Planning & Zoning Commission
Regular MeetingDeKalb, IL · May 1, 2023
Minutes
Planning and Zoning Commission
May 1, 2023
Page 1 of 3
MINUTES
CITY OF DEKALB
PLANNING AND ZONING COMMISSION
May 1, 2023
The Planning and Zoning Commission held a meeting on May 1, 2023, in the Yusunas Meeting
Room at the DeKalb Public Library, 309 Oak St. DeKalb, Illinois. Chair Max Maxwell called the
meeting to order at 6:00 PM.
A. ROLL CALL
Recording Secretary Stephanie Turner called the roll. Planning and Zoning Commission
members present were: Trixy O’Flaherty, Maria Pena-Graham, Shannon Stoker, Jerry
Wright, Bill McMahon, and Chair Max Maxwell. Steve Becker was absent. Planning
Director Dan Olson, City Manager Bill Nicklas, and City Engineer Zac Gill were present
representing the City of DeKalb.
B. APPROVAL OF THE AGENDA (Additions/Deletions)
Chair Maxwell requested a motion to approve the May 1, 2023, agenda as presented. Mr.
McMahon motioned to approve the agenda as presented. Mr. Wright seconded the
motion, and the motion was approved by unanimous voice vote.
C. APPROVAL OF MINUTES
1. April 17, 2023 –Chair Maxwell requested a motion to approve the April 17, 2023,
minutes as presented. Ms. O’Flaherty motioned to approve the minutes as presented.
Ms. Stoker seconded the motion, and the motion was approved by unanimous voice
vote.
D. PUBLIC PARTICIPATION (Open Floor to Anyone Wishing to Speak on Record)
None
E. NEW BUSINESS
1. Public Hearing – A petition by EO5 Hotels represented by Pramit Patel for the
approval of the rezoning of the site at 902 Peace Road from the “HI” Heavy Industrial
District to the “PD-I” Planned Development Industrial District and approval of a
preliminary development plan, and associated waivers to the UDO in order to
accommodate a 121 room Marriott branded hotel.
Pramit Patel of EO5 Hotels, contract purchaser of subject site, stated he currently is
the owner of the Hampton Inn and Home2 Suites on S. Annie Glidden Rd. and is
requesting rezoning of the property to accommodate a Marriott branded hotel. Mr.
Patel informed the Commission he knows there is a demand for another hotel in the
area due to currently operating two hotels in DeKalb.
Mr. Patel stated workers in DeKalb who are Marriott loyal guests have been staying in
Aurora and Naperville to obtain loyalty points. He stressed there are no hotels on
Planning and Zoning Commission
May 1, 2023
Page 2 of 3
Peace Road in DeKalb and the subject site is four miles from Chicago West Business
Center. He explained this will be a dual branded hotel sharing a lobby and a pool. He
added 60 rooms will be a Fairfield Inn which will be standard stay, and 61 rooms will
be a TownePlace Suites which is an extended stay option.
Planning Director Olson went through the Staff Report dated April 27, 2023. Mr. Olson
stated the petition is to rezone the site from the “HI” Heavy Industrial District to the
Planned Development Industrial District to accommodate the hotel. He stated the
subject site is a 2.5-acre lot in the Airport North Industrial Park Unit 4 Subdivision which
currently has a shared access off Peace Road with adjoining businesses. He
mentioned the hotel access will be slightly modified to make it safer and more efficient.
Mr. Olson said the number of parking spaces required is 127 and 136 spaces will be
provided. He informed the Commission a Final Development Plan will come back to
the Commission for review and will include engineering, landscaping, a lighting plan,
and final architectural renderings.
Planning Director Olson explained the applicant is meeting many of the goals of the
Comprehensive Plan and the hotel will be a catalyst for future development along
Peace Road. Mr. Olson covered two waivers to the UDO, one being the maximum site
coverage and the other a reduced parking setback along the north property line. He
added the two waivers will not have a detrimental effect on the surrounding area.
Mr. Olson discussed the public input that was received including an e-mail from David
Swigart, CEO of Conserv FS (owners of Fast Stop Express) noting support of the
request. He said three additional letters were received today. Mr. Olson mentioned
letters of strong support were received from the DeKalb County Convention and
Visitors Bureau and Paul Borek of the DeKalb County Economic Development
Corporation. He added a letter not supporting the proposal was received from the
DeKalb County Building and Construction Trades Council. Mr. Olson ended by saying
the City strongly recommends approval of the project.
Chair Maxwell asked if there were any comments from the public in which there were
none.
Chair Maxwell asked if there were any questions or comments from the Commission
members.
Shannon Stoker inquired if there would be any other shared amenities like a restaurant
or bar amongst both hotels. Pramit Patel stated just a pool and a gym.
Maria Pena-Graham asked if the workers working there will be local workers, including
construction workers. Mr. Patel said all workers at other hotels live in DeKalb and there
is a requirement that any manager relocate to DeKalb. He stated the residence of the
construction workers depends on the company that wins the bids for the work.
Maria Pena-Graham addressed Mr. Olson and inquired if he thinks other businesses
and restaurants will come to the area because she has talked with people who stay at
hotels that are near restaurants. Mr. Olson said he strongly believes the proposed
hotel will lead to future development in the area.
Planning and Zoning Commission
May 1, 2023
Page 3 of 3
Mr. Wright asked if someone could speak to the letter from the DeKalb County Building
and Construction Trades Council which did not support the hotel. Mr. Olson noted the
applicant can respond but the focus of the Commission should be on the findings of
fact for the rezoning. Mr. Patel explained they try to use union workers when feasible,
however it depends on bids they receive and the project budget. He mentioned the
entire project could not be completed using all union laborers, as it would not be
feasible.
Mr. McMahon moved that based on the submitted petition and testimony presented,
the Planning and Zoning forward its findings of fact and recommend to the City Council
approval of the rezoning of subject site at 902 Peace Road from the “HI” Heavy
Industrial District to the “PD-I” Planned Development Industrial District for a 121-room
Marriott Branded Motel to be located on the subject property per the Preliminary
Development Plans and Development Standards listed in Exhibit A of the staff report
with the condition the access to the subject site be revised on the Final Development
Plan per the approval of the City Engineer.
Ms. Pena-Graham seconded the motion.
A roll call vote was taken. Ms. O’Flaherty – Yes, Ms. Pena-Graham – Yes, Ms. Stoker-
Yes, Mr. Wright – Yes, Mr. McMahon – Yes, Chair Maxwell – Yes. Steve Becker was
absent. Motion passed 6-0-1.
F. REPORTS
Planning Director Olson announced the next Commission meeting is set for Monday,
May 15, which will consist of two hearings. One is for a text amendment for the
Kishwaukee Water Reclamation District and the other is an extension of a special use
permit for Littlejohn School’s modular classroom.
City Engineer Zac Gill touched on the current and upcoming road projects starting with
the work being conducted on two bridges (N. 1st St. and Lucinda Ave). He said the City
received funding from the State and the bridges were deemed at the end of their useful
life. He mentioned the work should be completed by this fall. Mr. Gill also explained
the major project along Peace Road including the widening through Fairview Dr.
Finally, he stated they are ahead of schedule with the annual street maintenance
program for the year.
G. ADJOURNMENT
Mr. Wright motioned to adjourn, Ms. O’Flaherty seconded the motion, and the motion
was approved by unanimous voice vote. The Planning and Zoning Commission
Meeting adjourned at 6:18 PM.
Minutes prepared by: Stephanie Turner Approved: May 15, 2023
Agenda
DEKALB PLANNING AND ZONING COMMISSION AGENDA
Monday, May 1, 2023
6:00 P.M.
DeKalb Public Library
Yusunas Meeting Room
309 Oak Street
DeKalb, IL 60115
A. ROLL CALL
B. APPROVAL OF AGENDA (Additions or Deletions)
C. APPROVAL OF MINUTES
1. April 17, 2023
D. PUBLIC PARTICIPATION (Open Floor to Anyone Wishing to Speak on Record)
E. NEW BUSINESS
1. Public Hearing – A petition by EO5 Hotels represented by Pramit Patel for the approval of the rezoning
of the site at 902 Peace Road from the “HI” Heavy Industrial District to the “PD-I” Planned Development
Industrial District and approval of a preliminary development plan, and associated waivers to the UDO in
order to accommodate a 121 room Marriott branded hotel.
F. REPORTS
G. ADJOURNMENT
COVID-19 Notice: The corporate authorities of the City of DeKalb intend to conduct this meeting in-person with a physically present
quorum that is open to the public and in compliance with all applicable public health requirements. Pursuant to current public
health guidelines, persons attending this meeting are not required to wear protective face masks/coverings.
Planning and Zoning Commission
April 17, 2023
Page 1 of 3
MINUTES
CITY OF DEKALB
PLANNING AND ZONING COMMISSION
April 17, 2023
The Planning and Zoning Commission held a meeting on April 17, 2023, in the Yusunas Meeting
Room at the DeKalb Public Library, 309 Oak St. DeKalb, Illinois. Chair Max Maxwell called the
meeting to order at 6:01 PM.
A. ROLL CALL
Recording Secretary Stephanie Turner called the roll. Planning and Zoning Commission
members present were: Steve Becker, Trixy O’Flaherty, Maria Pena-Graham, Shannon
Stoker, Jerry Wright, and Chair Max Maxwell. Bill McMahon was absent. Planning Director
Dan Olson was present representing the City of DeKalb.
B. APPROVAL OF THE AGENDA (Additions/Deletions)
Chair Maxwell requested a motion to approve the April 17, 2023, agenda as presented.
Ms. Stoker motioned to approve the agenda as presented. Mr. Wright seconded the
motion, and the motion was approved by unanimous voice vote.
C. APPROVAL OF MINUTES
1. April 3, 2023 –Chair Maxwell requested a motion to approve the April 3, 2023, minutes
as presented. Ms. O’Flaherty motioned to approve the minutes as presented. Mr.
Becker seconded the motion, and the motion was approved by unanimous voice vote.
D. PUBLIC PARTICIPATION (Open Floor to Anyone Wishing to Speak on Record)
None
E. NEW BUSINESS
1. Public Hearing – A petition by Brian and Kristy Foster for approval of a variance to
the Unified Development Ordinance in order to construct a driveway addition at 3353
Basswood Lane that exceeds the maximum width allowed.
Brian Foster, owner of 3353 Basswood Lane, explained the request to expand their
driveway to accommodate a three-car length driveway which is what others in the
surrounding neighborhood currently have. He stated the hardship comes from their
property being a pie shaped lot. Mr. Foster added he has a child driving and doesn’t
want multiple cars parked on the street.
Planning Director Olson went through the Staff Report dated April 13, 2023. Mr. Olson
spoke on the driveway width regulations in the UDO, which states no drive can cover
more than 40% of the lot or 36 feet, whichever is less. He stated the request is for a
12-foot addition to the current 17-foot-wide driveway to accommodate an extra parking
space.
Planning and Zoning Commission
April 17, 2023
Page 2 of 3
Mr. Olson added the lot is wide in the rear and narrows down to 40 feet at the front lot
line and the current driveway even exceeds the 40% regulation. He added the lot is
under the 50-foot-wide lot width regulation in the UDO. Mr. Olson informed the
Commission there are 47 lots in the subdivision (Hidden Grove) with 18 consisting of
three car garages. He reiterated the shape of the lot creates a hardship for the owners.
Planning Director Olson said three letters of support were received for this request.
The first was an e-mail from Jason and Whitney Hawkins of 3337 Basswood Lane
noting their support. He also mentioned Margie Lepien of 3318 White Oak Drive and
Amy and Dennis Johnson of 3328 Basswood Lane sent documentation to show their
support for the variance. Mr. Olson stated the City recommends approval of the
variance.
Chair Maxwell asked if there were any comments from the public in which there were
none.
Chair Maxwell asked if there were any questions or comments from the Commission
members in which there were none.
Ms. O’Flaherty moved that based on the submitted petition, testimony presented and
findings of fact, the Planning and Zoning Commission approve a variance to Article
12.03.6.c.1 of the Unified Development Ordinance in order to construct a driveway
addition at 3353 Basswood Lane that exceeds the maximum width allowed as shown
on Exhibit A.
Ms. Pena-Graham seconded the motion.
A roll call vote was taken. Mr. Becker – Yes, Ms. O’Flaherty – Yes, Ms. Pena-Graham
– Yes, Ms. Stoker- Yes, Mr. Wright – Yes, Chair Maxwell – Yes. Bill McMahon was
absent. Motion passed 6-0-1.
F. REPORTS
Planning Director Olson announced the next Commission meeting is set for Monday,
May 1 with a hearing scheduled for a hotel on Peace Road north of Pleasant Street.
He mentioned the second meeting in May is scheduled for May 15 which will consist
of an extension of a special use permit for Littlejohn School’s modular classroom. Mr.
Olson informed the Commission the City Council approved the rezoning for 2239
Sycamore Road at their last meeting.
Shannon Stoker inquired if there were any updates on the cannabis dispensaries.
Planning Director Olson explained both dispensaries (E. Locust St. and W. Lincoln
Hwy.) are working on the interior of their buildings, and both indicated they should be
opened by end of the summer.
Steve Becker asked about a date for completion of the residential project at 200 S. 4th
Street (City Hall Suites). Mr. Olson said they have started back up with work on one of
the buildings and the developers’ focus (Pappas) this year is on the project.
Planning and Zoning Commission
April 17, 2023
Page 3 of 3
Mr. Olson informed the Commission a rezoning petition will be coming for the site at
the NW corner of W. Hillcrest Dr. and Blackhawk Rd. once the City Council determines
what will be built on the property.
Steve Becker questioned the timing of the City entryway signs referenced in the 2022
Comprehensive Plan. Mr. Olson stated he would check with the City Manager on the
status and respond back to Mr. Becker.
Shannon Stoker asked the status of the sandwich shop that was to be located at 922
S. 4th Street. Mr. Olson responded the owner was no longer pursuing the sandwich
shop for the location.
G. ADJOURNMENT
Mr. Wright motioned to adjourn, Mr. Becker seconded the motion, and the motion was
approved by unanimous voice vote. The Planning and Zoning Commission Meeting
adjourned at 6:15 PM.
STAFF REPORT
April 27, 2023
TO: Planning and Zoning Commission
`
FROM: Dan Olson, Planning Director
RE: 902 Peace Road – Rezoning from the “HI” Heavy Industrial District to the
“PD-I” Planned Development Industrial District - (EO5 Hotels)
I. GENERAL INFORMATION
A. Purpose Establishment of a 121 room Marriott
branded hotel.
B. Owner/Applicant EO5 Hotels represented by Pramit Patel
C. Location and Size 902 Peace Road/2.5 acres
D. Existing Zoning and Land Use “HI” Heavy Industrial District; Vacant Lot
E. Surrounding Zoning and Land Use North: HI; Commercial
South: HI; Fuel Station
East: HI; Agriculture
West: HI; Various Commercial Uses
F. Comprehensive Plan Designation Commercial
II. BACKGROUND AND ANALYSIS
Request/Background
The City received a petition from EO5 Hotels represented by Pramit Patel for approval of
the rezoning of the 2.5-acre site at 902 Peace Road from the “HI” Heavy Industrial District
to the “PD-I” Planned Development Industrial District. The intent is to accommodate the
development of a 4-story 121 room Marriott branded hotel. Approval is also requested for
a preliminary development plan and waivers to the Unified Development Ordinance for
site coverage and parking setbacks. The subject property is Lot 2 in the Airport North
Industrial Park Unit Four. The lot lies between the Bumper to Bumper auto parts store
and the Fast Stop Express gas station along the east side of Peace Road, north of
Pleasant St.
Mr. Patel owns and operates the Hampton Inn and Home2 Suites Hotels along S. Annie
Glidden Road. The applicant has the property under contract, pending approval of the
zoning entitlements. Sixty rooms will be branded as Fairfield Inn and Suites by Marriott
(standard stay) and the other 61 rooms will be branded as TownePlace Suites by Marriott
(extended stay). Both places will share the same building, parking lot, lobby, front desk,
meeting room and swimming pool.
Hotels are not permitted in the “HI” District so rezoning the site to the “PD-I” Planned
Development Industrial District was seen as the best possible option and the most
compatible with the surrounding neighborhood. The proposed “PD-I” District fits into the
surrounding neighborhood, with “HI” zoning existing to the south, east, north and west
and along both sides of Peace Road.
Access will be provided via the existing shared access at Peace Road. The access will
be slightly modified to allow for a safer and more efficient entrance into the hotel property.
A marked-up re-design of the entrance was provided by our City Engineer and is located
in the background materials. The applicant concurs with the proposed re-design and the
plans will be revised in conjunction with the submittal of the final development plan. The
number of required parking spaces is 127 based upon the UDO parking requirement of
one space for every hotel room (121) and one space for every employee on the maximum
shift (6). A total of 136 parking spaces are provided on the plan including six handicap
accessible spaces.
A copy of the proposed architectural renderings is provided as well as a preliminary
development plan. The prototype architectural rendering shows a 137 room protype,
however this project is for 121 rooms so one bay of windows from each side of the building
will be removed when the final development plan is submitted (see rendering marked up
in red). A final development plan including final engineering, landscaping, lighting and
final architectural elevations will be provided after the rezoning and preliminary
development plan are approved. The final plan will be reviewed by the Commission and
City Council prior to the issuance of a building permit for the hotel.
Page 2 of 6
The proposed hotel meets many of the Commercial Development Goals and Objectives
found in the 2022 Comprehensive Plan. The hotel will provide diversity in commercial
services and will be the first Marriott branded hotel in DeKalb County. The hotel will also
provide a new option for visitors to the area and keep Marriott loyal guests in DeKalb. The
development will also increase hotel/motel and property tax revenue for the City and other
taxing bodies.
The project is also meeting the goals of clustering new commercial development at
strategic arterial and collector crossroads. The development of the hotel should be a
catalyst for further commercial development along the Peace Road corridor. The hotel
will be the only one along Peace Road in DeKalb and will help serve the growing
ChicagoWest Business Center and Meta Data Center to the south. Additionally, the site
is located within 3 miles of I-88 and will be able to have a sign along the Tollway capturing
additional customers. The hotel is also meeting the recommendations of the Urban
Design Guidelines in the Comprehensive Plan including having buildings with a variation
of wall planes and a variety of building materials.
The following waivers to the UDO are being requested for approval.
• Increase the maximum site coverage from 70% to 77%. Article 5.13.07.4.a. In the
PD-I District, a site coverage bonus up to 90% is allowed if the site meets certain
performance criteria. The subject site meets many of those including providing
underground detention, shared access with other properties, and meeting several
of the goals and objectives of the Comprehensive Plan.
• Decrease the parking setback along the north property line. Article 12.03.6. The
minimum parking setback along interior lot lines is five feet. The preliminary
development plan shows a parking setback of 4.5 feet along the north property
line. Staff recommends approval of the slight reduction of the setback. There is
adequate green space to the north of the subject site with the adjacent building
located almost 150 feet away. Landscaping meeting the UDO requirements will
still be able to be planted in the reduced setback area.
III. STANDARDS FOR ZONING MAP AMENDMENT
1. The proposed rezoning conforms to the Comprehensive Plan, or conditions
have changed to warrant the need for different types of land uses in that area. The
proposed rezoning is appropriate considering the length of time the property has
been vacant, as originally zoned, and taking into account the surrounding areas
trend in development.
The 2022 Comprehensive Plan recommends the subject site for Commercial use. The
proposal also meets many of the goals and objectives set forth in the Plan. The trend of
development in the area has been commercial uses. The lot has been vacant for 26 years
since the plat for the Airport North Industrial Park Unit 4 Subdivision was approved in
1997.
Page 3 of 6
2. The proposed rezoning conforms to the intent and purpose of the Unified
Development Ordinance.
The rezoning of the subject property to the “PD-I” Planned Development Industrial District
will better match the proposed hotel use on the property. Planned Developments allow
the developer and the City the flexibility to agree to appropriate development standards.
The proposed rezoning request and development are in compliance with the Unified
Development Ordinance, except for the waivers noted in this staff report. The proposal
also meets the General Standard requirements for a Planned Development as described
in Article 5.13.07 of the UDO.
3. The proposed rezoning will not have a significantly detrimental effect on the
long-range development of adjacent properties or adjacent land uses.
The proposed rezoning will not have a detrimental effect on the adjacent properties or
land uses as it entitles the subject property to a use that is complementary and compatible
with the adjacent area. A Marriott brand hotel is not available in the area and will offer
another hospitality option and keep Marriott loyal guests in DeKalb. The development will
also increase hotel/motel and property tax revenue for the City and other taxing bodies.
Adequate off-street parking is provided on the site and access to Peace Road will be
improved to accommodate the use and increase safety. The proposed “PD-I” District fits
into the surrounding area, with similar zoning surrounding the subject site.
4. The proposed rezoning constitutes an expansion of an existing zoning
district that, due to the lack of undeveloped land, can no longer meet the demand
for the intended land uses.
The subject property is currently zoned “HI” Heavy Industrial District. Rezoning the
property to “PD-I” Planned Development Industrial District will allow the demand for the
intended land use to be accommodated and which is compatible with the surrounding
area.
5. Adequate public facilities and services exist or can be provided.
Adequate public services and utilities are already provided to the subject property or
adjacent to the site. Stormwater detention will be provided underground. There is an 8-
inch water main on the property and a 15-inch sanitary sewer line is located along the
west side of Peace Road. A total of 136 parking spaces are provided on the lot exceeding
the required number of 127 spaces per UDO. The existing access to Peace Road will be
modified to accommodate the use and improve safety.
IV. PUBLIC INPUT
The City received a letter of support from Dave Swigart, CEO and General Manager of
Conserv FS (Fast Stop Express), who own the property directly south of the subject site.
Page 4 of 6
V. CONCLUSIONS AND RECOMMENDATION
The staff’s recommendation is to approve, and a sample motion has been prepared. The
proposed rezoning will allow a vacant lot to be occupied by a hotel that will be an
economic benefit to the Peace Road Corridor and the City.
Sample Motion:
Based upon the submitted petition and testimony presented, I move the Planning and
Zoning Commission forward its findings of fact and recommend to the City Council
approval of the rezoning of subject site at 902 Peace Road from the “HI” Heavy Industrial
District to the “PD-I” Planned Development Industrial District for a 121-room Marriott
Branded Motel to be located on the subject property per the Preliminary Development
Plans and Development Standards listed in Exhibit A with the condition the access to the
subject site be revised on the Final Development Plan per the approval of the City
Engineer.
Page 5 of 6
Exhibit A
Preliminary Development Plans
Preliminary Development Plan (Concept Plan “B”) dated 4-5-23 prepared by Wendler
Engineer.
Exterior Elevations (Sheets 211 and 212) dated 6-24-21.
Planned Development Standards
Permitted Uses:
121 room hotel with accessory uses.
Bulk Regulations/Landscaping/Parking/Open Space:
Setbacks, building lines, site coverage, building dimension limitations, height restrictions,
parking, landscaping and other similar restrictions and regulations shall meet those
standards as set forth in the “PD-I” District and “HI” District of the UDO, except for the
waivers as listed below.
Article 5.13.07.4.a. - Increase the maximum site coverage from 70% to 77% as shown on
the Preliminary Development Plan (Concept Plan “B”) dated 4-5-23 prepared by Wendler
Engineer.
Article 12.03.6. - Decrease the parking setback along the north property line from 5 feet
to 4.5 feet as shown on the Preliminary Development Plan (Concept Plan “B”) dated 4-5-
23 prepared by Wendler Engineer.
Final Development Plan:
A Final Development Plan including engineering plans, landscape plan, lighting plan and
final building elevations shall be submitted and reviewed by the Planning and Zoning
Commission and City Council prior to the issuance of a building permit.
Page 6 of 6
F:\2022Jobs\2220341\CIVIL\CONCEPT-2220341B.dwg, 4/5/2023 1:25:00 PM, DJV
W
S N
E
PE
AC
E
RO
AD
LOT 2
LOCATION:
BENCHMARK INFORMATION:
TOPOGRAPHIC
LEGEND
PROPOSED SURVEY
DESIGNED BY:
CONCEPT PLAN "B" DAW,MAG REVISIONS
REVISION DATE
CONCEPT DRAWN BY:
OF DJV
LOT 2 AIRPORT IND. PARK - DEKALB, IL. SURVEYED BY:
DATE PLAN WITH wendler engineering services, inc.
MRK
2220341
ph: 815.288.2261
SHEET NO. 04/05/2023
FOR
1 of 1 Acquired by
ENGINEERING ARCHITECTURE LAND SURVEYING
JOB NUMBER
BOOK NO.:
SHEET TITLE
inloislIProfessionalDesignrFimNo
1.84-000918-0015 Willett Hofmann & Associates Inc. 345-91
PHOTO EO5 HOTELS
REFERENCE NOTES GENERAL NOTES CRITERIA NOTES EXTERIOR FINISH LEGEND SEE DUAL BRAND BUILDING SITE + EXTERIOR BUILDING
PRODUCT MANUAL FOR MATERIAL AND COLOR SPECIFICATIONS These design guidelines and all materials,
procedures, systems and content herein
CHANNEL LETTER SIGNAGE AT FRONT AND REAR OF PERGOLA AT REAR OUTDOOR PATIO: METAL HORIZONTAL EEF-001 EIFS 1 - MATCH COLOR BY SHERWIN-WILLIAMS SW7002 ALPACA contained or depicted (the “Design
A. REFER TO EITHER BRAND DESIGN STANDARDS "SITE & 1. BUILDING ELEVATIONS ARE APPROXIMATE AND WILL CRITERIA NOTES ARE SHOWN CATEGORIZED BY DISCIPLINE A7 A11 ENGINEERING:
BUILDING. SEE EXTERIOR SIGNAGE SPECIFICATIONS FOR MEMBERS TO BE WOOD-LOOK WITH FINISH TO MATCH ENTRY Guidelines”) have been prepared for and/or
BUILDING EXTERIOR" CHAPTER FOR MAIN REQUIREMENTS VARY BASED ON STRUCTURAL SYSTEM. AND COULD BE INTERPRETED TO APPLY TO MORE THAN ONE
REQUIREMENTS. CANOPY CEILING; 4" X 8" TUBE STEEL SUPPORTS TO HAVE PTAC LOUVER INTEGRAL WITH WINDOW FRAME. FINISH TO MATCH WINDOW EEF-002 EIFS 2 - MATCH COLOR BY SHERWIN-WILLIAMS SW7655 STAMPED CONCRETE developed by Marriott International, Inc. or
RELATED TO THIS SHEET. ARCHITECT IS RESPONSIBLE FOR DISCIPLINE. FOR EFFICIENCY, NOTES ARE ONLY SHOWN UNDER E1
FINISH COLOR TO EPT-001. FRAME. its affiliate (“Marriott”), and are the sole and
DESIGNING PROJECT IN ACCORDANCE WITH THE ENTIRE 2. PROVIDE CONTRACTOR WITH COLOR PRINTS OF ONE PREDOMINANT DISCIPLINE. CONSULTANTS SHOULD EEF-003 EIFS 3 - MATCH COLOR BY SHERWIN-WILLIAMS SW 7069 IRON ORE
PROVIDE ADEQUATE BLOCKING BEHIND WALL FOR SIGNAGE. exclusive property of Marriott, which owns
DESIGN STANDARDS. ELEVATIONS FOR ADDITIONAL CLARITY. FAMILIARIZE THEMSELVES WITH ALL CRITERIA NOTES. A8 PROVIDE ACCESS FOR MOUNTING ELECTRICAL A12 PREFINISHED METAL PARAPET AND OR GRAVEL STOP/FASCIA. E2 EXTERIOR LIGHT FIXTURE. MOUNTING HEIGHT TO BE COORDINATED WITH all right, title and interest therein, including
ARCHITECTURE: COMPONENTS AND MAKING FINAL ELECTRICAL EWP-001 EXTERIOR ARCHITECTURAL CEMENT FIBERBOARD WALL PANEL all copyright, and which reserves all rights
B. REFER TO DUAL BRAND BUILDING SITE + EXTERIOR BUILDING 3. CONTINUE FINISH TO INSIDE CORNER VERSUS FINISH EXTERIOR FEATURES OR ELEMENTS. SEE ALSO SITE PLAN AND RCP.
CONNECTIONS. PROVIDE ADEQUATE DEDICATED CIRCUITRY CANTILEVERED ENTRY CANOPY WITH UPLIGHTING AND herein. All contents should be used only as
PRODUCT MANUAL FOR MATERIALS AND COLORS; AND ALSO TRANSITIONS AT OUTSIDE CORNER. A1 TYPICAL GUESTROOM WINDOW AT GROUND FLOOR A13 EWP-002 COLUMN WRAP BREAK METAL PANEL authorized by Marriott and should not be
BROUGHT TO SIGN LOCATION FROM ELECTRICAL PANEL. WOOD-LOOK METAL PANEL CEILING FINISH. PREFINISHED EXTERIOR VERTICAL ACCENT LIGHT IN COVE, SEE DETAIL. ACCENT
FOR TYPICAL FINISHES FOR EXTERIOR ELEMENTS SUCH AS E3 copied either in whole or in part without
ALUM TRIM PANELS. SEE ALSO WALL PROFILES FOR LIGHITNG TO BE CONTINUOUS FROM TOP OF ENTRY CANOPY TO SOFFIT
TYPICAL LOUVER COLOR, DOOR FRAMES, ETC. 4. ALL DOWNSPOUTS MUST HAVE CLEANOUTS. A2 TYPICAL GUESTROOM WINDOW FOR UPPER FLOOR EWP-003 METAL PANEL TRIM AT ENTRY CANOPY its written consent.
OPT 1 - PREFERRED LOCATION FOR OPTIONAL CHANNEL INFORMATION. ABOVE. PROVIDE QUANTITY OF FIXTURES AS REQUIRED FOR THIS LENGTH.
A9 LETTER SIGNAGE ON SIDES OR ENDS OF BUILDING. LOCATE
C. REFER TO THE EXTERIOR SIGNAGE SPECIFICATIONS FOR BOTH 5. PROVIDE INTERNAL DOWNSPOUTS, GUTTERS, ROOF ALIGN AND COORDINATE REVEALS ALONG FACADE OF EDS-001 GRANITE SILL AT JEWEL BOX BELOW STOREFRONT, COLOR: ABSOLUTE BLACK, POLISHED.
A3 AS APPROPRIATE BASED ON BUILDING ORIENTATION. VERIFY EXTERIOR FENCE AT POOL AND OUTDOOR PATIO, EMF-001: FAIRFIELD INN & SUITES and
BRANDS FOR REQUIREMENTS RELATED TO SIGNAGE SHOWN DRAINS AND OVERFLOWS AS REQUIRED FOR LOCAL BUILDING. SEE ENLARGED DETAILS FOR DIMENSIONS. A14
PARAPET HEIGHT OR WALL CONSTRUCTION IN THE AREA LOW MASONRY WALLS WITH EIFS FINISH, EEF-002; AND EXTERIOR STONE LOOK CLADDING AT JEWEL BOX TO BE SELECTED BY OWNER'S TOWNEPLACE SUITES by MARRIOTT
ON THIS SHEET. RAINFALL. PROVIDE SECONDARY OVERFLOWS TO TW-TBD
SIGN TO BE INSTALLED WILL ALLOW FOR REAR ACCESS PREFINISHED METAL FENCE. SEE SITE DETAILS. ARCHITECT/DESIGNER PER IMPLEMENTATION GUIDE Marriott International Inc.
DAYLIGHT IN AREAS THAT WILL NOT DRAIN ACROSS A4 VERTICAL REVEALS IN EIFS. SEE DETAILS FOR SPACING. REQUIRED FOR CHANNEL LETTER INSTALLATION AND 10400 Fernwood Road
WALKING SURFACES. EMF-001 PREFINISHED METAL FENCE AT EXTERIOR OUTDOOR AREAS, COLOR: BLACK
OPERATION. STONE-LOOK CLADDING AT JEWEL-BOX EXTERIOR WALLS, TW- Bethesda, MD 20817
SYMBOLS 6. IF EQUIPMENT IS LOCATED ON THE ROOF, SCREEN
A5 SIDE ENTRY CANOPY, SIMILAR BOTH SIDES. A15 TBD. OWNER'S ARCHITECT/DESIGNER TO SELECT MATERIAL
ECT-001 EXTERIOR PAINT AT HM DOORS AND FRAMES, COLOR: SHERWIN-WILLIAMS SW 7069 IRON ORE
(301) 380-3000
OPT 2 - SECONDARY LOCATION FOR OPTIONAL SIGNAGE ON FOR THIS APPLICATION. REFER TO THE ARCHITECTUR
EQUIPMENT SO THAT IT IS NOT VISIBLE TO THE GUEST WINDOW GLAZING TO RECIEVE FILM TO CREATE VISUAL
DOOR TYPE A6 A10 SIDES OR ENDS OF BUILDING (NOT SHOWN). LOCATE AS SECTION OF THE DUAL PROTOTYPE IMPLEMENTATION GUIDE.
21 AT GRADE LEVEL. SCREEN TO LAUNDRY ROOM AND OTHER BOH AREAS. CP-001 WOOD LOOK METAL CEILING PANEL
APPROPRIATE AND SEE NOTE ABOVE FOR WALL
REQUIREMENTS FOR CHANNEL LETTER INSTALLATION. INSTALL EPW-001 EXTERIOR WALL PANELS USING SIZES TO
A S2 WINDOW OR STOREFRONT TYPE A16 ERF-002 ALUMINUM COPING AT PARAPETS, COLOR: BLACK
AVOID VERTICAL JOINTS. VERTICAL JOINTS AT FRONT FACE
TO ALIGN WITH EDGES OF WINDOWS BELOW. NO VERTICAL ERF-003 ALUMINUM GRAVEL STOPS/FASCIA AT PARAPETS, COLOR: BLACK
JOINTS TO OCCUR ELSEWHERE IN THESE PANELS.
EEF-001 ERF-002 EEF-001 EEF-003 EEF-001 ERF-002
4
EIFS 1" REVEALS
J H.8 H G F A10 211 E D C B A10 A.1 A AND CJ, TYP.
05-Roof 6' - 11 3/4"
42' - 6"
2' - 11"
EEF-002
10' - 1"
SPACING OF VERTICAL
REVEALS CHANGES AT 3' - 11" 2' - 4"
6' - 1"
3' - 4"
EVERY FLOOR LINE. SEE
TYP. 2"
DETAILS FOR MORE
0' - 4"
03-Third Floor 05-Roof
INFORMATION. 22' - 0" 42' - 6"
2 EEF-003 EEF-002
222 A16 EWP-001
EEF-003 D 3' - 4" 3' - 4"
4"
04-Fourth Floor 04-Fourth Floor
32' - 0" 32' - 0"
ERF-002
4
222 D 3' - 4" A12
EEF-001
EWP-003 4"
3 03-Third Floor
222 22' - 0"
A13 A15 ERF-002
03-Third Floor
0' - 4"
22' - 0" 02-Second Floor D 3' - 4" 3' - 4" A11
12' - 0"
02-Second Floor
4" 12' - 0"
TOPS OF PROJECTING EEF-002 A14
EFM-001
EIFS SECTIONS TO BE S1 63
SLOPED TO DRAIN PER EWP-002
MANUFACTURER'S 51 64 52
RECOMMENDATIONS, TYP. 01-First Floor
0' - 0"
02-Second Floor E2 A5 A4 E2
12' - 0" EDS-001 EEF-002 ERF-003 EEF-003 EEF-002 EEF-002
TW-TBD
JEWEL BOX
4 ELEVATION DETAIL @ END TOWERS 3 ELEVATION DETAIL @ RIBBED EIFS PANEL 2 SIDE ELEVATION - EAST
SCALE: 3/16" = 1'-0" Referenced from 211 SCALE: 1/4" = 1'-0" Referenced from 211 SCALE: 3/32" = 1'-0"
1 2 3 4 5 6 7 8 9 10 11 11.8 12 13 14 15 16 17 18 19 20 21 22 23
A9 A8 ALY-035 A8 A9
ERF-002 EIFS 1" REVEALS
E3 1 A2 A3 A12 A4
AND CJ, TYP.
ERF-002 EEF-003 EEF-003 EEF-001 EIFS 1" REVEALS A7 220 A12 ERF-002 A7 EEF-001
A4 A12 AND CJ, TYP. EEF-002 EEF-003
A16 EEF-003
2
220 EWP-001
3' - 11"
2"
TYP. 05-Roof
42' - 6"
6' - 0" 9' - 10" 4' - 9" 4' - 9" 5' - 11" 8 4' - 8" 4' - 8"
A E A A
222
4"
04-Fourth Floor
32' - 0"
7 3
3' - 0" 3' - 0" 3' - 7" 3' - 7" 3' - 7" 5' - 11" 6 4' - 8" 4' - 8"
222 E 222
222
4"
03-Third Floor
DUAL PROTOTYPE
ALY-035 22' - 0" FAIRFIELD INN and
TOWNEPLACE SUITES by
4 2
6' - 0" 9' - 10" 4' - 9" 4' - 9" 5' - 11" 4' - 8" MARRIOTT
A5 E 222 222
4"
Design Guideline Drawings
02-Second Floor
12' - 0" ISSUE DATE: 06-24-2021
REVISION DATE:
ERF-003
GENERATION: 1.0 - 137 UNITS
DECOR: Modern Calm & Real Living
51' - 5 21/ 32"
B B B A5
7' - 3"
61
EXTERIOR
01-First Floor
0' - 0" ELEVATIONS
TW-TBD EDS-001
ERF-003 EEF-003 EEF-002 EEF-002 EEF-003 A6 B.1 S2 A13 EWP-003 EEF-002 3
E2 A1 E1 E2 EWP-001 A16 TYP.
A15 EWP-002 EWP-002 211
BOH LAUNDRY CP-001
JEWEL BOX
1 FRONT ELEVATION - SOUTH
SCALE: 3/32" = 1'-0" 211
NOT FOR CONSTRUCTION
6/20/21 2:13:05 PM FILE NAME: 02-TF-G1-211-Ext Elevs
REFERENCE NOTES GENERAL NOTES CRITERIA NOTES EXTERIOR FINISH LEGEND SEE DUAL BRAND BUILDING SITE + EXTERIOR BUILDING
PRODUCT MANUAL FOR MATERIAL AND COLOR SPECIFICATIONS These design guidelines and all materials,
procedures, systems and content herein
CRITERIA NOTES ARE SHOWN CATEGORIZED BY DISCIPLINE CHANNEL LETTER SIGNAGE AT FRONT AND REAR OF PERGOLA AT REAR OUTDOOR PATIO: METAL HORIZONTAL EEF-001 EIFS 1 - MATCH COLOR BY SHERWIN-WILLIAMS SW7002 ALPACA contained or depicted (the “Design
A. REFER TO EITHER BRAND DESIGN STANDARDS "SITE & 1. BUILDING ELEVATIONS ARE APPROXIMATE AND WILL A7 A11 ENGINEERING:
AND COULD BE INTERPRETED TO APPLY TO MORE THAN ONE BUILDING. SEE EXTERIOR SIGNAGE SPECIFICATIONS FOR MEMBERS TO BE WOOD-LOOK WITH FINISH TO MATCH ENTRY Guidelines”) have been prepared for and/or
BUILDING EXTERIOR" CHAPTER FOR MAIN REQUIREMENTS VARY BASED ON STRUCTURAL SYSTEM. EEF-002 EIFS 2 - MATCH COLOR BY SHERWIN-WILLIAMS SW7655 STAMPED CONCRETE
DISCIPLINE. FOR EFFICIENCY, NOTES ARE ONLY SHOWN UNDER REQUIREMENTS. CANOPY CEILING; 4" X 8" TUBE STEEL SUPPORTS TO HAVE PTAC LOUVER INTEGRAL WITH WINDOW FRAME. FINISH TO MATCH WINDOW developed by Marriott International, Inc. or
RELATED TO THIS SHEET. ARCHITECT IS RESPONSIBLE FOR E1
ONE PREDOMINANT DISCIPLINE. CONSULTANTS SHOULD FINISH COLOR TO EPT-001. FRAME. its affiliate (“Marriott”), and are the sole and
DESIGNING PROJECT IN ACCORDANCE WITH THE ENTIRE 2. PROVIDE CONTRACTOR WITH COLOR PRINTS OF EEF-003 EIFS 3 - MATCH COLOR BY SHERWIN-WILLIAMS SW 7069 IRON ORE
FAMILIARIZE THEMSELVES WITH ALL CRITERIA NOTES. PROVIDE ADEQUATE BLOCKING BEHIND WALL FOR SIGNAGE. exclusive property of Marriott, which owns
DESIGN STANDARDS. ELEVATIONS FOR ADDITIONAL CLARITY. A8 PROVIDE ACCESS FOR MOUNTING ELECTRICAL A12 PREFINISHED METAL PARAPET AND OR GRAVEL STOP/FASCIA. E2 EXTERIOR LIGHT FIXTURE. MOUNTING HEIGHT TO BE COORDINATED WITH all right, title and interest therein, including
ARCHITECTURE: EWP-001 EXTERIOR ARCHITECTURAL CEMENT FIBERBOARD WALL PANEL
COMPONENTS AND MAKING FINAL ELECTRICAL EXTERIOR FEATURES OR ELEMENTS. SEE ALSO SITE PLAN AND RCP. all copyright, and which reserves all rights
B. REFER TO DUAL BRAND BUILDING SITE + EXTERIOR BUILDING 3. CONTINUE FINISH TO INSIDE CORNER VERSUS FINISH
CONNECTIONS. PROVIDE ADEQUATE DEDICATED CIRCUITRY CANTILEVERED ENTRY CANOPY WITH UPLIGHTING AND herein. All contents should be used only as
PRODUCT MANUAL FOR MATERIALS AND COLORS; AND ALSO TRANSITIONS AT OUTSIDE CORNER. A1 TYPICAL GUESTROOM WINDOW AT GROUND FLOOR A13 EWP-002 COLUMN WRAP BREAK METAL PANEL
BROUGHT TO SIGN LOCATION FROM ELECTRICAL PANEL. WOOD-LOOK METAL PANEL CEILING FINISH. PREFINISHED EXTERIOR VERTICAL ACCENT LIGHT IN COVE, SEE DETAIL. ACCENT authorized by Marriott and should not be
FOR TYPICAL FINISHES FOR EXTERIOR ELEMENTS SUCH AS E3
ALUM TRIM PANELS. SEE ALSO WALL PROFILES FOR LIGHITNG TO BE CONTINUOUS FROM TOP OF ENTRY CANOPY TO SOFFIT copied either in whole or in part without
TYPICAL LOUVER COLOR, DOOR FRAMES, ETC. 4. ALL DOWNSPOUTS MUST HAVE CLEANOUTS. A2 TYPICAL GUESTROOM WINDOW FOR UPPER FLOOR EWP-003 METAL PANEL TRIM AT ENTRY CANOPY
OPT 1 - PREFERRED LOCATION FOR OPTIONAL CHANNEL INFORMATION. ABOVE. PROVIDE QUANTITY OF FIXTURES AS REQUIRED FOR THIS LENGTH. its written consent.
A9 LETTER SIGNAGE ON SIDES OR ENDS OF BUILDING. LOCATE
C. REFER TO THE EXTERIOR SIGNAGE SPECIFICATIONS FOR BOTH 5. PROVIDE INTERNAL DOWNSPOUTS, GUTTERS, ROOF ALIGN AND COORDINATE REVEALS ALONG FACADE OF EDS-001 GRANITE SILL AT JEWEL BOX BELOW STOREFRONT, COLOR: ABSOLUTE BLACK, POLISHED.
A3 AS APPROPRIATE BASED ON BUILDING ORIENTATION. VERIFY EXTERIOR FENCE AT POOL AND OUTDOOR PATIO, EMF-001: FAIRFIELD INN & SUITES and
BRANDS FOR REQUIREMENTS RELATED TO SIGNAGE SHOWN DRAINS AND OVERFLOWS AS REQUIRED FOR LOCAL BUILDING. SEE ENLARGED DETAILS FOR DIMENSIONS. A14
PARAPET HEIGHT OR WALL CONSTRUCTION IN THE AREA LOW MASONRY WALLS WITH EIFS FINISH, EEF-002; AND EXTERIOR STONE LOOK CLADDING AT JEWEL BOX TO BE SELECTED BY OWNER'S TOWNEPLACE SUITES by MARRIOTT
ON THIS SHEET. RAINFALL. PROVIDE SECONDARY OVERFLOWS TO TW-TBD
SIGN TO BE INSTALLED WILL ALLOW FOR REAR ACCESS PREFINISHED METAL FENCE. SEE SITE DETAILS. ARCHITECT/DESIGNER PER IMPLEMENTATION GUIDE Marriott International Inc.
DAYLIGHT IN AREAS THAT WILL NOT DRAIN ACROSS A4 VERTICAL REVEALS IN EIFS. SEE DETAILS FOR SPACING. REQUIRED FOR CHANNEL LETTER INSTALLATION AND 10400 Fernwood Road
WALKING SURFACES. EMF-001 PREFINISHED METAL FENCE AT EXTERIOR OUTDOOR AREAS, COLOR: BLACK
OPERATION. STONE-LOOK CLADDING AT JEWEL-BOX EXTERIOR WALLS, TW- Bethesda, MD 20817
SYMBOLS 6. IF EQUIPMENT IS LOCATED ON THE ROOF, SCREEN
A5 SIDE ENTRY CANOPY, SIMILAR BOTH SIDES. A15 TBD. OWNER'S ARCHITECT/DESIGNER TO SELECT MATERIAL
ECT-001 EXTERIOR PAINT AT HM DOORS AND FRAMES, COLOR: SHERWIN-WILLIAMS SW 7069 IRON ORE (301) 380-3000
OPT 2 - SECONDARY LOCATION FOR OPTIONAL SIGNAGE ON FOR THIS APPLICATION. REFER TO THE ARCHITECTUR
EQUIPMENT SO THAT IT IS NOT VISIBLE TO THE GUEST WINDOW GLAZING TO RECIEVE FILM TO CREATE VISUAL
DOOR TYPE A6 A10 SIDES OR ENDS OF BUILDING (NOT SHOWN). LOCATE AS SECTION OF THE DUAL PROTOTYPE IMPLEMENTATION GUIDE.
21 AT GRADE LEVEL. SCREEN TO LAUNDRY ROOM AND OTHER BOH AREAS. CP-001 WOOD LOOK METAL CEILING PANEL
APPROPRIATE AND SEE NOTE ABOVE FOR WALL
REQUIREMENTS FOR CHANNEL LETTER INSTALLATION. INSTALL EPW-001 EXTERIOR WALL PANELS USING SIZES TO
A S2 WINDOW OR STOREFRONT TYPE A16 ERF-002 ALUMINUM COPING AT PARAPETS, COLOR: BLACK
AVOID VERTICAL JOINTS. VERTICAL JOINTS AT FRONT FACE
TO ALIGN WITH EDGES OF WINDOWS BELOW. NO VERTICAL ERF-003 ALUMINUM GRAVEL STOPS/FASCIA AT PARAPETS, COLOR: BLACK
JOINTS TO OCCUR ELSEWHERE IN THESE PANELS.
ERF-002 EEF-001 ERF-002 EEF-003 EEF-001 EEF-003 EEF-001
A4
A12 A A.1 A10 B C D E F G H H.8 J
A10
EIFS 1" REVEALS
AND CJ, TYP.
9' - 0 1/2"
6' - 1"
EEF-002 05-Roof
2" 42' - 6"
A2
A3
A E1
4"
C 04-Fourth Floor
32' - 0"
A3
ERF-002
4"
C 03-Third Floor
EEF-002 22' - 0"
EWP-003
EEF-003
A13
EFM-001 EEF-001
4"
02-Second Floor
A14 12' - 0"
A15
S8 B B
64
01-First Floor
0' - 0"
EEF-002 ERF-003 E1 E2 TW-TBD
A1 A5
JEWEL
BOX
2 SIDE ELEVATION - WEST
SCALE: 3/32" = 1'-0"
23 22 21 20 19 18 17 16 15 14 13 12 11.8 11 10 9 8 7 6 5 4 3 2 ERF-002
1
2 3
1 A8 ERF-002 A8 1
EEF-003
221 EEF-002 221 EIFS 1" EEF-003 A4
ERF-002 EIFS 1" REVEALS EEF-001 A2 222 EEF-003 ERF-002 A12 221 A2 ERF-002 A3 EEF-001 A4
REVEALS
AND CJ, TYP. A7 A7
AND CJ, TYP.
9' - 11"
6' - 1"
2"
05-Roof
42' - 6"
9' - 10" 6' - 0"
A A A A
04-Fourth Floor
4" 32' - 0"
ERF-002
3' - 0" 3' - 0"
DUAL PROTOTYPE
03-Third Floor FAIRFIELD INN and
4" 22' - 0" TOWNEPLACE SUITES by
9' - 10" 6' - 0" MARRIOTT
A12
Design Guideline Drawings
02-Second Floor ISSUE DATE: 06-24-2021
ERF-003 4" 12' - 0" REVISION DATE:
ERF-003 GENERATION: 1.0 - 137 UNITS
DECOR: Modern Calm & Real Living
EFM-001 A5
B B
53 65 S6 66 65 67
7' - 3"
B B
EXTERIOR
01-First Floor ELEVATIONS
0' - 0"
S7 S5 S4 S13 S12 S11 S10 S9 EIFS 1"
A5 A1 E1 EEF-001 EEF-002 E2 A14 A11 EEF-001 A14 E2 EEF-002 ERF-003 A1 REVEALS
EEF-003 EEF-002 EEF-003
AND CJ, TYP.
1 REAR ELEVATION - NORTH
SCALE: 3/32" = 1'-0"
212
NOT FOR CONSTRUCTION
6/20/21 2:14:04 PM FILE NAME: 02-TF-G1-212-Ext Elevs
Reasons for Rezoning Request
EO5 Hotels is requesting to rezone lot 902 Peace Road, DeKalb from Heavy Industrial to Planned
Development - Industrial. The lot will be used to develop and operate a 121 room Marriot
branded hotel. The hotel will be branded with two different Marriott flags that will share the
same building, parking lot, lobby, front desk, and pool, but feature different amenities inside
the rooms. EO5 Hotels is planning to start construction in spring of 2024 with an opening in the
summer of 2025.
Sixty of the rooms will be branded as Fairfield Inn and Suites by Marriott (standard stay) and the
other 61 rooms will be branded as TownePlace Suites by Marriott (extended stay). The two
Marriott flags are the mirror opposite of the Hampton Inn by Hilton and Home2 Suites by Hilton
located on Annie Glidden Road, which are also owned, operated, and developed by EO5 Hotels.
One of the objectives outlined in the new Comprehensive Plan for Commercial Development
(page 47), states the need for diversity in commercial services and products. This will be the
first Marriott branded hotel of any kind in DeKalb County providing a new option for visitors to
DeKalb. Currently, Marriott loyal guests are working in DeKalb but staying in neighboring towns
like Naperville/Aurora which feature Marriott brands. This project is aiming to recapture any
tax revenue generated by that guest, for both the hotel and other ancillary businesses, back
into DeKalb.
Referencing one of the Commercial Goals from the Comprehensive Plan, “Cluster new
commercial development at strategic arterial and collector crossroads”, We are hoping that this
new development, located at 902 Peace Road, will be the strategic catalyst for further
commercial and retail development between Pleasant St and Barber Green Rd off Peace Road.
The abundant land remains prime for development with direct access to Peace Road and
located 4 miles directly North from the ChicagoWEST Business Center. With the growing
economic landscape of DeKalb County and the influx of new multi-billion-dollar corporations
like Meta, Ferrara, and Amazon there is a need for additional high-end rooms which cater to
the business traveler, sports teams, and families.
Additionally, the lot is located within the 3-mile exit buffer necessary to have a Lodging sign on
I-88 for Peace Road, capturing additional transient tax revenue, which might have previously
been missed.
Objective 10 of the Commercial goals states the encouragement of shared driveways and the
lessening of curb cuts. The 902 Peace Road site will share the entrance off of Peace Road with
Bumper to Bumper auto parts store and the Fast Stop Express gas station, eliminating the need
for additional curb cuts.
Objective 6 of the Economic development goals from the Comprehensive Plan mentions
increasing the quality of education for the DeKalb School District. This hotel project will provide
close to $150K annually from its property taxes for the school district.
Marriott is considered by many to be one of the best hotel brands in the world. With a
prestigious reputation also comes high standards enforced by Marriott on all their franchised
properties. EO5 Hotels takes pride in developing, operating, and maintaining the best hotels in
DeKalb County. We will work with the City and Marriott to develop a hotel that maintains a
human scale through variations in wall planes and variety of building materials. EO5 hotels will
also provide a landscape plan to be approved by the city as it had done for its previous
development, the Home2 Suites on Annie Glidden Road, which opened September of 2020.
We are proposing to have the attached site plan approved as the Preliminary Development
Plan. A final architectural rendering of the hotel will be submitted and approved as part of the
Preliminary Development Plan.
An prototype architectural rendering is included showing a 137 room prototype. This project
will be for 121 rooms which will remove one bay of windows from each side of the building (as
marked in red). A final architectural rendering of the hotel will be submitted and approved as
part of the Preliminary Development Plan.
We acknowledge that we must submit a Final Plan that includes an engineering plan, lighting
plan, and landscape plan. The Final Plan will be approved by the Planning & Zoning Commission
and City Council.
The following are the known waivers/variances:
1. The maximum Site Coverage for a PD-I rezoned site is 70%. This project will cover
76.7%
2. During our initial meeting with the City, there were a few areas where the parking
was slightly less than required 5-foot setback from the property line. Wendler
Engineering was able to realign the site to be parallel with the south property line
(see attachment “Wendler Parking Layout”), but there are parking spaces to the
North, that do not meet the required setback by roughly 6 inches for which we will
need a waiver.
STANDARDS OF REZONING
A. The proposed rezoning conforms to the Comprehensive Plan, or conditions have
changed to warrant the need for different types of land uses in that area. The
proposed rezoning is appropriate considering the length of time the property has
been vacant, as originally zoned, and taking into account the surrounding area’s trend
in development.
The proposed rezoning complies with the vision, goals and objectives set forth in
the City’s Comprehensive Plan which recommends the subject site for
Commercial uses.
B. The proposed rezoning conforms to the intent and purpose of the Unified
Development Ordinance.
The purpose of the Planned Development district is stated in the UDO as:
“to provide a means of achieving greater flexibility in the development of
land in a manner not always possible in conventional zoning districts; to
encourage a more imaginative and innovative design of projects; to
promote a more desirable community environment; and to retain
maximum control over both the design and future operations of the
development”
The rezoning of the subject property provides a location for a hotel development
that will serve both existing and future residents and visitors to the area. The
PD-I zoning provides the opportunity to more directly shape the development
use and appearance of this property in accordance with the City’s design criteria
and standards.
C. The proposed rezoning will not have a detrimental effect on the long-range
development of adjacent properties or adjacent land uses.
The proposed rezoning will not have a detrimental effect on the adjacent
properties or land uses as it entitles the subject property to commercial uses
that are appropriate for the area. The proposed use and the design and layout
of the site were considered in light of the property’s proximity to an intersection
along a major street. The PD-I zoning provides the mechanism to minimize the
proposed commercial development’s impacts on the area while fulfilling the
City’s vision for the property.
D. The proposed rezoning does not impact adjacent property values.
The existing “HI” Heavy Industrial zoning is not the ideal zoning district for the proposed
development on the subject property. Rezoning the property to PD-I will allow the developer the
flexibility to meet the needs of the development while the City can ensure that the project is
accommodating to the surrounding area. The development will continue to provide the
foundation for future commercial developments along the Peace Road Corridor. The PD-I zoning
provides the mechanism to minimize the proposed commercial development’s impacts on the
area while fulfilling the City’s vision for the property.
E. Adequate public facilities and services exist or can be provided.
Adequate facilities exist and will be provided to service this redevelopment
project. Existing utilities already serve the site. The site will be able to retain
100% stormwater detention.
From: Swigart, David (CONSERV FS)
To: Olson, Dan
Subject: 902 Peace Road Proposed Rezoning
Date: Monday, April 17, 2023 11:11:44 AM
[NOTICE: This message originated outside of the City Of DeKalb mail system -- DO NOT
CLICK on links or open attachments unless you are sure the content is safe.]
Dan,
I am writing to inform you that Conserv FS, the owner of the FAST STOP Express directly south of
902 Peace Rd., supports the proposed rezoning. In addition, we believe the proposed project will
have a positive impact on the local economy.
Sincerely,
Dave Swigart
CEO & General Manager – Conserv FS
dswigart@conservfs.com
217-248-5930
LEGAL NOTICE
NOTICE is hereby given that a public hearing will be held before the DeKalb Planning and Zoning
Commission at its regular meeting on Monday, May 1, 2023, at 6:00 p.m. in the Yusunas Meeting
Room at the DeKalb Public Library, 309 Oak St., DeKalb, IL, on the petition by EO5 Hotels
represented by Pramit Patel for the approval of the rezoning of the site at 902 Peace Road from the
“HI” Heavy Industrial District to the “PD-I” Planned Development Industrial District in order to
accommodate a 121 room Marriott branded hotel. Approval is also requested for a preliminary
development plan and waivers to the Unified Development Ordinance for site coverage, parking
setbacks and other approvals as required for the subject site to allow for the development as
proposed. The subject site is 2.52 acres, has a Parcel Identification Number of 08-24-201-021 and
is legally described below.
Lot 2 in Airport North Industrial Park, Unit No. 4, being a subdivision of part of Sections Thirteen
(13) and Fourteen (14), Township Forty (40) North, Range Four (4), East of the Third Principal
Meridian, according to the plat thereof recorded August 13, 1997 as Document 97009526 in Book
“Z” of Plats, Page 267, all in the City of DeKalb, DeKalb County, Illinois.
All interested persons are invited to appear and be heard at the time and place listed above.
Interested persons are also encouraged to submit written comments on the proposal to the City of
DeKalb, Community Development Department, 164 E. Lincoln Highway, DeKalb, Illinois, 60115
by 12:00 p.m. on Monday, May 1, 2023, or by e-mail to dan.olson@cityofdekalb.com. Further
information regarding the petition is available from the Community Development Department at
(815) 748-2361 or on the City of DeKalb’s web page at
https://www.cityofdekalb.com/1103/Public-Hearings.
Max Maxwell, Chair
DeKalb Planning and Zoning Commission
These design guidelines and all materials,
procedures, systems and content herein
contained or depicted (the “Design
Guidelines”) have been prepared for and/or
developed by Marriott International, Inc. or
its affiliate (“Marriott”), and are the sole and
exclusive property of Marriott, which owns
all right, title and interest therein, including
all copyright, and which reserves all rights
herein. All contents should be used only as
authorized by Marriott and should not be
copied either in whole or in part without
its written consent.
FAIRFIELD INN & SUITES and
TOWNEPLACE SUITES by MARRIOTT
Marriott International Inc.
10400 Fernwood Road
Bethesda, MD 20817
(301) 380-3000
DUAL PROTOTYPE
FAIRFIELD INN and
TOWNEPLACE SUITES by
MARRIOTT
Design Guideline Drawings
ISSUE DATE: 06-24-2021
REVISION DATE:
GENERATION: 1.0 - 137 UNITS
DECOR: Modern Calm & Real Living
EXTERIOR
PERSPECTIVES
1 FRONT VIEW
210
NO SCALE
NOT FOR CONSTRUCTION
6/20/21 2:11:32 PM FILE NAME: 02-TF-G1-210-Ext Perspectives