City Council
Regular MeetingDeKalb, IL · April 10, 2017
Minutes
MINUTES
CITY OF DEKALB
COMMITTEE OF THE WHOLE MEETING
APRIL 10, 2017
The City Council of DeKalb, Illinois held a Committee of the Whole meeting on April 10,
2017, in the City Council Chambers of the DeKalb Municipal Building, 200 South Fourth
Street, DeKalb, Illinois.
Mayor Rey called the meeting to order at 5:00 p.m.
A. ROLL CALL
City Clerk Jennifer Jeep Johnson called the roll, and the following members of the City
Council were present: Alderman Bill Finucane, Alderman Mike Marquardt, Alderman
Bob Snow, Alderman Kate Noreiko, Alderman Tony Faivre, and Mayor John Rey.
Alderman David Jacobson arrived at 5:06 p.m. Alderman Dave Baker was absent.
Also present were: City Manager Anne Marie Gaura, Assistant City Manager Patty
Hoppenstedt, City Attorney Dean Frieders, Police Chief Gene Lowery, Fire Chief Eric
Hicks, Community Development Director Jo Ellen Charlton, Public Works Director Tim
Holdeman, Human Resources Director Cris Randall, Information Technology Director
Marc Thorson, Economic Development Planner Jason Michnick, Management Analyst
Aaron Stevens, and City Clerk Jennifer Jeep Johnson.
B. ITEMS ALSO ON THE REGULAR AGENDA
There were none.
C. CONSIDERATIONS
1. A Recent History of DeKalb Growth Trends.
Community Development Director Charlton introduced the topic at hand. She began by
discussing the difficult times in the community from the past decade. She highlighted
that development has been increasing over the past decade, particularly since the low
point in 2011. She also highlighted some of the larger projects, stating that she wanted
to dispel the misunderstanding that development has been stagnant since 2009.
Economic Development Planner Michnick provided information on the equalized
assessed value (EAV) and how it interacts with the tax bill. He explained that new
property EAV is considered, as well as reassessed value. A property tax bill (rate) is
determined from the overall EAV. As the EAV goes up, the tax rate goes down. As the
tax rate goes down, the City becomes more competitive.
Committee of the Whole Meeting Minutes
April 10, 2017
Page 2 of 3
Economic Development Planner Michnick showed the steady decline in 2005-2006,
explaining that the City’s particular housing market didn't bottom out until 2012-2013.
He stated that he anticipates the City will see a continuing upward trend in EAV by the
time the reassessment happens in 2019.
Economic Development Planner Michnick provided additional data on DeKalb's housing
market.
Brief discussion ensued as to the data referenced.
Alderman Faivre discussed impact fees and the role they play given that the residential
tax increases have a two year lag.
Mayor Rey thanked Community Development Director Charlton and Economic
Development Planner Michnick for the presentation.
D. PUBLIC PARTICIPATION
There was none.
E. RECESS FOR EXECUTIVE SESSION OF THE CITY COUNCIL
1. Approval to Hold an Executive Session to Discuss Personnel as Provided for in 5
ILCS 120/2(c)(1).
2. Approval to Hold an Executive Session to Discuss Collective Bargaining as
Provided for in 5 ILCS 120/2(c)(2).
3. Approval to Hold an Executive Session to Discuss Executive Session Minutes as
Provided for in 5 ILCS 120/2(c)(21).
MOTION
Alderman Marquardt moved to hold an Executive Session; seconded by Alderman
Noreiko.
VOTE
Motion carried on a 7-0-1 roll call vote. Aye: Jacobson, Finucane, Marquardt, Snow,
Noreiko, Faivre, Rey. Nay: None. Absent: Baker. Mayor Rey declared the motion
passed.
Mayor Rey closed the meeting to the public at 5:18 p.m.
Mayor Rey opened the meeting to the public at 5:50 p.m.
Committee of the Whole Meeting Minutes
April 10, 2017
Page 3 of 3
F. ADJOURNMENT
MOTION
Alderman Finucane moved to adjourn; seconded by Alderman Jacobson.
VOTE
Motion carried on a 7-0-1 voice vote. Aye: Jacobson, Finucane, Marquardt, Snow,
Noreiko, Faivre, Rey. Nay: None. Absent: Baker. Mayor Rey declared the motion
passed and concluded the meeting at 5:50 p.m.
_____________________________________
JENNIFER JEEP JOHNSON, City Clerk
Approved by City Council: May 8, 2017.
Agenda
AGENDA
Committee of the Whole Meeting
April 10, 2017
5:00 p.m.
A. Roll Call
B. Items Also on the Regular Agenda
C. Considerations
1. A Recent History of DeKalb Growth Trends.
D. Public Participation
E. Recess for Executive Session of the City Council
1. Approval to Hold an Executive Session to Discuss Personnel as
Provided for in 5 ILCS 120/2(c)(1).
2. Approval to Hold an Executive Session to Discuss Collective
Bargaining as Provided for in 5 ILCS 120/2(c)(2).
3. Approval to Hold an Executive Session to Discuss Executive Session
Minutes as Provided for in 5 ILCS 120/2(c)(21).
F. Adjournment
Assistive services available upon request.
Hearing assistance devices are available in the Information & Technology
Office, which is located to the right, just before entering Council Chambers.
DATE: April 5, 2017
TO: Honorable Mayor John Rey
City Council
FROM: Anne Marie Gaura, City Manager
Jo Ellen Charlton, Community Development Director
SUBJECT: A Recent History of DeKalb Growth Trends.
I. Summary
The year 2008 is recognized by many in DeKalb to be the year the economic downturn
hit the City the worst. Layoffs in City staff cut deep across many departments. Building
Department reports show a steady decline in the value of construction permits beginning
in 2006 where values totaled $43.8 million, reaching $16.8 million by 2008. With the
exception of a single $25 million 3M project in 2010, values continued to decline for three
more years, when the decline bottomed out in 2011 with only $5.9 million in new
construction for the entire year.
TOTAL CONSTRUCTION VALUE
$43,804,626
$32,703,335 $32,121,097
$16,769,706
$12,984,362
$5,886,978
2006 2007 2008 2009 2010 2011
In the years since 2011, the City has realized steady increases in overall construction
values. After 10 years, total construction values in 2016 surpassed 2006
construction values. This report takes a closer look at these trends and some of the
important projects that contributed to DeKalb’s return to construction values that haven’t
been achieved in over 10 years.
II. Analysis
Occasionally, staff must address perceptions that the City is not business friendly.
Another common perception is that development is stagnant in the City of DeKalb. While
recent efforts by staff and elected officials to be more business friendly are being
recognized and helping dispel that image, this analysis was undertaken to evaluate the
theory that development continues to be stagnant. The remainder of this report utilizes
construction value data provided by the applicant and pulled from building permits dating
back to 2009. Only those permits valued $100,000 or more were incorporated into the
analysis in order to exclude minor alteration permits and allow for a focus on new growth
or significant enhancements to existing properties.
The chart below shows a steady increase in construction values since 2011, and breaks
down permits by type of use. Specific data is attached to this report as Exhibit 1. It is
interesting to note that while overall trends are increasing, some years are attributed to
large economic development efforts or single development projects.
DeKalb Developments Valued > $100,000
$60,000,000
$50,000,000
$40,000,000
Residential
Institutional
$30,000,000
Industrial
Commercial
$20,000,000
$10,000,000
$-
2009 2010 2011 2012 2013 2014 2015 2016
Page |2
For example, the $40 million 3M project in 2016 was an important contributor to DeKalb’s
continued increase in construction value for the year. Without the project, construction
values would have declined over 2015 by over $25 million. Bringing this project forward
in the timeframe required by the developer required a significant effort by City staff and
elected officials, which ultimately saved hundreds of 3M jobs from leaving the region.
Commercial development during the same year was comparatively strong, with over
17 permits, including the new Aspen Dental building and multiple commercial build-
outs or alterations. Six of these projects were for various restaurant projects that
exceeded the $100,000 threshold established for this study.
A few significant projects were also responsible for construction values achieved in 2015
as well. Two Target projects in Park 88 totaled just over $20 million in construction value.
In addition, nearly $4.5 million was spent to construct the University Plaza project as
tallied in the residential category, while $12 million in the institutional category was added
as a result of the Oak Crest DeKalb Area Retirement Center project.
Totals in 2014 were fueled by construction of the new library and a mosque, which
show up in the institutional category. Commercial activity totaled nearly $5 million
that same year, with several new restaurant buildouts and alterations (Wingstop,
Panera, Culvers, Subway, Ellwood), a new airport hangar, and the expansion of
Manning Ford.
More commercial value was added in 2013 than any of the years evaluated. During this
year, a new hotel (Hampton), a new McDonald’s, and Pappas’ new mixed use building
on Sycamore Road were all newly permitted that year. Several other significant remodels
and new tenant build-outs were also accommodated in 2013.
A $1.5 million building on Wagner Court added to the industrial totals in 2012.
Commercial totals during the same year totaled nearly 8.3 million and included
investments for 130 W. Lincoln Highway.
Also of note is that while construction of new residential units has not regained the
magnitude achieved in 2006 and 2007, most years experienced some alterations
large enough to exceed the $100,000 limit established for the study. This is
represented by the rust color in the table above.
The map provided on the next page shows the geographic distribution of construction
projects over the years by color. Additionally, the size of the project is also represented,
with larger circles representing a larger construction value. The map clearly represents
that development in the community is not stagnant or limited in area of size. New
development is evenly distributed throughout the community with a wide range of both
small and large investments being made.
Page |3
Page |4
It is important to note that none of the data represented above includes City, school district
or Northern Illinois University construction projects, which also occurred during the
time period evaluated. The $13 million Police Station started in 2012, and the $85
million high school began construction in 2009. Northern Illinois University construction
projects are also not included in the data. Like the library projects, these projects do
not add to the tax base, but they do contribute to the short term economy by
providing construction jobs to residents or individuals who likely spend money in the
community.
In order to further test the results of the data obtained from building permits, staff
evaluated total and new equalized assessed value (EAV) aggregate data from the County
dating back to 2005. This data is presented in the table below. Note that the table
includes different dollar values on the left and right sides of the chart. Red line values
representing total EAV are shown on the left side, while blue line values representing new
EAVs are shown on the right side.
It is worthy to note the downward trend of new EAVs starting after 2005, while the total
EAV trend line continued to increase until 2008. Possible explanations for this variation
are the time that it takes for the market to correct total EAVs, or the time that lapses
between County reassessments that happen every four years, known as the quadrennial
reassessment. It is also important to note that assessed values can be expected to be at
least two years behind permit data valuations. This is because values associated with
permits is reported at the time the permit is issued (prior to construction). Assessed
values are not fully reported until the year after a project is completed. It is therefore not
surprising that the 2011 low shown in the table on Page 1 doesn’t show up until 2013 in
the table below.
City of DeKalb Total EAV & New Property EAV
$800,000,000 $35,000,000
$700,000,000 $30,000,000
$600,000,000
$25,000,000
New Property EAV
$500,000,000
Total EAV
$20,000,000
$400,000,000
$15,000,000
$300,000,000
$10,000,000
$200,000,000
$100,000,000 $5,000,000
$0 $0
2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
Total EAV New Property EAV
Page |5
The increasing trend line in new EAV is also what would be expected based on permit
data, although it does not appear to be at the same rate as shown in the permit data,
which may not show up until 2018 or 2019.
III. Conclusion
Permit data shows that construction values in 2016 rose to a level that was higher than
total construction in 2006, which was the last year evaluated prior to declining trends that
bottomed out in 2011. Furthermore, this 2016 data is the end of a five year increase in
construction values that occurred consistently after 2011. This data is contrary to popular
belief from some that development is stagnant in the City of DeKalb.
While this analysis shows that many of the annual increases can be attributed to
single or a few major projects, these projects are none-the-less an important part of
the City’s efforts to promote and/or support development in the community. These
projects all contribute to both the short term economy in terms of construction jobs, and
the long term economy for those projects that contribute to the property tax base. They
are also viewed by prospective developers as a positive when considering DeKalb as a
possible location to locate or expand their business.
Supporting the “right” projects as opposed to many projects has been DeKalb’s recent
history and has positioned the City well in achieving overall construction value increases.
Continuing these trends by supporting economic development efforts that encourage new
development and continued investments in existing properties are important steps in
positioning the City on the right track toward stabilizing its tax base, which will in turn help
to reduce the overall tax burden.
The year 2017 will include increases for University Village, Casey’s, Sonic, a new gas
station, and the downtown projects recently approved by the City Council. These
projects include the approval of the new mixed use Cornerstone project, Sundog IT's
rehab of the old Moxie building, and the Forge’s rehab of an existing downtown
space for their brewery and tasting room. These and other projects being targeted in
Downtown DeKalb will add to construction values in 2017 and beyond. Exhibit 2
provides a graphic overview of recently completed, approved and projects under
construction in downtown DeKalb. It also shows the locations of properties where
significant investments in civic projects may occur.
Projects outside of the downtown are also on staff’s radar. Efforts to stabilize and grow
projects on West Lincoln Highway and Sycamore Road are being evaluated. Staff also
continues to work with its development partners on industrial opportunities along Peace
road and elsewhere throughout the community.
The City’s success depends, in large part, on perceptions of potential investors that are
often times based on what they hear on the street or see in print regarding the local
economy’s health. The information in this report supports the story that growth in DeKalb
is not stagnant. These statistics, along with a willingness to support new investments, by
Page |6
the actions of staff to move worthy projects through the development process to a
successful approval by the City Council, are viewed positively by investors considering
DeKalb locations. Staff encourages City officials and residents to use this information as
a basis to speak positively of growth and economic development in DeKalb.
Page |7
APPENDIX 1
PERMIT DATA FOR PERMITS GREATER THAN $100,000
Property Address Value Description Totals
2009
Commercial
2555 SYCAMORE RD 6,900,000 TARGET STORE
1037 S ANNIE GLIDDEN RD 168,310 GOODWILL
1740 E LINCOLN HWY 300,000 GAS STATION
2270 BARBER GREENE RD 400,000 TAILS TRAINING CENTER
917 GREENBRIER RD 100,000 ALTERATION OF 8 UNITS 7,868,310.00
Residential
312 QUINLAN AV 275,000 house
449 QUINLAN AV 125,000 house
437 QUINLAN AV 125,000 house
425 QUINLAN AV 125,000 house
455 QUINLAN AV 125,000 house
1021 S SIXTH ST 150,000 house
3415 SANBORN LN 300,000 house
109 COBBLESTONE TRL 100,000 1,325,000.00
Industrial
1832 PLEASANT ST 1,000,000 DEKALB FORGE ADDITION 1,000,000.00
Institutional
507 E TAYLOR ST 1,100,000 ROOM ALTERATION 1,100,000.00
2009 TOTAL 11,293,310.00
2010
Industrial
1250 MACOM DR 25,000,000 3M - NEW 25,000,000.00
Commercial
3260 SYCAMORE RD 125,000 FIRE JOB - PHYSICAL THERAPY
1405 S FOURTH ST 178,000 DOLLAR GENERAL BUILDOUT
2518 SYCAMORE RD 300,000 SEARS
2500 SYCAMORE RD 380,000 HOBBY LOBBY TENANT BUILDOUT
2563 SYCAMORE RD 138,000 DENTIST OFFICE
2201 SYCAMORE RD 450,000 SHELL BLDG - COMMERCIAL
2451 SYCAMORE RD 150,000 MAURICES BUILDOUT
HOBBY LOBBY LANDLORD
2500 SYCAMORE RD 475,000 BUILDOUT
2151 SYCAMORE RD 450,000 ADVANCED AUTO
1455 COUNTY FARM RD 100,954 BIOLIFE ALTERATION
CAFETERIA ALTERATION
900 CRANE DR 350,000 UNIVERSITY PLAZA
2870 PLEASANT ST 850,000 AIRPORT HANGAR 3,946,954.00
Residential
900 CRANE DR 450,000 CAFETERIA
489 RUTLAND RD 250,000 house
447 RUTLAND RD 250,000 house
577 MAGNOLIA ST 160,000 house 1,110,000.00
2010 TOTAL 30,056,954.00
2011
Commercial
1250 MACOM DR 100,000 3M GUARDHOUSE
1401 PLEASANT ST 250,000 TEGRANT OFFICE SPACE
1211 S FOURTH ST 112,000 FIRE REPAIR - CHUCK JOHNSON
Page |8
WALMART-REFRIGERATED DOOR
2300 SYCAMORE RD 175,000 CASES
1212 S SECOND ST 200,000 PINE ACRES REMODEL
400 E HILLCREST DR 125,000 BUSINESS STRIP CENTER
705 E LINCOLN HWY 200,000 GAS STATION RENOVATION
118 W LINCOLN HWY 125,000 CASTLE BANK ALTERATION
1022 W LINCOLN HWY 1,100,000 CVS
115 W GARDEN ST 170,000 fire restoration
1015 W LINCOLN HWY 168,000 ASPEN LEAF YOGURT 2,725,000.00
Industrial
770 ENTERPRISE AV 100,000 NEW INDUSTRIAL BLDG
800 NESTLE CT 190,000 NESTLE 290,000.00
Institutional
1145 RUSHMOORE DR 650,000 HOPE HAVEN ADDITION
339 WURLITZER DR 137,000 HOPE HAVEN 787,000.00
Residential
808 DORKEN LN 115,000 house
3469 COMSTOCK AV 250,000 house 365,000.00
2011 TOTAL 4,167,000.00
2012
Commercial
130 W LINCOLN HWY 2,000,000 NEW NB&T
2569 SYCAMORE RD 450,000 ALDI'S
2520 SYCAMORE RD 800,000 ROSS DRESS FOR LESS BUILDOUT
1401 PLEASANT ST 225,000 TEGRANT
835 EDGEBROOK DR 2,300,000 COMPLETE RENOVATION
BETHANY HEALTH CARE - INTERIOR
3298 RESOURCE PKWY 400,000 ALTERATION
1076 RIDGE DR 150,000 FIRE REPAIR
121 W LINCOLN HWY 400,000 CASTLE BANK REMODEL
1024 W HILLCREST DR 120,000 COMPLETE RENOVATION
2062 SYCAMORE RD 396,801 ULTA - TENANT BUILDOUT
335 WURLITZER DR 180,000 ADDITION
770 ENTERPRISE AV 350,000 ADDITION. H.A. PHILLIPS
AMERICA'S BEST CONTACTS & EYE
2506 SYCAMORE RD 150,000 GLASSES
141 W LINCOLN HWY 350,000 1ST NATIONAL BANK RENOVATION 8,271,801.00
Residential
714 S 1ST ST 180,000 180,000.00
Industrial
2754WAGNER CT 1,500,000 NEW INDUSTRIAL BLDG 1,500,000.00
2012 TOTAL 9,951,801.00
2013
Commercial
1101 W LINCOLN HWY 400,000
663 S ANNIE GLIDDEN RD 4,150,000 HAMPTON INN
545 E LINCOLN HWY 1,500,000 MCDONALDS
COMMERCIAL SHELL W/ 8
2179 SYCAMORE RD 1,000,000 APARTMENTS ABOVE
901 S ANNIE GLIDDEN RD 157,000 ANYTIME FITNESS
1212 W LINCOLN HWY 250,000 RED ROOF - CONCRETE WORK
2359 SYCAMORE RD 115,000 SEARS
2466 SYCAMORE RD 100,000 BUFFALO WILD WINGS REMODEL
2211 SYCAMORE RD 1,000,000 SHELL
302 GROVE ST 181,000 FERANDAS
Page |9
2347 SYCAMORE RD 420,000 DSW - LANDLORD
2300 SYCAMORE RD 500,000 WALMART REMODEL
9,773,000.00
Residential
832 RIDGE DR 1,492,000
507 E TAYLOR ST 160,000 ALTERATION OF 8 UNITS
3628 PEBBLE BEACH CT 235,000 house
122 ELM ST 135,000 house
3403 COMSTOCK AV 200,000 house
540 FOX HOLLOW 250,000 house 2,472,000.00
Industrial
DEKALB FORGE NEW
1832 PLEASANT ST 890,000 CONSTRUCTION
816 E LOCUST ST 1,300,000 CONEX CABLE ADDITION
1455 COUNTY FARM RD 550,000 BIOLIFE REMODEL
2585 WAGNER CT 150,000 INDUSTRIAL BUILDOUT 2,890,000.00
2013 TOTAL 15,135,000.00
2014
Commercial
2347 SYCAMORE RD 289,000 DSW - TENANT BUILDOUT
1015 W LINCOLN HWY 150,000 WINGSTOP
2476 SYCAMORE RD 150,000 PANERA ALTERATION
VERIZON WIRELESS -
2387 SYCAMORE RD 350,000 ADDITION/ALTERATION
1262 W LINCOLN HWY 450,000 CULVERS
217 S SECOND ST 150,000 COSENTINO LAW FIRM ALTERATION
2300 SYCAMORE ROAD 100,000 SUBWAY
2575 WAGNER CT 200,000 RAYNOR DOOR
402 MANNING DR 1,480,000 BRAD MANNING FORD ADDITION
1387 S FOURTH ST 500,000 MARDI GRAS LAUNDRA-MAT
3232 PLEASANT ST 1,200,000 AIRPORT HANGAR
2219 SYCAMORE RD 250,000 ELWOOD STEAK HOUSE 5,269,000.00
Institutional
801 NORMAL RD 300,000 MOSQUE
309 OAK ST 25,464,568 DEKALB PUBLIC LIBRARY 25,764,568.00
Residential
532 FOX HOLLOW DR 225,000 house
427 N FOURTEENTH ST 106,000 house alteration
808 DORKEN LN 265,000 house addition
900 CRANE DR 2,875,719 South Tower Floors 2-8 3,471,718.50
2014 TOTAL 34,505,286.50
2015
Commercial
1116 W LINCOLN HWY 128,000 MUKESH PATEL
629 E LINCOLN HWY 200,000 SKATEBOARD LOVE
800 NESTLE CT 215,000 NESTLE
2579 SYCAMORE RD 200,000 ANYTIME FITNESS
913 W LINCOLN HWY 510,000 BURGER KING
2300 SYCAMORE RD 1,083,500 WALMART COOLING EQUIPT
2383 SYCAMORE RD 325,000 CHIPOTLE
237 E LINCOLN HWY 120,000 Q-NAILS
2337 SYCAMORE RD 213,917 ATHLETICO 2,995,417.00
Institutional
2944 GREENWOOD ACRES
DR 12,000,000 OAKCREST ADDITION 12,000,000.00
Industrial
P a g e | 10
733 ENTERPRISE DR 182,947 LIGHTHOUSE CATHOLIC HVAC
TARGET DISTRIBUTION CENTER -
1115 MACOM DR 5,000,000 ALTERATION
TARGET DISTRIBUTION CENTER -
1115 MACOM DR 15,006,654 ALTERATION 20,189,601.00
Residential
ANNIE GLIDDEN HOUSE
1115 N ANNIE GLIDDEN RD 200,000 ALTERATION
900 CRANE DR 105,000 CANOPY
900 CRANE DR 3,286,536 NORTH TOWER
900 CRANE DR 974,399 CENTRAL BUILDING
453 RUTLAND RD 256,000 house
3486 SANBORN LN 225,000 house
3701 GREEN TREE LN 400,000 house
1726 FURROW ST 175,000 house
217 FORSYTHE LN 214,913 house
3664 PEBBLE BEACH CT 260,000 house
900 CRANE DR 410,817 SOUTH TOWER 1ST FLOOR 6,507,664.43
2015 TOTAL 41,692,682.43
2016
Commercial
625 BETHANY RD 350,000 RESOURCE BANK
2577 SYCAMORE RD 330,000 STARBUCKS ALTERATION
811 W LINCOLN HWY 106,000 STRUCTURAL REPAIR
2061 SYCAMORE RD 378,000 SHELL BUILDING - ASPEN DENTAL
2101 SYCAMORE RD 368,000 SHELL BUILDING -
1127 W LINCOLN HWY 750,000 POPEYE'S LOUISIANNA CHICKEN
BRIAN BEMIS
1890 SYCAMORE RD 400,000 ADDITION/ALTERATION
460 E LINCOLN HWY 400,000 SHELL BUILDING -
2061 SYCAMORE RD 250,000 ASPEN DENTAL TENANT BUILDOUT
2300 SYCAMORE RD 127,000 ALTERATION - WALMART
1321 SYCAMORE RD 300,000 WENDY'S ALTERATION
920 GREENBRIER RD 110,000 ALTERATION
1180 W LINCOLN HWY 140,000 BOWLRRITO
456 E LINCOLN HWY 150,000 MARCO'S PIZZA
2160 SYCAMORE RD 450,000 CINEMA REMODEL
1001 N ANNIE GLIDDEN RD 280,000 CASEY'S ADDITION
251 E LINCOLN HWY 108,000 THAI PAVILLION
Residential
540 W LINCOLN HWY 150,000 house addition
455 LARKING AV 210,000 house
125 MCCORMICK AV 100,000 house alteration 460,000.00
Industrial
1650 MACOM DR 40,000,000 3M
1801 PLEASANT ST 500,000 DEKALB FORGE NEW 40,500,000.00
Institutional
2350 PRIDE DR 6,000,000 CHRIST COMMUNITY CHURCH 6,000,000.00
2016 TOTAL 46,960,000.00
P a g e | 11
Downtown Projects
WL
OC
US PIN
TS E
T ST
ST
N5
TH
N1
ST
ST OA
Egyptian K
ST
ST
N2
Theatre ND
ST Commercial
Kitchen
ST
PAL N3
RD
W LINCOLN HWY ME N4
RC
T
TH
Potential
Potential EL
OC STEAM Site
US
STEAM Site
ST
TS
T
N6
New Thai TH
DeKalb
Pavilion
Cornerstone Forge
Brewery
Sun Dog
ST
EL
INC
S1
ST OL UNION PACIFI
NH C RAILROAD
WY
Mixed Use
Commercial
ST
N7
TH
GIR
ST
A RD
S2 ST
ND ST
S3
RD ST
GR
O VE
S4 ST
TH GIR
A
ST
RD
ST
S5
FRA TH
NK
LIN City
Completed S T
Hall ST
Approved S7
TH
Possible
SPE Civic Project Site
ROP ST
CT S6
ST TH
Under Construction
File: \Community Development\Downtown Opportunities.mxd
Created: 1/31/2017 DJE
Return to Agenda
I 0 125 250 500 750 1,000
Feet
Last Updated: 4/6/2017 DJE