Committee of the Whole & Public Works Committee
Regular MeetingLombard, IL · August 15, 2016
Minutes
Village of Lombard
Village Hall
255 East Wilson Ave.
Lombard, IL 60148
villageoflombard.org
Minutes
Monday, August 15, 2016
7:30 PM
Lorraine G. Gerhardt Community Room
Committee of the Whole & Public Works Committee
President Keith Giagnorio, Village Clerk Sharon Kuderna
Trustee Dan Whittington, Trustee Mike Fugiel,
Trustee Reid Foltyniewicz, Trustee Bill Johnston,
Trustee Robyn Pike, Trustee Bill Ware
Public Works Committee: Bill Ware - Chairperson
Art Kuehl, John Kaforski, Mark Dvorak,
Mike Kuderna, David Arnold, Joe Glazier, Jr.,
Robert Bachner
Committee of the Whole & Public Minutes August 15, 2016
Works Committee
1.0 Call to Order and Pledge of Allegiance
The Special Meeting of the President and Board of Trustees and the
Public Works and Transportation Committee held on Monday, August
15, 2016 in the Community Room of the Lombard Village Hall was
called to order by Village President Keith Giagnorio at 7:30 pm.
2.0 Roll Call
Present 14 - Keith Giagnorio, Sharon Kuderna, Mike Fugiel, Reid Foltyniewicz, Bill
Johnston, Robyn Pike, Bill Ware, Arthur Kuehl, John Kaforski, Mark
Dvorak, Mike Kuderna, David Arnold, Joe Glazier Jr., and Robert Bachner
Absent 1 - Dan Whittington
Staff Present:
Village Manager Scott Niehaus
Director of Finance TIm Sexton
Assistant Director of Finance Jamie Cunningham
Director of Public Works Carl Goldsmith
Assistant Village Manager Nicole Aranas
Executive Coordinator Carol Bauer
3.0 Public Participation
4.0 Agenda
160268 FY 2017 - FY 2026 Capital Improvement Program
Discussion of the proposed FY 2017-2026 Village of Lombard Capital
Improvement Program.
Trustee Bill Ware, Chairperson of the Public Works & Environmental
Concerns Committee stated that on behalf of the Public Works
Committee and staff, he was proud to introduce the 2017 - 2026
Capital Improvement Plan. The Plan was developed in accordance
with Village Board policies, Public Works Standard Operating
Procedures and available Village resources. The Plan continues to
heavily focus on three areas: Facility repairs/improvements,
Stormwater Management and Maintaining the existing infrastructure.
The Public Works Committee met on June 14th and reviewed the plan
presented by Village staff. The proposed 2017-2026 CIP continues to
meet the needs of the community and prioritizes maintenance activity.
Through the development of this Plan, the Public Works Committee
and staff have evaluated projects and prioritized projects that are
Village of Lombard Page 1
Committee of the Whole & Public Minutes August 15, 2016
Works Committee
critical and projects that can be deferred without significant impact to
operations and future costs. The plan before you this evening
represents the culmination of many man hours to perform condition
ratings and assess the Villages infrastructure. The CIP for the
2017-2026 is estimated at $155,453,901. In 2017 the Village
anticipates spending $21,435,601 with a significant amount of the
funding ($7,980,001) being dedicated to water and sewer projects. I
would like to thank the Village staff and the Committee for the time
and effort that they have put into the planning process. At the June
14th meeting, the Committee unanimously supported the Plan as
presented and requested that the Plan be submitted to the Village
Board for consideration.
Director of Public Works Carl Goldsmith thanked the members of the
Public Works & Transportation Committee and staff for all of their time
and guidance in preparing the proposed CIP. He proceeded with the
following:
The FY 2017 - FY 2026 Capital Improvement Program is proposed at
$155,449,901. A total of $146,821,401 in local and $8,628,500 in
non-local funds are projected to be spent for capital improvements
during the FY 2017-FY 2026 Capital Improvement Program. For FY
2017, the CIP is funded at $21,431,601, with $20,449,101 in local
funds (Construction Fund, Facility Fund, Hotel/Motel Fund, Parking
Capital Reserve Fund, Tax Increment Financing Fund and
Water/Sewer Capital Reserve Fund) and $932,500, in non-local funds.
The draft plan was presented to the Public Works and Environmental
Concerns Committee at their June 14, 2016 meeting. After
deliberation on the plan, the Committee voted to unanimously support
the plan as presented by staff.
Included in the proposed expenditures for FY 2017 of $21,431,601 are
the following expenditures: $265,000 for Bikeway and Pedestrian Path
Improvements; $166,000 for Commuter Parking Facilities; $452,100
for Facility Improvements and Maintenance; $20,000 for Parking Lot
Improvements; $365,000 for Right-of-Way Maintenance and
Beautification; $7,102,500 for Sewer System/Stormwater Control
Improvements not performed in conjunction with a street project;
$110,000 for Sidewalk Improvements; $3,836,000 for Street
Construction and Maintenance (including related underground
improvements); $1,135,000 for Traffic Signal and Street Lighting
Improvements; and $7,980,001 for Water System Improvements not
attributable to a street project.
In addition to the non-home rule sales tax, other revenue sources
used to finance capital improvements include sales tax,
utility/telecommunications tax, the public benefit property tax, motor
Village of Lombard Page 2
Committee of the Whole & Public Minutes August 15, 2016
Works Committee
fuel tax, commuter parking fund revenue and water and sewer fund
revenue. As part of the Long Range Budget Planning process, the
Village will be establishing a Building Reserve Fund, for the future
replacement or major renovation of Village owned buildings.
The Village has also initiated a water and sewer rate study that will
assess the current and future revenue demands for the operation &
maintenance and capital needs of the water system, as well as
evaluate the structure of the water rate to ensure system-wide equity.
The goal of the study and any potential rate changes is to eliminate
the Non-Home Rule Sales Tax subsidy of the Water and Sewer Fund.
This will result in additional funding available for construction projects.
The results of the study will be incorporated into future CIP
documents. The tentative schedule for the review of the water and
sewer rate is largely based upon the implementation of new water
meters for residential customers and is as follows:
· December 1, 2016 - Illinois Environmental Protection Agency
approval of low interest loan to cover cost of meter installation
· April 6, 2017 - Village Board award of contract for installation of
water meters
· May 1, 2017 - Installation of meters to begin. Two year period
for installation of all residential meters
· October 2017 - Public Works and Environmental Concerns
Committee and Finance Committee review results of meter
program and Water and Sewer Fund Rate Study
· October 2017 - Village Board consideration of Water and
Sewer Fund Rate Study
· January 1, 2018 - Implementation of Water & Sewer Rate
Study recommendations
This timeframe is subject to change based upon feedback from the
Committees.
What follows is the FY 2017-FY 2026 Capital Improvement Program.
Revisions and additions will be incorporated in the Second Draft of the
Capital Improvement Program based upon the Committee’s direction
and further Staff review. The projects contained in the Capital
Improvement Program for FY 2017 are summarized below and are
presented by project category.
Bikeway & Pedestrian Path Improvements
Sustainable Transportation Program - The 2017 CIP contains $50,000
to implement the lowest cost recommendations from the Village-wide
Bicycle and Pedestrian Master Plan. The proposed work for 2017
includes the addition of bike boulevard designation of Elizabeth Street
Village of Lombard Page 3
Committee of the Whole & Public Minutes August 15, 2016
Works Committee
and the designation of Grace Street as a bike lane. Future
improvements include bike lanes, bike boulevards, and wayfinding
signage. Facility maintenance is included in the program, and crossing
improvements may also be included as funding allows. This program
provides a sustainable approach to transportation, meaning that the
program provides transportation facilities that are advantageous to all
society levels, the environment, and are cost efficient (triple bottom
line approach).
Westmore-Meyers Bicycle/Pedestrian Improvements - This project will
transform Westmore-Meyers Road from St. Charles Road to
Roosevelt Road into a welcoming bicycle and pedestrian corridor. The
roadway will become a three lane cross section with buffered bike
lanes on either side. Trail and intersection crossing improvements are
included, and wayfinding signage will also be incorporated in
conjunction with the project. The project will link two regional trails,
three proposed Village bike facilities, businesses, and parks.
Completing this project will also address a high priority project within
the Village-wide Bicycle and Pedestrian Master Plan and utilize funds
from the Traffic Signal Modernization Program. The 2017 CIP
contains $215,000 for design engineering and geotechnical
engineering. The project is anticipated to be constructed in 2018 at an
estimated cost of $1,929,000. The Village is seeking STP funding,
which will cover 70% of the cost of construction.
John Kaforski asked if the second leg of this project was not
completed, what would happen to the funds.
Carl Goldsmith noted that the funding is for design only at this point.
Commuter Parking Facilities
The FY 2017 CIP contains $166,000 for work to be completed on the
Village’s commuter facilities. The following work is scheduled:
· Striping of the Hammerschmidt Parking Lot
· Crack Seal and Surface Treatment in the Park/Elizabeth
Quarterly Lot
· Striping of the Parkside East Lot (Charlotte)
· The reconstruction of the Parkside East Lot (Martha)
· Striping of the Parkside West Lot
· Striping of the Premium Quarterly Lot
· Crack Seal and Surface Treatment of the St. Charles Road
Quarterly Lot
Facility Maintenance and Improvements
Fire Station #2 Outdoor Storage Facility - This project includes the
construction of a new outdoor storage facility located on the west side
of Station#2. The existing station cannot accommodate the storage
of material and equipment and the construction of the facility will
provide for more efficient use of the station. The FY 2017 CIP
Village of Lombard Page 4
Committee of the Whole & Public Minutes August 15, 2016
Works Committee
contains $30,000 to complete the upgrades.
Village Hall Skylight Modification - This project includes the removal
and replacement of the skylight panels in Village Hall vestibule. The
CIP initially included the replacement of the panels, but the facilities
group is recommending capping off the skylights and including
improved lighting for the area. The initially budget for the project was
$250,000, which has been reduced to $50,000 based upon the
change in project scope.
Village Hall Door Replacement - This project will include new entrance
doors at the main entrance to the Village Hall. This project will ensure
compliance with the ADA and improve the functionality of the door
system. There is $50,000 included in the FY 2017 CIP for this project.
Village Hall HVAC Improvements- Through this project, the Village will
install rooftop AC units in the Community Room and Village Board
Room. This improvement will allow independent controls for these
facilities, which will increase energy efficiency and reduce expenses to
cool the building. There is $200,000 included in the FY 2017 CIP for
this project.
Plymovent Upgrade - Fire Stations 1 & 2 - The Village has included
funds to upgrade the Plymovent system that contains exhaust from
the garage floors. The Village has included $40,000 in the FY 2017
CIP for this project.
General Facility Maintenance - The funding of this project is $75,000
for 2017. These funds are used for the maintenance of the Village
facilities, not attributable to a specific project.
Downtown Camera Maintenance - The Village has included $7,100 in
the FY 2017 for the maintenance of the security systems in the
downtown corridors. This project had previously funded through TIF
funds.
Parking Lot Improvements
Village Complex Pavement Maintenance - The Village has established
a program to cover the cost and the schedule for improvements for the
parking lots at Village facilities. The FY 2017 CIP contains $20,000
for the repair, grind and overlay and striping of the parking lots at the
Public Works facility.
Right of Way Maintenance and Beautification
Public Information Notification - The Village has included $100,000 for
an electronic message board for the southeast corner of Main Street
and Wilson Avenue. The message board will replace the current
banner system and allow for greater dissemination of Village
information to the public.
Downtown TIF Streetscape Improvements Program - This annual
program is designed to improve the streetscape elements, brick
pavers and other downtown features. The program contains $25,000
Village of Lombard Page 5
Committee of the Whole & Public Minutes August 15, 2016
Works Committee
annually.
Parkway Ash Tree Removal and Replacement Program - Based upon
the wholesale removal of Ash trees that was completed in 2015, the
Village has adjusted the FY 2017 CIP to contain $150,000 for the
planting of replacement trees (where applicable). The Village
anticipates that the replanting effort will take three (3) years to
complete. 2017 is the second year of program.
Right-of-Way Beautification Program - This annual program is
designed to improve landscaped areas in the Village to enhance the
aesthetic appeal of the Village. The program contains $65,000 in FY
2017.
Sewer System/Stormwater Improvements
Clear Water Disconnect Grant Program - In 2012, the Village revised
the grant program to incorporate “triggers” for compliance that is tied
to Village issued building permits. FY 2017 contains $79,000 in funds
for the grant program.
Pump Station Component Replacement - The FY 2017 CIP contains
$15,000 to establish and fund a regular maintenance cycle for the
replacement of the electrical cabinet, level transducer and flow
transducer at various pump stations throughout the Village. The
program includes the installation of a new permanent back-up
generator at Charles Lane pump station in FY 2019.
Backyard Sewer Lining Program - This project continues to fund the
lining of sewers in the rear yards throughout Lombard. Based upon
GIS data and Village records, there are three (3) years of lining to
complete. FY 2017 (2nd year of program) contains $125,000 and
future year budgets are reduced based upon quantity of lining
projected.
Detention Pond Maintenance and Improvements - The Village has
developed a maintenance schedule for the Village owned detention
facility. The program is designed to provide funding for the
maintenance of native plantings and structures in Village-owned
stormwater basins. The FY 2017 CIP contains $14,000 for the
following projects:
· Wetland Plantings at the Civic Center Pond - $1,500
· Wetland Plantings at the Grace and Central Pond - $3,800
· Wetland Plantings at the Echo Pond - $3,300
· Wetland Plantings at the Morris Pond - $5,200
Manhole Inspection and Rehabilitation - The FY 2017 CIP contains
$105,000 to fund a comprehensive manhole inspection and
rehabilitation program that over time will encompass all the structures
within the Village. The scope of this program is the inspection of
manholes by a high definition camera and recording GPS information
along with pertinent information about the manhole. Subsequently all
structures that are found to be in substandard condition will be
Village of Lombard Page 6
Committee of the Whole & Public Minutes August 15, 2016
Works Committee
repaired.
IL Route 53 Stormwater Pump Station - The original improvements
anticipated for the station included the replacement of the existing
vertical turbine pumps with submersible pumps and inclusion of a grit
chamber to prevent debris from entering that station and interrupting
operations. However, as the consultant presented the Preliminary
Design Report (PDR), it became clear that this was not the most
suitable option. Instead, the Village will be looking to abandon the
station, which is constructed in the 100 year floodplain and construct a
new station upstream that will ensure proper operation of the station.
The new station will increase the capacity to pump stormwater and
alleviate flooding upstream. The cost of the project is estimated at
$5,340,900. The FY 2016 CIP contains $2,024,400 for construction
and construction material testing. The FY 2017 CIP contains
$3,316,500 for the completion of construction.
Terrace View Pond and Garfield Pond Maintenance - An
Intergovernmental Agreement between the Village of Lombard and the
Lombard Park District makes the Village responsible for maintenance
of Terrace View Pond. As part of the DuPage County Storm water
Permit for the storm water project constructed in 2013, the Village
must inspect and document the establishment of the wetland plantings
along the shoreline of the pond for up to five years. The Village has a
similar obligation with DuPage County concerning the Garfield site
detention pond. The 2017 CIP contains $20,000 for this project.
Gatz Pond Outfall - This project would involve extending the large
diameter storm sewer from North Broadway north on Chase Avenue to
Maple Street and east on Maple Street to Westmore Meyers Road.
This sewer would allow the discharge from Gatz Pond to be
separated, which includes the Vista Pond watershed. This project
would separate approximately 450 acres. The construction for the
project is contained in the FY 2017 CIP at a cost of $2,521,000.
SCADA System Hardware Upgrades - Due to obsolete hardware and
rising costs of existing components along with programming issues,
the SCADA system has become difficult and complex to maintain.
The new equipment will allow the Village to reboot and purge all of the
old hardware, software, and programming. The cost for the upgrade
to the SCADA system is $150,000 in 2017 and additional $135,000 in
2018.
Maintenance Programs - The FY 2017 CIP contains $32,000 for the
Sewer Televising and Cleaning Program; $79,000 for the
Underground Structure Maintenance Program; $21,000 for the
Backyard Flooding Prevention Program; $83,000 for the Pump Station
Maintenance Program; $52,000 for Overhead Sewer Grant Program;
$200,000 for Sewer Maintenance and Improvements Program;
$79,000 for the Sanitary Sewer Lining Program; $79,000 for the Catch
Basin Cleaning Program; $53,000 for the Sewer Stub Lining Program
Village of Lombard Page 7
Committee of the Whole & Public Minutes August 15, 2016
Works Committee
and $79,000 for the Large Sewer Flushing Program.
Sidewalk Improvements
Trip Hazard Replacement Program - This annual program is set up to
repair and replace existing sidewalks determined to be a trip hazard
pursuant to Village policies. The program is funded at $89,000
annually.
Deteriorated Sidewalk Program - This program established under
Village Board policy provides a 50% cost share to residents for the
replacement of damaged/deteriorated sidewalks. The cost of the
program is $21,000 annually.
Street Construction and Improvements
Finley & Roosevelt Intersection Improvements - The 2017 CIP
contains $960,000 in funding for resident engineering and construction
of improvements to increase intersection capacity in conjunction with
proposed redevelopment at this location. The project includes the
installation of double lefts for northbound and southbound Finley
Road. These improvements are needed to facility traffic through the
intersection and reduce the wait times for turning movements during
peak periods. It should be noted that Finley Road is a Village roadway
and that these improvements would be needed today even without the
redevelopment of the site. At present, the intersection is performing at
failing rate based upon national traffic standards. The project includes
an additional westbound lane on Roosevelt Road from the proposed
traffic signal to just west of Finley Road.
Maintenance Programs - The FY 2017 CIP contains $70,000 for the
Surface Treatment Program; $140,000 for Parkway Restoration;
$850,000 for General Concrete Street Rehabilitation Program;
$105,000 for the Concrete Utility Patching; $125,000 for the Asphalt
Utility Patching; $582,000 for the General Local Street Resurfacing
Program; $336,000 for the Local Street Resurfacing with Village
Crews; $50,000 for the Curb Replacement Program; $448,000 for the
Full-Depth Asphalt Patching Program; $140,000 for Crack Sealing and
$30,000 for Pavement Marking Replacement Program
Traffic Signal and Street Lighting Improvements
Street Light and Traffic Signal Pole Replacement - This project
provides $50,000 for the maintenance and replacement of existing
street light and traffic signal poles that are not included in a specific
project.
Railroad Crossing at Elizabeth Street - The project intent is to upgrade
the crossing gates at Elizabeth and the railroad tracks to a quad gates
system. The project is a collaborative effort between the Village of
Lombard, the Illinois Commerce Commission (ICC) and the UP
Railroad in efforts to improve public safety for at-grade railroad
Village of Lombard Page 8
Committee of the Whole & Public Minutes August 15, 2016
Works Committee
crossings. Expenditures reflect anticipated Village costs only. The
2017 CIP contains $107,000 for the project.
Traffic Signal Modernization Program Replacement - The 2017 CIP
anticipates the repair and upgrade of 24 incandescent intersections to
uninterrupted power supplies, LED signal heads, and ADA compliant
push buttons and pedestrian timers. In addition, the program will save
energy costs to the Village through energy efficient LED technologies,
which promote the triple bottom line. The FY 2017 CIP contains
$138,000 for the project(s). The intersection improvements will take
place at the following locations:
· Main Street and Maple Street
· Main Street and Hickory Street
· Main Street and Madison Street
· Main Street and 16th Street
· Main Street and 22nd Street
Oak Creek Drive Traffic Signal Replacement - In conjunction with the
development of the former Ken Loch Golf Course, the Village will be
partnering with the developer to improve the traffic signal at Finley
Road and Oak Creek Drive. The Village and developer will split the
cost of the signal improvement. The total cost of the project is
$300,000, with the Village contributing $150,000 in 2017.
Roosevelt Road Traffic Signal Installation - In conjunction with the
development of the former Kmart site, the Village will be funding the
installation of a traffic signal at the east access for the site. The cost
of the installation of the traffic signal is $340,000.
TIF Lighting Street Lighting Reliability Program - This is a program
designed to repair/replace underground electrical conduit and cable
for the TIF streetlights. The system has had numerous ground faults
and has become unreliable. Additional improvements to circuits and
pole mounted receptacles will be included in the program. The 2017
CIP contains $200,000 for the project.
Water System Improvements
Watermain Maintenance & Improvements Program - The FY 2017 CIP
contains $150,000 for the Watermain Maintenance and Improvement
Programs not associated with a standalone project.
High Service Pump Rehabilitation - The FY 2017 CIP contains
$100,000 for the rehabilitation of potable water high service pumps at
various locations. A schedule for the maintenance of the pumps has
been developed to ensure proper operation of the equipment.
Water Meter Replacement - The 2011 CIP included a project to install
an automated reading system infrastructure and replaced the water
meters for commercial and multi-family accounts. The residential
meters were installed in 1988 and 1989. Testing performed on the
meters for the 2011 project indicated the overall meter accuracy was
still acceptable so that portion of the project was delayed until 2017.
Village of Lombard Page 9
Committee of the Whole & Public Minutes August 15, 2016
Works Committee
Meter testing data indicated this is when the meters will slow down
enough to have a significant impact on revenues. The Village will be
seeking IEPA State Revolving Loan Funding for the improvement. It is
anticipated that the replacement of the residential meters will occur in
2017 and 2018 at a cost of $2,745,000 per year.
Roosevelt Road Watermain Replacement Phase II - The Village has
experienced significant break history along Roosevelt Road between
Finley Road and Wisconsin Avenue. The Village has developed a
project to perform cured in place lining of significant portions of the
existing watermain network in the corridor. The project has been split
into two phases. Phase I is the western limits of the Village to
Fairfield. The FY 2017 CIP contains $4,587,001 for the construction
of the watermain improvement. The Village has received IEPA
Revolving Loan Program funds to cover the cost of the project.
Central Station Reservoir Improvement - The 2017 CIP contains
$273,000 for the design engineering and material testing for the
rehabilitation of the Central Station Reservoir. The station was
originally constructed in the 1920s with minimal maintenance and
upgrades. There are 2 concrete tanks with 300,000 gallon capacity in
each tank. Additional work includes pumps station improvements,
valve replacement, pump replacement and generator improvements.
Village Manager Scott Niehaus spoke about the water system
improvements and the IEPA loan.
Trustee Foltyniewicz questioned the proposed changeable sign at
Main and Wilson.
Carl Goldsmith noted the sign was a two-sided sign on a single
pedestal; the stone-work will be similar to that used at the Metra
Station; it will be large enough so that it is easily legible by motorists.
Trustee Fugiel commented on the changeable sign across the street
ate Glenbard East High School and issues that the high school has
had.
President Giagnorio thanked the Public Works and Environmnetal
Concerns Committee and staff for their hard work.
5.0 Adjournment
A motion was made by Trustee Reid Foltyniewicz, seconded by Trustee Bill
Johnston, that the Special Meeting of the President and Board of Trustees and
the Public Works and Environmental Concerns Committee held on Monday,
August 15, 2016 in the Community Room of the Lombard Village Hall be
Village of Lombard Page 10
Committee of the Whole & Public Minutes August 15, 2016
Works Committee
adjourned at 8:18 p.m. The motion carried by the following vote:
Aye: 5- Mike Fugiel, Reid Foltyniewicz, Bill Johnston, Robyn Pike, and Bill Ware
Absent: 1- Dan Whittington
Village of Lombard Page 11
Agenda
Village of Lombard
Village Hall
255 East Wilson Ave.
Lombard, IL 60148
villageoflombard.org
Meeting Agenda
Monday, August 15, 2016
7:30 PM
Lorraine G. Gerhardt Community Room
Committee of the Whole & Public Works Committee
President Keith Giagnorio, Village Clerk Sharon Kuderna
Trustee Dan Whittington, Trustee Mike Fugiel,
Trustee Reid Foltyniewicz, Trustee Bill Johnston,
Trustee Robyn Pike, Trustee Bill Ware
Public Works Committee: Bill Ware - Chairperson
Art Kuehl, John Kaforski, Mark Dvorak,
Mike Kuderna, David Arnold, Joe Glazier, Jr.,
Robert Bachner
Committee of the Whole & Public Meeting Agenda August 15, 2016
Works Committee
1.0 Call to Order and Pledge of Allegiance
2.0 Roll Call
3.0 Public Participation
4.0 Agenda
160268 FY 2017 - FY 2026 Capital Improvement Program
Discussion of the proposed FY 2017-2026 Village of Lombard Capital
Improvement Program.
Legislative History
6/14/16 Public Works & approved by a unanimous voice vote of the
Environmental Concerns members present
5.0 Adjournment
Village of Lombard Page 2 Printed on 8/11/2016