Airport Advisory Board
Regular MeetingDeKalb, IL · September 18, 2018
Minutes
DEKALB TAYLOR MUNICIPAL AIRPORT
AIRPORT ADVISORY BOARD
MINUTES
September 18, 2018
Chairman Bob Owens called the meeting to order at 7:02pm.
Roll Call: Bob Owens, Paul Borek, Matt Duffy, Gary Hanson, Bernard Pupino.
Absent: Ryan James and Jim Rhoades
Guests: None
APPROVAL OF AGENDA- Motion by Bernie Pupino. Seconded by Gary Hanson. Motion
passed.
PUBLIC PARTICIPATION - None
APPROVAL OF MINUTES- Motion by Paul Borek. Seconded by Bernie Pupino. Motion
passed.
OLD BUSINESS- None
NEW BUSINESS – Airport Manager Tom Cleveland discussed the DRAFT FY2019 –
FY2023 Transportation Improvement Program that will be presented to the Federal
Aviation Administration (FAA) and the Illinois Department of Transportation – Division of
Aeronautics (IDOT–DOA) on October 30, 2018 in Springfield Illinois.
There are three projects currently programmed and funded by the FAA and IDOT-DOA
for FY2017, FY2018, FY 2019.
1) Replace the existing Visual Approach Path Indicators (VASI) units on runway ends
2, 20 and 27 with Precisian Approach Path Indicators (PAPI) units
2) Crack Repair and Re-Mark Runway 2-20
3) Replace Perimeter Fencing – Phase 1
These projects total approximately $2.6 million in secured and programmed funding from
the FAA and IDOT-DOA for DeKalb Airport.
Future projects include replacing part of the main aircraft parking apron, purchasing the
Frontier Building, Overlay of the main runway, 2-20. Rehabilitating Taxiway C, Replacing
additional Perimeter Fencing,
Airport Managers Report _ Airport Manager Tom Cleveland reported on the status of
the low-cost jet fuel program. The airport has been selling approximately 8000 – to
12,000 gallons of jet fuel per month. The cost for the Airport to purchase fuel has gone
up so they had to raise the price of jet fuel to the customer.
An Embraer 135 30 passenger jet came in from Utah with football fans for the NIU/Utah
football game. The aircraft crew purchased 600 gallons of jet fuel before they left.
Airport Manager had to borrow a lavatory cart from DuPage Airport to service the
washrooms on the aircraft. Tom thanked DuPage airport for the use of their equipment.
MOTION TO ADJOURN- Motion by Paul Borek. Seconded by Bernie Pupino. Motion
passed.
Meeting adjourned at 7:45 pm.
Minutes – Approved October 23, 2018
Agenda
Transportation Improvement Program:
Airports FY 2019-2023
DEKALB TAYLOR MUNICIPAL AIRPORT
DEKALB, ILLINOIS
ELEMENTS REQUIRED Estimated Cost
Clear Bldg Size
Sponsor AIP Project Title Project Description Project Environmental Approaches Land Apron RGFE Cals/
Year Federal
Project Priority on ALP Determination (from 5010 Acquired Sizing Evaluation Equipment Notes / Comments
Requested State Local Total
Priority Number EA/CATEX/EIS Inspection Calcs Form Inventory
Results) Discretionary
Entitlement
Yes / No / NA Pending/Approved Yes / No Yes / No / NA Yes / No / NA Yes / No / NA Yes / No / NA Apportionment
Replace the existing VASI
Replace the existing VASI units on Runway Ends 2, 20 CatEx Will Be
Funded 2017 units on Runway Ends 2, 20 YES YES YES NA NA NA $509,400 $148,500 $36,550 $36,550 $731,000 FY-2017 GA Entitlements will be used.
& 27 with PAPI units Completed
& 27 with PAPI units
2008 PCI Survey rates generally below 60. Includes
Crack Repair and Re-Mark CatEx Will Be
Funded 70 2018 crack repair of adjacent "lead-to" pavements not being YES YES YES NA NA NA $571,500 $148,500 $0 $80,000 $800,000 FY-2018 GA Entitlements will be used.
Runway 2-20 Completed
rehabilitated
FY 2019
Reimbursement for the purchase of the Frontier Buidling
Reimbursement for
to serve as a SRE building for the airport. IDOA has
1 45 2019 Purchase of SRE Building - YES N/A YES NO NA NA YES $0 $150,000 $0 $0 $150,000 FY-2019 GA Entitlements will be used.
determined that 65% of the Building would be eligible for
Phase 1
AIP Particpation. Funding in multi-years.
Replace the existing 4 foot perimeter fencing with a 10' Wildlife Hazard Study recommended 10' tall fence.
Replace Perimeter Fencing -
2 81 2019 tall Class E, chain link, fence as recommended by the YES To Be Completed YES YES NA NA NA $1,125,000 $0 $62,500 $62,500 $1,250,000 If building reimbursement is not funded, NPE would
Phase 1
Wildlife Study - Phased/funded in multiple years. be utlilized for this project.
FY 2020
The current PCI rating for this pavement is 75. This
pavement is experiencing more and more jet traffic and
Remove & replace a portion is showing distress. The City of DeKalb desires to
3 64 2020 YES To Be Completed YES YES NA NA NA $1,128,000 $150,000 $71,000 $71,000 $1,420,000 FY-2020 GA Entitlements will be used.
of the aircraft parking apron remove and replace this pavement with 9" PCC
Pavement in order to have pavement of sufficient
strength to handle the aircraft using it.
Replace the existing 4 foot perimeter fencing with a 10'
Replace Perimeter Fencing -
4 81 2020 tall Class E, chain link, fence as recommended by the YES To Be Completed YES YES NA NA NA $1,125,000 $0 $62,500 $62,500 $1,250,000 Wildlife Hazard Study recommended 10' tall fence.
Phase 2
Wildlife Study - Phased/funded in multiple years.
FY 2021
2008 PCI Survey rates generally below 60. Includes
5 70 2021 Overlay Runway 2-20 crack repair of adjacent "lead-to" pavements not being YES To Be Completed YES YES NA NA NA $3,510,000 $0 $195,000 $195,000 $3,900,000
rehabilitated
6 66 2021 Rehabilitate Taxiway C Rehabilitate and strengthen Taxiway C for Part 139 YES To Be Completed YES YES NA NA NA $2,475,000 $0 $137,500 $137,500 $2,750,000
Reimbursement for the purchase of the Frontier Buidling
Reimbursement for
to serve as a SRE building for the airport. IDOA has
7 45 2021 Purchase of SRE Building - YES N/A YES NO NA NA YES $277,500 $150,000 $0 $47,500 $475,000 FY-2021 GA Entitlements will be used.
determined that 65% of the Building would be eligible for
Phase 2
AIP Particpation. Funding in multi-years.
Replace the existing 4 foot perimeter fencing with a 10'
Replace Perimeter Fencing -
8 81 2021 tall Class E, chain link, fence as recommended by the YES To Be Completed YES YES NA NA NA $1,125,000 $0 $62,500 $62,500 $1,250,000 Wildlife Hazard Study recommended 10' tall fence.
Phase 3
Wildlife Study - Phased/funded in multiple years.
FY 2022
Acquire approximately 47 + ac. (fee simple)(Winter's FY-2022 G.A. Entitlements. The City of DeKalb will
9 40 2022 Acquire 47 + ac. (fee simple) YES N/A YES NO NA NA NA $1,903,500 $150,000 $105,750 $105,750 $2,115,000
Property). seek Discretionary funding for this acquisition.
Rehabilitate T-Hangar Rehabilitation of the T-hangar Pavements that have The City of DeKalb would accept this project as a
10A 68 2022 YES To Be Completed YES YES NA NA NA $428,400 $0 $23,800 $23,800 $476,000
Pavements, Phase 3 PCIs ranging from 34 to 56. 90/10 State/Local Project.
Rehabilitate T-Hangar Rehabilitation of the T-hangar Pavements that have
10B 68 2022 YES To Be Completed YES YES NA NA NA $0 $0 $428,400 $47,600 $476,000 If funded as part of State/Local program.
Pavements, Phase 3 PCIs ranging from 34 to 56.
Acquire approximately 25+ Acquire approximately 25+ acres (fee simple) (Faiver
11 40 2022 YES N/A YES NO NA NA NA $810,000 $0 $45,000 $45,000 $900,000
acres Property).
Replace the existing 4 foot perimeter fencing with a 10'
Replace Perimeter Fencing -
12 81 2022 tall Class E, chain link, fence as recommended by the YES To Be Completed YES YES NA NA NA $1,125,000 $0 $62,500 $62,500 $1,250,000 Wildlife Hazard Study recommended 10' tall fence.
Phase 4
Wildlife Study - Phased/funded in multiple years.
K:\!TIPs\CMT-Aurora\2017\DKB\Final for Board-Council Approval_2017 DKB E-TIPS FFY 2019-2023.xls Page 1 of 2 12/12/2017
Transportation Improvement Program:
Airports FY 2019-2023
DEKALB TAYLOR MUNICIPAL AIRPORT
DEKALB, ILLINOIS
ELEMENTS REQUIRED Estimated Cost
Clear Bldg Size
Sponsor AIP Project Title Project Description Project Environmental Approaches Land Apron RGFE Cals/
Year Federal
Project Priority on ALP Determination (from 5010 Acquired Sizing Evaluation Equipment Notes / Comments
Requested State Local Total
Priority Number EA/CATEX/EIS Inspection Calcs Form Inventory
Results) Discretionary
Entitlement
Yes / No / NA Pending/Approved Yes / No Yes / No / NA Yes / No / NA Yes / No / NA Yes / No / NA Apportionment
YES
FY-2023 G.A. Entitlements. The City of DeKalb
Rehabilitate T-Hangar Rehabilitation of the T-hangar Pavements that have
13A 68 2023 YES To Be Completed YES YES NA NA NA $345,000 $150,000 $27,500 $27,500 $550,000 would accept this project as a 90/10 State/Local
Pavements, Phase 4 PCIs ranging from 34 to 56.
Project.
Rehabilitate T-Hangar Rehabilitation of the T-hangar Pavements that have
13B 68 2023 YES To Be Completed YES YES NA NA NA $0 $0 $495,000 $55,000 $550,000 If funded as part of State/Local program.
Pavements, Phase 4 PCIs ranging from 34 to 56.
Develop a preliminary plan sheet that shows the location
Airport Utility Relocation, of all the existing utilities on the airport and the
14 56 2023 NO To Be Completed YES NA NA NA NA $72,000 $0 $4,000 $4,000 $80,000
Phase I preliminary layouts of the needed utility relocations to
accommodate future airport developments.
Phase II - Enlargement of the first detention basin and
Enlarge 1st detention basin construction of a second detention basin in the frontal
15 44 2024 YES To Be Completed YES NO NA NA NA $1,560,000 $150,000 $95,000 $95,000 $1,900,000 FY-2024 GA Entitlements will be used.
& const. 2nd basin area. Both detention basins will flow to the existing
detention basin located along Loves Road.
Acquire 32 + acres for Acquire 32 + acres (fee) for future corporate hangar
16 40 2024 YES N/A YES NO NA NA NA $1,360,800 $0 $75,600 $75,600 $1,512,000
hangar expansion expansion. (Larson Property).
Rehabilitate Airfield Lighting and update Airfield
Rehabilitate Airfield Lighting
17 72 2025 Signage in accordance with a newly developed Master YES To Be Completed YES YES NA NA NA $1,200,000 $150,000 $75,000 $75,000 $1,500,000 FY-2025 GA Entitlements will be used.
and Signage
Signage Plan
Relocate a portion of Relocate a portion (3,000' x 24') of Pleasant Street to
18 21 2025 YES To Be Completed YES NO NA NA NA $657,000 $0 $36,500 $36,500 $730,000
Pleasant Street develop the East Frontal Area.
Relocation of the existing utilities on the Airport that
Airport Utility Relocation,
19 56 2025 were shown in Phase I to conflict with future NO To Be Completed YES NA NA NA NA $675,000 $0 $37,500 $37,500 $750,000
Phase II
development.
20 70 2026 Rehabilitate Runway 9/27 Rehabilitate Runway 9/27 YES To Be Completed NO YES NA NA NA $1,830,000 $150,000 $110,000 $110,000 $2,200,000 FY-2026 GA Entitlements will be used.
21 66 2026 Rehabilitate Taxiway A Rehabilitate and strengthen Taxiway A for Part 139 YES To Be Completed YES YES NA NA NA $607,500 $0 $33,750 $33,750 $675,000
Expand the large aircraft
22 54 2026 Expand the large aircraft parking apron YES To Be Completed YES YES NA NA NA $1,350,000 $0 $75,000 $75,000 $1,500,000
parking apron
K:\!TIPs\CMT-Aurora\2017\DKB\Final for Board-Council Approval_2017 DKB E-TIPS FFY 2019-2023.xls Page 2 of 2 12/12/2017
Transportation Improvement
Program (TIP) Data Sheet
Airport: DeKalb Taylor Municipal Airport LOCID: DKB Local Priority: 1
Project Reimbursement for Purchase of SRE Building – Phase 1
FY 2019
Description:
The DeKalb Taylor Municipal Airport is seeking reimbursement for the purchase of the existing
Frontier building. The Division of Aeronautics has determined that 65% of the purchase price is
Justification:
eligible for AIP funds. The building will be utilized as the SRE building for the Airport. This project
will be a Others category project per FAA Order 5100.39A.
Cost Estimate: (Attach detailed cost estimate)
Federal (100%) $150,000 State (0%) $0 Local (0%) $0 Total: $150,000
Sponsor Verification Date: (see instruction sheet)
08/29/2003 Date of approved ALP with project drawn
Date of environmental determination (ROD, FONSI, CE) or cite
CE paragraph # (307-312) in Order 1050.1E, determination to
N/A accompany submittal
N/A Date of land acquisition or signed purchase agreement
For each and every project
Snow removal equipment inventory & sizing worksheet (for SRE
as applicable
N/A acquisition)
N/A Apron sizing worksheet (for apron projects)
5010 Inspection Compliance (Attach copy of letter from Bureau of
09/21/2015 Aviation Safety)
N/A Revenue producing facilities (for fuel farms, hangars, etc.)
I certify to the best of my belief and knowledge that all runway approaches are clear of obstructions.
Sponsor’s Signature: Date:
Printed Name: Jerry Smith Title: Mayor
Phone Number (815) 748-8102
Division of Aeronautics use only
Preapp Number Grant Number NPIAS Code Work Code FAA Priority Federal $
Printed 12/18/2017 Page 1 of 2 AER 104 (Rev. 08/02/16)
INSTRUCTIONS FOR COMPLETING
TRANSPORTATION IMPROVEMENT PROGRAM (TIP)
DATA SHEET
A Transportation Improvement Program (TIP) Data Sheet must be submitted for each major work item that is requesting
Federal assistance for FY17. Submittal of this information is necessary to effectively administer the Airport Improvement
Program.
HEADER INFORMATION – Include the name of the airport, the LOCID, the local priority of the requested work, and the
project description.
SKETCH – Color-coded sketch that depicts and identifies the scope and limits of the proposed project.
JUSTIFICATION – The justification should be brief and describe the need, objectives, method of accomplishment, and
the benefit expected to be obtained from the assistance.
COST ESTIMATE – The estimate of total cost (engineering, administrative, legal, appraisal costs, etc.) including Federal,
State, and Local shares. Attach a detailed cost estimate showing unit costs; aggregate in square yards (S.Y.), concrete
paving in square yards (S.Y.) and asphaltic paving in tons. Separate the costs for land acquired in fee and land acquired
in easement. NOTE: cost estimates may include a 3% contingency.
SPONSOR’S VERIFICATION – The verification that the project is properly planned and is ready to “go” within the 1st year
of the three-year TIP program period. Except for equipment acquisition, proposed development and land acquisition must
be shown on an approved ALP, have cleared environmental processing, and the land already acquired or have a signed
purchase agreement. These requirements must be completed before a project can be considered for funding. Provide a
date for each item verifying that all project requirements are satisfied.
If requesting Federal assistance for snow removal equipment, include an inventory of existing airport equipment and
calculations based on Chapters 4 & 5 of the Airport Winter Safety and Operations, Advisory Circular (AC) 150/5200-30
and the Airport Snow and Ice Control Equipment, AC 150/5220-20 showing the minimum equipment needed, along with
the TIP Data Sheet.
If requesting Federal assistance for general aviation apron expansion, include calculations based on Appendix 5 of the
Airport Design Advisory Circular 150/5300-13 showing justification for the size of apron needed, along with the TIP Data
Sheet.
If requesting Federal assistance for revenue producing facilities (fuel farms, hangars), please contact the Division for
eligibility requirements. Submit with the TIP Data Sheet; 1) A statement that airside development projects are complete or
a financial plan to fund airside needs over the next three years, 2) A statement that approach surfaces are clear of
obstructions, and 3) A statement of capacity justification for the project.
Printed 12/18/2017 Page 2 of 2 AER 104 (Rev. 08/02/16)
2019 Transportation Improvement Program
Estimate of Work
Airport Name: DeKalb Taylor Municipal
Associated City: DeKalb
Year Requested: 2019 Sponsor Priority: 1
PROJECT TITLE:
Reimbursement for Purchase of SRE Building - Ph 1
Estimate of Work
ITEM
QUANTITY UNIT PRICE
PRICE
Potential DBE
# Unit(s) $ / Unit $ %
#DIV/0!
EXCAVATION
Clearing/Grubbing /
Earthwork /
DRAINAGE
Underdrains /
Pipe /
Curb and Gutter /
Special Structures /
PAVING
Agg. Base Course /
Bituminous Course /
PCC Pavement /
Seal Coat /
Crack Filling /
Panel Replacement /
Butt Joint. /
Grooving /
Special /
LIGHTING
Fixtures, Signs (New/Relocated) /
Cable & Transformers /
Taxiway Lighting Fixtures /
Duct / Conduit /
Fixture Removals /
LANDSCAPING
Seeding/Mulching/Blanket /
Sodding /
Watering /
Special (Wetlands) /
FENCING
Class C /
Class E /
Gates (Manual/Electric) /
OTHER / MISC.
Mobilization / #DIV/0!
Marking /
Demolition /
Other Items - Equipment /
Engineering/Administration /
Studies / #DIV/0!
Land Acquisition / #DIV/0!
Survey / #DIV/0!
Other Specialty Items 1 LS $150,000.00 / LS $150,000.00
Geotechnical / #DIV/0!
Utility/Force Account Work / #DIV/0!
Mobilization / #DIV/0!
/ #DIV/0!
#DIV/0!
Potential DBE
TOTAL COST:
$ %
Printed 12/12/2017
$150,000.00 AER 102 (Rev. 08/02/16)
Transportation Improvement
Program (TIP) Data Sheet
Airport: DeKalb Taylor Municipal Airport LOCID: DKB Local Priority: 2
Project Replace Perimeter Fencing – Phase 1
FY 2019
Description:
This project replaces the existing 4’ perimeter fence with 10’ chain link fence and associated
vehicular/pedestrian gates as recommended by the Wildlife Study. This project will be completed in
Justification: phases due to the necessary funding required. The project will be environmentally evaluated
through the project development stage.
This project will be a Safety/Security related project per FAA Order 5100.39A.
Cost Estimate: (Attach detailed cost estimate)
Federal (90%) $1,125,000 State (5%) $62,500 Local (5%) $62,500 Total: $1,250,000
Sponsor Verification Date: (see instruction sheet)
08/29/2003 Date of approved ALP with project drawn
Date of environmental determination (ROD, FONSI, CE) or cite
CE paragraph # (307-312) in Order 1050.1E, determination to
To be completed accompany submittal
N/A Date of land acquisition or signed purchase agreement
For each and every project
Snow removal equipment inventory & sizing worksheet (for SRE
as applicable
N/A acquisition)
N/A Apron sizing worksheet (for apron projects)
5010 Inspection Compliance (Attach copy of letter from Bureau of
09/21/2015 Aviation Safety)
N/A Revenue producing facilities (for fuel farms, hangars, etc.)
I certify to the best of my belief and knowledge that all runway approaches are clear of obstructions.
Sponsor’s Signature: Date:
Printed Name: Jerry Smith Title: Mayor
Phone Number (815) 748-8102
Division of Aeronautics use only
Preapp Number Grant Number NPIAS Code Work Code FAA Priority Federal $
Printed 12/18/2017 Page 1 of 2 AER 104 (Rev. 08/02/16)
INSTRUCTIONS FOR COMPLETING
TRANSPORTATION IMPROVEMENT PROGRAM (TIP)
DATA SHEET
A Transportation Improvement Program (TIP) Data Sheet must be submitted for each major work item that is requesting
Federal assistance for FY17. Submittal of this information is necessary to effectively administer the Airport Improvement
Program.
HEADER INFORMATION – Include the name of the airport, the LOCID, the local priority of the requested work, and the
project description.
SKETCH – Color-coded sketch that depicts and identifies the scope and limits of the proposed project.
JUSTIFICATION – The justification should be brief and describe the need, objectives, method of accomplishment, and
the benefit expected to be obtained from the assistance.
COST ESTIMATE – The estimate of total cost (engineering, administrative, legal, appraisal costs, etc.) including Federal,
State, and Local shares. Attach a detailed cost estimate showing unit costs; aggregate in square yards (S.Y.), concrete
paving in square yards (S.Y.) and asphaltic paving in tons. Separate the costs for land acquired in fee and land acquired
in easement. NOTE: cost estimates may include a 3% contingency.
SPONSOR’S VERIFICATION – The verification that the project is properly planned and is ready to “go” within the 1st year
of the three-year TIP program period. Except for equipment acquisition, proposed development and land acquisition must
be shown on an approved ALP, have cleared environmental processing, and the land already acquired or have a signed
purchase agreement. These requirements must be completed before a project can be considered for funding. Provide a
date for each item verifying that all project requirements are satisfied.
If requesting Federal assistance for snow removal equipment, include an inventory of existing airport equipment and
calculations based on Chapters 4 & 5 of the Airport Winter Safety and Operations, Advisory Circular (AC) 150/5200-30
and the Airport Snow and Ice Control Equipment, AC 150/5220-20 showing the minimum equipment needed, along with
the TIP Data Sheet.
If requesting Federal assistance for general aviation apron expansion, include calculations based on Appendix 5 of the
Airport Design Advisory Circular 150/5300-13 showing justification for the size of apron needed, along with the TIP Data
Sheet.
If requesting Federal assistance for revenue producing facilities (fuel farms, hangars), please contact the Division for
eligibility requirements. Submit with the TIP Data Sheet; 1) A statement that airside development projects are complete or
a financial plan to fund airside needs over the next three years, 2) A statement that approach surfaces are clear of
obstructions, and 3) A statement of capacity justification for the project.
Printed 12/18/2017 Page 2 of 2 AER 104 (Rev. 08/02/16)
2019 Transportation Improvement Program
Estimate of Work
Airport Name: DeKalb Taylor Municipal
Associated City: DeKalb
Year Requested: 2019 Sponsor Priority: 2
PROJECT TITLE:
Replace Perimeter Fencing - Phase 1
Estimate of Work
ITEM
QUANTITY UNIT PRICE
PRICE
Potential DBE
# Unit(s) $ / Unit $ %
#DIV/0!
EXCAVATION
Clearing/Grubbing /
Earthwork /
DRAINAGE
Underdrains /
Pipe /
Curb and Gutter /
Special Structures /
PAVING
Agg. Base Course /
Bituminous Course /
PCC Pavement /
Seal Coat /
Crack Filling /
Panel Replacement /
Butt Joint. /
Grooving /
Special /
LIGHTING
Fixtures, Signs (New/Relocated) /
Cable & Transformers /
Taxiway Lighting Fixtures /
Duct / Conduit /
Fixture Removals /
LANDSCAPING
Seeding/Mulching/Blanket 2 AC $4,500.00 / AC $9,000.00
Sodding /
Watering /
Special (Wetlands) /
FENCING
Class C /
Class E 11000 LF $75.00 / LF $825,000.00
Gates (Manual/Electric) 6 EA $8,000.00 / EA $48,000.00
OTHER / MISC.
Mobilization 1 LS $55,000.00 / LS $55,000.00
Marking /
Demolition 11000 LF $4.00 / LF $44,000.00
Other Items - Equipment /
Engineering/Administration 1 LS $194,000.00 / LS $194,000.00
Studies / #DIV/0!
Land Acquisition / #DIV/0!
Survey / #DIV/0!
Other Specialty Items / #DIV/0!
Geotechnical / #DIV/0!
Utility/Force Account Work 1 LS $75,000.00 / LS $75,000.00
/ #DIV/0!
/ #DIV/0!
#DIV/0!
Potential DBE
TOTAL COST:
$ %
$1,250,000.00
Printed 12/12/2017 AER 102 (Rev. 08/02/16)