Muyni
← Back to Burlington

Development Review Board

Regular Meeting

Burlington, VT · June 2, 2026

AgendaPacketMinutes

Minutes

AJ LaRosa Caitlin Halpert Evan Gould Burlington Development Review Board Geoff Hand Department of Permitting & Inspections Sean McKenzie 645 Pine Street Leo Sprinzen Miles Waite Burlington, VT 05401 Marina Campbell, (Alternate) www.burlingtonvt.gov/DPI/DRB Chase Taylor, (Alternate) Telephone: (802) 865-7188 Fax (802) 863-0466 BURLINGTON DEVELOPMENT REVIEW BOARD Tuesday, June 2, 2026, 5:00 PM MINUTES Hybrid & In Person (at 645 Pine Street) Meeting Board Members Present: AJ LaRosa, Caitlin Halpert, Evan Gould, Geoff Hand, Sean McKenzie, Leo Sprinzen, and Miles Waite Board Members Absent: Marina Campbell and Chase Taylor Staff Members Present: Mary O’Neil, Kirk Dressing, and Joseph Cava Staff Members Absent: Scott Gustin and Collin Naheedy I. Agenda II. Communications III. Minutes IV. Public Hearing 1. ZP-26-167; 355 Ethan Allen Pkwy (RM, Ward 7) 355 Ethan Allen Pkwy, LLC / Norman Benoit Proposed amendment to the Planned Unit Development (PUD) approved under ZP-25-517. The three 2-unit additions will change to three 2-unit detached buildings. (Project Manager, Kirk Dressing) Norman Benoit: Sworn in. AJ LaRosa: We have reviewed this project previously, but can you please tell us about some of the changes created under this amendment? Norman Benoit: The buildings are remaining the same. Due to their closeness, there was extra costs in design, which conflicts with the goal of affordable housing. Instead of being an integral part of the existing buildings, the new proposal is to detach the previous proposal into separate buildings. AJ LaRosa: Can you tell us about the screening? Norman Benoit: Nothing is changing. AJ LaRosa: As long as screening is remaining the same under the previously approved project, then I have no additional concerns. Are there any additional questions or comments from members of the Board? Hearing none, is there anyone present in person or online with questions or comments concerning this agenda item? Hearing none, would someone like to make a motion? AJ LaRosa: Motioned to approve and adopt staff findings and recommendations, Caitlin Halpert 2nd. Vote 7-0. Motion carried. The programs and services of the City of Burlington are accessible to people with disabilities. Individuals who require special arrangements to participate are encouraged to contact the Zoning Division at least 72 hours in advance so that proper accommodations can be arranged. For information call 865-7188 (TTY users: 865-7142). Printed on 100% Recycled Paper 2. ZP-26-191; 418 Saint Paul St (RC, Ward 6) Allan Walker-Hodkin Proposed 2-lot subdivision. No development proposed. (Project Manager, Kirk Dressing) Nathalie Torres, owner, present AJ LaRosa: Can you tell us about this project? As a subdivision, it seems straightforward and additional zoning, building, and trades permits will be required for any type of development. Are there any questions or comments from members of the Board? Hearing none, is there anyone present in person or online with questions or comments concerning this agenda item? Hearing none, would someone like to make a motion? AJ LaRosa: Motioned to approve and adopt staff findings and recommendations, Geoff Hand 2nd. Vote 7-0. Motion carried. V. Adjournment Hearing closed at 5:05 PM. Participation in the DRB proceeding is a prerequisite to the right to take any subsequent appeal. Please note that ANYTHING submitted to the Zoning office is considered public and cannot be kept confidential. This may not be the final order in which items will be heard. Please view final Agenda, at https://burlingtonvt.portal.civicclerk.com/ or the office notice board, one week before the hearing for the order in which items will be heard. The City of Burlington will not tolerate unlawful harassment or discrimination on the basis of political or religious affiliation, race, color, national origin, place of birth, ancestry, age, sex, sexual orientation, gender identity, marital status, veteran status, disability, HIV positive status, crime victim status or genetic information. The City is also committed to providing proper access to services, facilities, and employment opportunities. For accessibility information or alternative formats, please contact Human Resources Department at (802) 540-2505.

Agenda

Tuesday, June 2, 2026, 5:00 PM 645 Pine Street, Front Conference Room or Remote on Zoom: Please click the link below to join the webinar: Zoom: https://us02web.zoom.us/j/83225696227?pwd=SGQ0bTdnS000Wkc3c2J4WWw1dzMxUT09 Webinar ID: 832 2569 6227 Passcode: 969186 Telephone: US +1 929 205 6099 or +1 301 715 8592 or +1 312 626 6799 or +1 669 900 6833 or +1 253 215 8782 or +1 346 248 7799 1. Agenda 2. Communications 3. Adopt Minutes 4. Public Hearing 4.1. ZP-26-167; 355 Ethan Allen Pkwy (RM, Ward 7) 355 Ethan Allen Pkwy, LLC / Norman Benoit Proposed amendment to the Planned Unit Development (PUD) approved under ZP-25-517. The three 2-unit additions will change to three 2-unit detached buildings. (Project Manager, Kirk Dressing) 4.2. ZP-26-191; 418 Saint Paul St (RC, Ward 6) Allan Walker-Hodkin Proposed 2-lot subdivision. No development proposed. (Project Manager, Kirk Dressing) 5. Adjournment 6. Informational and Non-Discrimination Statements The City of Burlington will not tolerate unlawful harassment or discrimination on the basis of political or religious affiliation, race, color, national origin, place of birth, ancestry, age, sex, sexual orientation, gender identity, marital status, veteran status, disability, HIV positive status, crime victim status or genetic information. The City is also committed to providing proper access to services, facilities and employment opportunities. The programs and services of the City of Burlington are accessible to people with disabilities. Individuals who require special arrangements, auxiliary aid, service for effective communication, or a modification of policies or procedures to participate in a program, service, or activity of the City of Burlington, should contact the office of the Title II Burlington ADA Coordinator at 802-865-7000 as soon as possible but no later than 48 hours before the scheduled event.

Packet

Tuesday, June 2, 2026, 5:00 PM 645 Pine Street, Front Conference Room or Remote on Zoom: Please click the link below to join the webinar: Zoom: https://us02web.zoom.us/j/83225696227?pwd=SGQ0bTdnS000Wkc3c2J4WWw1dzMxUT09 Webinar ID: 832 2569 6227 Passcode: 969186 Telephone: US +1 929 205 6099 or +1 301 715 8592 or +1 312 626 6799 or +1 669 900 6833 or +1 253 215 8782 or +1 346 248 7799 1. Agenda 2. Communications 3. Adopt Minutes 4. Public Hearing 4.1. ZP-26-167; 355 Ethan Allen Pkwy (RM, Ward 7) 355 Ethan Allen Pkwy, LLC / Norman Benoit Proposed amendment to the Planned Unit Development (PUD) approved under ZP-25-517. The three 2-unit additions will change to three 2-unit detached buildings. (Project Manager, Kirk Dressing) 4.2. ZP-26-191; 418 Saint Paul St (RC, Ward 6) Allan Walker-Hodkin Proposed 2-lot subdivision. No development proposed. (Project Manager, Kirk Dressing) 5. Adjournment 6. Informational and Non-Discrimination Statements The City of Burlington will not tolerate unlawful harassment or discrimination on the basis of political or religious affiliation, race, color, national origin, place of birth, ancestry, age, sex, sexual orientation, gender identity, marital status, veteran status, disability, HIV positive status, crime victim status or genetic information. The City is also committed to providing proper access to services, facilities and employment opportunities. The programs and services of the City of Burlington are accessible to people with disabilities. Individuals who require special arrangements, auxiliary aid, service for effective communication, or a modification of policies or procedures to participate in a program, service, or activity of the City of Burlington, should contact the office of the Title II Burlington ADA Coordinator at 802-865-7000 as soon as possible but no later than 48 hours before the scheduled event. Page 1 of 37 Department of Permitting & Inspections William Ward, Director Scott Gustin, AICP, CFM, Principal Planner Zoning Division Mary O’Neil, AICP, Principal Planner 645 Pine Street Kirk Dressing, Associate Planner Burlington, VT 05401 Joseph Cava, Permit Technician Telephone: (802) 865-7188 Collin Naheedy, Code Compliance Officer MEMORANDUM TO: Development Review Board FROM: Kirk Dressing, Associate Planner DATE: June 2, 2026 RE: ZP-26-167; 355 Ethan Allen Parkway Note: These are staff comments only; decisions on projects are made by the Development Review Board, which may approve, deny, table or modify any project. THE APPLICANT OR REPRESENTATIVE MUST ATTEND THE MEETING. File: ZP-26-167 Location: 355 Ethan Allen Parkway Zone: RL Ward: 7 Date application accepted: May 1, 2026 Applicant/Owner: Norman Benoit/355 Ethan Allen Parkway LLC Request: Proposed amendment to the Planned Unit Development (PUD) approved under ZP-25- 517. The three 2-unit additions will change to three 2-unit detached buildings. Applicable Regulations: Article 3 (Applications, Permits, & Project Reviews), Article 4 (Maps & Districts), Article 5 (Citywide General Regulations), Article 6 (Development Criteria & Guidelines), Article 8 (Parking), Article 11 (Planned Development) Background:  ZP-25-517 – Approval for the addition of 2 dwelling units to each existing building for a change from 12 to 18 dwelling units total.  ZP-1996-269; Installation of vinyl siding over the existing wood (T1-11) Sections of the multi-Unit residential buildings. Overview: 355 Ethan Allen Avenue is currently developed with 3 multi-unit dwellings, each with 4 units for a total of 12 dwelling units. This is an update to a previously approved application noted above. The difference is the proposed units are to be detached from the existing buildings as opposed to attached as previously approved. The proposed scope of work includes 3 new buildings. Each new building will have 2 units, for a total of 18 units. The previous iteration of the application was heard by the Conservation Board January 5, 2026, and the board recommend approval of the application with the conditions that the infiltration areas avoid tree root zones, replacement trees be installed following development, and that the project comply with the city’s erosion control standards. The application was also heard by the Design Advisory Board January 13, 2026, and the board recommended the applicant revisit and revise parts of the proposal regarding bicycle storage, dumpster enclosure, lighting plan, landscaping plan, and location of the northwestern most addition as depicted on the original site plan. The application was heard again by the Design Advisory Board February 10, 2026, and the board was satisfied with the changes to the plan and further recommended minor revisions Page 2 of 37 to elevation drawings, specifically the dumpster enclosure fence material, and the scale and location of windows and doors. Recommendation: Certificate of Appropriateness approval as per, and subject to, the following findings and conditions: I. Findings Article 3: Applications, Permits, & Project Reviews Sec. 3.3.1, Applicability: Impact fees are likely due upon completion of the additional units. Water impact fees are determined by estimated flows. Transportation impact fees are determined by estimated peak hour trip ends. Applicability of impact fees is determined by the city’s Water Resources Division and Department of Public Works. (Affirmative finding as conditioned) Part 5, Conditional Use & Major Impact Review: Section 3.5.6 (a) Conditional Use Review Standards Not applicable. (b) Major Impact Review Standards 1. Not result in undue water, air, or noise pollution; This residential development is not expected to generate undue water, air, or noise pollution. (Affirmative finding) 2. Have sufficient water available for its needs; The proposed development will be served by municipal water. Sufficient water capacity is available to serve the new dwelling units. (Affirmative finding) 3. Not unreasonably burden the city’s present or future water supply or distribution system; Water and wastewater impact fees will be due to help offset impacts on the city’s water and wastewater infrastructure. Permit approval from VT DEC must be obtained. (Affirmative finding as conditioned) 4. Not cause unreasonable soil erosion or reduction in the capacity of the land to hold water so that a dangerous or unhealthy condition may result; See Sec. 5.5.3. 5. Not cause unreasonable congestion or unsafe conditions on highways, streets, waterways, railways, bikeways, pedestrian pathways or other means of transportation, existing or proposed; There are no proposed changes to the onsite parking. Traffic associated with this project is not sufficient enough to require a traffic impact analysis. Traffic impact fees will likely be due and will mitigate effects of increased traffic caused by this proposed development. (Affirmative finding) 6. Not cause an unreasonable burden on the city’s ability to provide educational services; A total of 12 bedrooms between 6 units will be added. Anticipated impacts on the city school system are minimal. (Affirmative finding) ZP-26-167 pg. 2 of 17 Page 3 of 37 7. Not place an unreasonable burden on the city’s ability to provide municipal services; The proposed development is modest in size and while it will generate additional impacts on city services, they will be minimal. (Affirmative finding) 8. Not have an undue adverse effect on rare, irreplaceable or significant natural areas, historic or archaeological sites, nor on the scenic or natural beauty of the area or any part of the city; See Article 6 for effects on significant natural areas, historic buildings, and archaeological significance. (Affirmative finding) 9. Not have an undue adverse effect on the city’s present or future growth patterns nor on the city’s fiscal ability to accommodate such growth, nor on the city’s investment in public services and facilities; The project is modest in scope and impacts on city services and facilities will be minimal. (Affirmative finding) 10. Be in substantial conformance with the city’s municipal development plan; The project is in substantial conformance with the municipal development plan:  The proposed development is consistent with the existing development pattern, building scale, and neighborhood character (planBTV, Planning to Sustain).  The inclusion of dedicated secure bicycle storage will serve to benefit the connectivity of the proposed development to neighborhood-serving businesses and amenities (planBTV, Neighborhood Connectivity).  The project will manage stormwater, in part, with newly created stormwater infiltration areas onsite (Comprehensive Plan, Natural Environment Action Plan). (Affirmative finding) 11. Not have an undue adverse impact on the present or projected housing needs of the city in terms of amount, type, affordability and location; The proposed dwellings are all two-bedroom units that will be added to an existing planned unit development which will serve to bolster the city’s housing supply. (Affirmative finding) 12. Not have an undue adverse impact on the present or projected park and recreation needs of the city. The development will include interior green spaces; however, residents of the new dwelling units will likely utilize the city’s park and recreation facilities. Its location provides easy access to the Robert Miller Community and Recreation Center as well as Ethan Allen Park. Additional impacts to these parks facilities are expected to be modest. (Affirmative finding) (c) Conditions of Approval: In addition to imposing conditions of approval necessary to satisfy the General Standards specified in (a) or (b) above, the DRB may also impose additional conditions of approval relative to any of the following: 1. Mitigation measures, including but not limited to screening, landscaping, where necessary to reduce noise and glare and to maintain the property in a character in keeping with the surrounding area. This residential development is not expected to generate impacts in need of mitigation. (Affirmative finding) ZP-26-167 pg. 3 of 17 Page 4 of 37 2. Time limits for construction. Most zoning permits are valid for three years and afford 1 year to start construction and another 2 to finish. No extended timeframe or phasing is included in this application. (Affirmative finding) 3. Hours of operation and/or construction to reduce the impacts on surrounding properties. Days and hours of construction are proposed as Monday – Saturday, 7:00 am – 6:00 pm. Interior construction on Sundays as needed. (Affirmative finding) 4. That any future enlargement or alteration of the use return for review to the DRB to permit the specifying of new conditions; and, Any future enlargement or alteration will be reviewed under the zoning regulations in effect at that time. (Affirmative finding) 5. Such additional reasonable performance standards, conditions and safeguards, as it may deem necessary to implement the purposes of this chapter and the zoning regulations. See conditions of approval. Article 4: Maps & Districts Sec. 4.4.5, Residential Districts: (a) Purpose (1) Residential Low Intensity (RL) This district is intended for relatively low density residential development that includes a mix of housing types, generally including single family homes through quadplexes. The proposal of additional units is consistent with this intent. (Affirmative finding) (b) Dimensional Standards The subject property has ±385’ of road frontage and it will not be changed. The minimum frontage is 30’. The minimum front setback will be reduced to ±40’, and the minimum side yard setback will be reduced to ±20’. All proposed buildings and the bike storage building/dumpster enclosure are no closer than ±20’ to the rear property line. The proposed buildings will not exceed 24’8”, which is below the 35’ height limit. Proposed lot coverage has not been provided but needs to be. (Affirmative finding as conditioned) (c) Permitted & Conditional Uses Multifamily Dwellings are a permitted use in the RL district. The resultant 6-unit buildings are permissible by way of PUD (see Article 11). (Affirmative finding) (d) District Specific Regulations 1. Additional Residential Development Permitted (Not applicable) 2. Exceptions to Dimensional Standards ZP-26-167 pg. 4 of 17 Page 5 of 37 (Not applicable) 3. Exception for Neighborhood Commercial Uses (Not applicable) 4. Miscellaneous Standards (Not applicable) Article 5: Citywide General Regulations Sec. 5.2.3, Lot Coverage Requirements No lot coverage exceptions are sought. (Not applicable) Sec. 5.2.5, Setbacks No setback encroachments are sought under this criterion. (Not applicable) Sec. 5.2.6, Building Height Limits No exceptions to height limits are sought. (Not applicable) Sec. 5.5.1, Nuisance Regulations Nothing in the application appears to constitute a nuisance under this criterion. (Affirmative finding) Sec. 5.5.2, Outdoor Lighting See Sec. 6.22. Sec. 5.5.3, Stormwater and Erosion Control Per the city’s Water Resources Division the previously approved Erosion Prevention Sediment Control plan will cover this updated scope of work. (Affirmative finding) Article 6: Development Review Standards Part 1: Land Division Standards Not applicable Part 2: Site Plan Design Standards Sec. 6.2.1 Applicability These standards shall be satisfied for the approval of all development subject to the provisions of this ordinance found in Article 3, Section 3.4.2(1) – Site Plan Review. Sec. 6.2.2 Review Standards (a) Protection of Important Natural Features: ZP-26-167 pg. 5 of 17 Page 6 of 37 The landscape, existing terrain and any significant trees and vegetation shall be preserved in their natural state insofar as practicable in keeping with the objectives of the underlying zoning district. Development and site disturbance shall preserve watercourses, wetlands, steep slopes, flood-prone areas, rock outcroppings, wildlife habitat and travel corridors, specimen trees and contiguous stands of forest, and other sensitive ecological and geological areas insofar as practicable in keeping with the objectives of the underlying zoning district. Site plans shall provide suitable buffers from any proposed site improvements, and maintain continuity and contiguousness of greenspace while allowing reasonable development in support of the overall intent of the zoning district. Where any natural features are proposed to be removed or the topography altered, special attention shall be given to replace or mitigate the loss of such features. Any development occurring on parcels containing significant natural areas identified in the city’s Open Space Protection Plan shall avoid disturbance to these natural areas and establish appropriate buffers that protect their natural functions. Submitted landscaping plans show three maple trees are proposed on the site as well as a row of arborvitae along the northern boundary line per previous DRB conditions. Landscaping plan also identifies existing trees on property, and no trees are labeled as proposed to be removed. (Affirmative finding) (b) Topographical Alterations: Alteration to the natural contour of the site shall minimize grading, cut, and fill, and shall take necessary measures to protect against erosion and future instability. Any grade changes shall be in keeping with the general appearance of neighboring developed areas. In areas where more intense levels of development are encouraged, development should seek to take advantage of topographical changes to hide and/or blend new construction into the landscape. Proposed design and construction details for any cut and fill, or retaining walls over 3-feet in height, or any height along the lakeshore, shall be subject to review and approval by the city engineer before receiving approval of the site plan. Minimal grading, primarily for stormwater management, is proposed on this flat site. (Affirmative finding) (c) Protection of Important Public Views: Distant terminal views of Lake Champlain and the mountains to the east and west, and important public and cultural landmarks, framed by public rights-of-way or viewed from public spaces shall be maintained through sensitive siting and design to the extent practicable. This shall not be construed to include views from exclusively private property. Not applicable. (d) Protection of Important Cultural Resources: Burlington’s architectural and cultural heritage shall be protected through sensitive and respectful redevelopment, rehabilitation, and infill. Archeological sites likely to yield information important to the city’s or the region’s pre-history or history shall be evaluated, documented, and avoided whenever feasible. Where the proposed development involves sites listed or eligible for listing on a state or national register of historic places, the applicant shall meet the applicable development and design standards pursuant to Sec. 5.4.8(b). Not Applicable. (e) Supporting the Use of Renewable Energy Resources: ZP-26-167 pg. 6 of 17 Page 7 of 37 Where feasible, the site plan should be so designed as to take advantage of the site’s inherent potential to utilize sources of renewable energy including direct sunlight, wind, or running water. The site plan should also incorporate site planning and landscaping decisions intended to minimize energy demand such as siting buildings to maximize solar access or the use of deciduous and coniferous trees to create shade and windbreak. Buildings should, where appropriate within the context of the neighborhood development pattern, maximize their solar exposure by being oriented to maximize natural light and heat gain during winter months, and to minimize casting shadows into ground floor living space of a building on an adjacent property. The building proposed on the southeastern corner of the property has a façade that is southern facing, however it appears it will be in the shade of large established trees that will likely limit the amount of sunlight that reaches the proposed units. The northeastern building will have a façade with significant southern exposure. The northwestern building while not having a south facing façade will likely receive decent sunlight exposure with the relocation of the northernmost addition to the eastern side of the existing building. (Affirmative finding) (f) Brownfield Sites: Where a proposed development involves a known or suspected brownfield, the site plan shall indicate areas of known or suspected contamination, and the applicant shall identify completed or planned remediation necessary to support the intended use(s). The parcel is not listed on DEC’s Brownfield Sites. Not applicable. (g) Provide for nature's events: Special attention shall be accorded to stormwater runoff so that neighboring properties and/or the public stormwater drainage system are not adversely affected. All development and site disturbance shall follow applicable city and state erosion and stormwater management guidelines in accordance with the requirements of Art 5, Sec 5.5.3. Proposed stormwater infiltration areas are identified on the proposed plan. The previously approved Erosion Prevention and Sediment Control plan will cover this updated scope of work. Design features which address the effects of rain, snow, and ice at building entrances, and to provisions for snow and ice removal or storage from circulation areas shall also be incorporated. Entrances to the new dwellings appear to be enclosed/covered which will offer protection from inclement weather. No changes to the parking area are proposed, it does not appear that there will be any adverse effects on snow storage on the property. (Affirmative finding) (h) Building Location and Orientation: The proposed buildings are slightly offset from the existing buildings, however, they are generally inalignment with the existing buildings.(Affirmative finding) (i) Vehicular Access: ZP-26-167 pg. 7 of 17 Page 8 of 37 Curb cuts shall be arranged and limited in number to reduce congestion and improve traffic safety. A secondary access point from side roads is encouraged where possible to improve traffic flow and safety along major streets. The width and radius of curb cuts should be kept to the minimum width necessary, and sight triangles and sufficient turnarounds for vehicles shall be provided to reduce the potential for accidents at points of egress. There are no proposed changes to the curb cut or parking lot. Not Applicable. (j) Pedestrian Access: Pedestrians shall be provided one or more direct and unobstructed paths between a public sidewalk and the primary building entrance. Well defined pedestrian routes shall be provided through parking areas to primary building access points and be designed to provide a physical separation between vehicles and pedestrians in a manner that minimizes conflicts and improves safety. Where sidewalks and driveways meet, the sidewalk shall be clearly marked by differentiated ground materials and/or pavement markings. The submitted site plan shows the proposed reconfiguration of paved walkways that lead from the parking area to the unit entrances as well as to the proposed shared bicycle storage building. (Affirmative finding) (k) Accessibility for the Handicapped: Special attention shall be given to the location and integration of accessible routes, parking spaces, and ramps for the disabled. Special attention shall also be given to identifying accessible access points between buildings and parking areas, public streets and sidewalks. The federal Americans with Disabilities Act Accessibility Guidelines (ADAAG) shall be used as a guide in determining the adequacy of the proposed development in addressing the needs of the disabled. ADA compliance is under the jurisdiction of the building official. (l) Parking and Circulation: To the extent possible, parking should be placed at the side or rear of the lot and screened from view from surrounding properties and adjacent public rights of ways. Attempts to link adjacent parking lots or provide shared parking areas which can serve neighboring properties simultaneously shall be strongly encouraged. Parking shall be laid out to provide ease in maneuvering of vehicles and so that vehicles do not have to back out onto city streets. Dimensions of spaces shall at a minimum meet the requirements as provided in Article 8. The perimeter of all parking areas shall be designed with anchored curb stops, landscaping, or other such physical barriers to prevent vehicles from encroaching into adjacent green spaces. Surface parking and maneuvering areas should be shaded in an effort to reduce their effect on the local microclimate, air quality, and stormwater runoff with an objective of shading at least 30% of the parking lot. All parking areas shall provide a physical separation between moving and parked vehicles and pedestrians in a manner that minimizes conflicts and gives pedestrians a safe and unobstructed route to building entrance(s) or a public sidewalk. Where bicycle parking is provided, access shall be provided along vehicular driveways or separate paths, with clearly marked signs indicating the location of parking areas. Where ZP-26-167 pg. 8 of 17 Page 9 of 37 bicycle parking is located proximate to a building entrance, all shared walkways shall be of sufficient width to separate bicycles and pedestrians, and be clearly marked to avoid conflicts. All bicycle parking areas shall link directly to a pedestrian route to a building entrance. All bicycle parking shall be in conformance with applicable design & construction details as provided by the dept. of public works. A 20’ x 8’ shared bicycle storage building is proposed. The submitted plans note there will be long term storage for up to 16 bicycles, as well as outdoor temporary bicycle storage for up to 8 bicycles on either side of the storage building. (Affirmative finding) (m) Landscaping, Fences and Retaining Walls: Landscaping shall be used to beautify the development site and to provide specific functions and benefits to the uses and buildings on the site. These include but are not limited to stormwater retention and erosion control, winter windbreaks and summer shade, recreational and habitat corridors, buffers and screening of parking areas, and creating privacy for and from adjacent property. Existing trees shall be retained and incorporated into a landscape plan to the extent possible, and existing trees to be retained shall be protected during construction in accordance with specifications provided by the city arborist. Contiguous green space, both within the site and with adjacent properties, should be provided on a site whenever possible and be designed to provide wildlife travel corridors and habitat preservation, as well as enabling recreational access. If open space is intended to be publicly accessible, it shall be designed to maximize accessibility for all individuals including the disabled, encourage social interaction, and facilitate ease of maintenance. Along the street edge, landscaping shall be used to provide a visual buffer into parking areas from the public street and reinforce the streetscape. The selection of plant materials and planting sites should create a sustainable landscape, and consideration shall be given to factors such as hardiness, salt tolerance, disease resistance, invasiveness, root and canopy spread, underground and overhead utilities, soil conditions, and microclimates. The use of native plant materials is encouraged, and the use of plants considered invasive by VT Agency of Agriculture shall be prohibited. For more information on sustainable landscapes, applicants are encouraged to consult Planting Sustainable Landscapes: A Guide for Plan Reviewers prepared for the Vermont Department of Forests Parks and Recreation by the Vermont Chapter of the American Society of Landscape Architects. New or replacement street trees shall be provided consistent with the city’s Street Tree Master Plan. All proposed street trees shall be selected and planted in accordance with specifications provided by the city arborist. Fences may be placed within the required setback along a property line, but shall be setback sufficiently to provide for the maintenance of both sides of the fence without entering onto the adjacent property and shall present a finished side to the adjoining property and public street. Fences placed within a clear sight triangle shall adhere to the standards of Sec. 5.2.6 (c). Styles, materials, and dimensions of the proposed fence shall be compatible with the context of the neighborhood and the use of the property. Retaining walls greater than 5 feet tall shall incorporate textured surfaces, terracing, and/or vegetation to avoid long monotonous unarticulated expanses and to minimize adverse visual ZP-26-167 pg. 9 of 17 Page 10 of 37 impacts to neighboring properties. As with fences, retaining wall styles, materials, and dimensions shall be compatible with the context of the neighborhood and use of the property Submitted plans identify existing and proposed trees as well as stormwater infiltration areas. (Affirmative finding) (n) Public Plazas and Open Space: Where public open space is provided as an amenity to the site plan, it should be sited on the parcel to maximize solar exposure, with landscaping and hardscape (including fountains, sitting walls, public art, and street furniture) to encourage its use by the public in all seasons. Public plazas should be visually and physically accessible from public rights-of-ways and building entrances where appropriate and shall be designed to maximize accessibility for all individuals, including the disabled and encourage social interaction. Public space should be coordinated with the surrounding buildings without compromising safety and visibility. Public spaces should be surrounded by active uses that generate pedestrian traffic, and connect the space to major activity centers, streets, or corridors. New structures and additions to existing structures shall be shaped to reduce shadows on public plazas and other publicly accessible spaces. In determining the impact of shadows, the following factors shall be taken into account: the mass of area shaded, the duration of shading, and the importance of sunlight to the utility of the type of open space being shadowed. Proposed development shall be considered for solar impact based the sun angle during the Vernal and Autumnal Equinox. Not applicable. (o) Outdoor Lighting: Where exterior lighting is proposed the applicant shall meet the lighting performance standards as per Sec 5.5.2. The application materials include a basic lighting plan showing the model and location of proposed lighting. The only outdoor lighting proposed is a wall sconce to be placed next to the shared bicycle storage entrance. Based on the model number provided by the applicant, the proposed outdoor fixture has an output of 1,105 lumens which qualifies as low output. (Affirmative finding) (p) Integrate infrastructure into the design: Exterior storage areas, machinery and equipment installations, service and loading areas, utility meters and structures, mailboxes, and similar accessory structures shall utilize setbacks, plantings, enclosures and other mitigation or screening methods to minimize their auditory and visual impact on the public street and neighboring properties to the extent practicable. Utility and service enclosures and screening shall be coordinated with the design of the principal building, and should be grouped in a service court away from public view. On-site utilities shall be place underground whenever practicable. Trash and recycling bins and ZP-26-167 pg. 10 of 17 Page 11 of 37 dumpsters shall be located, within preferably, or behind buildings, enclosed on all four (4) sides to prevent blowing trash, and screened from public view. Any development involving the installation of machinery or equipment which emits heat, vapor, fumes, vibration, or noise shall minimize, insofar as practicable, any adverse impact on neighboring properties and the environment pursuant to the requirements of Article 5, Part 5 Performance Standards. The proposed site plan includes a combination shared bicycle storage/dumpster enclosure. (Affirmative finding) PART 3: Architectural Design Standards Sec. 6.3.1 Applicability. These standards are enacted and shall be satisfied for the approval of all development subject to the provisions of this ordinance found in Article 3, Section 3.4.2(b) – Design Review. Sec. 6.3.2 Review Standards (a) Relate development to its environment: Proposed buildings and additions shall be appropriately scaled and proportioned for their function and with respect to the purpose of the zoning district. They should integrate harmoniously into the topography, and to the use, scale, and architectural details of existing buildings in the vicinity; however, such consideration shall not require building height to be more limited than otherwise allowed within an applicable zoning district or overlay zone per Article 4. The following shall be considered: 1. Massing, Height and Scale: While architectural styles or materials may vary within a streetscape, proposed development should maintain an overall scale similar to that of surrounding buildings, or provide a sensitive transition, where appropriate, to development of a dissimilar scale. In low and medium residential districts, the height and massing of existing residential buildings should be carefully considered when evaluating the compatibility of additions and infill development; however, no modifications by the DRB shall be made to projects which otherwise limit the allowable Principal Structure footprint, height, and number of units per building otherwise permitted by Tables 4.4.5-1 and 4.4.5-2. Buildings should maintain consistent massing and perceived building height at the street level, regardless of the overall bulk or height of the building. Buildings should maintain a relationship to the human scale through the use of architectural elements, variations of proportions and materials, and surface articulations. Large expanses of undifferentiated building wall along the public street or sidewalk shall be avoided. The apparent mass and scale of buildings shall be broken into smaller parts by articulating separate volumes reflecting existing patterns in the streetscape, and should be proportioned to appear more vertical than horizontal in order to avoid monotonous repetition. (See also (d) Provide an active and inviting street edge below.) ZP-26-167 pg. 11 of 17 Page 12 of 37 The proposed buildings appear to have a maximum height ±4’2” less than the existing buildings. The design and scale of the proposed buildings matches the existing buildings, and the slight difference in height offers visual appeal. The buildings are proposed to be slightly offset from the existing buildings and are proportionally narrower with rotated gable ends. As proposed, the buildings avoid simply being identical to what is currently in place. (Affirmative finding) 2. Roofs and Rooflines. New buildings should incorporate predominant roof forms and pitches within the existing neighborhood and appropriate to the context. Large expanses of undifferentiated roof forms shall be avoided. This can be achieved by incorporating dormers or some variation in the roof form to lessen the impact of the massing against the sky. While flat roofs can be a reasonable architectural solution, pitched roof forms and architectural elements that enhance the city’s skyline are strongly encouraged. Roof eaves, parapets, and cornices should be articulated as an architectural detail. Roof-top mechanicals shall be screened from view from the public street, and should be incorporated into and hidden within the roof structure whenever possible. Solar panels, light colored ballast or roof membranes, split roof clerestories, planted or “green” roof technologies (with a clearly articulated maintenance plan) and “gray water” collection are encouraged. Active rooftop uses are also encouraged to add to the visual complexity and activity of the city’s skyline, and afford public access to otherwise unseen views of the city and surrounding landscape. The proposed additions feature the same style pitched roof as the existing building, however, the gable ends are rotated which lessens the impact of massing against the sky. (Affirmative finding) 3. Building Openings Principal entrances shall be clearly defined and readily identifiable from a public street whether by a door, a canopy, porch, or other prominent architectural or landscape features. People with physical challenges should be able to use the same entrance as everyone-else and shall be provided an “accessible route” to the building. Attention shall also be accorded to design features which provide protection from the affects of rain, snow, and ice at building entrances, and to provisions for snow and ice removal or storage. Window openings shall maintain consistent patterns and proportions appropriate to the use. The window pattern should add variety and interest to the architecture, and be proportioned to appear more vertical than horizontal. Buildings placed on a side or rear property line where no setback is required shall contain neither doors nor windows along such façade so as not to restrict future development or re-development options of the adjacent property due to fire safety code restrictions. Otherwise they should be setback a minimum of 5-feet. Entrances to the new dwellings appear to be enclosed/covered which will offer protection from inclement weather. Proposed windows are similar to what exists, except the proposed second floor windows are singles as opposed to the mulled windows on the existing buildings ZP-26-167 pg. 12 of 17 Page 13 of 37 which makes the windows appear less horizontal and adds variety and interest. (Affirmative finding) (b) Protection of Important Architectural Resources: Burlington’s architectural and cultural heritage shall be protected through sensitive and respectful redevelopment, rehabilitation, and infill. Where the proposed development involves buildings listed or eligible for listing on a state or national register of historic places, the applicant shall meet the applicable development and design standards pursuant to Sec. 5.4.8. The introduction of new buildings to a historic district listed on a state or national register of historic places shall make every effort to be compatible with nearby historic buildings. Not applicable. (c) Protection of Important Public Views: Development shall preserve distant terminal views of Lake Champlain and the Adirondack Mountains and important public and cultural landmarks from public places and along east-west public rights-of-way to the extent practicable. This shall not be construed to include similar views from exclusively private property. Sensitivity shall be used in the massing of proposed development such that light and air is allowed to penetrate and some views may be preserved. Alternatives that extend access to such views by allowing public access into and through the proposed development are encouraged. In no case shall development be permitted to span across the public rights-of-way in such corridors. There are no protected public views here. Not applicable. (d) Provide an active and inviting street edge: Building facades shall be varied along the street edge by the integration of architectural features, building materials, or physical step-backs of the façade along its length. Large expanses of undifferentiated building wall shall be avoided. This may be accomplished by incorporating fenestration patterns, bays, horizontal and vertical façade articulations, the rhythm of openings and prominent architectural features such as porches, patios, bays, articulated bases, stepping back an elevation relative to surrounding structures, and other street level details. The use of traditional facade components such as parapet caps, cornices, storefronts, awnings, canopies, transoms, kick plates, and recessed entries are highly encouraged. In areas where high volumes of pedestrian traffic are desired, the use of architectural recesses and articulations at the street-level are particularly important in order to facilitate the flow of pedestrian traffic There is no street-edge to the development. Within the property, entries to the additions are well defined and accessible via interior walkways. Inventory of materials has been provided. Color rendered elevations of the proposed additions indicate they will remain visually similar to what exists with the noticeable difference being the proposed additions have vertical wood siding on the first level compared to the brick of the existing building. (Affirmative finding) (e) Quality of materials: ZP-26-167 pg. 13 of 17 Page 14 of 37 All development shall maximize the use of highly durable building materials that extend the life cycle of the building, and reduce maintenance, waste, and environmental impacts. Such materials are particularly important in certain highly trafficked locations such as along major streets, sidewalks, loading areas, and driveways. Efforts to incorporate the use of recycled content materials and building materials and products that are extracted and/or manufactured within the region are highly encouraged. Owners of historic structures are encouraged to consult with an architectural historian in order to determine the most appropriate repair, restoration or replacement of historic building materials as outlined by the requirements of Art 5, Sec. 5.4.8 Exterior finish material information has been provided. The materials such as vinyl and engineered treated wood siding, and composite deck boards appear to be acceptably durable. (Affirmative finding) (f) Reduce energy utilization: All new construction shall meet the Guidelines for Energy Efficient Construction pursuant to the requirements of Article VI. Energy Conservation, Section 8 of the City of Burlington Code of Ordinances. Windows and doors will be required to meet Residential Building Energy Standards (RBES). (Affirmative finding as conditioned) (g) Make advertising features complementary to the site: Where signs and other advertising features are proposed, the applicant shall meet the requirements as per Article 7 – Signs. The size, location. Design. Texture, lighting, and materials of all exterior signs and advertising features shall not detract from the use and enjoyment of proposed buildings or surrounding properties. National branding through signage and architecture shall be discouraged. Not applicable. (h) Integrate infrastructure into the building design: Exterior machinery and equipment installations, service and loading areas, utility meters and structures, mailboxes, and similar accessory features shall utilize setbacks, plantings, enclosures and other mitigation or screening methods to minimize their auditory and visual impact on the public street and neighboring properties. Rooftop mechanicals, including heating and cooling devices and elevator equipment, should be incorporated into the structure’s design, and shall be arranged to minimize their visibility from the street level. Such features, in excess of one foot in height, shall be either enclosed within the roof structure, outer building walls, or parapets, or designed so that they are integrated into the overall design and materials of the building. Where such rooftop features do not exceed ten percent (10%) of the total roof area, they may be considered ZP-26-167 pg. 14 of 17 Page 15 of 37 “ornamental and symbolic features” pursuant to Sec. 5.2.7 for the purposes of measuring building height. Any development involving the installation of machinery or equipment which emits heat, vapor, fumes, vibration, or noise shall minimize any adverse impact on neighboring properties and the environment pursuant to the requirements of Article 5, Part 5 Performance Standards. No building infrastructure has been identified on the submitted plans. If any is proposed they will need to be depicted on elevations and site plans, as applicable (Affirmative finding as conditioned) (i) Make spaces secure and safe: Spaces shall be designed to facilitate building evacuation, accessibility by fire, police or other emergency personnel and equipment, and, to the extent feasible, provide for adequate and secure visibility for persons using and observing such spaces. Building entrances/entry points shall be visible and adequately lit, and intercom systems for multi-family housing should be incorporated where possible, to maximize personal safety. The application materials include a specific model of outdoor wall light as well as proposed locations outside of the unit entryways as well as the entrance to the shared bicycle storage building. (Affirmative finding) Article 8: Parking Sec. 8.1.9, Maximum On-Site Parking Spaces The property is located within the Neighborhood Parking District. Within that district, up to 3 parking spaces per dwelling unit are allowed. The existing parking lot has 27 striped parking spaces. No changes to the parking lot are proposed (Affirmative finding) Article 11: Planned Development Sec. 11.1.5 Residential District Planned Unit Developments (a) Dimensional Standards The proposed building footprints and dwellings per units is acceptable per table 11.1.5-1. (Affirmative finding) Sec. 11.1.6 Approval Requirements The following requirements shall be met for the DRB to approve a planned unit development: (a) The minimum project size requirements of Sec. 11.1.3 shall be met; The property is ±1.55 acres, in excess of the minimum 0.5. (Affirmative finding) (b) The minimum setbacks required for the district have been met at the periphery of the project; See Sec. 5.2.5 (Affirmative finding) (c) The project shall be subject to design review and site plan review of Article 3, Part 4; See Sec. 6 (Affirmative finding) ZP-26-167 pg. 15 of 17 Page 16 of 37 (d) The project shall meet the requirements of Article 10 for subdivision review where applicable; (Not applicable) (e) Density, frontage, and lot coverage requirements of the underlying zoning district have See Sec. 5 (Affirmative finding) (f) All other requirements of the underlying zoning district have been met as calculated across the entire project; See Sec. 4 (Affirmative finding) (g) Open space or common land shall be assured and maintained in accordance with the conditions as prescribed by the DRB; There is existing open/common space on the property and it is not proposed to be changed (Affirmative finding) (h) The development plan shall specify reasonable periods within which development of each phase of the planned unit development may be started and shall be completed. Deviation from the required amount of usable open space per dwelling unit may be allowed provided such deviation shall be provided for in other sections of the planned unit development; No phasing is proposed (Affirmative finding) (i) The intent as defined in Sec. 11.1.1 is met in a way not detrimental to the city’s interests; and, The PUD is existing. (Not applicable) (j) The proposed development shall be consistent with the municipal development plan. See Sec. 3.5.6b(10) above. (k) Any proposed accessory uses and facilities shall meet the requirements of Sec. 11.1.6 below. No accessory uses or facilities are proposed (Not applicable) II. Conditions of Approval 1. Prior to release of the zoning permit: a. Any proposed building or utility infrastructure and screening shall be added to the site plan and/or elevation drawings, subject to staff review and approval b. Proposed lot coverage calculations shall be provided. 2. Impact fees may be due at least 7 days prior to issuance of a certificate of occupancy, as determined by the Water Resources Division and the Technical Services Division of the Department of Public Works based on water and wastewater flows and peak hour vehicle trip ends, respectively. 3. Wastewater permit approval shall be obtained from Vermont Department of Environmental Conservation. ZP-26-167 pg. 16 of 17 Page 17 of 37 4. All new construction is required to meet the Guidelines for Energy Efficient Construction pursuant to the requirements of Article VI. Energy Conservation, Section 8 of the City of Burlington Code of Ordinances. 5. Vermont Residential Building Energy Standards apply to this project. Compliance with the standards is the Owner’s responsibility. Prior to requesting a Certificate of Occupancy, a copy of a completed Vermont Residential Building Energy Standards Certificate shall be submitted with a Certificate of Occupancy (final or temporary) request, and filed in the Land Records located at the Clerk/Treasurers office in City Hall (149 Church Street). For more information, see http://publicservice.vermont.gov/energy_efficiency 6. Standard Conditions 1-15. ZP-26-167 pg. 17 of 17 Page 18 of 37 355 ETHAN ALLEN PARKWAY-BURLINGTON, VT 3 NEW BUILDINGS ADDING 6 -2 BEDROOM UNITS TOTALING 18 UNITS DESCRIPTI OWNER: ______________________________________________________________________ DESIGNER: CIVIL ENGINEER: MAIN CONSULTANT ON SANDRA VITZTHUM ARCHITECT,LLC REVISED BY NLB CONSTRUCTION CONSULTING LLC KREBS & LANSING CONSULTING ENGINEERS, INC REVISION TABLE 355 ETHAN ALLEN PARKWAY, LLC 111 EAST SHORE ROAD SOUTH 164 MAIN STREET, SUITE 201 14 LOOMIS STREET 177 OVERLAKE VIEW GRAND ISLE, VT 05458 COLCHESTER, VT 05446 MONTPELIER, VT 05602 WILLISTON, VT 05495 NUMBER DATE 802-355-4130 (802) 223-1806 802-922-1403 ARCHITECTURAL SHINGLES (TYP) 12 5 1' TYP VINYL SIDING W03 W14 W13 PAGE TITLE 24'-8" VERTICAL SIDING 355 ETHAN ALLEN PKWY LLC W02 W11 CONSTRUCTION DOCUMENTS 4/16/26 PROJECT TITLE CIVIL DRAWINGS A3.1 BUILDING & WALL SECTIONS ELECTRICAL DRAWINGS C-1.0 SITE PLAN A4.1 DUMPSTER & BIKE STORAGE PLAN E1 FLOOR PLANS NLB CONSTRUCTION CONSULTING,LLC C-1.1 STORMWATER & EPSC PLAN A5.1 KITCHEN ELEVATIONS & DETAILS E2 LIGHTING PLAN C-2.0 EXISTING CONDITIONS PLAN A6.1 WINDOW & DOOR SCHEDULES 111 East Shore Road South DRAWINGS PROVIDED BY: Grand Isle, VT 05458 C-3 CIVIL DETAILS LANDSCAPING 802-355-4130 C-4 WATER/SEWER DETAILS L2 LANDSCAPING PLAN STRUCTURAL DRAWINGS ARCHITECTURAL DRAWINGS S1.0 FOUNDATION PLAN SK50 PERSPECTIVE VIEW DATE: A.0 COVER SHEET S1.2 ROOF & FLOOR FRAMING PLAN 4/16/2026 A0.1 EGRESS / CODE REVIEW SCALE @24 x 36 A1.1 FIRST & SECOND FLOOR PLANS PROJECT # 2025-18 A2.1 EXTERIOR ELEVATIONS SHEET NUMBER PERMIT REVIEW ONLY A0 Page 19 of 37 e Moore Driv x16 9.0 New Stormwater Infiltration Area#1 Bottom elev. 168.5 Top 169.25. SITE Overflow at 169.0 LAT: N44° 30' 48" LONG: W73° 14' 30" .5 169 168 New SMh .75 Rim 171.6 69 x1 Inv. in 165.95 Inv. out 165.85 R 35 New 4" PVC SD s=14"/ft. min 164 Main Street, Suite 201 P: (802) 878-0375 New 1" CTS polyethylene Colchester, Vermont 05446 www.krebsandlansing.com 169 170 water service with tracer Inv. 167.5± wire and curb stop to each unit. Sawcut pavement and restore pavement, gravel STAMP: subbase and curb. 35 363 Ethan Allen Parkway New 2-unit P R 4 UNITS Building s= VC FF 172.8± 0.0 S 170 6" 1 D 170 Ne w LOCATION MAP New Stormwater SCALE: 1" = 2,000 FT Infiltration Area#3 New walk Bottom elev. 168.75 New 2-unit Top 170.0 Building and stairs Overflow at 169.75 FF 174.1± Inv. New walk 169 171 VC 168.5± and stairs 4" P New DR 35 S 1 /ft. min s= 4" New SMh Rim 171.5 Inv. in 164.97 1, van Inv. out 164.87 accessible HC space 8 spaces 7 spaces 355 Ethan New Allen Parkway bike SDR 35 rack 4 Units New 6" PVC s=0.01 New dumpster 171 pad and enclosure 170 Ethan Alle x170.75 New FF 172.0± New Stormwater Sawcut and restore bike Project: storage Infiltration Area#2 pavement for sewer n Parkway Bottom elev. 170.0 x171.95 building Top 171.0 installation. Overflow at 170.75 x171.8 353-365 ETHAN x170.75 1, HC New walk New ALLEN PARKWAY space paved and stairs 8 spaces New access to bike bike rack storage 170 314.7 x Project No. 25301 171 Scale 1" = 20' Drawn by TJB 335 Ethan Allen Parkway New 2-unit 173 4 Units Building SWH FF 174.65± Checked by Date 01/22/2026 Inv. 169.0± Revisions 173 No. Date Description s=14"/ft. min New 4" PVC SDR 35 04/16/2026 building layout New SMh Rim 171.5 Inv. in 163.1± Inv. out 163.0± New 1" CTS polyethylene water service with tracer Drawing Title wire and curb stop to each unit. Sawcut pavement and restore pavement, gravel subbase and curb. Site Plan Drawing No. C-1.0 Page 20 of 37 TRAVEL DISTANCE FROM REMOTE POINT TO EXIT 41' TRAVEL DISTANCE FROM 1' REMOTE POINT TO EXIT 33' 5'-8 1/16" 6'-11" 5'-7 7/8" DESCRIPTI 7'-7 5/16" 5' ON 5'-6 3/8" W13 W14 W03 CL 4'-11 3/8" W11 D13 W02 1 1 10'-4 3/16" SB36 BCB9R DCW2436R B24R 1 REVISED BY 4'-11 3/8" BCB9R W936R REVISION TABLE 1 A3.1 A3.1 1 B12 SB33 B12R DCW2436R B24R 1 W1236R EGRESS B12R 18' A3.1 A3.1 10'-2 11/16" W3036 11'-4 1/2" W10 2 BEDROOM 201 EGRESS W3018 EXISTING CONSTRUCTION KITCHEN 200 W936R A5.1 11'-3 7/8" 1'-5 5/16"B9R W08 ELEVATION 5 UP BEDROOM 101 W1236R 11'-8" ELEVATION 6 B12 1 W3820 NUMBER DATE A5.1 EXISTING LIVING/DINING W3220 2'-8 13/16" HELP D10 D10 1'-8 9/16" 11'-3 9/16" 5'-5 1/8" 2' KITCHEN 100 D06 D02 D01 C W/D L 3'-3 5/8" EXISTING STRUCTURE D08 W/D 2' CROSS SECTION 1 UTILITY B40 3'-4" 4' 4' D10 4'-0 1/2" S1 1'-10 5/16" SHOWER UTILITY 10' CROSS SECTION 1 1DB3620 18 8'-3 3/8" GRAB BARS CL D05 D11 S1 CLOSET 4'-4 1/4" 2' W04 18 3068 HANDICAP G 4 G 3 D09 CLOSET DN BATH 204 DN W01 A5.1 A5.1 ACCESSIBLE UNIT 10'-4 3/16" 5'-7 3/16" EGRESS PLANS ELEVATION 8 35' E8 PORCH 2'-6 9/16" D10 BATH 104 GRAB BARS ADA TOILET 4' 15 D02 3068 D14 12'-9 7/16" 2' 5'-5 1/8" D11 2'-3 1/4" CLOSET D10 1 5'-2 11/16" D03 D07 A3.1 10'-4 5/16" PAGE TITLE 11'-11 3/8" 14'-3 1/8" LIVING 203 14'-1 5/8" BEDROOM 102 13'-10 1/8" EGRESS EGRESS W09 LIVING 103 BEDROOM 202 W07 11'-5 7/16" 6'-2 5/8" 6'-1 3/8" 355 ETHAN ALLEN PKWY LLC W15 W17 W12 W16 6'-5 1/2" 10'-10 11/16" 6'-5" 5'-7 9/16" 23' 2 SECOND FLOOR EGRESS PLAN A0.1 1/4"=1' G PROJECT TITLE 1 FIRST FLOOR EGRESS PLAN A0.1 1/4"=1' NLB CONSTRUCTION CONSULTING,LLC S E W A I E 111 East Shore Road South E DRAWINGS PROVIDED BY: L E V Grand Isle, VT 05458 P R D Y E 802-355-4130 N I D A S RO V DATE: P 4/15/2026 SCALE @24 x 36 CODE REVIEW /EGRESS PROJECT # 2025-18 1/4"=1' SHEET NUMBER A0.1 Page 21 of 37 TRAVEL DISTANCE FROM REMOTE POINT TO EXIT 31' DESCRIPTI UP ON REVISED BY TRAVEL DISTANCE FROM REVISION TABLE REMOTE POINT NUMBER DATE TO EXIT 41' TRAVEL DISTANCE FROM 1' REMOTE POINT TO EXIT 33' 5'-6 3/8" 7'-7 5/16" 5' W11 D13 W02 5'-8 1/16" 6'-11" 5'-7 7/8" W13 W14 W03 4'-11 3/8" 4'-11 3/8" 1 1 B12 SB33 B12R DCW2436R B24R 1 10'-4 3/16" 1 1 SB36 BCB9R DCW2436R B24R 1 W1236R B12R 18' A3.1 A3.1 10'-2 11/16" A3.1 BCB9R W936R A3.1 2 FLOOR PLANS EGRESS EGRESS A5.1 W3018 W3036 11'-3 7/8" W08 ELEVATION 5 11'-4 1/2" W10 BEDROOM 101 UP BEDROOM 201 KITCHEN 200 W1236R ELEVATION 6 W936R B12 1 1'-5 5/16"B9R A5.1 11'-8" W3220 2'-8 13/16" HELP W3820 11'-3 9/16" KITCHEN 100 D06 D02 D10 D10 3'-3 5/8" 1'-8 9/16" 5'-5 1/8" PAGE TITLE 2' D08 W/D D01 C W/D L 3'-4" 2' 4'-0 1/2" SHOWER UTILITY 10' CROSS SECTION 1 1DB3620 CROSS SECTION 1 GRAB BARS D05 UTILITY B40 S1 4' D10 S1 4'-4 1/4" EXTERIOR ELEVATION LEFT 2 1'-10 5/16" 2' HANDICAP 18 EXTERIOR ELEVATION LEFT 2 G 4 G 3 CLOSET DN 18 8'-3 3/8" A5.1 ACCESSIBLE UNIT D09 D11 CLOSET CL W01 A5.1 5'-7 3/16" E4 W04 15 35' E4 BATH 204 DN E8 BATH 104 ADA TOILET 15 10'-4 3/16" 355 ETHAN ALLEN PKWY LLC 4' D02 15 2'-6 9/16" D10 GRAB BARS D14 2'-3 1/4" CLOSET 12'-9 7/16" 1 5'-5 1/8" 2' 5'-2 11/16" D03 D11 D07 A3.1 D10 BEDROOM 102 10'-4 5/16" 13'-10 1/8" 11'-11 3/8" 14'-3 1/8" LIVING 203 14'-1 5/8" EGRESS LIVING 103 EGRESS W07 PROJECT TITLE W09 BEDROOM 202 11'-5 7/16" 6'-1 3/8" 6'-2 5/8" W12 W16 W15 W17 NLB CONSTRUCTION CONSULTING,LLC 6'-5 11/16" 5'-7 9/16" 6'-5 1/2" 10'-10 11/16" 111 East Shore Road South DRAWINGS PROVIDED BY: Grand Isle, VT 05458 802-355-4130 1 SECOND FLOOR PLAN A1.1 1 FIRST FLOOR PLAN 1/4"= 1'-0" A1.1 1/4"= 1'-0" DATE: 4/15/2026 SCALE @24 x 36 PROJECT # 2025-18 SHEET NUMBER A1.1 Page 22 of 37 ARCHITECTURAL SHINGLES (TYP) DESCRIPTI ON REVISED BY 12 REVISION TABLE 5 1' TYP NUMBER DATE VINYL SIDING W03 W14 W13 24'-8" 42" 12 8 W02 VERTICAL SIDING W11 RAMP PAGE TITLE FRONT ELEVATION LEFT ELEVATION 1/4"=1' 1/4"=1' 355 ETHAN ALLEN PKWY LLC PROJECT TITLE W04 W15 W10 W09 W17 NLB CONSTRUCTION CONSULTING,LLC EGRESS EGRESS 111 East Shore Road South DRAWINGS PROVIDED BY: Grand Isle, VT 05458 W01 W12 W16 W08 W07 802-355-4130 EGRESS EGRESS REAR ELEVATION RIGHT ELEVATION DATE: 1/4"=1' 1/4"=1' 4/15/2026 SCALE @24 x 36 EXTERIOR ELEVATIONS PROJECT # 2025-18 1/4"= 1' A2.1 SHEET NUMBER Page 23 of 37 3'-6" 6'-8" 6'-8" 2'-4" DESCRIPTI ON REVISED BY REVISION TABLE 1 /4" ID STEEL PIPE HAND-RAIL GALV. & PTD. TYP THROUGH BOLT CONN. TYP 3'-6" NUMBER DATE 2'-10" TYP. CELLLULOSE 2X6 PT DECK INSULATION 2 X 12 TREAD TYP RETURN HANDRAILS ENDS TO SIDING 11" FIBERGLASS BUILDING & INSULATION 2 STAIR SECTION WALL SECTIONS A3.1 PAGE TITLE 1/4"=1'-0" VINYL SIDING TJI FLOOR TO MATCH EXISTING 355 ETHAN ALLEN PKWY LLC JOIST 1/2" 2 x 6 Walls DRYWALL SEAL ALL PENETRATIONS IN ATTIC, VAPOR RETARDER/AIR VERTICAL SIDING BARRIER WITH FOAM INSULATION OR SEALANT TRUSS PROJECT TITLE CELLULOSE INSULATION TO R-63 HARDY BOARD CEMENT VERTICAL 12 5 SIDING NLB CONSTRUCTION CONSULTING,LLC 4" CONCRETE SLAB W17 4' CONCRETE STEM WALL 1 1 111 East Shore Road South S1 DRAWINGS PROVIDED BY: A3.1 Grand Isle, VT 05458 NOTE: FLOOR ASSEMBLY UNIT D CEILING TO BE 802-355-4130 5/8" TYPE X DRYWALL CONTINUOUS OVER 1/2" RESILIENT CHANNEL W16 TYPICAL WALL SECTION DATE: 1/4"=1' 4' CONCRETE FROST WALL AND SLAB 4/15/2026 -----------ENVELOPE AIR BARRIER CONTINUUMS AROUND BUILDING ENVELOPE SCALE @24 x 36 SEAMS AND PENETRATIONS SEALED SECTION PROJECT # 1 2025-18 A3.1 1 1/4"=1'-0" 6 A3.1 A3.1 SHEET NUMBER Page 24 of 37 DUMPSTER ENCLOSURE/SHORT TERM/LONG TERM BICYCLE STORAGE 1/2"=1' E2 CORRUGATED METAL ROOFING ELEVATION 2 10 20' DESCRIPTI 9 9/16" 16'-2 7/16" 3' ON EXTERIOR LIGHT FIXTURE REVISED BY REVISION TABLE With 6 new dwelling units, 2 short term spaces will be needed (i.e. a bike rack), and 6 long term spaces will be needed (i.e. covered within a garage, shed, or within the dwelling units). 3068 Scott Gustin 10/21/25 SHORT TERM BICYCLE STORAGE (4) NUMBER DATE LONG TERM BICYCLE STORAGE SHORT TERM BICYCLE STORAGE (4) CEILING MOUNTED CODE COMPLIANT FIXTURE R6 8' 2 X 4 WALLS Single-Sided Grid Bike Rack - 4 Bike Capacity (TYP) TOTAL 16 BIKE SPACES. CONCRETE SLAB REAR ELEVATION 36" CONCRETE BOLLARD 1/2"=1' 8' 18' 12 PAGE TITLE 2.5 6'-5" 7'-2" 7'-2" 3 FT ENTRY DOOR DUMPSTER 3' DUMPSTER 6" OH 10' 355 ETHAN ALLEN PKWY LLC VERTICAL SIDING (TYP) R " D O O 6 " CONCRETE SLABW/ 6 " X 6" W4XW4 - '0 3 6' vinly fence 10' 10'-2" PROJECT TITLE PLAN 1/2"=1' Linden 6 NLB CONSTRUCTION CONSULTING,LLC SIDE VIEW 4 BIKE CAPACITY (TYP) HIGHEST POINT ft. H x 8 ft. W White Privacy 111 East Shore Road South DRAWINGS PROVIDED BY: Vinyl Grand Isle, VT 05458 VERTICAL SIDING Fence Panel 802-355-4130 10'-11 5/8" BIKE RACK BASE DETAIL RACK ANCHORED TO DATE: 4 " CONCRETE BASE 4' x 32" 4/16/2026 SCALE @24 x 36 PROJECT # 2025-18 SHEET NUMBER T 111 VERTICAL SIDING PAINTED WHITE FRONT ELEVATION 1/2"=1' REVISED FOR DRV 2/25/26 SIDE VIEW PERMIT REVIEW ONLY A4.1 Page 25 of 37 96 1/2" 96 1/2" 1/8" 1/8" 17 11/16"3/16"16 1/16"1 1/4" 11 5/16" 6 11/16" 3/16" 1/2" 6 1/2" 35 7/8" 13 7/8" 36" 46 5/8" 13/16" 24" 24" 12" 12" 55" 59 1/2" 9/16" 88" 30" 29 11/16" 110 3/8" 110 3/8" 12" 12 7/8" 12" 12" 140 1/2" 140 1/2" 1/16" Elevation 2 CL 33" 37 1/4" 32 11/16" 31 3/4" 12" 1/16"4 7/16" 10 9/16" 52 1/2" 12" Elevation 1 24" 37 1/8" 12" 3 7/8" 14 1/8" 10 7/16" 7 9/16" 11/16" 6 1/2" 36" 17 5/16" 13 1/8" 96 1/2" 103 3/8" 103 3/8" 103 3/8" 37" 11 5/8" 3/4" 5' 26 3/8" 26 3/8" 25 5/8" 26 3/8" D13 W04 KITCHEN DETAILS 13 7/8" 82 5/8" 96 1/2" 2 A5.1 11'-3 3/8" 1 A5.1 FLOOR PLANS KITCHEN 100 3/4"=1' D08 W/D 3'-3 5/8" PERSPECTIVE 4'-0 1/2" HANDICAP CLOSET D08 ACCESSIBLE UNIT 4'-4 1/4" HANDICAP 4' ACCESSIBLE UNIT Floor Plan View Dimensioned PERMIT REVIEW ONLY DRAWINGS PROVIDED BY: PROJECT TITLE PAGE TITLE REVISION TABLE DESCRIPTI NLB CONSTRUCTION CONSULTING,LLC NUMBER DATE REVISED BY ON DATE: 355 ETHAN ALLEN PKWY LLC 2025-18 111 East Shore Road South KITCHEN DETAILS Grand Isle, VT 05458 PROJECT # 4/16/2026 SHEET NUMBER SCALE @24 x 36 802-355-4130 A5.1 Page 26 of 37 WINDOW & DOOR SCHEDULES WINDOW SCHEDULE DESCRIPTI FLOOR TO ON SQ. FT. NET NUMBER LABEL QTY FLOOR SIZE R/O EGRESS MANUFACTURER SILL CLEAR OPENING REVISED BY HEIGHT REVISION TABLE ANDERSON E -SERIES W01 2830SH 1 1 2830SH 33"X37" W02 2830SH 1 1 2830SH 33"X37" W03 2830SH 1 2 2830SH 33"X37" NUMBER DATE W04 2830SH 1 2 2830SH 33"X37" W07 3046SC 1 1 3046SC 37"X55" YES 7.81 32" W08 3046SC 1 1 3046SC 37"X55" YES 7.81 32" W09 3046SC 1 2 3046SC 37"X55" YES 10.04 26" W10 3046SC 1 2 3046SC 37"X55" YES 10.04 26" WINDOW & DOOR W11 3046SH 1 1 3046SH 37"X55" W12 3046SH 1 1 3046SH 37"X55" W13 3046SH 1 2 3046SH 37"X55" W14 3046SH 1 2 3046SH 37"X55" SCHEDULES W15 3046SH 1 2 3046SH 37"X55" W16 W16-6046MU 1 1 6046 73"X55" PAGE TITLE W17 6054MU 1 2 6054 73"X65" 355 ETHAN ALLEN PKWY LLC DOOR SCHEDULE PROJECT TITLE NUMBER LABEL QTY FLOOR SIZE R/O DESCRIPTION HEADER CODE MANUFACTURER COMMENTS D01 2068 1 2 2068 R IN 25 1/2"X82 1/2" HINGED-DOOR P04 2"X6"X28 1/2" (2) D02 21068 2 1 21068 L IN 36"X82 1/2" HINGED-DOOR P04 2"X6"X39" (2) D03 21068 1 1 21068 R IN 36"X82 1/2" HINGED-DOOR P04 2"X6"X39" (2) D05 2668 1 1 2668 L 32"X82 1/2" 2 DR. BIFOLD-LOUVERED 2"X6"X35" (2) NLB CONSTRUCTION CONSULTING,LLC D06 2668 1 1 2668 L IN 32"X82 1/2" HINGED-DOOR P04 2"X6"X35" (2) D07 2668 1 1 2668 R 32"X82 1/2" 2 DR. BIFOLD-LOUVERED 2"X6"X35" (2) D08 2668 1 1 2668 R IN 32 1/8"X82 1/2" HINGED-DOOR P04 2"X6"X35 1/8" (2) 111 East Shore Road South DRAWINGS PROVIDED BY: D09 2668 1 1 2668 R IN 32"X82 1/2" HINGED-DOOR P04 2"X6"X35" (2) Grand Isle, VT 05458 D10 2668 5 2 2668 L IN 32"X82 1/2" HINGED-DOOR P04 2"X6"X35" (2) 802-355-4130 D11 2668 2 2 2668 R IN 32"X82 1/2" HINGED-DOOR P04 2"X6"X35" (2) D13 3068 1 1 3068 R EX 38"X83" EXT. HINGED-SLAB 2"X6"X41" (2) D14 3068 1 2 3068 R EX 38"X83" EXT. HINGED-PANEL 2"X6"X41" (2) DATE: 4/15/2026 SCALE @24 x 36 PROJECT # 2025-18 A6.1 SHEET NUMBER Page 27 of 37 All concrete to be 3,000 PSI at 28 days DESCRIPTI Footings to be 1’-0”x2’-0” reinforced with 2 runs of ON #4 rebar and continuous REVISED BY REVISION TABLE key way. Frost walls to be 8”x3’-10” with 2 runs of #4 rebar NUMBER DATE top and bottom tie ½”x8” anchor bolts 12” from the corners and 6’ OC 23' Breaking of ties FOUNDATION PLAN 1' 1 1 1 5' A3.1 A3.1 CL SLAB-ON-GRADE WITH CONCRETE STEM WALL 3'-4" 6'-8" PAGE TITLE 1 S1 CROSS SECTION 1 S1 FFE.100.00 6'-8" 18 355 ETHAN ALLEN PKWY LLC 35' E8 15 CL 3'-6" PROJECT TITLE 2 X 6 EXTERIOR WALL 4" CONCRETE SLAB NLB CONSTRUCTION CONSULTING,LLC 2x6 TREATED PLATE CAST-IN-PLACE 1/2" x 12 ANCHOR BOLT UNDERSLAB 15 MIL VAPOR RETARDER 23' 111 East Shore Road South DRAWINGS PROVIDED BY: Grand Isle, VT 05458 4" GRAVEL BASE BACKFILL WITH COMPACTED GRANULAR FILL 802-355-4130 8" x 48" CONCRETE FOUNDATION WALL VERTICAL STEEL REINFORCING REBAR AS REQUIRED IN GROUT FILLED CORE RIDGED INSULATION REINFORCING STEEL AS REQUIRED FOUNDATION DATE: 1/4"=1' 4/16/2026 SCALE @24 x 36 COMPACTED SOIL 8X16 CONCRETE FOOTING PROJECT # 2025-18 SECTION 2 3 1 1 1"=1'-0" SHEET NUMBER PERMIT REVIEW ONLY S1.0 Page 28 of 37 DESCRIPTI ON ROOF FRAMING / TRUSS NOTES: REVISED BY REVISION TABLE TRUSS DRAWING IS FOR ILLUSTRATION ONLY. ALL TRUSSES SHALL BE INSTALLED & BRACED TO MANUFACTURERS DRAWINGS & SPECIFICATIONS. ALL TRUSSES SHALL CARRY MANUFACTURERS STAMP. ALL TRUSSES WILL NOT BE FIELD ALTERED WITHOUT PRIOR NUMBER DATE BUILDING DEPT. APPROVAL OF ENGINEERING CALCULATIONS. ALL TRUSSES SHALL HAVE DESIGN DETAILS & DRAWINGS ON SITE FOR FRAMING INSPECTION. ALL CONNECTIONS OF RAFTERS, JACK OR HIP TRUSSES TO MAIN 2X6 X 36" HEADER (2) 2X8 X 65" HEADER (2) 2X6 X 36" HEADER (2) GIRDER TO BE PROVIDED BY TRUSS MANUFACTURER. 2X6 X 36" HEADER (2) 2X6 X 36" HEADER (2) 2X6 X 36" HEADER (2) ALL ROOF FRAMING 24" O.C. ALL OVERHANGS 16". 2X6 X 42" HEADER (2) 2X6 X 42" HEADER (2) INSTALL POLYISOCYANURATE FOAM TYPE INSULATION AT FLOOR AND PLATE LINES, OPENINGS IN PLATES, CORNER STUD CAVITIES AND AROUND DOOR AND WINDOW ROUGH OPENING CAVITIES. ATTIC VENTILATION: REQUIRED ABOVE HOUSE. 2X6 X 35" HEADER (2) 2X6 X 39" HEADER (2) 2X6 X 35" HEADER (2) 2X6 X 35" HEADER (2) MIN. SNOW LOAD 50 LBs PER SQUARE FOOT. 2X6 X 35" HEADER (2) 2X6 X 35 1/8" HEADER (2) 2X6 X 35" HEADER (2) 2X6 X 35" HEADER (2) 2X6 X 35" HEADER (2)2X6 X 28 1/2" HEADER (2) WALL HEADERS: (2) 2 X 10 DF 2 TYP. UNO PAGE TITLE ROOF & FLOOR TRUSS MANUFACTURER: _______________________ OTH 2X6 X 36" HEADER (2) ER 2X6 X 36" HEADER (2) S 2X6 X 39" HEADER (2) 2X6 X 41" HEADER (2) BY 2X6 X 34 3/8" HEADER (2) 355 ETHAN ALLEN PKWY LLC 2X6 X 41" HEADER (2) DES IG 2X6 X 39" HEADER (2) 2X6 X 35" HEADER (2) N 2X6 X 35" HEADER (2) 2X6 X 35" HEADER (2) RO OF TR U 2X6 X 42" HEADER (2) SS 2X6 X 42" HEADER (2) TR-1 PROJECT TITLE TR-1 2X6 X 36" HEADER (2) 2X6 X 36" HEADER (2) NLB CONSTRUCTION CONSULTING,LLC Framing, Roof Plan View Framing, Floor Plan View 111 East Shore Road South DRAWINGS PROVIDED BY: Grand Isle, VT 05458 802-355-4130 DATE: 4/16/2026 SCALE @24 x 36 PROJECT # 2025-18 SHEET NUMBER PERMIT REVIEW ONLY S1.2 Page 29 of 37 ARCHITECTURAL SHINGLES (TYP) 12 RP Lighting DESCRIPTI ON 5 and Fans 12" REVISED BY 1' TYP REVISION TABLE VINYL SIDING W03 W14 W13 24'-8" 42" 12 8 Tall LED NUMBER DATE W02 VERTICAL SIDING W11 RAMP Outdoor Wall Elevation 8 Exterior Elevation Front Sconce Model: 4428OB- 17-3K PAGE TITLE 355 ETHAN ALLEN PKWY LLC Junction Box Light 3068 Fixture with Plastic- SHORT TERM BICYCLE STORAGE (4) LONG TERM BICYCLE STORAGE SHORT TERM BICYCLE STORAGE (4) PROJECT TITLE Coated Glass Globe R6 8' Junction and Wire Guard 2 X 4 WALLS Single-Sided Grid Bike Rack - 4 Bike Item number Item NLB CONSTRUCTION CONSULTING,LLC Capacity (TYP) TOTAL 16 BIKE SPACES. CONCRETE SLAB #: 190hlfc 111 East Shore Road South DRAWINGS PROVIDED BY: 36" CONCRETE BOLLARD 8' Grand Isle, VT 05458 802-355-4130 6'-5" 7'-2" 7'-2" DUMPSTER 3' DUMPSTER 10' DATE: 4/16/2026 R SCALE @24 x 36 D O O 6 " CONCRETE SLABW/ 6 " X 6" W4XW4 ' 0" PROJECT # 3- 2025-18 10' 10'-2" REVISED 4/15/26 E-2 SHEET NUMBER LIGHTING PLAN PERMIT REVIEW ONLY Page 30 of 37 Emerald Green Arborvitae Thuja occidentalis 'Emerald DESCRIPTI Green' ON REVISED BY REVISION TABLE NEW Nature Hills Nursery S CR EEN IN G Vibrant Emerald Green Color NUMBER DATE RO W OF EVE R GR EEN Stays Rich Year-Round, Even S (arb orv itae ) in Winter Cold Cold Hardy: Thrives in Zones 4-8 PAGE TITLE Grows 15 ft Tall, 4 ft Wide Evergreen Year-Round Color and Privacy 355 ETHAN ALLEN PKWY LLC Great Choice for Privacy NEW 2" MAPLE Screen or Hedge PROJECT TITLE NLB CONSTRUCTION CONSULTING,LLC 111 East Shore Road South DRAWINGS PROVIDED BY: Grand Isle, VT 05458 802-355-4130 DATE: SUGAR MAPLE 4/16/2026 SCALE @24 x 36 (Acer saccharum) PROJECT # 2025-18 REVISED 3/30/26 L-2 SHEET NUMBER EXISTING EA Parkway C1 draft 4-15-26 TREES TO REMAIN PERMIT REVIEW ONLY Page 31 of 37 PERSPECTIVE VIEW OF SEPARATED BUILDINGS PERMIT REVIEW ONLY DRAWINGS PROVIDED BY: PROJECT TITLE PAGE TITLE REVISION TABLE DESCRIPTI NLB CONSTRUCTION CONSULTING,LLC NUMBER DATE REVISED BY ON DATE: 355 ETHAN ALLEN PKWY LLC 111 East Shore Road South 2025-18 Grand Isle, VT 05458 PROJECT # 4/16/2026 SHEET NUMBER SCALE @24 x 36 SK50 802-355-4130 Page 32 of 37 Department of Permitting & Inspections William Ward, Director Scott Gustin, AICP, CFM, Principal Planner Zoning Division Mary O’Neil, AICP, Principal Planner 645 Pine Street Kirk Dressing, Associate Planner Burlington, VT 05401 Joseph Cava, Permit Technician Telephone:(802) 865-7188 Collin Naheedy, Code Compliance Officer (802) 865-7195 (FAX) TO: Development Review Board FROM: DATE: June 2, 2026 RE: ZP-26-191; 418 Saint Paul Street ====================================================================== Note: These are staff comments only; decisions on projects are made by the Development Review Board, which may approve, deny, table or modify any project. THE APPLICANT OR REPRESENTATIVE MUST ATTEND THE MEETING. Zone: Residential - Corridor Ward: 6 Owner/Applicant: Allan Walker-Hodkin Request: Combined preliminary and final plat approval for proposed 2-lot subdivision. No development proposed. Applicable Regulations: Article 4 (Zoning Maps and Districts), Article 6 (Development Criteria & Guidelines), and Article 10 (Subdivision) Background Information: The applicant is seeking combined preliminary and final plat approval for a 2-lot subdivision. No development is included in this subdivision. All development anticipated on the subject lands is to be pursued under separate zoning permit. Recommendation: Combined Preliminary and Final Plat approval as per, and subject to, the following findings and conditions. I. Findings Article 4: Maps & Districts Sec. 4.4.5, Residential Districts: (a) Purpose (b) Dimensional Standards Table 4.4.5-1: Lot Size, Frontage, Setback, and Lot Coverage Standards in Residential Districts Page 33 of 37 Proposed lot 1 frontage remains unchanged at 57.96’. Setbacks remain unchanged with the exception of the rear setback which as proposed is ±30.93’. The proposed lot coverage of lot 1 is ±34%. Proposed frontage of lot 2 is 50.39’. As there is no existing or proposed structure, there are neither setbacks nor lot coverage. (Affirmative finding) (c) Permitted and Conditional Uses: No change of use is proposed. Not applicable. (d) District Specific Regulations: Not applicable. Article 6: Development Review Standards: Part 1: Land Division Design Standards Section 6.1.2 Review Standards (a) Protection of important natural features The arrangement of blocks and lots shall preserve watercourses, wetlands, steep slopes, flood- prone areas, rock outcroppings, wildlife habitat and travel corridors, specimen trees and contiguous stands of forest, and other sensitive ecological and geological areas to the extent practicable. ZP-26-191 pg. 2 of 3 Page 34 of 37 There are no significant natural features in the land to be subdivided. (Affirmative finding) (b) Block Size and Arrangement Not applicable. (c) Arrangement of Lots The lot is regular in shape, and the arrangement is consistent with other parcels in the neighborhood. (Affirmative finding) (d) Connectivity of streets within the city street grid Both lots will have access to the existing street grid. (Affirmative finding) (e) Connectivity of sidewalks, trails, and natural systems Not applicable. Sec. 10.1.9, Final Plat Review D. Review Criteria Decisions by the DRB on a final plat shall be based on the project’s conformance with the following: 1. The requirements of the underlying zoning district(s) and all applicable overlay district(s) as set forth in Article 4; See Article 4 above. 2. The review criteria for Conditional Uses and Major Impact in Article 3, Part 5 where applicable; Not applicable. 3. The requirements of Article 5 with regard to Special Uses and Performance Standards as applicable; and, Not applicable. 4. The land division and site development principles and design standards in Article 6. See Article 6 above. II. Conditions of Approval 1. Within 180 days of approval, a mylar copy of the approved final plat, with all applicable signatures, shall be filed in the city’s land records. Failure to do so renders this approval null and void. 2. Standard conditions 1-15. ZP-26-191 pg. 3 of 3 Page 35 of 37 Page 36 of 37 To the Development Review Board, We are submitting for approval of a subdivision to the lot currently located at 418 St Paul Street. The resulting two subdivided lots would include: (1) the existing home at 418 Saint Paul Street and (2) the land that faces South Winooski Ave, with the tentative address 395 South Winooski Ave. The subdivision has been drawn and designed in accordance with the residential corridor upzoning and is made with no specific development plans. We would sell the land to someone with the means to build additional housing in the community. Thank you, Nathalie and Allan Page 37 of 37