Planning & Zoning Commission
Regular MeetingHoffman Estates, IL · February 5, 2025
Minutes
MINUTES
Planning & Zoning Commission
Regular Meeting
Village Hall
1900 Hassell Road, Hoffman Estates, IL 60169
February 5, 2025 Council Chambers 6:30 PM
1. CALL TO ORDER/ROLL CALL
Chairperson Combs called the meeting to order at 06:30 PM .
Commissioners Present: Eva Combs, Adam Bauske, Lon Harner, Lenard Henderson ,
Daniel Lee, Nancy Trieb, John Wise , Rajkumari Chhatwani , Denise Wilson (arrived at 06 :32
PM)
Commissioners Absent: Excused: Minerva Milford
A quorum was present.
Administrative Personnel Present: Jenny Horn , Director of Planning & Transportation ;
James Donahue, Senior Planner; Kevin Anderson , Associate Planner; Eric Palm , Village
Manager
2. APPROVAL OF MINUTES
A. Planning & Zoning Commission 01-15-2025
Chairperson Combs announced that the approval of the January 15, 2025 , minutes would be
deferred until the February 19, 2025 , meeting in order to allow the Commissioners enough
time to review revisions she requested be made to the original draft.
3. CHAIRPERSON'S REPORT
Chairperson Combs stated the rear yard setback at 3688 Wh ispering Trails Drive was
approved by the Village Trustees .
Chairperson Combs stated the garage enlargement to 850 square feet at 1120 Ash Road
was approved by the Village Trustees based upon ADA Requirements.
4. NEW BUSINESS
Page 1
February 5, 2025 Village of Hoffman Estates Planning & Zoning Commission
A. Public Hearings
1. Variation from Section 9-3-6-K-2 of the Municipal Code to permit a garage to be 930
square feet instead of the maximum permitted 750 square feet for the property located
at 5560 Airdrie Court
Motion by Commissioner Harner, seconded by Commissioner Henderson, to Open Public
Hearing. Voice vote taken. Ayes - 9, Nays - 0, (Abstain: None). Motion Passed.
Chairperson Combs swore in the petitioner.
Selena Latic (5560 Airdrie Court)
lylin Latic (1234 Windsor Lane)
Ms. Latic presented an overview of the project.
Kevin Anderson presented an overview of the project.
Commissioner Lee had no questions.
Commissioner Wise asked the petitioner about storage needs. Ms. Latic stated they would
likely build storage cabinets at the back of the garage space. Commissioner Wise inquired
whether an exterior shed would be built. Ms. Latic stated she was new to the neighborhood
and whether sheds would be allowed in this area.
Commissioner Wilson had no questions.
Commissioner Henderson had no questions.
Commissioner Harner had no questions.
Commissioner Trieb had no questions.
Commissioner Chhatwani had no questions.
Vice Chairperson Bauske asked the petitioner if she agreed with the conditions of approval
in the staff report. Ms. Latic stated yes.
Chairperson Combs had no questions.
Chairperson Combs asked if there were any members of the audience who would like to
comment on this request. There were no public comments.
Motion by Commissioner Harner, seconded by Commissioner Henderson, to Close Public
Hearing. Voice vote taken. Ayes - 9, Nays - 0, (Abstain: None). Motion Passed.
Page2
February 5, 2025 Village of Hoffman Estates Planning & Zoning Commission
Motion by Vice Chairperson Bauske, seconded by Commissioner Harner, to adopt the
Findings of Fact for the variation as of the February 5, 2025, Staff Report.
Chairperson Combs read aloud the list of Findings of Fact indicated within the February 5,
2025, Staff Report.
Commissioner Wilson asked for clarification about whether a "yes" vote means they are
denying the request. Mr. Anderson explained that a "yes" vote means that the Findings of
Fact as they have been listed in the Staff Report provided to the Commissioners are
accurate. He also stated that if you disagree with any of the Findings, you need to express
this now so that the Findings can be revised before the final reading to the Village Board.
Commissioner Wilson asked what Chairperson Combs read aloud, to which Mr. Anderson
stated that Chairperson Combs had read verbatim the Findings of Fact from the Code as
well as staffs determination of those Findings.
Roll call vote:
Aye: Eva Combs, Adam Bauske, Lon Harner, Lenard Henderson, Daniel Lee, Nancy Trieb,
Denise Wilson, John Wise, Rajkumari Chhatwani
Nay: None
Absent: Minerva Milford
Motion Passed.
Motion by Vice Chairperson Bauske, seconded by Commissioner Harner, to recommend to
the Village Board approval of a Variation from Section 9-3-6-K-2 of the Municipal Code to
permit a garage to be 930 square feet instead of the maximum permitted 750 square feet for
the property at 5560 Airdrie Court, subject to the conditions as of the February 5, 2025, Staff
Report.
Chairperson Combs asked if there was any discussion from the Commissioners. There was
no discussion held about the motion.
Roll call vote:
Aye: Adam Bauske, Lon Harner, Lenard Henderson, Daniel Lee, Nancy Trieb, Denise
WIison, John Wise, Rajkumari Chhatwani
Nay: Eva Combs
Absent: Minerva Milford
Motion Passed.
Mr. Anderson stated this item is scheduled to be presented to the Village Board on Monday,
February 17, 2025 at 7:00 p.m.
2. Text Amendment to Section 9-1-18A of the Hoffman Estates Municipal Code
(Temporary Planned Development Process)
Motion by Commissioner Harner, seconded by Commissioner Chhatwani, to Open Public
Hearing. Voice vote taken. Ayes - 9, Nays - 0, (Abstain: None). Motion Passed.
James Donahue presented an overview of the staff report.
Page3
February 5, 2025 Village of Hoffman Estates Planning & Zoning Commission
Commissioner Chhatwani asked if there is a set time frame as before or if this would be
continuous. Mr. Donahue answered that this will continue until the new Code is adopted by
the Village Board, which is anticipated sometime in the spring or summer of 2025.
Commissioner Chhatwani asked what happens to this text amendment when the Code is
adopted. Mr. Donahue stated the text amendment would go away.
Commissioner Trieb had no questions.
Commissioner Harner had no questions.
Commissioner Henderson had no questions.
Commissioner Wilson had no questions.
Commissioner Wise had no questions.
Commissioner Lee had no questions.
Vice Chairperson Bauske had no questions.
Chairperson Combs had no questions.
Chairperson Combs asked if there were any members of the audience that would like to
comment on this request. There were no public comments.
Motion by Commissioner Harner, seconded by Commissioner Henderson, to Close Public
Hearing. Voice vote taken. Ayes - 9, Nays - 0, (Abstain: None). Motion Passed.
Motion by Vice Chairperson Bauske, seconded by Commissioner Harner, to adopt the
Findings of Fact for a Text Amendment as of the February 5, 2025, Staff Report.
Roll call vote:
Aye: Eva Combs, Adam Bauske, Lon Harner, Lenard Henderson, Daniel Lee, Nancy Trieb,
Denise Wilson, John Wise, Rajkumari Chhatwani
Nay: None
Absent: Minerva Milford
Motion Passed.
Motion by Vice Chairperson Bauske, seconded by Commissioner Harner, to recommend to
the Village Board approval of a Text Amendment to Section 9-1-18A of the Hoffman Estates
Municipal Code (Temporary Planned Development Process) as of the February 5, 2025,
Staff Report.
Roll call vote:
Aye: Eva Combs, Adam Bauske, Lon Harner, Lenard Henderson, Daniel Lee, Nancy Trieb,
Denise Wilson, John Wise, Rajkumari Chhatwani
Nay: None
Absent: Minerva Milford
Motion Passed.
B. Public Meetings
Page4
February 5, 2025 Village of Hoffman Estates Planning & Zoning Commission
1. Preliminary and Final Plat of Subdivision and Site Plan for Compass Data Center
located at 3333 Beverly Road
Chairperson Combs swore in the petitioners.
Mark Halford (Compass Data Centers, 14555 N Dallas Parkway, Dallas, TX)
Brooke Hodel (Compass Data Centers, 14555 N Dallas Parkway, Dallas, TX)
Jamie Putnam (Kimley-Horn, 4201 Winfield Road, Warrenville, IL)
Taylor Eschback (Kimley-Horn, 4201 Winfield Road, Warrenville, IL)
Mr. Halford presented an overview of the project.
Jennifer Horn presented an overview of the history of the Prairie Stone Business Park.
James Donahue presented an overview of the staff report.
Commissioner Lee asked for clarification from staff of the process - is the Commission
recommending it to the Village Board? Mr. Donahue stated yes. Commissioner Lee asked
under what scenario would the Commission not be recommending? Mr. Donahue stated a
vote of no would be for the entire plat of subdivision and site plan.
Commissioner Wise asked what type of noise is generated by a data center. Mr. Halford
stated the noise would be from power. Commissioner Wise further inquired if the noise
would be a humming sound. Mr. Halford stated yes.
Commissioner Wise asked if the Commission would be able to review items, such as
fencing. Mr. Donahue stated the fence is a black, wrought iron style, Palisades fence around
the entire site.
Commissioner Wilson had no questions.
Commissioner Henderson asked if there would be any barbed wire fencing used on site. Mr.
Halford stated they do not use barbed wire fencing.
Commissioner Henderson inquired how negotiations with ComEd are progressing. Mr.
Halford stated they have passed negotiations and are in the project management stage and
ComEd is working with Compass during twice-weekly calls in order to finalize matters.
Commissioner Henderson restated his concerns about concertina (barbed) wiring and not
wanting the campus to look like a prison. He stated ComEd has a tendency to utilize this
style of fencing. Mr. Halford responded that he believes that ComEd's substation fencing is
anticipated to be a similar style to the proposed Palisades style fence on the Compass
campus.
Commissioner Harner commented that the proposal being presented is great. However, he
expressed his opinion that the ComEd substation component is presently being hidden from
the Commissioners and will be unattractive. Mr. Halford and Ms. Hodel responded that they
Page5
February 5, 2025 Village of Hoffman Estates Planning & Zoning Commission
are working with ComEd during their meetings to aim for consistency of fencing and
landscaping for both the Compass campus and ComEd substation sites. A representative
from Kimley-Horn also provided insight into the access and landscaping of the site.
Commissioner Trieb asked about noise and sound remediation as this will be different from
any other uses currently in the neighborhood - is there a real-life example people could go
see/or a recording that can be listened to in order to experience the sounds that will be
occurring from this project. Ms. Hodel stated there was a noise study completed that shows
the sound levels in the area are relatively low. However, she did not have an answer to
provide to the Commissioners about a location to visit to experience similar sounds.
Commissioner Chhatwani had no questions.
Vice Chairperson Bauske asked the petitioners if they agreed with the conditions of approval
in the staff report. Mr. Halford stated yes.
Vice Chairperson Bauske asked if there is adequate water access for cooling needs on the
site. Mr. Halford stated yes.
Chairperson Combs asked if the site is directly wired to the police and fire stations for
emergency services. Mr. Halford stated they meet all the Code requirements for Fire codes.
Chairperson Combs clarified her question relates to dispatching emergency services in the
event of a fire, not the codes in particular. Mr. Donahue stated that all municipal buildings
with sprinkler systems are automatically connected to dispatch for fires; incidents requiring
Police assistance are not automatic and require a call to 9-1-1 .
Chairperson Combs asked about wetland mitigation for the site and the site's proximity to a
forest preserve - is the project impacting wildlife near the forest preserve? Mr. Putnam stated
an endangered species report was completed and that the jurisdictional wetland on the east
side of the site will remain untouched. He further stated that the wetlands being impacted are
isolated wetlands, not jurisdictional wetlands, per Army Corps requirements. Mr. Putnam
stated they have been working with MWRD and obtained a permit to fill in low, depressional
areas that have not been maintained which have, over time, created wetland style plants;
these areas are not bound by Army Corps. Chairperson Combs stated her concern is that
wildlife on the property will not have anywhere to go. Mr. Putnam stated that the area to the
east is being kept since this is a feature and will not be impacted, but the others were just
areas of overgrowth.
Chairperson Combs asked if the humming sounds on the site would have any impact on the
wildlife in the forest preserve. Ms. Hodel stated it should not, since the sounds are
intermittent.
Chairperson Combs asked if the generators would be on at night. Ms. Hodel stated that the
generators would not on in the evenings or late at night.
Chairperson Combs asked if there were any additional questions. There were no additional
questions.
Chairperson Combs asked if there were any members of the audience that would like to
comment on this request. Chairperson Combs swore in the petitioner.
Page 6
February 5, 2025 Village of Hoffman Estates Planning & Zoning Commission
Doreen Gibrich (1850 Nicholson Drive)
Ms. Gibrich expressed her appreciation to the staff for keeping residents notified about the
project. She asked if an EPA review is required for this site and was one completed. Mr.
Donahue stated yes, and they have an approved permit in hand from the Illinois EPA for the
site.
Ms. Gibrich asked if there is a way for the Com Ed substation location to be relocated from
the southwest corner to the northwest corner. Mr. Donahue stated that moving the location
to Higgins Road is a high traffic area with increased visibility, moving it to the interior of the
park places it closer to the businesses, so the location on Beverly is the probably the best
location for the site. Ms. Gibrich commented that this location is closer to the homes in the
surrounding area. Mr. Donahue stated the nearest home is approximately one-mile away
from the site.
Ms. Gibrich asked when the noise study was completed and if it was done with 5 buildings
running. Mr. Donahue replied that the study was completed for all 5 buildings.
Ms. Gibrich asked about the approximate number of jobs that would be created by the
project. Mr. Halford stated construction jobs are the first jobs that have been created, then
when the data center is fully complete, the staff is generally 20-30 full-time positions per
building depending on customer needs.
Ms. Gibrich asked what happens to the location if the current owners go out of business? Mr.
Halford stated it is unlikely that these particular owners will go out of business, considering
they are two of the largest pension funds and asset managers currently in business, so this
is of minimal concern from Compass' viewpoint.
Ms. Gibrich asked what the Village's plan is for the future - will there be other data centers
coming to the Village, since we already have Microsoft and now Compass, but still have
larger areas of open land. Mr. Donahue stated that he could not speak for the Board, but
stated in 2022, the Board approved data centers to be allowed within certain Zoning districts.
Ms. Gibrich asked if there were a set number, to which Mr. Donahue replied there was not a
set number.
Motion by Vice Chairperson Bauske, seconded by Commissioner Henderson, to adopt the
Findings of Fact for Site Plan as of the February 5, 2025, Staff Report.
Roll call vote:
Aye: Eva Combs, Adam Bauske, Lenard Henderson, Daniel Lee, Nancy Trieb, Denise
Wilson, John Wise, Rajkumari Chhatwani
Nay: Lon Harner
Absent: Minerva Milford
Motion Passed.
Motion by Vice Chairperson Bauske, seconded by Commissioner Harner, to recommend to
the Village Board approval of Preliminary and Final Plat of Subdivision, subject to the Final
Plat of Subdivision for Compass Datacenter dated January 7, 2025.
Roll call vote:
Page 7
' ,
February 5, 2025 Village of Hoffman Estates Planning & Zoning Commission
Aye: Eva Combs, Adam Bauske, Lon Harner, Lenard Henderson, Daniel Lee, Nancy Trieb,
Denise Wilson, John Wise, Rajkumari Chhatwani
Nay: None
Absent: Minerva Milford
Motion Passed.
Motion by Vice Chairperson Bauske, seconded by Commissioner Harner, to recommend to
the Village Board approval of Preliminary and Final Site Plan for Compass Data Center
located at 3333 Beverly Road, subject to the conditions as of the February 5, 2025, Staff
Report.
Roll call vote:
Aye: Eva Combs, Adam Bauske, Lon Harner, Lenard Henderson, Daniel Lee, Nancy Trieb,
Denise Wilson, John Wise, Rajkumari Chhatwani
Nay: None
Absent: Minerva Milford
Motion Passed.
Chairperson Combs stated this recommendation would be presented to the Village Board at
the next regular meeting on Monday, February 17, 2025 at 7:00 p.m.
5. STAFF DISCUSSION
Kevin Anderson stated that the items heard this evening will be presented at the Village
Board meeting on February 17, 2025, and there will be three items on the agenda for the
next regular PZC meeting on February 19, 2025.
6. PUBLIC COMMENT
None.
7. ADJOURNMENT
Motion by Commissioner Chhatwani, seconded by Commissioner Harner, to Adjourn at
07:42 PM. Voice vote taken. Ayes - 9 I Nays - 0 (None) I Abstain - 0 (None). Motion Passed.
Minutes prepared by Marque/le Cnota, Administrative Assistant.
Vic~ C " ° n ' s A 0 Date Approved
PageB
Agenda
AGENDA
Planning & Zoning Commission
Regular Meeting
Village Hall
1900 Hassell Road, Hoffman Estates, IL 60169
February 5, 2025 Council Chambers 6:30 PM
1. CALL TO ORDER/ROLL CALL
2. APPROVAL OF MINUTES
A. Planning & Zoning Commission 01-15-2025
3. CHAIRPERSON'S REPORT
4. NEW BUSINESS
A. Public Hearings
1. Variation from Section 9-3-6-K-2 of the Municipal Code to permit a garage to be 930
square feet instead of the maximum permitted 750 square feet for the property located
at 5560 Airdrie Court
2. Text Amendment to Section 9-1-18A of the Hoffman Estates Municipal Code
(Temporary Planned Development Process)
B. Public Meetings
1. Preliminary and Final Plat of Subdivision and Site Plan for Compass Data Center
located at 3333 Beverly Road
5. STAFF DISCUSSION
6. PUBLIC COMMENT
7. ADJOURNMENT
The next regular Planning & Zoning Commission meeting is scheduled for Wednesday, February 19, 2025 at
6:30 p.m.
Further details and information can be found in the agenda packet attached hereto and incorporated herein and
can also be viewed online at www.hoffmanestates.org and/or in person in the Village Clerk's office. The Village of
Hoffman Estates complies with the Americans with Disabilities Act (ADA). For accessibility assistance, call the
ADA Coordinator at 847/882-9100.
Page 1
Packet
AGENDA
Planning & Zoning Commission
Regular Meeting
Village Hall
1900 Hassell Road, Hoffman Estates, IL 60169
February 5, 2025 Council Chambers 6:30 PM
1. CALL TO ORDER/ROLL CALL
2. APPROVAL OF MINUTES
A. Planning & Zoning Commission 01-15-2025
3. CHAIRPERSON'S REPORT
4. NEW BUSINESS
A. Public Hearings
1. Variation from Section 9-3-6-K-2 of the Municipal Code to permit a garage to be 930
square feet instead of the maximum permitted 750 square feet for the property located
at 5560 Airdrie Court
2. Text Amendment to Section 9-1-18A of the Hoffman Estates Municipal Code
(Temporary Planned Development Process)
B. Public Meetings
1. Preliminary and Final Plat of Subdivision and Site Plan for Compass Data Center
located at 3333 Beverly Road
5. STAFF DISCUSSION
6. PUBLIC COMMENT
7. ADJOURNMENT
The next regular Planning & Zoning Commission meeting is scheduled for Wednesday, February 19, 2025 at
6:30 p.m.
Further details and information can be found in the agenda packet attached hereto and incorporated herein and
can also be viewed online at www.hoffmanestates.org and/or in person in the Village Clerk's office. The Village of
Hoffman Estates complies with the Americans with Disabilities Act (ADA). For accessibility assistance, call the
ADA Coordinator at 847/882-9100.
Page 1
Page 1 of 115
MINUTES
Planning & Zoning Commission
Regular Meeting
Village Hall
1900 Hassell Road, Hoffman Estates, IL 60169
January 15, 2025 Council Chambers 6:30 PM
1. CALL TO ORDER/ROLL CALL
Chairperson Combs called the meeting to order at 06:00 PM.
Commissioners Present: Eva Combs, Adam Bauske, Lon Harner, Lenard Henderson,
Daniel Lee, Minerva Milford, Denise Wilson, John Wise, Rajkumari Chhatwani
Commissioners Absent: Excused: Nancy Trieb
A quorum was present.
ft
Administrative Personnel Present: Jenny Horn, Director of Planning & Transportation;
Kevin Anderson, Associate Planner; Phil Green, Transportation & Long Range Planner;
Daisy Dose-Adamzadeh, Assistant Planner; Sonia Zala, Senior Transportation Engineer
2.
ra
APPROVAL OF MINUTES
3.
A.
D
Planning & Zoning Commission 12-04-2024
Motion by Commissioner Harner, seconded by Commissioner Chhatwani, to approve the
December 04, 2024, regular meeting minutes. Voice vote taken. Ayes - 8, Nays - 0,
(Abstain: Lenard Henderson). Motion Passed.
CHAIRPERSON'S REPORT
Chairperson Combs stated the Special Use to Ivy Massage N Spa, Inc. for a massage
establishment located at 1033 W. Golf Road was approved by the Village Board.
Chairperson Combs introduced Phil Green, Transportation & Long Range Planner to provide
a brief presentation regarding Findings of Fact & Standards that was not previously listed on
the agenda. Mr. Green gave a brief overview of the Findings of Fact & Standards process,
with a specific emphasis on how it will relate to New Business Item 3 on the current agenda.
4. NEW BUSINESS
Page 1
Page 2 of 115
January 15, 2025 Village of Hoffman Estates Planning & Zoning Commission
A. Public Hearings
1. Variation from Section 9-5-5-D-6 of the Municipal Code to permit a rear yard setback of
9.5 feet instead of the minimum required 20 feet for the property located at 3688
Whispering Trails Drive
Motion by Commissioner Harner, seconded by Commissioner Henderson, to Open Public
Hearing. Voice vote taken. Ayes - 9, Nays - 0, (Abstain: None). Motion Passed.
Chairperson Combs swore in the petitioner.
Barbara Mlynska (3688 Whispering Trails Drive, Hoffman Estates)
Ms. Mlynska presented an overview of the project.
ft
Kevin Anderson presented an overview of the staff report.
Commissioner Wise had no questions.
ra
Commissioner Milford asked how long construction will take place. Ms. Mlynska stated it
might approximately 3 to 4 months. The family does not want to take any longer than this
time and they plan to hire a contractor for the project.
Commissioner Wilson had no questions.
Commissioner Henderson clarified the number of people the family has increased to and
D
whether they were adults or children. Ms. Mlynska stated there will be 5 people; 3 adults and
2 children.
Commissioner Henderson inquired whether each adult has a vehicle. Ms. Mlynska stated
that she and her husband are the only drivers in the home since her mother-in-law does not
drive and the children are still very young at 4 and 2 years old.
Commissioner Harner asked staff if sprinklers will be required. Mr. Anderson stated this will
not be determined until the final cost estimate for the project along with an appraiser's report
of the existing home's value is submitted. The determination for sprinklers is a function of the
home's value; if the changes increase the value by more than 35%, then the project would
require the installation of a fire sprinkler system. Commissioner Harner inquired whether this
is because the home does not currently have a sprinkler system to which Mr. Anderson
stated yes, any additions that are greater than 1000 square feet, or that increase the overall
value of the property by more than 35% require the installation of sprinklers. Commissioner
Harner asked the petitioner if she was aware of this requirement to which Ms. Mlynska
stated she was aware.
Commissioner Chhatwani asked the petitioner if she was aware of the Village's setback
Page 2
Page 3 of 115
January 15, 2025 Village of Hoffman Estates Planning & Zoning Commission
requirements prior to meeting with an architect for the project. Ms. Mlynska responded that
she had met with Mr. Anderson prior to starting the design process.
Commissioner Chhatwani asked the petitioner if she would be concerned that they will not
have much play area in their yard for the kids as they grow up. Ms. Mlynska stated that the
area where the addition is planned to be built is an area they do not currently use and that
the "L" shape allows for more of the useable yard area to be maintained, so yes, they did
think about the yard area for the kids to play.
Commissioner Lee had no questions.
Vice Chairperson Bauske asked staff whether the dotted line on the proposed site plan is
only showing the encroachment area. Mr. Anderson stated yes, only the last 10.5 feet of the
addition is the encroachment. Vice Chairperson Bauske clarified that the majority of the
addition meets Code, but because of the "L" shape that is where the concern comes in. Mr.
Anderson stated yes, the last 10 foot by 20 foot section is the only portion that is
encroaching.
Vice Chairperson Bauske clarified that the addition is providing mostly living space (kitchen,
dining, etc.), and that there is no additional bedrooms being added. Ms. Mlynska stated yes.
ft
Vice Chairperson Bauske inquired whether there is currently a fence on the property, or if
the neighbors have a fence. Ms. Mlynska stated yes, they installed the fence.
Vice Chairperson Bauske inquired about the unique sideyard space that will be created by
ra
the project in lieu of a traditional backyard. Ms. Mlynska stated that to ensure privacy,
windows are not directly facing neighbors property and plantings will be installed.
Chairperson Combs asked the petitioner if she agreed with the conditions of approval in the
staff report. Ms. Mlynska stated yes.
D Chairperson Combs asked if there were any members of the audience that would like to
comment on this request. There were no public comments.
Motion by Commissioner Harner, seconded by Commissioner Henderson, to Close Public
Hearing. Voice vote taken. Ayes - 9, Nays - 0, (Abstain: None). Motion Passed.
Motion by Vice Chairperson Bauske, seconded by Commissioner Harner, to adopt the
Findings of Fact for a Variation as stated in the January 15, 2025, Staff Report.
Roll call vote:
Aye: Eva Combs, Adam Bauske, Lon Harner, Lenard Henderson, Daniel Lee, Minerva
Milford, Denise Wilson, John Wise, Rajkumari Chhatwani
Nay: None
Absent: Nancy Trieb
Motion Passed.
Motion by Vice Chairperson Bauske, seconded by Commissioner Harner, to recommend to
the Village Board of Trustees approval of a request for a Variation from Section 9-5-5-D-6 of
the Municipal Code to permit a rear yard setback to be 9.5 feet instead of the minimum
Page 3
Page 4 of 115
January 15, 2025 Village of Hoffman Estates Planning & Zoning Commission
required 20 feet for the property located at 3688 Whispering Trails Drive, subject to the
conditions as of the January 15, 2025, Staff Report.
Roll call vote:
Aye: Eva Combs, Adam Bauske, Lon Harner, Lenard Henderson, Daniel Lee, Minerva
Milford, Denise Wilson, John Wise, Rajkumari Chhatwani
Nay: None
Absent: Nancy Trieb
Motion Passed.
Chairperson Combs stated this recommendation would be presented to the Village Board at
the next regular meeting on January 20, 2025, at 7:00 p.m.
3. Rezoning from R-2 One-Family Residential District to R-10 Attached Single-Family
Dwelling Residential District, Variations from Sections 9-5-10-D-1 and 9-5-10-D-10 of
the Municipal Code, and Preliminary Concept Site Plan for the property located at
1180-1190 Apple Street
Motion by Commissioner Harner, seconded by Commissioner Henderson, to Open Public
Hearing. Voice vote taken. Ayes - 9, Nays - 0, (Abstain: None). Motion Passed.
ft
Chairperson Combs swore in the petitioner.
Robert Kirk (Group A Architecture)
ra
Mr. Kirk presented an overview of the project.
Chairperson Combs swore in an additional petitioner.
Dawn Larsen (Baird & Warner; 1140 N Bluebonnet Ln, Hoffman Estates)
D Ms. Larsen presented an overview of market analysis conducted for the project.
Daisy Dose-Adamzadeh presented an overview of the staff report.
Commissioner Henderson asked for clarification of Ms. Larsen's presented information that
Hoffman Estates has no available rental properties. Ms. Larsen stated analysis was done on
townhomes and that none are listed on MLS as New Construction. Commissioner
Henderson asked if these will be townhomes purchased with mortgages. Ms. Larsen stated
that is correct.
Commissioner Henderson asked how does this impact the neighbors. Mr. Kirk expressed his
understanding of the question as being how this affects the value and sales dollar amount of
the existing residences that are part of the same community. Commissioner Henderson
restated the meaning of his question, that while that information would be quantified, what he
is inquiring about is "if I'm the house next door, how am I going to feel about a large
apartment complex going up next to my house?" He also stated that watching the new
apartment complex being built at Higgins and Moon Lake, it primarily is surrounded by
businesses, with some residential nearby. While the concept for this development looks
good, it may not be appropriate for the area seeing as how this complex is planned to be
Page 4
Page 5 of 115
January 15, 2025 Village of Hoffman Estates Planning & Zoning Commission
placed in the middle of an established residential area. Mr. Kirk stated that this site is unique
with the car wash, Golf Road and the Hoffman Plaza Shopping Center access road with lots
of truck traffic. The four sides of this property are adjacent to commercial uses, and the high-
density project would help provide a buffer between the commercial to the north and west,
and south which is the single family. Ms. Larsen stated the average sale price of the
neighborhood is approximately $350,000, and these new homes will be priced at
approximately $650,000. These townhomes would draw people to the neighborhood
because they are new construction.
Commissioner Harner asked staff why the number of parking spaces decreased from 10 to
3. Ms. Dose-Adamzadeh stated that when this project was proposed, there were some
concerns about over parking, as well as geometry issues with the fire truck turning radius. As
preliminary and final site plan have not yet been received, this concern will be analyzed at
that time. As this is the concept site plan that has been provided so far, this is what was
available to be presented. Commissioner Harner commented that he shares in the opinion
that if you have a higher density type of home in that area, just having parking spaces in
front of the home is inadequate for that type of arrangement.
Commissioner Chhatwani expressed her concern that the lot is too small to accommodate
10 townhomes, and that it is difficult to maneuver on the site. She is afraid this will impact
the homes in the area with people visiting. Mr. Kirk stated the property owner did say he
ft
would be willing to discuss reducing density to meet R-10 District Standards (6 units/acre).
Commissioner Wilson asked how long section 9-5-10-D of the Code has been at 6 units. Ms.
Dose-Adamzadeh stated the section has been in place for a while then stated that
ra
Blackberry Creek Townhomes received a variation from this section back in approximately
1995. Commissioner Wilson asked if Barrington Square Townhomes is 6 units per acre. Ms.
Dose-Adamzadeh stated that Barrington Square Townhomes is a different zoning district.
Commissioner Wilson said she is not in favor of increasing the density as she feels it will be
too congested. She would like to see increased parking on site.
D Commissioner Wilson inquired as to the fact that there is no outdoor area being proposed for
residents to gather. Mr. Kirk stated that setbacks for the property meet or exceed the Code
requirements. He also stated that there are some areas of greenspace that could be adapted
to small gathering areas. Commissioner Wilson commented that residents would not be able
to purchase their own patio furniture or sit out in their own area, to which Mr. Kirk stated the
green space areas would be set up for all to use and maintained by the property, such as the
landscaping and snow removal maintenance.
Commissioner Milford expressed her concern about the tight space for the project.
Commissioner Wise expressed his concern about the increased parking density. He stated
that people are going to be parking on the street and in front of people's houses. Mr. Kirk
stated there are 50 parking spaces in the plan and asked if there was a specific number of
spaces the Commissioners felt would be more appropriate. There were some interjections
from the audience. Chairperson Combs requested order be kept and Ms. Dose-Adamzadeh
reminded audience members that following the petitioner's testimony there would be time
provided for public comment. Commissioner Wise stated he had no further questions or
comments.
Page 5
Page 6 of 115
January 15, 2025 Village of Hoffman Estates Planning & Zoning Commission
Commissioner Lee stated he feels the parking issue has been commented on enough, and
that he likes the design of the project because it is utilizing space to create housing for more
population. He stated that Hoffman Estates has a lack of housing based on the commercial
and economic activities which have been rapidly growing over the past three years.
Residential availability has not been keeping up with the speed. We need to be concerned
with the area residents and take a step back to look at this project from the homeowners’
point of view. However, he is of the opinion that more housing for the Village is better if a
peaceful outcome can be achieved.
Vice Chairperson Bauske asked staff how long the Minimum Development Area for the R-10
district has been in place. Ms. Dose-Adamzadeh stated that she was unsure when the R-10
district was created but the Blackberry Creek Townhome project, which is also R-10,
received a variation about 30 years ago for the same code section. Vice Chairperson
Bauske stated that project was a variation to grant 8 acres instead of 10, which is very
different from the proposed development area of 0.9 acres. Vice Chairperson Bauske stated
that he assumes the reason that is in the code is to allow for more green space. Mr.
Anderson stated that it is important to take historical context into account when you consider
the code. When the R-10 district was developed, the Village had large tracts of undeveloped
land. The commission should consider this as the village is nearly built out today.
ft
Vice Chairperson Bauske stated that he understands this is a concept plan and asked staff if
greenspace, parking and drainage would be considered. Ms. Dose-Adamzadeh stated the
Engineering Division will do a full review once preliminary and final site plans are submitted.
ra
Vice Chairperson Bauske stated that the petitioner had mentioned that the setbacks meet
the R-10 district requirements. He had asked the petitioner if they meet the R-2 setback
requirements. Mr. Kirk stated that they do not meet the R-2 setback requirements. R-2
setback requirements are shown on sheet D1.
Vice Chairperson Bauske commented about the height of the buildings and how they will fit
D in with the single-family homes. He stated that the bulk of the buildings, including setbacks
and heights, will fit in with R-2 District requirements and a single-family home as large as the
proposed townhome building could be built. Mr. Kirk stated that was correct.
Vice Chairperson Bauske stated that he is in favor of more housing in the Village and wants
to bring in more residents. He is concerned about the proposed density. He is glad that the
intent of use for the property would be to remain residential.
Chairperson Combs expressed her familiarity with this area and residential concerns; they
have always had major issues with respect to traffic, its proximity to Roselle and Golf, as well
as the challenges on the side street. She feels this project could add to these concerns and
create additional problems on the side street and Golf Road. She stated that if the
development was located elsewhere, she might not have the same concerns with the project
outside of the parking issue, but as such she has a problem with the development in this
location.
Chairperson Combs commented on her concerns about commentary that a single-family
home on the lot would not be inappropriate/not feasible. Mr. Kirk stated his feelings that a
single-family home on this lot would not be the appropriate use for this lot. Discussion was
Page 6
Page 7 of 115
January 15, 2025 Village of Hoffman Estates Planning & Zoning Commission
had between Ms. Combs and Mr. Kirk about a similar type of property in Schaumburg where
a single family home was built and sold, and the difference between what is considered
architecturally appropriate for a community versus what is sellable.
Chairperson Combs expressed that this is clearly a neighborhood of families who come
together and to add additional traffic to the street would not be safe for the neighborhood.
Mr. Kirk mentioned a discussion regarding traffic movements from a previously held hearing
that acknowledged concerns over the public use of Apple Street as a bypass between
Higgins and Golf Roads and how this travel movement could be deterred. Mr. Kirk stated
that keeping the traffic for this development on site is a major deal and would like to
determine a figure for parking spaces that would be appropriate in the view of the community
and the developer for this site. An additional comment was provided by a resident in the
audience about notification issues for the previous meeting mentioned by Mr. Kirk, as well as
concerns about traffic on Apple Street. Mr. Kirk mentioned his disappointment over the
Village's lack of attention and communication regarding the traffic concerns on Apple Street.
Ms. Dose-Adamzadeh responded that the Village is aware of the traffic concerns in Parcel A.
There have been numerous studies conducted, and some actions have been taken.
Separately the Village's Engineering Division is preparing a survey and will be releasing the
survey to Parcel A residents to address some of their concerns and gather feedback. The
Engineering Division is working on a big picture analysis of traffic issues in the area.
ft
Chairperson Combs asked if there were any members of the audience that would like to
comment on this request, provided guidance and swore in public commentators.
Kyle Louder (1160 Apple St)
ra
Mr. Louder objected to the rezoning and variations requested by the petitioner. Mr. Louder
stated that the request will nearly quintuple the density of the lot next to his home. He does
not believe that a variation for minimum development area should be granted as it has less
than 1/10th of what is required by code for R-10.
Bianca Aguilar (1848 Jamestown Circle)
D Ms. Aguilar stated she does not live in this neighborhood but resides in the Barrington
Square Townhomes. She stated that she supports this project and feels that it is good to
bring more housing variety to the village.
Chairperson Combs requested that commentators limit their responses to 2 minutes.
Jim Rapetta (965 Ash Road)
Mr. Rapetta stated that he does not believe that the proposed development fits into the
neighborhood characteristics. He also believes that rezoning the property would set
precedent for other owners in the neighborhood to rezone their properties.
Jeff Whyte (405 Azalea Lane)
Mr. Whyte stated that he believes the proposed townhomes will decrease property values in
the immediate vicinity. Mr. Whyte stated that there is a land covenant in this parcel that
restricts use to single family homes. Mr. Whyte stated that he believes that the petitioner
could split the lots into four separate lots. He also stated that Apple Street should be cut off
at golf road and at the Hoffman Plaza Service Drive.
Mike Larsen (1140 N Bluebonnet Lane)
Page 7
Page 8 of 115
January 15, 2025 Village of Hoffman Estates Planning & Zoning Commission
Mr. Larsen asked Village Staff if the Village believes we could lose a lawsuit should the
petitioner sue the village, what would be the possibility of him winning. Ms. Dose-
Adamzadeh stated that the Village cannot speculate on what future court cases would entail.
Commissioners asked staff to elaborate. Phil Green stated that the Village Attorney is not
present tonight and no staff members present are attorneys. No village attorney or staff
member would speculate on any chances of litigation or outcomes.
Stephanie Gotter (420 Hawthorn Lane)
Ms. Gotter stated that these properties should become a Historical Society.
Wayne Korecky (1140 Apple Street)
Mr. Korecky stated that there are other areas in the village that can be used for multi-family
or single-family attached, including the Bell Works development and Barrington Square
Town Center.
Steven Dumpman (1060 Apricot Street)
Mr. Dumpman stated that there should be additional parking added to the development. He
also stated that the additional structure could impact homes that are in flood zone properties.
Jessie (750 Audubon Street)
Jessie stated that the safety of the children playing in the area would be put at risk when
ft
adding additional units. She also questioned why the developer chose to go with a modern
design that does not fit in with the neighborhood.
Mark Vandelinde (1020 Apple Street)
ra
Mr. Vandelinde discussed traffic concerns, particularly as it relates to the intersection of
Apple Street and Golf Road.
Jim Rapetta (965 Ash Road)
Mr. Rapetta additionally commented that the developer is currently a landlord and voiced
concerns about the property potentially becoming rental properties in the future.
D Katarzyna Bialkowska (1015 Apple Street)
Ms. Bialkowska voiced her concerns about traffic in the neighborhood.
Chairperson Combs inquired about next steps. Ms. Dose-Adamzadeh clarified that there
would be no motions considered this evening, only discussion of the Findings of Fact. Phil
Green stated that the Chairperson would need to close the public hearing and then move
into Commissioner Discussion which is separate from the public hearing.
Motion by Commissioner Harner, seconded by Commissioner Henderson, to Close Public
Hearing. Voice vote taken. Ayes - 9, Nays - 0, (Abstain: None). Motion Passed.
Commissioner Discussion commenced on the Findings of Fact.
Phil Green clarified that the goal of the discussion now is to provide feedback for staff in
order to draft the Findings of Fact, so it is not necessarily an individual "do we all agree on
each of these" but rather to voice our concerns if there are any standards that we feel do not
match so the staff can accurately reflect those concerns in the draft that will be presented in
February. Additionally, he clarified the reasoning behind the need for the discussion and
Page 8
Page 9 of 115
January 15, 2025 Village of Hoffman Estates Planning & Zoning Commission
suggested a means to continue moving forward with the discussion.
Chairperson Combs expressed that in general, she does not believe this development meets
any of the standards. She believes that the rezoning would not compliment the surrounding
zoning and believes that the properties are suitable to be single-family. Mr. Green clarified
with Chairperson Combs that she is referring to the finding as it relates to the character of
the neighborhood and that she has concerns that this standard would not be met.
Chairperson Combs agreed.
Mr. Green proceeded to clarify with the commission that they are not obliged to give a
specific reason but are welcome to do so.
Commissioner Harner asked for clarification about Findings. Mr. Green stated that the
commission should view the findings as being drafted in the affirmative right now and should
provide a response if they believe it does not meet the standard. In this case, Village Staff
has been advised by Corporation Counsel to have the Commissioners discuss the findings
and staff will draft them for a future meeting (2/19). Vice Chairperson Bauske asked if they
should go through the standards one by one. Mr. Green stated it may be more helpful to
start to go through it request by request and determine if they need to go through it one by
one.
ft
Commissioner Henderson asked if staff could clarify what page of the packet the Findings
can be found on. Phil Green stated he would troubleshoot for him separately.
Commissioner Lee asked if their opinions are only in regard to the findings or if it is only in
ra
regard to the findings. Mr. Green stated that the commission may discuss anything that the
commissioners want to discuss. Commissioner Lee stated that he usually listens to minority
opinions. He believes that after the Public Testimony, the public talked about very specific
and impactful issues that could come up with the proposal. Commissioner Harner stated that
it is easy to have an opinion but to draft them in relation to the findings is the more difficult
part. Commissioner Harner asked if the Commission can ask about the findings one by one.
D Vice Chairperson Bauske clarified that staff will be drafting the findings.
Mr. Green stated that staff is seeking direction for the recommendations.
Chairperson Combs stated that the petitioner has not met all three standards for a rezoning.
Chairperson Combs asked if the other commissioners felt differently.
Commissioner Lee stated that the second standard may be met.
Vice Chairperson Bauske stated that 1b may be met.
Commissioner Harner stated that 1c may be met.
Commissioner Wilson asked for clarification if we agreed to change it.
Vice Chairperson Bauske stated that is where there may be some confusion as some
standards could be met but some may not be met.
Page 9
Page 10 of 115
January 15, 2025 Village of Hoffman Estates Planning & Zoning Commission
Mr. Green read the Standards of Rezoning to the commissioners. He stated that the
commission is being asked to find if there is evidence to support these findings.
Vice Chairperson Bauske clarified that even if the commission does find evidence to support
the findings, the commission can still vote against a positive recommendation. Vice
Chairperson Bauske stated that he believes there is evidence with 1 b and 1 c as it is a
unique property, however, does not mean he personally agrees with it or will vote for a
positive recommendation.
Mr. Green summarized that he understands that the commission is generally stating that
there has been no evidence provided for Standards for an Amendment (rezoning) except for
1 b and 1 c.
Chairperson Combs requested to move on to the Variations for Minimum Development Area.
Mr. Green read the standards aloud for the commission. Mr. Green stated that through
discussion there have been apparent conversations around the benefit of financial gain and
housing. He asked the commission to discuss whether there has been enough evidence to
support the standards.
Commissioner Lee stated that he does not believe there is enough evidence presented to
support the Variation for Minimum Development Area, specific to the property.
ft
Commissioner Wilson stated that she does not believe there is enough evidence presented
to support the Variation for Minimum Development Area, specific to the property.
ra
Vice Chairperson Bauske stated that there are some standards that are being met and some
standards that are not being met.
Mr. Green clarified that the findings should be affirmative or negative if the standard has
been met. What Mr. Green is understanding from this conversation is that there may be
some commissioners that feel like some standards of a variation for Minimum Development
D Area have been met, but most of the commission feels that standards have not been met.
Commissioner Lee asked for clarification.
Vice Chairperson Bauske clarified that when the commission votes on the project in
February, they will be making multiple motions, with the first one being approval of the
findings of fact. This means that they are approving the findings for the Village Board to use
to support their ultimate vote. He stated that the Commission can vote to approve or deny
the specific requests. Vice Chairperson Bauske stated that he is not thinking about what he
is going to vote on ultimately, he is just thinking about the specific standards as it relates to
the project application and what was presented at the meeting.
Commissioner Harner stated that he does not believe there is any evidence for any of the
Minimum Development Area Variation Standards.
Vice Chairperson Bauske stated that he does not believe that there has been any evidence
presented for any of the standards – 1a – c, 2a – f, and 3. He stated that he had some back
and forth in regard to 1a.
Page 10
Page 11 of 115
January 15, 2025 Village of Hoffman Estates Planning & Zoning Commission
Commissioner Henderson asked for clarification. Commissioner Henderson stated that for
2c, there is no evidence that the variation is not based exclusively upon a desire to increase
the value of the property.
Vice Chairperson Bauske stated that there is a third standard for Variation for Minimum
Development Area.
Chairperson Combs stated that there was no evidence to support number 3 under Standards
of Variation for Minimum Development Area. Vice Chairperson Bauske agreed.
Mr. Green stated that this would be the motion to put conditions on, however it sounds like
the commission does not agree that the standards for a variation have been met.
Vice Chairperson Bauske directed the commission to look at the third request which is a
Variation for Maximum Density.
Chairperson Combs stated that she does not believe that there has been any evidence that
has been presented for Maximum Density.
Vice Chairperson Bauske asked for clarification; Is this request assuming the rezoning and
variations have been approved? Mr. Green stated that the question is in relation to the land
ft
that would require a variation for maximum density from the code. Vice Chairperson Bauske
asked if the uniqueness is if it is small. Commissioner Lee stated that there is no uniqueness
to
ra
Commissioner Chhatwani asked to clarify the question. If the plight of the owner is due to
unique circumstances, can the unique circumstance be that it is a small lot. Commissioner
Lee stated that what it is asking is if the current condition is unique enough to allow greater
density.
Mr. Green stated that he understands that the commission feels that the standards have not
D been met to support a variation for maximum density.
Mr. Green stated that there will be no action taken tonight regarding this project. Staff have
been directed to draft findings for the February 19 meeting. The meeting will not go in front
of the trustees at this point.
Mr. Whyte (405 Azaela Ln) requested that staff and the Commission take care of what is
recommended because this project impacts their life.
Mr. Green stated that the February 19th meeting will be a public meeting where public
comment can be made but it will not be a public hearing.
2. Variation from Section 9-3-6-K-2 of the Municipal Code to permit a garage to be 1,258
square feet instead of the maximum permitted 750 square feet for the property located
at 1120 Ash Road
Motion by Commissioner Harner, seconded by Commissioner Henderson, to Open Public
Hearing. Voice vote taken. Ayes - 9, Nays - 0, (Abstain: None). Motion Passed.
Page 11
Page 12 of 115
January 15, 2025 Village of Hoffman Estates Planning & Zoning Commission
Chairperson Combs swore in the petitioner.
Sergiu Tabirta (1120 Ash Road, Hoffman Estates)
Mr. Tabirta presented an overview of the project.
Kevin Anderson presented an overview of the staff report. Chairperson Combs added to Mr.
Anderson's report a comment that if you were to approve the enclosed and unenclosed
portions of the garage, that there is nothing to prevent the petitioner from enclosing the
overhang (unenclosed) portion at a later time, so it would become the equivalent to another
house. Mr. Anderson agreed and stated the Zoning Code as written would allow him to
enclose the unenclosed portion without any further zoning review. So no matter if the
petitioner decided to enclose it or a future resident made this decision, there would be no
further zoning review to prevent this from occurring. Ms. Combs stated this is the reason
there are two forms of the second motion up for discussion.
Commissioner Lee asked what is the need for the unenclosed portion of the garage. Mr.
Tabirta responded that it was for the ability to have a covered patio. Commissioner Lee
asked for further clarification from staff to determine what makes the unenclosed portion be
considered part of the garage; is it the type of roofing/piers being used, or could he for
instance add an awning to allow for the covered section? Mr. Anderson stated an awning
ft
would be considered a separate structure and as such would be classified as a shed. It
would then require Mr. Tabirta to revise his plans to meet the maximum size of a shed for
the covered area in order to be permitted separate of the garage.
ra
Commissioner Wise asked about whether the shed (unenclosed) area would be accessible
from inside the enclosed garage via a door of some sort. Mr. Tabirta stated it would not be
accessible from the enclosed space, only from the exterior.
Commissioner Milford had no questions.
D Commissioner Wilson asked for clarification on two options of motion number two; the first
allowing both the enclosed and unenclosed garage sections, and the second option only
allowing the enclosed portion. Chairperson Combs and Vice Chairperson Bauske helped
Commissioner Wilson distinguish between the two options.
Commissioner Henderson had no questions.
Commissioner Harner asked if you can still park a car on the unenclosed area regardless of
whether the space had an overhang. Mr. Tabirta stated yes.
Commissioner Chhatwani had no questions.
Vice Chairperson Bauske clarified that you could still park on the unenclosed location, you
just would not have an overhang, so in the winter your vehicle would get snow on it, but you
could still store items and park in this area. Mr. Tabirta stated yes.
Chairperson Combs asked the Commissioners if they were all in agreement they would be
recommending the alternate option for Motion Number Two which permits the 850 square
foot garage area. The Commissioners agreed.
Page 12
Page 13 of 115
January 15, 2025 Village of Hoffman Estates Planning & Zoning Commission
Vice Chairperson Bauske asked the petitioner if he agreed with the conditions of approval in
the staff report. Mr. Tabirta stated yes, but asked to clarify if he would be able to keep the
concrete area without the roof. Mr. Anderson stated yes this would be permitted.
Chairperson Combs indicated for the record that concerns were received from neighboring
properties about the size of the larger garage request.
Chairperson Combs asked if there were any members of the audience that would like to
comment on this request. There were no public comments.
Motion by Commissioner Harner, seconded by Commissioner Henderson, to Close Public
Hearing. Voice vote taken. Ayes - 9, Nays - 0, (Abstain: None). Motion Passed.
Motion by Vice Chairperson Bauske, seconded by Commissioner Harner, to adopt the
Findings of Fact for a Variation as noted in the Findings & Recommendations Summary
dated January 15, 2025.
Roll call vote:
Aye: Eva Combs, Adam Bauske, Lon Harner, Lenard Henderson, Daniel Lee, Minerva
Milford, Denise Wilson, John Wise, Rajkumari Chhatwani
Nay: None
Absent: Nancy Trieb
Motion Passed. ft
Motion by Vice Chairperson Bauske, seconded by Commissioner Harner, to recommend to
ra
the Village Board approval of a Variation from Section 9-3-6-K-2 of the Municipal Code to
permit a garage to be 850 square feet instead of the maximum permitted 750 square feet,
subject to the conditions as of the January 15, 2025, Staff Report.
Roll call vote:
Aye: Eva Combs, Adam Bauske, Lon Harner, Lenard Henderson, Daniel Lee, Minerva
5.
D Milford, Denise Wilson, John Wise, Rajkumari Chhatwani
Nay: None
Absent: Nancy Trieb
Motion Passed.
Chairperson Combs stated this recommendation would be presented to the Village Board at
the next regular meeting on January 20, 2025, at 7:00 p.m.
STAFF DISCUSSION
Daisy Dose-Adamzadeh stated the February 5, 2025 regular meeting has a full agenda. She
will be sending an attendance request shortly. There will also be a full agenda for the
February 19, 2025 regular meeting.
Commissioner Harner inquired whether there will be a means of dealing with the Post Office
delays of delivery of packet materials. Ms. Dose-Adamzadeh stated that we are unable to
guarantee mail delivery. Mr. Anderson stated the Village has moved mailings up two full
days from previous practice and unfortunately it has made minimal difference. Commissioner
Harner asked if there were any plans to return to hand delivery of packets as was practice in
Page 13
Page 14 of 115
January 15, 2025 Village of Hoffman Estates Planning & Zoning Commission
the past. Ms. Dose-Adamzadeh stated we could set something up where Commissioners
who want a paper packet could come to Village Hall to pick it up. Mr. Anderson stated that
the digital packets are available immediately to which Commissioner Harner and
Chairperson Combs expressed concerns about the glitches experience with the most recent
packet.
6. PUBLIC COMMENT
None.
7. ADJOURNMENT
Motion by Commissioner Chhatwani, seconded by Commissioner Harner, to adjourn at
09:39 PM. Voice vote taken. Ayes - 9 | Nays - 0 (None) | Abstain - 0 (None). Motion Passed.
Minutes prepared by Marquelle Cnota, Administrative Assistant.
ft
______________________________
Chairperson’s Approval
__________________________
Date Approved
ra
D
Page 14
Page 15 of 115
PLANNING & ZONING COMMISSION STAFF REPORT
Meeting Date: 2/5/2025
From: Kevin Anderson, Associate Planner
PLN24-0049
Public Hearing
Variation from Section 9-3-6-K-2 of the Municipal Code to permit a garage to be
930 square feet instead of the maximum permitted 750 square feet for the
property located at 5560 Airdrie Court
REQUEST SUMMARY
A 3,800 square foot single-family home is currently under construction at 5560 Airdrie
Court. The owners are seeking a Variation in order to increase the size of the attached
garage under construction to 930 square feet. A maximum garage size of 750 square
feet is permitted by Section 9-3-6-K-2 of the Municipal Code.
Location: 5560 Airdrie Ct.
Property Owner / Applicant: Selena and Husein Latic
Property Size: 0.47 acres
Zoning / Land Use: R-2 One-Family Residential, residence under
construction
Adjacent Properties: East: R-2 One-Family Residential
West: R-2 One-Family Residential
South: R-2 One-Family Residential
North: Unincorporated Cook County R-3 Single-
Family Residential
BACKGROUND / ANALYSIS
The approved building plans for the home under construction includes a workshop and
storage area adjacent to a 2-car garage. The owners are proposing to revise the plans
to convert the workshop/storage area to a 3rd stall within the garage. The additional
stall would increase the overall garage size to 930 square feet, requiring a Variation
from Section 9-3-6-K-2 of the Municipal Code.
The change in floor plans would not alter the exterior elevations of the structure. The
original approved building plans include three overhead garage doors which is
permitted by code. The home as approved meets all other bulk standards of the R-2
zoning district. The Airdrie Estates Homeowner's Architectural Review Committee has
approved the plans and the proposal complies with the restrictions of the Airdrie
Estates Lot Development Standards.
The Village Board has granted three garage-size Variations in the Airdrie Estates
neighborhood over the last four years. This includes the lot directly east of the subject
Page 1 of 2
Page 16 of 115
property (5550 Airdrie Ct.) which was granted relief for a 1,225 square foot, 4-car
garage in 2021.
MOTIONS
The Planning & Zoning Commission shall make the following motions (a total of 2
motions are required):
1. Adopt the Findings of Fact for a Variation.
2. Recommend to the Village Board approval of a Variation from Section 9-3-6-K-2
of the Municipal Code to permit a garage to be 930 square feet instead of the
maximum permitted 750 square feet for the property at 5560 Airdrie Court,
subject to the following conditions:
a. The development shall substantially conform to the plans submitted as
part of this application except as such plans may be changed to conform
to all Village Codes and Ordinances.
b. Plan revisions shall be provided for permit # BLDG2408-0282 prior to the
next scheduled building inspection.
ATTACHMENTS
1. PZC Findings and Recommendations Summary - 5560 Airdrie Ct
2. Location Map - 5560 Airdrie Ct.
3. Supporting Documents - 5560 Airdrie Ct
Page 2 of 2
Page 17 of 115
Exhibit B
PLANNING & ZONING COMMISSION
FINDINGS & RECOMMENDATION SUMMARY
Meeting Date: 2/5/2025
Prepared By: Kevin Anderson, Associate Planner
PLN24-0049
Variation from Section 9-3-6-K-2 of the Municipal Code to permit a garage to be 930 square
feet instead of the maximum permitted 750 square feet for the property located at
5560 Airdrie Court
Draft Findings of Fact – Variation (as drafted by staff and may be modified by the Commission)
Sec. 9-1-15-C: Standards for Variations.
1. The Planning and Zoning Commission shall not recommend the variation of the regulations of the Code
unless it shall first make a finding based upon the evidence presented to it in each specific case that:
a. The property in question cannot yield a reasonable return if permitted to be used only under the
conditions allowed by the regulations in the district in which it is located;
FINDING: No evidence was presented to support that this standard was met.
b. The plight of the owner is due to unique circumstances;
FINDING: No evidence was presented to support that this standard was met.
c. The variation, if granted, will not alter the essential character of the locality.
FINDING: The Variation, if granted, will not alter the character of the neighborhood.
2. For the purpose of implementing the above rules, the Planning and Zoning Commission shall also, in
making its determination whether there are practical difficulties or particular hardships, take into
consideration the extent to which the following facts favorable to the applicant have been established
by the evidence:
a. The particular physical surroundings, shape or topographical condition of the specific property
involved would result in a particular hardship upon the owner, as distinguished from a mere
inconvenience, if the strict letter of the regulations were carried out;
FINDING: No evidence was presented to support that this standard was met.
b. The conditions upon which the petition for a variation is based would not be applicable,
generally, to other property within the same zoning classification;
FINDING: No evidence was presented to support that this standard was met.
c. The purpose of the variation is not based exclusively upon a desire to increase the value of the
property;
Page 18 of 115
FINDING: Petitioner has indicated that the intent of the Variation is to increase
functionality of the space and not based exclusively on the desire to increase the value
of the property.
d. The alleged difficulty or hardship has not been created by any person presently having an
interest in the property;
FINDING: No evidence was presented to support that this standard was met.
e. The granting of the variation will not be detrimental to the public welfare or injurious to other
property or improvements in the neighborhood in which the property is located; and
FINDING: The Variation, if granted, will not be detrimental to public health or injurious to
other properties.
f. The proposed variation will not impair an adequate supply of light and air to adjacent property,
or substantially increase the congestion in the public streets, or increase the danger of fires, or
endanger the public safety, or substantially diminish or impair property values in the
neighborhood.
FINDING: The Variation, if granted, will not impair the supply of light and air, increase
congestion, or endanger public safety.
3. The Planning and Zoning Commission may recommend to the Village Board that such conditions and
restrictions be imposed upon the premises benefitted by a variation as may be necessary to comply
with the standards set forth in this section to reduce or minimize the injurious effect of such variation
upon other property in the neighborhood, and better to carry out the general intent of this Code.
Draft Recommendations
The following motions will be considered by the Planning & Zoning Commission (a total of 2 motions):
1. Adopt the Findings of Fact for a Variation.
2. Recommend to the Village Board approval of a Variation form Section 9-3-6-K-2 of the Municipal Code
to permit a garage to be 930 square feet instead of the maximum permitted 750 square feet for the
property located at 5560 Airdrie Court, subject to the following conditions:
a. The development shall substantially conform to the plans submitted as part of this application
except as such plans may be changed to conform to all Village Codes and Ordinances.
b. Plan revisions shall be provided for permit # BLDG2408-0282 prior to the next scheduled
building inspection.
Findings & Recommendations Summary
Page 2 of 2
Page 19 of 115
Page 20 of 115
VILLAGE OF HOFFMAN ESTATES
PLANNING & ZONING APPLICATION SUMMARY
APPLICATION INFORMATION
Project Number: PLN24-0049
Project Name: Garage Size Variation
Project Application Date: 12/4/2024
Project Manager: Kevin Anderson
PROJECT TYPE
SITE INFORMATION
Property Address: 5560 AIRDRIE CT
All Included PINs:
PROJECT CONTACTS
Relationship to
Name / Firm Address Phone E-Mail
Project
1234 Windsor Ln
APPLICANT Husein and Selena Latic HANOVER PARK, 6303980857 latic@comcast.net
IL 60133
AUTHORIZED ,
Selena Latic 6303980857
AGENT
1234 Windsor Ln Hanover
OWNER Husein and Selena Latic Park,
IL 60133
1 of 1
Page 21 of 115
Page 22 of 115
Page 23 of 115
,/
3/$72)6859(<
&22.&2817< 287/27$
),3
PROPERTY ADDRESS:
!)2$2)%#/524 (/&&-!.%34!4% ),,)./)3 /27 07
$'
SURVEY NUMBER: ), ,1*
9$&$17/27 (6
; 7(0325$5<*
DATE SIGNED: FIELD WORK DATE: /27 /27
REVISION DATE(S): ;
5$',1*(607
2%6 7(
03
;
25
POINTS OF INTEREST 3
8 $5 &
( <* 5 5 &
5
/ 5 &
/ &+
6%
(
38
&
STATE OF ILLINOIS ),3 5 5 &
COUNTY OF LASALLE
SS ( / 5 &
1
THIS IS TO CERTIFY THAT THIS PROFESSIONAL SERVICE CONFORMS TO &+
THE CURRENT ILLINOIS MINIMUM STANDARDS FOR A BOUNDARY 5
SURVEY. GIVEN UNDER MY HAND AND SEAL THIS DATE HEREON. &
7
877
(5 2 3
* 7
%
85
&
6%/ &2
1&
7
5 , ( &
'
$ , 5 $ '
38( 5
),3 &
)1'&5266
ILLINOIS PROFESSIONAL LAND SURVEYOR No. 2971
1: /<
LICENSE EXPIRES 11/30/2024
EXACTA LAND SURVEYORS, LLC
PROFESSIONAL DESIGN FIRM 184008059-0008
&/
$,5'5,(&7 5:
*5$3+,&6&$/( ,Q)HHW
LQFK IW
SEE PAGE 2 OF 2 FOR LEGAL DESCRIPTION
PAGE 1 OF 2 - NOT VALID WITHOUT ALL PAGES
Page 24 of 115
VILLAGE OF
HOFFMAN ESTATES
Permit #: BLDG2408-0282
Rev #: 1 Date: 11/18/2024
APPROVED Engineering Div: MC
PLANS
Site Plan Under Construction
Page 25 of 115
Proposed 930 sf. 3-car garage
Page 26 of 115
Approved 740 sf. 2-car garage with workshop
VILLAGE OF
CODE HOFFMAN ESTATES
Permit #: BLDG 2408-0282
COMPLIANCE
REVIEWED FOR Rev #: 1 Date: 11/08/2024
Code Official: DD
Page 27 of 115
PLANNING & ZONING COMMISSION STAFF REPORT
Meeting Date: 2/5/2025
From: James Donahue, Senior Planner
PLN25-0001
Public Hearing
Text Amendment to Section 9-1-18A of the Hoffman Estates Municipal Code
(Temporary Planned Development Process)
REQUEST SUMMARY
The proposed text amendment extends the effective date of the temporary Planned
Development regulations until the Unified Development Ordinance (UDO) is adopted.
BACKGROUND / ANALYSIS
In 2023, the Village Board adopted Ordinance 5018-2023, which established a
temporary Planned Development process within the Zoning Code (Sec. 9-1-18A). This
process was created to accommodate the growing demand for modern multi-family
developments in the Village by allowing them to be considered under the temporary
Planned Development regulations in specific zoning districts (B-2, B-3, B-4, O-5, and
M-1).
Implemented with a 12-month duration, the temporary process was intended to serve
as a bridge until the adoption of permanent Planned Development regulations through
the UDO. The temporary Planned Development process expired as of April 2024. The
UDO timeline has been extended, with adoption anticipated in spring/summer 2025.
Following Village Board direction on January 13, 2025, the proposed text amendment
extends the effective date of the temporary Planned Development regulations until the
UDO's adoption. All other regulations as originally adopted will remain unchanged.
MOTIONS
The Planning & Zoning Commission shall make the following motions (a total of 2
motions are required):
1. Adopt the Findings of Fact for a Text Amendment.
2. Recommend to the Village Board approval of a Text Amendment to Section 9-1-
18A of the Hoffman Estates Municipal Code (Temporary Planned Development
Process).
ATTACHMENTS
1. Draft Findings and Recommendations Summary
2. Amended Sec. 9-1-18A Temporary Planned Developments
Page 1 of 1
Page 28 of 115
Exhibit B
PLANNING & ZONING COMMISSION
FINDINGS & RECOMMENDATION SUMMARY
Meeting Date: 2/5/2025
Prepared By: James Donahue, Senior Planner
PLN25-0001
Text Amendment to Section 9-1-18A of the Hoffman Estates Municipal Code (Temporary
Planned Development Process)
Draft Findings of Fact – Amendments (as drafted by staff and may be modified by the Commission)
Sec. 9-1-17-E: Findings of Fact and Recommendations
2. The Planning and Zoning Commission shall not recommend the adoption of a proposed amendment
unless it finds that the adoption of such amendment is in the public interest and is not solely for the
interest of the applicant.
FINDING: The Village, as applicant, is proposing the amendment as a tool to help with the
redevelopment of properties to meet the economic development goals of the Village.
Page 29 of 115
Sec. 9-1-18A. Planned developments.
A. Authority. The Village Board may, in accordance with the procedures and standards set out in this section,
and by ordinance duly adopted, grant special use authorizing the development of Planned Developments,
but only in the districts where such developments are listed as an authorized special use.
B. Time for Applications: It is the intent of the Village Board that the provisions within this section are to be valid
for no more than 12 months from the date of adoption, or until the enactment of a permanent Planned
Development process the Unified Development Ordinance. No application made pursuant to this section
may be made later than 12 months from the date of adoption of this section unless this section has been
extended by the Village Board. Upon adoption of a permanent Planned Development process, the Unified
Development Ordinance, all applications must be made pursuant to that process and no applications may be
made pursuant to this Section. Applications received prior to the expiration of this Section must be complete
and include all of the requirements of subsections H and I below in order to be reviewed pursuant to the
requirements of this limited-time process. Any incomplete applications received prior to the expiration of
this Section shall proceed according to the permanent process.
C. Applications pending at the enactment of the Unified Development Ordinance expiration of the temporary
process. Any complete application submitted prior to the expiration of this Section must complete all
requirements necessary for submission to the Village Board for approval or denial no later than nine months
after the date the application was submitted. Failure to complete the review process in this time period shall
result in the application being reviewed pursuant to the requirements of the permanent process. Any change
in ownership after the submission of an application shall result in the application being reviewed pursuant to
the permanent process. Nothing in this Section shall prevent an applicant from electing to have an
application that was reviewed prior to the expiration of this Section reviewed pursuant to the permanent
process.
D. Purpose. Planned Developments are included in this section as a distinct category of special use. As such,
they are authorized for the same general purposes as all other special uses. The Planned Development is
intended to allow the flexible application of substantive requirements of Chapters 9 and 10 of the Municipal
Code for developments that meet certain criteria as outlined in this section. This special regulatory approach
is included in this Chapter in recognition of the fact that traditional regulations, which may be useful in
protecting the character of substantially developed and stable areas, may impose inappropriate regulations
and rigidities upon the development or redevelopment of parcels or areas that lend themselves to an
individual, planned approach. Through the flexibility of the Planned Development process, the village seeks
to achieve the following specific objectives:
1. Creation of a more desirable environment than would be possible through strict application of other
Village land use regulations.
2. Promotion of a creative approach to the use of land and related physical facilities resulting in better
design and development, including aesthetic amenities.
3. Preservation and enhancement of desirable site characteristics such as natural topography, vegetation,
and geologic features, and the prevention of soil erosion.
4. Combination and coordination of architectural styles, building forms, and building relationships.
5. Provision for the preservation and beneficial use of open space.
6. Encouragement of land uses that promote the public health, safety, and general welfare.
7. Support the economic development goals of the Village, as conveyed through the Village's
Comprehensive Plan, or other relevant adopted sub area or strategic plans.
E. Authorized Districts. A special use for a Planned Development will only be allowed in the following zoning
districts:
Page 30 of 115
1. B-2 Community Business District.
2. B-3 Business District.
3. B-4 Business District.
4. O-5 Office District.
5. M-1 Manufacturing District.
F. Authorized Uses.
1. Primary Uses.
a. Dwelling-Multiple.
2. Accessory uses. Accessory uses including, but not limited to, the following:
a. Club houses, pools, patios, decks, gazebos, parks, sports courts, and other structures designed to
provide support amenities for the multi-family use.
b. Home occupations.
c. Those uses listed as permitted uses within the B-1 Neighborhood Business District.
G. Parties Entitled to Seek Planned Development Approval. An application for a special use for a Planned
Development may be filed by the owner of, or any person having a contractual interest in, the subject
property.
H. General Requirements for Planned Development. The following are required for all Planned Developments:
1. Unified Ownership Required. A Planned Development shall be under single ownership or unified control
to ensure that the entire property will be developed, constructed, and maintained as a unified whole.
No conveyance of any portion of the property within the Planned Development shall occur without
approval of a minor amendment to the special use for a Planned Development as outlined in Section 9-
1-18A-K-3.
2. Minimum Area. The minimum area for a proposed Planned Development is two-acres; provided,
however, that the applicant shall have the burden of establishing that the property is of sufficient size
and shape for the proposed Planned Development and to be planned and developed as a unified whole
capable of meeting the objectives for which Planned Developments may be established pursuant to
this section.
3. Covenants and Restrictions Required. In the event of multiple parcels not under single ownership,
unified control will be required in the form of covenants, deed restrictions, easements, and similar
restrictions to be recorded in connection with the Planned Development to provide for maintenance of
common areas, shared access, parking and other site operational requirements as applicable.
4. Public Open Space and Contributions. Donations shall be provided in accordance with Section 10-9-1.
I. Procedure for Approval of Planned Development. The procedure to be followed in considering applications
for a special use for a Planned Development shall be as follows:
1. Special Use. Applications for Planned Developments shall follow the process outlined in Section 9-1-18
to obtain a special use. No special use for a Planned Development shall be granted unless the standards
found in Section 9-1-18-I are met. In conjunction with this application, all documents as outlined in
Section 9-1-18A-J-2 shall be submitted as part of the application submittal.
2. Plat of Subdivision and/or Easement. For all Planned Developments involving the subdivision of land or
granting of easements, a plat of subdivision and/or easement shall be required in accordance with
Section 10-6-3 of the Subdivision Code.
Page 31 of 115
3. Building Permit. Following approval of an ordinance granting a special use for a Planned Development,
a building permit shall be required. Building permit applications shall be made in accordance with
requirements of Chapter 11 of the Municipal Code and the requirements of Section 9-1-18A-J.
J. Submission for Planned Development.
1. Staff Pre-Application Meeting. A formal meeting to review the proposed Planned Development shall be
held with Village staff for discussion of the proposed development relative to the requirements of this
Chapter 9 and other sections of the Municipal Code. The petitioner, along with all consultants
responsible for preparing plans, studies and documents for the Planned Development plan, shall be
present at the pre-application meeting. Prior to this meeting, the applicant shall submit the following
materials and any other items that may be required by Village staff to provide useful background for
the review team:
a. A scaled drawing in sketch form showing the proposed location and extent of the land uses,
major streets, lots, environmental areas, stormwater management facilities, and other features
as needed to convey the proposed form of development.
b. A general description of the proposed Planned Development, the planning objectives to be
achieved by it, including the rationales and assumptions of the applicant supporting the proposed
Planned Development, and the market it is intended to serve.
2. Development Documents for Planned Development. The following items are required for submission for
approval of a Planned Development:
a. Completion of an application in a form as determined by the Development Services Department.
b. Legal description.
c. Plat of Survey.
d. Proof of ownership or interest in property, including current Title Report.
e. A written statement addressing the following matters:
(1) A general description of the proposed Planned Development, the planning objectives to be
achieved by it, including the rationales and assumptions of the applicant supporting the
proposed Planned Development, and the market it is intended to serve.
(2) How the proposed Planned Development is to be designed, arranged, and operated so as
not to adversely affect the development and use of neighboring property in accordance
with applicable regulations of this title.
(3) A summary of existing natural and environmental resources and features on the subject
property, including its topography, vegetation, soils, geology, and scenic view, and the
impact of the proposed Planned Development on such resources and features, including
proposals to preserve or protect such resources and features.
(4) Applicant's intent with respect to the ownership, sale and leasing of the various completed
units, structures, spaces and areas within the proposed Planned Development.
(5) A development schedule for each and every stage of construction stating the approximate
beginning and completion date, proportion of total public or common open space to be
provided for each use and with each development stage.
(6) A summary of density of residential uses, including the number of dwelling units by type,
the number of buildings by type and the number of bedrooms in each building and dwelling
unit type.
(7) Information on the type and amount of primary and accessory uses, including the amount
of open space.
Page 32 of 115
(8) A detailed summary of existing bicycle, pedestrian, and transit improvements serving the
site and what improvements will be made to enhance or maintain connectivity within the
Planned Development and surrounding network.
(9) Economic impact summary addressing the economic impacts of the Planned Development
on the community including sales tax, equalized assessed property values, transit ridership,
employer housing and workforce, etc.
(10) A summary of areas proposed to be conveyed, dedicated or reserved for public uses
including parks, playgrounds and open spaces.
f. Site plan indicating:
(1) Property lines, lot dimensions, and total gross acreage.
(2) Public rights-of-way and easements, including street pavement widths.
(3) Buildings, structures, and other constructed features (such as fences), with entry and exit
points. Building areas, construction types, and heights shall be included.
(4) All paved surfaces (hardscape), including, but not limited to pedestrian and vehicular travel
areas.
(5) Parking areas, including delineated spaces, handicapped spaces, curbs, and planted islands.
(6) Landscaped areas.
(7) Natural site features such as water bodies, wetlands, streams, rock outcroppings, etc.
(8) Transformers and HVAC equipment.
(9) Conditions on adjacent properties such as buildings, streets, driveways, parking lots, fences
and related improvements.
(10) Fire hydrants.
(11) Fire Department Connection (FDC).
(12) Fire lanes.
(13) Freestanding signs.
(14) Site lighting.
(15) Trash storage area and loading areas.
(16) Chart with all relevant zoning data such as FAR, building height, lot coverage, density,
setbacks, parking ratios (by bedroom and unit), etc.
g. Architectural floor plans.
h. Building elevations.
i. Colored renderings.
j. Site lighting including locations, heights, types and specifications of all exterior fixtures, including,
but not limited to, freestanding, wall mounted, ground mounted, security lighting fixtures, and
decorative or accent lighting.
k. Fire apparatus auto-turn exhibits, and location of Fire Department Connection (FDC).
l. Preliminary landscape plan including, but not be limited to, the following information:
(1) North arrow, scale, developer/owner name and address, name and address of landscape
architect, and date of preparation.
Page 33 of 115
(2) Locations of existing features and proposed improvements.
(3) A tree survey and preservation plan.
(4) Property lines.
(5) All buildings and other structures, paved areas, planted areas, utility poles, fire hydrants,
sign locations, fences, underground and overhead utility lines, and any other existing or
proposed permanent features.
(6) All streets, sidewalks, curbs and gutters, drainage ditches, and other improvements within
and adjacent to the site.
(7) Locations, sizes, quantity and types (groundcover, shrubs, and ornamental, shade and
evergreen trees) of all proposed plantings. Plant sizes shall be scaled to reflect sizes five
years after planting.
(8) Location of existing natural site features (including, but not limited to, wetland areas, water
bodies, streams, rock outcroppings). Locations of existing and proposed berms shall also be
shown.
(9) Site drainage information, including existing and proposed contours (to verify that the
proposed landscaping is compatible with site drainage patterns).
(10) Calculations of landscape area.
m. Signage plan detailing a narrative and graphic explanation of the following:
(1) Number, location, type and placement of signs on the subject property;
(2) Sign materials and methods of illumination;
(3) Height and size of signs and sign band areas.
n. Preliminary engineering plan indicating storm sewer lines, sanitary sewer lines, water mains and
storm water detention or retention facilities and proposed grading plans.
o. Preliminary stormwater report to meet the requirements of the Metropolitan Water Reclamation
District (MWRD) Watershed Management Ordinance (WMO) and applicable portions of
Municipal Code. The stormwater management design shall be incorporated into the preliminary
plans and required calculations/reports shall be prepared and submitted concurrently with the
preliminary engineering.
p. Draft of all proposed bylaws, covenants, easements, maintenance and other agreements,
wherever applicable.
q. Traffic Impact Study and Parking Study.
r. Preliminary and Final Plat of Subdivision (if required) in accordance with the requirements of
Section 10-6-3.
s. Ultimate population table per Section 10-9-1.
t. Fiscal Impact Analysis indicating the possible tax consequences the proposed Planned
Development will have upon the Village and other affected taxing bodies.
u. Market Study.
v. Other information, documents or plans as may be determined necessary by the Department of
Development Services to complete the evaluation of the request.
K. Building Permit for Planned Development. No building permit shall be issued without prior Village Board
approval of an ordinance for a special use for a Planned Development. The following items shall be required
Page 34 of 115
as part of a submittal for a building permit, in addition to all other permit requirements of Chapter 11 of the
Municipal Code:
1. Final engineering plans and details for all utilities, stormwater retention and drainage, and grading.
2. Final stormwater management report to meet the requirements of the Metropolitan Water
Reclamation District (MWRD) Watershed Management Ordinance (WMO). The stormwater
management design shall be incorporated into the final engineering plans and required
calculations/reports shall be prepared and submitted concurrently with the final engineering.
3. Professional engineer's estimate of probable cost for all public and project improvements. A line item
cost estimate for all site improvements is required, including the following work categories, at a
minimum:
a. Site Grading.
b. Erosion Control.
c. Sanitary Sewer.
d. Storm Sewer (including stormwater detention, volume control).
e. Water Main.
f. Pavement (roadway, parking lot, sidewalk, curb & gutter).
g. Site Restoration.
h. Landscaping.
i. Lighting.
4. Final construction staging plan, including a construction schedule.
5. Final, recorded copy of all bylaws covenants, easements, and maintenance agreements as requested by
the Village.
6. Final lighting plan and specifications including the following:
a. A photometric plot, measured in footcandles. The plot shall include all existing and proposed
fixtures on and adjacent to the subject site that affect the site.
b. Minimum illumination levels and uniformity ratios.
7. Final landscape plan in substantial conformance with the approved preliminary landscape plan. In
addition to those items provided on the preliminary plan, the final landscape plan shall include the
following information:
a. Species of all proposed plantings and a proposed material schedule (in tabular form), listing:
botanical name; common name; size; and quantity. Shade, evergreen, and ornamental tree
dimensions shall be scaled to reflect sizes five years after planting in lieu of size at full maturity.
b. A cost estimate for landscape materials under separate cover or on the landscape plan.
c. Proposed treatment of all ground surfaces; i.e., stone materials, bark, sod, seed and/or other.
d. Irrigation plan, including the location and type of system to be provided.
e. Building elevations, cross sections, renderings and/or photographs to show relationship of
proposed plantings to buildings.
8. Other information, documents or plans as may be determined necessary by the Department of
Development Services to complete building permit review.
Page 35 of 115
L. Amendments to Approved Planned Developments. Amendments to approved Planned Developments shall be
reviewed by the Director of Development Services, who shall determine whether the changes are "staff
level", "administrative", "minor" or "major" and outlined below:
1. Staff level changes shall be reviewed by Department of Development Services staff for compliance with
all code requirements and shall be limited to non-significant impact alterations to an approved Planned
Development, such as a change in species of plant material, minor adjustment in building materials,
the addition of outdoor seating at a restaurant where there is no negative impact on parking or
pedestrian access, addition of a dumpster or utility screen, or other minimal changes that do not
materially affect the operational impacts or aesthetics of an approved Planned Development. Such
changes may be approved through the issuance of a building permit, where necessary.
2. Administrative amendments shall be limited to the addition of landscaping and other changes to the
project that meet or exceed current code requirements where feasible in consideration of the existing
improvements present on the site, and where a maximum increase to the gross building floor area
would be not more than 20 percent of the existing gross floor area. An administrative Planned
Development amendment may be granted if the above changes, on a long-term basis, will not
substantially increase traffic to the location, the amount of noise, artificial light or other impacts. Such
administrative Planned Development amendments may be approved by the Village Manager, following
review procedures established by the Village.
3. Minor amendments to previously approved applications shall be acted upon by the Village Board, after
review and recommendation by the Planning, Building and Zoning Committee, who shall receive a
recommendation from the Department of Development Services for consideration and final action on
such amendments.
4. Major amendments to previously approved applications shall be conducted in accordance with the
procedures and requirements for Planned Developments review (including public hearing before the
Planning and Zoning Commission and final consideration by the Village Board) as specified in this
Chapter. Major amendments shall also require an amendment to the special use for a Planned
Development and shall be approved by Ordinance.
M. Waiver of Submittal Documents. The Director of Development Services may upon written request by the
applicant, and in the discretion of the Director of Development Services, waive one or more of the required
applications submittals set forth in Section 9-1-18A-J. Any request by an applicant for such a waiver must be
submitted at the time of application and must include specific reasons why such a waiver is being sought.
N. Site Design and Bulk Requirements.
1. Bulk Regulations. To promote flexibility in design while meeting the purpose of this section, Planned
Developments are not subject to the bulk regulations of the underlying zoning district. Instead, the
following regulations shall apply:
Maximum Building 125 ft.
Height—Residential Uses
Maximum Building 45 ft.
Height—All Other Uses
Maximum FAR 2.0
2. Site Design Regulations. Planned Developments shall comply with the all site design regulations of
Chapter 10 of the Municipal Code (the Subdivision Code), with the exception of Article 1, Article 2 and
Article 6 of Chapter 10. If there is a conflict between this section and the requirements of Chapter 10,
the regulations within this section shall govern. Approval of a building permit for an approved Planned
Development shall be considered equivalent to site plan approval as outlined in Section 10-1-2-A and
10-2-1-B. Under no circumstance will a development be required to receive both Planned Development
and site plan approval.
Page 36 of 115
3. Off Street Parking Regulations. The provisions of Section 9-3-2 and Section 10-5-2 shall apply. Proposed
parking counts must be supported by evidence including, but not limited to the most recent edition of
the ITE Parking Generation Manual and actual demand data from existing developments similar in
nature to that being proposed.
4. Signage. Signage shall be considered as part of the overall Planned Development, based upon plans
submitted. Plans shall include detailed information about all proposed freestanding and wall signs,
including the materials, exact dimensions, and proposed lighting. Signage requirements found within
Section 9-3-8 shall not otherwise apply, with the exception of Section 9-3-8-A through Section 9-3-8-L.
5. Exceptions from Regulations. The Village Board may, at their sole discretion, approve exceptions from
the bulk regulations for Planned Developments, or from any other pertinent requirements as found in
Chapter 10, provided the applicant specifically identifies each such exception and demonstrates how
each such exception would be compatible with surrounding development; is in furtherance of the
stated objectives of this section; and is necessary for proper development of the site.
O. Conditions on Planned Development Approvals. The approval of Planned Development may be conditioned
on such matters as the Village Board may find necessary to prevent or minimize any possible adverse effects
of the proposed Planned Development; or to ensure its compatibility with surrounding uses and properties
and its consistency with the general purposes, goals, and objectives of this Chapter, Chapter 10 of the
Municipal Code, and the Comprehensive Plan, or other relevant sub area and strategic plans. Such conditions
shall be expressly set forth in the ordinance granting the approval in question. Violation of any such
condition or limitation shall be a violation of this Chapter, and shall constitute grounds for revocation of all
approvals granted for the Planned Development as well as, as applicable, penalties as found in Section 9-1-
20.
P. Fees. All applications for Planned Development and amendments thereto shall pay fees equal to an
equivalent site plan approval in addition to the required special use approval.
Q. Any amendments made to any Planned Development approved pursuant to this time-limited process after the
expiration of this process and enactment of a permanent Planned Development process shall be reviewed and
subject to the requirements of the process in effect at the time of the requested amendment.
(Ord. No. 5018-2023, § 1, 4-17-23)
Page 37 of 115
VILLAGE OF HOFFMAN ESTATES
PLANNING & ZONING APPLICATION SUMMARY
APPLICATION INFORMATION
Project Number: PLN25-0001
Project Name: Text Amendment - Temp PD Process
Project Application Date: 1/21/2025
Project Manager: James Donahue
PROJECT TYPE
Text Amendment
SITE INFORMATION
Property Address:
All Included PINs:
PROJECT CONTACTS
Relationship to
Name / Firm Address Phone E-Mail
Project
1900 HASSELL RD
The Village of Hoffman
APPLICANT HOFFMAN ESTATES, 8477812660 planning@vohe.org
Estates
IL 60169
1900 HASSELL RD
The Village of Hoffman
OWNER HOFFMAN ESTATES, 8477812660 planning@vohe.org
Estates
IL 60169
Page 38 of 115
1 of 1
PLANNING & ZONING COMMISSION STAFF REPORT
Meeting Date: 2/5/2025
From: James Donahue, Senior Planner
PLN24-0011
Public Meeting
Preliminary and Final Plat of Subdivision and Site Plan for Compass Data Center
located at 3333 Beverly Road
REQUEST SUMMARY
Compass Datacenters ORD 1 LLC is seeking Preliminary and Final Plat of Subdivision
and Site Plan approval for a 1.25 million square foot hyperscale data center campus on
the 193 acre site of the former Sears Holdings headquarters.
Location: 3333 Beverly Road
Property Owner / Applicant: Compass Datacenters ORD 1 LLC
Property Size: 193 acres
Zoning / Land Use: O-5 Office District / Former Sears
Headquarters
Adjacent Properties: North: Cook County Forest Preserve (Not in the
Village)
South: O-5; Various Office Buildings
East: O-5; Various Office Buildings
West: Plote gravel pit property (not in the
Village)
BACKGROUND / ANALYSIS
The Sears Holding headquarters was originally occupied in 1992 when Sears moved
from Chicago. The 2.4 million square foot facility was home to more than 8000
employees at its peak and remained operational until Sears went bankrupt in 2018 and
sold its assets to Transformco, which later put the site up for sale in 2021. Compass
Datacenters (Compass), a Dallas, TX based data center developer, purchased the 193
acre site in September 2023 with plans to develop a 1.25 million square foot hyperscale
data center campus.
The proposed data center campus consists of five data center buildings used to store
and manage data in support of cloud internet platforms. Each building is approximately
250,000 square feet and comprised of administration spaces at either end with the data
halls and equipment in between making up the bulk of each building. Equipment yards
with power distribution equipment, backup generators, and cooling equipment for the
data halls are located around the perimeter of each building. A ring road is proposed for
circulation around the site and in between each building. The site will be secured by a
fence and guard house at the main entrance off Trillium Boulevard.
Page 1 of 8
Page 39 of 115
Demolition of the buildings and parking structures began in April 2024. A permit for site
mass grading and tree removals was issued in July 2024 following Village Board
approval for these early site activities. Building demolition and site grading activities are
ongoing.
Overall Site Plan:
LAND USE AND ZONING
Data centers are unique commercial uses in that they have very little impact on traffic
and community resources like fire, police, public works and schools, while also having a
significant positive financial impact by diversifying the property tax base and generating
significant property and utility taxes. These benefits make it desirable for the Village to
attract data centers to appropriate parcels within the Village.
Recognizing the immediate and long-term benefits data centers could bring to the
community, the Village Board approved amendments to the Municipal Code in 2022 to
include data centers as permitted uses in specific zoning districts. Since then, economic
development staff have attended data center association events, built networks in the
industry, and promoted appropriate sites in the Village to data center developers.
The proposed data center and associated electrical substation is permitted within the
O-5 Office District. The subject property is located close to a mile away from any
existing residential uses and is surrounded by commercial and industrial uses on the
east, south, and west, and a state principal arterial roadway (IL-72) and Forest
Preserve property to the north.
PRELIMINARY AND FINAL PLAT OF SUBDIVISION
The property consists of three previously platted lots. The plat proposes to subdivide
Page 2 of 8
Page 40 of 115
the property into 2 lots. The newly created Lot 1, on which the data center will be
located, is approximately 182 acres and Lot 2, where the ComEd substation will be
located, is approximately 10 acres. A 15' right-of-way dedication along Beverly Road is
shown as well as easements for utilities, storm water and sidewalks being dedicated as
per Village code.
The plat meets all the Village requirements for a plat of subdivision and has been
reviewed by Corporation Counsel.
Final Plat of Subdivision:
PRELIMINARY AND FINAL SITE PLAN
Access and Parking: Site access will be on the south side of site off Trillium
Boulevard, west of Pratum Avenue via a secured entrance with a guard house. The
existing site entrance on the northeast side of the site off Trillium Boulevard will remain
as a secondary emergency only entrance. The existing site entrances off Higgins Road
(IL-72) and Beverly Road will be removed. The Higgins Road entrance removal will be
performed in coordination with IDOT and will include removal of the traffic signal.
Internal to the site, access roads will be provided between each building and around the
entire site. Parking for the the entire development will include 204 spaces, including
handicap accessible and electrical vehicle charging space as required by the Village
Code.
The applicant commissioned a trip generation study that found that the proposed data
center redevelopment is expected to result in a net decrease in site-generated traffic as
compared to the former Sears Headquarters. The number of daily trips is expected to
drop by 13,940 including significant reductions in the AM and PM peak hours. The
study concluded that impacts to the area roadway network were not anticipated and
that the proposed access configuration would consolidate the site access to two
driveways off Trillium Boulevard, thereby reducing conflicts on Beverly Road and
Page 3 of 8
Page 41 of 115
Higgins Road, which have greater daily vehicular counts.
A sidewalk is being installed along Trillium Boulevard between Beverly Road and the
site entrance south of Higgins. Compass has agreed to provide a fee in lieu of installing
pedestrian and bicycle accommodation along Beverly Road and Higgins Road. These
funds will go towards future design and construction of comprehensive bicycle and
pedestrian facilities in the area providing connectivity to other adjacent uses and
facilities.
Engineering: The Engineering Division has reviewed the proposed engineering,
grading, utility, and erosion control plans and found the plans acceptable. Existing
utilities on and near the site will be utilized for the development. Water and sewer
connections internal to the site are being abandoned and removed with accompanying
utility easements being vacated as well. Public watermain will be installed outside the
fenced area along Higgins Road and public sanitary sewer will be installed outside the
fenced area along Trillium Boulevard. The on-site (inside fence area) watermain will be
privately maintained. As the water enters the site, valves will be in place to control flow
and allow for shutdown if repairs were needed, but the internal watermain that loops
through the site will be privately owned and maintained. A private watermain agreement
between the property owner and the Village will be required and a condition has been
added for this.
Detention for the site will be provided onsite utilizing two newly created basins in the
northwest and southeast corners of the site, providing detention and volume control
necessary to meet all current stormwater management regulations as required by the
Village and Metropolitan Water Reclamation District (MWRD). The applicant must
receive MWRD permit approval prior to construction commencement.
Landscaping: The exterior of the site contains pockets of preserved trees, especially
on the northeast and east sides of the site. These trees are incorporated into the
proposed landscape plan which overall includes a variety of trees, shrubs and
perennials into the site design. A condition has been added stating that at time of
acceptance, any dead or dying trees will be required to be replaced. The buildings will
be significantly set back site from the public right-of-way on all sides (200' minimum)
and will include landscape and native plantings to help screen the site. The new
landscape plan conforms to Village Code with respect to setbacks and screening. The
applicant is seeking a waiver from Section 10-4-4 C.2.b. which requires a 2.5" tree at
the end of each parking row. They have stated that per owner and tenant security
requirements, trees are not permitted within the secured fence area as they obstruct
security camera visibility. The required parking island trees were included in the
periphery landscape plantings. The site will be surrounded by 8' black steel palisade
fencing. All landscape will be located between the public right-of-way and the fence.
The applicant has provided a line of sight analysis providing an anticipated visual
depiction of the development from the surrounding public rights-of-way, accounting for
grading, setbacks, existing trees to be preserved, and new landscape materials as
outlined in the landscape plan. Two conditions have been incorporated into the
recommendation regarding landscaping and screening to ensure compliance with
landscape plan and adequate screening is provided from public rights-of-way as
Page 4 of 8
Page 42 of 115
verified by staff after construction completion.
Line of Sight Exhibit - Beverly Road Perspective:
Building Design: Each building will be approximately 250,000 square feet with
equipment yards on either side of each building which contain power distribution
equipment, backup generators, and cooling equipment for the data halls. The proposed
buildings are 29' - 8" in height and will be constructed of precast concrete panels and a
2-tone color scheme. Buildings will be significantly set back from the public right-of-way
with landscape and grading providing the screening for the buildings and equipment
yards.
Exterior Lighting and Site Acoustics: Light poles are proposed with LED light fixture
heads along the internal road system and entrances. The head design, direction and
distance will limit the lighting from adjoining properties. The lighting levels and
downcast fixtures are in compliance with the standards in the Subdivision Code.
As required by Village Code, the applicant commissioned a noise study to identify noise
impacts on the site from development. The study identified four nearby noise receptors
including a nursing college, school, beer garden and hotel. The school is located
approximately 200 feet from the project boundary and 940 feet from the nearest noise
source. The nursing college is located directly adjacent to the project boundary and 510
Page 5 of 8
Page 43 of 115
feet from the nearest noise source. The hotel is located approximately 1,800 feet from
the project boundary and 2,340 feet from the nearest noise source and the Beer
Garden is located approximately 955 feet from the project boundary and 1,645 feet
from the nearest noise source. The emergency generators, critical and power center
cooling units were identified as the main noise generating sources.
The study found that when the project is built out through construction of building 3
(moving sequentially from west to east), the continuous operations will be in compliance
with the nighttime Cook County and State of Illinois noise limits at all nearby sensitive
receptors. The intermittent operations will follow the daytime noise limits at all nearby
sensitive receptors. Upon buildout of buildings 4 and 5, the sound levels at the nursing
college will exceed the daytime/nighttime noise limits at some octave bands. As such,
Compass is proposing to install enclosures on the noise generating equipment installed
as part of buildings 4 and 5. Implementation of the mitigation measures as outlined in
the noise study will ensure that the development is in compliance with the Village Code,
Cook County and State of Illinois performance standards. A condition has been added
that the recommended mitigation measures as noted in the noise study be implemented
by the petitioner as part of the building plan submittals for buildings 4 and 5.
Off-Site Electricity Transmission Lines and Substation: In order to accommodate
the projected electric power needs of the project at full build-out, Compass is working
directly with ComEd to design and install new high voltage electric transmission lines
from an existing ComEd substation south of Interstate 90, west of Beverly Road to a
new substation to be constructed on Lot 2. The substation plans have not been
finalized at this time; however, the landscape plans for the overall development include
significant landscaping along the Beverly Road and Trillium Boulevard frontages to
ensure consistency between Lots 1 and 2. Fencing around the substation will be
required to match the 8' palisade fence proposed around the perimeter of Lot 1.
Preliminary and Final Site Plan approval for Lot 2 will be required prior to commencing
construction of the substation.
MOTIONS
The Planning & Zoning Commission shall make the following motions (a total of 3
motions are required):
1. Adopt the Findings of Fact for Site Plan.
2. Recommend to the Village Board approval of Preliminary and Final Plat of
Subdivision, subject to the Final Plat of Subdivision for Compass Datacenter
dated January 7, 2025.
3. Recommend to the Village Board approval of Preliminary and Final Site Plan for
Compass Data Center located at 3333 Beverly Road, subject to the following
conditions:
a. The building permit shall be obtained within twelve (12) months of Village Board
action on this request.
b. A waiver from Section 10-4-4 C.2.b. is granted to eliminate the required shade
tree at the end of each parking row.
Page 6 of 8
Page 44 of 115
c. A fee in lieu for future sidewalks along Beverly Road and Higgins Road shall be
paid. The agreed upon amount will be based on an Engineer’s Estimate of Cost
as approved by the Director of Engineering.
d. A private watermain agreement, in a form approved by Corporation Counsel,
shall be executed prior to issuance of the first certificate of occupancy for the
development.
e. Prior to issuance of the final certificate of occupancy for the development,
property owner shall commission a review of all preserved and installed trees
around the perimeter of the site, perform any maintenance required to ensure
tree survivability or, if a tree is dead or dying, remove and replace with a similar
species.
f. Prior to issuance of final certificate of occupancy for each building, staff shall
conduct a review of perimeter screening to ensure adequate screening (grades,
setbacks, landscaping) is provided to obscure view of equipment yards from all
public rights-of-way. If staff identifies areas lacking screening, owner shall be
notified and additional landscaping installed prior to final occupancy inspection.
g. The development shall comply with all Village, Cook County, and State of Illinois
noise regulations at all times. Prior to issuance of building permits for buildings 3
and 4 of the development, applicant shall provide plans and documentation
verifying that noise mitigation measures as recommended in the Environmental
Noise Study dated 1/17/25 have been incorporated into the design.
h. Separate Site Plan approval is required for the electric substation planned for Lot
2.
i. Landscaping along the Beverly Road and Trillium Boulevard frontages of the
substation on Lot 2 shall be consistent with the landscape plans approved as
part of this final site plan approval. Fencing around the substation on Lot 2 shall
be the consistent with the fencing approved for Lot 1.
j. A performance guarantee based on an Engineers' Estimate of Cost shall be
submitted to the Village prior to issuance of the site development permit.
k. A permit from the Metropolitan Water Reclamation District (MWRD) shall be
provided prior to site construction commencing.
l. No exterior signage is approved with these plans. Any site or building signage
will be required to meet current Village code.
m. The owner shall comply with obligations of any approved development, incentive
or other agreement related to the subject property.
n. The following conditions relate to the site construction:
1. A pre-construction meeting shall be conducted with the Village staff prior
to construction commencing.
2. Fire Department and emergency access to the property shall be
maintained at all times. Petitioner shall make any adjustments on the site
as needed for access as per direction by the Village.
3. In accordance with Village Code, construction hours shall be limited to 7
a.m. to 7 p.m. Monday through Friday, and 8 a.m. to 6 p.m. Saturday and
Sunday.
o. The following documents and plans, all on file with the Village, are hereby
approved and constitute the final site plan approval for the project:
1. Final Civil Engineering Plans dated 1/8/25
2. Final Plat of Subdivision for Compass Datacenter dated 1/7/25
3. Final Landscape Plans updated 11/21/24
Page 7 of 8
Page 45 of 115
4. Elevations dated 8/30/24
5. Community Impact Statement and attachments dated 1/10/25
6. Traffic Generation Memo dated 3/15/24
7. Final Stormwater Report dated 12/18/24
8. Environmental Noise Study dated 1/17/25
ATTACHMENTS
1. Draft Findings and Recommendations Summary - Compass Data Center
2. Location Map
3. Final Plat of Subdivision
4. Final Civil Engineering Plans
5. Landscape Plans
6. Landscape Pallette
7. Building Elevations
8. Overall Site (Buildout)
9. Line of Sight Study
10. Community Impact Statement
11. Application Summary
Page 8 of 8
Page 46 of 115
Exhibit B
PLANNING & ZONING COMMISSION
FINDINGS & RECOMMENDATION SUMMARY
Meeting Date: 2/5/2025
Prepared By: James Donahue, Senior Planner
PLN24-0011
Preliminary and Final Plat of Subdivision and Site Plan for Compass Data Center
located at 3333 Beverly Road
Draft Findings of Fact – Site Plan (as drafted by staff and may be modified by the Commission)
Sec. 10-2-2-H: Planning and Zoning Commission Review and Recommendation
1. The Planning and Zoning Commission recommends approval for the stated reasons.
FINDING: The proposed use is permitted by the zoning code, is a good use for the land and meets
the Village’s economic development goals of diversifying the tax base.
Draft Recommendations
The Planning & Zoning Commission shall make the following motions (a total of 3 motions are required):
1. Adopt the Findings of Fact for Site Plan.
2. Recommend to the Village Board approval of Preliminary and Final Plat of Subdivision, subject to the
Final Plat of Subdivision for Compass Datacenter dated January 7, 2025.
3. Recommend to the Village Board approval of Preliminary and Final Site Plan for Compass Data Center
located at 3333 Beverly Road, subject to the following conditions:
a. The building permit shall be obtained within twelve (12) months of Village Board action on this
request.
b. A waiver from Section 10-4-4 C.2.b. is granted to eliminate the required shade tree at the end of
each parking row.
c. A fee in lieu for future sidewalks along Beverly Road and Higgins Road shall be paid. The agreed
upon amount will be based on an Engineer’s Estimate of Cost as approved by the Director of
Engineering.
d. A private watermain agreement, in a form approved by Corporation Counsel, shall be executed
prior to issuance of the first certificate of occupancy for the development.
e. Prior to issuance of the final certificate of occupancy for the development, property owner shall
commission a review of all preserved and installed trees around the perimeter of the site, perform
any maintenance required to ensure tree survivability or, if a tree is dead or dying, remove and
replace with a similar species.
f. Prior to issuance of final certificate of occupancy for each building, staff shall conduct a review of
perimeter screening to ensure adequate screening (grades, setbacks, landscaping) is provided
to obscure view of equipment yards from all public rights-of-way. If staff identifies areas lacking
screening, owner shall be notified and additional landscaping installed prior to final occupancy
inspection.
g. The development shall comply with all Village, Cook County, and State of Illinois noise regulations
at all times. Prior to issuance of building permits for buildings 3 and 4 of the development,
applicant shall provide plans and documentation verifying that noise mitigation measures as
Page 47 of 115
recommended in the Environmental Noise Study dated 1/17/25 have been incorporated into the
design.
h. Separate Site Plan approval is required for the electric substation planned for Lot 2.
i. Landscaping along the Beverly Road and Trillium Boulevard frontages of the substation on Lot 2
shall be consistent with the landscape plans approved as part of this final site plan approval.
Fencing around the substation on Lot 2 shall be the consistent with the fencing approved for Lot
1.
j. A performance guarantee based on an Engineers' Estimate of Cost shall be submitted to the
Village prior to issuance of the site development permit.
k. A permit from the Metropolitan Water Reclamation District (MWRD) shall be provided prior to site
construction commencing.
l. No exterior signage is approved with these plans. Any site or building signage will be required to
meet current Village code.
m. The owner shall comply with obligations of any approved development, incentive or other
agreement related to the subject property.
n. The following conditions relate to the site construction:
1. A pre-construction meeting shall be conducted with the Village staff prior to construction
commencing.
2. Fire Department and emergency access to the property shall be maintained at all times.
Petitioner shall make any adjustments on the site as needed for access as per direction by
the Village.
3. In accordance with Village Code, construction hours shall be limited to 7 a.m. to 7 p.m.
Monday through Friday, and 8 a.m. to 6 p.m. Saturday and Sunday.
o. The following documents and plans, all on file with the Village, are hereby approved and constitute
the final site plan approval for the project:
1. Final Civil Engineering Plans dated 1/8/25
2. Final Plat of Subdivision for Compass Datacenter dated 1/7/25
3. Final Landscape Plans dated 11/21/24
4. Elevations dated 8/30/24
5. Community Impact Statement and attachments dated 1/10/25
6. Traffic Generation Memo dated 3/15/24
7. Final Stormwater Report dated 12/18/24
8. Environmental Noise Study dated 1/17/25
Findings & Recommendations Summary
Page 2 of 2
Page 48 of 115
Page 49 of 115
P.I.N. 01-31-202-002
FINAL PLAT OF SUBDIVISION P.I.N. 01-31-201-003
AREA SUMMARY
P.I.N. 01-32-100-005
COMPASS DATACENTER
ILLINOIS
ROUTE
72
VICINITY MAP LOT 4A2A2A
NO SCALE
CL
LOT 1
BEVERLY
LEGEND
LOT 4A2A2C
B O UL E V A R D
ROAD
ABBREVIATIONS
CLIENT
©
LOT 4A2B
COMPASS DATACENTER
HOFFMAN ESTATES, IL
IUM
LINE LEGEND
PROJECT
IL L
TR
PHONE: (630) 820-9100 FAX: (630) 820-7030 EMAIL: ADMIN@CLSURVEYING.COM
ALTA SURVEYS l TOPOGRAPHY l CONSTRUCTION STAKING
LOT 2
2631 GINGER WOODS PARKWAY, STE. 100
LC
LOT 4A2D1
AURORA, IL 60502
C
L T R I L L IU M
B O UL
EV A
RD LOT 4C
LO UM
AT
LOT 4A1A LOT 4A1B LOT 4A1C1 LO
T 4 PR ENUE
LOT 4F G7 AV G1C
LOT 4G1B3
LOT 4G1A T 4 SCALE: 1" = 150'
1 OF 4
PROJ. NO.: 23.0110-01
Page 50 of 115
ROAD BEVERLY CL
LOT 4A1A
C
L LOT 2
LOT 4A1B
T R I L L IU M
LOT 4A1C1
ILLINOIS
B O UL ROUTE
EV A
RD
72
LOT 4F
LOT 1
LOT 4G1B3
LOT 4G1A
FINAL PLAT OF SUBDIVISION
COMPASS DATACENTER
LO
T 4
G7
LO
T 4
UM
AT
PR ENUE
AV G1C
LOT 4C
LC
TR
IL L
LOT 4A2D1 IU M
B O UL E V A R D
LOT 4A2B
LOT 4A2A2C LOT 4A2A2A
PROJECT CLIENT
COMPASS DATACENTER
HOFFMAN ESTATES, IL
PROJ. NO.:
ALTA SURVEYS l TOPOGRAPHY l CONSTRUCTION STAKING ©
2631 GINGER WOODS PARKWAY, STE. 100
SCALE: 1" = 150'
AURORA, IL 60502
2 OF 4
PHONE: (630) 820-9100 FAX: (630) 820-7030 EMAIL: ADMIN@CLSURVEYING.COM
23.0110-01
Page 51 of 115
FINAL PLAT OF SUBDIVISION
COMPASS DATACENTER
ILLINOIS
ROUTE
72
EASEMENT
DETAIL "C"
LOT 4A2A2A
TRILLIU
M BOUL
CL
SEE EASEMENT
LOT 1 DETAIL "C"
EVARD
BEVERLY
LOT 4A2A2C
B O UL E V A R D
EASEMENT
DETAIL "A"
ROAD
LOT 2 LOT 1 EASEMENT
DETAIL "B"
CLIENT
©
LOT 4A2B
COMPASS DATACENTER
TRILL
BOUL IUM
EVAR
D D
AR
HOFFMAN ESTATES, IL
EV
UL
BO IU M
PROJECT
M IL L
IU
TRILL TR
PHONE: (630) 820-9100 FAX: (630) 820-7030 EMAIL: ADMIN@CLSURVEYING.COM
ALTA SURVEYS l TOPOGRAPHY l CONSTRUCTION STAKING
LOT 2
2631 GINGER WOODS PARKWAY, STE. 100
LC
LOT 4A2D1
AURORA, IL 60502
C
L T R I L L IU M
SEE EASEMENT
B O UL DETAIL "B"
EV A
RD LOT 4C
SEE EASEMENT
DETAIL "A"
LO UM
AT
LOT 4A1A LOT 4A1B LOT 4A1C1 LO
T 4 PR ENUE
T 4
AV G1C
LOT 4F
LOT 4G1A G7
LOT 4G1B3 SCALE: 1" = 150'
3 OF 4
PROJ. NO.: 23.0110-01
Page 52 of 115
FINAL PLAT OF SUBDIVISION
COMPASS DATACENTER
OWNER'S CERTIFICATE PLANNING AND ZONING COMMISSION CERTIFICATE
SURVEYOR'S CERTIFICATE
VILLAGE BOARD CERTIFICATE
NOTARY'S CERTIFICATE
VILLAGE TREASURER CERTIFICATE
PUBLIC WATERMAIN EASEMENT PROVISIONS
”
MORTGAGEE'S CERTIFICATE
CLIENT
SURVEYOR'S DESIGNATION OF RECORDING ©
COMPASS DATACENTER
’
PUBLIC SANITARY SEWER EASEMENT PROVISIONS
HOFFMAN ESTATES, IL
”
PROJECT
PHONE: (630) 820-9100 FAX: (630) 820-7030 EMAIL: ADMIN@CLSURVEYING.COM
ALTA SURVEYS l TOPOGRAPHY l CONSTRUCTION STAKING
NOTARY'S CERTIFICATE
2631 GINGER WOODS PARKWAY, STE. 100
PUBLIC SIDEWALK EASEMENT PROVISIONS
“
”
AURORA, IL 60502
’
STORMWATER MANAGEMENT EASEMENT FOR PRIVATE FACILITY
“
”
SCALE: N/A
4 OF 4
PROJ. NO.: 23.0110-01
Page 53 of 115
Call
Before
FINAL ENGINEERING PLANS You Dig
COMPASS DATACENTERS ORD I
1-800-892-0123
5500 TRILLUM BLVD
UTILITY AND GOVERNING AGENCY CONTACTS HOFFMAN ESTATES, IL 60192
Sheet List Table C5.12 GRADING DETAILS
Sheet Number Sheet Title C5.13 GRADING DETAILS
C0.0 COVER SHEET C5.14 SIDEWALK CROSS-SECTIONS
C0.1 GENERAL NOTES C5.15 SIDEWALK CROSS-SECTIONS
C0.2 MWRD GENERAL NOTES C6.0 OVERALL DRAINAGE PLAN
MWRD ROUTING MAP V1.0
V1.1
ALTA SURVEY
ALTA SURVEY
C6.1
C6.2
DRAINAGE PLAN
DRAINAGE PLAN
(NOT TO SCALE)
C1.0 OVERALL EXISTING UTILITY MAP C6.3 DRAINAGE PLAN
C1.1 OVERALL EXISTING UTILITIES AND DEMO PLAN C6.4 DRAINAGE PLAN
AIL
IN R
NORTH C1.2 EXISTING UTILITIES AND DEMO PLAN C6.5 DRAINAGE PLAN
BARTLETT RD
HIGGINS RD
PROJECT TRA
C1.3 EXISTING UTILITIES AND DEMO PLAN C6.6 DRAINAGE PLAN
LOCATION I-59
C1.4 EXISTING UTILITIES AND DEMO PLAN C6.7 DRAINAGE DETAILS
C1.5 EXISTING UTILITIES AND DEMO PLAN C7.0 OVERALL WET UTILITY PLAN
C1.6 EXISTING UTILITIES AND DEMO PLAN C7.1 WET UTILITY PLAN
BEVERLY RD
TRILLIUM BLVD
C1.7 EXISTING UTILITIES AND DEMO PLAN C7.2 WET UTILITY PLAN
©
C2.0 OVERALL EXISTING CONDITIONS AND DEMO PLAN C7.3 WET UTILITY PLAN
I-90 I-90
C3.0 OVERALL SITE PLAN C7.4 WET UTILITY PLAN
C3.1 SITE PLAN C7.5 WET UTILITY PLAN
BEACON POINTE DR SHOE FACTORY RD C3.2 SITE PLAN C7.6 WET UTILITY PLAN
C3.3 SITE PLAN C7.7 SANITARY PROFILES
CONGDON AVE C3.4 SITE PLAN C7.8 SANITARY PROFILES
TRA
IN R I-59 C3.5 SITE PLAN C7.9 SANITARY PROFILES
D AIL C7.10 SANITARY PROFILES
C3.6 SITE PLAN
SSEN
R C3.7 BEVERLY ROAD IMPROVEMENTS C8.0 FIRE TRUCK TURNS
ROHR C8.1 PRATUM AVENUE & TRILLIUM BOULEVARD TURNS
I-58 I-58
C4.0 OVERALL EROSION CONTROL PLAN
C4.1 EROSION CONTROL PLAN C9.0 MWRD PLAN
PROJECT TEAM C4.2 EROSION CONTROL PLAN C9.1 MWRD MAINTENANCE & MITIGATION PLAN
BARTLETT RD
C4.3 EROSION CONTROL PLAN C10.0 CONSTRUCTION DETAILS
BODE RD C4.4 EROSION CONTROL PLAN C10.1 CONSTRUCTION DETAILS
C4.5 EROSION CONTROL PLAN C10.2 CONSTRUCTION DETAILS
PKWY
IL
SHALE
RA
CHI
CAG IN SCHAUMBURG RD
C4.6 EROSION CONTROL PLAN C10.3 CONSTRUCTION DETAILS
OS TR
T A
RG RD C4.7 EROSION CONTROL DETAILS C10.4 CONSTRUCTION DETAILS
SCHAUMBU
C5.0 OVERALL GRADING PLAN C10.5 CONSTRUCTION DETAILS
C5.1 GRADING PLAN L1.0 OVERALL LANDSCAPE PLAN
I-2
C5.2 GRADING PLAN L1.1 LANDSCAPE PLAN
0
C5.3 GRADING PLAN L1.2 LANDSCAPE PLAN
C5.4 GRADING PLAN L1.3 LANDSCAPE PLAN
C5.5 GRADING PLAN L1.4 LANDSCAPE PLAN
C5.6 GRADING PLAN L1.5 LANDSCAPE PLAN
C5.7 SITE PLAN & GRADING DETAILS L1.6 LANDSCAPE PLAN
C5.8 SITE PLAN & GRADING DETAILS L2.0 LANDSCAPE NOTES AND DETAILS
C5.9 SITE PLAN & GRADING DETAILS L2.1 LANDSCAPE NOTES AND DETAILS
C5.10 SITE PLAN & GRADING DETAILS
C5.11 SITE PLAN & GRADING DETAILS
COVER SHEET
LEGAL DESCRIPTION
DRAINAGE CERTIFICATION
BENCHMARKS
OFESS IONA L E
SE D PR N
LICEN GINE
HOFFMAN ESTATES, IL 60192
JAMIE ER
W.
5500 TRILLIUM BLVD
PUTNAM
062-056317
ORD I
ST AT IS
O
E OF ILLIN
Date of Expiration: 11-30-25
PROFESSIONAL ENGINEER'S CERTIFICATION
OFESSIONA L E
SE D PR N
LICEN GINE
JAMIE ER
W.
PUTNAM
062-056317
ST AT IS
O
E OF ILLIN
C0.0
Date of Expiration: 11-30-25
Page 54 of 115
GENERAL NOTES PAVING NOTES
ADA GENERAL NOTES
©
STORM SEWER NOTES
VILLAGE OF HOFFMAN ESTATES NOTES
EARTHWORK NOTES
GENERAL NOTES
WATERMAIN NOTES
SIGNAGE AND PAVEMENT MARKING NOTES
HOFFMAN ESTATES, IL 60192
5500 TRILLIUM BLVD
ORD I
SANITARY SEWER NOTES
C0.1
Page 55 of 115
ORD I MWRD GENERAL ©
C0.2 5500 TRILLIUM BLVD
HOFFMAN ESTATES, IL 60192
NOTES
Page 56 of 115
V1.1
V1.0
Page 57 of 115
V1.1
V1.0
Page 58 of 115
NORTH
IL ROUTE 72 (HIGGINS ROAD)
©
ROAD
BEVERLY OVERALL
EXISTING UTILITY
MAP
HOFFMAN ESTATES, IL 60192
5500 TRILLIUM BLVD
ORD I
EXISTING UTILITY LEGEND
TRILLIUM BOULEVARD
C1.0
Page 59 of 115
Call
Before
You Dig
NORTH
1-800-892-0123
GENERAL NOTES
HIGGINS RD (ROUTE 72)
RD
BEVERLY
PAVING AND CURB LEGEND
©
BUILDING 1 BUILDING 2 BUILDING 3 BUILDING 4 BUILDING 5
TOTAL PARKING SUMMARY
BUILDING PARKING SUMMARY OVERALL SITE
PLAN
PR
UM
AT
HOFFMAN ESTATES, IL 60192
TRILLIUM BLVD
AV
5500 TRILLIUM BLVD
EN
ORD I
UE
FEMA NOTE
C3.0
Page 60 of 115
RD
BEVERLY
ONLY
BUILDING 1
BUILDING 2
BUILDING 3
TRILLIUM BLVD
BUILDING 4
HIGGINS RD (ROUTE 72)
BUILDING 5
PR
UM
AT
AV
EN
UE
NORTH
GRADING NOTES
Call
Before
You Dig
1-800-892-0123
ORD I OVERALL ©
C5.0 5500 TRILLIUM BLVD
HOFFMAN ESTATES, IL 60192
GRADING PLAN
Page 61 of 115
RD
BEVERLY
ONLY
BUILDING 1
BUILDING 2
BUILDING 3
TRILLIUM BLVD
BUILDING 4
HIGGINS RD (ROUTE 72)
BUILDING 5
PR
UM
AT
AV
EN
UE
NORTH
≥
UTILITY NOTES
Call
Before
You Dig
1-800-892-0123
ORD I OVERALL WET ©
C7.0 5500 TRILLIUM BLVD
HOFFMAN ESTATES, IL 60192
UTILITY PLAN
Page 62 of 115
RD BEVERLY
ONLY
NAME
CL STREET
EXCEPTIO
CEL 1 N TO PAR
BUILDING 1
BUILDING 2
BUILDING 3
TRILLIUM BLVD
HIGGINS RD (ROUTE 72)
BUILDING 4
STREET NAME
CL
IU
T R IL L
M
BUILDING 5
BOU
LE V
ARD
PR
AT
UM
AV
EN
UE
NORTH
Call
Before
You Dig
1-800-892-0123
ORD I FIRE TRUCK ©
C8.0 5500 TRILLIUM BLVD
HOFFMAN ESTATES, IL 60192
TURNS
Page 63 of 115
Call
Before
You Dig
NORTH
1-800-892-0123
HIGGINS RD (ROUTE 72)
BEVERLY
RD
SEE SHEET L1.1 SEE SHEET L1.2 SEE SHEET L1.3
©
ONLY
OVERALL
SEE SHEET L1.4 SEE SHEET L1.5 SEE SHEET L1.6 LANDSCAPE
PLAN
HOFFMAN ESTATES, IL 60192
5500 TRILLIUM BLVD
ORD I
UM
TRILLIUM BLVD AT
PR
AV
UE
EN
L1.0
Page 64 of 115
Call
HIGGINS RD (ROUTE 72) Before
You Dig
NORTH
PIZZO NATIVE PLANT NURSERY SEED MIX, TYP.
MESIC PRAIRIE SEED MIX EMERGENT WETLAND PLUG MIX, TYP.
1-800-892-0123
3 3
TM QA
3
PF
TURF SEED, TYP.
2
PG
45 27
VR AM
16 16
PROPOSED NW TT TT
BEVERLY
DETENTION BASIN
HWL: 849.39
5 NWL: 845.50
AN BOTTOM: 844.50
5
QA
RD 3 ©
UA
MATCHLINE - SEE SHEET L1.2
3
GK
3
PA
BUILDING 1 BUILDING 2
1
FFE: 860.70 FFE:859.70
QA
5
TC
PIZZO NATIVE PLANT NURSERY SEED MIX, TYP.
LOW PROFILE PRAIRIE MIX
LANDSCAPE PLAN
5 5
PA ZA
5
GA
5
TM
ONLY
4
QA
HOFFMAN ESTATES, IL 60192
5500 TRILLIUM BLVD
ORD I
5
PF
3
PG
MATCHLINE - SEE SHEET L1.4
L1.1
Page 65 of 115
Call
Before
You Dig
HIGGINS RD (ROUTE 72) NORTH
PIZZO NATIVE PLANT NURSERY SEED MIX, TYP.
LOW PROFILE PRAIRIE MIX 1-800-892-0123
3
2 5 QM
6 4 5
QA QM 7 AN
3 5 GK TC 2
GT AC
PD QB
3 8 5 7
PS PO PA
7 CO
PG
TURF SEED, TYP.
26 45 53 11
AM VR AM VR
16 16 16
TT TT TT
©
MATCHLINE - SEE SHEET L1.1 MATCHLINE - SEE SHEET L1.3
BUILDING 2 BUILDING 3 BUILDING 4
FFE: 859.70 FFE: 858.70 FFE: 857.70
LANDSCAPE
PLAN
HOFFMAN ESTATES, IL 60192
5500 TRILLIUM BLVD
ORD I
MATCHLINE - SEE SHEET L1.5 L1.2
Page 66 of 115
Call
HIGGINS R Before
D (ROUTE You Dig
72) NORTH
1-800-892-0123
3
QA
5
SP 5
GA
1
QB
TURF SEED, TYP.
34
VR
4
PIZZO NATIVE PLANT NURSERY SEED MIX, TYP.
LOW PROFILE PRAIRIE MIX
QA
4
AN
©
B LVD
U M
I
TRILL
MATCHLINE - SEE SHEET L1.2
BUILDING 5
FFE: 856.70
1
TC
3
AC
LANDSCAPE
PLAN
5
QB
5
PF 6
PIZZO NATIVE PLANT NURSERY SEED MIX, TYP. UA
HOFFMAN ESTATES, IL 60192
LOW PROFILE PRAIRIE MIX
5500 TRILLIUM BLVD
PIZZO NATIVE PLANT
ORD I
NURSERY SEED MIX, TYP.
MESIC PRAIRIE SEED MIX EXISTING WETLAND
2
DETENTION BASIN
ZA
4
TM
PROPOSED SE
DETENTION 5
PS
BASIN
HWL: 844.78
NWL: 840.50
BOTTOM: 839.50
3
AN
MATCHLINE - SEE SHEET L1.6
L1.3
Page 67 of 115
MATCHLINE - SEE SHEET L1.1
Call
Before
You Dig
NORTH
5
ZA 3
GT
6 1-800-892-0123
SP
PIZZO NATIVE PLANT
NURSERY SEED MIX, TYP.
LOW PROFILE PRAIRIE MIX
6
CO
BUILDING 1 BUILDING 2
FFE: 859.70
3
FFE: 860.70
PS
©
5
5 QM
GK
5
5 AC
AN
D
R
BEVERLY
MATCHLINE - SEE SHEET L1.5
21 20 20 21 8
3 TT DN DN TT DN
PD
3 3 5
QB GA AG2
6
SH 4 6 6 6
TURF SEED, TYP. SH SH SH SH
4 2
PO AN
10' TURF SEED MOW STRIP, TYP.
4
PO
1
TM
2
PO
LANDSCAPE
7
CM
SUBSTATION TO
BE DESIGNED AND
PLAN
PERMITTED BY SEE EROSION CONTROL PLANS FOR
5 OTHERS TEMPORARY SEEDING
HV
SW DETENTION BASIN
4 TO BE DESIGNED AND
HOFFMAN ESTATES, IL 60192
UA PERMITTED BY
16 OTHERS
5500 TRILLIUM BLVD
CO2
ORD I
5 5 2
8 PS ZA CO
13 17
9 3 FM CK
CA CM CO2
3
3 HV
TM 11 7 4 5
CO2 CE CO TM
5
ZA
2
GT
BLVD
TRILLIUM
L1.4
Page 68 of 115
MATCHLINE - SEE SHEET L1.2
Call
Before
You Dig
NORTH
1-800-892-0123
BUILDING 2 BUILDING 3 BUILDING 4
FFE: 859.70 FFE: 858.70 FFE: 857.70
©
MATCHLINE - SEE SHEET L1.4 MATCHLINE - SEE SHEET L1.6
12 20 21 20 20 21 20 20 19
DN DN TT DN DN TT DN DN TT
6
SH
5 5 5
AG2 AG2 AG2
4 6 6 4 6 6 6 4 6 6
SH SH SH SH SH SH SH SH SH SH
TURF SEED, TYP.
10' TURF SEED MOW STRIP, TYP.
LANDSCAPE
PIZZO NATIVE PLANT NURSERY SEED MIX, TYP.
MESIC PRAIRIE SEED MIX
PROPOSED SE
DETENTION BASIN PLAN
EMERGENT WETLAND PLUG MIX, TYP.
HWL: 844.78
NWL: 840.50
PIZZO NATIVE PLANT NURSERY SEED MIX, TYP.
LOW PROFILE PRAIRIE MIX
BOTTOM: 839.50
SW DETENTION BASIN
TO BE DESIGNED AND
PERMITTED BY
HOFFMAN ESTATES, IL 60192
OTHERS
5500 TRILLIUM BLVD
SEE EROSION CONTROL PLANS FOR
ORD I
TEMPORARY SEEDING
3 3 3 6
CO PA UA TM 2
4 GK
GK 2
4 GA
GA
5
AN
5 2
4 3 11
3 5 QA SP
ZA AC 13 QM
TM QB 7 PD 2
5 TC GK
GA
TRILLIUM BLVD
L1.5
Page 69 of 115
MATCHLINE - SEE SHEET L1.3
Call
Before
You Dig
1 1 NORTH
ZA TM
1-800-892-0123
4
SP
3
QB
BUILDING 5 1
TC
FFE: 856.70 EXISTING NURSING
SCHOOL
5
PG
©
3
PO
1
TC
EMERGENT WETLAND PLUG MIX, TYP.
PIZZO NATIVE PLANT NURSERY SEED MIX, TYP.
2 MESIC PRAIRIE SEED MIX
TT PIZZO NATIVE PLANT NURSERY SEED MIX, TYP.
MATCHLINE - SEE SHEET L1.5
LOW PROFILE PRAIRIE MIX
20 20
DN DN
PROPOSED SE 10
5 GK
AG2 DETENTION BASIN
4 6 6 HWL: 844.78
SH SH SH TURF SEED, TYP.
6
NWL: 840.50
SH BOTTOM: 839.50
10' TURF SEED MOW STRIP, TYP.
5
GT
10
PD
7
UA
6
UA
LANDSCAPE
6
PF
EMERGENT WETLAND PLUG MIX, TYP.
6
QB
PLAN
V D
12
PF BL
I UM
I LL
TR
HOFFMAN ESTATES, IL 60192
10
5500 TRILLIUM BLVD
GT
5
CO
ORD I
UM
7 3
SP GK
AT
PR
A UE
TURF SEED TO LIMITS OF DISTURBANCE, TYP.
PRAV
EN
TU L1.6
M Page 70 of 115
SYMBOL CODE QTY BOTANICAL / COMMON NAME CONT SPACING SIZE
SHRUBS Call
PLANT SCHEDULE Before
ARONIA MELANOCARPA 'MORTON' / IROQUOIS BEAUTY™ BLACK CHOKEBERRY You Dig
AM 106 - SEE PLAN 24" HT. MIN.
2'-3' AT MATURITY
SYMBOL CODE QTY BOTANICAL / COMMON NAME CONT CAL SIZE
ARONIA MELANOCARPA 'UCONNAM165' / LOW SCAPE MOUND® BLACK CHOKEBERRY
TREES AG2 25 - SEE PLAN 6" HT. MIN.
18"-24" AT MATURITY
1-800-892-0123
AN 29 ACER X FREEMANII 'AUTUMN BLAZE' / AUTUMN BLAZE MAPLE B&B 2.5" CAL. MIN. CEPHALANTHUS OCCIDENTALIS / BUTTONBUSH
CO2 40 - SEE PLAN 36" HT. MIN.
5'-12' AT MATURITY
DIERVILLA RIVULARIS 'SMNDRSF' / KODIAK® BLACK HONEYSUCKLE
VR 135 - SEE PLAN 24" HT. MIN.
CO 23 CELTIS OCCIDENTALIS / COMMON HACKBERRY B&B 2.5" CAL. MIN. 3'-4' AT MATURITY
FORSYTHIA X INTERMEDIA 'MINDOR' / SHOW OFF® FORSYTHIA
FM 17 - SEE PLAN 36" HT. MIN.
3'-6' AT MATURITY
GA 24 GINKGO BILOBA 'AUTUMN GOLD' / AUTUMN GOLD MAIDENHAIR TREE B&B 2.5" CAL. MIN.
HAMAMELIS VIRGINIANA / COMMON WITCH HAZEL
HV 8 - SEE PLAN 36" HT. MIN.
15'-20' AT MATURITY
PHYSOCARPUS OPULIFOLIUS 'LITTLE DEVIL' / LITTLE DEVIL™ DWARF NINEBARK
GT 23 GLEDITSIA TRIACANTHOS F. INERMIS / THORNLESS HONEY LOCUST B&B 2.5" CAL. MIN. DN 200 - SEE PLAN 24" HT. MIN.
3'-4' AT MATURITY
SH 110 SPOROBOLUS HETEROLEPIS / PRAIRIE DROPSEED 2 GAL. SEE PLAN
GK 35 GYMNOCLADUS DIOICUS / KENTUCKY COFFEETREE B&B 2.5" CAL. MIN.
EVERGREEN SHRUBS
TAXUS X MEDIA `TAUNTONII` / TAUNTON`S ANGLO-JAPANESE YEW
QA 27 QUERCUS ALBA / WHITE OAK B&B 2.5" CAL. MIN. TT 185 - SEE PLAN 24" HT. MIN.
3'-4' AT MATURITY
SYMBOL CODE QTY BOTANICAL / COMMON NAME
QB 25 QUERCUS BICOLOR / SWAMP WHITE OAK B&B 2.5" CAL. MIN.
GROUND COVERS
EW 413,537 SF EMERGENT WETLAND PLUG MIX
QM 24 QUERCUS MACROCARPA / BURR OAK B&B 2.5" CAL. MIN. ©
PM 127,768 SF PIZZO MESIC PRAIRIE SEED MIX
TM 31 TILIA AMERICANA 'MCKSENTRY' / AMERICAN SENTRY® LINDEN B&B 2.5" CAL. MIN.
NM2 1,800,374 SF PIZZO NATIVE PLANT NURSERY / LOW PROFILE PRAIRIE MIX
UA 29 ULMUS X 'MORTON' / ACCOLADE™ ELM B&B 2.5" CAL. MIN. TD2 303,464 SF TURF SEED
NOTE: SEED TO BE INSTALLED ONLY WITHIN AREAS THAT ARE NOT INUNDATED AT TIME OF PLANTING.
ZA 27 ZELKOVA SERRATA 'AUTUMN GLOW' / JAPANESE ZELKOVA B&B 2.5" CAL. MIN.
EVERGREEN TREES
AC 18 ABIES CONCOLOR / WHITE FIR B&B 6` HT. MIN.
PA 18 PICEA ABIES / NORWAY SPRUCE B&B 6` HT. MIN.
PG 17 PICEA GLAUCA / WHITE SPRUCE B&B 6` HT. MIN.
PO 18 PICEA OMORIKA / SERBIAN SPRUCE B&B 6` HT. MIN.
PF 31 PINUS FLEXILIS 'VANDERWOLF'S PYRAMID' / VANDERWOLF'S PYRAMID LIMBER PINE B&B 6` HT. MIN.
LANDSCAPE
PS 21 PINUS STROBUS / WHITE PINE B&B 6` HT. MIN.
NOTES AND
SP 24 PINUS SYLVESTRIS / SCOTCH PINE B&B 6` HT. MIN.
DETAILS
PD 31 PSEUDOTSUGA MENZIESII / DOUGLAS FIR B&B 6` HT. MIN.
TC 19 TSUGA CANADENSIS / EASTERN HEMLOCK B&B 5` HT MIN
HOFFMAN ESTATES, IL 60192
ORNAMENTAL TREES
5500 TRILLIUM BLVD
ORD I
CA 9 CARPINUS CAROLINIANA / AMERICAN HORNBEAM B&B 6` HT. MIN. SINGLE STEM
CE 7 CERCIS CANADENSIS / EASTERN REDBUD MULTI-TRUNK B&B 6` HT. MIN. MULTI-STEM
CK 8 CORNUS KOUSA / KOUSA DOGWOOD B&B 6` HT. MIN. SINGLE STEM
CM 10 CORNUS MAS / CORNELIAN CHERRY B&B 6` HT. MIN. SINGLE STEM
L2.0
Page 71 of 115
Call
Before
You Dig
1-800-892-0123
NOTES: NOTES:
1. INSPECT TREE FOR DAMAGED BRANCHES, APPLY 1. INSPECT TREE FOR DAMAGED BRANCHES, APPLY
LANDSCAPE NOTES
CORRECTIVE PRUNING. CORRECTIVE PRUNING.
2. SET ROOT BALL ON UNEXCAVATED OR TAMPED 2. SET ROOT BALL ON UNEXCAVATED OR TAMPED
1. THE LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING MATERIALS AND PLANTS
SOIL. TOP OF ROOTBALL SHALL BE TWO INCHES SOIL. TOP OF ROOTBALL SHALL BE TWO INCHES SHOWN ON THE LANDSCAPE PLAN. THE CONTRACTOR IS RESPONSIBLE FOR THE COST TO REPAIR
ABOVE SURROUNDING GRADE WITH BURLAP AND ABOVE SURROUNDING GRADE WITH BURLAP AND
WIRE BASKET INTACT. WIRE BASKET INTACT.
UTILITIES, ADJACENT LANDSCAPE, PUBLIC AND PRIVATE PROPERTY THAT IS DAMAGED BY THE
3. REMOVE WIRE BASKET AND BURLAP DOWN 1/2 OF 3. REMOVE WIRE BASKET AND BURLAP DOWN 1/2 OF CONTRACTOR OR THEIR SUBCONTRACTOR'S OPERATIONS DURING INSTALLATION OR DURING THE
ROOT BALL. REMOVE ANY TWINE, SYNTHETIC TREE TO HAVE STRONG CENTRAL ROOTBALL. REMOVE ALL TWINE AND (IF USED), TREE TO HAVE STRONG CENTRAL SPECIFIED MAINTENANCE PERIOD. CALL FOR UTILITY LOCATIONS PRIOR TO ANY EXCAVATION.
OVERALL HEIGHT
MATERIAL, WIRES, STRAPS, BURLAP, ETC. THAT LEADER (CODOMINANT STEMS WILL BE SYNTHETIC MATERIAL. REMOVE OR CORRECT LEADER (CODOMINANT STEMS WILL BE
COULD GIRDLE THE TREE OR RESTRICT TREE REJECTED, UNLESS NOTED OTHERWISE) GIRDLING ROOTS. REJECTED, UNLESS NOTED OTHERWISE) 2. THE CONTRACTOR SHALL REPORT ANY DISCREPANCY IN PLAN VS. FIELD CONDITIONS IMMEDIATELY TO
GROWTH. REMOVE OR CORRECT GIRDLING ROOTS. 4. TAMP EXCAVATED SOIL AROUND BASE OF THE LANDSCAPE ARCHITECT, PRIOR TO CONTINUING WITH THAT PORTION OF WORK.
4. TAMP EXCAVATED SOIL AROUND BASE OF TRUNK/ROOTBALL TO BE CENTERED ROOTBALL. TRUNK/ROOTBALL TO BE CENTERED
ROOTBALL. AND PLUMB/LEVEL IN PLANTING PIT 5. BACKFILL REMAINDER EXCAVATED SOIL TAMPED AND PLUMB/LEVEL IN PLANTING PIT 3. NO PLANTING WILL BE INSTALLED UNTIL ALL GRADING AND CONSTRUCTION HAS BEEN COMPLETED IN
5. BACKFILL REMAINDER EXCAVATED SOIL TAMPED
CONTRACTOR TO CUT AND REMOVE ALL LIGHTLY. HIGH CLAY OR POOR SOIL SHALL CONTRACTOR TO CUT AND REMOVE ALL THE IMMEDIATE AREA.
LIGHTLY. RECEIVE SOIL AMENDMENT PER LANDSCAPE
6. WATER THOROUGHLY WITHIN TWO HOURS USING
TWINE FROM GIRDLING TREE TRUNK &
NOTES.
TWINE FROM GIRDLING TREE TRUNK & 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR OF ANY OF THEIR TRENCHES OR
EXCAVATE AND EXPOSE ROOT FLARE EXCAVATE AND EXPOSE ROOT FLARE
10 TO 15 GALLONS OF WATER. 6. WATER THOROUGHLY WITHIN TWO HOURS USING EXCAVATIONS THAT SETTLE.
7. APPLY MULCH IN EVEN LAYER, KEEPING 6" AWAY 6" DIA. CLEAR OF MULCH AT 10 TO 15 GALLONS OF WATER. 6" DIA. CLEAR OF MULCH AT
FROM ROOT FLARE. TRUNK/ROOT FLARE TRUNK/ROOT FLARE
5. ALL PLANTS TO BE SPECIMEN GRADE, WELL BRANCHED, HEALTHY, FULL, PRE-INOCULATED AND
7. APPLY MULCH IN EVEN LAYER, KEEPING AWAY
8. FINAL LOCATION OF TREE TO BE APPROVED BY FROM ROOT FLARE. FERTILIZED. PLANTS SHALL BE FREE FROM DISEASE, PESTS, WOUNDS, AND SCARS. PLANTS SHALL BE
OWNER. 3" DEPTH SHREDDED HARDWOOD MULCH 3" DEPTH SHREDDED HARDWOOD MULCH
3X ROOTBALL
8. FINAL LOCATION OF TREE TO BE APPROVED BY
3X ROOTBALL FREE FROM NOTICEABLE GAPS, HOLES, OR DEFORMITIES. PLANTS SHALL BE FREE FROM BROKEN OR
9. PERFORM PERCOLATION TEST PER PLANTING OWNER.
SPECIFICATIONS. IF SUBSURFACE DRAINAGE WIDTH 4" HEIGHT BERM, TIGHTLY COMPACTED
9. PERFORM PERCOLATION TEST PER PLANTING WIDTH 4" HIGH BERM, TIGHTLY COMPACTED DEAD BRANCHES. TRUNKS WILL BE WRAPPED IF NECESSARY TO PREVENT SUN SCALD AND INSECT
PROBLEMS ARE ENCOUNTERED, NOTIFY PROJECT
BED EDGE SPECIFICATIONS. IF SUBSURFACE DRAINAGE BED EDGE, TYP. DAMAGE. THE LANDSCAPE CONTRACTOR SHALL REMOVE THE WRAP AT THE PROPER TIME AS PART OF
LANDSCAPE ARCHITECT. PROBLEMS ARE ENCOUNTERED, NOTIFY PROJECT
FINISH GRADE LANDSCAPE ARCHITECT FINISH GRADE THIS CONTRACT.
6. THE OWNER'S REPRESENTATIVE MAY REJECT ANY PLANT MATERIALS THAT ARE DISEASED, DEFORMED,
UNDISTURBED NATIVE SOIL UNDISTURBED NATIVE SOIL OR OTHERWISE NOT EXHIBITING SUPERIOR QUALITY.
ROOT FLARE TO BE ROOT FLARE TO BE
SCARIFY BOTTOM AND SIDES OF SCARIFY BOTTOM AND SIDES OF 7. ALL NURSERY STOCK SHALL BE GUARANTEED, BY THE CONTRACTOR, FOR ONE YEAR FROM DATE OF
PLANTING PITS PLANTING PITS
FINAL INSPECTION. THE GUARANTEE BEGINS ON THE DATE OF THE LANDSCAPE ARCHITECT'S OR
PREPARED BACKFILL PREPARED BACKFILL OWNERS WRITTEN ACCEPTANCE OF THE INITIAL PLANTING. REPLACEMENT PLANT MATERIAL SHALL HAVE
PLANTED 1" ABOVE PLANTED 1" ABOVE
REMOVE BURLAP AND WIRE CAGE A MIN. REMOVE BURLAP AND WIRE CAGE A MIN. A ONE YEAR GUARANTEE COMMENCING UPON PLANTING.
OF 1/2 BELOW THE TOP OF THE ROOT OF 1/2 BELOW THE TOP OF THE ROOT 8. PLANTS TO MEET AMERICAN STANDARD FOR NURSERY STOCK (ANSI Z60.1-2014 OR MOST CURRENT
BALL BALL
VERSION) REQUIREMENTS FOR SIZE AND TYPE SPECIFIED.
ADJACENT FINISH GRADE ADJACENT FINISH GRADE
©
4' DIA. MULCH RING (MIN.) FOR INDIVIDUAL SET ROOTBALL ON UNDISTURBED STABLE 4' DIA. MULCH RING (MIN.) FOR INDIVIDUAL SET ROOTBALL ON UNDISTURBED STABLE 9. PRUNE PLANTS AS NECESSARY- PER STANDARD NURSERY PRACTICE AND TO CORRECT POOR
TREES NOT IN LANDSCAPE BEDS TREES NOT IN LANDSCAPE BEDS
SUBSOIL OR TAMPED BACKFILL SO THAT SUBSOIL OR TAMPED BACKFILL SO THAT BRANCHING OF EXISTING AND PROPOSED TREES.
THE ROOTBALL IS 1" ABOVE FINISHED THE ROOTBALL IS 1" ABOVE FINISHED
SECTION GRADE AND TO PREVENT SETTLING SECTION GRADE AND TO PREVENT SETTLING 10. TOPSOIL SHALL BE PROVIDED AND GRADED BY THE GENERAL CONTRACTOR UP TO 6 INCHES BELOW
FINISHED GRADE IN TURF AREAS AND 18 INCHES IN PLANTING AREAS.
11. PLANTING AREA TOPSOIL SHALL BE TESTED AND AMENDED PER THE RECOMMENDATIONS OF THE
TYPICAL TREE PLANTING EVERGREEN TREE PLANTING AGRONOMICAL SOIL REPORT. CONTRACTOR SHALL OBTAIN AGRONOMICAL SOIL REPORT.
1 N.T.S.
2 N.T.S.
12. SEED/SOD LIMIT LINES ARE APPROXIMATE. CONTRACTOR SHALL SEED/SOD ALL AREAS WHICH ARE
DISTURBED BY GRADING WITH THE SPECIFIED SEED/SOD MIXES.
13. EDGING TO BE A SPADED EDGE UNLESS INDICATED OTHERWISE ON THE PLANS. SPADED EDGE TO
PROVIDE V-SHAPED DEPTH AND WIDTH TO CREATE SEPARATION BETWEEN MULCH AND GRASS. A
SPADED BED EDGE SHALL SEPARATE MULCH BEDS FROM TURF OR SEEDED AREAS. A SPADED EDGE IS
NOT REQUIRED ALONG CURBED EDGES.
14. CONTRACTOR SHALL INSTALL SHREDDED HARDWOOD MULCH AT A 3" DEPTH TO ALL TREES, SHRUB,
PERENNIAL, AND GROUNDCOVER AREAS. TREES PLACED IN AREA COVERED BY TURF SHALL RECEIVE A 4
FT WIDE MAXIMUM TREE RING WITH 3" DEPTH SHREDDED HARDWOOD MULCH.
15. INSTALLATION OF TREES WITHIN PARKWAYS SHALL BE COORDINATED IN THE FIELD WITH LOCATIONS OF
UNDERGROUND UTILITIES. TREES SHALL NOT BE LOCATED CLOSER THAN 5' FROM UNDERGROUND
UTILITY LINES AND NO CLOSER THAN 10' FROM UTILITY STRUCTURES.
16. DO NOT DISTURB THE EXISTING PAVING, LIGHTING, OR LANDSCAPING THAT EXISTS ADJACENT TO THE
SITE UNLESS OTHERWISE NOTED ON PLAN.
17. ALL DISTURBED AREAS TO BE SODDED OR SEEDED, UNLESS OTHERWISE NOTED. SOD/SEED SHALL BE
LOCAL HARDY TURF GRASS MIX UNLESS, OTHERWISE NOTED.
18. PLANT QUANTITIES SHOWN ARE FOR THE CONVENIENCE OF THE OWNER AND JURISDICTIONAL REVIEW
AGENCIES. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL PLANT QUANTITIES AS DRAWN.
19. THE CONTINUED MAINTENANCE OF ALL REQUIRED LANDSCAPING SHALL BE THE RESPONSIBILITY OF THE
OWNER OF THE PROPERTY ON WHICH SAID MATERIALS ARE REQUIRED. ALL PLANT MATERIALS
REQUIRED BY THIS SECTION SHALL BE MAINTAINED AS LIVING VEGETATION AND SHALL BE PROMPTLY
REPLACED IF THE PLANT MATERIAL HAS DIED PRIOR TO FINAL ACCEPTANCE. PLANTING AREAS SHALL BE
KEPT FREE OF TRASH, LITTER, AND WEEDS AT ALL TIMES.
LANDSCAPE
NOTES AND
DETAILS
HOFFMAN ESTATES, IL 60192
5500 TRILLIUM BLVD
ORD I
L2.1
Page 72 of 115
Compass Landscape Palette
Autumn Blaze Maple Autumn Gold Ginkgo White Oak American Sentry Linden Kentucky Coffeetree Accolade Elm Japanese Zelkova Common Hackberry
White Fir Norway Spruce Serbian Spruce White Pine Scotch Pine Eastern Redbud Eastern Hemlock Kousa Dogwood
Black Chokeberry Buttonbush Blackbush Honeysuckle Mindor Forsythia Common Witch Hazel Dwarf Ninebark Prairie Dropseed
Page 73 of 115
Building Elevations
View A - South
Scale: 1" = 120'
View B - North
Scale: 1" = 120'
View C - East
Scale: 1" = 120'
View D - West
Scale: 1" = 120' 1D
1
D
A
1 B
A
1
1 Key Plan
C
Confidential and Proprietary 1
Key Page 74 of 115
Plan
1 Key C
Plan11
Exterior Rendering
Confidential and Proprietary 1 Key Plan
Page 75 of 115
Page 76 of 115
E
D
F
C
A
B
N
N O T TO S C A L E
COMPASS OBSERVATION POINT MAP
H O F F M A N E S TAT E S, I L A U G U S T, 2024
Page 77 of 115
KEY MAP
STREET
NAME
TRILLIUM BLVD
C
L STREET NAME
A
A RD
B OU L E V
C T R IL LIU M
L
LANDSCAPE PLAN REFERENCE
PROPOSED BUILDING
871.93
834’ from Building to Right of Way
656’ from Generator Yard to Right of Way
EXISTING
PROPOSED MIXED TREES DECIDUOUS
SIGHT LINE TREE
GENERATOR PROPOSED GRADE TRILLIUM BLVD
PROPOSED BUILDING ELECTRICAL
EQUIPMENT YARD 851.50 EXISTING GRADE
856.70
870.20 868.4 844.30
8’ ORNAMENTAL FENCE
859.50 PROPOSED DETENTION BASIN
COMPASS SECTION ELEVATION - A
H O F F M A N E S TAT E S, I L A U G U S T, 2024
Page 78 of 115
COMPASS OBSERVATION POINT A - EXISTING CONDITIONS
H O F F M A N E S TAT E S, I L A U G U S T, 2024
Page 79 of 115
COMPASS OBSERVATION POINT A - PROPOSED CONDITIONS
H O F F M A N E S TAT E S, I L A U G U S T, 2024
Page 80 of 115
©
KEY MAP
STREET
NAME
C
L STREET NAME
TRILLIUM BLVD
TRILLIUM BLVD
1-800-892-0123
A RD
B OU L E V
B
C T R IL LIU M
L
Call
Before
You Dig
LANDSCAPE PLAN REFERENCE
PROPOSED BUILDING
872.93
638’ from building to Right of Way
PROPOSED MIXED TREES EXISTING
DECIDUOUS
TREE
SIGHT LINE
TRILLIUM BLVD
PROPOSED PARKING PROPOSED GRADE 8’ ORNAMENTAL EXISTING GRADE
PROPOSED BUILDING
856.60 854.80 FENCE 852.03
857.70
859.95
COMPASS SECTION ELEVATION - B
H O F F M A N E S TAT E S, I L A U G U S T, 2024
Page 81 of 115
COMPASS OBSERVATION POINT B - EXISTING CONDITIONS
H O F F M A N E S TAT E S, I L A U G U S T, 2024
Page 82 of 115
COMPASS OBSERVATION POINT B - PROPOSED CONDITIONS
H O F F M A N E S TAT E S, I L A U G U S T, 2024
Page 83 of 115
TRILLIUM BLVD
KEY MAP
TRILLIUM BLVD
STREET
NAME
RD
BEVERLY
C
C
L STREET NAME
A RD
B OU L E V
C T R IL LIU M
L
LANDSCAPE PLAN REFERENCE
401’ from building to Right of Way
PROPOSED BUILDING
875.93
256’ from Generator Yard to Right of Way
TRILLIUM BLVD
PROPOSED MIXED TREES
EXISTING DECIDUOUS TREE
SIGHT LINE
BEVERLY RD
PROPOSED GRADE EXISTING GRADE ELECTRICAL EQUIPMENT
862.89 873.98 871.85 PROPOSED BUILDING
860.70
8’ ORNAMENTAL FENCE
871.23
COMPASS SECTION ELEVATION - C
H O F F M A N E S TAT E S, I L A U G U S T, 2024
Page 84 of 115
COMPASS OBSERVATION POINT C - EXISTING CONDITIONS
H O F F M A N E S TAT E S, I L A U G U S T, 2024
Page 85 of 115
COMPASS OBSERVATION POINT C - PROPOSED CONDITIONS
H O F F M A N E S TAT E S, I L A U G U S T, 2024
Page 86 of 115
KEY MAP
BEVERLY
STREET
NAME
RD
BEVERLY
D
RD
C
L STREET NAME
A RD
B OU L E V
C T R IL LIU M
L
LANDSCAPE PLAN REFERENCE
521’ from building to Right of Way
PROPOSED BUILDING
872.93
376’ from Generator Yard to Right of Way
EXISTING DECIDUOUS TREES
PROPOSED TREES
SIGHT LINE
BEVERLY RD
PROPOSED GRADE
858.80 ELECTRICAL EQUIPMENT PROPOSED BUILDING
EXISTING GRADE 857.70
871.85
886.45 8’ ORNAMENTAL FENCE
COMPASS SECTION ELEVATION - D
H O F F M A N E S TAT E S, I L A U G U S T, 2024
Page 87 of 115
COMPASS OBSERVATION POINT D - EXISTING CONDITIONS
H O F F M A N E S TAT E S, I L A U G U S T, 2024
Page 88 of 115
COMPASS OBSERVATION POINT D - PROPOSED CONDITIONS
H O F F M A N E S TAT E S, I L A U G U S T, 2024
Page 89 of 115
KEY MAP
STREET
NAME
E
C
L STREET NAME
HIGGINS RD
A RD
B OU L E V
C T R IL LIU M
L
LANDSCAPE PLAN REFERENCE
PROPOSED BUILDING
871.93
285’ from building to Right of Way
PROPOSED MIXED TREES
EXISTING DECIDUOUS TREE
G H T L I N E
SI
HIGGINS RD
PROPOSED GRADE
EXISTING GRADE 856.70 PROPOSED BUILDING
858.45 856.70
8’ ORNAMENTAL FENCE
864.70
COMPASS SECTION ELEVATION - E
H O F F M A N E S TAT E S, I L A U G U S T, 2024
Page 90 of 115
COMPASS OBSERVATION POINT E - EXISTING CONDITIONS
H O F F M A N E S TAT E S, I L A U G U S T, 2024
Page 91 of 115
COMPASS OBSERVATION POINT E - PROPOSED CONDITIONS
H O F F M A N E S TAT E S, I L A U G U S T, 2024
Page 92 of 115
KEY MAP
STREET
NAME
F
C
L STREET NAME
A RD
B OU L E V
C T R IL LIU M
L
LANDSCAPE PLAN REFERENCE
PROPOSED BUILDING
871.93
997’ from Building to Right of Way
852’ from Generator Yard to Right of Way
EXISTING TREES PROPOSED TREES
SIGHT LINE
PROPOSED BUILDING ELECTRICAL GENERATOR PROPOSED GRADE EXISTING GRADE
856.70 EQUIPMENT YARD
870.20 868.4
851.60 836.80 TRILLIUM BLVD
8’ ORNAMENTAL FENCE
PROPOSED DETENTION BASIN
COMPASS SECTION ELEVATION - F
H O F F M A N E S TAT E S, I L A U G U S T, 2024
Page 93 of 115
COMPASS OBSERVATION POINT F - EXISTING CONDITIONS
H O F F M A N E S TAT E S, I L A U G U S T, 2024
Page 94 of 115
COMPASS OBSERVATION POINT F - PROPOSED CONDITIONS
H O F F M A N E S TAT E S, I L A U G U S T, 2024
Page 95 of 115
Compass ORD1 – Community Impact Statement
To: Village of Hoffman Estates Today’s Date: 2025-01-10_________________
Project: Compass ORD1 Issuance: Site Plan – Final Engineering
James Donahue
Senior Planner
Village of Hoffman Estates
1900 Hassell Rd, Hoffman Estates, IL 60169
Dear Jim:
In reference to the requirements for the Community Impact Statement requirements identified in the Hoffman
Estates Code of Ordinances, Chapter 10, Article 6, Section 10-6-2, our team has assembled the following document.
The requirements of Section 10-6-2 have been restated, with our team’s responses following in bold.
1. Project Information
a. Boundary Survey. A boundary survey or survey of record prepared at a scale of not less than one inch
equals 100 feet. The survey shall include the following material:
Response: Please reference Exhibit #1 – Plat of Survey.
i) Name of the person or firm responsible for preparation of the survey.
Response: COMPASS SURVEYING, LTD. 2631 GINGER WOODS PKWY, SUITE 100, AURORA, IL
60502
ii) Location, width and name of abutting or adjoining rights-of-way.
Response: North: IL Route 72 / Higgins Rd - 240' ROW Width
South and East: Trillium Boulevard - 100' ROW Width
West: Beverly Road - 120' to 128' ROW Width
iii) Legal description of the parcel in a format appropriate for legal advertisement (including the total acreage
of the parcel).
Response:
Parcel 1:
LOTS 2 AND 3 IN SEARS BUSINESS PARK AMENDED PLAT OF SUBDIVISION, RECORDED AUGUST 5,
1991 AS DOCUMENT NUMBER 91394943, A SUBDIVISION OF PART OF SECTIONS 31, 32 AND 33,
TOWNSHIP 42 NORTH, RANGE 9, EAST OF THE THIRD PRINCIPAL MERIDIAN, ALL IN COOK COUNTY,
ILLINOIS, EXCEPTING THAT PART OF THE LAND DEDICATED FOR ROAD PURPOSES PER DOCUMENT
NUMBER 92573116.
Parcel 2:
LOT 1A IN FINAL PLAT OF RESUBDIVISION OF LOT 1 IN PRAIRIE STONE, BEING A RESUBDIVISION OF
PART OF SECTION 31 AND 32, TOWNSHIP 42 NORTH RANGE 9, EAST OF THE THIRD PRINCIPAL
MERIDIAN, ACCORDING TO THE PLAY THEREOF RECORDED MAY 12, 2010 AS DOCUMENT NUMBER
1013244049, IN COOK COUNTY, ILLINOIS.
1
© 2025 confidential & proprietary Page 96 of 115
Compass ORD1 – Community Impact Statement
To: Village of Hoffman Estates Today’s Date: 2025-01-10_________________
Project: Compass ORD1 Issuance: Site Plan – Final Engineering
Parcel 3:
TOGETHER WITH NON-EXCLUSIVE EASEMENTS CONTAINED IN SEARS BUSINESS PARK DECLARATION
OF PROTECTIVE COVENANTS RECORDED MARCH 8, 1991 AS DOCUMENT NO. 91105432, AND AS
AMENDED AND SUPPLEMENTED FROM TIME TO TIME, RELATING TO AND INCLUDING BUT NOT
LIMITED TO THE FOLLOWING:
FIRST SUPPLEMENTARY DECLARATION TO SEARS BUSINESS PARK DECLARATION OF PROTECTIVE
COVENANTS RECORDED JULY 31, 1992 AS DOCUMENT NO. 91383966.
SECOND SUPPLEMENTARY DECLARATION TO SEARS BUSINESS PARK DECLARATION OF PROTECTIVE
COVENANTS RECORDED OCTOBER 23, 1991 AS DOCUMENT NO. 91554407.
THIRD SUPPLEMENTARY DECLARATION TO SEARS BUSINESS PARK DECLARATION OF PROTECTIVE
COVENANTS RECORDED NOVEMBER 4, 1994 AS DOCUMENT NO. 94944869.
FIRST AMENDMENT TO SEARS BUSINESS PARK DECLARATION OF PROTECTIVE COVENANTS
RECORDED JUNE 26, 1995 AS DOCUMENT NO. 95408255.
FOURTH SUPPLEMENTARY DECLARATION TO SEARS BUSINESS PARK DECLARATION OF PROTECTIVE
COVENANTS RECORDED FEBRUARY 14, 2007 AS DOCUMENT NO. 0704518041 RE-RECORDED AS
DOCUMENT NO. 0831018027.
SECOND AMENDMENT TO SEARS BUSINESS PARK DECLARATION OF PROTECTIVE COVENANTS
RECORDED MARCH 30, 2017 AS DOCUMENT NO. 1708939175.
WITH REGARD THERETO:
ASSIGNMENT OF DECLARANT’S INTEREST IN THE SEARS BUSINESS PARK DECLARATION OF
PROTECTIVE COVENANTS DATES APRIL 20, 2016 AND RECORDED JUNE 2, 2016 AS DOCUMENT NO.
1615457008.
ASSIGNMENT OF DECLARANT’S INTEREST IN THE SEARS BUSINESS PARK DECLARATION OF
PROTECTIVE COVENANTS DATED SEPTEMBER 13, 2022 AND RECORDED SEPTEMBER 16, 2022 AS
DOCUMENT NO. 2225907004.
THIRD AMENDMENT TO SEARS BUSINESS PARK DECLARATION OF PROTECTIVE COVENANTS
RECORDED NOVEMBER 2, 2022 AS DOCUMENT NO. 2230646023 RE-RECORDED DECEMBER 1, 2022
AS DOCUMENT NO. 2233516009.
193.355 TOTAL ACRES
b. Location Map. A location map prepared to scale with the subject property clearly marked.
Response: Please refer to Exhibit #2 – Location Map.
c. Permanent Index Number (PIN). A listing of all the PINs for the subject property.
Response:
01-31-201-003
01-31-202-002
01-32-100-005
2
© 2025 confidential & proprietary Page 97 of 115
Compass ORD1 – Community Impact Statement
To: Village of Hoffman Estates Today’s Date: 2025-01-10_________________
Project: Compass ORD1 Issuance: Site Plan – Final Engineering
d. Owner of Record. Name and address of the owner of record.
Response:
Jared Day
Compass Datacenters ORD I, LLC
Dallas, TX 75254
e. Out Parcel Reference. Notation of surveys and other documents pertaining to parcels which are not part of
the project, or parcels identified for future subdivision.
Response: The scope of work is contained to the three parcels listed above.
f. Land Use. Description of the existing land use.
Response: The site was the former Sears headquarters that closed in 2021. The large Sears facility
and the former daycare at the northeast corner of the site will be demolished and the campus
redeveloped.
2. Project Description. The following material shall be submitted to provide an accurate description of the
proposed project.
a. Proposed Land Use Plan. Descriptions shall be provided for project sub-areas in mixed use or phased
projects. The proposed land use plan shall be prepared to scale; however, detailed sub- area maps at a
larger scale than the land use plan may be required. The following material shall be submitted to provide
an accurate description of the proposed land use plan.
i) Identification and description of the land use, including the size in acres, type and number of residential
units to be constructed, project density, and type and size of non-residential construction.
Response: The Site is located at an approximate address of 5500 Trillium Boulevard, Hoffman
Estates, IL 60192. The total site area is 193.35 acres in size while the proposed development area
is 44.5 acres in size. The site improvements will contain five data center buildings totaling 1.25
million +/- square feet, equipment yards, parking lots, ComEd substation, customer switchyard /
substation, and internal roadways. Following construction, landscaping of the project area will
be completed, and the wetlands, buffers and naturalized stormwater management basins will
undergo long-term maintenance and monitoring. Trees will not be provided at the ends of the
parking rows, see Section 10-4-4 C.2.b of the municipal code.
ii) Description of structures, including proposed use, height, total square footage, number of bedrooms
(for residential units), construction materials, and other items deemed necessary to accurately describe
the proposed structure.
Response: Each of the proposed five (5) buildings will consist of approximately 250,000 gross
square feet, single story building, 29’- 8" tall, serving as a data center with office and support
space. The buildings consist of a pre-engineered precast concrete panel structure.
iii) Notation of the presence of cafeteria or other food preparation or processing facilities in order to
determine applicability of a sewer and water surcharge.
Response: No cafeteria, food preparation, or processing facilities are part of this project.
3
© 2025 confidential & proprietary Page 98 of 115
Compass ORD1 – Community Impact Statement
To: Village of Hoffman Estates Today’s Date: 2025-01-10_________________
Project: Compass ORD1 Issuance: Site Plan – Final Engineering
iv) The number of trips generated by the use, the number of off-street and on-street parking provided,
parking demand expected, handicapped spaces proposed, and loading spaces
Response:
Estimated trips generated: 10 vehicle trips during 4pm-6pm peak hour, 85 vehicle trips during
site specific peak hour (2-3pm shift change)
Off-street parking provided: 204 spaces (193 standard and 11 ADA)
On-street parking provided: 0
Parking demand expected: 100
ADA spaced proposed: 11 spaced
Loading spaced proposed: 15 full size truck spaces
b. Adjacent Land Use. A map shall be submitted indicating the adjacent land uses.
Response: Please refer to Exhibit #3 – Adjacent Land Use.
c. Adjacent Zoning Classification. A map shall be submitted indicating the adjacent zoning classifications.
Response: Please refer to Exhibit #4 – Zoning Map.
d. Project Compatibility. A statement describing the compatibility of the proposed project with adjacent land
uses and/or land uses permitted under existing zoning. Items analyzed shall include, but not be limited to,
lighting, noise, mixture of land uses, building design, screening and shadows (cast by structures over 35
feet in height). Where potential incompatibilities may exist, mitigation measures shall be proposed.
i) A statement shall be submitted which reviews the appropriateness of the building design both with the
regard to the individual structure, as well as in relationship to the context developed by surrounding
buildings and topography. The following aspects of the building design shall be specifically discussed:
a) Building scale relative to planned development in the area and permanent neighboring
developments.
Response: The proposed building is compatible with the surrounding low-rise construction
and conforms to zoning and development plan guidelines. Utilization of the site and
placement of the buildings creates a campus/technology park-like setting.
b) Architectural materials which are durable, suitable for the type of building and design, as well as
demonstrating good architectural character and harmony with nearby buildings.
Response: The proposed buildings will be constructed of precast concrete panels with
multiple roof heights and a 2-tone color scheme.
c) The appropriate relationship and proportion of building components to one another.
Response: The building proportions are purpose-driven, meeting the needs of the client’s
use. Exterior equipment is screened via landscaping and grading per the included sight line
study. Please refer to Exhibit #5 – Sight Line Study.
4
© 2025 confidential & proprietary Page 99 of 115
Compass ORD1 – Community Impact Statement
To: Village of Hoffman Estates Today’s Date: 2025-01-10_________________
Project: Compass ORD1 Issuance: Site Plan – Final Engineering
d) The use of primary and accent colors with regard to their harmony with other buildings in the area
and the limitation of accent colors to secondary uses on the building.
Response: Color selection for materials is intended to be compatible with the landscape and
surrounding context, consisting of natural colors that complement one another and work
with the landscape.
e) The avoidance of monotony of design through the use of variation and detail form and setting to
provide visual interest.
Response: The architectural envelopes use multiple roof heights to break up the buildings’
profile as well as a separate paint color for the support area at the south end of each building,
3. Construction/Phasing Schedule. A statement of the proposed construction/phasing schedule shall be
submitted. This statement shall include the following material:
a. Estimated starting date of construction.
Response: Construction start estimated June 2024
b. Total square footage or total residential units to be built by type per year or by phase.
There are no residential units intended to be built at the site.
c. Estimated completion date of construction.
Response: Construction completion date is unknown at this time.
4. Environmental Impact Analysis. The following material shall be submitted to provide an accurate description of
the environmental impact of the proposed project.
a. Topography, Drainage and Hydrology. The following material shall be submitted describing the
topography, drainage system, and site hydrology:
i) Identification of floodplains, including the delineation of the floodway and flood fringe, description of
flood hazards, and a description of proposed uses within the floodplain.
Response: The site is located in FEMA Flood Zone X, an area of low flood risk and out- side the
100-year and 500-year flood zone. Please refer to Exhibit #6 - FEMA FIRMette showing portions
of 17031C0155J
ii) Identification of water courses within or adjacent to the proposed project.
Response: There are no water courses on site or adjacent to the proposed project.
iii) Description and delineation of wetlands.
Response: There are (3) man-made ponds and (8) existing wetlands on-site. Wetland 2 is a
USACE jurisdictional wetland that will remain undisturbed. Wetlands 1 and 6 are under MWRD
jurisdiction and will be mitigated off-site. The remaining (5) wetlands are exempt. Please refer
to Exhibit #7 – Wetland Delineation.
5
© 2025 confidential & proprietary Page 100 of 115
Compass ORD1 – Community Impact Statement
To: Village of Hoffman Estates Today’s Date: 2025-01-10_________________
Project: Compass ORD1 Issuance: Site Plan – Final Engineering
iv) A description of the existing drainage system, including the location and description of all drainage
improvements.
Response: The existing drainage system consists of above ground swales, underground storm
sewer, and stormwater management basins. The northwest portion of the site outfalls to an
existing pipe under Higgins Road while the remainder of the site outfalls to the existing Wetland
2 and ultimately under Trillium Blvd to the east.
The proposed project includes demolition of the existing on-site storm sewer infrastructure and
construction of a new storm sewer network adequately sized to convey stormwater to one of
two proposed stormwater management basins which will preserve the overall area of the
existing drainage divides. The two basins located in the northwest and southeast corners of the
site will provide detention and volume control to meet current stormwater ordinances.
v) Previous applicable drainage and hydrologic studies.
Response: Previous stormwater reports have been prepared for the site and surrounding area
with the most recent being MWRD Permit 07-221 / RL 20-019 for Prairie Stone Crossing.
vi) Description of existing drainage problems and any anticipated future drainage patterns.
Response: There are no known existing drainage problems. Future drainage patterns will mimic
the existing regional drainage patterns with the northwest portion of the site outfalling to an
existing pipe under Higgins Road and the remainder of the site outfalling to Wetland 2 at a rate
that will preserve its existing hydrology.
vii) Project drainage plan listing all required improvements and easements for both on-site and off-site
drainage facilities, including improvements necessary to satisfy detention requirements.
Response: Please reference stormwater drawing plans and details and associated stormwater
report for detailed information.
viii) An easement of the impact of the project on community drainage facilities, including a description of
methodologies proposed to minimize adverse effects.
Response: No easement is anticipated.
b. Soils. The following material shall be submitted describing soil conditions:
i) Soil map describing the types of soil found at the site.
Response: Please refer to Exhibit #8 – Soils Map.
ii) Identification of building constraints and description of methodology to be used to overcome
constraints.
Response: Please refer to Exhibit #9 - Geotechnical Report
iii) Reference to recent soil tests conducted at this site.
Response: Please refer to Exhibit #9 - Geotechnical Report
6
© 2025 confidential & proprietary Page 101 of 115
Compass ORD1 – Community Impact Statement
To: Village of Hoffman Estates Today’s Date: 2025-01-10_________________
Project: Compass ORD1 Issuance: Site Plan – Final Engineering
iv) A summary of the North Cook County Soil and Water Conservation District soils report, with the full
report attached.
Response: Please refer to Exhibit #9 - Geotechnical Report
c. Water Quality. The following material shall be submitted to assess the project impact on water quality:
i) Identification of methodologies to be utilized to control erosion and sedimentation during construction
of the project.
Response: Please refer to Erosion and Sediment Control plans for details.
ii) Certification by the project developer that the project will conform to all water quality requirements of
the Illinois Environmental Protection Agency.
Response: The project will conform to all water quality requirements of the Illinois Environmental
Protection Agency.
d. Flora and Fauna. The following material shall be submitted to assess the impacts of the project on plants
and animals:
i) Endangered Plant and Animal Species. The following material shall be submitted describing
endangered species: Species inventory of endangered, threatened, or unique plants, reptiles,
amphibians, mammals, birds, waterfowl, and other wildlife located in the project area.
Response: The initial EcoCAT results indicated that the Black-Billed Cuckoo may be in the vicinity
of the project location. ECS conducted a BBCU Habitat Assessment and determined that the
subject site does not provide suitable habitat for the black-billed cuckoo.
A determination letter from the Fish and Wildlife service has also been included which
determines that the proposed project is not likely to adversely affect the northern long-eared
bat.
Another letter from the USFWS has been included determining that there are no critical habitats
within the project area.
Please refer to Exhibit #10 – Endangered Species Documentation.
ii) Tree Survey. A tree survey of all existing trees over three inches in diameter, as required under the
Landscape Section of the Subdivision Code.
Response: Tree preservation and removals have been coordinated with Village staff.
e. Noise. The following material shall be submitted to assess the noise impacts of the project:
i) Identification of existing major generators of noise which may potentially affect the project, including
noise generated by aircraft, vehicular traffic, industrial activities, commercial activities, etc.
Response: Please refer to Exhibit #11 – Acoustic Study. The noise producing equipment is
identified starting on Page 5 and include Generators, Critical Cooling Units, and Power Center
Cooling Units.
ii) Identification of noise sensitive facilities located in the vicinity of the project, including hospitals,
schools, nursing homes, churches, parks, housing for the elderly, etc.
7
© 2025 confidential & proprietary Page 102 of 115
Compass ORD1 – Community Impact Statement
To: Village of Hoffman Estates Today’s Date: 2025-01-10_________________
Project: Compass ORD1 Issuance: Site Plan – Final Engineering
Response: Please refer to Exhibit #11 – Acoustic Study. The nearby sensitive receptors are
identified starting on Page 3.
Identification of proposed permanent noise generators located within the project and their anticipated
noise levels, including a statement describing noise generation resulting from construction sources.
Response: Please refer to Exhibit #11 – Acoustic Study. Table 3 on Page 6 includes the estimated
Sound Power Data for each major noise Generator. A noise impact study of potential
construction noise sources is not available at this time.
An assessment of the impact of the project on adjacent land uses and conversely the impact of adjacent
land uses on the project, including a description of the methodologies to be utilized to alleviate
excessive noise levels both during and after construction.
Response: Please refer to Exhibit #11 – Acoustic Study. Page 14 discusses the potential noise
mitigation strategies. Table 8 shows the results of implementing one possible solution of
equipment enclosures on the noise generating equipment.
Certification by the project developer that the project will conform to all noise control requirements of
the Illinois Environmental Protection Agency and the Cook County Environmental Control Department.
Response: The project design will conform to all noise control requirements identified by IEPA
and the Cook Country Environmental Control Department
f. Archaeological/Historical Significance. Material shall be submitted identifying and describing the significant
archaeological/historical aspects of the project site.
Response: Please refer to Exhibit #12 - SHPO Clearance Letter. No Cultural Resources are anticipated
to be impacted by the Project.
g. Recycling. A recycling plan shall be submitted in accordance with the requirements of the Article 10 of the
Municipal Code (Subdivision Code).
Response: Compass operations include provisions for an active recycling program at every facility.
The project will fully comply with Article 5 – Section 10-5-3 and Article 9 – Section 7-9-1
requirements for Commercial Recycling Services. Compliance will include the following:
⚫ Recycling storage will be located within secured exterior fence and screen wall of the property.
⚫ Refuse and recyclable material storage enclosures will be located within designated areas to
provide accessibility for service vehicles at the Loading Dock.
⚫ Reporting requirements identified in Article 9 – Section 7-9-1-3-a:f.
5. Revenue/Expenditure Impact Analysis. The following material shall be submitted to provide a description of the
impact of the project on community revenues and expenditures:
a. Financial Description. The following material shall be submitted describing the financial aspects of the
proposed project:
i) Statement of the estimated total project value, equalized assessed value, and the multiplier used.
Estimated selling price for residential units.
8
© 2025 confidential & proprietary Page 103 of 115
Compass ORD1 – Community Impact Statement
To: Village of Hoffman Estates Today’s Date: 2025-01-10_________________
Project: Compass ORD1 Issuance: Site Plan – Final Engineering
Response: This information is not available at this time.
ii) Current land assessment of the property.
Response: The current land assessment of the property is available via public records of the
recent site purchase.
9
© 2025 confidential & proprietary Page 104 of 115
Compass ORD1 – Community Impact Statement
To: Village of Hoffman Estates Today’s Date: 2025-01-10_________________
Project: Compass ORD1 Issuance: Site Plan – Final Engineering
iii) Identification of all corporate parties financially involved in the project, including the identification of
the principal officers and all major stockholders owning over five percent stock.
Response: The site application is for Compass Datacenters ORD I, LLC and its subsidiaries.
Compass Datacenters owns 100% of Compass Datacenters ORD I, LLC.
iv) Identification of parcels to be subdivided from the total tract for future sale or separate financing.
Response: Parcels will not be subdivided for future sale or separate financing for this project.
b. Estimated Revenue Generation. Identification of the total amount of estimated revenue to be generated by
the project. This estimate shall include the following material:
i) Identification and description of sources and amounts of revenue generated by the project. This
description shall include, but not limited to, real estate tax revenues, vehicle license revenues, Illinois
personal income tax revenues, motor fuel tax revenues, water and sewer use revenues, annexation fees,
and miscellaneous contributions to various government agencies.
Response: This information is not available at this time.
ii) Identification and description of those revenues specifically available to the Village of Hoffman Estates
and each of the other taxing bodies to which the project is subject.
Response: This information is not available at this time.
c. Estimated Village Expenditures. Identification and description of the sources and total amounts of estimated
Village revenue expenditures, based on Village requirements and demands created by the project.
Response: This information is not available at this time.
d. Revenue/Expenditure Evaluation. Summarization, in tabular format, of the estimated revenue generation
and Village revenue expenditures required above. Where a negative financial impact to the Village is
indicated, justification of the project, in terms of specific community benefits, shall be provided.
Response: This information is not available at this time.
e. Supplementary Community Impact Statement Requirements. Additional information may be required in the
Supplementary Community Impact Statement based upon the Community Impact Statement and
development plans submitted. The scope of issues to be addressed in the Supplementary Community
Impact Statement shall be determined by the Assistant Village Manager-Development Services.
6. Market Analysis. A statement identifying the need for the proposed project shall be submitted. The statement
shall include the following material:
a. Residential. Analysis of the impact the proposed project would have on the existing housing market, the
availability of housing for persons currently residing in the Village, the availability of housing for persons
desiring to relocate in the Village, and the availability of housing for the elderly and persons of low and
moderate income.
Response: Not Applicable
10
© 2025 confidential & proprietary Page 105 of 115
Compass ORD1 – Community Impact Statement
To: Village of Hoffman Estates Today’s Date: 2025-01-10_________________
Project: Compass ORD1 Issuance: Site Plan – Final Engineering
b. Non-residential. Analysis of the impact the proposed project would have on similar existing and proposed
projects located in the Village and conversely an analysis of the impact similar existing and proposed
projects would have on the proposed project.
Response: This information is not available at this time.
c. Employment. Analysis of the impact the proposed project would have on both permanent community
employment rates and temporary community employment rates during construction phases of
development. This analysis shall include total number of employees.
Response: Compass anticipates approximately 70 regular staff and 30 visitors on the project for
operations. The operations will have three (3) shifts; with 35 people max per shift.
7. Air Quality. The following material shall be submitted to assess the project impact on air quality.
a. Description of the existing air quality based on measurements taken at County and State monitoring
stations.
Response: Please refer to Exhibit #12 - IEPA Air Emissions Permit.
b. A list of both temporary and permanent pollution emission sources, including a description of type and
estimate of amount of pollutants to be emitted by non-residential projects.
Response: Please reference Please refer to Exhibit #13 - IEPA Air Emissions Permit, which identifies
the Emergency Generator Systems.
c. A list of air pollution control equipment to be utilized to meet air pollution control regulations, including a
description of methodologies to be used to minimize air pollution during construction of the project.
Response: Please refer to Exhibit #13 - IEPA Air Emissions Permit. The site will operate below 100
Tons per year of Nox. The Engine Generator Systems will be designed with Tier II emissions
standards.
d. Certification that all local, state and federal air pollution standards will be met.
Response: Design of the Engine Generator Systems will meet IEPA, NAAQS, NSPS and MACT Federal
regulations.
8. Archaeological/Historical Significance.
a. An analysis of any existing structures by period of construction, historical significance, architectural style,
condition, present use, assessed valuation, location, identification of structures deemed desirable for
preservation, and an evaluation of the impact the proposed project would have on the historic aspects of
the site.
Response: Please refer to Exhibit #12 - SHPO Clearance Letter. No Cultural Resources are anticipated
to be impacted by the Project.
11
© 2025 confidential & proprietary Page 106 of 115
Compass ORD1 – Community Impact Statement
To: Village of Hoffman Estates Today’s Date: 2025-01-10_________________
Project: Compass ORD1 Issuance: Site Plan – Final Engineering
b. A description of archaeological resources which may have existed at the site, including data as to artifacts
or evidence of prehistoric or early historic occupation or utilization which may have been uncovered at or
near the project site.
Response: Please refer to Exhibit #12 - SHPO Clearance Letter. No Archaeological or Cultural
Resources have been identified at the existing site.
c. An assessment of the degree to which development of the site would inhibit or eliminate the possibility of
significant archaeological finds.
Response: Please refer to Exhibit #12 - SHPO Clearance Letter. No Cultural Resources are anticipated
to be impacted by the Project.
9. Public Service Impacts. The following material shall be submitted to provide a description of the impact of the
project on public services.
a. Village Services. The following material shall be submitted describing the impact of the project on Village
services:
i) Village Administration. Assessment of the impact of the project on Village administrative services,
including the identification of additional manpower and equipment requirements due to any increase
in demand created by the project.
Response: This information is not available at this time.
ii) Police Department. Assessment of the impact of the project on law enforcement services, including the
identification of additional manpower and equipment requirements due to any increase in demand
created by the project.
Response: Compass anticipates approximately 70 regular staff and 30 visitors on the project for
operations. The operations will have three (3) shifts; with 35 people max per shift.
iii) Fire Department. Assessment of the impact of the project on fire protection services, including the
identification of additional manpower and equipment requirements due to any increase in demand
created by the project, location of the nearest fire station, location of proposed fire hydrants, and
topographical or other constraints for accessibility of fire-fighting equipment.
Response: The design will include FDCs and a fire hydrant will be installed within 100 feet of
FDCs. Truck circulation for the site has been designed to accommodate the Village of Hoffman
Estates fire truck specifications and will allow for fire truck access through the site; please
reference the final engineering plans for truck turning movements. Please reference Hydrant
locations and road access on Civil Site Plans. The facility will maintain 24/7 security operations
and Knox boxes will be provided for Fire Department access.
12
© 2025 confidential & proprietary Page 107 of 115
Compass ORD1 – Community Impact Statement
To: Village of Hoffman Estates Today’s Date: 2025-01-10_________________
Project: Compass ORD1 Issuance: Site Plan – Final Engineering
iv) Water Production/Distribution System. Assessment of the impact of the project on the water
production/distribution system, including the identification of the projected demand for water
(estimated daily or monthly usage), location of existing and proposed distribution lines, proposed
primary sources of water and emergency water sources, and description of improvements to be
installed by the developer, including a looped watermain system.
Response: The proposed development will not be a water-cooled data center facility and will
require significantly less water and sewer demand than the previous use on the property.
b. Metropolitan Water Reclamation District (MWRD). The following material shall be submitted describing the
treatment of sanitary waste material generated by the project:
i) Certification that the project is located within the MWRD.
Response: The project is located within the MWRD.
ii) Estimated quantity of sewage to be generated by the project and a description of any unusual or toxic
waste products to be discharged from non-residential uses, including a description of any methods of
pretreatment to be conducted on-site.
Response: There will be significantly less sewer flow generated by the proposed development as
compared to the previous use. No negative impacts to downstream sewers are anticipated.
iii) Location and description of existing sewer lines and improvements in the immediate area which will
serve the project.
Response: Existing on-site sanitary sewer lines will be demolished to accommodate the proposed
improvements. A new sanitary sewer network will be constructed in accordance with MWRD
requirements to convey sanitary sewer flows from the proposed buildings. The proposed point
of connection is an existing sewer pipe on the east side of the site. Please refer to civil
engineering drawings for details.
c. Public Utilities. Description of all existing and proposed public utility systems (i.e. gas, electric, telephone,
etc.) available to service the project, including the identification and location of existing lines and capacities,
existing easements and proposed easements both on-site and off- site.
Response: Please refer to the ALTA survey and civil engineering drawings for details.
d. Solid Waste. The following material shall be submitted describing solid waste collection and disposal:
i) Estimated amounts and types of solid waste material to be generated by the project. This figure shall
be determined by using acceptable generation rates for the various land uses.
Response: The site will generate approximately 20-40 yards of trash and approximately 40-60
yards of recycling materials per 40MW building/month.
ii) Description of storage containers to be utilized, including identification of their site location, type and
location of materials used to screen waste collection areas, and identification of anticipated special pick
up requirements.
Response: This information is not available at this time.
e. Recreation System. The following material shall be submitted describing the recreation system:
13
© 2025 confidential & proprietary Page 108 of 115
Compass ORD1 – Community Impact Statement
To: Village of Hoffman Estates Today’s Date: 2025-01-10_________________
Project: Compass ORD1 Issuance: Site Plan – Final Engineering
i) Identification of the park district within which the project will be located.
Response: This project does not include residential design and is not anticipated to have an
impact on the local park district.
ii) Location and description of existing and proposed public recreation facilities available to serve project
residents.
Response: This project does not include residential design and is not anticipated to have an
impact on the local park district.
iii) Location and description of proposed public recreation facilities to be located within the project,
including identification of sites to be dedicated or reserved for public use, improvements to be installed
by the developer, and the percentage of the project to be permanent public open space.
Response: This project does not include public recreation facilities. The property is intended to
be private and secure.
iv) Location and description of proposed private recreation facilities to be located within the project. The
maintenance provider for the proposed facilities should be identified.
Response: This project does not include private recreation facilities.
f. Library System. Identification of the library district serving the project and the location of the nearest library
facility shall be identified and submitted.
Response: This project does not include residential design and is not anticipated to have an impact
on the local library system.
g. School System. The following material shall be submitted describing the school system:
i) Identification of school districts serving the project.
ii) Letter from the school districts serving the project confirming that adequate capacity and services are
available for the students associated with the project.
Response: This project does not include residential design and is not anticipated to have an
impact on the local school system.
h. Mass Transit. The following shall be submitted describing mass transit systems:
i) Identification of all existing and proposed mass transit systems available to service the project, including
identification of the location of nearest access points.
Response: The nearest bus stop is the Pace Prairie Stone Terminal (Hoffman Estates) at the SW
corner of Trillium and Pratum.
ii) Description of mass transit service improvements within the project limits, including identification of
those improvements to be installed by the developer. Such improvements shall conform to guidelines
developed by the transit service provider.
Response: The project does not include mass transit service improvements
14
© 2025 confidential & proprietary Page 109 of 115
Compass ORD1 – Community Impact Statement
To: Village of Hoffman Estates Today’s Date: 2025-01-10_________________
Project: Compass ORD1 Issuance: Site Plan – Final Engineering
i. Transportation Network. The following material shall be submitted describing the transportation network:
i) Reference to traffic or transportation studies conducted for this project.
Response: No traffic or transportation studies have been conducted for the project as the
proposed trip generation is significantly less than the previous use.
ii) Transportation network map identifying the existing on-site and adjacent off-site transportation
network, including street names, right-of-way widths, pavement widths, current traffic counts, and
proposed plans for widening roads.
Response: Off-site roadway improvements include:
⚫ Higgins Road - Removing the traffic signal at the existing site access point to Higgins Road,
removing the existing WBL and EBR turn lanes, and reconstructing a landscape median along
Higgins.
⚫ Beverly Road - Closing the existing site access from Beverly and making some striping
improvements.
⚫ Trillium Blvd - Closing the existing site access at Pratum and removing the existing EBL turn
lane.
The proposed use will be a significant reduction in vehicle trips to the site from the previous use,
therefore no road widening is proposed. Please refer to engineering drawings for details.
iii) Traffic generation counts for automobiles and trucks and their directional distribution.
Response: No traffic or transportation studies have been conducted for the project as the
proposed trip generation is significantly less than the previous use.
iv) Proposed transportation plan, including right-of-way dedications, pavement width, sidewalks,
bikeways, lighting and identification of those improvements to be installed by the developer.
Response: Please reference the Civil Site Improvement Plans and Civil Road Profiles for detail of
onsite roadway and sidewalk design.
v) Analysis of Levels of Service by intersection movement under the proposed transportation plan,
including generation figures for approved, but not yet constructed projects located in the vicinity of
the project.
Response: No traffic or transportation studies have been conducted for the project as the
proposed trip generation is significantly less than the previous use.
vi) Identification and location of both internal and external traffic control measures, including traffic control
signals, traffic control signs, and identification of those improvements to be installed by the developer.
Response: The network of onsite roads are designed to accommodate WB-67 trucks. With the
site being a 24/7/365 facility, the site has a main security entrance. The entrance is designed to
accommodate the rejection of large truck deliveries without impeding traffic flow on Trillium
Blvd. Other traffic control improvements include closing the existing site access points to
Higgins, Beverly, and Pratum.
15
© 2025 confidential & proprietary Page 110 of 115
Compass ORD1 – Community Impact Statement
To: Village of Hoffman Estates Today’s Date: 2025-01-10_________________
Project: Compass ORD1 Issuance: Site Plan – Final Engineering
vii) An assessment of the impact of the project on the existing transportation network, including a
description of methodologies to be utilized to alleviate any adverse impacts. The supporting
documentation of trip reduction methods to reduce travel during peak hours is required if proposed
as part of the impact reduction assessment. Plans shall comply with the trip reduction requirements of
the Clean Air Act.
Response: No traffic or transportation studies have been conducted for the project as the
proposed trip generation is significantly less than the previous use.
j. Sustainability. Identification of any aspects of the project designed based on sustainability practices, such
as energy efficient systems, use of recycled building materials, solar or wind power generators, accreditation
under LEED or similar programs, or any other aspect of the project that exceeds minimum code
requirements with regards to efficiency, reduced energy usage, or sustainability.
Response: The project is being designed with the intent to achieve Green Globes certification at the
One Green Globe level. Energy efficiency and recycling/waste reduction are part of the strategies
intended to meet the Green Globes certification, however at this early stage of the project, all Green
Globes points have not been fully defined.
Please contact me if you have questions or need additional clarifications on our team’s responses
and submission.
Very truly yours,
dlbassociates
Eric T. Severson
Associate Director
732-829-7310
eseverson@dlbassociates.com
16
© 2025 confidential & proprietary Page 111 of 115
Compass ORD1 – Community Impact Statement
To: Village of Hoffman Estates Today’s Date: 2025-01-10_________________
Project: Compass ORD1 Issuance: Site Plan – Final Engineering
Enclosure:
⚫ (13) supplemental Exhibits:
o Exhibit #1 – Plat of Survey
o Exhibit #2 - Location Map
o Exhibit #3 – Adjacent Land Use
o Exhibit #4 – Zoning Map
o Exhibit #5 – Sight Line Study
o Exhibit #6 – FEMA FIRMette
o Exhibit #7 – Wetland Delineation
o Exhibit #8 – Soil Map
o Exhibit #9 – Geotechnical Report
o Exhibit #10 – Endangered Species Documentation
o Exhibit #11 – Acoustic Study
o Exhibit #12 – SHPO Clearance Letter
o Exhibit #13 – IEPA Air Emissions Permit
17
© 2025 confidential & proprietary Page 112 of 115
Page 113 of 115
VILLAGE OF HOFFMAN ESTATES
PLANNING & ZONING APPLICATION SUMMARY
APPLICATION INFORMATION
Project Number: PLN24-0011
Project Name: Compass Data Center
Project Application Date: 3/8/2024
Project Manager: James Donahue, SENIOR PLANNER
PROJECT TYPE
SITE PLAN AND PLAT OF SUBDIVISION
SITE INFORMATION
Property Address: 3333 BEVERLY RD
All Included PINs: 01-31-202-002, 01-31-201-003, 01-32-100-005
PROJECT CONTACTS
Relationship to
Name / Firm Address Phone E-Mail
Project
4201 Winfield Road, Suite
Jamie.Putnam@kimley-
APPLICANT Kimley Horn 600 Warrenville, 6304875568
horn.com
IL 60555
14555 DALLAS PKWY
COMPASS DATACENTERS
OWNER DALLAS, 9723220754
ORDI LLC
TX 75254
PREVIOUS TF HOFFMAN ESTATES II PO BOX 2440 SPOKANE,
8663224547
OWNER LLC WA 99210-2440
Page 114 of 115
1 of 1
Page 115 of 115