Historic Preservation Commission
Regular MeetingGlen Ellyn, IL · August 21, 2025
Minutes
Village of Glen Ellyn
Minutes
Village of Glen Ellyn
Historic Preservation
Regular Meeting
Commission
August 21, 2025
7:00PM
Glen Ellyn Civic Center
Board or Historic Preservation Date: August 21, 2025
Commission:
Meeting: Regular Called to 7:00 p.m.
Order:
Quorum: Yes Adjourned: 9:12 p.m.
MEMBER ATTENDANCE:
Penn French Chairman Present
Nathan Darga Commissioner Present
Donna Leak Commissioner Present
Barb Lemme Commissioner Present
Robert Margetts Commissioner Present
Jeremy Schletz Commissioner Present
Zak Wilson Commissioner Present
Also Present:
Jordan Frahm Associate Planner
Tim Loftus GE Historical Society
Kelli Kalinich Village Trustee
Elisa Pollina Recording Secretary
Public Present:
Ian Dawson Glen Ellyn resident
Mike & Chris Wilson
Jon Olenski Glen Ellyn resident – 644 N. Main Street
A. CALL TO ORDER
The August 21, 2025 regular meeting of the Historic Preservation Commission was called to
order by Chairman French at 7:00 PM at the Glen Ellyn Civic Center.
B. PUBLIC COMMENT – None
Historic Preservation 2
August 21, 2025
C. APPROVAL OF MINUTES FROM May 15, 2025 HPC MEETING
MOVE TO APPROVE THE MINUTES OF HPC MEETING OF 5/15/2025 as amended
RESULT: Motion Unanimously Carried
MOVER: Commissioner Lemme
SECONDER: Commissioner Darga
AYES: 7
D. OLD BUSINESS
1. Approve a Final Draft Resolution regarding Preservation Incentives and a
Preservation Matching Grant – Chairman French noted that the final draft
resolution was approved at the May meeting. Jordon presented the clean version
of the finalized document for the Commission’s review. French asked if there were
any additional comments from the HPC; seeing none, he turned to Trustee
Kalinich for next steps.
Trustee Kalinich explained that all information on the incentives, particularly the
matching grant, should be consolidated in one location for the public to avoid
confusion. Jordon added that once the Commission is aligned, the entire suite of
incentives should move forward to the Village Board. Kalinich noted her
understanding was that all components should precede together, with matching
grant and zoning approvals addressed later.
Commissioner Lemme commented that the overall program has already been
approved. Trustee Kalinich further noted that the Village Board is expecting a
follow-up presentation from the HPC and confirmed her understanding that the
program will be piloted for 18 months, with an evaluation of its effectiveness
during that time. Jordon added that, if needed, a paragraph could be included in
the resolution to reference additional incentives and the exploration of future
options with the goal of eventual implementation.
Commissioner Lemme moved to direct staff to revise the final draft resolution to
include language on exploring additional incentives with the goal of future
implementation. Commissioner Wilson seconded the motion. The motion
unanimously passed.
Ian Dawson, a resident of 869 Hillside Avenue, addressed the HPC, noting his
understanding was that the program would be available in the fourth quarter. He
submitted his application for the program and expressed his thanks to Jordan
Frahm and Trustee Kalinich for their engagement and commitment in moving the
program forward, as well as to the HPC for their work in developing it.
E. CURRENT BUSINESS
1. Historic Preservation Incentives - Draft Policy Document for Historic Preservation
Historic Preservation 3
August 21, 2025
Grant - The HPC reviewed the draft policy and noted inconsistencies in the stated
timeframes. Frahm stated he would review and revise the timeframes and
confirmed the policy will be integrated into the online application. He also noted
that the HPC website will need to be updated.
F. NEW BUSINESS
1. Landmark Alteration Request - 535 Duane Street – Jordan Frahm provided
background on 535 Duane Street (see attached), noting that under the 2025 Capital
Plan, the Facilities Maintenance Division initiated the Civic Center Exterior Door
Replacement Project on June 19, 2025, with the issuance of a Request for Proposals.
The project originally included replacement of multiple sets of exterior doors: the west
Auditorium entrance, south rear entrance, east employee entrance, and the Duane
Street main entrance.
Based on the bids received, the scope was narrowed to include only the Auditorium
doors and the east employee entrance doors, with replacement of the main and rear
entrances deferred to 2026. The new doors will be metal frame replacements installed
“in kind”. It was also noted that the current doors are not original to the building.
Commissioner Margetts adds that all the doors, window panes and handles should all
be consistent on the building. The HPC discussed a preference for the doors to be wood.
Commissioner Lemme motioned to preliminary approve the plan to replace the east door
entry and disapprove the plan to replace the west auditorium door entry; Commissioner
Margetts seconded the motion. The motion unanimously passed.
2. Landmark Alteration Request - 644 N. Main Street - Jordon Frahm reviewed the
property with the HPC (see attached), noting it was designated a Village landmark by
Ordinance No. 6162 on September 9, 2013. Built in 1904, the home is known as the
Christian A. Sievert residence. Jon Olenski, who has lived in the property since 2016, is
requesting approval for alterations that include replacing the cedar siding and trim with
James Hardie Cedarmill lap siding, and installing James Hardie Straight Edge Shake on
the gables, dormers, and turret. Frahm explained that this request involves alterations
to the heritage materials and architectural details of the landmark, either in part or in
whole.
Homeowner Jon Olenski stated the changes are necessary to address ongoing water
issues and to better seal and preserve the home. The Historic Preservation Commission
was asked to review the request and determine whether the proposed alterations,
including a door replacement, would have an adverse impact on the landmarked
property.
The HPC discussed the proposed alteration. Commissioner Darga motioned to
recommend preliminary approval for the Landmark Alteration at 644 N. Main Street.
Commissioner Lemme seconded the motion. The motion passed unanimously.
3. Landmark Nomination Request - 779 Riford Road Preliminary Designation – Jordon
Frahm reviewed the nomination request with the HPC (see attached). Petitioner
Historic Preservation 4
August 21, 2025
Christine Wilson submitted the application on behalf of the property owner, Mike
Wilson. The home, built in 1922, is an English cottage that has been well preserved,
featuring a front porch and fireplace. Its location, architectural integrity, and historical
significance make it a strong candidate for landmark designation. Notable features
include its steeply pitched gable roof, hardwood floors, large log fireplace in the living
room, and a screened porch that reflects the design sensibilities of early 20th-century
Glen Ellyn.
Commissioner Margetts motioned to approve the preliminary determination for
landmark designation of the property at 779 Riford Road and requested an in-depth
planning report. Commissioner Schletz seconded the motion. The motion unanimously
passed.
G. HISTORICAL SOCIETY BUSINESS – Tim Loftus from the Glen Ellyn Historical Society
provided several updates. He announced that the next HPC meeting will be held at the
History Center on September 18, as part of the Historical Society’s fall kickoff which
begins at 5:00 pm. Commissioners are invited to arrive early for the event prior to their
meeting.
He also noted that programs for Historical Society members are free, and the History
Center continues to draw between 100 and 170 visitors. Non-members are encouraged
to consider joining to take full advantage of these offerings.
H. CHAIRMAN REPORT – Chairman French reported that on May 27 he presented the
HPC Awards to the Village Board and included his remarks in the record (see attached).
A total of 11 awards were presented, although only a few recipients were able to attend.
Chairman French personally delivered the remaining awards to recipients at their
homes. He noted there was discussion about retroactive awards, but expressed
uncertainty about whether this practice should continue on an ongoing basis.
Commissioner Lemme added that the Commission has not formally discussed this
matter, and recommended it be included as an agenda item for next month’s meeting.
I. TRUSTEE’S REPORT – Trustee Kalinich provided several updates. She began by
acknowledging the tragic and unexpected passing of Trustee Steve Szymanski a few
weeks ago. Trustee Szymanski was newly elected to the Village Board, and his loss has
been deeply felt. As a result, a vacancy now exists, and interested individuals are
encouraged to submit an application by Monday at 8:00 a.m.
On Monday, the Board will also hold a workshop to discuss speed limits within the
Village. The current limit is 30 MPH, and the discussion will center on whether it should
be lowered.
Trustee Kalinich further reported that the parking lot at Crescent and Glenwood Station
is undergoing rehabilitation and will not be accessible during this time. Alternative
parking will be available in the Duane Street lot next to the library.
Lastly, she noted that the Board is in the process of developing the 2026 budget. At the
next HPC meeting, commissioners should be prepared to discuss any funding requests
Historic Preservation 5
August 21, 2025
they would like to make.
J. STAFF REPORT – Jordon Frahm mentioned RFP zoning code requirements discussion
will take place next week.
K. ADJOURNMENT & NEXT MEETING DATE – Commissioner Darga motioned to adjourn
the meeting and Commissioner Margetts seconded the motion. The meeting was
adjourned at 9:12 p.m. The next HPC meeting is September 18, 2025.
Submitted by Elisa Pollina, Recording Secretary
Reviewed by Jordan Frahm, Staff Liaison
Agenda
Agenda
Village of Glen Ellyn
Historic Preservation Commission Meeting
Thursday, August 21, 2025
7:00 PM
Glen Ellyn Civic Center, Galligan Board Room
Visitors are most welcome to attend all public meetings and can find copies of the Agenda online at www.glenellyn.org
prior to the meeting. Any individual with a disability requiring reasonable accommodation in order to participate in a
meeting should contact the Village of Glen Ellyn ADA Coordinator, 630-469-5000, at least five (5) business days
in advance of the next scheduled meeting.
A. Call to Order
B. Approval of Minutes
1) Approval of the May 15, 2025, Historic Preservation Commission Meeting Minutes
C. Public Comment
D. Old Business
1) Approve a Final Draft Resolution regarding Preservation Incentives and a
Preservation Matching Grant.
E. Current Business
1) Historic Preservation Incentives - Draft Policy Document for Historic Preservation
Grant
F. New Business
1) Landmark Alteration Request - 535 Duane Street
2) Landmark Alteration Request - 644 N. Main Street
3) Landmark Nomination Request - 779 Riford Road Preliminary Designation
G. Chairman's Report
H. Trustee's Report
I. Staff Report
J. Reminders
K. Adjourn
Village of Glen Ellyn
Packet
Agenda
Village of Glen Ellyn
Historic Preservation Commission Meeting
Thursday, August 21, 2025
7:00 PM
Glen Ellyn Civic Center, Galligan Board Room
Visitors are most welcome to attend all public meetings and can find copies of the Agenda online at www.glenellyn.org
prior to the meeting. Any individual with a disability requiring reasonable accommodation in order to participate in a
meeting should contact the Village of Glen Ellyn ADA Coordinator, 630-469-5000, at least five (5) business days
in advance of the next scheduled meeting.
A. Call to Order
B. Approval of Minutes
1) Approval of the May 15, 2025, Historic Preservation Commission Meeting Minutes
C. Public Comment
D. Old Business
1) Approve a Final Draft Resolution regarding Preservation Incentives and a
Preservation Matching Grant.
E. Current Business
1) Historic Preservation Incentives - Draft Policy Document for Historic Preservation
Grant
F. New Business
1) Landmark Alteration Request - 535 Duane Street
2) Landmark Alteration Request - 644 N. Main Street
3) Landmark Nomination Request - 779 Riford Road Preliminary Designation
G. Chairman's Report
H. Trustee's Report
I. Staff Report
J. Reminders
K. Adjourn
Village of Glen Ellyn
Page 1 of 68
Glen Ellyn Historic Meeting 8/21/2025 7:00 PM
Preservation Commission Department: Community Development
535 Duane Street Department Head: Jennifer Henaghan
Glen Ellyn, IL 60137 Category: Minutes
Prepared By: Jordan Frahm
AGENDA ITEM (ID # 2025- DOC ID: 2025-695
695)
Approval of the May 15, 2025, Historic Preservation Commission
Meeting Minutes
Statement of the Issue:
Review and Approve the minutes from the May 15, 2025 Historic Preservation Commission Regular
Meeting minutes.
Analysis:
Items discussed at the May 15, 2025 HPC meeting included the discussion of the historic
preservation matching grant pilot program.
Budget Impact:
Contribution to Strategic Plan
Action Requested:
Review the May 15, 2025 meeting minutes for accuracy and clarity and approve with changes as
required.
Attachments:
1. May 15, 2025 Historical Preservation Commission Minutes
Page 2 of 68
Village of Glen Ellyn
Minutes
Village of Glen Ellyn
Historic Preservation
Regular Meeting
Commission
May 15, 2025
7:00PM
Glen Ellyn Civic Center
Board or Historic Preservation Date: May 15, 2025
Commission:
Meeting: Regular Called to 7:00 p.m.
Order:
Quorum: Yes Adjourned: 9:02 p.m.
MEMBER ATTENDANCE:
Penn French Chairman Absent
Nathan Darga Commissioner Present
Donna Leak Commissioner Present
Barb Lemme Commissioner Present
Robert Margetts Commissioner Present
Jeremy Schletz Commissioner Present
Zak Wilson Commissioner Present
Also Present:
Jordan Frahm Associate Planner
Tim Loftus GE Historical Society
Kelli Kalinich Village Trustee
Public Present:
Ian Dawson Glen Ellyn resident
A. CALL TO ORDER
The May 15, 2025 regular meeting of the Historic Preservation Commission was called to
order by Commissioner Lemme at 7:00 PM at the Glen Ellyn Civic Center.
B. PUBLIC COMMENT – Ian Dawson shared that the Plan Commission is celebrating its
100th anniversary this month. Coincidentally, 100 years ago the Village bid farewell to
its 14th President, Douglas Bradford Robertson. Dawson stated through his historical
research, he also identified Robertson’s place of residence. He concluded his remarks by
congratulating Jim Burket, the newly seated 42nd President of Glen Ellyn, who took
office on Monday.
Page 3 of 68
Historic Preservation 2
May 15, 2025
C. APPROVAL OF MINUTES FROM APRIL 17, 2025 HPC MEETING
MOVE TO APPROVE THE MINUTES OF HPC MEETING OF 4/17/2025 as amended
RESULT: Motion Unanimously Carried
MOVER: Commissioner Wilson
SECONDER: Commissioner Schletz
AYES: 7
D. NEW BUSINESS
Proposed Historic Preservation Incentive Program – Eligibility Criteria and
Matching Grant - Staff Liaison Frahm explained that the Historic Preservation
Commission (HPC) received guidance from the Village Board and staff on how to
proceed with the incentive program. In March, the HPC discussed eligibility
requirements and a process for qualifying homes. Frahm drafted a resolution,
which the Commission reviewed at the meeting.
Commissioner Lemme inquired about the structure of the pilot program. Trustee
Kalinich clarified that the matching grant program should operate as an 18-month
pilot, allowing flexibility for future adjustments. This timeframe is intended to
allow for sufficient participation and program evaluation.
Dawson asked about procedures for reclaiming funds (claw backs). Trustee
Kalinich noted that while timelines were considered, monitoring would be difficult,
and claw backs were not included in the program. Hinsdale, which has a similar
program, has not experienced issues with claw backs. Commissioner Lemme
suggested revisiting this during the pilot phase. Frahm added that if funds are
awarded but not used within a set timeframe, the Commission will need to
determine how to reallocate those funds.
The HPC also discussed the process for verifying bids. Commissioner Darga
confirmed that applicants must submit bids reflecting the full project cost, and
Frahm agreed to include this requirement in the resolution.
Commissioner Lemme asked whether the Commission could approve any major
changes to the resolution via email. Trustee Kalinich responded that such changes
would require a special meeting.
The Commission reviewed and suggested edits to the resolution, particularly
clarifying the language around "significant" and "potentially significant" properties.
The resolution allows eligibility for properties that may not be designated
significant but meet age criteria.
Following further discussion, the Commission approved the eligibility criteria as
written. Trustee Kalinich added that the resolution will go to legal review before
final approval by the Village Board.
Page 4 of 68
Historic Preservation 3
May 15, 2025
Commissioner Lemme asked whether the village funded the architectural surveys.
Tim Loftus confirmed they were funded through both the village and grants from
Landmarks Illinois. Commissioner Lemme suggested exploring future grant
opportunities to update the surveys.
The Commission also discussed the inclusion of eligible roof work in the program.
Commissioner Darga clarified that while routine roof maintenance is not eligible;
restoration work to preserve historic roofing may qualify and would be evaluated
on a case by case basis.
The HPC concluded its review.
Commissioner Margetts motioned to approve the resolution as amended.
Commissioner Leaks seconded the motion. The motion unanimously passed.
E. OLD BUSINESS
1. Update on HPC Awards - Staff Liaison Frahm reported that yard signs for this year’s
award recipients have been received. The award ceremony is scheduled to take place at
the Village Board meeting on May 27, where honorees will be formally recognized. All
preparations are on track for nominees to be honored at that meeting.
Commissioner Lemme raised a suggestion regarding the possibility of recognizing
heritage projects completed in years prior to the award cycles. She asked whether the
Commission could consider honoring such projects retroactively. The HPC is open to
that consideration. Additionally, she noted the challenge in evaluating streetscape
compatibility award category between new construction and existing homes. Lemme
asked the Commission to consider separating the award into two categories—new builds
and existing homes for future consideration. Staff Liaison Frahm responded that the
current award category is primarily focused on new construction, but in years without
qualifying new builds, the Commission has considered existing homes. He
acknowledged that splitting the category could be a worthwhile adjustment moving
forward.
Commissioner Lemme also asked for feedback from the Commission on the Citizens for
Glen Ellyn yard sign placements. Commissioner Leak noted that one recipient declined
the sign and misunderstood it as something they had to pay for. She suggested that
next year; recipients should be informed in advance that the signs are complimentary
and optional. Trustee Kalinich praised the increased visibility this year, stating that the
additional signs (100 more than last year) created a stronger visual impact throughout
the Village. The signs remain in place for one month. Tim Loftus shared that one
resident declined the sign because they felt Citizens for Glen Ellyn carried political
connotations. Commissioner Leak added that recipients expressed appreciation when
they were informed ahead of time, reinforcing the value of proactive communication.
F. HISTORICAL SOCIETY BUSINESS – Tim Loftus from the Glen Ellyn Historical Society
provided several updates. Stacey’s Tavern is currently closed for construction, with
Grove Masonry scheduled to begin tuck-pointing work on the chimneys and both
Page 5 of 68
Historic Preservation 4
May 15, 2025
interior and exterior areas starting tomorrow. This project is funded by the Village. The
replacement of skylights at the History Center is currently out for bid, and the security
system will also be upgraded—both projects are also Village-funded.
The Historical Society’s fiscal year ends in June, and a new membership program is
being launched, featuring updated classifications and modest price increases.
Membership now includes free access to programs, which typically draw between 75 to
200 attendees. Loftus encouraged non-members to consider joining, as word continues
to spread about the benefits of membership.
Regarding the 551 Geneva Road property, the demolition request recently went before
the Zoning Board of Appeals. While the house will be demolished, the goal is to retain
the garage, seeking a variance. The Village informed the Historical Society that planned
utility work was removed from the project due to the upcoming Geneva roadwork
project, meaning the Historical Society will only be responsible for the demolition,
replatting and related drawings which are estimated at $40,000. Funding for that is
currently in place. The Historical Society will determine future use of the land post-
demolition and will go before the Village Board in June to seek a variation.
Upcoming events include: June 14: Teddy Roosevelt Discussion, June 19: Antique
Market Fundraiser, Jim Manak Auto Fest: Antique car show—attendees are encouraged
to bring their vehicles and Leslie Goddard: Presentation on Route 66.
G. CHAIRMAN REPORT – No report
H. TRUSTEE’S REPORT – Trustee Kalinich provided several updates. First, she noted that
budget requests for 2026 are due in August. She also reported that the Village Board
recently passed a new mobility ordinance. The ordinance addresses the use of bicycles,
e-bikes, and e-scooters, reinforcing existing rules that prohibit their operation on
downtown sidewalks. This updated ordinance aligns with state law, which permits e-
bike use for individuals aged 16 and older, and e-scooter use for those 18 and older.
Individuals below those age thresholds are technically not permitted to operate these
vehicles.
The police department will be partnering with local schools to conduct educational
outreach, and the ordinance was recently featured in the Village newsletter. Additional
signage will be installed downtown, and a broader awareness campaign is being
planned. Violations of the ordinance are subject to ticketing. Kalinich noted that several
other communities are grappling with similar issues.
She also shared that, as mentioned in a prior newsletter, the Community Development
Department has transitioned to an electronic permitting system. All permit applications
are now processed online, with extensive information available on the Village website.
Lastly, Kalinich announced that the new Village Board was seated on Monday. The
meeting included a tribute to outgoing trustees Ann Gould and Gary Fasules in
recognition of their service.
Page 6 of 68
Historic Preservation 5
May 15, 2025
I. STAFF REPORT – Jordon Frahm commends the HPC for all their work they have done
on the incentive program. He looks forward to working with them on the pilot program.
Frahm will send a final draft of the resolution to the HPC. He mentioned to let him
know of any additional changes they may see.
Commissioner Lemme thanks Chris Wilson for all her work on Citizens for Glen Ellyn
Preservation and the coordination of the signs placements in yards of historically
significant homes.
J. ADJOURNMENT & NEXT MEETING DATE – Commissioner Shletz motioned to adjourn
the meeting and Commissioner Wilson seconded the motion. The meeting was
adjourned at 9:02 p.m. The next HPC meeting is August 21, 2025.
Submitted by Elisa Pollina, Recording Secretary
Reviewed by Jordan Frahm, Staff Liaison
Page 7 of 68
Glen Ellyn Historic Meeting 8/21/2025 7:00 PM
Preservation Commission Department: Community Development
535 Duane Street Department Head: Jennifer Henaghan
Glen Ellyn, IL 60137 Category: Resolution
Prepared By: Jordan Frahm
AGENDA ITEM (ID # 2025- DOC ID: 2025-694
694)
Approve a Final Draft Resolution regarding Preservation Incentives
and a Preservation Matching Grant.
Statement of the Issue:
Review the Final Draft Resolution of the Preservation Matching Grant.
Analysis:
The Historic Preservation Commission passed a resolution describing the framework and directing
the Village Staff to create a pilot program for a residential preservation matching grant program.
Funding for such a program was previously approved by the Village Board at a level of
$50,000.
Budget Impact:
Contribution to Strategic Plan
Action Requested:
Review the May 15, 2025 Resolution for accuracy and clarity and approve with changes as required.
Attachments:
1. Final Draft Resolution HiPI May 15 Meeting
Page 8 of 68
A Resolution by the Village of Glen Ellyn Historic Preservation Commission Requesting that
Village Staff Fulfill Objectives for the Creation of a Historic Preservation Incentive Program;
To Include a Historic Preservation Matching Grant Incentive Program.
A Resolution by the Village of Glen Ellyn Historic Preservation Commission Requesting that
Village Staff Fulfill the Objectives as Discussed Herein, and at Regular Meetings of both Historic
Preservation Commission Meetings and the March 17th, 2025, Village Board Workshop, regarding
the Creation of a Historic Preservation Incentive Program. This is to Include the Formalization of a
Process for Eligibility and Qualification, and an Application and Approval Process for Structures
Qualified for the proposed Matching Grant Preservation Program.
Hereby, the Glen Ellyn Historic Preservation Commission (HPC), at the May 15th, 2025,
Regular Meeting, resolves that the following directives and evaluation criteria be the framework for
the creation of a Historic Preservation Incentives Program (henceforth referred to as “the
Program”); and,
Whereas, structures must be at least 50 years old to be eligible for consideration for the
Program; and,
Whereas, structures that have received Village Landmark status, or Glen Ellyn Historical
Society plaques, or structures that were evaluated and categorized as Significant or Potentially
Significant in Architectural Resource Surveys commissioned by the Village Board of Trustees and
that typically emulate the architectural, historical, and cultural significance required to be eligible
for the Program; and,
Whereas, Village Staff, as designated by the Historic Preservation Commission, will
conduct an initial review of applicants to the Program; and,
Whereas, after an evaluation by staff, applicants that satisfy the age and designation
criteria, and that have not undergone alteration or extreme disrepair that would disqualify the home
for consideration as a Village Landmark or National Historic Register property, are to be included
as a consent item at Regular Historic Preservation Commission Meetings for inclusion in the
Program when applicable; and,
Whereas, properties that may meet age and designation criteria, but have a history of
alterations, or the condition of the home is in dispute, will be brought before the HPC by an
applicant for review, testimony, and discussion; and,
Whereas, such properties will be qualified for inclusion in the Program by a majority vote of
HPC members; and,
Whereas, structures not designated as Village Landmarks, Glen Ellyn Historical Society
properties, nor rated as Significant or Potentially Significant by Architectural Resource Surveys may
petition the HPC for inclusion in the Program; and,
Page 9 of 68
Whereas, such properties will encompass one or more of the following criteria
representative of the U.S. Department of the Interior preservation standards: the structure will
exhibit master craftsmanship, the structure will display distinct features that exhibit a historically
important architectural style from a representative period, the property possesses local or regional
cultural significance or is associated with historically significant individuals, and/or the property
significantly contributes to the Village as a source of civic pride; and
Whereas, such properties may be qualified for inclusion in the Program by a majority vote of
the Historic Preservation Commission after petitioned by an applicant for review, testimony, and
discussion; and,
Whereas, the Village of Glen Ellyn intends for the creation of a suite of incentives for these
qualified properties that embody the mission of the Program; and,
Whereas, the first incentive that is intended to be introduced is the Preservation Matching
Grant, which has been approved by the Village Board for an initial funding amount of $50,000; and,
Whereas, the owners or representatives of qualified properties may submit a grant
application for up to $10,000 (total project costs must meet or exceed $20,000) for consideration
by the Historic Preservation Commission on a rolling, first-come-first-serve basis, with an open
application window until approved funds are exhausted; and,
Whereas, the applicants must provide construction plans that demonstrate U.S.
Department of the Interior preservation standards and provide multiple quotes for construction
costs, or qualify under stipulations allowing for sole-source bid; and,
Whereas, the Historic Preservation Commission will consider grant applications on the
merits of the proposed project’s adherence to national preservation standards as directed by the
Department of the Interior such as rehabilitating or returning significant architectural features, the
use of heritage materials, sympathetic design, etc.; and,
Whereas, matching grant-eligible projects must include exterior improvements that
enhance the home's appearance and contribute to improving the streetscape. Examples of costs
not eligible for incentives include routine or deferred maintenance projects (such as painting not as
part of a restoration), landscaping, fences and other accessory structures, and driveways and
other paved areas; and,
Henceforth, the Historic Preservation Commission directs Village Staff to act on all the
objectives herein as for the creation of a Historic Preservation Incentive Program, including
guidelines for eligibility and qualification, and the initiation of the Matching Grant program. The
Historic Preservation Commission designates Village Staff to pursue these objectives,
recommended to be created as a Pilot Program for a period of 18 months.
And so, by a unanimous vote of 6 “Yea” votes, to 0 “Nay” votes, the Historic Preservation
Commission of the Village of Glen Ellyn approves this resolution for the creation of the Historic
Preservation Incentive Program on this 15th Day of May 2025.
Page 10 of 68
Glen Ellyn Historic Meeting 8/21/2025 7:00 PM
Preservation Commission Department: Community Development
535 Duane Street Department Head: Jennifer Henaghan
Glen Ellyn, IL 60137 Category: Policy
Prepared By: Jordan Frahm
AGENDA ITEM (ID # 2025- DOC ID: 2025-692
692)
Historic Preservation Incentives - Draft Policy Document for
Historic Preservation Grant
Statement of the Issue:
At the May 15, 2025 Regular Meeting of the Historic Preservation Comission, the HPC directed
Village Staff to take the required actions to launch a pilot program for residential preservation
matching grant awards. The creation of an application packet describing the purpose, program
requirements, and eligible projects is necessary for the launch of this pilot program.
Analysis:
Staff have created a draft information packet that discusses the purpose, program requirements and
eligible projects for a historic preservation matching grant. In April 2025, the Village transitioned to
an online application system. It is anticipated by Village Staff that such an application would be
integrated into the Village's online application portal like landmark alteration or nomination
requests.
Budget Impact:
Contribution to Strategic Plan
Action Requested:
Please review the draft policy document prepared by Village staff and discuss. Provide feedback and
direction to Village Staff.
Attachments:
1. Residential Matching Grant Application Packet
Page 11 of 68
VILLAGE OF GLEN ELLYN
Village of Glen Ellyn Residential Preservation Matching Grant Program
Application Packet
Village Manager’s Office
535 Duane Street — Glen Ellyn, IL 60137 — Telephone 630.547.5345 — Fax 630.547.8849
______________________________________________________________________________
1
Page 12 of 68
VILLAGE OF GLEN ELLYN
Village of Glen Ellyn Residential Preservation Matching Grant
(As of MMM/DD, YYYY)
Purpose
The Village of Glen Ellyn and the Historic Preservation Commission recognize the importance of
preserving historic homes, as 150 years of architectural styles provide for charming neighborhood
landscapes that foster the Village’s rich cultural heritage. Historic preservation programs not only
protect historical and architectural assets, but also promote sustainability, community vitality and a
diverse housing stock. The Village of Glen Ellyn Residential Preservation Matching Grant Program
was created to encourage the restoration of architecturally or historically significant properties built
at least 50 years prior to the date of application. The Village Board reserves the sole right to amend,
modify, add, or delete any part or subpart of this Grant program.
Assistance Available
Approved projects are eligible to receive a Residential Preservation Matching Grant in an amount
not to exceed $10,000, as determined by the Historic Preservation Commission. Approval of
funding will be made by the Village Board on the recommendation of the Historic Preservation
Commission. Grant awards will be administered as a reimbursement grant after the preservation
project is completed and all requested documentation is received and reviewed by the Historic
Preservation Commission and Village Board to verify the approved the scope of work has been met.
Property Eligibility Requirements
• Homes at least 50 years old may be considered for a grant award.
• Homes that are Village Landmark properties, Glen Ellyn Historical Society plaque
properties, and homes considered architecturally significant or potentially significant by
architectural resource survey commissioned by the Village Board of Trustees may be
qualified by Village Staff for eligibility for the grant award, with subsequent Historic
Preservation Commission approval.
o Village Landmarks, Glen Ellyn Historical Society plaque homes, and Significant and
Potentially Significant rated homes are specifically mentioned, as these homes
typically emulate the architectural, historical, and cultural significance required to be
eligible for a grant award.
o After an application for grant consideration is received, Village Staff will review
permit history, conduct site visits and/or utilize other historical resources to
investigate whether a property has undergone significant alteration or is in a
2
Page 13 of 68
condition of extreme disrepair that would potentially disqualify the home for
consideration as a Village Landmark or National Historic Register property.
• Homes that are qualified by Village Staff receive final determination of eligibility at a regular
meeting of the Historic Preservation Commission. Present members that would like to
discuss the eligibility of any Landmark, GEHS Plaque or architecturally rated property, at
length and separately from other applications, may motion to address an individual
application. Otherwise, staff qualified applicants will collectively receive final approval by a
majority vote of the Historic Preservation Commission.
• All other homes that are at least 50 years old may be considered for eligibility by the Historic
Preservation Commission by application and review at a regularly scheduled public meeting.
Applicants and supporters would be encouraged to attend these eligibility discussions, and
the Historic Preservation Commission will vote on approval of eligibility.
o Such properties will encompass one or more of the following criteria:
▪ The structure exhibits master craftsmanship.
▪ The structure displays distinct features that exhibit a historically important
architectural style from a representative period.
▪ The property possesses local or regional cultural significance or is associated
with historically significant individuals.
▪ The property significantly contributes to the Village as a source of civic pride.
o Such properties may be determined to be eligible in the grant program by a majority
vote of the Historic Preservation Commission after review, testimony, and
discussion when an applicant petitions the Village for inclusion.
• Applicants must receive a determination of eligibility to submit a grant award application.
• Grant award project applications will be reviewed by the Historic Preservation Commission,
in the order that they are received, at Regular Meetings of the Historic Preservation
Commission.
Grant Award and Project Eligibility
Eligible properties may submit an application seeking a grant award for up to $10,000 (total project
costs must meet or exceed $20,000. Grants will be awarded on a rolling basis with an open
application window until funds are exhausted. Annual approved funds for the Residential
Preservation Grant Award total $50,000. Applicants must provide construction plans that
demonstrate U.S. Department of the Interior preservation standards and provide multiple quotes for
construction costs or be exempt under stipulations allowing for sole-source bid. Such stipulations
3
Page 14 of 68
may include a documented effort to seek multiple bids with a failure to respond within a reasonable
timeframe, or a project where the level of expertise being sought is specialized so that the number or
qualifications of potential project bids is limited.
Projects that may qualify for a Residential Preservation Grant Award must include exterior
improvements that enhance the home’s appearance and contribute to improving the streetscape.
Due to the program’s intent to promote high preservation standards, proposed projects should aim
to preserve or restore significant architectural features of the home, utilize heritage materials, and
use principles of sympathetic design per the standards of the U.S. Department of the Interior. Grant
funds must be awarded prior to the start of any eligible project to be considered for reimbursement.
Ineligible projects include routine or deferred maintenance (such as painting not part of a
restoration), landscaping, fences and other accessory structures, driveways and other paved areas.
Work must be completed within 24 months of receiving Village Board approval for the award.
Examples of Eligible Improvements
• Rehabilitation of roof or siding using heritage materials like cedar or stone.
• Restoration of non-extant details like corbels on a craftsman bungalow.
• Preservation of a home’s historic feature, like a prominent front porch on an American
Four Square.
• Protection of original architectural features, like a turret on a Queen Anne Victorian.
Ineligible Improvements
• Regular or deferred maintenance (such as painting not as part of a restoration)
• Landscaping
• Fences
• Accessory structures that have not been designated as Landmark structures or National
Register properties
• Driveways or other paved areas
The Residential Preservation Award is a reimbursement grant, and the project must be completed to
receive grant award funds. Awards are only valid if the preservation project is completed within a
year of the date of the Award approval. Written requests for time extensions may be considered by
the Community Development Director.
Project Evaluation
Project evaluation and approval is handled by the Village of Glen Ellyn Historic Preservation
Commission regular meetings and may require approval by the Village Board.
4
Page 15 of 68
Application Requirements
Required Submittals with Application:
• Photos depicting existing conditions of the home that will receive improvements;
• A schematic drawing with detailing the proposed improvements;
• Scope of Work with detailed costs for each proposed improvement (excluding ineligible
portions of improvements) from multiple contractors. All contractors must be registered
with the Village’s Community Development Department prior to a building permit being
issued;
• A narrative as outlined below:
➢ Description of proposed preservation work including information about the
proposed building materials and methodology for proposed changes.
➢ Details on how improvements sought will positively impact the historical
preservation of the Village.
➢ Credentials and experience of contractors
➢ Any unusual or expected difficulties or hardships in making the proposed
improvements.
5
Page 16 of 68
Glen Ellyn Historic Meeting 8/21/2025 7:00 PM
Preservation Commission Department: Community Development
535 Duane Street Department Head: Jennifer Henaghan
Glen Ellyn, IL 60137 Category: Discussion Item
Prepared By: Jennifer Henaghan
AGENDA ITEM (ID DOC ID: 2025-687
# 2025-687)
Landmark Alteration Request - 535 Duane Street
Statement of the Issue:
The applicant, the Village of Glen Ellyn, requests approval of alterations to the exterior of a Village
landmark located at 535 Duane Street.
Analysis:
The proposed alterations include the replacement of the exterior doors on the west (Auditorium)
and east (employee entrance) sides of the Civic Center. Both sets of doors are in poor condition.
The proposed new doors are like-for-like replacements in terms of both materials (metal on the west
side and wood on the east side) and appearance and are intended to have no impact to the historic
character and appearance of the Civic Center. Details of the proposed doors can be found in the
attached plans and memorandum from Public Works.
Ordinance No. 4214, passed on November 28th, 1994, designated the Civic Center as a Village
Landmark per the recommendation by the Historical Sites Commission. Per the Ordinance, the
Civic Center satisfies three distinct criteria for designation as a landmark under Section 2-13-3(A).
This includes the Civic Center's value as an example of the architectural, cultural, economic, historic
and social heritage of the Village of Glen Ellyn; an exemplification of an architectural type
distinguished by rarity uniqueness, rarity or overall qualify of the design (the Civic Center is built in a
Colonial Revival style); and a distinctive physical appearance or presence representing an established
and familiar visual feature of the Village of Glen Ellyn. The building, constructed in 1927, has served
the Community for nearly a century as a school, a police department, Village offices, election
precinct, open gym and meeting hall. The distinctive bell tower is emblematic of the Village,
appearing on its crest. In 1994, the Historical Sites Commission praised the property as an "excellent
example of adaptive reuse of an historic structure" and highlighted its eligibility for the National
Register. This project, to maintain the envelope of the building by replacing doors in-kind that are in
worsening condition, is a continuation of the preservation goals set forth by the Village over 30
years ago by landmark designation.
Budget Impact:
Contribution to Strategic Plan
Page 17 of 68
Action Requested:
The applicant is requesting that the Historic Preservation Commission review and consider the
proposed door replacement and make a determination if the proposed alteration will have an
adverse impact on the landmarked property. Staff finds that the alteration is in line with Village
standards for Commission approval.
Attachments:
1. Interoffice Memorandum - Civic Center East Employee Door Replacement - 8.12.25
2. East Doors Shop Drawing
3. West Door Details
4. West Door Frame Details
Page 18 of 68
Glen Ellyn Public Works Department
Interoffice Memorandum
To: Jennifer Henaghan, Community Development Director
From: Vic Sabaliauskas, Facilities Superintendent
Subject: Civic Center East Employee Entrance and Auditorium Door Replacement
Date: August 12th, 2025
Replacement of various Civic Center exterior doors was planned for and included in the 2025 Capital
plan, and the Facilities Maintenance Division initiated the Civic Center Exterior Door Replacement
Project on June 19th, 2025 with the issuance of a Request for Proposals to replace various sets of Civic
Center exterior doors, including the west Auditorium entranceway, southside rear entranceway, east
employee entranceway, and the Duane St. main entranceway. Based on responses from prospective
bidders, the scope of work was reduced to include replacement of the Auditorium doors and the east
employee entrance doors only. The replacement of the main and rear entrance doors would be deferred to
2026, and staff is proposing new funds in the FY2026 Capital budget to design and install new
entranceway systems for the main and rear entranceways. Staff would work with the Historic
Preservation Committee (HPC) in 2026 to review design concepts prior to proceeding with any
construction.
At this time, staff is recommending proceeding with replacing the Auditorium and east entranceways in
2025 as those doors are not public access doors and do not require architectural plans and specifications.
Replacement of the Auditorium and East doors is more straightforward and less expensive than replacing
the main and rear doorways. The Auditorium doors have not been replaced in decades and are in poor
condition, and the east employee entrance doors are also in poor condition with visible cracking and light
infiltration. The existing Auditorium doors are metal, and the new doors would also be metal. The
existing east employee entrance doors are wood (oak) and would be replaced with new white oak doors.
The appearance of both door systems would remain unchanged maintaining the historic character and
appearance of the Civic Center.
Staff submitted an agenda item for the July 28th, 2025 Village Board meeting requesting approval of an
Independent Contractor Agreement with JLJ Contracting to replace the Auditorium and east employee
entrance doors. JLJ Contracting was the contractor that completed the Civic Center Parking Garage
repairs in the Spring of 2025 and they performed very well and did excellent work. At the July 28th
Village Board meeting, the Board delayed the approval of the contract with JLJ Contracting and
requested that staff consult with the Historic Preservation Committee (HPC) to review the scope of work
and obtain HPC approval to proceed with the proposed new doors. Staff requested shop drawings from
JLJ Contracting of the proposed new doors for the east employee entrance. The shop drawing is included
with this Memo.
Page 19 of 68
Below are some points and details regarding the proposed work:
- The existing Auditorium doors are metal, and the new doors would also be metal and painted to
match the color of the existing doors. Only the doors and metal door frame would be replaced.
The existing side windows and transom windows above the doors would remain. The contractor
would provide cut sheets of the proposed new doors once the contract is approved and the
contractor has been given an official Notice to Proceed. The cut sheets can be shared with the
HPC if requested.
- The new east employee entrance doors would be wooden - same as the existing doors (clear white
oak). The archway / transom glass (described as “fan light” on the shop drawing) above the doors
would remain.
- The overall appearance of both door systems would remain unchanged maintaining the historic
character and appearance of the Civic Center.
- JLJ Contracting is the contractor that completed the Civic Center Parking Garage repairs, and they
did excellent work. They have stated that the door fabricator they work with does exceptional
work.
- All other supporting documentation pertinent to this project can be found in the previous Board
agenda item from July 28th, 2025.
Please forward this information to the HPC to be included on their agenda for their August 21st,
2025 Committee Meeting, and please let me know if you have any questions, comments or
concerns.
Thank you.
Enc. Glen Ellyn Civic Center – East Employee Entrance Door Replacement Shop Drawing dated 8-08-2025
C.c: John Hubsky, Interim Public Works Director
Miguel Montero, Facilities Lead Engineer
Page 20 of 68
8-08-2025
Glen Ellyn Civic Center - East Employee Entrance Door Replacement
535 Duane St.
Glen Ellyn, IL 60137
Contractor: JLJ Contracting
Existing Fan Light to Remain
Hardware Schedule:
1 Steel Mullion KR4954 8'6" SP28
Species: Clear White Oak 6 Hinges T4A3386 4 1/2 X 4 1/2 NRP 10
Interior: Stained and Sealed to match 2 Exit Device 99EO US10
existing 2 Exit Device Trim 996L-NL-R&V RHR US10
Exterior: Painted to match existing 2 Closer 4040XP HCUSH TBSRT LBRNZ
2 Protection Plate K1050 12" x 34" US10
Scale: NTS 1 Electric Strike to match existing
Approved by: Date:
Page 21 of 68
DOORS TECH-DATA POLYSTYRENE
1-3/4” LEGION (LP) POLYSTYRENE CORE
D4A-1
DOORS
FLUSH PANEL STEEL DOORS, BEVELED LOCK EDGE, HANDED
FLUSH DESIGNS SIMILAR LESS EMBOSSED PANEL Polystyrene slab, bonded to the
inside of both face sheets with a
waterproof, contact adhesive.
SUGGESTED USE:
- Interior or Exterior...
- Office
- Motel/Hotel
- Apartment
- Condominiums
- Dormitories
- Urban renewal
- Health care
- Institutional
- Mercantile
- Public utility
- Factory
EMBOSSED PANEL DESIGNS: 6 PANEL
- Warehouse
HIGH DEFINITION
CROSSBUCK EMBOSSED PANEL DESIGNS:
1 & 2 PANEL
DOOR DESIGNS
F G V N___ N___ GLB
DDT
DDB
LB LD LT DUTCH E101 E201 E202 E203 E601, EN61
V, G, & N
DESIGNS AVAILABLE
1 2 6
PANEL PANEL PANEL
MAX. SIZE 3’0X8’0” 3’0X8’0” 3’0X7’0”
MIN. SIZE 2’8X6’8” 2’8X6’8” 2’6X6’8”
EMBOSSED NARROW 6 PANEL DESIGNS WILL BE CENTER EDGE SEAM CONSTRUCTION.
06/05/25 (CONVERSION: 1” = 25.4 MM, E.G., 1-3/4” = 44.45 MM) 100
Page 22 of 68
DOORS TECH-DATA
D4A-2
LEGION DOORS
DOOR ELEVATION VERTICAL SECTION
1/8"
10'-0" 9'-0" *8'-0" *7'-10" *7'-2" *7'-0" *6'-8"
3 1
* * 4
8.875" 6
CYLINDRICAL LOCK
NOMINAL DOOR OPENING HEIGHT
MORTISE LOCK
ACTUAL LEAF HEIGHT
25.33"
34" 30" 26"
34" 33" 31"
8
HINGE SPACING
25.33"
34" 30" 26"
2
2
34" 33" 31"
25.33"
41.063" 40.688"
34" 30" 26"
1
5 9
8.25"
3/4"
FINISHED FLOOR
HARDWARE LOCATIONS SHOWN MATCH CECO STANDARD FRAMES.
HORIZONTAL SECTIONS SEE ALL EMBOSSED PANEL DESIGNS AND SIZE LIMITATIONS ON PAGE 100.
DOUBLE SWING
7
SINGLE SWING
ACT LEAF WIDTH
ACT LEAF WIDTH ACT LEAF WIDTH
3/32" NOMINAL DOOR 1/8"
3/32" NOMINAL DOOR 3/32"
OPENING WIDTH
OPENING WIDTH
7 LISTED 7 LISTED
STEEL
STEEL
INACTIVE ACTIVE
INACTIVE ACTIVE
STEEL
OVERLAPPING ASTRAGAL 4441 OVERLAPPING ASTRAGAL 4471
FOR 1-3/4” THICK DOORS FOR 1-3/4” THICK DOORS
01/03/20 (CONVERSION: 1” = 25.4 MM, E.G., 1-3/4” = 44.45 MM) 101
Page 23 of 68
DOORS TECH-DATA
D4A-3
LEGION DOORS
1 16 GAUGE STEEL END CHANNELS 2 VERTICAL EDGES
EPOXY SEAL
MECHANICALLY HAIRLINE
INTERLOCKED HEMMED SEAM
WELDED TO BOTH FACE EDGES
SHEETS
ALSO AVAILABLE SEAMLESS
(WELDED OR BODY FILLER)
EMBOSSED NARROW 6
INVERTED TOP PANEL WILL BE CENTER EDGE
AND BOTTOM SEAM CONSTRUCTION.
CENTER EDGE SEAM
CONSTRUCTION PROVIDED
WITH 14 GAUGE SKINS
OPTIONAL TOP AND BOTTOM CAPS ARE AVAILABLE
3 CLOSER REINFORCEMENT(OPTIONAL)
4 LOCK PREPARATION GOV. 160/161 CYLINDRICAL TYPE
14 GAUGE STEEL
CHANNEL 20” LONG (LC1)
(ANSI A115.2)
2-3/4” BACKSET
LOCK EDGE IS BEVELED 1/8” IN 2” (1:16)
5 HINGE PREPARATION 6 LOCK PREPARATION
GOV. 86, ANSI/
4-1/2 OR 5 IN. HIGH, STANDARD BHMA A115.1
OR HEAVY WEIGHT, FULL MORTISE TYPE
MORTISE HINGES
7 GAGE
REINFT.
HINGE EDGE IS HANDED
AND NOT BEVELED.
ANSI A156.7 TEMPLATE
LOCK EDGE IS BEVELED 1/8” IN 2” (1:16)
NOTE: EITHER OF THE LOCK REINFORCEMENTS/GUARDS
SHOWN MAY BE INSTALLED WITH ANY MORTISE LOCK
PREPARATION.
16 GAGE
2 VERTICAL EDGES FULL HEIGHT 8 GLAZING TRIM 9 FIXED SLAT TYPE LOUVER
CHANNEL SLIMTRIM 4634
14 GAGE WILL
BE CENTER
EDGE SEAM 3/8” WIDE
FOR 1-3/4”
CONSTRUCTION GLAZING
THICK STEEL
POCKET
DOORS
50% FREE
NARROW 6 PANEL
AIR FLOW
DESIGNS ARE
CENTER EDGE SEAM
CONSTRUCTION
WELD SEAMLESS AND BODY FILLER STEEL
SEAMLESS IS OPTIONAL LISTED
07/14/20 (CONVERSION: 1” = 25.4 MM, E.G., 1-3/4” = 44.45 MM) 102
Page 24 of 68
DOORS TECH-DATA
D4A-4
LEGION DOORS
STANDARD SIZES
NOMINAL DOOR OPENING
PRODUCT SPECIFICATIONS:
WIDTH 1-3/4” Thick steel doors shall be as manufactured by Ceco Door Products. Doors shall
HEIGHT conform to the Steel Door Institute guide specification, ANSI A250.8; see chart below for
SINGLE DOUBLE
performance classifications.
2’-0” 4’-0”
LEGION doors are made full-flush or (optional) seamless style. Face sheets are
2’-4” 4’-8”
commercial quality cold rolled steel conforming to ASTM A1008...or (optional) hot-dipped
2’-6” 5’-0” 6’-8” galvannealed or galvanized steel conforming to ASTM A924 and A653 -- see chart below.
2’-8” 5’-4” 7’-0”
2’-10” Legion full-flush doors have mechanically interlocked, hemmed, hairline seams on
5’-8” 7’-2”
vertical edges and have no visible seams on faces. Embossed narrow 6 panel doors will
3’-0” 6’-0” 7’-10” have center edge seam construction. Doors specified “seamless” have no visible seams
3’-4” 6’-8” 8’-0” on faces or vertical edges (S.D.I. Model 2). A one piece, polystyrene slab, conforming to
3’-6” 7’-0” ASTM C578 TYPE 1, is bonded to the inside of both face sheets with a waterproof contact
9’-0”
adhesive. The top and bottom door edges are closed with 16 gauge steel channels
3’-8” 7’-4” 10’-0” welded to both face sheets.
3’-10” 7’-8”
4’-0” 8’-0” Hardware Provisions: Hinge preparations are handed. Hinge edges are mortised for
4-1/2” or 5” high, standard and heavy weight hinges (specify which). 7 gauge steel hinge
reinforcements are welded inside the door edge and are drilled and tapped for fasteners in
FIRE DOORS accordance with ANSI A156.7. The lock edge has a standard bevel (1: 16) and is prepared
LABELING AGENCIES : for Gov. series 86, 160/161, or 90 locks in accordance with ANSI A 115 (specify which).
UL SOLUTIONS Optional closer reinforcement is a 14 gauge steel channel.
WARNOCK HERSEY
Paint: 1-3/4” steel doors shall be provided with one coat of oven-cured neutral color
TEST: UL 10C, UL 10B, UL 1784,
& NFPA 252
primer paint. Primer coat shall conform with ANSI A250.10. The primer coat is a
preparatory base for necessary finish painting. “Colorstyle” finish coat is also available
DESIGNS: F, G, N, V, E1, E2, E6, EN6 from a selection of standard colors (optional). Colorstyle finish is electrostatically applied,
oven-cured urethane enamel and shall conform to ANSI A250.3. For accurate color
RATING: 20 MIN, 3/4 HR, 1-1/2 HR selectors ask for a Ceco Colorstyle chart.
OR 3 HR
SIZE LIMITS - DESIGNS
MAX. SIZE: 4’0” X 8’0” SINGLE E1, E2 & E6 DESIGNS: MORTISE LOCK
PREPARATION LIMITED TO 3’0” WIDTH.
8’0” X 8’0” PAIR* FLUSH 1 2 6 1 & 2 PANEL DOORS ARE AVAILABLE IN 18 GAUGE
¨8’0” X 9’0” WITH VERTICAL RODS DESIGNS PANEL PANEL PANEL FACE SHEETS ONLY.
CROSSBUCK DOORS ARE AVAILABLE IN 20 & 18
GAUGE FACE SHEETS ONLY.
NOT ALL RATINGS ARE AVAILABLE MAX 4’0”x10’0” 3’0”x8’0” 3’0”x8’0” 3’0”x7’0” 6 PANEL IS AVAILABLE IN 20, 18, & 16 GAUGE.
IN ALL SIZES, DESIGNS AND MIN 2’0”x6’8” 2’0”x6’8” 2’0”x6’8” 2’0”x6’8” PANEL DESIGN DOOR FACE SHEETS ARE FORMED
MATERIALS. FROM A40 GALVANNEALED STEEL.
MATERIAL
GALV
DOOR FACE SHEETS LEVEL C.R. RECOMMENDED DOOR
A60 G90 FRAME MATERIAL
20 GAUGE STEEL (4080 STANDARD DUTY N/A STD N/A 16 GAUGE STEEL
MAX.)
18 GAUGE STEEL HEAVY DUTY STD OPT OPT 16 GAUGE STEEL
16 GAUGE STEEL EXTRA HEAVY DUTY STD OPT OPT 16 OR 14 GAUGE STEEL
14 GAUGE STEEL MAXIMUM DUTY STD OPT OPT 14 OR 12 GAUGE STEEL
PERFORMANCE
THERMAL CORE CALCULATED (ASTM C518) R = 6.08 U = 0.16
CHARACTERISTIC NFRC 102-2014 & ASTM FLUSH DOOR WITH MERCURY FRAME R = 2.33 U = 0.43
VALUE NFRC 102-2014 & ASTM FLUSH DOOR WITH WEATHERKERF FRAME R = 2.27 U = 0.44
NFRC 102-2014 & ASTM FLUSH DOOR WITH STANDARD FRAME R = 2.22 U = 0.45
NFRC102-2014: THE GENERAL REQUIREMENTS OF TESTING SHALL BE AS DEFINED IN NFRC 102, ASTM C1199 AND ASTM C1363.
SOUND TRANSMISSION CLASS STC 27 (F DESIGN, 18 GAUGE FACE SHEETS, ASTM E90 & E413 [FULLY OPERABLE])
PHYSICAL ENDURANCE LEVEL MEETS ANSI A250.4 PERFORMANCE TEST, 20 GAUGE: LEVEL B (500,000 CYCLES);
18 AND 16 GAUGE: LEVEL A (1,000,000 CYCLES)
12/05/22 (CONVERSION: 1” = 25.4 MM, E.G., 1-3/4” = 44.45 MM) 103
Page 25 of 68
Page 26 of 68
Page 27 of 68
Glen Ellyn Historic Meeting 8/21/2025 7:00 PM
Preservation Commission Department: Community Development
535 Duane Street Department Head: Jennifer Henaghan
Glen Ellyn, IL 60137 Category: Discussion Item
Prepared By: Jordan Frahm
AGENDA ITEM (ID DOC ID: 2025-688
# 2025-688)
Landmark Alteration Request - 644 N. Main Street
Statement of the Issue:
The applicant, Craftsmen Revival, requests approval of alterations to the exterior of a Village
landmark.
Analysis:
The property was designated as a Village landmark by Ordinance No. 6162 on September 9th, 2013.
The home was built in 1904, and is known as the Christian A. Sievert home. Built in a distinctive
Victorian style, the Historic Preservation Commission recommended approval as a Village landmark
due to architectural merit, cultural impact, and local historical significance as outlined in Section 2-
13-3(A).
Per Village Code Section 2-13-10 all permits for alterations, construction, erection, demolition,
relocation or other work on the exterior of the structure of Village Landmark properties shall be
reviewed by staff in the Community Development department within 15 days of receipt. Village
Staff has determined the Historic Preservation Commission is required to hold a preliminary review
of this project. The proposed project at 644 N. Main Street, which includes the replacement of cedar
siding and trim with James Hardie Cedarmill lap siding and James Hardie Straight Edge Shake in the
gables, dormers and turret, constitutes an alteration to the heritage materials and architectural details
of the landmark in part or in whole. Specifically, the proposed scope of work includes the following
elements that, upon Staff review, were deemed incongruent with the Village's preservation goals:
o A change of material from heritage cedar siding to fiber cement Hardie Board siding
requires Historic Preservation Commission review.
o The project proposal replaces scalloped siding details on the gables, dormers and
turrets on the second and third levels with Hardie Straight Edge Shake siding.
o Arts and Crafts detailing on the front porch columns, corbels and other elements of
the Queen Anne Victorian architectural style are proposed for removal.
Budget Impact:
Page 28 of 68
Contribution to Strategic Plan
Action Requested:
The applicant is requesting that the Historic Preservation Commission review and consider the
proposed door replacement and make a determination if the proposed alteration will have an
adverse impact on the landmarked property.
Attachments:
1. Staff Comment Letter
2. Contract with Detailed Scope of Work
Page 29 of 68
August 8, 2025
Craftsmen Revival
3030 Warrenville Rd. Unit 106
Lisle, IL 60532
Permit Address: 644 N Main St
Project Description: Siding/Tuckpointing
Permit #: 2025-1210-SDG
Dear Craftsmen Revival:
The following comments were generated from the review of the submitted plans and documents for the
referenced permit.
For the next submittal, please provide a disposition of comments, revised plans, and/or other information as
requested for further review. The disposition of comments needs to include both the original comment and
the appropriate response. Re-submitted plans that do not include the disposition of comments document will
not be reviewed and will be returned to you.
Planning- NOT APPROVED
1. Per Village Code Section 2-13-10 all permits for alterations, construction, erection, demolition,
relocation or other work on the exterior of the structure of Village Landmark properties shall be
reviewed by staff in the Community Development department within 15 days of receipt.
Village Staff has determined the Historic Preservation Commission is required to hold a
preliminary review of this project.
The proposed project at 644 N. Main, which includes the replacement of cedar siding and trim
with James Hardie Cedarmill lap siding and James Hardie Straight Edge Shake in the gables,
dormers and turret, constitutes an alteration to the heritage materials and architectural details of
the landmark in part or in whole. Specifically, the proposed scope of work includes the
following elements that are incongruent with the Village's preservation goals:
o A change of material from heritage cedar siding to fiber cement Hardie Board siding
requires Historic Preservation Commission review.
o The project proposal replaces scalloped siding details on the gables, dormers and turrets
on the second and third levels with Hardie Straight Edge Shake siding.
Page 30 of 68
Page 2 of 2
August 14, 2025
o Arts and Crafts detailing on the front porch columns, corbels and other elements of the
Queen Anne Victorian architectural style are proposed for removal.
The next regularly scheduled meeting of the Historic Preservation Commission is set for
August 21, 2025. The Historic Preservation commission will conduct a preliminary review of
the proposed project. The attendance of the property owner or a representative would be
encouraged, however, this preliminary discussion is not a public hearing. If the Historic
Preservation Commission determines preliminary disapproval of the project, a public hearing
will be required for the consideration of an economic hardship exception. For any questions
regarding this process, please contact Associate Planner Jordan Frahm at jfrahm@glenellyn.org
or by phone at 630-547-5371.
If you have any questions or comments, please contact the Community Development Department at (630)
547-5250.
Thank you,
Permit Team
Page 31 of 68
Craftsmen Revival
Siding Replacement Proposal
PREPARD
FOR:
Jon Olenski
PREPARED
BY:
Ryan Anderson
630-450-3335
PROJECT
ADDRESS:
644 N Main St.
Glen Ellyn, IL 60137
Page 32 of 68
Document Ref: H5MS4-GC8VV-VYWRZ-OWPMU Page 1 of 17
Craftsmen Revival
Siding Scope of Work to be Performed:
• Removal/disposal of all existing cedar siding and trim on your home. Craftsmen Revival is
responsible for all disposal
o EPA Lead Safe removal & disposal included
o The garage has been itemized for replacement. With the garage option, Craftsmen Revival
will fur out the walls with ½” strips and then side over walls for flush, finished work. CR
will keep siding 6” from grade per JH installation requirements
o A portion of the driveway will be needed for material and dumpster placement
• Proper inspection of substrate for any problems between the walls and wrapping of the home in
Hardiewrap. CR will tape the house wrap at all seams and nail it to the substrate to guarantee
maximum efficiency. Reframing of any walls will be paid as a job site extra
o All seams will overlap by the specified 6 inches and taped with Hardiewrap Seam Tape.
The Seam Tape adheres to the sheathing and Housewrap to form the absolute tightest
water-resistant system possible.
o Seam Tape will also be used to seal all window perimeters and protrusions with the
specified sealing methods of James Hardie.
o The Housewrap will extend a minimum of 6-inches around each corner being replaced, and
overlap the foundation by 1-inch.
• Professional application of James Hardie 7¼” (6” exposure) Color Plus Cedarmill lap siding with
James Hardie Straight Edge Shake in gables, dormers, and front turret (see renderings for details)
o Craftsmen Revival includes eliminating the sweep down the side for the rear gable
o With the garage option, Shake is included in all 4 gables
• Craftsmen Revival includes with James Hardie replacement:
o James Hardie Statement Collection Color Plus finish for all lap & trim installed
o All flashings for James Hardie, including but not limited to termination , drip caps, deck
ledger, front porch and roofline flashings
o SturdiMount blocks for all protrusions; blocks to be painted the color of the siding
o 5 ½” x 3½” 5/4 Smooth Hardie Corner Posts
o 3 ½” 5/4 Smooth Hardie Trim around all windows & doors where siding is replaced
including Azek PVC window sills & head cap (accent color flashing included)
o 7 ¼” 5/4 Smooth James Hardie trim dividing the gable elevations & the accent lap siding
o Boral TruExterior trim around garage door including new weather-stripping with the
garage siding option
o 4 Fypon corbles (white) for the front gable of the home
• Itemized options for:
o James Hardie Soffit & James Hardie Fascia for the home with the porch ceiling will be
Stained Bead Board Rafter blocking included
o Mastic Aluminum Soffit & Aluminum Fascia for the home with the porch ceiling will be
Stained Bead Board
o All new 5” Seamless gutters with oversized downspouts
o 7 ¼” “Water Table Board” itemized for running around the perimeter of the home;
excluded on garage
o New Westbury aluminum front porch railing with new porch columns
Initials__________ Page 1
Page 33 of 68
Document Ref: H5MS4-GC8VV-VYWRZ-OWPMU Page 2 of 17
Craftsmen Revival
RENDERINGS
James Hardie Cedarmill Lap with Straight Edge Shake in the
gables and dormers. 7 ¼” Smooth “Belly Band” dividing the
elevations.
Initials__________ Page 2
Page 34 of 68
Document Ref: H5MS4-GC8VV-VYWRZ-OWPMU Page 3 of 17
Craftsmen Revival
James Hardie Cedarmill Lap with Straight Edge Shake in
the gables and dormers. 7 ¼” Smooth “Belly Band”
dividing the elevations. NOTE: all windows, including the
bank of windows called out here will be trimmed in new
Hardie trim. Recess cladding for “insert” windows included
Initials__________ Page 3
Page 35 of 68
Document Ref: H5MS4-GC8VV-VYWRZ-OWPMU Page 4 of 17
Craftsmen Revival
General Specifications
1. The work area will be cleaned of all debris at the end of each day. Craftsmen Revival (“CR”) will come
around with a magnetic sweeper for any loose nails after the installation.
2. All work performed by Craftsmen Revival. will be in accordance with manufacturer’s recommendations
and guidelines and the local building codes.
3. Craftsmen Revival extends to its customers a 5 year service warranty to supplement any
applicable manufacturer’s warranty program.
Initials__________ Page 4
Page 36 of 68
Document Ref: H5MS4-GC8VV-VYWRZ-OWPMU Page 5 of 17
Craftsmen Revival
Jobsite Preparation:
1. Upon the start of the job, we will place a job site yard sign on your property and request that it stay
for a period of 2 weeks after completion of your project. This signage helps make the neighborhood
aware of who is working if they have questions or concerns while we work in the community. This
signage also aides for city inspections where required.
2. Craftsmen Revival will haul away all job-related debris
3. Very often we order more material than will actually go on your home. We order more to eliminate
the crews needing to leave the site for extra material that can be needed due to a bad cut or even a
less-than-perfect board. All materials left over after the project is complete belong to CR. While we
are happy to leave behind a few pieces for you; we reserve the right to collect all remaining
materials.
4. All materials that can be recycled have been taken into consideration when quoting your specific
project. The crew assigned to your project will be removing all recyclable materials and taking them
to the proper facility. We ask that you allow the crew this easement.
5. Craftsmen Revival may require the full use of your driveway during the course of your project. Extra
charges will be assessed if use of the driveway is not permitted prior to or during the
course of the job. It will also be necessary to have access to an external electrical power source.
Please identify whether or not sensitive equipment is attached to these circuits as we
cannot be held responsible for damage to these items, or damage due to faulty wiring.
6. Craftsmen Revival will make every attempt to protect the siding, doorways, floors, porches, decks,
patios, surrounding grounds, including flower beds, bushes and shrubbery with tarps and/or plywood.
Due to the large amount of debris being removed from your home, there are times when damage
will occur. A 2’ clearance around the perimeter of your home prior to installation is
required. If the minimum clearance is not met and CR cannot work in that area, there will
be a job delay fee of $100 per day until we can resume our work. If there is a particular tree
or bush that you wish to protect, please note below under “special requests” prior to the start of your
project. However, CR will not be held responsible for minor damage to landscaping.
7. Craftsmen Revival recommends that prior to start of the job that you remove or secure all fragile or
irreplaceable items on walls and ceilings that could be disturbed or damaged during the job. CR
cannot be held responsible for damage to said items. We also require customers to remove
all window treatments and decorations.
8. Craftsmen Revival will make every attempt to protect the gutters, downspouts, awnings and trim from
damage by removal of the old roofing materials. Please be aware that there may be times when minor
damage or marring may occur, as we cannot guarantee it will not. There are times when siding,
awnings, wood or aluminum trim or gutters may need to be removed to continue the roof work required.
Should we be required to remove and/or replace said items; there will be an extra time &
material charge of $65 per man hour plus materials.
9. If we are removing solar panels or power vents, homeowner must have all interior electrical
connections and venting disconnected prior to start of job.
10. Craftsmen Revival will remove and/or replace antennas, cables, satellite dishes, cupolas, and any
other electronic devices to accommodate continuation of the scope of work contracted. We cannot
be held responsible for operating condition or damage to said items after replacement.
Television or satellite reception, all cabling, wiring and hardware are the responsibility of
the homeowner.
11. Craftsmen Revival will not be held responsible for poor appearance or damage due to a pre-existing
condition. Examples of such conditions would be: gaps in siding due to multiple layers of roofing
being removed, damage to siding due to improper flashing work prior to job, etc. We cannot be held
responsible for nail pops in drywall or ceilings due to normal roof application during the course of the
job.
12. Customer agrees that the chosen dumpster provider based upon its’ knowledge and expertise, is
responsible for competent placement and removal of its dumpster without damage to customer’s
property under normal operating conditions. However, they are not liable for damage to property
resulting from unusual or unforeseeable pre-existing conditions at customer’s property that leads to
Initials__________ Page 5
Page 37 of 68
Document Ref: H5MS4-GC8VV-VYWRZ-OWPMU Page 6 of 17
Craftsmen Revival
damage to landscaping, pavement, curbing, driving services, buildings, vehicles, or any other
property resulting from dumpster placement. Customer agrees to indemnify, defend, and hold
harmless the dumpster provider against all claims, damages, suits, penalties, fines and liabilities for
injury or death to persons or loss of damage to property arising out of customer use, operation or
possession of the dumpster while they are not present at customer’s property to oversee its normal
and safe operation.
13. Craftsmen Revival provides professional staining services for the windows and doors we install. We
provide these services with a high degree of care and expertise. Wood is a natural product with
strong variations in grain and structure. This causes natural variations in the depth of color and
staining patterns of the wood. CR will not be held responsible for the natural variances in the
appearance of stained wood products, or the matching of these items to existing windows,
doors, and trim in the home. CR will not be responsible for paint lines, if customer chooses trim
casing, that is the same width as existing casing trim.
14. When CR’s project manager arrives back on the site, he may remove a piece of interior trim to see
the exact opening of the window. This is done to potentially protect you from additional costs that
might be associated with “buckframing” the opening to the correct size of the window.
15. Craftsmen Revival will provide a Port-O-Potty on site for workers.
17. Notice: All of our window/door pricing is based upon a wall depth of 4 9/16”. Every once in a while, a
home may be built will very thick exterior substrate sheeting. This will require jamb extensions to be
added to the new windows. This can only be determined by removing the interior or exterior trim of
the existing windows at the time of your project managers meeting. If the jamb extensions are
needed there will be an additional cost. CR will notify you prior to any additional work requiring
additional costs.
18. Window Installation Preparation: Please remove all furniture 3ft from around all the windows
being replaced. This will give the crews some space to work. If you have any pictures, decorations on
or around the window areas please move away from the work areas. We also ask for you to remove
all your window treatments such as blinds, drapes and interior shutters prior to the start day of the
installation. If you do not have the window treatments removed the day of the window installation,
CR will charge $55 per hour to remove them. CR will be very careful and respectful of your
window treatments but we cannot be responsibility for any prior damage. Therefore, CR cannot be
held liable for any of the window treatments removed.
Substrate Preparation:
Craftsmen Revival will replace rotten wood at the request of the homeowner at the rates below
1. Replace rotted or damaged fascia boards at $10.00 per linear foot.
2. Replace rotted or damaged plywood or OSB at $4.00 per square foot or $80.00 per
4x8 foot sheet.
3. Any replacement of rotted or damaged framing or finishing lumber charged at a
time & material basis.
4. Install sub fascia (necessary when installing James Hardie fascia boards) $3.42
per LF.
5. Install 2x2 anchors to nail Hardie Soffit to if it does not exist already at $3.19 per
LF.
6. Install blocking support for soffit over 12 inches to prevent sagging $3.42 per LF
7. Homeowner to pay job extras at the time they occur.
Initials__________ Page 6
Page 38 of 68
Document Ref: H5MS4-GC8VV-VYWRZ-OWPMU Page 7 of 17
Craftsmen Revival
INSTALLATION OF JAMES HARDIE 7.25 (6-IN EXPOSURE) CEDARMILL LAP
SIDING WITH COLORPLUS FINISH
• Lap siding will be installed with blind-nailing techniques where the above panels overlap by 1.25-inches
to ensure a uniform and level exposure.
o All nails used to fasten the siding (not trim) will be Hardie recommended hot-dipped galvanized
steel nails, 2-inches long.
o All nails will be pneumatically fastened perpendicular to the siding and fit snug against the
siding to eliminate air space.
o All nails will be at least 3/8-inch away from the end of the board and be spaced no more than 16
inches apart.
• Butt joints will be installed in direct contact without caulk, but with additional flashing as specified by
James Hardie.
o CR will flash all butt joints with Hardie-approved aluminum membrane that color-matches the
siding.
o The aluminum butt flashing will be an additional layer of protection over the Hardiewrap and
will extend 1-inch to the course below
o Butt joint flashing protects the sheathing, ensures water run-off and helps avoid ugly white gaps
in case the foundation shifts in years to follow.
• All butt joints will be offset to not occur directly above windows/doors and all butt joints will be
staggered a minimum of 32-inches.
• All sides of lap siding cut on site will be touched up with Hardie supplied touch-up kits.
• CR will use decorative flashing for all mandated Hardie flashing techniques, including, but not limited
to (trim flashing specifications are covered under the Hardie Trim section):
o 2-in clearance with decorative flashing along rooflines where siding intersects with the roof.
o 2-in clearance with decorative flashing above patio floor.
o 2–in clearance termination flashing (closed bottom) where siding meets brick
• Application of Hardie recommended SturdiMount mounting plates with and integrated drip edge for all
applicable protrusions (light fixtures, electrical outlet, and dryer vents).
o If SturdiMount mounting plate cannot be matched up with specific protrusion, CR will angled
weather-cut HardieTrim around the protrusion and provide appropriate Z-flashing above the
block.
Initials__________ Page 7
Page 39 of 68
Document Ref: H5MS4-GC8VV-VYWRZ-OWPMU Page 8 of 17
Craftsmen Revival
PICTURES OF PROPER LAP SIDING INSTALLATION TECHNIQUE
The following are some of the many James Hardie installation requirements that Craftsmen
Revival religisously follows to maximize the lifespan of the product and achieve your 30yr
nonprorated warranty.
PROPER FLASHING OF BUTT JOINTS
Hardie requires an additional layer of flashing behind each joint and voids its warranty if these joints
are caulked together
Examples of improper use of caulk which will eventually crack and fade.
Initials__________ Page 8
Page 40 of 68
Document Ref: H5MS4-GC8VV-VYWRZ-OWPMU Page 9 of 17
Craftsmen Revival
FLASHING OF ROOFLINES WITH DECORATIVE ALUMINUM:
Hardie Recommended
EXAMPLE OF EXISTING
Initials__________ Page 9
Page 41 of 68
Document Ref: H5MS4-GC8VV-VYWRZ-OWPMU Page 10 of 17
Craftsmen Revival
INSTALLATION OF HARDIE TRIM WITH COLORPLUS WARRANTY
• Craftsmen Revival will remove corner trim, and install new 5/4 Hardie Trim NT3 boards
• CR will utilize the concealed aluminum flat tabs wherever possible (needs plywood sheathing) for all
HardieTrim and Cornerposts. These “blind fasteners” ensures the absolute smoothest look possible.
• Cornerposts will consist of a 6-inch and 4-inch boars butted together with L-shaped aluminum tabs in
the back.
o Tabs will be pneumatically fastened to the back of the Cornerposts with 18 gauge galvanized
staples.
o 4 of these staples will be used on each piece of trim for each bracket (8 total staples for each L-
shaped bracket).
o All aluminum tabs will be a minimum 1-inch from the end of each board and will be spaced no
more than 36-inches from the next tab.
o All Cornerposts will be angled-weather cut at 45° angle as specified by Hardie.
• CR will install HardieTrim to imitate current appearance around specified windows and doors if
applicable to your Scope of Work
o CR will fasten 4 staples to the center of the backside of the trim.
o The HardieTrim aluminum tabs need to be fasten to a minimum of 7/16 OSB with a minimum 6d
nail.
§ If the sheathing is not acceptable for HardieTrim tabs, Craftsmen Revival will face nail
the trim with appropriate stainless steel finish nails, and use touch-up kits supplied
directly by James Hardie to cover the flush nail heads.
• A minimum of a 1/8 inch gap will be left between the siding and vertical trim and will be sealed with
OSI Quad caulk that color-matches the siding. OSI Quad is a James Hardie approved sealant and is
more flexible and elastic than the majority of caulks; making it more resilient to the extreme temperature
changes that happen throughout the year.
• All horizontal trim pieces above windows and doors will be installed to James Hardie flashing
specification.
o A minimum of a ¼ inch gap will be left and not caulked between the top of the horizontal trim
piece and bottom of the lap siding.
o Z-shaped aluminum flashing will be installed above horizontal trims this gap to ensure water
runoff.
Initials__________ Page 10
Page 42 of 68
Document Ref: H5MS4-GC8VV-VYWRZ-OWPMU Page 11 of 17
Craftsmen Revival
1/8 INCH OF CAULK WHERE HARDIE BUTTS UP TO A
CORNER:
Hardie Recommended
Examples of Craftsmen Revival Finished Product Following
Hardie Guidelines
Initials__________ Page 11
Page 43 of 68
Document Ref: H5MS4-GC8VV-VYWRZ-OWPMU Page 12 of 17
Craftsmen Revival
JAMES HARDIE FIBER CEMENT LAP SIDING
We will properly install new James Hardie fiber siding. You can take great comfort
knowing your installation will be done properly. James Hardie actually audits some of
our job’s as members of the contractor alliance program to ensure that your fiber
cement siding was installed properly.
JAMES HARDIE FEATURES:
• Character and feel of natural wood combined with greater durability than any
other lap siding
• Resists moisture damage - will not rot, crack, warp, buckle, swell or de-laminate
• Impact and Wind resistant - withstands winds up to 130 MPH
• Termite, bird and carpenter ant resistant
• 30-year transferable, non-prorated, product warranty for plank and panel
• Low maintenance - holds paint up to three times longer than wood
• Increases curb appeal and lowers insurance premium (14% on average) compared
to vinyl siding
• Voted one of top 10 American building products by Home magazine
Hardie Lap Siding will include James Hardie Color Plus Technology
• James Hardie is the only siding that stays in one building location from the original mix to the last
coat of paint.
• Hardie Boards pass 41 quality assurance checks during its Color Plus stage
• Consistent multiple baked-on coats of a paint created especially for fiber cement siding.
• Beautiful consistent finish that lasts up to three times longer than other finishes.
• Baked-on coating offers maximum durability and resistance to prolonged exposure to freezing
climate and moisture contact.
Initials__________ Page 12
Page 44 of 68
Document Ref: H5MS4-GC8VV-VYWRZ-OWPMU Page 13 of 17
Craftsmen Revival
July 2, 2025
Dear Jon,
I would briefly like to tell you about Craftsmen Revival so you feel 100% comfortable
with us as your contractor.
• Craftsmen Revival maintains $2,000,000.00 general liability insurance.
• We are James Hardie Preferred Installers
• Craftsmen Revival won “Best of Houzz” in 2024 & 2025 for Customer
Service
• The founders have combined 26 years remodeling experience and have
worked with our crews nearly the entire time.
• We use all of our own dedicated installers whom we’ve known since
starting in this industry and who’ve have been working with us since
the company began; no random sub-contractors will work on your job
As a legitimate and dependable remodeling company, we maintain these affiliations
and credentials to provide you with the highest level of confidence and customer service.
I personally have been working in home construction for over 13 years. We take pride in
our quality workmanship and the specialty services offered to our clients.
Your home … Our reputation.
Very Truly Yours,
Ryan Anderson
Project Consultant
Initials__________ Page 13
Page 45 of 68
Document Ref: H5MS4-GC8VV-VYWRZ-OWPMU Page 14 of 17
Craftsmen Revival
This Proposal is based upon current material and labor cost. This Proposal may be withdrawn if not accepted within
thirty (30) days.
OPTIONS & ACCESSORIES Investment Accepted
Option
Hardie Siding, Soffit/Fascia & Gutters
James Hardie 6” Cedarmill Lap, Shake, HardieWrap, proper flashing, and 53,779 53,779
all trimming options listed in “scope of work” for the home
Add 7 ¼” Smooth “Water Table Board” (recommended, not required) 1,736 1,736
James Hardie 6” Cedarmill Lap, Shake in all gables, HardieWrap, proper 13,116 13,116
flashing, and all trimming options listed in “scope of work” for the
garage including furing strips on all walls
5” Seamless Gutters & all new oversized downspouts 3,993 3,993
Add Raindrop Gutter Guards over all new gutter runs 2,313 --------------
James Hardie Soffit & Fascia for the whole home with stained beadboard 15,022 15,022
for the porch
Westbury Aluminum Porch Railing with new front porch posts 8,618 POSTS ONLY
Posts to be 6” Azek post wraps with base and head caps (no charge)
MARKETING DISCOUNT (permit before & after photos to be taken & (1,875) -1,875
posted on our website/social. No address or names will be used)
We accept MasterCard, Visa, Discover at an additional 2% per
transaction fee
***These numbers include labor, material, and tax. Permits and Total 85,771
job extras will be paid via jobsite extra form***
35% Deposit 30,000
25% Arrival 21,500
40% 34,271
Substantial
Completion
YOU, THE OWNER MAY CANCEL THIS TRANSACTION AT ANY TIME PRIOR TO MIDNIGHT OF THE THIRD
BUSINESS DAY AFTER THE DATE OF THIS TRANSACTION. SEE THE NOTICE OF CANCELLATION CLAUSE
BELOW FOR AN EXPLANATION OF THIS RIGHT.
This contract is contingent upon approval for production by the management of Craftsmen Revival (CR).
The customer will be notified of approval for production by the production department. If gross errors or
omissions are found, the contract may be re-negotiated by CR and the homeowners prior to final approval.
Any changes will be approved in writing and signed by all parties. Subsequent additional costs due to
unforeseeable hidden circumstances will be approved via jobsite extra form. This contract defines the total
scope of work. No verbal agreements will be honored. It is the homeowners’ responsibility to review this
contract to assure that the agreement specifies exactly what you intended!
COMMENCEMENT OF WORK: Craftsmen Revival agrees to commence work and adhere to the schedule as indicated
in the contract. However, CR will not be responsible for delays beyond their control or for any of the following: (a)
acts of negligence of omission of the buyer, (b) acts of God, (c) stormy or inclement weather, (d) extra work ordered
by the buyer, (e) inability to secure materials through regular channels, (f) failure of the buyer to make payments
when due, (g) delays caused by inspection or changes ordered by inspectors or the authorized government bodies, (l)
holidays, or other causes beyond CR’s control. Craftsmen Revival will not compensate nor reimburse buyer for wages
they may claim to lose due to rescheduling or failure to complete the job by the scheduled date.
PAYMENT PREFERENCE:
Credit Card_________ V/MC/D CHECK _____________________________________________
Home Owner Initials _______
Initials__________ Page 14
Page 46 of 68
Document Ref: H5MS4-GC8VV-VYWRZ-OWPMU Page 15 of 17
Craftsmen Revival
FINAL PAYMENT TERMS: Final payment is due at substantial completion. Monies withheld for outstanding work must be
proportional to cost of outstanding work. A service charge will be assessed if payment is not received after 15 days of substantial
completion. Final Payment is due the day of work completion. If Final Payment is over 15 days late the customer agrees to pay
Craftsmen Revival a service charge of 5% on total contract amount. If any situation arises out of this contract wherein Craftsmen
Revival reasonably feels the need to consult legal counsel, Craftsmen Revival shall be entitled to be compensated for all of the
reasonable costs of the legal consultation regardless of whether or not litigation or arbitration is initiated. Craftsmen Revival may
record an Illinois Mechanics Lien on the property if final payment goes over 30 days past due. Non-payment voids labor warranty.
RETURNED CHECK POLICY: NSF checks are subject to a $20.00 charge.
Home Owner Initials _______
CANCELLATION OF CONTRACT: (1) The buyer has the right to cancel a home solicitation sale until midnight of the third business
day after the day on which the buyer signs an agreement or offers to purchase services & goods. If the buyer cancels after the third business
day, he or she is subject to a 40% penalty depending on the stocking position of our supplier/distributor and efforts placed in the ordering
process.
(2) Cancellation occurs when the buyer gives written notice of cancellation to the seller at the address stated in the agreement or offer to
purchase. (3) Notice of cancellation given by the buyer need not take a particular form and is sufficient if it indicates by any form of written
expression the intention of the buyer not to be bound by the home solicitation sale. (4) The buyer may not cancel a home solicitation sale if
the buyer requests the seller to provide goods or services without delay because of an emergency, and
(a) The seller in good faith makes a substantial beginning of performance of the contract before the buyer gives notice of cancellation, and (b)
The buyer's emergency request is in a dated writing personally signed by the buyer and which expressly states that the buyer understands that
he is waiving his right to cancel the sale under the provisions of this act.
Home Owner Initials _______
ACCEPTANCE OF CONTRACT: The above prices, specifications and conditions are satisfactory and are
hereby accepted. Craftsmen Revival is authorized to do the work as specified. Payment outlined above.
SIGNATURE: _________________________________________________DATE____________________
2025-07-11
Initials__________ Page 15
Page 47 of 68
Document Ref: H5MS4-GC8VV-VYWRZ-OWPMU Page 16 of 17
Craftsmen Revival
Notes For Production
Location of Materials:
Location of Dumpster:
Location of Electrical Service:
Yard Sign Notes:
Additional Phone #:
Vacation/Unavailable:
Special Concerns/Requests:
Communication Frequency: ☐ Weekly ☐ Updates ☐ Other:
Communication Preference: ☐ Phone ☐ Email
Date: 2025-07-11 Project Consultant: Ryan Anderson 630.450.3335
PARTICULARS
Siding Brand: James Hardie
Siding Color: Arctic White
Siding Type/exposure: 6” Cedarmill Lap & Straight Edge Shake
Outside Corners: James Hardie Arctic White
Inside Corners: James Hardie Arctic White
Window trim: James Hardie Arctic White
Soffit type/color: James Hardie Cedarmill Arctic White
Fascia type/color: James Hardie Smooth Arctic White
Gutters: White
Downspouts: White
Gutter Guard: N/A
!
!" #$% C' ()#*+ , - $" ('
Initials__________ Page 16
Page 48 of 68
Document Ref: H5MS4-GC8VV-VYWRZ-OWPMU Page 17 of 17
REF. NUMBER DOCUMENT COMPLETED BY ALL PARTIES ON
H5MS4-GC8VV-VYWRZ-OWPMU 11 JUL 2025 14:57:27 UTC
SIGNER TIMESTAMP SIGNATURE
SENT
JON OLENSKI 02 JUL 2025 14:12:42 UTC
EMAIL VIEWED
JON.OLENSKI@GMAIL.COM 02 JUL 2025 14:32:42 UTC
SHARED VIA SIGNED
LINK IP ADDRESS
11 JUL 2025 14:57:27 UTC 172.58.167.167
LOCATION
CHICAGO, UNITED STATES
Signed with PandaDoc PAGE 1 OF 1
Page 49 of 68
Glen Ellyn Historic Meeting 8/21/2025 7:00 PM
Preservation Commission Department: Community Development
535 Duane Street Department Head: Jennifer Henaghan
Glen Ellyn, IL 60137 Category: Discussion Item
Prepared By: Jordan Frahm
AGENDA ITEM (ID DOC ID: 2025-689
# 2025-689)
Landmark Nomination Request - 779 Riford Road Preliminary
Designation
Statement of the Issue:
The petitioner, Christine Wilson, has applied for landmark nomination for the property at 779
Riford Road. Section 2-13-3 of Village code details the criteria for which a Landmark may be
considered by the Village. For residences, only the exterior of a building shall be considered.
A home must be at least 50 years old to be considered and qualify under at least two of the
following criteria per Village Code:
(a)
It be listed on the National or State Register of Historic Places; or
(b)
Its integrity of location, design, materials and workmanship make it worthy of preservation or
restoration; or
(c)
Its value as an example of the architectural, cultural, economic, historic, social or other aspect
of the heritage of the Village of Glen Ellyn, the State of Illinois, or the United States; or
(d)
Its certain distinguishing characteristic of architecture is inherently valuable for the study of a
time period, type of property, method of construction or use of indigenous materials; or
(e)
Its location as a site of an important archaeological, significant historic, or natural event; or
(f)
Its identification with a person or persons who significantly contributed to architectural,
cultural, economic, historic, social or other aspect of the development of the Village of Glen
Ellyn, the State of Illinois, or the United States; or
(g)
It be one of the few remaining examples of a particular architectural style; or
(h)
Page 50 of 68
Its exemplification of an architectural type or style distinguished by innovation, rarity,
uniqueness or overall quality of design, detail, materials or craftsmanship; or
(i)
Its identification as the work of an architect, designer, engineer or builder whose individual
work is significant in the history or development of the Village of Glen Ellyn, the State of
Illinois, or the United States; or
(j)
Its representation of an architectural, cultural, economic, historic, social or other theme
expressed through distinctive areas, districts, places, buildings, structures, works of art or
other objects that may or may not be contiguous; or
(k)
Its unique location or distinctive physical appearance or presence representing an
established and familiar visual feature of a neighborhood, community or the Village.
Analysis:
The following background and analysis are provided by the petitioner as part of the
narrative section of the Landmark Nomination Request application packet:
"As the current owner of 779 Riford Road, I purchased the property 16 years ago, motivated by a
long-standing appreciation for its architectural character and presence within the Glen Ellyn
community. Having grown up in Glen Ellyn, I have admired this house for decades. One of my
most vivid childhood memories is riding my bicycle past the property while nearby excavation work
was underway at Perry’s Pond. It was during that excavation that a mastodon was unearthed—just
half a block from the home.
The following summer, while working at Richard Rush Studios in Chicago (owned by a Glen Ellyn
resident), I assisted in the restoration of that mastodon. My contributions included helping mold the
missing right tusk. That opportunity was made possible in part thanks to my grandfather, Howard
Wilson, who helped me secure the position—a formative high school job that deepened my
connection to local history and craftsmanship. Today, the restored mastodon is on permanent
display at the Meyer Science Center at Wheaton College, serving as a unique intersection of local
natural and cultural history tied to the area around 779 Riford.
When I learned the house was being listed for sale, I purchased it with the intent of preserving it
from potential demolition or redevelopment. Since then, I have maintained the home as a rental
residence, ensuring its continued upkeep and presence within the neighborhood. It is a remarkable
example of the architectural and historical fabric that defines Glen Ellyn.
Prominently located at the corner of Riford Road and Elm Street, the home sits along one of the
community’s most historically significant entryways—just off St. Charles Road and a short distance
from the Forest Hill Cemetery. The property’s location, architectural integrity, and connection to the
local history make it a worthy candidate for historic landmark designation.
Built in 1922, the home is a classic example of the English cottage style that was popular in Glen
Ellyn during the early 20th century. Its defining features—such as a steeply pitched gable roof, a rich
hardwood floored interior, a large log fireplace in the living room, and the charming screened
porch—evoke the period’s design sensibilities.
Positioned near Lake Ellyn and within walking distance of historic downtown and the Metra station,
Page 51 of 68
the house is rooted in the same era that shaped Glen Ellyn’s identity as an idyllic Chicago suburb
with thoughtful, human-scaled architecture. Its form, scale, setbacks, and landscaping reflect Glen
Ellyn’s documented design principles of uniform green space, front porches, mature trees, and
pedestrian-friendly frontage—hallmarks of the village’s historic character.
This property contributes to the visual and cultural continuity of its neighborhood. Just blocks from
Lake Ellyn Park, Glenbard West High School, Hadley Middle, and Forest Glen Elementary—all
within a half-mile—it supports the strong sense of place associated with this historic suburban
village. The home echoes the same materials, massing, and scale found in landmarked
neighborhoods and helps preserve the historic atmosphere of the Lake Ellyn–Springs subdivision.
According to the Village of Glen Ellyn’s Historic Preservation Commission, landmark designation
offers both tax benefits for rehabilitation and community protections for properties that embody
architectural significance or aesthetic value to the Village’s heritage.
As a well-preserved, English cottage from 1922, 779 Riford Road represents a strong candidate for
local designation. Official recognition would help ensure its character-defining features—like the
original fireplace, porch, and hardwood floors—can be sympathetically maintained for future
generations. Style and neighborhood context align well with Tudor-, cottage-, and
Craftsman-inspired homes identified in local surveys of architectural resources.
Imagine… a quiet street lined with mature deciduous trees, where a humble yet carefully composed
1922 English cottage sits in harmony with its surroundings. Its unassuming scale, thoughtful
orientation, and fine details—like the brick fireplace, classic framed original windows, and screened
porch—quietly echo the craftsmanship and suburban ideals that shaped Glen Ellyn in its golden age.
Designating 779 Riford Road as a local landmark would:
• Preserve an authentic example of early suburban architecture in the Lake Ellyn area
• Strengthen neighborhood coherence and historical narrative near the lake and downtown
• Encourage sensitive care for original architectural features via tax and regulatory guidance
In conclusion, 779 Riford Road is more than a home—it’s a tangible link to the era that helped
define Glen Ellyn’s charming character. Landmark protection would honor that legacy, offer
preservation incentives, and enrich the village’s historic tapestry.
Research Material provided:
• The 1922 tax assessment (paid in 1923) shows lot with improvements and value, which
establishes the house is built. Robert Day Wilcox, as first home owner pays the property tax.
House is built in 1922.
• Land Patent – USA to John D. Ackerman in 1845
• Riford property in Section 11
• Legal Description of 779 Riford
• Property located in Glen Ellyn Springs Subdivision, lot 31
• The picture of the original homeowner, Robert Day Wilcox is attached.
Page 52 of 68
• The 1930 census shows Robert Day Wilcox and his wife living in the house in the 1930's
with their 5 children."
Budget Impact:
Contribution to Strategic Plan
Action Requested:
The Historic Preservation Commission should review the application and any testimony at the
regular meeting and make a preliminary determination of the property's landmark eligibility.
Attachments:
1. 779 Riford Rear View
2. 779 Riford Landmarking Research (1)
3. 779 Riford Interior Photos
Page 53 of 68
Page 54 of 68
Local Landmarking Research
779 Riford Road, Glen Ellyn
Legal Description:
Page 55 of 68
0,/721 715( 6(&7,211257+($6748$57(5($67+$/)
'83$*(&2817<,//,12,65($/(67$7(7$;$66(660(173$5&(/6
%0HUHGLWK V$GGWR*OHQ(OO\Q
5
%*OHQ(OO\Q6SULQJV
0(5(',7+3/
5
'
$F
%*OHQ(OO\Q6SULQJVVW$GG
'
5
($67(51$9
%-RKQ%URZQ V$GGWR*OHQ(OO\Q
|
% 5
%
%
%&R&OHUN VUG$VVPW'LY
5
%&KLFNHUQHR V5HVXE
5
(/0
%$SROOR6SULQJV$PHQGHG6XE
$F
67
5
|
%5LIRUG6SULQJV(VWDWHV
5
%*OHQ(OO\Q6SULQJVQG$GG
5
!
(/0 67
%)3'3HUU\$3
|
%
5
%0DU'HOO5HVXERI+REVRQ V
5HVXE
5
!
|
|
%5LIRUG5G5HVXE
/,1&2/1 $9
5,)25' $9
5
&+,'
% !
%5XGROSK5HVXE
(67
(56
%
5
7
|
% %&XVKLQJ V5HVXE
5
%$&+RIIPDQ V6XE
5
&+,'(67(5 67
|
%/DNH5G5HVXE
5
%3HUU\$VVPW3ODW
%
5
$F
!
3W %
%:DVVHOO V&UHVFHQW%OYG6XE
| 5
$9
%&ODUNH5HVXE
*
5$
5
$F $F
$F
1'
3W$F %0DUWLQ V6XE
$F
5
|
%
%/LFKWHQEHUJHU$VVPW3ODW
2XWORW$
5
| %6XQGHQH V6XE
3W
%
5
2$
%&UHVFHQW2DNV6XE
.6 3W 3W 5
3W $F
7
$F %-37$VVPW3ODW
3W
3W $F
!
$F 5
%
%+HGVWURP V5HVXE3W/RW
5
$F
%%RRFNIRUG V3ODW
%
5
!
' $9
F %'LY/RW:DVVHO V&UHVFHQW
N $
% %OYG6XE
3DU
%
5
*5
%:*$VVPW3ODW
3W
$1
F
$
5
|
%
%
%:5&OLQHV5HVXE
5
5'
%
%
3/80 75(( 5'
)2
%
%5RVVLWHU V'LY/RWRI
5, %
%
3W
|
:ULJKWZRRG
5
$9
(66
%%DOO$QQD&&RQVRO
(;
5
5
'
%
%
%6FRWW5RJHUV3ODW
5
%
%6ZDQVRQ V&UHVFHQW%OYG$GG
5
%:ULJKWZRRG
%
5
%+%%DUQHV6XE
5
|
%
'(VWDWH&RQVRO
5
|
%
%
%
.(
3W$F
5'
/$
$
3W
3W
%
/9
'
$
%
17
%
%
%
&(
5(
6
%
%
&
|
3W
%
%
%
!
$
%
%
5,
%
%
)2
5'
!
' '5
!
5'
2
:2
/(
('
%
(
67
|
*(
&
|
|
'
m
7KLVPDSFUHDWHGIRUDVVHVVPHQWSXUSRVHVRQO\5HIHUWRUHFRUGHG '(
-HDQ.DF]PDUHN 1&RXQW\)DUP5G
%: $:
:KHDWRQ,/
SODWVDQGGHHGVIRUOHJDOGHVFULSWLRQVDQGSURSHUW\GLPHQVLRQV
&RS\ULJKW7KH&RXQW\RI'X3DJH,OOLQRLV %(
'X3DJH&RXQW\&OHUN 6FDOHLQ)HHW '(
Page 56 of 68
Page 57 of 68
Page 58 of 68
Page 59 of 68
Moses Stacy John D. Ackerman 779 Riford Road
land
1842 1845
NE 1/4 of Section 11
11
Lewey Newton William Churchill
1842 1843
Page 60 of 68
Land Patent
USA to John D. Ackerman in 1845
Page 61 of 68
First homeowner: Robert Day Wilcox
Page 62 of 68
1930 Census for 779 Riford Road
Page 63 of 68
Page 64 of 68
Page 65 of 68
Page 66 of 68
Page 67 of 68
Page 68 of 68