RAB values USA manufacturing! Upon request,
color RAB may be able to manufacture this product to
Polycarbonate lens
be compliant with the Buy American Act (BAA).
Green Technology:
Mounting: Please contact customer service to request a
Mercury and UV free. RoHS-compliant quote for the product to be made BAA
Hinged wiring access and conduit entries on the
components. compliant.
back, sides, top and bottom make installation a
snap Other
Cut Off: 5 Yr Limited Warranty:
Adjustable from 0° (full cutoff) to 90°. 7 settings The RAB 5-year, limited warranty covers light
at 15° each. output, driver performance and paint finish.
RAB's warranty is subject to all terms and
conditions found at rablighting.com/warranty.
Dimensions Features
Selectable CCT
Adjustable cutoff
Integrated photocell
0-10V dimming standard
Ordering Matrix
Family Wattage Style
SLIM17FA 15 ADJ
15 = 15W ADJ = Angle Adjustable
30 = 30W
Need help? Tech help line: (888) 722-1000 Email: custserv@rablighting.com Website: www.rablighting.com
Copyright © 2021 RAB Lighting All Rights Reserved Note: Specifications are subject to change at any time without notice
Page 2 of 2
Page 26 of 68
6" '-0"
55' - 0"
Project number 220050
Date 0-0-22
Drawn by
Checked by Scale
5
26' - 0"
Client Name
Project Name
First Floor
1
3/16" = 1'-0"
Page 27 of 68
Roof Plan
1
1/4" = 1'-0"
Project number
Date
Drawn by
Checked by Scale
Page 28 of 68
-
---
Ridge
15'
First Floor
0' - 0"
Foundation
-0' - 10 3/4"
Grade
-1' - 7 3/4"
West
1
1/4" = 1'-0"
Project number
Date
Drawn by
Checked by Scale
Page 29 of 68
Ridge
16' - 5 3/4"
Roof
9' - 0"
First Floor
0' - 0"
Grade
-1' - 7 3/4"
South
1
1/4" = 1'-0"
Project number
Date
Drawn by
Checked by Scale
Page 30 of 68
-
---
Ridge
15'
First Floor
0' - 0"
Foundation
-0' - 10 3/4"
Grade
-1' - 7 3/4"
East
1
1/4" = 1'-0"
Project number
Date
Drawn by
Checked by Scale
Page 31 of 68
-
---
Ridge
15'
First Floor
0' - 0"
Foundation
-0' - 10 3/4"
Grade
-1' - 7 3/4"
North
1
1/4" = 1'-0"
Project number
Date
Drawn by
Checked by Scale
Page 32 of 68
3D SW 3D SE
1 2
Project number
Date
Drawn by
Checked by Scale
Page 33 of 68
14' - 2 3/4"
--- -
DN
31' - 0"
--- -
1
First Floor
1/4" = 1'-0"
WH
D
DN
Project Name Client Name
Project number 220001
Date 03-23-22 11
Drawn by D
Page 34 of 68 Checked by Scale 1/4" 1'-0"
-
---
-
---
Roof Plan
1
1/4" = 1'-0"
Project number
Date
Drawn by
Checked by Scale
Page 35 of 68
1
Ridge
10' - 0"
Roof
7' - 6"
First Floor
0' - 0"
Foundation
-0' - 10 3/4"
Grade
-1' - 7 3/4"
West
1
1/4" = 1'-0"
Project number
Date
Drawn by
Checked by Scale
Page 36 of 68
Ridge
10' - 0"
7
Roof
7' - 6"
8' - 0"
3' - 7"
First Floor
0' - 0"
Grade
-1' - 7 3/4"
South
1
1/4" = 1'-0"
Project number 000
Date 0-0-
Drawn by
Checked by Scale " '-0"
Page 37 of 68
Ridge
10' - 0"
Roof
7' - 6"
First Floor
0' - 0"
Foundation
-0' - 10 3/4"
Grade
-1' - 7 3/4"
East
1
1/4" = 1'-0"
Project number
Date
Drawn by
Checked by Scale
Page 38 of 68
Ridge
10' - 0"
Roof
7' - 6"
First Floor
0' - 0"
Foundation
-0' - 10 3/4"
Grade
-1' - 7 3/4"
North
1
1/4" = 1'-0"
Project number
Date
Drawn by
Checked by Scale
Page 39 of 68
Page 40 of 68
Page 41 of 68
Page 42 of 68
Page 43 of 68
BY
City of Burlington
Find Your Orbit
www.upendthis.com Shelter Pods
Page 44 of 68
2022 Shelter Pods
Our Shelter Pods is a quality space with a light and airy
interior and solid environmental controls to provide: fresh
air year round, warmth in the winter and a comfortable
tempurature when the mercury rises.
Our Shelter Pods are designed to provide the City of
Burlington with a quality work of relocatable architecture that
will endure the elements year after year and remain flexible
to adapt to changes in use over the products lifespan.
www.upendthis.com
Page 45 of 68
Shelter Pod Exterior Specifications
Dimensions
64 Square Feet
Overall 15’ - 0” x 8’ - 6” x 10’ - 0” (L x W x H)
Integral Legs telescope 4” to 18”
Weight 5800lbs (estimated)
Accessibility
32” all steel door with commercial locking door handle
Integral 24” x 84” covered stoop
Step 16” x 48” x 8”
Envelope
Exterior siding: Corrugated Metal
Exterior Corners: Painted Steel
Roof Material: Corrugated Metal
R Values: Floor (R-22) Walls (R-22) Ceiling (R30)
24” x 24” operable awning window
28” x 48” operable casement window (egress rated)
Roof meets 40psf snow load
Power and Lighting
30 amp panel with 25’ RV power cord
(x4) 20 amp electrical outlets
Exterior LED light at Entry Door, switch at door
Interior LED overhead light fixture, switch at door
Environmental Controls
9000 BTU Mini Split heating and AC
15 amp Heat Recovery Ventilator
Hardwired Smoke Detector
www.upendthis.com
Page 46 of 68
Shelter Pod Interior Specifications
Flooring
Resilient and sustainable cork flooring
Walls
1/2” Poplar plywood with satin white finish
Integral cleat system for easy installation and
repositioning of CRATE options
Ceiling
1/2” Poplar plywood with satin white finish
Dimensions
Ceiling Height 8’ - 0”
Width 7’ - 2”
Length 9’ - 2”
www.upendthis.com
Page 47 of 68
Accessories Included
Our furniture options are called CRATEs. They are modular
in nature and work directly with our innovative and integrated
wall cleat system. All CRATEs are made of high quality
furniture grade plywood. Parts are made using the CNC
router and assembled with precision. A high gloss paint finish
is on all surfaces.
Shelter Pods are equipped with:
(x1) CRATE Beds
6” Twin Mattresses fit our bed frames (not included). The
frames attach to our wall cleat system with four adjustable
wall brackets. The beds have a 400lb weight capacity.
(x1) CRATE Locker XL
This Locker is 24” x 24” x 70”. A large cabinate with two full
length doors with padlock clasp. Outside face of Locker has
a chalkboard finish that is magnetic.
(x1) CRATE Desk
The Desk is 48” x 16” x 8”. It has two interior shelves for
books and papers. An integral outlet built in that plugs into
the wall outlet of the module. This outlet has one USB port
and two 15 amp outlets. This Desk is designed to be a bench
if installed lower on the wall or a shelf if installed higher. It
has a 350lb weight capacity.
(x1) CRATE Cleat for hanging two folding chairs
This simple Cleat is rated for 350lbs and in this module will
hold two metal folding chair when not in use (chairs not
included). It can also easily handle the weight of a large
backpack.
(x1) Bycicle Wall Mount with locking loop
www.upendthis.com
Page 48 of 68
Brad Rabinowitz
Burlington Development Review Board AJ LaRosa
Geoffrey Hand
645 Pine Street Brooks McArthur
Burlington, VT 05401 Caitlin Halpert
www.burlingtonvt.gov/DPI/DRB Chase Taylor
Phone: (802) 865-7188 Leo Sprinzen
Sean McKenzie (Alt.)
Burlington Development Review Board
Findings of Fact
Deliberative Hearing Tuesday, June 21, 2022
In RE: ZP-22-199; 51 Elmwood Avenue (Ward 3C, RH) (Tax Lot No. 044-4-048-000)
Owner/Applicant: Burlington DPW / Samantha Dunn
Request: Establish a temporary emergency shelter including 30 shelter pods, community
resource center, and bathhouse
Members Present:
Brad Rabinowitz
AJ LaRosa
Caitlin Halpert
Brooks McArthur
Leo Sprinzen
Sean McKenzie
Evidence Presented:
The Board examined the materials submitted in support of this request.
I. FINDINGS
Background Information:
The applicant is requesting approval to establish a temporary emergency shelter on an existing
nonconforming municipal parking lot. The requested duration is 3 years. The parking lot will
remain in place, and the proposed structures will be placed upon it with limited earthwork for
utility installations and connections. Additional fencing, outdoor lighting, and raised planters are
also proposed. Emergency shelters are a conditional use in the Residential – High Density zone
wherein the project is located. A related community center is included and will serve occupants
of the shelter but will also be open to the public.
As a municipally owned and operated facility the application for this emergency shelter is
subject to only limited zoning review per 24 VSA, Sec. 4413, Limitations on municipal bylaws.
The development may be reviewed only with respect to location, size, height, building bulk,
yards, courts, setbacks, density of buildings, off-street parking, loading facilities, traffic, noise,
lighting, landscaping, and screening requirements.
There are no previous zoning actions for this property.
Page 49 of 68
Article 3: Applications, Permits, and Project Reviews
Part 3: Impact Fees
Sec. 3.3.2, Applicability & Sec. 3.3.3, Exemptions & Waivers
The proposed emergency shelter does not contain any new dwelling units, but is it categorized as
a special residential use. Occupants of the shelter will stay there rent free. As such, it qualifies
for an exemption from impact fees per Sec. 3.3.3.
The community resource center, even though temporary, does not qualify for an exemption from
impact fees. Those will be due prior to issuance of a certificate of occupancy. (Affirmative
finding as conditioned)
Article 3: Applications and Reviews
Part 5, Conditional Use & Major Impact Review:
Section 3.5.6 (a) Conditional Use Review Standards
Approval shall be granted only if the DRB, after public notice and public hearing, determines
that the proposed conditional use and associated development shall not result in an undue
adverse effect on each of the following general standards:
1. Existing or planned public utilities, facilities or services are capable of supporting the
proposed use in addition to the existing uses in the area;
The property will be served by municipal utilities. Electrical service is present, and water and
wastewater service will be installed. Sufficient water and sewer service are available. While the
use is temporary, a State of Vermont wastewater permit will be required. A wastewater capacity
letter from the Department of Public Works will be required for issuance of the wastewater
permit. (Affirmative finding as conditioned)
2. The character of the area affected as defined by the purpose or purposes of the zoning
district(s) within which the project is located, and specifically stated policies and standards
of the municipal development plan;
The property is located within the Residential – High Density zone. This zone is intended
primarily for high density residential development in the form of attached multi-family
buildings. A variety of residential uses are allowed, including “special residential uses” such as
emergency shelters. The temporary emergency shelter fits within the residential context of the
RH zone. (Affirmative finding)
3. The proposed use will not have nuisance impacts from noise, odor, dust, heat, and vibrations
greater than typically generated by other permitted uses in the same zoning district;
The proposed emergency shelter will be limited to 35 individuals (30 pods, including 5 pods that
will allow 2 people if there are couples who request being together) and onsite staff. With
continuous onsite staff, the shelter is not expected to generate nuisance impacts from noise, odor,
dust, and the like that may be more typically associated with commercial uses. (Affirmative
finding)
ZP-22-199 Minutes/FOF pg. 2 of 11
Page 50 of 68
4. The transportation system is capable of supporting the proposed use in addition to the
existing uses in the area. Evaluation factors include street designations and capacity; level of
service and other performance measures; access to arterial roadways; connectivity; transit
availability; parking and access; impacts on pedestrian, bicycle and transit circulation;
safety for all modes; and adequate transportation demand management strategies;
No traffic analysis has been provided or is required for this application. The anticipated
occupants of the emergency shelter are not expected to generate any traffic impacts. Staff will
park onsite on a small number of parking spaces. (Affirmative finding)
and,
5. The utilization of renewable energy resources;
Depending on available funding, solar panels will be installed on the rooftops of the community
resource center and/or the bathhouse. (Affirmative finding)
and,
6. Any standards or factors set forth in existing City bylaws and city and state ordinances;
It is the applicant’s responsibility to comply with other applicable city and state bylaws and
ordinances.
(b) Major Impact Review Standards
Not applicable.
(c) Conditions of Approval:
In addition to imposing conditions of approval necessary to satisfy the General Standards
specified in (a) or (b) above, the DRB may also impose additional conditions of approval relative
to any of the following:
1. Mitigation measures, including but not limited to screening, landscaping, where necessary to
reduce noise and glare and to maintain the property in a character in keeping with the
surrounding area.
The emergency shelter is similar to a multi-family residential development. As opposed to
dwelling units, the facility will have 30 individual shelter pods and a related community center
and a bathhouse. The emergency shelter will have onsite staff to manage it 24/7. All of the
buildings are fully enclosed. Shared outdoor space is located in the center of the site to lessen
potential noise impacts to neighboring properties. Trash and recycling units will be enclosed
behind screening. (Affirmative finding)
2. Time limits for construction.
All of the buildings are pre-fabricated and will take relatively little time to install. Standard
zoning permit time limits will apply – 1 year to start construction and 2 more to complete (total
of 3 years). In this case, the emergency shelter will cease operation after 3 years. (Affirmative
finding)
ZP-22-199 Minutes/FOF pg. 3 of 11
Page 51 of 68
3. Hours of operation and/or construction to reduce the impacts on surrounding properties.
The emergency shelter will operate 24 hours per day, 7 days per week for up to 3 years. The
related community center will operate, open to the public, 7 days per week from 9:00 AM – 4:00
PM. These hours are within the permissible hours of 5:30 AM – 11:00 PM for community
centers.
Hours of construction are not noted. Within residential areas, hours of construction are typically
limited to M-F 7:00 am to 5:30 pm, with Saturday hours restricted to interior work. No work on
Sundays. (Affirmative finding as conditioned)
4. That any future enlargement or alteration of the use return for review to the DRB to permit the
specifying of new conditions; and,
Any future enlargement or alteration will be reviewed under the zoning regulations in effect at
that time.
5. Such additional reasonable performance standards, conditions and safeguards, as it may
deem necessary to implement the purposes of this chapter and the zoning regulations.
See the recommended conditions.
Article 4: Maps & Districts
Sec. 4.4.5, Residential Districts:
(a) Purpose
(5) Residential High Density (RH)
As noted previously, the subject property is located within the Residential – High Density zone.
This zone is intended primarily for high density residential development in the form of attached
multi-family apartments. A variety of residential uses are allowed, including “special residential
uses” such as emergency shelters. The temporary emergency shelter fits within the residential
context of the RH zone. Community centers are permitted in the RH zone and serve as an
ancillary amenity to the surrounding neighborhoods. (Affirmative finding)
(b) Dimensional Standards & Density
There is no residential density per se. See Sec. 5.4.13 for residential density equivalent for
emergency shelters.
Lot coverage is nonconforming at 100%. No change in lot coverage is proposed, although some
green space will be introduced to the site with planters.
The front yard setback is based on the average of neighboring properties. In this case, a 5’ front
yard setback is proposed and is based on an average of 3.’ Note that the average provided is for
just the two adjacent properties. The average is based on 4 properties, the two to the north and
the two to the south in this case. All of the buildings look to be close to the street, but the
average needs to be recalculated based on the 4 properties. As all of the proposed buildings are
15’ tall or less, 5’ minimum side and rear yard setbacks are required. The site plan reflects these
required side and rear minimum setbacks.
ZP-22-199 Minutes/FOF pg. 4 of 11
Page 52 of 68
The community resource center is 15’ tall and the rest of the buildings are just 10’ tall. These
heights are well below the 35’ height limit. (Affirmative finding as conditioned)
(c) Permitted & Conditional Uses
An emergency shelter is a conditional use in the RH zone. The related community center is a
permitted use. (Affirmative finding)
(d) District Specific Regulations
Not applicable.
Article 5: Citywide General Regulations
Sec. 5.2.3, Lot Coverage Requirements
See Sec. 4.4.5 (b).
Sec. 5.2.4, Buildable Area Calculation
See Sec. 4.4.5 (b).
Sec. 5.2.5, Setbacks
See Sec. 4.4.5 (b).
Sec. 5.2.6, Building Height Limits
See Sec. 4.4.5 (b).
Sec. 5.2.7, Density and Intensity of Development Calculations
See Sec. 4.4.5 (b).
Part 4: Special Use Regulations
Section 5.4.13 Emergency Shelters
Emergency shelters shall be subject to the site and design review standards in Art 6.
In addition to conditional use standards where applicable, proposals for all new emergency
shelters shall comply with the following requirements:
(a) All dimensional standards for the underlying zoning per the requirements of Art. 4 shall
be applicable;
See Sec. 4.4.5 above.
(b) Density within the residential zones shall be per the residential density standards of
Article 4. For the purposes of density calculation for emergency shelters, every four (4)
beds shall count as one (1) dwelling unit;
The 30 pods contain 30-35 beds. Assuming a maximum of 35 beds, that equates to 9
dwelling units on this ~ ½ acre property. With a limit of 40 units per acre, the equivalent
of 9 units is acceptable. (Affirmative finding)
(c) Density within the neighborhood mixed use zones shall be limited to fifty (50) beds, and
there is no density limit in the downtown or downtown transition zones;
(Not applicable)
ZP-22-199 Minutes/FOF pg. 5 of 11
Page 53 of 68
(d) Overnight stays by any individual are limited to 180 consecutive days. An extension of
up to 60 days may be provided if no alternative housing is available;
This standard will be a condition of approval. The applicant is aware of this criterion.
(Affirmative finding as conditioned)
(e) There shall be onsite management by qualified adults during all hours of operation with
at least 1 management person for every 25 beds; and,
Up to four onsite staff will be present, including 1 or 2 overnight staff. One overnight
staff will be present until or unless the number of individuals in the shelter pods exceeds
25. At that point, the applicant proposes that 2 overnight staff would be present. In light
of community concerns about management of the shelter and potential nuisance impacts,
at least 2 overnight stall shall be present in any event. (Affirmative finding as
conditioned)
(f) An emergency shelter may be the primary use of a property, or it may be accessory to
another primary use on a property.
In this case, the emergency shelter will be the primary (albeit temporary) use of the
property. (Affirmative finding)
Sec. 5.5.1, Nuisance Regulations
The emergency shelter is anticipated to have impacts similar to multi-family housing. Design
and management measures, such as enclosed buildings, centralized community spaces, and 24/7
onsite staffing will lessen potential noise and related impacts. Substantial testimony from the
community raised valid concerns about management of the shelter and concern about the lack of
an identified management team for the facility. In an effort to further mitigate potential nuisance
impacts, there must be no amplified outdoor music or other sound, and an operational
management plan must be provided. (Affirmative finding as conditioned)
Sec. 5.5.2, Outdoor Lighting
Existing pole lights will remain. New outdoor lighting consists of canister and wall-pack
fixtures that will illuminate building entries. The proposed fixtures will provide illumination
with acceptable low output lamps. (Affirmative finding)
Sec. 5.5.3, Stormwater and Erosion Control
An erosion prevention and sediment control plan is required for the utility earthwork associated
with this project. Review by the city’s Water Resources staff is underway. Approval of the
erosion prevention and sediment control plan is required prior to construction. (Affirmative
finding as conditioned)
Article 6: Development Review Standards
Part 1, Land Division Design Standards
Not applicable.
Part 2, Site Plan Design Standards
Sec. 6.2.2, Review Standards
(a) Protection of important natural features
ZP-22-199 Minutes/FOF pg. 6 of 11
Page 54 of 68
There are no important natural features within the project area. The site is entirely a paved
parking lot. (Affirmative finding)
(b) Topographical alterations
Not applicable per 24 VSA, Sec. 4413.
(c) Protection of important public views
Not applicable per 24 VSA, Sec. 4413.
(d) Protection of important cultural resources
Not applicable per 24 VSA, Sec. 4413.
(e) Supporting the use of alternative energy
Not applicable per 24 VSA, Sec. 4413.
(f) Brownfield sites
Not applicable per 24 VSA, Sec. 4413.
(g) Provide for nature’s events
Not applicable per 24 VSA, Sec. 4413. The city’s stormwater standards under Chapter 26
continue to apply.
(h) Building location and orientation
Not applicable per 24 VSA, Sec. 4413.
(i) Vehicular access
Not applicable per 24 VSA, Sec. 4413.
(j) Pedestrian access
Not applicable per 24 VSA, Sec. 4413.
(k) Accessibility for the handicapped
Not applicable per 24 VSA, Sec. 4413. Accessibility requirements under the City’s building
code continue to apply.
(l) Parking and circulation
The property is presently nonconforming as a large parking lot. The parking lot will remain
largely as is with the modular buildings installed on top. A small section of the parking lot in the
southeast corner will remain available for parking. These parking spaces are located behind the
front yard setback and to the side of the community resource center building. The spaces can be
accessed directly from the street. The parking spaces are in close proximity to the community
resource center and access into the site. (Affirmative finding)
(m) Landscaping, fences, and retaining walls
A number of planters will be installed to introduce as least some green space into this temporary
facility. Several are located amongst the shelter pods, and a cluster is proposed between the pods
ZP-22-199 Minutes/FOF pg. 7 of 11
Page 55 of 68
and the bathhouse. A relatively large planter will be installed to provide some green space along
the front of the community resource center.
The site is presently fenced on three sides with chain link. This fencing will be repaired where
needed, and bamboo screening slats will be installed. A new wooden privacy fence with gates is
proposed along the front of the property and around the trash and recycling receptacles.
(Affirmative finding)
(n) Public plazas and open space
Shared outdoor space will be located within the center of the site. It will be proximate to the
shelter pods and relatively far from adjoining residential properties. (Affirmative finding)
(o) Outdoor lighting
See Sec. 5.5.2.
(p) Integrate infrastructure into the design
No new ground-mounted mechanical equipment is proposed. (Affirmative finding)
Part 3, Architectural Design Standards
Sec. 6.3.2, Review Standards
(a) Relate development to its environment
1. Massing, Height, and Scale
The most prominent building onsite, the community resource center, approximates a
residence in appearance. It is residential in scale with basic massing and relatively low
height. Other buildings onsite are behind fencing and not as apparent from the street. The
bathhouse reads as an outbuilding of smaller scale with simple form and massing. All of the
shelter pods read as miniature cottages with typically residential characteristics like pitched
roofs, front doorways, and windows. (Affirmative finding)
2. Roofs and Rooflines
Not applicable per 24 VSA, Sec. 4413.
3. Building Openings
Not applicable per 24 VSA, Sec. 4413.
(b) Protection of important architectural resources
Not applicable per 24 VSA, Sec. 4413.
(c) Protection of important public views
Not applicable per 24 VSA, Sec. 4413.
(d) Provide an active and inviting street edge
Not applicable per 24 VSA, Sec. 4413.
(e) Quality of materials
Not applicable per 24 VSA, Sec. 4413.
ZP-22-199 Minutes/FOF pg. 8 of 11
Page 56 of 68
(f) Reduce energy utilization
Not applicable per 24 VSA, Sec. 4413.
(g) Make advertising features complimentary to the site
No new exterior signs are included in this proposal. (Not applicable)
(h) Integrate infrastructure into the building design
No new rooftop mechanical equipment is proposed. The project plans depict interior mechanical
spaces for the community resource center and bathhouse. (Affirmative finding)
(i) Make spaces safe and secure
The proposed building must provide adequate egress as required by the building code. Entries
will be illuminated. A central emergency access aisle will be provided into the site.
(Affirmative finding)
Article 8: Parking
Sec. 8.1.8, Minimum Off-Street Parking Requirements
The emergency shelter has no minimum onsite parking requirement. The ~1,400 sf community
center requires 5 parking spaces (3.3 spaces per 1,000 sf). A total of 6 parking spaces will be
provided onsite. (Affirmative finding)
Sec. 8.2.4, Bicycle Parking Requirements
There is no bicycle parking requirement for the emergency shelter. The community resource
center is required to have 2 short term bike parking spaces. It is not large enough to require long
term spaces. The project plans do not depict an outdoor bike rack. One is required and should
be placed near the primary entrance to the community resource center. (Affirmative finding as
conditioned)
II. MINUTES
The meeting minutes will be distributed separately upon review and approval by the
Development Review Board.
III. MOTION
Motion: AJ LaRosa
I move that the Board grant certificate of appropriateness and conditional use approval to
establish a temporary emergency shelter including 30 shelter pods, community resource center,
and bathhouse at 51 Elmwood Avenue, based on the findings in Section I above and subject to
the following conditions:
1. Prior to release of the zoning permit, the following items shall be addressed, subject to
staff review and approval:
ZP-22-199 Minutes/FOF pg. 9 of 11
Page 57 of 68
a. The applicant must submit an operational management plan for the facility,
including contact information for public use in the event of problems related to
the emergency shelter;
b. A wastewater capacity letter from the Dept. of Public Works shall be obtained;
c. The front yard setback shall be recalculated based on the 4 neighboring properties
(2 on each side), and, if need be, the location of the community resource center
adjusted to be compliant;
d. A bicycle rack for at least 2 bikes shall be installed near the primary entrance to
the community resource center; and,
e. The erosion prevention and sediment control plan shall be reviewed and approved
by city stormwater staff.
2. At least 7 days prior to the issuance of a certificate of occupancy, the applicant shall
pay to the Permitting & Inspections Department the impact fee as calculated by staff
based on the net new square footage of the proposed community center building.
3. At least 2 overnight staff shall be present at the emergency shelter.
4. Amplified outdoor music or other sound is prohibited.
5. This zoning permit approval is valid for 3 years, and the site must be returned to its
current state or to another approved use immediately following that. Extension of this
time will require review and approval by the Development Review Board per Sec. 3.2.9,
Zoning Permits, (d) Time Limits on Zoning Permits.
6. Overnight stays by any individual are limited to 180 consecutive days. An extension of
up to 60 days may be provided if no alternative housing is available.
7. Hours of construction shall be limited to M-F 7:00 am to 5:30 pm, with Saturday hours
restricted to interior work. No work on Sundays.
8. Any new utility lines must be buried.
9. The Applicant/Property Owner is responsible for obtaining all necessary Zoning Permits
and Building Permits through the Department of Public Works as well as other permit(s)
as may be required.
10. Standard permit conditions 1-15.
Seconded: Brooks McArthur
Vote: 6-0-0, motion carried
22nd day of June 2022
Dated at Burlington, Vermont, this ___
Respectfully Submitted,
_______________________________________
Brad Rabinowitz, Development Review Board Chair
Please note that an interested person may appeal a decision of the Development Review
Board to the Vermont Superior Court Environmental Division. (Zoning Ordinance Article
17, Section 17.1.7, Appeals of Development Review Board Decisions: An interested person
may appeal a decision of the Development Review Board to the Vermont Superior Court
ZP-22-199 Minutes/FOF pg. 10 of 11
Page 58 of 68
Environmental Division. The appeal shall be taken in such a manner as the supreme court
may by rule provide for appeals from state agencies governed by Sections 801 through 816
of Title 3). The Court rules may require that such an appeal be commenced within Thirty
(30) days of the Board’s decision.
ZP-22-199 Minutes/FOF pg. 11 of 11
Page 59 of 68
Department of Permitting & Inspections William Ward, Director
Scott Gustin, AICP, CFM, Principal Planner
Zoning Division Mary O’Neil, AICP, Principal Planner
645 Pine Street Kirk Dressing, Associate Planner
Burlington, VT 05401 Joseph Cava, Permit Technician
Telephone:(802) 865-7188 Collin Naheedy, Code Compliance Officer
TO: Development Review Board
FROM: Kirk Dressing
DATE: May 05, 2026
RE: ZP-26-122; 118 Dale Road
======================================================================
Note: These are staff comments only; decisions on projects are made by the Development
Review Board, which may approve, deny, table or modify any project. THE APPLICANT
OR REPRESENTATIVE MUST ATTEND THE MEETING.
Zone: RL Ward: 4
Owner/Applicant: Evan Gould
Request: Proposed establishment of a spa home occupation.
Applicable Regulations:
Article 3 (Applications, Permits, & Project Reviews), Article 5 (Citywide General Regulations)
Background Information:
The applicant is requesting approval to establish a spa home occupation business. The property is
a single detached dwelling unit and is located in a residential zone. The home occupation is
subject to conditional use review. No site or exterior building changes are proposed.
Previous zoning actions for this property are noted below.
ZP-05-407 – Approval for expansion of kitchen and deck addition.
ZP-1999-430 – Approval for construction of a partial second floor (25'x25') For the
existing single family home. No change in use or footprint.
Recommendation: Approval as per, and subject to, the following findings and conditions:
I. Findings
Article 3: Applications, Permits, and Reviews
Part 5, Conditional Use & Major Impact Review:
Section 3.5.6 (a) Conditional Use Review Standards
Approval shall be granted only if the DRB, after public notice and public hearing, determines that
the proposed conditional use and associated development shall not result in an undue adverse
effect on each of the following general standards:
1. Existing or planned public utilities, facilities or services are capable of supporting the proposed
use in addition to the existing uses in the area;
The proposed home occupation is small in scale and will not increase demand on existing or
planned public utilities. (Affirmative finding)
Page 60 of 68
2. The character of the area affected as defined by the purpose or purposes of the zoning
district(s) within which the project is located, and specifically stated policies and standards of
the municipal development plan;
The subject property is located within the Residential Low Intensity zone and is in a neighborhood
characterized predominantly by other single detached dwelling units on similarly sized lots. No
exterior changes are proposed for the home occupation, and only one resident employee is
proposed. There will be little, if any, evidence of the home occupation as perceived from the
neighborhood. (Affirmative finding)
3. The proposed use will not have nuisance impacts from noise, odor, dust, heat, and vibrations
greater than typically generated by other permitted uses in the same zoning district;
Spa activities will take place within the existing primary structure. No impacts from noise, dust,
heat, or vibrations are anticipated. (Affirmative finding)
4. The transportation system is capable of supporting the proposed use in addition to the existing
uses in the area. Evaluation factors include street designations and capacity; level of service
and other performance measures; access to arterial roadways; connectivity; transit
availability; parking and access; impacts on pedestrian, bicycle and transit circulation; safety
for all modes; and adequate transportation demand management strategies;
Traffic impacts, if any, are expected to be minimal. Just one employee, a resident of the property,
will work the home occupation, and no commercial vehicle deliveries are anticipated. While there
will be people visiting the studio for treatments, there will be no overlapping of customers, and
treatments will be by appointment only. (Affirmative finding)
and,
5. The utilization of renewable energy resources;
Nothing within the application will preclude the use of wind, solar, geothermal, or other renewable
energy resource. (Affirmative finding)
and,
6. Any standards or factors set forth in existing City bylaws and city and state ordinances;
The home occupation will be subject to any applicable city or state requirements. (Affirmative
finding as conditioned)
Article 5: Citywide General Regulations
Sec. 5.4.6, Home Occupations
Pursuant to the requirements of 24 VSA 4412(4), it is the intent of these regulations to provide
for the use of a minor portion of a dwelling unit for a home occupation and to ensure
compatibility with other permitted uses and with the residential character of the neighborhood.
Such a home occupation must clearly be secondary or incidental to the principal residential
use, and so located and conducted that the average neighbor, under normal circumstances,
would not otherwise be aware of its existence.
(b) Conditional Use Review:
ZP-26-122 pg. 2 of 4
Page 61 of 68
All home occupations not otherwise eligible for administrative approval above shall
require review and approval by the DRB pursuant to the requirements of Art. 3, Part 5. In
addition to the conditional use criteria, the following criteria must be met for any home
occupation:
1. A home occupation shall be conducted solely by resident occupants plus no more than
one additional full-time equivalent employee in RL districts, and no more than two (2)
full-time equivalent employees in other districts. The home occupation shall be conducted
entirely within an existing dwelling unit and/or one enclosed accessory structure;
The home occupation will be operated solely by one resident occupant. (Affirmative
finding)
2. No more than thirty-five per cent (35%) of the floor area of said residence, including
accessory structures, up to a maximum of seven hundred fifty (750) square feet,
whichever is less, shall be used for such purpose;
The home occupation will occupy up to ±200 sf on the first level of the principal
structure; ±6% of the 3,278 sf total floor area of the dwelling unit. (Affirmative finding)
3. No home occupation shall require alterations, construction or equipment that would
change the fire rating of the structure or the fire district in which the structure is located;
No construction, equipment or alterations are proposed. (Affirmative finding)
4. There shall be no outside storage of any kind related to the home occupation;
No outside storage is proposed. (Affirmative finding)
5. There shall be no exterior evidence of the conduct of a home occupation except for:
A. Occasional garage/lawn/yard type sales (up to twice a year not to exceed two (2)
days each);
None proposed. (Affirmative finding)
and
B. One non-illuminated attached parallel sign that shall not exceed two (2) square feet.
No other signs shall be permitted.
None proposed. (Affirmative finding)
6. No home occupation may increase vehicular traffic flow or parking by more than one
additional vehicle at a time for customers or deliveries. All parking shall be located off-
street and shall maintain the required front yard setback;
No substantial increase in vehicular traffic flow or parking are proposed. The existing
driveway provides off-street parking for at least one vehicle. (Affirmative finding)
7. No home occupation shall create sounds, noise, dust, vibration, smell, smoke, heat,
humidity, glare, radiation, electrical interference, fire hazard or any other hazard,
nuisance or unsightliness which is discernible from any adjacent dwelling unit;
See Sec. 3.5.6 (a) 3 above.
8. The home occupation shall be clearly incidental and secondary to the use of the dwelling
for residential purposes and shall not change the character thereof or adversely affect
the uses permitted in the residential district of which it is a part.
ZP-26-122 pg. 3 of 4
Page 62 of 68
As proposed, the home occupation will be inconsequential to the residential district in
which it is located. (Affirmative finding)
9. Delivery of products and materials related to the home occupation by vehicles other than
automobiles shall occur no more than once per day;
No commercial vehicle deliveries are proposed. (Affirmative finding)
10. With the exception of one delivery per day, as specified in subparagraph (9), no more
than one (1) commercial vehicle shall be allowed on the premises at any one time;
See criterion 9 above.
and
11. There shall be no sale of goods except for goods fabricated on the premises as part of an
approved home occupation.
No retail activities will take place onsite. (Affirmative finding)
II. Conditions of Approval
1. It is the applicant’s responsibility to comply with any applicable city or state requirements
related to the proposed spa business.
2. Standard Conditions 1-15.
ZP-26-122 pg. 4 of 4
Page 63 of 68
Department of Permitting and Inspections
645 Pine Street
Burlington, VT 05401-8415
Phone: (802) 865-7188
www.burlingtonvt.gov/dpi
Home Occupation Application Questionnaire
Use this checklist for all applications for a home occupation - See Sec. 5.4.6 of the Zoning Ordinance. This
questionnaire is provided to summarize details and is required to accompany a zoning permit application form and
required fee (for either administrative approval or conditional use review).
Please note:
1. The specific requirements for home occupations can be found in Section 5.4.6 of the Comprehensive
Development Ordinance which is available in its entirety on our website at www.burlingtonvt.gov/PZ
2. A ‘Business Personal Property Registration Form’ may be required to be submitted to the Assessors Office.
This form is available at www.burlingtonvt.gov/assessor/businesses
Atelier Privé
Name of Business Proposed: _____________________________________________________________________
Skincare Studio
Type of Business Proposed: _____________________________________________________________________
Provide a detailed description of the proposed Home Occupation such as: activities involved; materials and equipment
used; quantities of materials and equipment stored on-site; methods of operation; hours of operation.
This may be done on a separate piece of paper and attached.
Please respond to the following:
1. How many persons will be involved or employed in the conduct of the proposed Home Occupation:
1
Residents of premises: __________ Others Total Number 1 _______
2. What type of product will be produced, serviced, or repaired in the conduct of your Home Occupation? (For
example: repair of clocks or watches, making jewelry, etc.). Explain:
________________________________________________________________________________________
Skincare treatments, specifically facials and waxing treatments will be performed in studio spare bedroom.
________________________________________________________________________________________
3. Describe any alterations to the home or premises that might be required to facilitate your Home Occupation:
________________________________________________________________________________________
NA
________________________________________________________________________________________
4. Describe what rooms will be used in the conduct of the Home Occupation and how these rooms will be used.
(For example: garage will be used to store supplies; or den will contain desk and file cabinets, etc.). Indicate
the gross floor area(s) that will be used in the conduct of the Home Occupation. Indicate the total gross floor
areas of your house and include any accessory structure(s) to be used for the Home Occupation, (Ex. Garage).
________________________________________________________________________________________
Spare bedroom will be used as aesthetic studio and for storage of necessary supplies and materials.
________________________________________________________________________________________
Basement washer and dryer will be used to launder linens. Clients will have access to first floor bathroom..
________________________________________________________________________________________
5. Describe the mechanical and/or electrical equipment that will be necessary to conduct your business activity:
________________________________________________________________________________________
Portable steamer and magnification lamp, wax pot, towel warmer and sterilizer.
_______________________________________________________________________________________
6. Describe how, where and in what amounts the material, supplies and/or equipment related to your Home
Occupation will be displayed or stored:
________________________________________________________________________________________
In enclosed containers, disposable consumables (cotton rounds, tongue depressor sticks, ect.), linens, back bar
________________________________________________________________________________________
2and sanitation products for services will be stored in studio spare bedroom in cabinet. Steamer and magnification lamp
are wheeled devices that will stand alone in room. Wax pot, towel warmer and sterilizer will be stationary on
cabinet/dresser top. PLEASE TURN OVER
July 2020
Page 64 of 68
7. Will people come to your home to obtain any product or utilize any service connected with the proposed Home
Occupation activity? Yes X ___________ No ___________
If yes, please explain in detail:
Without overlapping schedule, clients will visit studio for treatment one at a time. To maintain home privacy
________________________________________________________________________________________
________________________________________________________________________________________
treatments are solely by appointment only.
8. Are any signs necessary or proposed relative to the Home Occupation?
Yes _______ No X ________
If yes, you are required to file for a Sign Permit. An application form can be obtained at the Planning and
Zoning Department or on our website.
9. If trucks or other equipment will be used in your Home Occupation, where will they be parked or stored?
________________________________________________________________________________________
NA
________________________________________________________________________________________
10. Will the Home Occupation involve the use of commercial vehicles for delivery of materials to or from the
premises? Yes No X
If yes, please explain:
________________________________________________________________________________________
________________________________________________________________________________________
11. 1
How may parking spaces will be provided for the home occupation? ________________________________
Where will they be located? Indicate parking spaces on a site plan of this property as part of your application
submission. 1 of the 2 parking spots in front of garage of the home
12. Is your proposed Home Occupation in conformance with the conditions, covenants and restrictions pertaining
to your property? Yes X No
We suggest checking your deed for conditions, covenants and restrictions.
I have read and understand ‘Sec 5.4.6 Home Occupations’ under the City of Burlington Comprehensive Development
Ordinance and believe that to the best of my knowledge my proposed Home Occupation would not violate any portion
of said Ordinance:
Applicant’s Signature: ________________________________________
Maria Gould
Date: 3/29/26
_________________
Property Owner’s Signature: ___________________________________
Date: 3/29/26
_________________
July 2020
Page 65 of 68
0.00 sq ft
Page 66 of 68
Page 67 of 68
Department of Permitting & Inspections William Ward, Director
Scott Gustin, AICP, CFM, Principal Planner
Zoning Division Mary O’Neil, AICP, Principal Planner
645 Pine Street Kirk Dressing, Associate Planner
Burlington, VT 05401 Joseph Cava, Planning Technician
Telephone: (802) 865-7188 Collin Naheedy, Code Compliance Officer
TO: Development Review Board
FROM: Kirk Dressing
DATE: May 5, 2026
RE: ZP-26-67; 180 Queen City Park Road
ZP-26-68; 266 Queen City Park Road
======================================================================
Outstanding application materials requested for this item have not yet been provided. Staff
recommends deferral of this item to a future meeting.
Page 68 of 68