Transit Commission
Regular MeetingGreen Bay, WI · June 18, 2025
Minutes
MINUTES OF THE TRANSIT COMMISSION
WEDNESDAY, JUNE 18, 2025, 8:15 AM
TRANSIT
901 University Ave
A. ROLL CALL.
1. Members: Roger Kolb, Chair; Randy Scannell, Vice-Chair; Kevin Kuehn, Secretary; Alderman
Craig Stevens, Michael Conley-Kuhagen, Terri Refsguard and Hector Rodriguez.
Present: Roger Kolb, Michael Conley-Kuhagen, Randy Scannell, and Terri Refsguard
Excused: Kevin Kuehn, Hector Rodriguez, and Alderman Craig Stevens
Chair Roger Kolb called the meeting to order at 8:16 a.m.
B. APPROVAL OF THE AGENDA.
1. Approval of the agenda for the Wednesday, June 18, 2025, meeting of the Transit
Commission.
Moved by Randy Scannell, seconded by Terri Refsguard to approve the June 18, 2025 agenda.
Motion carried.
Yes – Roger Kolb and Michael Conley-Kuhagen
No – None, Abstain - None
C. APPROVAL OF MINUTES.
1. Approval of the minutes from the May 21, 2025, meeting.
Moved by Randy Scannell, seconded by Terri Refsguard to approve the May 21, 2025,
minutes. Motion carried.
Yes – Roger Kolb and Michael Conley-Kuhagen
No – None, Abstain - None
D. REGULAR BUSINESS.
1. Discussion/Action: Green Bay Metro Severe Weather Policy
Director Kiewiz shared that this policy is reviewed annually. The main section we've
updated this year was the potential shelter locations along each route.
No further comments were made.
Moved by Randy Scannell, seconded by Michael Conley-Kuhagen, to approve the Green Bay
Metro's Sever Weather Policy as presented. Motion carried.
Yes - Roger Kolb and Terri Refsguard
No- None, Abstain- None
E. INFORMATIONAL.
1. 2024 WisDOT Transit System Management Performance Final Review
Director Kiewiz stated that the WisDOT audit takes place every five years. This is a
complete audit of the whole system which includes policy, procedures and service. Staff and
Lisa Conard, Brown County Planning MPO, worked on this audit. Many changes, specifically
to service, have occurred since the last review.
P. Kiewiz noted that upon receipt of the draft report, it is shared with the MPO staff for
review and comment.
L. Conard noted that Green Bay Metro received very favorable ratings but confirmed P.
Kiewiz's assertion that the peer system comparisons used to evaluate the system can be
misleading as it is not a true apples-to-apples comparison.
L. Conard provided a review of two of the metrics used in the report.
Green Bay Metro’s Operating Ratio (percent of operating cost recovered by fares) has been
13-17% in recent years. If the Transit Commission chose to cut fares, the operating ratio
would likely drop as it would be unlikely that the fare decrease would result in a significant
increase in ridership. The report would give this a negative rating, although the local climate
may support low fares for passengers.
L. Conard noted that the approximate population of the service area is 176,000. During the
study period, Metro provided an average of 71,000 hours of service per year for Revenue
Hours per Capita rate of .41. Now picture a peer community with the same population but
that population is spread out over a larger area. That community would have to provide
more service hours to offer the same level of service as Green Bay Metro. Since the other
community would be providing more service hours for the same population, the other
community would receive a higher score. Important factors such as the size of the area
served and the density of the community are not considered.
L. Conard stated that the valuable portion of the audit is the recommendations section. The
recommendations contained in the report, many of which were suggested by staff, can be
used as support/justification in grant applications and provide general guidance to staff.
The review team concluded that Green Bay Metro is a well-managed transit system that
delivers effective service while proactively planning for the future.
Terri Refsguard commented if this is used for grant money considerations?
P. Kiewiz shared that this is required by Wisconsin state statute, but we can use the
recommendations when applying for grants.
2. Operational Reports
Director Kiewiz stated ridership has been adjusted through May with the corrections we
found.
No further discussion was held.
3. Financial Reports
Director Kiewiz provided an overview of the financial report. No concerns or comments at
this time, we are on track. It has been a slow process with grants, because of the changes
made.
No further discussion was held.
4. Director's Report
Director Kiewiz stated grants have been our big focus. The BEB has been out on routes
frequently and excited to start pulling and looking at data.
We currently have 3 vacant Operator positions and 1 Dispatch position that we are
currently going through applicants now.
5. Next Transit Commission Meeting: July 23, 2025 at 8:15am.
F. ADJOURNMENT.
1. Adjournment for the Wednesday, June 18, 2025, meeting of the Transit Commission.
Motion by Randy Scannell, seconded by Terri Refsguard, to adjourn at 8:33 a.m. Motion
carried.
Yes – Roger Kolb and Michael Conley-Kuhagen
No – None. Abstain - None
Agenda
AGENDA OF THE TRANSIT COMMISSION
WEDNESDAY, JUNE 18, 2025, 8:15 AM
TRANSIT
901 University Ave
A. Roll Call.
1. Members: Roger Kolb, Chair; Randy Scannell, Vice-Chair; Kevin Kuehn, Secretary; Alderman
Craig Stevens, Michael Conley-Kuhagen, Terri Refsguard and Hector Rodriguez.
B. Approval of the Agenda.
1. Approval of the agenda for the Wednesday, June 18, 2025, meeting of the Transit
Commission.
C. Approval of Minutes.
1. Approval of the minutes from the May 21, 2025, meeting.
D. Regular Business.
1. Discussion/Action: Green Bay Metro Severe Weather Policy
E. Informational.
1. 2024 WisDOT Transit System Management Performance Final Review
2. Operational Reports
3. Financial Reports
4. Director's Report
5. Next Transit Commission Meeting: July 23, 2025 at 8:15am.
F. Adjournment.
1. Adjournment for the Wednesday, June 18, 2025, meeting of the Transit Commission.
Agenda of the Transit Commission
June 18, 2025
Page 1
1) ACCESSIBILITY: Any person wishing to attend who requires special accommodation because of a disability,
should contact the City Safety Manager at 920-448-3125 at least 48 hours before the scheduled meeting time so
that arrangements can be made.
2) QUORUM: Please take notice that a majority or quorum of the Common Council will attend this Transit
Commission meeting and will constitute a meeting of the Common Council for purposes of discussion and
information gathering relative to this agenda.
3) REPRESENTATION: The party requesting the communication, or their representative, should be present at this
meeting.
Agenda of the Transit Commission
June 18, 2025
Page 2
Packet
AGENDA OF THE TRANSIT COMMISSION
WEDNESDAY, JUNE 18, 2025, 8:15 AM
TRANSIT
901 University Ave
A. Roll Call.
1. Members: Roger Kolb, Chair; Randy Scannell, Vice-Chair; Kevin Kuehn, Secretary; Alderman
Craig Stevens, Michael Conley-Kuhagen, Terri Refsguard and Hector Rodriguez.
B. Approval of the Agenda.
1. Approval of the agenda for the Wednesday, June 18, 2025, meeting of the Transit
Commission.
C. Approval of Minutes.
1. Approval of the minutes from the May 21, 2025, meeting.
D. Regular Business.
1. Discussion/Action: Green Bay Metro Severe Weather Policy
E. Informational.
1. 2024 WisDOT Transit System Management Performance Final Review
2. Operational Reports
3. Financial Reports
4. Director's Report
5. Next Transit Commission Meeting: July 23, 2025 at 8:15am.
F. Adjournment.
1. Adjournment for the Wednesday, June 18, 2025, meeting of the Transit Commission.
Agenda of the Transit Commission
June 18, 2025
Page 1
1) ACCESSIBILITY: Any person wishing to attend who requires special accommodation because of a disability,
should contact the City Safety Manager at 920-448-3125 at least 48 hours before the scheduled meeting time so
that arrangements can be made.
2) QUORUM: Please take notice that a majority or quorum of the Common Council will attend this Transit
Commission meeting and will constitute a meeting of the Common Council for purposes of discussion and
information gathering relative to this agenda.
3) REPRESENTATION: The party requesting the communication, or their representative, should be present at this
meeting.
Agenda of the Transit Commission
June 18, 2025
Page 2
Report to the
Transit Commission
of the City of Green Bay
MEETING DATE PREPARED BY
June 18, 2025 Becky Fleck, Transit Staff
AGENDA ITEM # C.1
Approval of the minutes from the May 21, 2025, meeting.
BACKGROUND
Minutes from the meeting held on May 21, 2025.
RECOMMENDATION
Staff recommends approval of the minutes from the May 21, 2025, meeting.
FISCAL IMPACT
ATTACHMENTS
1. Transit Commission 5-21-2025
901 University Avenue, Green Bay, Wisconsin 54302
greenbaymetro.org
MINUTES OF THE TRANSIT COMMISSION
WEDNESDAY, MAY 21, 2025, 8:15 AM
TRANSIT
901 University Ave
A. ROLL CALL.
1. Roger Kolb, Chair; Randy Scannell, Vice-Chair; Kevin Kuehn, Secretary; Alderman Craig
Stevens, Michael Conley-Kuhagen, Terri Refsguard and Hector Rodriguez.
Present: Roger Kolb, Kevin Kuehn, Michael Conley-Kuhagen, Randy Scannell, Alderman
Craig Stevens, and Hector Rodriguez
Excused: Terri Refsguard
Chair Roger Kolb called the meeting to order at 8:15 a.m.
B. APPROVAL OF THE AGENDA.
1. Approval of the Wednesday, May 21, 2025 Transit Commission Agenda.
Moved by Randy Scannell, seconded by Alderman Craig Stevens to approve the May 21, 2025
agenda. Motion carried.
Yes – Roger Kolb, Kevin Kuehn, Hector Rodriguez, and Michael Conley-Kuhagen
No – None, Abstain - None
C. APPROVAL OF MINUTES.
1. Approval of Transit Commission minutes from April 16, 2025.
Moved by Randy Scannell, seconded by Kevin Kuehn to approve the April 16, 2025, minutes.
Motion carried.
Yes – Roger Kolb, Hector Rodriguez, Michael Conley-Kuhagen, and Alderman Craig Stevens
No – None, Abstain - None
D. REGULAR BUSINESS.
1. Discussion/Action: Green Bay Metro's Public Transit Agency Safety Plan (PTASP)
Director Kiewiz shared the Public Transit Agency Safety Plan (PTASP). This is a working
document that the Safety Solution Team reviews and approves quarterly. The PTASP was
updated with the new changes to the 49 CFR.
P. Kiewiz stated this plan has been approved by the Safety Solutions Team this month.
No further comments were made.
Moved by Kevin Kuehn, seconded by Randy Scannell, to approve the Green Bay Metro's
Public Transit Agency Safety Plan (PTASP) as presented. Motion carried.
Yes - Roger Kolb, Michael Conley-Kuhagen, Hector Rodriguez, and Alderman Craig Stevens
No- None, Abstain- None
2. Discussion/Action: Green Bay Metro's 2026 Transit Asset Management Plan
Director Kiewiz stated Metro is required by Federal Transit Administration (FTA) guidelines
for all transit agencies that own, operate, or manage capital assets used in the provision of
public transportation and receive federal financial assistance under 49 U.S.C. Chapter 53,
either as recipients or subrecipients, must develop a TAM plan. This plan layouts how capital
assets will be tracked, monitored and the process for replacement. Modifications to this plan
will be made annually. Green Bay Metro's investment projects were shared with the
commission, showing the life remaining and project updates.
P. Kiewiz shared under 5310, Curative is a subrecipient of that program and we oversee
their fleet.
Moved by Alderman Craig Stevens, seconded by Kevin Kuehn to approve the revised Green
Bay Metro's 2026 Transit Asset Management (TAM) Plan. Motion carried.
Yes - Roger Kolb, Michael Conley-Kuhagen, Hector Rodriguez, and Randy Scannell
No- None, Abstain- None
E. INFORMATIONAL.
1. Operational Reports
Director Kiewiz stated ridership shows a decline. However, we are working on reporting
errors that have been discovered.
No further discussion was held.
2. Financial Reports
Director Kiewiz provided an overview of the financial report. No concerns or comments at
this time.
No further discussion was held.
3. Director's Report
Director Kiewiz shared that she recently returned from WIPTA in DC on Capitol Hill. She
stated many good discussions took place.
Kevin Kuehn asked if there would be transit cuts to our operation or fleet expenses.
P. Kiewiz shared that many elected officials are in the dark, and there are alot of unknowns.
Things have been moving very slowly, and they have been going back and pulling away from
other projects.
P. Kiewiz shared that we had our State Management Review and will be sharing the results at
the next commission meeting.
P. Kiewiz stated we are currently only 2 short for operators and have a vacant position in
dispatch. We received around 90 applications for dispatch and will be having interviews
shortly.
P. Kiewiz shared a review of the NFL Draft. Green Bay metro provided under 20,000 rides
that weekend. Service was good and there were no issues.
No further discussion was had.
4. Next Transit Commission Meeting: June 18, 2025 at 8:15am.
F. ADJOURNMENT.
Motion by Randy Scannell, seconded by Kevin Kuehn, to adjourn at 8:51 a.m. Motion carried.
Yes – Roger Kolb, Michael Conley-Kuhagen, Hector Rodriguez, Alderperson Craig Stevens.
No – None. Abstain - None
Report to the
Transit Commission
of the City of Green Bay
MEETING DATE PREPARED BY
June 18, 2025 Patricia Kiewiz, Transit Director
AGENDA ITEM # D.1
Discussion/Action: Green Bay Metro Severe Weather Policy
BACKGROUND
Annually, the Green Bay Metro staff reviews the Green Bay Metro Severe Weather Policy.
Modifications have been made to reflect current routes.
The policy has been updated to ensure compliance with federal regulations and as part of Metro's overall
safety program.
RECOMMENDATION
Staff recommends approval of the Green Bay Metro Severe Weather Policy.
FISCAL IMPACT
ATTACHMENTS
1. Severe Weather 6-2025
901 University Avenue, Green Bay, Wisconsin 54302
greenbaymetro.org
Severe Weather Policy
JUNE 2025
The purpose of this policy is to ensure the safety of both employees and the public by providing
an action plan to follow in case of an emergency.
The following information is intended to provide a better understanding of our Severe Weather
Policy plan and the personal action required following a tornado warning:
1. During a tornado warning, management, along with the Dispatcher, will continuously
monitor the storms movement. During the tornado warning, the radio will remain on
“MAIN”. This will facilitate immediate full communication throughout the system.
Operators should minimize radio usage as much as possible.
2. The Dispatcher will alert all buses in service at the time of the tornado warning. The
Dispatcher will announce the official warning, the immediate need to seek shelter, and
if possible, the length of time the warning will last. Operators should immediately notify
Dispatch of their shelter location and seek shelter after receiving the warning. If
communication with the Dispatcher cannot be made prior to seeking shelter, the
Operator is to secure their bus appropriately and use their best judgement in seeking
immediate shelter for his/herself and their passengers.
Management will work with dispatch to notify all employees in the facility of the
tornado warning by using the phone system or in person.
3. Operators should contact the Dispatcher if a tornado is sighted or if a warning siren is
heard prior to the Dispatcher’s general announcement. It is possible, depending on
where the bus is on route, that the operator may hear the warning siren before
dispatch. The tornado warning will be transmitted multiple times to ensure that all
operators receive the entire message and to minimize the need for an operator to
attempt radio contact with the dispatch.
4. The Dispatcher will provide the following information when a severe weather warning is
in effect:
a. Advise as to the degree of severe weather. Examples include a tornado watch or a
tornado warning. The announcement will be made multiple times to ensure
complete coverage.
b. If Brown County receives a tornado warning, all operators will be advised as to the
location and direction of reported sightings. All operators will also be advised to
seek shelter immediately after the tornado warning has been issued. The length of
time that the warning will be in effect will be communicated. Operators should not
leave shelter locations and go back to their bus prior to the end of the warning
period.
Avoid seeking shelter at locations that pose immediate danger. The following list
represents specific locations to avoid: gasoline stations, parking lots, construction
sites, antennas, high voltage lines, power poles, power transmission stations,
buildings with glass exteriors, trees, etc.
Examples of proper shelter include cellars, overpasses, underground walkways,
steel-framed or reinforced concrete buildings, ditches, depressions in the earth, etc.
Avoid rooms with glass windows. Do not seek shelter under the bus. Do not return
to your bus until the tornado warning has passed.
If time does not allow the Operator to seek a safe location for shelter, then the
Operator should advise all passengers, including his/herself, to get as low as possible
in the bus, and cover their head.
5. To maintain control during a tornado situation, you must:
a. Receive and understand tornado warning information provided.
b. Operators should advise their passengers of the tornado warning and of safety
procedures. Communicate the situation to your passengers in a calm and controlled
manner.
c. Seek safe shelter along your route (see attached shelter list by route).
d. Request that all passengers evacuate your bus (you cannot force anyone to leave)
and proceed to a safe shelter in the immediate area. Inform passengers that if they
refuse to leave, they will be assuming all risks involved, if personal injury occurs.
e. Remain at the shelter location until the communicated “all clear” time has been
reached. Inform passengers that the warning is over and that you are preparing to
resume service.
6. Passengers that use wheelchairs or other personal mobility aids should be evacuated
the same as non-disabled passengers. Wheelchair evacuations should take place
through the front door while non-disabled passengers exit through the rear doors.
7. During severe weather or torrential downpours, operators should pull over the bus in a
safe area until it is okay to proceed. Notify dispatch of your location.
EXAMPLE SHELTER LOCATIONS
Below is a list of various locations that may be used as potential shelters along each route. This
list should not be assumed as the only available options. Operators may select any store,
church, hospital, or other public facility and should make their best judgement call for their
safety as well as their passengers.
Route #1 Pink Line
- Bellin Hospital 744 S. Webster Ave, Green Bay, WI 54301
- St. Vincent Hospital 835 S. Van Buren St, Green Bay, WI 54301
- Kroc Center 1315 Lime Kiln Rd, Green Bay, WI 54311
Route #2 Orange Line
- St. Peter and Paul 710 N. Baird Ave, Green Bay, WI 54302
- University Avenue Market 2080 University Ave, Green Bay, WI 54302
- Festival Foods 2430 University Ave, Green Bay, WI 54302
Route #3 Silver Line
- Neville Public Museum 210 Museum Pl, Green Bay, WI 54303
Route #4 Blue Line
- Neville Public Museum 210 Museum Pl, Green Bay, WI 54303
- ADRC 300 S. Adams St, Green Bay, WI 54301
- City Hall 100 N. Jefferson St, Green Bay, WI 54301
- St. Mary’s Hospital 1726 Shawano Ave, Green Bay, WI 54303
- Aspiro 1673 Dousman St, Green Bay 54303
Route #5 Yellow Line
- Bellin Hospital 744 S. Webster Ave, Green Bay, WI 54301
- St. Vincent Hospital 835 S. Van Buren St, Green Bay, WI 54301
- Kroc Center 1315 Lime Kiln Rd, Green Bay, WI 54311
Route #6 Red Line
- Green Bay Plaza 1481-1535 Green Bay Plaza, Green Bay, WI 54304
- Festival Foods 2250 W. Mason St, Green Bay, WI 54303
- Wal-Mart 2440 W. Mason St, Green Bay, WI 54303
- NWTC 2740 W. Mason St, Green Bay, WI 54303
- City Hall 100 N. Jefferson St, Green Bay, WI 54301
- ADRC 300 S. Adams St, Green Bay, WI 54301
Route #7 Lime Line
- University Avenue Market 2080 University Ave, Green Bay, WI 54302
- Brown County Treatment Center 3150 Gershwin Dr, Green Bay, WI 54311
- University of WI-Green Bay 2420 Nicolet Dr, Green Bay, WI 54311
- Festival Foods 2430 University Ave, Green Bay, WI 54302
- Veterans Clinic 2851 University Ave, Green Bay, WI 54311
Route #8 Green Line
- Bay Park Square Mall 303 Bay Park Square, Ashwaubenon, WI 54304
- Target 1001 Cormier Rd, Green Bay, WI 54304
- Lambeau Field 1265 Lombardi Ave., Green Bay WI 54304
- ADRC 300 S. Adams St, Green Bay, WI 54301
- City Hall 100 N. Jefferson St, Green Bay, WI 54301
- Brown County Library SW Branch 974 9th St, Green Bay, 54304
Route #9 Gold Line
- Target 1001 Cormier Rd, Green Bay, WI 54304
- Bay Park Square Mall 303 Bay Park Square, Ashwaubenon, WI 54304
- ADRC 300 S. Adams St, Green Bay, WI 54301
- City Hall 100 N. Jefferson St, Green Bay, WI 54301
- DMV 942 Van Der Perren Way, Green Bay, WI 54304
- Delta Hotel 2750 Ramada Way, Green Bay, WI 54304
- Ashwaubenon Village Hall 2155 Holmgren Way, Green Bay, WI 54304
Route #10 Plum Line
- Pick ‘n Save 1819 Main St, Green Bay, WI 54302
- Walmart 2292 Main St, Green Bay, WI 54311
Route #11 Sky Line
- Prevea 1821 S. Webster Ave, Green Bay, WI 54301
- St. Vincent Hospital 835 S. Van Buren St, Green Bay, WI 54301
- Bellin Hospital 744 S. Webster Ave, Green Bay, WI 54301
- Supervalu Foods 1220 S. Webster Ave, Green Bay, WI 54301
Adoption and Revision History
Approved by the Green Bay Transit Commission on September 19, 2007.
Updated and approved by the Green Bay Transit Commission on June 16, 2010.
Updated and approved by the Green Bay Transit Commission on October 20, 2010.
Updated and approved by the Green Bay Transit Commission on March 21, 2012.
Updated and approved by the Green Bay Transit Commission on March 21, 2012.
Updated and approved by the Green Bay Transit Commission on July 24, 2013.
Updated and approved by the Green Bay Transit Commission on July 19, 2017.
Updated and approved by the Green Bay Transit Commission on January 16, 2019.
Updated and approved by the Green Bay Transit Commission on August 12, 2020.
Updated and approved by the Green Bay Transit Commission on August 18, 2021.
Updated and approved by the Green Bay Transit Commission on June 18, 2025.
Report to the
Transit Commission
of the City of Green Bay
MEETING DATE PREPARED BY
June 18, 2025 Patricia Kiewiz, Transit Director
AGENDA ITEM # E.1
2024 WisDOT Transit System Management Performance Final Review
BACKGROUND
Section 85.20 of the Wisconsin Statutes requires the Wisconsin Department of Transportation (WisDOT)
to conduct a transit system management performance review (MPR) of all urban mass transit systems
receiving state aid at least once every five years. This report summarizes the 2024 MPR for the City of
Green Bay’s public transit system, doing business as Green Bay Metro. The previous Green Bay Metro MPR
was conducted in 2019.
"The review team concludes that Green Bay Metro is a well-managed transit system that delivers effective
service while proactively planning for the future. Indeed, the team gives Green Bay Metro its highest rating
(“conducive to effective operations”) in all functional areas reviewed. We also note that peer agencies across
Wisconsin frequently turn to the agency for assistance with their own operations.
Green Bay Metro’s continued efforts to improve its use of technology, take advantage of new service
models, and maintain an excellent safety and maintenance record demonstrate the agency’s commitment to
providing high-quality service to the Green Bay region."
RECOMMENDATION
FISCAL IMPACT
No action necessary.
ATTACHMENTS
1. 2024WisDOT_MPR_Green Bay_Final
901 University Avenue, Green Bay, Wisconsin 54302
greenbaymetro.org
City of Green Bay
Green Bay Metro
Serving the Cities of Green Bay and De Pere and the Villages of
Allouez, Ashwaubenon, and Bellevue
Source: Green Bay Metro.
Wisconsin Department of Transportation
2024 Transit System Management Performance Review
Final Report | May 2025
Prepared for the Wisconsin Department of Transportation by SRF Consulting Group
Contents
List of Figures ..................................................................................................................................................................... ii
List of Tables ...................................................................................................................................................................... iii
Introduction ......................................................................................................................................................................... 1
Status of Previous Recommendations ................................................................................................................................... 1
Summary ........................................................................................................................................................................................ 2
Part I: System Overview ................................................................................................................................................... 4
Fixed-Route Service .................................................................................................................................................................... 4
Paratransit ...................................................................................................................................................................................... 5
Microtransit ................................................................................................................................................................................... 5
Fares ................................................................................................................................................................................................ 5
Fleet ................................................................................................................................................................................................. 6
Facilities .......................................................................................................................................................................................... 7
Part II: Analysis of System Performance ...................................................................................................................... 9
Peer Groups ................................................................................................................................................................................ 10
Performance Measures: Results ............................................................................................................................................ 12
Performance Summary ............................................................................................................................................................ 15
Part III: Policy- and Decision-Making Processes ..................................................................................................... 17
Organizational Structure ..........................................................................................................................................................17
Policy Environment ................................................................................................................................................................... 18
Conclusions ................................................................................................................................................................................. 20
Part IV: Functional Area Review................................................................................................................................... 21
Transportation Operations ..................................................................................................................................................... 21
Vehicle and Facility Maintenance ......................................................................................................................................... 23
Finance ......................................................................................................................................................................................... 24
Planning and Scheduling ........................................................................................................................................................ 24
Marketing..................................................................................................................................................................................... 26
Summary ...................................................................................................................................................................................... 28
Part V: Recommendations Summary.......................................................................................................................... 29
Appendix A: Peer Performance Analysis ................................................................................................................... 30
Appendix B: Completed Questionnaire ..................................................................................................................... 46
SRF Consulting Group 2024 Transit System Management Performance Review | i
List of Figures
Figure 1. Green Bay Metro Vehicles............................................................................................................................................................ 6
Figure 2. Green Bay Metro Headquarters and Transfer Facility ......................................................................................................... 7
Figure 3. Green Bay Metro Bus Storage Area .......................................................................................................................................... 7
Figure 4. Green Bay Metro Bus Maintenance Area ................................................................................................................................ 8
Figure 5. Green Bay Metro Organizational Chart (2024).................................................................................................................... 17
Figure 6. Green Bay Metro Online Bus Tracker (Desktop) .................................................................................................................27
SRF Consulting Group 2024 Transit System Management Performance Review | ii
List of Tables
Table 1. Summary of Recommendations from Previous Management Performance Review (2019) ................................................1
Table 2. Peer Analysis Performance Summary ................................................................................................................................................. 2
Table 3. Assessment of Policy- and Decision-Making Processes................................................................................................................ 2
Table 4. Summary Assessment of Functional Areas........................................................................................................................................ 3
Table 5. Summary of Recommendations – 2024 Management Performance Review ......................................................................... 3
Table 6. Green Bay Metro Regular Local Fixed-Route Bus Service Summary......................................................................................... 4
Table 7. Green Bay Metro Fare Structure ........................................................................................................................................................... 5
Table 8. Green Bay Metro Fixed-Route Fleet .................................................................................................................................................... 6
Table 9. Performance Objectives and Performance Measures .................................................................................................................... 9
Table 10. 2022 Operating Statistics – Wisconsin Peer Group, DR and Bus ............................................................................................ 10
Table 11. 2022 Operating Statistics – National Peer Group, DR and Bus................................................................................................. 11
Table 12. Operating Statistics – Green Bay Metro, 2018-2022 ................................................................................................................... 12
Table 13. Performance Measures – Green Bay Metro, 2018-2022 ............................................................................................................ 12
Table 14. Summary of Green Bay Metro’s Performance Relative to Peers ............................................................................................ 15
Table 15. Assessment of Policy- and Decision-Making Processes ........................................................................................................... 20
Table 16. Summary Assessment of Functional Areas ................................................................................................................................... 28
Table 17. Summary of Recommendations ....................................................................................................................................................... 29
SRF Consulting Group 2024 Transit System Management Performance Review | iii
Introduction
Section 85.20 of the Wisconsin Statutes requires the Wisconsin Department of Transportation (WisDOT) to
conduct a transit system management performance review (MPR) of all urban mass transit systems receiving
state aid at least once every five years. This report summarizes the 2024 MPR for the City of Green Bay’s
public transit system, doing business as Green Bay Metro. The previous Green Bay Metro MPR was
conducted in 2019.
The 2024 MPR process consisted of three main activities: performance analysis, review of completed written
MPR questionnaire and provided documentation, and a virtual interview with the transit director and other
staff. In October 2024, the team sent an electronic MPR questionnaire form to Green Bay Metro’s transit
director. The review team then conducted a quantitative performance analysis to inform the areas of focus
for the virtual interview. The interview was conducted on November 20, 2024, via Zoom.
This report consists of five sections: System Overview; Analysis of System Performance; Policy- and Decision-
Making Processes; Functional Area Review; and Conclusions. The Functional Area Review focuses on
transportation operations, vehicle and facility maintenance, finance, planning and scheduling, marketing, and
the agency’s response to the COVID-19 pandemic.
Status of Previous Recommendations
Green Bay Metro (GBM) investigated or implemented many recommendations from its 2019 MPR, including
finance and technology improvements and planning efforts. However, the agency notes that it needs
additional staff time and/or resources in order to address several remaining identified deficiencies, including
in fixed-route supervision and paratransit scheduling. Green Bay Metro’s report on the status of previous
MPR recommendations is shown in Table 1.
Table 1. Summary of Recommendations from Previous Management Performance Review (2019)
Functional Area Recommendation Priority
Establish a transit user advisory group to provide customer input on current operations and
Low
proposed service revisions.
Continue to monitor the employment market for bus drivers in the Green Bay area; consider
Policy- and Decision-
exploring changes that would allow new drivers more flexibility with scheduling, or other Medium
Making Processes
strategies to improve employee engagement.
Continue to leverage statewide resources, relationships with peer transit agencies, and regional
Low
and national peer groups to bring new and innovative practices to Green Bay Metro.
Transportation
No Recommendations. --
Operations
Vehicle and Facility
Procure and implement a barcode system for parts and maintenance. Low
Maintenance
Monitor passenger revenue effectiveness metrics after the January 2020 fare increase, as well as
Finance any impact on ridership (particularly ridership by low-income passengers and other Medium
underrepresented groups).
Continue to explore new service delivery models for low-density areas, including restructuring
Medium
fixed routes and/or conducting pilot projects as feasible.
Planning and
Scheduling Develop a consistent process and funding structure for engaging and adding municipalities to
the Green Bay Metro system, including establishing the appropriate amount and type of Medium
service, and allocating operating and capital costs among new and existing municipalities.
Work to provide public data in the GTFS file format for use in Google Maps and other third-
Marketing Medium
party applications, and advertise these trip planning tools once available.
SRF Consulting Group 2024 Transit System Management Performance Review | 1
Adopt a plan to conduct regular customer surveys on an annual or triennial basis, and track
Medium
customer satisfaction as a performance measure.
Continue and strengthen Green Bay Metro’s presence at local community events, including
Medium
outreach efforts by the agency’s mobility coordinator.
Summary
The tables below highlight this report’s findings and recommendations. Detailed descriptions and analyses
accompany these throughout this report. The data included in this analysis is the combined “Demand
Response” and “Bus” data as submitted to NTD by each agency.
Table 2. Peer Analysis Performance Summary 1
Single Year: 2022 Trend Analysis: 2018-2022
Performance
Performance Measure WI Peer US Peer WI Peer US Peer
Objective
Comparison Comparison Comparison Comparison
Cost Effectiveness Operating Expenses Per Passenger Trip
Cost Efficiency Operating Expenses Per Revenue Hour
Service Effectiveness Passenger Trips Per Revenue Hour
Passenger Trips Per Capita - -
Market Penetration
Revenue Hours Per Capita - -
Average Fare Per Passenger Trip*
Passenger Revenue
Operating Ratio*
Effectiveness
Subsidy Per Passenger Trip
Better than peer average
Key to
Within satisfactory range (+/- one standard deviation)
Symbols
Outside satisfactory range
Table 3. Assessment of Policy- and Decision-Making Processes
Criterion Rating
The manager has sufficient authority and control to manage in an efficient manner.
The lines of authority, responsibility, and accountability are well defined and appropriate.
The lines of communication provide for sufficient exchange of information to ensure decision makers are
knowledgeable on issues.
The current organizational structure is conducive to effective and efficient operation.
Structures and procedures are conducive to effective operations
Key to
Structures and procedures are adequate with room for improvement
Symbols
Structures and procedures are insufficient
1 National Transit Database (NTD) data used in these peer analyses exclude revenues from agencies’ partnership
agreements and non-fare revenues such as advertising proceeds. These exclusions – which reflect NTD data collection
and reporting practices from 2018 to 2022 – disproportionately (adversely) impact Green Bay Metro’s average fare per
passenger, operating ratio, and subsidy per passenger trip relative to its peers. This point is elaborated upon in Part II.
SRF Consulting Group 2024 Transit System Management Performance Review | 2
Table 4. Summary Assessment of Functional Areas
Functional Area Rating
Transportation Operations
Vehicle and Facility Maintenance
Finance
Planning and Scheduling
Marketing
Structures and procedures are conducive to effective operations
Key to
Structures and procedures are adequate with room for improvement
Symbols
Structures and procedures are insufficient
Table 5. Summary of Recommendations – 2024 Management Performance Review
Functional Area Recommendation Priority
Establish a transit user advisory group to provide customer input on current operations and
Low
proposed service revisions
Continue to monitor the employment market for bus drivers in the Green Bay area; consider
exploring policy/procedure changes that would allow new drivers more flexibility with Medium
Policy- and Decision- scheduling, or other strategies to retain newer drivers.
Making Processes
Continue to leverage statewide resources, relationships with peer transit agencies, and regional
Low
and national peer groups to bring new and innovative practices to Green Bay Metro.
Work with 5310 program managers to explore options for additional support and training for
Medium
the agency’s role as administrator and overseer of the program in the Green Bay TMA
Transportation Consider Remix or other similar software to streamline scheduling and dispatch technology for
Medium
Operations fixed route, microtransit, and paratransit service.
Vehicle and Facility Continue to test, review, and eventually procure and implement a barcode (or other) system for
Low
Maintenance parts and maintenance.
Finance No Recommendations --
Create an ADA Transition Plan to formalize ADA accessibility improvements and secure
Planning and Medium
additional discretionary funding for accessibility-related projects.
Scheduling
Work with regional partners and WisDOT to conduct an analysis of the travel delays caused by
Low
rail traffic and explore potential solutions.
Adopt a plan to conduct regular customer surveys on an annual or triennial basis, and track
Marketing Medium
customer satisfaction as a performance measure.
SRF Consulting Group 2024 Transit System Management Performance Review | 3
Part I: System Overview
The City of Green Bay provides public transit service as Green Bay Metro, serving over 800,000 unlinked trips
in 2023. Green Bay Metro operates a total of 11 regular fixed routes (Routes 1-11), reduced from 17 regular
fixed routes since the last performance review in 2019. The agency also operates three limited service routes,
Americans with Disabilities Act (ADA) complementary paratransit service, as well as microtransit service
connecting outlying areas to fixed route transfer centers. The Green Bay Metro fleet consists of 36 fixed-
route buses, including four 29-foot buses, 30 35-foot buses, and two 40-foot buses.
The contractor-owned ADA paratransit fleet currently includes 14 vehicles. Green Bay Metro also owns two
pickup trucks and three Ford SUVs for use as support vehicles.
Fixed-Route Service
Green Bay Metro’s fixed bus routes are shown in Table 6. Service operates from 5:15 a.m. to 6:45 p.m. on
weekdays and from 7:45 a.m. to 1:45 p.m. on Saturdays. Green Bay Metro also has three Limited Service
Routes (71, 75, and 78) that operate on regular school days only. These routes are open to the public and
regular fares are charged. Lastly, four Game Day Routes (29, 30, 31, 36) operate on Packer’s home game days
only which are open to the public and free to ride.
Table 6. Green Bay Metro Regular Local Fixed-Route Bus Service Summary
Service Days Route Span of Service Frequency (Minutes)
Weekday 1: Pink Line 5:15 a.m. – 6:45 p.m. 60
2: Orange Line 5:15 a.m. – 6:45 p.m. 30
3: Silver Line 5:15 a.m. – 6:45 p.m. 30
4: Blue Line* 5:45 a.m. – 6:45 p.m. 60
5: Yellow Line 5:45 a.m. – 6:15 p.m. 60
6: Red Line 5:15 a.m. – 6:45 p.m. 30
7: Lime Line 5:15 a.m. – 6:45 p.m. 30
8: Green Line 5:45 a.m. – 6:45 p.m. 60
9: Gold Line 5:15 a.m. – 6:15 p.m. 60
10: Plum Line 5:15 a.m. – 6:45 p.m. 30
11: Sky Line 5:15 a.m. – 6:45 p.m. 30
Saturday 1: Pink Line 8:15 a.m. – 1:45 p.m. 60
2: Orange Line 7:45 a.m. – 1:45 p.m. 30
3: Silver Line 8:15 a.m. – 1:45 p.m. 60
4: Blue Line 7:45 a.m. – 1:45 p.m. 60
5: Yellow Line 7:45 a.m. – 1:15 p.m. 60
6: Red Line 7:45 a.m. – 1:45 p.m. 30
7: Lime Line 7:45 a.m. – 1:45 p.m. 60
8: Green Line 7:45 a.m. – 1:45 p.m. 60
9: Gold Line 8:15 a.m. – 1:15 p.m. 60
10: Plum Line 7:45 a.m. – 1:45 p.m. 30
11: Sky Line 7:45 a.m. – 1:15 p.m. 60
Source: Green Bay Metro.
* Route deviates to serve specific locations on select trips.
SRF Consulting Group 2024 Transit System Management Performance Review | 4
Paratransit
Green Bay Metro provides complementary paratransit service for eligible customers with disabilities through
a turnkey operating contract with MV Transportation, Inc. Green Bay Metro conducts eligibility assessments
in-house and issues determinations, including unconditional, conditional, or temporary paratransit eligibility,
based on the customer’s ability to use fixed-route transit service. Paratransit service is provided using
contractor-owned vehicles and serves eligible customers within ¾ mile of any regular bus route and within
the municipal boundaries of Green Bay and other funding municipalities. The one-way customer fare for this
service is $4.00, twice the regular fixed route fare. Agency one-way trips are $21.00. Green Bay Metro
paratransit service operates from 5:15 a.m. to 6:45 p.m. on weekdays and from 7:45 a.m. to 1:45 p.m. on
Saturdays, during all times that Metro fixed routes operate.
Microtransit
Starting in August 2021, Green Bay Metro and Via partnered to launch GBM On Demand, an expanded
microtransit service in the Green Bay area. There are four microtransit service ‘zones’ surrounding the fixed-
route service area. GBM On Demand Rides can be booked from zone to zone, within the same zone or
between zone and the zone’s corresponding fixed route transfer point. Riders can book trips in any of the
four zones during fixed route service hours. After fixed route service hours, riders can also book trips within
the fixed route service area until 11:30pm on weekdays and 7:45pm on Saturdays. GBM On Demand fares are
equal to those of fixed route service. Riders can pay for a day pass directly through the app with a credit
card, cash, or use a Green Bay Metro day pass, weekly or monthly pass.
Fares
Table 7 summarizes Green Bay Metro’s current fare structure for fixed-route service. A one-way fare is $2.00
for adults, $1.50 for K-12 students (with ID), and $1.00 for seniors or people with disabilities (free for service-
connected veterans). Children under four ride free. Instead of offering paper transfers, Green Bay Metro sells
day passes for $4.00. Weekly and 30-day passes are also available.
Table 7. Green Bay Metro Fare Structure
Cash Day Pass Weekly Pass 30 Day Pass
Adult (19-64 years) $2.00 $4.00 $16.00 $41.00
K-12 Student (with ID)* $1.50 $3.00 (only on bus) -- $28.00
Seniors (65 & over) /
Disabled / Medicare Card $1.00 $2.00 (only on bus) -- $31.00
Holders
Service-Connected Veterans Free -- -- --
Source: Green Bay Metro.
* K-12 students in the Green Bay and Ashwaubenon school districts ride free with a valid, current student ID.
SRF Consulting Group 2024 Transit System Management Performance Review | 5
Fleet
As of January 2024, Green Bay Metro’s fixed-route fleet consists of 36 New Flyer and Gillig heavy-duty buses,
with most recent purchases ranging from 29 to 40 feet in length (Table 8). Green Bay Metro is in the process
of replacing vehicles purchased in 2009 and 2011 on a rolling basis in order to return to a more balanced
procurement schedule.
Per FTA rolling stock useful life policy guidelines, large, heavy-duty buses have a minimum useful life of at
least 12 years or 500,000 miles. 2 Green Bay Metro actively tracks and reports fleet conditions relative to these
useful life metrics. Currently, the agency is operating 16 vehicles (44% of its fixed-route fleet) beyond 12 years
or 500,000 miles. Figure 1 shows some of Green Bay Metro’s fleet.
Table 8. Green Bay Metro Fixed-Route Fleet
Vehicle Numbers Quantity Year Make/Model Length Average Life Miles (2024)* Age (years)*
901-903, 905,
6 2009 New Flyer D35LF 35’ 382,180 15
906, 909
1101-1110 10 2011 Gillig G27B102N4 35’ 439,067 13
1501-1504 4 2015 Gillig G27B102N4 35’ 270,706 9
1801-1803 3 2018 New Flyer XD35 35’ 137,488 6
1804-1805 2 2018 New Flyer XD40 40’ 136,981 6
1901-1903 3 2019 Gillig G27B 35’ 97,368 5
2001-2004 4 2020 Gillig G27B 35’ 110,307 4
2201-2204 4 2022 Gillig G27E 29’ 24,209 2
TOTAL 36 -- -- -- 257,866 --
Source: Green Bay Metro.
*Fleet, mileage, and age in this table are as of January 2024 and may not reflect subsequent bus replacements.
Figure 1. Green Bay Metro Vehicles
2
Federal Transit Administration. Circular 5010.1F: Award Management Requirements. 2024. Page IV-35.
https://www.transit.dot.gov/sites/fta.dot.gov/files/2024-10/C5010.1F-Circular-11-01-2024_0.pdf
SRF Consulting Group 2024 Transit System Management Performance Review | 6
Source: Green Bay Metro.
Facilities
Green Bay Metro’s headquarters facility is co-located with the agency’s main bus transfer point at 901
University Avenue in downtown Green Bay. This building, known as the Transportation Center (or “Transit
Center” on Green Bay Metro route maps), includes administrative offices, driver break areas, a maintenance
area, and bus storage bays for the agency’s entire fleet. In addition, the building offers an interior waiting
area serving Jefferson Lines, Indian Trails, and Amtrak Thruway intercity bus customers, as well as a sheltered
exterior bus transfer area.
Figure 2. Green Bay Metro Headquarters and Transfer Facility
Source: SRF Staff.
Figure 3. Green Bay Metro Bus Storage Area
SRF Consulting Group 2024 Transit System Management Performance Review | 7
Source: SRF Staff.
Figure 4. Green Bay Metro Bus Maintenance Area
Source: SRF Staff.
SRF Consulting Group 2024 Transit System Management Performance Review | 8
Part II: Analysis of System Performance
Part II of this report examines Green Bay Metro’s performance over the last several years. Since there are no
recognized industry standards for most measures of transit system performance, widespread practice is to
compare the performance of a system to the average values of a peer group of systems.
The following peer analysis compares Green Bay Metro fixed-route bus and demand response performance to
a Wisconsin peer group and a national peer group in five categories using eight specific measures (Table 9),
including six core measures that WisDOT uses in cost efficiency reports and MPRs consistent with section
85.20 of the Wisconsin Statutes.
Table 9. Performance Objectives and Performance Measures
WisDOT Core
Performance Objective Performance Measure
Measure
Cost Effectiveness Operating Expenses Per Passenger Trip X
Cost Efficiency Operating Expenses Per Revenue Hour X
Service Effectiveness Passenger Trips Per Revenue Hour X
Passenger Trips Per Capita X
Market Penetration
Revenue Hours Per Capita X
Average Fare Per Passenger Trip
Passenger Revenue
Operating Ratio (Passenger Revenues Per Operating Expenses) X
Effectiveness
Subsidy Per Passenger Trip
Because Green Bay Metro recently added microtransit service to replace some fixed-route service, this peer
performance analysis includes data from fixed-route bus, demand response (i.e. microtransit), and ADA
paratransit service. The selection of peers includes those with a similar mix of service types to allow for a
more direct comparison with peer transit systems in Wisconsin and around the Midwest.
Each measure in Table 9 is used to assess Green Bay Metro’s performance in two ways:
• Single Year: Comparison to peer average for most the current year. Year 2022 National Transit
Database (NTD) data are used. This is the most recent year for which NTD data were available for all
peer systems at the time of analysis. Consistent with the WisDOT approach, performance is
considered “satisfactory” within one standard deviation of the peer average. The system’s
performance is labelled “outside the satisfactory range” (unsatisfactory) if it falls more than one
standard deviation from the peer average in the direction – either positive or negative –
representing lower performance.
• Multi-Year Trend Analysis: Comparison to peer average for annual rate of change. NTD data from
2018 to 2022 are used. The annual rate of change from 2018 to 2022 is calculated as follows:
¼
Annual rate of change = (Value2022/Value2018) -1
For the trend analyses, Green Bay Metro’s annual rate of change is compared to the peer group’s average.
Again, the system’s trend performance is considered “satisfactory” within one standard deviation of the peer
group average. Beyond one standard deviation from the peer group average, the system’s trend
performance is considered “outside the satisfactory range.”
SRF Consulting Group 2024 Transit System Management Performance Review | 9
Peer Groups
The selection of the peer groups for Green Bay Metro was based on a review of small urban bus systems in
NTD. NTD was used because its data are readily available and consistently reported. That said, the review
team and WisDOT recognize that the uniqueness of each transit service, agency reporting vagaries, and
inherent limits in NTD data itself all dictate caution in drawing hard conclusions from peer group
comparisons. Regarding the former, each agency operates its transit service in a different environment,
serves a unique market, and has a unique management structure. Still, peer group comparisons provide
some context for evaluating operating conditions of the agency under review and provide the review team
with a starting point for its more detailed management performance assessment. The data included in this
analysis is the combined “Demand Response” and “Bus” data as submitted to NTD by each agency.
Two peer groups were selected for comparison: a Wisconsin peer group and a national peer group (Table 10,
Table 11). Each system’s fixed-route bus and demand response data were used in the selection of peers and
the subsequent analyses.
Table 10 contains 2022 operating statistics for Green Bay Metro and the selected Wisconsin peer systems,
while Table 11 provides this information for Green Bay Metro and selected national peer systems.
In developing the national peer group, the review team focused on peer systems in cold-weather states
mostly in the Midwest; specifically, those with relatively similar service area and transit service mix provided.
The Urban Integrated National Transit Database (Urban iNTD) was used to develop an initial list of national
peers. 3 This initial list was filtered to include only the most comparable peers, based on the criteria listed
above and previous MPR peer analyses.
The national peer group includes systems in Indiana, Iowa, Kansas, Michigan, Montana, and Ohio.
Table 10. 2022 Operating Statistics – Wisconsin Peer Group, DR and Bus
Revenue Passenger Operating Passenger Service Area
System Name City Hours Trips Expenses Revenues Population*
Valley Transit Appleton 96,632 737,910 $7,350,607 $1,020,821 230,967
Eau Claire Transit Eau Claire 67,413 586,437 $6,570,404 $853,616 78,258
Kenosha Transit Kenosha 74,498 1,210,177 $7,665,602 $1,630,690 99,894
La Crosse MTU La Crosse 67,746 606,371 $6,068,922 $755,477 79,727
Belle Urban System - RYDE Racine 92,537 618,997 $9,702,041 $989,633 112,100
Shoreline Metro Sheboygan 46,869 512,504 $4,112,908 $508,710 59,490
Waukesha Metro Transit Waukesha 67,191 464,344 $7,810,289 $575,789 141,642
Green Bay Metro Green Bay 71,593 728,361 $7,206,440 $892,279 176,664
Average 73,060 683,138 $7,060,902 $903,377 122,343
Green Bay Metro as Percent of Average 98% 107% 102% 99% 144%
Source: National Transit Database, 2022.
*The service area population for each system is pulled from the “Service Area Population” field in NTD data.
3
Urban iNTD is a tool developed by the Florida Department of Transportation (FDOT), based on Transit Cooperative Research Program
(TCRP) research. http://www.ftis.org/urban_iNTD.aspx.
SRF Consulting Group 2024 Transit System Management Performance Review | 10
Table 11 contains 2022 operating statistics for Green Bay Metro and the selected national peer systems.
Table 11. 2022 Operating Statistics – National Peer Group, DR and Bus
Revenue Passenger Operating Passenger Service Area
System Name City, State Hours Trips Expenses Revenues Population*
MET Transit Billings, MT 52,916 337,500 $6,023,616 $494,181 110,323
Stark Area Regional Transit Authority Canton, OH 203,232 1,223,686 $27,785,250 $1,193,823 375,586
Cedar Rapids Transit Cedar Rapids, IA 68,144 753,831 $8,438,680 $201,159 158,890
Citilink Fort Wayne, IN 124,667 1,328,482 $14,575,596 $1,322,383 279,469
Muskegon Area Transit System Muskegon
(MATS) Heights, MI 37,785 196,304 $3,903,225 $205,756 88,639
Sioux City Transit Sioux City, IA 53,488 626,395 $5,415,692 $702,035 122,128
Topeka Metro Topeka, KS 66,420 717,018 $7,747,369 $797,151 127,473
Wichita Transit Wichita, KS 148,773 1,076,276 $13,431,530 $1,952,943 395,745
Green Bay Metro Green Bay 71,593 728,361 $7,206,440 $892,279 176,664
Average 91,891 776,428 $10,503,044 $862,412 203,880
Green Bay Metro as Percent of Average 78% 94% 69% 103% 87%
Source: National Transit Database, 2022.
*The service area population for each system is pulled from the “Service Area Population” field in NTD data.
SRF Consulting Group 2024 Transit System Management Performance Review | 11
Performance Measures: Results
This section summarizes the results of the single-year (2022) and multi-year (2018-2022) analyses for each of
the eight performance measures reviewed in this MPR. Green Bay Metro is compared to its Wisconsin and
national peer groups for each of the eight performance measures. Table 14 summarizes Green Bay Metro’s
performance relative to peer systems across all measures.
Green Bay Metro Five-Year Summary
Table 12 and Table 13 show the agency’s operating statistics and performance measures, respectively, for
2018 through 2022. The average annual rate of change is calculated for each statistic and measure. The data
included in this analysis is the combined “Demand Response” and “Bus” data as submitted to NTD by each
agency.
Table 12. Operating Statistics – Green Bay Metro, 2018-2022
Annual Rate
Operating Statistic
2018 2019 2020 2021 2022 of Change
Revenue Hours 95,051 101,496 66,384 64,072 71,593 -6.80%
Passenger Trips 1,310,472 1,324,579 542,963 523,900 728,361 -13.70%
Operating Expenses $7,716,749 $7,660,169 $6,510,211 $6,346,725 $7,206,440 -1.70%
Passenger Revenue $811,199 $1,069,527 $735,072 $840,613 $892,279 2.40%
Service Area Population -- -- -- -- 176,664 --
Source: National Transit Database, 2018-2022.
Table 13. Performance Measures – Green Bay Metro, 2018-2022
Annual Rate of
Performance Measure 2018 2019 2020 2021 2022 Change
Operating Expense Per Passenger Trip $5.89 $5.78 $11.99 $12.11 $9.89 13.9%
Operating Expense Per Revenue Hour $81.19 $75.47 $98.07 $99.06 $100.66 5.5%
Passenger Trips Per Revenue Hour 13.79 13.05 8.18 8.18 10.17 -7.3%
Passenger Trips Per Capita -- -- -- -- 4.12 --
Revenue Hours Per Capita -- -- -- -- 0.41 --
Average Fare Per Passenger Trip $0.62 $0.81 $1.35 $1.60 $1.23 18.6%
Operating Ratio 10.51% 13.96% 11.29% 13.24% 12.38% 4.2%
Subsidy Per Passenger Trip $5.27 $4.98 $10.64 $10.51 $8.67 13.3%
Source: National Transit Database, 2018-2022.
The NTD revenue data that are summarized in Table 12 factor into both the revenue-related performance
measures in Table 13 and subsequent revenue-related peer comparisons. These data exclude revenues from
each agency’s partnership agreements and non-fare revenues such as advertising proceeds. These exclusions
– which reflect NTD data collection and reporting practices from 2018 to 2022 – disproportionately
(adversely) impact Green Bay Metro’s average fare per passenger trip, operating ratio, and subsidy per
passenger trip relative to its peers. The inclusion of supplemental revenues would no doubt improve Green
Bay Metro’s relative performance in at least some corresponding peer comparisons.
SRF Consulting Group 2024 Transit System Management Performance Review | 12
Wisconsin Peers
Source: National Transit Database, 2018-2022.
SRF Consulting Group 2024 Transit System Management Performance Review | 13
National Peers
Source: National Transit Database, 2018-2022.
SRF Consulting Group 2024 Transit System Management Performance Review | 14
Performance Summary
Table 14 summarizes the measures for which Green Bay Metro performed better than average, satisfactory,
or outside the satisfactory range. Table 10 and Table 11 display the agency’s 2022 performance measure
results relative to all Wisconsin and national peers in greater detail.
Table 14. Summary of Green Bay Metro’s Performance Relative to Peers
Single Year: 2022 Trend Analysis: 2018-2022
Performance
Performance Measure WI Peer US Peer WI Peer US Peer
Objective
Comparison Comparison Comparison Comparison
Cost Effectiveness Operating Expenses Per Passenger Trip
Cost Efficiency Operating Expenses Per Revenue Hour
Service Effectiveness Passenger Trips Per Revenue Hour
Passenger Trips Per Capita - -
Market Penetration
Revenue Hours Per Capita - -
Average Fare Per Passenger Trip*
Passenger Revenue
Operating Ratio*
Effectiveness
Subsidy Per Passenger Trip
Better than peer average
Key to
Within satisfactory range (+/- one standard deviation)
Symbols
Outside satisfactory range
* Note: NTD data do not include revenue from Green Bay Metro’s partnership agreements or advertising proceeds.
In 2022, Green Bay Metro outperformed Wisconsin peer averages in three of eight performance measures,
and national peer averages in six of eight measures (Table 14). In 2022, the system performed especially well
in operating expenses per passenger trip, passenger trips per revenue hour, and subsidy per passenger trip.
Looking at the five-year trend analysis, Green Bay Metro outperforms both Wisconsin and national peers in
four of six measures.
To best understand this analysis, it’s important to note three major factors affecting the data between 2018
and 2022. First, due to the start of the COVID-19 pandemic in 2020, the 2018-2022 period includes data from
before the pandemic, during the peak of the pandemic, and the recovery years after the pandemic. During
this period, every transit system in the country faced unprecedented challenges with reduced ridership, rising
costs, staffing issues, and more. While Green Bay Metro fared very well in the trend analysis over the five-
year period, the system recovered from the pandemic even better compared to these peers when looking at
2020 to 2022 data alone (see the line charts shown in Appendix A: Peer Performance Analysis)
Second, Green Bay Metro implemented microtransit in 2020, replacing some fixed-route service and
reducing total revenue hours. While this change led to relatively low revenue hours per capita in 2022, the
service coverage area was maintained and the service became more efficient. This is shown by the higher-
than-average passenger trips per revenue hour in 2022, as well as the better than average trend in
passenger trips per revenue hour over the five-year period. Furthermore, Green Bay Metro performed
especially better than the peers in recovering from the pandemic with the rate of change in passenger trips
per revenue hour being especially better than peers from 2020 to 2022 (see the line charts shown in
Appendix A: Peer Performance Analysis).
SRF Consulting Group 2024 Transit System Management Performance Review | 15
The implementation of microtransit did lead to the rate of change in the operating expense per revenue
hour to be higher than peers over the five-year period, however looking more closely at the yearly data, the
jump in operating expense per revenue hour occurred from 2019 to 2020, as expected, but then stabilized
from 2020 to 2022. In fact, Green Bay Metro’s average rate of change in operating expense per revenue hour
from 2020 to 2022 was better than average compared to the Wisconsin peers and national peers.
Finally, the NTD data used in these peer analyses exclude revenues from agencies’ partnership agreements
and non-fare revenues such as advertising proceeds, which are particularly high for Green Bay Metro. These
exclusions – which reflect NTD data collection and reporting practices from 2018 to 2022 – disproportionately
(adversely) impact Green Bay Metro’s average fare per passenger, operating ratio, and subsidy per passenger
trip relative to its peers. Additionally, such agreements have enabled the agency to keep fares lower than
those of peer agencies. It’s also worth noting that fares are a local policy decision informed by numerous
considerations, not all of which encourage high fare revenue.
SRF Consulting Group 2024 Transit System Management Performance Review | 16
Part III: Policy- and Decision-Making Processes
This section describes the transit-relevant policy- and decision-making processes in place at Green Bay
Metro and the City of Green Bay.
Organizational Structure
Green Bay Metro is an operating department of the City of Green Bay. Transit Director Patricia Kiewiz serves
as the head of Green Bay Metro and is responsible for staff communication with the agency’s Transit
Commission. The Transit Commission consists of seven mayor-appointed representatives, including a
member of the city council, who serves as the liaison between Green Bay Metro and city government. Figure
5 summarizes Green Bay Metro’s organizational structure.
Figure 5. Green Bay Metro Organizational Chart (2024)
Source: Green Bay Metro.
SRF Consulting Group 2024 Transit System Management Performance Review | 17
Within Green Bay Metro, the transit director supervises four divisions: maintenance, operations, paratransit,
and administrative. In addition to the transit director, the agency’s 48 total staff include 10 maintenance
employees, 3 operations supervisors, 1 operations assistant, 3 dispatchers, 23.5 bus drivers, 2 additional
operations support roles, and 3 administrative staff. This organizational structure is well-designed and
appropriately staffed for the level of service provided by Green Bay Metro.
Policy Environment
The transit director is responsible for Green Bay Metro’s day-to-day operations and is empowered to set
policy and priorities, with major decisions (such as fares, budgets, etc.) subject to approval by the Transit
Board. The City of Green Bay, including the current mayoral administration and various city departments, as
well as municipal partners De Pere, Allouez, Ashwaubenon, and Bellevue, support transit and actively
coordinate with Green Bay Metro staff on major initiatives. Green Bay Metro reports ridership and service
performance measures to the Transit Commission on a quarterly basis. While the commission approves most
transit agency actions, the Green Bay City Council approves Green Bay Metro’s union labor agreements.
When considering changes to bus service, Green Bay Metro staff typically develop recommendations with
planning assistance from the Brown County Planning Commission / Green Bay MPO. MPO staff have access
to Green Bay Metro’s fixed-route, microtransit, and paratransit ridership data and can provide analytical
support to assess the feasibility of the agency’s proposed initiatives, including route and fare changes. For
major changes, Green Bay Metro conducts public outreach per the public participation policy before bringing
a final proposal to the Transit Commission for approval.
As a municipal transit agency, Green Bay Metro benefits from constructive relationships with other city
departments, including Human Resources, Public Works, Purchasing, Finance, and the Legal Departments.
The agency currently does not have a transit user advisory group to provide ongoing public input. This
practice has proven beneficial for other transit systems as it provides continuity and consistency in public
involvement with the agency. Green Bay Metro sites challenges stemming from the COVID 19 impacts as an
obstacle for establishing the group, though they also note that recent service changes and initiatives have
garnered a lot of public involvement. Oftentimes they see the same engaged community members attending
public meetings.
Recommendation 1: Establish a transit user advisory group to provide customer input on current
operations and proposed service revisions. Priority: Low.
Like its peer transit agencies, Green Bay Metro has experienced moderate difficulty recruiting and retaining
new drivers despite offering relatively higher wages. While the agency can hire drivers directly at full-time
status and part-time drivers, newer drivers often receive less desirable schedules, including frequent overtime
and Saturday work. As a result, the agency has seen frequent turnover among low-seniority drivers, while
longstanding employees seem more satisfied with the current situation. Green Bay Metro’s work rules are set
by the transit agency and could be changed in the event that turnover becomes a serious problem.
On the other hand, Green Bay Metro has reported some improved success with recruiting part-time drivers.
Previously they found it difficult to hire part-time since the benefits are prorated. In the last few years they
have hired three part-time drivers, which is the maximum they plan to hire from a contractual standpoint.
Beyond maintaining formal work rules, Green Bay Metro manages employee conduct through frequent
employee engagement activities that foster a proactive culture of safety and promote high-level
performance. For example, the agency tracks safety performance daily and has received numerous awards
SRF Consulting Group 2024 Transit System Management Performance Review | 18
from the Transit Mutual Insurance Association of Wisconsin (TMI). When Green Bay Metro receives cash
awards, the agency invests the proceeds in events and amenities for employees, including a flat-screen
television for the driver break area. Such practices foster a positive work environment and demonstrate that
all employees benefit from safe and effective provision of transit service.
Recommendation 2: Continue to monitor the employment market for bus drivers in the Green Bay area;
consider exploring policy/procedure changes that would allow new drivers more flexibility with
scheduling, or other strategies to retain newer drivers. Priority: Medium.
Green Bay Metro continues to maintain strong relationships with other transit agencies through the
Wisconsin Public Transportation Association (WIPTA). Ms. Kiewiz serves as WIPTA’s Legislative Committee
chair, and has found WIPTA to be an effective conduit for exchanging best practices with other transit
agencies across the state. This involvement helps Green Bay Metro stand out as a regional leader and that
brings a lot of practices and lessons from the state and beyond back to its regional partners. Green Bay
Metro also engages in productive consultation with WisDOT, including efforts related to transit asset
management and FTA requirements. Green Bay Metro also prioritizes sending senior staff to relevant
trainings and conferences in order to pursue continual improvement of the agency’s operations and
practices.
Recommendation 3: Continue to leverage statewide resources, relationships with peer transit agencies,
and regional and national peer groups to bring new and innovative practices to Green Bay Metro. Priority:
Low.
In 2013 Green Bay Metro took on the role of 5310 administration after the Green Bay area was designated a
Transportation Management Area (TMA) for exceeding 200,000 in population. Just a couple years after this
designation Green Bay was found deficient in three areas for subrecipient oversight in the 5310 program.
Over the past decade the agency has gained more experience with administering and overseeing the
program, however; staff cited a need for more resources and support for this role from WisDOT particularly
in the form of training.
Recommendation 4: Work with 5310 program managers to explore options for additional support and
training for the agency’s role as administrator and overseer of the program in the Green Bay TMA.
Priority: Medium
SRF Consulting Group 2024 Transit System Management Performance Review | 19
Conclusions
The policy- and decision-making processes in place at Green Bay Metro are conducive to effective
operations. Table 15 contains the review team’s assessment of the agency based on the four criteria used for
analysis. Green Bay Metro’s transit director and staff appear to have sufficient authority and autonomy within
existing City of Green Bay departmental structures to perform their jobs without undo interference, and the
Transit Commission receives agency performance updates that are appropriately frequent and detailed. Staff
maintain good relationships with peer transit agencies and the agency’s executive team is recognized for its
transit management expertise within Wisconsin.
Table 15. Assessment of Policy- and Decision-Making Processes
Criterion Rating
The manager has sufficient authority and control to manage in an efficient manner.
The lines of authority, responsibility, and accountability are well defined and appropriate.
The lines of communication provide for sufficient exchange of information to ensure decision makers are knowledgeable
on issues.
The current organizational structure is conducive to effective and efficient operation.
Structures and procedures are conducive to effective operations
Key to
Structures and procedures are adequate with room for improvement
Symbols
Structures and procedures are insufficient
SRF Consulting Group 2024 Transit System Management Performance Review | 20
Part IV: Functional Area Review
Part IV of this report contains a review of the following functional areas:
• Transportation Operations
• Vehicle and Facility Maintenance
• Finance
• Planning and Scheduling
• Marketing
These areas were chosen because they impact long-term capital requirements financial resources needed for
daily operations and short-term capital planning.
Green Bay Metro staff completed a detailed MPR questionnaire prior to the virtual review, which was
conducted on November 20, 2024. Staff answered all questions and provided extensive supporting material,
as requested by the review team. The virtual review process consisted of discussions with the Transit Director
(Ms. Kiewiz), Finance Manager (Sherry Schuh), Brown County Planning Commission Transportation Planner
(Lisa Conrad), and the Metro Compliance Coordinator (Becky Fleck), who together addressed the functional
areas relevant to this report.
Transportation Operations
The structures and procedures pertaining to the transportation operations function at Green Bay Metro are
conducive to effective operations. For more details about transportation operations at Green Bay Metro, see
Appendix B for staff’s full response to the review team’s MPR questionnaire.
Operator Supervision and Communications
Green Bay Metro currently employs 3 dedicated full-time supervisors and 3 dispatchers to monitor daily
operations. At least one supervisor and dispatcher are present during all hours of transit operations. The
weekday supervisor is on call to shift while the Saturday supervisor is on call all weekend. Morning
dispatchers report at 3:30 a.m. and 5:00a.m. on weekdays to open the transit facility, check schedule and bus
assignments, confirm that all morning drivers report on time, conduct fitness for duty assessments, and call
replacement drivers if necessary. Mid-day dispatchers are responsible for various routine activities in addition
to service monitoring, including coordinating with intercity bus providers. Afternoon dispatchers are
responsible for finishing daily operations logs and closing the facility at 10:00 p.m.
During the service day, operators regularly communicate with dispatch staff, who monitor vehicle locations
and schedule adherence, and issue guidance to drivers when necessary. Alerts are also provided directly to
drivers in the dispatch check-in area where they can grab their own copies. Route changes or detours are
posted on the driver's board. Turn by turn's, route guide and CAD/AVL software are updated, if a permanent
change is made. When policies are changed, they are provided a copy of the change and a signature is
required once they have received and read the changes. There are boards posted in each breakroom that
employees are required to review prior to starting their shift.
SRF Consulting Group 2024 Transit System Management Performance Review | 21
Service Reliability
Green Bay Metro tracks and reports on-time performance with the aid of an online map and automatic
vehicle location (AVL) system provided by Equans. This software allows supervisors and dispatchers to track
vehicle locations and schedule adherence in real time, and to analyze on-time performance trends.
Operators are required to report any late trip. For fixed route service, on-time is considered within one
minute early or up to five minutes late. For paratransit, on-time is considered within a 30-minute window of
scheduled time. For On-Demand, on-time is within five minutes of the scheduled time. Depending on the
service delivery issue, an on-duty supervisor or dispatcher might dispatch an extra bus to minimize
downstream schedule disruptions.
Green Bay Metro has adopted high standards for on-time performance with fixed route at 90%, paratransit at
95%, and On-Demand at 90%.
Safety and Training
Green Bay Metro draws safety and training resources from numerous sources, including Smith Systems, TMI,
and WIPTA. Agency staff frequently consult with other peer agencies, WisDOT, and FTA.
Green Bay Metro provides a robust training program for new drivers, which was well-documented in the
agency’s MPR submittal. TAPCO is used for training new drivers and tracking training and certifications. The
agency hires drivers with or without a CDL license. Depending on each new hire’s experience, Metro provides
20-70 hours of classroom training and 60-110 hours of behind-the-wheel training. Training for typical CDL-
qualified drivers includes:
• Service overview from the transit director
• Ride-alongs with experienced operators
• Smith Systems training prior to driving buses (recertification in Chicago or Milwaukee)
• Practice driving an out-of-service bus (as needed)
• Customer service training prior to driving routes
• Ride-along trip with the transit director prior to solo driving
• 30-day follow-up meeting with the transit director
(to address issues, questions, and feedback about the training process)
After this training, a new driver undergoes supervisor-led ride checks three times per year, and after
experiencing any issue or incident during normal operations. In addition, all operators attend mandatory
quarterly safety meetings, which address specific topics and safety trends. Green Bay Metro’s management
team reviews all training materials and procedures annually to ensure they reflect current best practices and
contain up-to-date information about the agency’s equipment and technology.
Green Bay Metro conducts performance evaluations on an annual basis. Evaluations of driver staff are
considered union responsibility. Metro performs ride checks on a quarterly basis (video and in person). Via is
responsible for performance reviews on the paratransit service.
These safety and training procedures represent best practices among peer agencies, and Green Bay Metro’s
close attention to safety has resulted in a consistent first-place claims rate among agencies insured through
TMI.
Like many peer systems, Green Bay Metro has opted in to WisDOT’s statewide PTASP.
SRF Consulting Group 2024 Transit System Management Performance Review | 22
Work and Vehicle Assignments
Schedules and assignments for fixed route service are managed in Excel. The program has been used for
many years by the organization and has worked well as the system operates all routes on 30-minute service.
The introduction of microtransit service could have an impact on this practice. Green Bay Metro plans to go
out for RFP for microtransit and paratransit as their current contracts are up in the next year.
Recommendation 5: Consider Remix or other similar software to streamline scheduling and dispatch
technology for fixed route, microtransit, and paratransit service. Priority: Medium
Vehicle and Facility Maintenance
The structures and procedures pertaining to the vehicle and facility maintenance functions at Green Bay
Metro are conducive to effective operations. The agency currently has 16 vehicles in its fleet of 36 beyond
useful life benchmarks (12 years or older), with a plan for ongoing fleet renewal already underway. Green Bay
Metro’s Transportation Center is a combined operations and transfer facility that offers sufficient capacity for
the agency’s current operational needs, and both vehicles and the facility appear to be maintained to high
standards. For more details about vehicle and facility maintenance at Green Bay Metro, see Appendix B for
staff’s response to the review team’s MPR questionnaire.
Vehicle Maintenance
Maintenance work for Green Bay Metro’s fixed-route buses is conducted by in-house maintenance staff.
Green Bay Metro employs four full-time mechanics, one assistant manager, one maintenance clerk, one
building technician and two service technicians. The agency’s maintenance area is large, well-lit, well-
equipped, and maintained to an extremely high standard of cleanliness and organization. Maintenance staff
inspect and record the condition of each bus daily, communicating any issues with management in a timely
manner. Green Bay Metro has tested implementing a barcode software (RTA) for parts inventory but has had
limited success as the technology is becoming a little outdated. Green Bay Metro is still exploring and testing
other software options but is ultimately in the beginning stages of implementing functional barcode
software.
Recommendation 6: Continue to test, review, and eventually procure and implement a barcode (or other)
system for parts and maintenance. Priority: Low.
Vehicle Replacement
As of January 2024, Green Bay Metro’s 36 existing fixed-route buses consisted of a variety of 30-foot, 35-
foot, and 40-foot buses manufactured by New Flyer and Gillig.
While Green Bay Metro expects to transition to electric vehicles long-term, the agency is not planning any
immediate battery-electric bus purchases. Agency staff are actively tracking electric vehicle developments,
including peer pilot projects like Duluth Transit Authority’s. The agency will consider purchasing future-
generation electric buses that are expected to offer improved battery capacity, range, and cold-weather
reliability compared to existing models.
Facilities Maintenance
Green Bay Metro’s Transportation Center facility is in good condition, offering clean, comfortable conditions
for bus passengers, administrative staff, and operations and maintenance employees. Green Bay Metro funds
SRF Consulting Group 2024 Transit System Management Performance Review | 23
facility capital improvements by imposing a facilities and usage fee on each municipality it serves (Green Bay,
Allouez, Ashwaubenon, Bellevue, and De Pere) in proportion to its share of total operating expenses. Funds
from this charge cover the depreciation of existing assets (excluding buses) and are used to cover the local
match for federal capital grants. This arrangement generates sustainable and appropriate capital funding for
facilities and equipment purchases; buses are typically purchased through separate City of Green Bay
bonding or budgeting.
Finance
The structures and procedures pertaining to the finance function at Green Bay Metro are conducive to
effective operations. As a unit of the City of Green Bay, the agency receives support from the city’s finance
department for accounts receivable, accounts payable, and general ledger functions. Green Bay Metro’s
accountant and transit director are jointly responsible for the agency’s annual budgeting process and for
reviewing budgeted and actual operating expenditures on a monthly basis. See Appendix B for staff’s full
response to the review team’s MPR questionnaire, which includes more details about the finance function.
Green Bay Metro is fiscally segregated from other city departments and services, and is required to maintain
a fund balance of zero at the end of each fiscal year. The agency assesses annual local share contributions
from the cities of Green Bay and De Pere, and the villages of Allouez, Ashwaubenon, and Bellevue based on
budgeted operating expenses and each municipality’s share of total service provided. At the end of each
year, Green Bay Metro returns any surplus funding to the municipalities. In the rare case that its operating
expenses exceed budgeted amounts, Green Bay Metro assesses each municipality an overage fee
proportionate to its share of overall operating expenses.
In addition to municipal funding contributions, Green Bay Metro receives revenue through local funding
agreements with school districts in Green Bay and Ashwaubenon, the University of Wisconsin-Green Bay, and
the Green Bay Packers. These agreements provide free rides for K-12 students, a U-Pass program for college
students, and free rides for all passengers on specialized Sunday routes serving Lambeau Field.
Green Bay Metro collects fare revenue using GFI fareboxes, which are emptied daily, with cash placed in a
secure vault room. Fare revenue is counted by two authorized staff in full view of cameras; this is a best
practice.
In 2020, Green Bay Metro implemented a fare increase and introduced its microtransit program. At the time
of this transition, the MPO monitored (and continues to monitor) passenger revenue effectiveness. Previous
methods of tracking fare revenue effectiveness with contracts or agreements with area municipalities would
no longer work due to the new mode being added. Therefore, a new standard was developed with the MPO
to determine local share contributions. The new standard is a “regional approach” where microtransit and
fixed route service are grouped together. For paratransit, origin, destination and customer home address
data is available, so the municipality in which the customers live is used to bill. This standard was approved
and has been successful.
Planning and Scheduling
The structures and procedures pertaining to the planning and scheduling functions at Green Bay Metro are
conducive to effective operations. See Appendix B for staff’s full response to the review team’s MPR
questionnaire, which includes more details about the planning and scheduling functions at Green Bay Metro.
SRF Consulting Group 2024 Transit System Management Performance Review | 24
Strategic Planning
Beyond helping with service change planning, the Brown County Planning Commission/Green Bay MPO
assists Green Bay Metro with its strategic planning efforts, including the most recent 2024-2028 Transit
Development Plan which serves as the agency’s guide for near-term transit operating and capital
improvements. Metro and Brown County Planning Commission staff document their progress towards
achieving the goals set in the TDP annually. Some notable successes included the expansion of microtransit
services to 11:30pm and successes securing discretionary funding.
Since the agency’s last review, Green Bay Metro has implemented a microtransit program which has helped
them achieve their goal of providing options for transit service in low-density areas. Modern demand-
response service has proved to be a viable tool for preserving and extending service coverage while focusing
fixed-route resources on core transit-supportive markets. These changes will have an impact on the updated
plans which will be developed in the next couple of years.
While Metro regularly undertakes strategic planning initiatives, staff mentioned that they do not have a
formal ADA transition plan.
Recommendation 7: Create an ADA Transition Plan to formalize ADA accessibility improvements, which
may help secure additional discretionary funding for accessibility-related projects. Priority: Medium
Performance Monitoring
As mentioned in Part III: Policy- and Decision-Making Practices, Green Bay Metro tracks service performance
data and reports ridership and other performance data to the Transit Commission quarterly. For internal
purposes, the agency sets performance targets in its strategic plans. When considering service changes (such
as during a TDP), Metro and Brown County Planning Commission/Green Bay MPO staff analyze ridership and
service data to inform their decisions.
Green Bay Metro is able to monitor maximum vehicle loads and vehicle locations using CAD/AVL on-board
technology. This aids with tracking schedules and predicting arrival times. It also has purchased several
automated passenger counters (APCs) to aid in boarding and alighting counts when needed. These systems
provide an appropriate level of data to facilitate effective decision-making by the agency.
Service Changes
When Green Bay Metro receives requests for service changes they are reviewed by the Service Development
Team that evaluates potential changes based on ridership and schedule adherence metrics. Routes and
schedules are update as needed. Multiple routes underwent small route adjustments to alleviate
performance problems caused by intersections with busy rail tracks. Staff attribute changes to statewide rail
traffic including the loss of yard staff as a reason for increased fixed route delays.
Recommendation 8: Work with regional partners and WisDOT to conduct an analysis of the travel delays
caused by rail traffic and explore potential solutions. Priority: Low
Capital Planning
Green Bay Metro’s major capital planning activities address vehicle replacement, facilities maintenance
equipment acquisitions, and capital improvements including bus shelter, accessibility improvements, and
technology upgrades.
SRF Consulting Group 2024 Transit System Management Performance Review | 25
The City of Green Bay Department of Public Works (DPW) manages local street infrastructure projects
(including ADA improvements) within Green Bay. Green Bay Metro also routinely coordinates with all
appropriate municipal public works staff for each of the communities in which they serve on street
reconstruction projects, and consequently recent street improvements have included transit-supportive
features, including bus turnouts and space for stops and shelters. This is a best practice, one that Green Bay
Metro should continue – particularly on infrastructure improvements in high-ridership areas.
Public Engagement
Green Bay Metro conducts marketing through a number of events and ongoing initiatives, including local
radio ads. The agency has an affiliation with the Green Bay Packers (free gameday routes, bus wraps), and
has targeted outreach to schools and universities.
Green Bay Metro has also created and staffed a mobility coordinator position, (see Figure 5). Funded through
the MPO using 5310 funds, the mobility coordinator is a public facing position. Their role includes teaching
people how to use Green Bay Metro’s services, meeting one-on-one with members of the public, taking trips
with new users, coordinating services with employers and agencies. Most of their time is spent out in the
community, enhancing Green Bay Metro’s public presence at community events. Their role has been critical
as the structure of Green Bay Metro’s services has changed.
Overall, Green Bay Metro’s current marketing and community engagement efforts reflect the agency’s
commitment to promoting transit in the Green Bay region. The review team considers these efforts
conducive to effective operations.
Marketing
The structures and procedures pertaining to the marketing function at Green Bay Metro are conducive to
effective operations. The agency’s online and printed materials are largely effective, and staff conduct
outreach with area schools, businesses, and transportation advocates, accompanied by traditional
advertising. Green Bay Metro tracks complaints systematically, though the review team recommends that the
agency supplement this tracking with ongoing customer surveys.
Materials and Website
Green Bay Metro maintains online materials through the City of Green Bay’s website. The website is well
organized, with branded pages for Green Bay Metro services. Schedules are provided in a PDF rider’s guide
and individual route maps, and dedicated pages provide information on the agency’s ADA paratransit
service, rider alerts/detours, and free Green Bay Packers gameday routes. As of December 2024, the online
materials had most recently been updated in September 2024. Green Bay Metro’s website includes a link to
the agency’s online bus tracker, which provides real-time vehicle location information (using CAD/AVL
services provided by Equans), shown in Figure 6.
Social Media
Green Bay Metro maintains an active social media presence on Facebook, where it communicates events and
conducts general marketing and customer engagement. The agency tracks Facebook comments and follows
up on complaints when necessary. The agency occasionally posts quizzes and other interactive material
about transit history or other relevant topics in order to generate interest and assist with marketing.
SRF Consulting Group 2024 Transit System Management Performance Review | 26
Figure 6. Green Bay Metro Online Bus Tracker (Desktop)
Source: Green Bay Metro (Release date: February 6, 2025).
Green Bay Metro provides customers with information about additional transit and transportation services
primarily through the Mobility Coordinator, and information distributed in public lobby. These services
include Curative Connections NEMT for elderly county-wide. Green Bay Metro also responds to a lot of
questions about intercity bus services, (Mega Bus, Lamers, Indian Trails) as well as vanpool services (there are
five vanpools in the county). The County has a transportation coordinating committee that meets once a
quarter.
Green Bay Metro also translates many of their materials into Spanish and other languages, as needed.
Market Research
Green Bay Metro conducts market research primarily when considering service changes, usually with
assistance from MPO staff. Surveys are also often utilized as part of various plan development efforts.
However, it does not routinely conduct customer surveys to either gauge customer satisfaction or identify
relevant rider demographic changes. Many transit agencies conduct surveys regularly, typically every one to
three years.
Recommendation 9: Adopt a plan to conduct standardized customer surveys every one to three years,
and track customer satisfaction as a performance measure. Priority: Medium.
In the last couple of years, the City of Green Bay has rolled out a request for service program. Transit-related
requests will get relayed to Green Bay Metro who have the ability to address requests and track progress on
them. This is one of the most used systems by the city for getting direct public feedback.
SRF Consulting Group 2024 Transit System Management Performance Review | 27
Summary
Table 16 summarizes the review team’s assessment of each functional area. Ratings are based on the degree
to which the function’s structures and procedures are conducive to continued effective operations of the
system. Part V summarizes the review team’s specific recommendations for each functional area.
Table 16. Summary Assessment of Functional Areas
Functional Area Rating
Transportation Operations
Vehicle and Facility Maintenance
Finance
Planning and Scheduling
Marketing
Structures and procedures are conducive to effective operations
Key to
Structures and procedures are adequate with room for improvement
Symbols
Structures and procedures are insufficient
SRF Consulting Group 2024 Transit System Management Performance Review | 28
Part V: Recommendations Summary
The review team concludes that Green Bay Metro is a well-managed transit system that delivers effective
service while proactively planning for the future. Indeed, the team gives Green Bay Metro its highest rating
(“conducive to effective operations”) in all functional areas reviewed. We also note that peer agencies across
Wisconsin frequently turn to the agency for assistance with their own operations.
Green Bay Metro’s continued efforts to improve its use of technology, take advantage of new service models,
and maintain an excellent safety and maintenance record demonstrate the agency’s commitment to
providing high-quality service to the Green Bay region. Recommendations intended to help Green Bay Metro
build on its successes are summarized in Table 17.
Table 17. Summary of Recommendations
Functional Area Recommendation Priority
Establish a transit user advisory group to provide customer input on current operations and
Low
proposed service revisions
Continue to monitor the employment market for bus drivers in the Green Bay area; consider
exploring policy/procedure changes that would allow new drivers more flexibility with Medium
Policy- and Decision- scheduling, or other strategies to retain newer drivers.
Making Processes
Continue to leverage statewide resources, relationships with peer transit agencies, and regional
Low
and national peer groups to bring new and innovative practices to Green Bay Metro.
Work with 5310 program managers to explore options for additional support and training for
Medium
the agency’s role as administrator and overseer of the program in the Green Bay TMA
Transportation Consider Remix or other similar software to streamline scheduling and dispatch technology for
Medium
Operations fixed route, microtransit, and paratransit service.
Vehicle and Facility Continue to test, review, and eventually procure and implement a barcode (or other) system for
Low
Maintenance parts and maintenance.
Finance No Recommendations --
Create an ADA Transition Plan to formalize ADA accessibility improvements and secure
Planning and Medium
additional discretionary funding for accessibility-related projects.
Scheduling
Work with regional partners and WisDOT to conduct an analysis of the travel delays caused by
Low
rail traffic and explore potential solutions.
Adopt a plan to conduct regular customer surveys on an annual or triennial basis, and track
Marketing Medium
customer satisfaction as a performance measure.
SRF Consulting Group 2024 Transit System Management Performance Review | 29
Appendix A: Peer Performance Analysis
Note: The data included in this peer analysis in all of Appendix A is the combined “Demand Response” and “Bus” data as submitted to NTD by each
agency.
SRF Consulting Group 2024 Transit System Management Performance Review | 30
SRF Consulting Group 2024 Transit System Management Performance Review | 31
SRF Consulting Group 2024 Transit System Management Performance Review | 32
SRF Consulting Group 2024 Transit System Management Performance Review | 33
SRF Consulting Group 2024 Transit System Management Performance Review | 34
SRF Consulting Group 2024 Transit System Management Performance Review | 35
SRF Consulting Group 2024 Transit System Management Performance Review | 36
SRF Consulting Group 2024 Transit System Management Performance Review | 37
SRF Consulting Group 2024 Transit System Management Performance Review | 38
SRF Consulting Group 2024 Transit System Management Performance Review | 39
SRF Consulting Group 2024 Transit System Management Performance Review | 40
SRF Consulting Group 2024 Transit System Management Performance Review | 41
SRF Consulting Group 2024 Transit System Management Performance Review | 42
SRF Consulting Group 2024 Transit System Management Performance Review | 43
SRF Consulting Group 2024 Transit System Management Performance Review | 44
SRF Consulting Group 2024 Transit System Management Performance Review | 45
Appendix B: Completed Questionnaire
The following are sheets from the completed MPR questionnaire, as submitted by Green Bay Metro staff. These responses were reviewed and used to
develop discussion items for the November 20, 2024, virtual review and this MPR final report.
RECOMMENDATIONS FROM PRIOR MPR Green Bay Metro Transit
How has this recommendation been addressed? If not
Functional Area addressed, (a) what have been the barriers and/or (b)
# from Prior MPR Recommendation Priority what steps have been taken toward completing it?
Establish a transit user advisory group to provide
customer input on current operations and proposed
1 service revisions. Low No, due to COVID.
Policy- and
Continue to monitor the employment market for bus
Decision-Making
drivers in the Green Bay area; consider exploring
Processes
changes that would allow new drivers more flexibility
with scheduling, or other strategies to improve
2 employee engagement. Medium Yes, part time positions.
Continue to leverage statewide resources, relationships
with peer transit agencies, and regional and national
peer groups to bring new and innovative practices to
3 Green Bay Metro. Low N/A
Transportation
-- Operations No Recommendations. --
Vehicle and
Facility Procure and implement a barcode system for parts and We did through RTA. It has not worked within our operation
4 Maintenance maintenance. Low as we expected.
SRF Consulting Group 2024 Transit System Management Performance Review | 46
RECOMMENDATIONS FROM PRIOR MPR Green Bay Metro Transit
How has this recommendation been addressed? If not
Functional Area addressed, (a) what have been the barriers and/or (b)
# from Prior MPR Recommendation Priority what steps have been taken toward completing it?
Monitor passenger revenue effectiveness metrics after
the January 2020 fare increase, as well as any impact on
ridership (particularly ridership by low-income
5 Finance passengers and other underrepresented groups). Medium Done. No concerns. Additional mode implemented.
Continue to explore new service delivery models for
low-density areas, including restructuring fixed routes
6 and/or conducting pilot projects as feasible. Medium Done and implemented microtransit.
Planning and
Develop a consistent process and funding structure for
Scheduling
engaging and adding municipalities to the Green Bay
Metro system, including establishing the appropriate
amount and type of service, and allocating operating
and capital costs among new and existing New regional approach for local share contribution has been
7 municipalities. Medium implemented
Work to provide public data in the GTFS file format for
use in Google Maps and other third-party applications,
8 and advertise these trip planning tools once available. Medium Done
Marketing
Adopt a plan to conduct regular customer surveys on Surveys are done as needed. Public comment box is available
an annual or triennial basis, and track customer in the lobby at all times. Service comments are always
9 satisfaction as a performance measure. Medium accepted online via "Request for Services."
SRF Consulting Group 2024 Transit System Management Performance Review | 47
RECOMMENDATIONS FROM PRIOR MPR Green Bay Metro Transit
How has this recommendation been addressed? If not
Functional Area addressed, (a) what have been the barriers and/or (b)
# from Prior MPR Recommendation Priority what steps have been taken toward completing it?
Continue and strengthen Green Bay Metro’s presence at
local community events, including outreach efforts by
10 the agency’s mobility coordinator. Medium Done.
POLICY- AND DECISION-MAKING PROCESS Green Bay Metro Transit
# Question Yes No Response (as applicable)
GENERAL
1 How does the transit system interact with No written response is needed for this question, but it is likely we will discuss this during
WisDOT on this topic (policy)? the meetings.
2 How does the transit system interact with other No written response is needed for this question, but it is likely we will discuss this during
public transit systems on this topic (policy)? the meetings.
STAFFING & ORGANIZATION
3 How does the transit system fit into the overall City of Green Bay Department, under the authority of the Transit Commission
local government framework? Is it a stand-alone
entity, or is a division of the city/county
government?
4 Which of these functions are conducted "in-
house" and which are outsourced to other units
of government or organizations? (please name
these)
Human Resources X City
Operations X In-house
SRF Consulting Group 2024 Transit System Management Performance Review | 48
POLICY- AND DECISION-MAKING PROCESS Green Bay Metro Transit
# Question Yes No Response (as applicable)
Maintenance X In-house
Finance X In-house and City
Legal X City
Marketing Various newspapers, social media, radio, television, information on buses, and within
GBM Apps
Other (please note)
5 Have labor costs changed significantly in the last No written response is needed for this question, but it is likely we will discuss this during
few years? If so, how? the meetings.
6 Are there any clearly-identifiable barriers in place X Ongoing challenges recruiting drivers, consistent with many other systems across the
related to employee recruitment and retention? If country.
so, please list briefly.
7 Has the transit system been impacted recently by X
high turnover or retirements?
8 What is the starting wage for drivers (part-time Driver wage: 0-1040 hours $22.90 / 1041-2080 hours $24.28 Full scale $27.55
and/or full-time)? How, if at all, does this change
in the first year?
9 Is there a notable difference between benefits X
offered to part-time and full-time employees?
10 What actions does the transit system undertake No written response is needed for this question, but it is likely we will discuss this during
to improve employee retention? the meetings.
MANAGEMENT
11 Who does the transit manager report to? Transit Director reports the Transit Commission and the Mayor
12 Who is responsible for leading the following
activities? Please include names and/or job titles.
Preparing capital/operating budgets Director and Finance Manager
SRF Consulting Group 2024 Transit System Management Performance Review | 49
POLICY- AND DECISION-MAKING PROCESS Green Bay Metro Transit
# Question Yes No Response (as applicable)
Providing input on staffing levels All administrative staff
Administering discipline Director, Human Resources, Operation Supervisors
Hearing grievances Director, Human Resources
Negotiating labor contracts Director, Human Resources
13 How often does management hold regular staff Weekly
meetings?
14 How often does the transit manager meet with Director meets with Mayor every two weeks and Commission once a month
their supervisor?
15 What training has management staff received in TSI-First Observer Training, Reasonable Suspicion, Quarterly Safety Meetings, Threat
the past year, if any? Do you feel this is sufficient? Awareness, Emergency Evacuation, Customer Service, Severe Weather, CPR/AED. See
Appendix H in PTASP.
16 What training is planned for management staff in List can be provided. Yes, training is provided as needed and requested.
the next year, if any? Do you feel this is sufficient?
POLICY MAKING
17 Is there a governance board, transit commission, X Green Bay Transit Commission
or official oversight committee in place? If so,
please name these group(s).
18 Briefly, what are the responsibilities of the The Green Bay Transit Commission is responsible for the development of the annual
board/commission? budget, establishing service levels, setting fares, awarding contracts, staff levels and
other related duties.
SRF Consulting Group 2024 Transit System Management Performance Review | 50
POLICY- AND DECISION-MAKING PROCESS Green Bay Metro Transit
# Question Yes No Response (as applicable)
19 How many members are on the 7 members, (1 Council Liaison, 6 members of the public)
board/commission? What is its composition in
terms of elected officials, staff, members of the
public, etc.?
20 What is the term of members? Two Years
21 How frequently does the board/commission Once a month
meet?
22 Are board/committee meetings open to the X
public and publicized?
23 Are board/committee meeting agendas, packets, X Yes, https://greenbaywi.gov/129/Meetings-Agendas-Minutes
and minutes posted online? If so, please provide
a link.
24 Do transit system staff provide regular updates X
and/or written reports for board/committee
meetings?
25 Does the transit system track progress toward X Goals are tracked annually and when initiatives are put in place they are reported
specific performance goals or completion of based on commission requirements.
initiatives? If so, describe briefly.
26 Who is involved with setting policy on:
Operations Director, Operation Manager
Route / service planning and changes Director, Operation Manager, Operation Supervisors
Specifying / procuring equipment and rolling Director, Compliance Coordinator
stock
Fare policy Director
SRF Consulting Group 2024 Transit System Management Performance Review | 51
POLICY- AND DECISION-MAKING PROCESS Green Bay Metro Transit
# Question Yes No Response (as applicable)
27 Provide an example of a recent policy-making No written response is needed for this question, but it is likely we will discuss this during
process or policy change. the meetings.
COMPLIANCE
28 Did the transit system have any deficiencies, X Deficient in 4 areas, one in Satisfactory Continuing Control - Property report not
corrective actions, or findings in the most recent submitted and inadequate oversight in three areas for 5310 subrecipient.
FTA Triennial Review/WisDOT Compliance Site
Review? If so, please describe briefly.
TRANSPORTATION OPERATIONS Green Bay Metro Transit
# Question Yes No Response (as applicable)
GENERAL
1 Currently, what is the most important operational No written response is needed for this question, but it is likely we will discuss this during
issue the transit system is experiencing? the meetings.
2 How does the transit system interact with No written response is needed for this question, but it is likely we will discuss this during
WisDOT on this topic (operations)? the meetings.
3 How does the transit system interact with other No written response is needed for this question, but it is likely we will discuss this during
public transit systems on this topic (operations)? the meetings.
4 For each mode (or service type) operated, how 15 Vehicles for Fixed route, 12 for On Demand Service.
many vehicles are operated in maximum service?
5 How many of the following does the system
currently employ?
Full-time drivers 16
Part-time drivers
3
SRF Consulting Group 2024 Transit System Management Performance Review | 52
TRANSPORTATION OPERATIONS Green Bay Metro Transit
# Question Yes No Response (as applicable)
Full-time operations/street supervisors 3
Part-time operations/street supervisors 0
Full-time other operations staff (e.g., dispatchers,
communications staff) [please specify title]
5 (3 Dispatchers, 1 Operation Assistant, 1 Operations Manager)
Part-time other operations staff (e.g., dispatchers,
communications staff) [please specify title]
0
OPERATIONS MANAGEMENT AND SUPERVISION
6 Is there an operations manager? If so, who (name Chris Braatz, Operations Manager
and title)? X
7 Are operations supervisors scheduled and
present during all hours of revenue service? If
X
not, describe when.
8 Are supervisors ever on call at home? If so, when? When additional coverage may be needed due to training, staff shortages, etc.
X
9 Is at least one dispatcher (or customer service
staff) on duty for all hours of revenue service? If
X
not, describe when these staff are on duty.
10 Who are the first employees to report to work on Dispatch arrives at 3:30am and at 5:00am an operation supervisor arrives. Dispatch
weekdays? What time do they arrive? Do they turns on all of the lights inside the building and lobby, and security camera screens in
have specific first-to-report tasks to open up the dispatch. All the public doors automatically unlock when needed at the set times.
facility?
DRIVER COMMUNICATIONS
SRF Consulting Group 2024 Transit System Management Performance Review | 53
TRANSPORTATION OPERATIONS Green Bay Metro Transit
# Question Yes No Response (as applicable)
11 How are route and service changes, safety Alerts are provided in the dispatch check-in area where they can grab there own
bulletins, and other important policies copies. Route changes or detours are posted on the driver's board. Turn by turn's,
communicated to drivers? route guide and CAD/AVL software are updated, if permanent change is made. When
policies are changed they are provided a copy of the change and a signature is
required once they have received and read the changes. There are boards posted in
each breakroom that employees are required to review prior to starting their shift.
12 Is there a specific employee guidebook for
operations or a specific driver’s manual? If so,
please ensure this is included in the shared X
documents.
13 Is there a cellular phone/digital device usage
policy for drivers? X
14 Are job performance evaluations completed
regularly for all driver staff? If so, how often, and
what do they entail? X
15 Are there any incentive programs in place for Accidents and safety record is tracked on a digital board in Operations and
driver performance? If so, briefly describe them? Maintenance. Previous awards have been food party, and various safety awards.
X
DRIVER: PRE-TRIP / POST-TRIP
16 Where do drivers report to when starting their Dispatch
shift?
17 Do any drivers begin work at remote start points?
If so, what is the procedure for checking in with
X
dispatch/supervisors?
SRF Consulting Group 2024 Transit System Management Performance Review | 54
TRANSPORTATION OPERATIONS Green Bay Metro Transit
# Question Yes No Response (as applicable)
18 How far in advance of pull-out (in minutes) do 10 minutes
drivers report?
19 Is there a method for dispatchers (or other
relevant staff) to communicate with maintenance
staff to ensure that all routes have been assigned X
vehicles that are in good repair?
20 Are all drivers required to personally check-in or Face to face with dispatch.
report to a supervisor, dispatcher, or some other
management person before going on duty? If so,
describe this process. Is it face-to-face, by phone, X
etc.?
21 Prior to the start of their shift, how does the Face to face with dispatch and Ops Supervisor.
transit system ensure a driver is fit for duty?
22 Is a pre-trip inspection required before a vehicle
goes in service? X
23 Do drivers have a post-trip checklist? If not, what
functions do drivers complete at the end of the
X
shift?
24 Who locks up the garage at the end of the service Dispatch secures main garage door at end of shift. 7pm Weekdays and 2pm
day, and at what time? Is a security system used Saturdays during regular service. Maintenance does a perimeter check at end of shift
when no one is present? to ensure everything is locked. Maintenance staff is the last to leave approx. two
hours after dispatch.
DRIVER: IN-SERVICE
25 Do drivers record the following information
throughout the day? If so, how do they report it
(e.g., a paper form, farebox, MDT, tablet)?
SRF Consulting Group 2024 Transit System Management Performance Review | 55
TRANSPORTATION OPERATIONS Green Bay Metro Transit
# Question Yes No Response (as applicable)
Passenger boardings X Farebox
Fare paid X Farebox
Arrival times X CAD/AVL (Equans)
Start/end vehicle mileage X Paper form
Other (please specify)
26 Do drivers handle cash or tickets in any way? X
27 Is there an adopted on-time performance Buses are between 1 min early to 5 minutes late for being on-time. Paratransit is
standard (e.g., window of time to be considered arriving within a 30 minute window (15 minutes before and 15 minutes after pick up
"on time") for each mode or service type you X time).
provide? If so, what are the standards?
28 Does the transit system track on-time On-Demand pick-up should be within 5 minutes of the scheduled time.
performance for your demand response service?
If so, how is this tracked? How often are results X
summarized and reviewed?
29 Does the transit system track on-time Buses are tracked from the start and the end of the route. Tracked through real-time
performance at the start and/or end of a route? software. Summarized and reviewed daily. Paratransit is tracked at the start of pick
If so, how is this tracked? How often are results X up. It is tracked and summarized weekly.
summarized and reviewed?
30 Does the transit system track on-time Busses are tracked in live time through out the entire service using our AVL system.
performance at mid-points along a route? If so, They are summarized and reviewed daily.
how is this tracked? How often are results X
summarized and reviewed?
31 Is there an adopted on-time performance goal Buses are 90% Paratransit is 95% On-Demand is 90%
(e.g., percent on time) for each mode or service
X
type provided? If so, what are the goals?
SRF Consulting Group 2024 Transit System Management Performance Review | 56
TRANSPORTATION OPERATIONS Green Bay Metro Transit
# Question Yes No Response (as applicable)
32 Year-to-date, what was the actual level of on- Buses 01/02/24 - 10/22/24: 78% (Considerable construction and changes in train
time performance for each mode or service type schedule) Para 01/02/24 - 10/22/24: 98.2%
you provided (e.g., percent on-time)?
TRAINING
33 Are drivers, dispatchers, and supervisors given
training in how to respond to accidents and
X
medical emergencies?
34 Are drivers given training and direction in how to
respond to passenger incidents? X
35 Do you have an accidents per mile goal (e.g., 0, Performed well.
fewer than X accidents/100,000 miles)? If so, how
X
have you performed in relation to your goal
recently?
36 Who administers the transit system's driver All of Operations management helps with driver training, which consist of the
training program? operations manager, supervisors, and assistant.
37 Is the transit system's driver training program
documented? If so, please ensure this is included
X
in the shared documents.
38 Have drivers been through specialized driver TAPCO, Smith System, are the two main courses. See attached training form.
safety courses (e.g., Smith System, TSI, CTAA, WI
RTAP, etc.)? If so, please note the course and X
briefly describe how it is applied.
39 Approximately how long is the transit system's
driver training program?
Number of classroom hours Approximately 20-70 hours based if they do or don't have a CDL
SRF Consulting Group 2024 Transit System Management Performance Review | 57
TRANSPORTATION OPERATIONS Green Bay Metro Transit
# Question Yes No Response (as applicable)
Number of behind-the-wheel hours Approximately 60-110 hours based if they have a CDL
40 Is there a continuing education component to the Smith System is done every 2 years,
transit system's driver training program? If so,
please describe briefly or list the internal X
document that you have shared that addresses
this.
41 Do maintenance staff have any role in training
new drivers? If so, please describe briefly or list
the internal document that you have shared that X
addresses this.
42 Does the transit system provide or arrange for
CDL training for inexperienced drivers when a
X
CDL is required to operate one of its vehicles?
43 Is there a retraining program for drivers with poor Each issue is viewed case by case. Additional training is provided as deemed
safety or complaint records? If so, please describe necessary.
briefly or list the internal document that you have X
shared that addresses this.
44 Does the transit system's safety program offer TMI program and various levels of days accomplished with tracking injuries and
incentives and recognition to drivers with good accidents.
X
records? If so, please describe briefly.
45 Does the transit system have regular safety
meetings with the following staff? If so, how
often?
Drivers X Quarterly
Mechanics X Quarterly
Administration X Quarterly as they pertain to the staff
SRF Consulting Group 2024 Transit System Management Performance Review | 58
TRANSPORTATION OPERATIONS Green Bay Metro Transit
# Question Yes No Response (as applicable)
46 Does the transit system do driver ride checks Quarterly, additional if needed
("ride alongs") with management, supervisors,
X
trainers, or other drivers? If so, how often?
47 Are drivers given specific training in the use of a
passenger lift and how to properly secure a
X
wheelchair?
48 Who conducts safety training for maintenance Maintenance Manager or the equipment manufacturer if it is new equipment.
workers?
WORK AND VEHICLE ASSIGNMENTS
49 Does the transit system use specialized X
scheduling software (e.g. HASTUS) or other
software to maintain a schedule database? If so,
please describe briefly.
50 How and how often do drivers select work Drivers select their work assignments every 4 months.
assignments?
51 Are there rules or guidelines about the types of X Each part-timer's offer letter states the hours per week they were hired for. Section
work completed by part-time employees? If so, 1.16 of the Bus Operator Manual , covers part time operator's schedules.
please provide an overview or list the internal
document that you have shared that addresses
this.
52 Are there requirements for driver breaks? If so, X Driver breaks are not provided based on preferred scheduling.
please provide an overview or list the internal
document that you have shared that addresses
this.
53 Does the system employ standby drivers who X
report to work but are not immediately assigned
work ("extra board")?
SRF Consulting Group 2024 Transit System Management Performance Review | 59
TRANSPORTATION OPERATIONS Green Bay Metro Transit
# Question Yes No Response (as applicable)
54 Does the system employ on-call drivers who are X
available for work, but do not report to work
unless called in?
FINANCE Green Bay Metro Transit
# Question Yes No Response (as applicable)
GENERAL
1 How does the transit system interact with No written response is needed for this question, but it is likely we will discuss this during
WisDOT on this topic (finance)? the meetings.
2 How does the transit system interact with No written response is needed for this question, but it is likely we will discuss this during
other public transit systems on this topic the meetings.
(finance)?
3 Which staff positions are involved with
the following:
Payroll Dispatch, Compliance Coordinator, Finance Manager, Transit Director
Purchasing Compliance Coordinator, Maintenance Manager, Transit Director
Accounts payable Compliance Coordinator, Finance Manager, Transit Director
Accounts receivable Compliance Coordinator, Finance Manager, Transit Director
General ledger Finance Manager, Transit Director
User fare revenues Compliance Coordinator, Finance Manager
4 When was the last time the transit system CY2024 for FY2023
was subject to a financial audit?
ACCOUNTING AND PAYROLL
SRF Consulting Group 2024 Transit System Management Performance Review | 60
FINANCE Green Bay Metro Transit
# Question Yes No Response (as applicable)
5 Are security and backup systems in place X
for your computerized accounting
system?
6 Is there a secure database of employee X
records, pay rates, benefit elections, and
other data?
7 Are payroll checks approved/signed by X
someone other than the person who
prepares them?
REVENUE CONTROL
8 Does the transit system have a written X
policy for cash handling procedures? If so,
please ensure this is included in the shared
documents.
9 When collected aboard a vehicle in X
revenue service, are fares collected in a
locked fare box?
10 Do transit system vehicle have registering X
fare boxes?
11 Who is responsible for removing fares Service Technicians probe buses at EOD
from the vehicle?
12 Who counts the fares? When? Where? Two persons count farebox revenue, in the vault, each morning.
13 Is there an activated security camera in X
the fare counting room?
14 What is the average daily amount of cash Average Mon-Fri = $401 / Average Sat = $182
collected?
15 Who reconciles cash collected with the Finance Manger reconciles sales subsidiary monthly. This tracks all operating fare
passenger count? revenues.
16 Who is responsible for making the bank Compliance Coordinator, and Courier Service takes deposits to the bank, twice a
deposit? How often is this done? week.
SRF Consulting Group 2024 Transit System Management Performance Review | 61
FINANCE Green Bay Metro Transit
# Question Yes No Response (as applicable)
17 Are bank deposits reconciled back to X
driver or fare box revenues?
18 Are cash receipts for pass sales reconciled X
back to the number of passes issued?
19 Are you responsible for other points of Compliance Coordinator (Finance Manager) reconcile cash sales for Ticket Vending
sale for fares aside from aboard vehicles Machines (TVMs). Compliance Coordinator reconciles dispatch sales daily, and creates
(e.g., public counter, fare vending bank deposit (Finance Manager serves as backup). Finance Manager reconciles all
machines, etc.)? If so, please describe. credit card sales EOM for mobile app, On Demand hand held validator, and TVM
credit card sales. Compliance Coordinator enters credit card sales into Tyler Munis.
20 Are paper/electronic transfers issued? If X
so, what are the transfer rules for
passengers?
21 Do you track how transfers are used N/A
between routes or services? If so, how and
how often?
BUDGETING AND GRANTS
22 Which staff members are involved in the Transit Director, Finance Manager
annual budgeting process?
23 Who prepares annual funding application Entered by Finance Manager, Approved by Transit Director
to WisDOT?
24 Does the transit system have (or recently X Municipal Partners: Villages of Allouez, Ashwaubenon, & Bellevue and Cities of De
had) any agreements with local partners Pere & Green Bay. School agreements: Ashwaubenon Public School District & Green
(i.e., municipalities, educational Bay Public School District.
institutions, businesses) for transit service,
funding, and/or fares? If so, please list
with whom and, generally, for what.
SRF Consulting Group 2024 Transit System Management Performance Review | 62
FINANCE Green Bay Metro Transit
# Question Yes No Response (as applicable)
25 Are annual capital and operating budgets X
part of local transportation improvement
program (TIP) and/or capital
improvement program (CIP)?
26 Does the transit system compare actual X Finance Manager prepares monthly financials that compare to budget.
revenues and expenses against budgeted
revenues and expenses throughout the
fiscal year? If so, please describe your
process, including frequency.
27 What is the policy for handling unspent During audit process, municipal actuals are reconciled and any overpayments are
local funds previously obligated for returned to the municipal partners.
transit? Please describe briefly.
28 Is there a transit fleet replacement fund in X Transit Director maintains a fleet replacement spreadsheet.
place? If so, please describe briefly.
29 Is there a general transit capital X City of Green Bay has a Capital Improvement Plan (CIP) that is updated annually.
replacement fund in place? If so, please
describe briefly.
30 Has the transit system worked with the X Green Bay Metro has worked with Brown County MPO to apply for STBG funds for
MPO/RPC to seek grant opportunities for buses.
vehicle replacement and capital
investments? If so, which grants and with
whom have you worked?
31 Has the transit system had to turn back X
grant funds in the past 5 years? If so, from
which grants and under what
circumstances?
SRF Consulting Group 2024 Transit System Management Performance Review | 63
PLANNING Green Bay Metro Transit
# Question Yes No Response (as applicable)
GENERAL
1 What do you want to accomplish in the next No written response is needed for this question, but it is likely we will discuss this during
few years? the meetings.
2 In the past, has there generally been success No written response is needed for this question, but it is likely we will discuss this during
in implementing planning the meetings.
recommendations?
3 How does the transit system interact with No written response is needed for this question, but it is likely we will discuss this during
WisDOT on this topic (planning)? the meetings.
4 How does the transit system interact with No written response is needed for this question, but it is likely we will discuss this during
other public transit systems on this topic the meetings.
(planning)?
PLANNING FUNCTIONS / LONG-RANGE
PLANNING
5 Are any staff dedicated exclusively to service X Green Bay Metro has a service development committee.
planning? If so, how many? If not, who is
responsible for the service planning function?
6 When was the last transit development plan Nov-23
(TDP), operations analysis, or other strategic
plan completed?
7 Who led the last TDP (or similar project) and Lisa Conard, Principal Planner with Brown County MPO was the lead, with several
what was the transit system's role in the Green Bay Metro staff members participating.
process? Did any other local agencies
participate? Please list.
SRF Consulting Group 2024 Transit System Management Performance Review | 64
PLANNING Green Bay Metro Transit
# Question Yes No Response (as applicable)
8 Is the TDP (or similar project) incorporated X
into the local long-range transportation plan
for the community?
9 To what extent has the transit system Majority of recommendations are ongoing goals for the system.
addressed the recommendations in the TDP
(or similar project)? Approximately what
percentage of the recommendations have
been implemented or addressed?
10 Does the transit system survey riders
regarding the following? If so, how often is
this information gathered?
Frequency of use X Project specific
Transportation alternatives/mode choice X Project specific
Trip origins and destinations X Project specific
Trip purpose X Project specific
Level of satisfaction with service X Project specific
Demographics X Project specific
PLANNING DATA / PERFORMANCE EVALUATION
11 Who is responsible for monitoring daily Operations Supervisors
transit system performance data?
12 Outside of daily monitoring, what OTP, safety concerns, training schedule, bus downs
performance data are regularly or
occasionally reviewed by staff?
SRF Consulting Group 2024 Transit System Management Performance Review | 65
PLANNING Green Bay Metro Transit
# Question Yes No Response (as applicable)
13 Does the transit system have automatic X
passenger counters (APCs)? I not, briefly
describe how you collect ridership data.
14 Does the transit system monitor maximum X Tracked with in CAD/AVL, drivers also notify dispatch.
vehicle loads? If so, how and how often?
15 Does the transit system have an automatic X Yes, operations and the public use it to track buses, monitor schedule adherence, and
vehicle locator (AVL) system or other GPS predict arrival times.
tools to track vehicle location? If so, briefly
describe how this is used and if this differs by
mode of service provided.
SERVICE CHANGES
16 How does the transit system respond to Requests for service changes are received and reviewed by Service Development
requests for service changes? Team.
17 Does the transit system evaluate the X Ridership, and schedule adherence
effectiveness of service changes? If so, how?
18 Generally, how often are routes and/or When necessary. Ongoing reviews are done to ensure most accurate information is
schedules updated? shared.
19 When was the most recent notable service 9/2/24 Minor modification to route 4. 5/5/2024 Route 4, 6, 8 and 9 had changes to
change or set of changes implemented? assist with on time performance.
Generally, what was changed?
20 Have you instituted any new or substantially X LIFT Program - Limited number of passes available each month for low income riders.
expanded programs or service (new mode or
type of service) within the last few years? If
so, please describe briefly.
FIXED ROUTE SCHEDULES
SRF Consulting Group 2024 Transit System Management Performance Review | 66
PLANNING Green Bay Metro Transit
# Question Yes No Response (as applicable)
21 Are fixed route schedules arranged to have X
routes meet at transfer points?
22 Are buses “held” for late arriving buses at X Standard is hold for three minutes. However, last trip of the day buses will be held to
transfer points? If so, briefly state the policy. ensure transfers are made.
23 Are there situations in which a bus is X A detour could occur due to road closings, construction work, or emergencies.
permitted to go off route to make a pick-up Dispatch must be notified prior to.
or drop-off? If so, explain briefly.
24 Is layover time or recovery time incorporated X 3-5 minutes per route.
into schedules? If not, how is recovery time
accommodated?
25 Does the transit system operate trippers (i.e., X Three limited service routes operate to assist with passenger loads.
unique or supplementary scheduled trips for
schools or workplaces)? If so, briefly describe.
26 Are schedules checked on a regular basis to X They're monitored regularly during service to make live adjustments when necessary
determine if running time adjustments are to keep buses running on time.
warranted? If so, how is this completed?
PUBLIC INPUT
27 How does the transit system engage the We give public meeting notices when changes occur for any commenting or concerns.
public in planning decisions? Please provide We have a form online that can also be filled out by anyone with any service
an overview of the strategies you use and comments and concerns. https://greenbaywi.gov/FormCenter/Metro-Transit-
how often they are deployed or list the 7/Service-Comments-129
internal document that you have shared
addresses this.
28 Aside from the primary decision-making X MPO, Transportation Coordinating Committee
body (i.e., board or commission), is there an
advisory group that provides input or
direction on transit in your community? If so,
please describe.
SRF Consulting Group 2024 Transit System Management Performance Review | 67
PLANNING Green Bay Metro Transit
# Question Yes No Response (as applicable)
29 What guidelines are used to determine when Public Participation Policy.
a public meeting is needed? Please provide
an overview or list the internal document that
you have shared that addresses this.
30 Does the transit system hold public meetings X
before adopting service changes?
31 How are comments received at public All comments are documented.
meetings incorporated into service changes?
Please provide an overview or list the internal
document that you have shared that
addresses this.
CAPITAL PLANNING
32 Does the transit system have a Transit Asset X
Management (TAM) Plan and/or fleet
replacement plan? If so, please ensure this is
included in the shared documents.
33 How many, if any, revenue vehicles are on 1 - BEB due for delivery in January 2025, 2 - BEB expected in 2026 (Low-No Award, 3 -
order but have not yet arrived or have not BEB's expected in 2026 (State VW award)
yet been introduced to revenue service?
Please describe briefly, including funding
source(s) and which vehicles are being
replaced.
34 Has the transit system analyzed whether the X Clean Energy Plan 2024
current fleet mix is most appropriate relative
to existing/future demand? If so, when was
this last evaluated?
SRF Consulting Group 2024 Transit System Management Performance Review | 68
PLANNING Green Bay Metro Transit
# Question Yes No Response (as applicable)
35 Does the transit system have a facilities X
replacement/expansion plan? If so, please
ensure this is included in the shared
documents.
36 Briefly, what types of facility improvements New HVAC system, new interior LED lighting, and replaced all bus lifts
have been made in the last three years?
37 Briefly, what types of facility improvements Roof and generator (some dollars secured)
do you expect to make in the next few years
that you have secured funding for?
38 Briefly, what types of facility improvements Roof and generator
do you expect you will need to make in the
next three years but have not yet secured
funding for?
39 What type of steps has the transit system
made to improve energy efficiency and
become more environmentally friendly?
Adopted Clean Energy Plan in 2024. Expecting first BEB in early 2025
40 Is facilities planning conducted as part of the Facility needs are reviewed annually. This is part of the process for the TAM.
annual budgeting process or as part of
another budgeting process? Please describe
briefly.
41 Does the transit system own and/or maintain X We provide shelters, benches, and trash cans at some bus stop locations. Some
customer amenities at transit stops, such as enhanced signage is expected in 2025.
shelters, benches, enhanced signage, etc.? If
so, please list the types of amenities.
42 Does the transit system or its parent agency X Not an actual plan. However, all improvements to stops, facility, etc. must be ADA
have an ADA Transition Plan or similar plan accessible and compliant.
to program/implement ADA accessibility
improvements? If so, please describe.
COORDINATION
SRF Consulting Group 2024 Transit System Management Performance Review | 69
PLANNING Green Bay Metro Transit
# Question Yes No Response (as applicable)
43 Does the transit system coordinate with X Many times, it's project or grant specific. Senior staff meetings and strategic planning
other departments/municipalities/agencies meetings.
regarding land use, housing and economic
development, and related transportation
projects? If so, please briefly describe how
this coordination takes place.
44 Are transit system staff directly involved in X City of Green Bay’s Comprehensive Plan
updating the transportation element of local
planning documents? If so, please list
examples of those local planning documents.
INFRASTRUCTURE INVESTMENT AND JOBS ACT
(IIJA) - FEDERAL BIPARTISAN INFRASTRUCTURE
BILL
45 How is the transit system preparing for Adjust frequency and provide later service with a new mode.
additional operating funds through the IIJA?
46 How is the transit system preparing for It has allowed GBM to explore other fuel options.
additional capital funds through the IIJA?
MARKETING Green Bay Metro Transit
# Question Yes No Response (as applicable)
GENERAL
1 What are some successful marketing activities No written response is needed for this question, but it is likely we will discuss this during
you've completed? the meetings.
2 What are some unsuccessful marketing activities No written response is needed for this question, but it is likely we will discuss this during
you've done? the meetings.
SRF Consulting Group 2024 Transit System Management Performance Review | 70
MARKETING Green Bay Metro Transit
# Question Yes No Response (as applicable)
3 What is the perception of the system within the No written response is needed for this question, but it is likely we will discuss this during
communities served? the meetings.
4 How does the transit system interact with No written response is needed for this question, but it is likely we will discuss this during
WisDOT on this topic (marketing)? the meetings.
5 How does the transit system interact with other No written response is needed for this question, but it is likely we will discuss this during
public transit systems on this topic (marketing)? the meetings.
MARKETING FUNCTIONS
6 What percent of the transit system's total annual Typically, less than 1%. It can vary depending on current climate and needs.
operating budget goes to marketing?
7 Does the transit system have any dedicated X Transit Director and Mobility Coordinator work together to meet the need.
marketing staff? If so, how many FTE? If not,
who is responsible for the marketing function?
8 Does the transit system have a marketing plan, X We have a strategic plan. This plan is due for updating in 2025.
strategic plan, or other documentation of
strategy for promoting the transit system? If so,
how is it used and when was it last updated?
9 Do you contract for any marketing or customer X Radio, television, social media on an as needed basis.
information services from an outside vendor? If
so, please describe briefly.
10 What are the transit system's three largest Radio/television, driver recruitment and printed materials.
marketing expenditures?
MATERIALS
SRF Consulting Group 2024 Transit System Management Performance Review | 71
MARKETING Green Bay Metro Transit
# Question Yes No Response (as applicable)
11 Did the transit system use, create, or conduct
the following in the last year? If so, who,
generally, is responsible for this effort?
System map X MPO
Telephone information X
Website updates X Mobility Coordinator
Social media updates X Mobility Coordinator
Individual route maps and schedules X MPO, Operations
Rider or "how to ride" guide X Mobility Coordinator
Media contacts/press releases X Transit Director
Customer and/or public surveys X MPO, Mobility Coordinator, Finance Manager
Alternative language materials X Third Party
Business outreach X Transit Director and Mobility Coordinator
School outreach X Transit Director and Mobility Coordinator
Board updates X Transit Director
Public meetings X Transit Director
12 Does the transit system provide marketing X Spanish
materials in languages other than English? If so,
please list which languages.
13 If yes to the question above, how did you Title VI Plan
determine which languages to use?
14 Does the transit system have a printed and/or X Sep-24
online transit system map? If so, when was the
map last updated?
SRF Consulting Group 2024 Transit System Management Performance Review | 72
MARKETING Green Bay Metro Transit
# Question Yes No Response (as applicable)
15 Does the transit system provide customers with X Through the Mobility Coordinator, and information in public lobby
information about other transit and
transportation options in the community (e.g.
human services transportation, specialty
services, intercity bus services)? If so, please
describe how you do this.
WEB PRESENCE
16 Who is responsible for maintaining the transit Mobility Coordinator
system's website?
17 Which of the following are available on the
transit system's website?
System map X
Individual route maps and schedules X
Fare information X
Rider or "how to ride" guide X
Real-time bus location information X
Trip planner X
Board/committee meeting materials X
18 Does the transit system maintain route/schedule X Operations Manager
data in General Transit Feed Specifications
(GTFS) [sometimes referred to as or "Google
Transit" format]? If so, who creates and
maintains it?
SRF Consulting Group 2024 Transit System Management Performance Review | 73
MARKETING Green Bay Metro Transit
# Question Yes No Response (as applicable)
19 Does the transit system use and/or maintain X Mobility Coordinator (Ops Supervisor as backup) All alerts and latest system info is
Facebook, Twitter, and/or other social media posted on a regular basis, including job vacancies, new projects, grant awards and
pages? If so, briefly describe how, how often general community information.
each is used, and who maintains them.
20 Are policies in place to guide the use of social X
media as a marketing tool for the transit
system?
21 Does the transit system measure or evaluate the X
effectiveness of social media use for marketing
and customer information purposed?
MARKETING AND PROMOTIONS
22 In the last few years, did the transit system X Free passes for liking certain posts on specific pages and various transit swag.
conduct any advertising or promotional
campaigns (other than publishing a schedule)? If
so, briefly describe.
23 How often does the transit system communicate On an ongoing basis.
with area schools and employers to promote or
coordinate transit service?
24 Does the transit system maintain a database of X Excel. Various items are tracked such as driver, route, time, and bus. Trends are
customer contacts and complaints? If so, briefly monitored to assist in addressing.
describe the format (e.g., spreadsheet, software,
etc.) and how you analyze trends.
25 Is there an established procedure for X All complaints are logged, investigated and tracked. Each complaint form requires
investigating and responding to passenger follow up and must include if it was valid or not and how it was addressed.
complaints? If so, briefly describe.
26 Do customer complaint reports go to the X
governing board?
SRF Consulting Group 2024 Transit System Management Performance Review | 74
COVID-19 Green Bay Metro Transit
# Question Yes No Response (as applicable)
GENERAL
1 What actions did the transit system take to ensure Employees and passengers were required to wear PPE - per CDC regulations, bus
employee health and safety during the COVID-19 capacity were reduced, GBM had free fares from April-June 2020, driver barriers were
pandemic? installed, cashless fare options were implemented, UV light air purification system
installed on buses (later in Facility), rear door entry was implemented (unless ADA),
fixed route modifications were made, microtransit was implemented, etc. Employees
were required to do a temperature check every day, upon start of work and social
distancing was implemented based on CDC recommendations.
2 Which of the above changes, if any, do you plan GBM is maintaining cashless fares, driver barriers, UV light air purification system, and
to maintain in the future? microtransit.
3 How has the transit system revised the amount or During the pandemic, microtransit On Demand service was piloted. After the pilot
type of service you deliver in response to the period was over, it was reevaluated and Transit Commission approved the
COVID-19 pandemic, if at all? continuation of the On Demand Service. Since then, Service Development Committee
has made updates to fixed route and On Demand services.
4 Which of the above changes, if any, do you plan At this time, all.
to maintain in the future?
5 In terms of ridership, which of the transit system's At first, service hours. However, more service hours are now provided.
services and/or routes have been most
significantly affected since the COVID-19
pandemic?
6 In terms of ridership, which of the transit system's Route 6
services and/or routes have remained stable or
performed well since the COVID-19 pandemic?
SRF Consulting Group 2024 Transit System Management Performance Review | 75
COVID-19 Green Bay Metro Transit
# Question Yes No Response (as applicable)
7 Has the transit system received new federal CARES, ARP, CRRSAA
investments related to economic stimulus
packages? If so, from which programs?
8 How has the transit system spent federal stimulus ARP - was used for operating and preventative maintenance. CRRSSA-was used to
funding? Are there unspent funds remaining? purchase Quantums (self-securement system for ADA). CARES-used for operating and
facility renovation/rehabilitation capital projects (bus lifts, HVAC system, facility
lighting upgrades, fuel system, live bus video feed & generator). Not all projects have
been completed at this time.
SRF Consulting Group 2024 Transit System Management Performance Review | 76
Report to the
Transit Commission
of the City of Green Bay
MEETING DATE PREPARED BY
June 18, 2025 Patricia Kiewiz, Transit Director
AGENDA ITEM # E.2
Operational Reports
BACKGROUND
Green Bay Metro's staff will present the Commission with the monthly operational reports.
RECOMMENDATION
No action is necessary.
FISCAL IMPACT
ATTACHMENTS
1. 04.Apr 2025 Ridership
2. 04.Apr 2025 Micro KPIs
901 University Avenue, Green Bay, Wisconsin 54302
greenbaymetro.org
April
Fixed Route Ridership Microtransit On Demand Ridership
MONTHLY
YTD FIXED MONTHLY YTD ON
ADULT STUDENT *REDUCED *FREE FIXED ADULT STUDENT *REDUCED *FREE
ROUTE ON DEMAND DEMAND
ROUTE
April 2024 28,028 23,622 9,225 12,766 73,641 284,301 April 2024 4,903 570 269 18 5,760 23,047
April 2025 23,841 20,295 8,206 23,824 76,166 271,811 April 2025 4,114 1,704 655 69 6,542 23,232
Difference (4,187) (3,327) (1,019) 11,058 2,525 (12,490) (789) 1,134 386 51 782 185
-15% -14% -11% 87% 3% -4.4% -16% 199% 143% 283% 14% 0.8%
YTD
PASSENGERS
Free , 19% 295,043
Free
Free
Free ,19%
,,20%17%
13,158
Free ,, 11%
29% Adult,
Adult,34%
37%
Reduced
Reduced , 11% Adult, 42%
38%
Reduced , 11% Adult, 42%
8,179 29,738
*Reduced fare program is for
Reduced , 11%
Student, 28% individuals who are age 65 and older,
Student, 28%
Student,
19,968 34% Student, 26% Medicare recipients, and individuals
Student, 32% with qualifying disabilities.
Reduced , 11%
*Free is comprised of game day,
children 4 & under, promos, etc.
Paratransit Ridership
*AGENCY TOTAL
BASE TRIPS YTD Paratransit Ridership
TRIPS TRIPS
April 2024 455 803 1,258 4,938
April 2025 379 763 1,142 4,358
Difference (76) (40) (116) (580) 796
-16.7% -5.0% -9.2% -11.7% 738
*Agency Fare includes base fare plus additional
cost for expenses that is permitted by 49 CRF 461 359
37.131 to social service agencies and other
organizations for agency trips (i.e., trips March 2024 March 2025
guaranteed to the organization).
BASE TRIPS *AGENCY TRIPS
On Time Performance: 97.5%
Completed Trips: 1142
Completed On Time Trips: 1113
Completed Late Trips - 0-6 mins 19
Completed Late Trips - 6-30 mins 10
Completed Late Trips > 30 mins 0
Late Cancellations and No Show Trips 17
Fixed Route Mobility Devices Boarded Fixed Route Bikes Loaded
412 622
534 800
April 2025 April 2024 April 2025 April 2024
49 CRF 37.131 - Service Criteria for Complementary paratransit ( c) (4) The entity may charge a fare higher than otherwise permitted by this parapraph to a
social service agency or other organization for agency trips (i.e., trips guaranteed to the organization).
GBM On Demand Ridership
April 2025
Day Night
Service Service Total YTD Target
Passengers 2,510 4,032 6,542 23,232
Operating Hours 1,595 605 2,200 7,601
Passengers per Operating Hour 1.57 6.66 2.97 3.06 3.0
Average Customer Wait Time (minutes) 12.08 26.32 20.79 <20.0
On Demand 2025
Apr-25 2510 4032
Mar-25 2408 3605
Feb-25 2062 3155
Jan-25 2069 3391
Day Night
On Demand 2024
Apr-24 2,591 3,169
Mar-24 2,720 3,690
Feb-24 2,596 3,209
Jan-24 2,243 2829
Day Night
Day Service | Monday - Friday | 5:15 am -6:45 pm | Saturday | 7:45 am - 1:45 pm
Night Service | Monday - Friday | 6:45 pm - 11:30 pm | Saturday | 1:45 pm - 7:45 pm
Report to the
Transit Commission
of the City of Green Bay
MEETING DATE PREPARED BY
June 18, 2025 Patricia Kiewiz, Transit Director
AGENDA ITEM # E.3
Financial Reports
BACKGROUND
Director Kiewiz will provide an update on Metro finances through April 2025.
RECOMMENDATION
No action is necessary.
FISCAL IMPACT
ATTACHMENTS
1. 04.Apr - Financials
901 University Avenue, Green Bay, Wisconsin 54302
greenbaymetro.org
Green Bay Metro Transit Commission
Financial Report
April 2025
EXPENSES
% OF
ACCOUNT DESCRIPTION 2025 Jan-Apr 2024 Jan-Apr +/- % 2025 BUDGET
BUDGET
Wages & Salaries 739,942.39 716,980.75 22,962 3.2% 2,765,438 26.8%
Fringe Benefits 344,465.66 341,330.56 3,135 0.9% 1,830,692 18.8%
Other Employment Expenses 17,807.37 7,929.00 9,878 124.6% 68,932 25.8%
Contract Services 32,637.93 37,987.86 (5,350) -14.1% 424,140 7.7%
Materials & Supplies 132,795.48 152,228.62 (19,433) -12.8% 643,436 20.6%
Building & Equip Maintenance 83,250.78 121,399.68 (38,149) -31.4% 234,100 35.6%
Utilities 49,227.78 74,220.94 (24,993) -33.7% 235,106 20.9%
Insurance 122,934.00 130,736.00 (7,802) -6.0% 158,827 77.4%
Miscellaneous 63.00 58.80 4 7.1% 250 25.2%
Paratransit Services 125,793.06 139,996.87 (14,204) -10.1% 1,072,447 11.7%
Microtransit Services 458,734.40 441,250.38 17,484 4.0% 2,170,063 21.1%
Subrecipient Expenses - - - 0.0% - 0.0%
TOTAL 2,107,651.85 2,164,119.46 (56,468) -2.6% 9,603,432 21.9%
ORIGINAL BUDGET
REVENUES
% OF
ACCOUNT DESCRIPTION 2025 Jan-Apr 2024 Jan-Apr +/- % 2025 BUDGET
BUDGET
Federal Operating Asst - - - 0.0% 2,833,013 0.0%
State Operating Asst - - - 0.0% 2,833,013 0.0%
Other Local Municipalities 252,097.70 207,232.90 44,865 21.6% 665,249 37.9%
Green Bay 433,333.32 433,333.32 - 0.0% 1,934,650 22.4%
Farebox Revenue-Fixed Route 153,530.96 153,274.17 257 0.2% 710,000 21.6%
Farebox Revenue-Paratransit 66,063.00 67,455.00 (1,392) -2.1% 269,500 24.5%
Farebox Revenue-Microtransit 8,030.00 6,167.00 1,863 30.2% - 0.0%
College Program Fares 3,823.00 2,536.00 1,287 50.7% - 0.0%
TMI Refund 9,548.00 9,454.00 94 1% - 0.0%
Non-Transportation Revenue 42,541.22 11,848.78 30,692 259.0% 9,100 467.5%
State Fuel Refund 8,043.28 3,736.30 4,307 115.3% - 0.0%
Advertising 33,259.62 28,314.00 4,946 17.5% 110,000 30.2%
Intercity Bus Commissions 2,000.00 2,000.00 - 0.0% 6,000 33.3%
Partnership Contributions 10,363.15 10,808.00 (445) -4.1% 232,908 4.4%
TOTAL 1,022,633.25 936,159.47 86,474 9.2% 9,603,432 10.6%
KEY PERFORMANCE INDICATORS (KPI)
Operating Days 102 103 (1.0) -1.0% 307
Revenue Miles 216,654 222,638 (5,984) -2.7% 672,554
Revenue Hours 14,775 14,824 (49) -0.3% 45,552
Unlinked Passenger Trips 271,811 284,301 (12,490) -4.4% 934,849
Revenue / Cost 48.5% 43.3% 100%
Farebox Revenue / Mile 0.71 0.69 0.02 2.9% 1.06
Farebox Revenue / Pass Trip 0.56 0.54 0.03 4.8% 0.76
Farebox Revenue / Hour 10.39 10.34 0.05 0.5% 15.59
Passenger / Mile 1.25 1.28 (0.02) -1.8% 1.39
Cost / Mile 7.03 7.11 (0.08) -1.1% 9.46
Cost / Passenger Trip 5.60 5.57 0.04 0.6% 6.80
*Insurance is [NET] TMI
April - 33% **Diesel fuel is included in materials and supplies subtotal. 2025
Report to the
Transit Commission
of the City of Green Bay
MEETING DATE PREPARED BY
June 18, 2025 Patricia Kiewiz, Transit Director
AGENDA ITEM # E.4
Director's Report
BACKGROUND
Director Kiewiz will provide the Commission with an update on Green Bay Metro.
RECOMMENDATION
No action is necessary.
FISCAL IMPACT
ATTACHMENTS
None
901 University Avenue, Green Bay, Wisconsin 54302
greenbaymetro.org