Redevelopment Agency / Loan Committee
Regular MeetingNorwalk, CT · February 9, 2021
Agenda
CHAIRMAN
John E. Igneri
COMMISSIONERS
Kelly Bloom
Lisa M. Cooper
William R. Speirs
David G. Westmoreland
EXECUTIVE DIRECTOR
Brian T. Bidolli
TO: Members, Norwalk Redevelopment Agency
FROM: John Igneri, Chairman
DATE: February 5, 2021
RE: Regular Meeting Notice
************************************************************************
February 9th, 2021
5:30 P.M.
REGULAR MEETING
AGENDA
The next meeting of the Norwalk Redevelopment Agency will be held on Tuesday, February 9th,
2021 at 5:30 p.m. Due to the ongoing public health situation the regular meeting will be held as
a Zoom videoconference via the link provided below. The meeting will also be broadcast on the
Norwalk Redevelopment Agency YouTube channel.
https://www.youtube.com/channel/UCHMiAZt32k6BnjaKdnUaIug?view_as=subscriber.
ZOOM Meeting Link:
https://zoom.us/j/2038547810?pwd=bVZjM3duS1QwRlR6QVMwT09yeDg3Zz09
CALL TO ORDER
ROLL CALL
PUBLIC PARTICIPATION
I. ADMINISTRATION
1. APPROVAL OF MINUTES
i. Approve Minutes of the December 8, 2020 Regular Meeting
ii. Approve Minutes of the January 5, 2021 Special Meeting
3 BELDEN AVENUE, NORWALK, CT 06850 • (203) 854-7810 • WWW.NORWALKREDEVELOPMENTAGENCY.ORG
Page 1 of 2
2. FINANCIALS
i. Approve Norwalk Redevelopment Agency Statement of Revenues and
Expenditures for Operating Fund 100 for Year-to-Date December 31,
2020.
II. BUSINESS
1. URBAN CORE LANDSCAPING & MAINTENANCE SERVICES
i. Approve contract with Meticulous Landscaping through June 30, 2021 not
to exceed $40,000.
2. MATHEWS PARK DESIGN SERVICES
i. Approve contract with Heritage Landscapes not to exceed $27,500 with
$10,000 of funds provided by the Norwalk Historic Commission.
3. SOUTH NORWALK TRAIN STATION TOD STUDY
i. Approve contract with VHB for COVID-19 market response planning
services not to exceed $25,000.
4. DESIGN REVIEW
i. 637 West Ave
III. EXECUTIVE SESSION
1. DISCUSSION REGARDING AGENCY LEGAL SERVICES
i. Possible action regarding item III.1
IV. NEW BUSINESS
V. OLD BUSINESS
ADJOURNMENT
3 BELDEN AVENUE, NORWALK, CT 06850 • (203) 854-7810 • WWW.NORWALKREDEVELOPMENTAGENCY.ORG
Page 2 of 2
CITY OF NORWALK
NORWALK REDEVELOPMENT AGENCY
DECEMBER 8, 2020
VIA ZOOM
ATTENDANCE: William Speirs, Vice Chair; John Igneri, David Westmoreland and Kelly
Bloom
ABSENT: Lisa Cooper
STAFF: Brian Bidolli, Katie O'Leary, Eugenia Lupinski
OTHERS: Marc Grenier, Agency Counsel; Michael Sweeney, Esq.; and Mike
Solakian
CALL TO ORDER
Mr. Speirs called the meeting to order at 5:43p.m.
ROLL CALL
A quorum was present. It was noted that the meeting was being held via Zoom and live
streamed via You Tube.
PUBLIC COMMENT
There was no Public Comment.
ADMINISTRATION
1. APPROVAL OF MINUTES
i.) Approve Minutes of the November 3, 2020 Special Meeting
**MR. WESTMORELAND MADE A MOTION TO APPROVE THE MINUTES
**MR. IGNERI SECONDED THE MOTION
**3 IN FAVOR, 0 AGAINST, 1 ABSTENTION (Ms. Bloom)
City of Norwalk
Redevelopment Agency
December 8, 2020
Page 1 of 4
CITY OF NORWALK
NORWALK REDEVELOPMENT AGENCY
SPECIAL MEETING
JANUARY 5, 2021
VIA ZOOM
ATTENDANCE: John Igneri, Chairman; William Spiers, David Westmoreland, Kelly Bloom, Lisa
Cooper
STAFF: Brian Bidolli, Executive Director Redevelopment Agency; Katie O’Leary
OTHER: Eric Rains, David Sands, Harold Cobin, Jason Milligan, Bill, Marc Grenier, John
McClutchy, William Hennessey, Vincent Hynes, Todd D McClutchy, Michael
Weissbrod, Bill Warwick, Deborah, Bob Grzywacz
CALL TO ORDER
Mr. Igneri called the meeting to order at 5:31 P.M.
ROLL CALL
A quorum was present.
PUBLIC PARTICIPATION
Mr. Milligan came forwards to speak. He stated that, as the largest property owner in the Wall
Street area he had good opinions of the ongoing POKO 2.0 projects and desired to see them
finished. He stated that he did not like it when connected/favored people had different rules.
He stated that he was upset that special exceptions had been made and rules bent for the
project. He stated that the special exceptions would forever cement the project’s legacy as
being the largest building in the area. He pointed out the project is looking to be approved for
six stories tall. He claimed that the building that was there was compromised and will almost
definitely be removed so the project will be starting from scratch from the concrete decking. He
said there is nothing to grandfather and this doesn’t follow the grandfather clause section of
the regulations. He pointed out that the current zoning regulations for the area call for a
maximum height of four stories. He said it still does meet with the design keeping and design
standards. He said his concern with the project is deeper than design standards. He said he
thought the third-party architect had a lot of good things to say, the overall aesthetic is okay,
it’s the height he has an issue with in combination with the fact that it is over the top of an
easement and they don’t have enough parking. He said the redevelopment plan that this was
developed under expired and or was replaced. He believed that, due to ongoing litigation, that
the project won’t be moving forward and there were no tax credits to be obtained currently.
City of Norwalk
Norwalk Redevelopment Agency
Special Meeting
January 5, 2021 Page 1 of 5
I. ADMINISTRATION
1. APPROVAL OF MINUTES
APPROVE MINUTES OF THE DECEMBER 8TH, 2020 REGULAR MEETING
Chairman Igneri suggested that the minutes be tabled until the next meeting to accommodate
various corrections.
** COMMISSIONER IGNERI MOTIONED TO TABLE THE MINUTES OF DECEMBER 8TH, 2020
UNTIL THE NEXT MEETING OF THE REDEVELOPMENT AGENCY.
** COMMISSIONER BLOOM SECONDED THE MOTION.
** THE MOTION PASSED UNANIMOUSLY.
The minutes of December 8th, 2020 will be tabled till the next meeting.
II. BUSINESS
1. DISCUSSION REGARDING CDBG LOAN TO MARITIME CENTER
Mr. Bidolli presented on the loan. He said this is the next step in the process that was discussed
at the last meeting regarding a CDBG loan to The Maritime Center. He stated that the
application for the loan will be for a $500,000 assistance package. The total amount is $500,000
of assistance and the way it is split is $200,000 is a grant from the CDBG Coronavirus funds
provided by the federal government. The other $300,000 will come in the form of a loan and is
what is being discussed at this meeting. He indicated this loan has already been considered and
approved by the Planning Committee and the Common Council in terms of the overall
assistance package. The loan would be a 3-year loan with 0% interest funded by repurposed
Walk Bridge Mitigation funds.The funds would be expended under a 3 year loan agreement
with 1 year forbearance period so they can get caught up as a result of the pandemic. Mr.
Bidolli said the Maritime Center would be required to pay $150,000 within 24 months and
another $150,000 in the third year.
Mr. Bidolli introduced Marc Grenier to add more about how the loan details.
Mr. Grenier shared that after discussions with Brian and his team they came up with the
possibility of giving the loan as a line of credit as opposed to giving an up-front sum of
$300,000. They would go through an approval process internally with Brian and his team in
accordance with CDBG guidelines. With a line of credit facility there is the ability to put in a
request and then advance the funds subject to the request being supported with
documentation. Assuming they would draw the total amount down, Mr. Grenier said the
repayment terms would be at the 24 month level 50% or whatever the outstanding principal
City of Norwalk
Norwalk Redevelopment Agency
Special Meeting
January 5, 2021 Page 2 of 5
balance was at that time which, if they drew the whole $300,000, would be $150,000 and then
the entire balance due 36 months after closing. He said he has already started drafting up the
agreement, and tonight the Board was there to approve the business terms for The Maritime
Center subject to agency council review.
Chairman Igneri first gave the Board members a chance to ask questions and then asked that, if
they went with the line of credit and drew the money down, would they need the approval of
the commissioners to advance the money. Mr. Grenier said they would not, and that in the loan
document it would state that as part of the process they would have to submit to the Agency all
their requests and supporting documents. He said Brian and or staff will review what is
submitted and if everything is okay then it moves along.
Mr. Bidolli added they would be adhering to the terms of the CDBG program and we would be
following a similar procedure in terms of allowable expenditures. He said they wanted to be
sure it was a reimbursable process so they had some oversight.
Mr. Westmoreland asked what would happen if the Maritime Center was unable to meet the
repayment dates, and if the Board have the right to renegotiate the terms. Mr. Grenier said
that according to the loan documents it would be a default. He said he would expect them to
reach out to Brian and the issue would be brought to the Board which would then discuss a
forbearance and or loan modification regarding loan repayment. Mr. Westmoreland then asked
if Board had the right to do this considering it involves CDBG funds and Mr. Grenier said the five
Commissioners can make these decisions.
POSSIBLE ACTION REGARDING ITEM II.1
** COMMISSIONER WESTMORELAND MOTIONED TO APPROVE THE BUSINESS TERMS AND
AGREEMENT FOR THE MARITIME CENTER SUBJECT TO AGENCY COUNCIL REVIEW AS
DISCUSSED.
** COMMISSIONER SPEIRS SECONDED THE MOTION.
** THE MOTION PASSED UNANIMOUSLY.
2. DESIGN REVIEW
I. 61 WALL / 17 ISAACS STREET – WALL STREET PLACE
(REPORT AVAILABLE AT:
HTTPS://WWW.NORWALKCT.ORG/DOCUMENTCENTER/VIEW/20509/WALL-STREET PLACE-
FINAL-210105)
William Hennessey came forward to speak. He provided a quick review of the project history for
the agency. He said after July 15th they filed their zoning application and then made a small text
change and that was filed on August 13th. Then they filed the balance of their zoning
applications on August 27th. He said before they filed site plans, JHM hosted a Zoom meeting
City of Norwalk
Norwalk Redevelopment Agency
Special Meeting
January 5, 2021 Page 3 of 5
with neighbors and obtained input from them. He said they met with the Planning Commission
and Zoning Commission in September. He said they opened hearing with Zoning in late October
and continued until the end of December. He said they only changes since July 2020 are the
articulation of the building and design enhancements.
Michael Weissbrod came forward to speak. He stated that he was with Crosskey Architects
from Hartford. Mr. Weissbrod provided images and blueprints of the site for the agency. He
reviewed the design and changes proposed for the project. .
Robert Grzywacz came forward to speak. Mr. Grzywacz, the architect who wrote the peer
review for the City. He presented design choices for the agency to decide on and made a
recommendation to remove a few parking spaces at the entryway.
Chairman Igneri stated he was happy with the design changes and work that had been
accomplished, and preferred the applicant’s transparency option. He stated that the plan was
much improved over what had been presented prior. Mr. Westmoreland questioned if there
were five habitable stories in the front of the building and six in the rear. This was confirmed
after a pictorial review of the sightlines. Further discussion on the various details and
improvement of the designs in the project followed.
POSSIBLE ACTION REGARDING ITEM II.2.I
** COMMISSIONER IGNERI MOTIONED TO APPROVE THE DeCARLO AND DOLL PEER REVIEW
REPORT FOR WALL STREET PLACE DATED 1/5/2021 AS THE PROPOSED PROJECT MEETS THE
WALL STREET/WEST AVENUE DESIGN GUIDELINES.
** COMMISSIONER SPEIRS SECONDED THE MOTION.
** THE MOTION PASSED UNANIMOUSLY.
II. 467 WEST AVENUE – THE PINNACLE
Mr. Craig Flaherty from Redniss & Mead was present to speak. He provided pictures and
blueprints for the agency. He introduced his associates David Sans, Bill Warwick, and Eric Rains
for the development of the site. He provided a review of the site layout for the agency, which is
the fourth iteration of the plans, and discussed the following details:
1) Changes to the primary entryway.
2) Raised the base element of the entryway.
3) Added commercial space.
4) The addition of a pedestrian walkway between the buildings which will include
landscaping and specialty lighting.
5) Type of street lighting suggested by the third-party design reviewer.
City of Norwalk
Norwalk Redevelopment Agency
Special Meeting
January 5, 2021 Page 4 of 5
Bill Warwick from Barton Partners then spoke. He presented design elements including
suggestions made by Bob. He mentioned their collaboration with Eric on landscaping. He talked
about two items opened in Bob’s review.
1) An embellished and highlighted primary entryway to the building.
2) Increasing the transparency by narrowing the piers around the retail space windows.
Mr. Westmoreland asked about street lighting and Craig said they would be happy to work with
the manufacture to reduce the light noise.
POSSIBLE ACTION REGARDING ITEM II.2.II
** COMMISSIONER WESTMORELAND MOTIONED TO APPROVE DeCARLO AND DOLL DRAFT
PEER REVIEW REPORT FOR THE PINNACLE DATED JANUARY 5, 2021 SUBJECT TO THE
CONDITIONS ADDRESSED AT THIS MEETING AND FURTHER SUBJECT TO THE EXECUTIVE
DIRECTORS APPROVAL OF THE FINAL DEVELOPER DRAWINGS TO BE CONSISTANT WITH THE
CONDITIONS DISCUSSED IN THIS MEETING.
** COMMISSIONER IGNERI SECONDED THE MOTION.
** THE MOTION PASSED UNANIMOUSLY.
ADJOURNMENT
The meeting was adjourned at 6:40 P.M.
Respectfully Submitted,
Telesco Secretarial Services
City of Norwalk
Norwalk Redevelopment Agency
Special Meeting
January 5, 2021 Page 5 of 5
Meticulous Landscaping and Design, Inc.
115 New Canaan Ave PMB #705
Norwalk, CT 06854
Phone (203) 849-9340 Fax (203) 642-4428
Email: metic7@optimum.net
January 29, 2021
Norwalk Redevelopment Agency
125 East Avenue – Room 202
Norwalk, CT 06851
Attn: Brian Bidoli, Jessica Casey, David Shockley, Stephen Ivan
Dear Mr. Bidoli, Ms. Casey, Mr. Shockley and Mr. Ivan:
We want to thank all of you for the continued opportunity to service your grounds. There will be no increase in the amount
for services for the upcoming third year of our contract.
We have revised the billing schedule for RFP No. 100-1 for the upcoming season as per your direction and as noted
below; we will waive a deposit to be normally billed on January 1, 2021 and instead bill monthly based on the
maintenance requirements from Jan-June 2021 and July-Dec 2021 respectively.
Total for 2021 Services by Meticulous Landscaping & Design, Inc. and agreed to by Norwalk Redevelopment
Agency as a part of a 3 year contract approved for 2019, 2020, 2021:
RFP No 100-1 2021 $111,250.00*
*no increase for 2021
Proposed Schedule of Monthly Payments:
01/01/2021: $ 6,489.58
02/01/2021: $ 6,489.58
03/01/2021: $ 6,489.58
04/01/2021: $ 6,489.58
05/01/2021: $ 6,489.58
06/01/2021: $ 6,489.58
07/01/2021: $ 12,052.08
08/01/2021: $ 12,052.08
09/01/2021: $ 12,052.08
10/01/2021: $ 12,052.08
11/01/2021: $ 12,052.08
12/01/2021: $ 12,052.08
It is understood than any additional work items that are not covered in the RFP No.100-1 that we are asked to do will be
billed separately as they occur at a mutually agreed upon amount.
We are looking forward to continuing the servicing of your account needs with professional, courteous and superior
service.
Cordially,
Joseph Tamburro
President
Attachment A: Mathews Park Master Site Plan Approach Scope of Work
Mathews Park Master Site Plan Approach
Heritage Landscapes Team, a collaboration with Aris Stalis, PLA, of Aris Land Studio and
Bruce Mawhirter, PE, LEED AP, and Veera Karukonda, PE, Lead Traffic Engineer, of M& J
Engineers, will approach the Mathews Park Master plan project from three viewpoints,
historic, contemporary, and future, to address the evolution and ongoing vibrancy of this
public park landscape and its facilities. Heritage Landscapes is focused on the vitality and
ongoing stewardship of heritage places and Mathews Park, the former Lockwood-Mathews
26.4-acre property, is a few short blocks away from our 34 Wall Street, Norwalk office. We
are familiar with the park and are excited to have the opportunity to study it in detail and
prepare planning recommendations for a more vibrant future for this community treasure.
Over the decades, the private estate became an 18-acre public park and site of a vibrant
group of museums and community gathering places, as well as an open landscape to enjoy.
With the Lockwood-Mathews Mansion Museum as a centerpiece, the park hosts one of the
earliest and most significant Second Empire Style houses in the country with National
Landmark status.
Today the landscape around the Mansion fails to add value in terms of historic character
and features as a setting for the former estate buildings. This site planning project can
reverse this absence and celebrate the valuable landscape through the recapture of historic
character, while also addressing current issues throughout the park. With this project the
Heritage Landscapes Team will affirm the significance of Mathews Park for the Norwalk
community and enhance its uses and functions.
Heritage Landscapes, Norwalk CT, Charlotte VT ◾ November 20, 2020 ◾ Page 1
Mathews Park Master Site Plan Attachment A
Our team will align our efforts to the planning goals for this evolved public landscape.
These goals provide a comprehensive framework for this work, to include:
Reimagine the Historic Site- to understand and relate past, present, and future uses – The
foundation of this planning work, gaining a thorough understanding of site evolution,
landscape today, current uses, and analyzing connectivity and other relevant issues, will
serve as the starting point for reimagining the future vectors and bringing forward
actionable recommendations that uplift the park visitor experience.
Enhance the beauty and utility of the site through landscaping, and other site planning
strategies that improve the historic context for the site’s historic buildings – Heritage
Landscapes is uniquely suited to enhance Mathews Park beauty and functionality
thoroughly and appropriately, based on a body of knowledge assembled in this work to
include historic site evolution, uses, tenant and stakeholder inputs, and community
desires in a well-balanced, inclusive manner in the plan recommendations.
Improve connections into and out of park on all sides. Improve multimodal transportation
access to, through and around the site – Attention to multi-modal circulation within and
adjacent to Mathews Park will include addressing trails, sidewalks, crosswalks, vehicle
routes, and parking, with special focus on connectivity among landscape and
destinations within the park. For example, we will study connections to the adjacent
Waypoint, Stepping Stones Museum, and new Pinnacle project (s)underway to link the
park at West Avenue, Butler Street, Crescent Street and under I-95 to Oyster Shell Park.
The segment of the Norwalk River Valley Trail within the park and its internal
connections is another aspect to address. Working with professionals from M& J
Engineering PC, the team will integrate multi-modal access and traffic considerations
from nearby as well as within Mathews Park.
Provide pedestrian access from the mid-block Waypointe and Pinnacle development sites
to a “gateway” entry to Mathews Park from Butler Street – As part of the circulation
system efforts, we will study opportunity to strengthen the historic frontage of the
Lockwood Mathews estate along West Avenue and provide notable entrances to
Mathews Park via Butler Street.
Provide multimodal streetscape and roadway improvements to West Avenue – A review of
previous West Avenue connectivity plans will be undertaken, and recommendations for
West Avenue, particularly along the frontage of Mathews Park will be prepared to build
upon prior work.
Determine guidelines for quality activities, events, and other programmatic uses of the
Park – By gathering information on current uses form tenants and stakeholders, this
team will assess event types and capacities with a sustainable park landscape in mind.
Guidance recommendations will identify for appropriate activities and capacities that
can support social engagement while limiting environmental impacts and historic
landscape degradation.
Encourage ways for the City’s businesses to benefit from the over 500,000 annual visitors
Heritage Landscapes, Norwalk CT, Charlotte VT ◾ Page 2
Mathews Park Master Site Plan Attachment A
per year to the park’s existing institutions – While parks are not considered economic
generators themselves, the activities and destinations within them and the adjacent and
nearby businesses often reap benefits as park users engage within and around the park.
Having the park function well and be clearly and safely connected to the surroundings
encourages longer park visits and flows over into nearby purchasing.
Taken together, the goals, initial and secondary questions and the requested tasks will yield
a well-crafted, effective, plan resulting from this collaborative, inclusive work by the
Heritage Landscapes Team.
Heritage Landscapes Work Scope Tasks and Deliverables
1 Research, Base Mapping, Observations, Interviews, Work Session,
Community Listening Session
The following subtasks will be undertaken in Task 1:
1a Hold Project Start-up Virtual Meeting
1b Research Park History and Evolution
1c Prepare Park and Adjacent Area Base Map
Heritage Landscapes, Norwalk CT, Charlotte VT ◾ Page 3
Mathews Park Master Site Plan Attachment A
1d Review Relevant Plans, Studies and Regulations
1e Observe Park Uses and Record Observations
1f Conduct Tenant Telephone/Video Conference Interviews, Gain Input
1g Prepare and Submit Report on Tasks 1a – 1f Findings and Products
1h Hold MPOC Work Session and Community Listening Session
1a Hold Project Start-up Virtual Meeting
Heritage Landscapes will schedule an online start-up meeting with the Norwalk
Redevelopment Agency. At this meeting we will determine representative members
of the Mathews Park Oversite Committee (MPOC), review scope of work scope and
deliverables, identify repositories for Mathews Park historic documents and affirm a
preliminary project schedule and milestones.
1b Research Park History and Evolution
Heritage Landscapes will obtain historic documents from the Norwalk Public
Library History Room, Lockwood Mathews Mansion Archives, and other locations as
identified during the project start up meeting. We will carry out an analysis of the
1876 Davies Survey and the collection of historic photographs of the property in the
museum archives. This effort will include collecting and studying the historical maps
and aerial photographs of the property from the 1870s to the present. This
assessment will reveal the character of the landscape to form a foundation for
recommendations about the character and features of the landscape. These future
directions will include attention to historic features of the landscape, historic
landscape details, paths, plantings, and small-scale elements and objects that can
shape a recognizable landscape character, improving the historic setting of the
Mansion and its associated historic buildings.
1c Prepare Park and Adjacent Area Base Map
Obtain available recent surveys, mapping, digital files, partial AutoCAD survey and
aerials to create a Master Plan base drawing. Using this base mapping, Heritage
Landscapes staff will undertake fieldwork to prepare a current park base map. The
composite base map will be used for planning proposes undertaken as part of this
Master Planning process. While Heritage Landscapes is in the park to conduct field
work, we will informally observe park uses that will inform the approach to
observing uses more formally in tasks 1e.
1d Review Relevant Plans, Studies and Regulations
Obtain and review relevant plans and studies of West Avenue, city-wide as they
affect planning for Mathews Park to gain an understating of how the goals and
objectives of these earlier studies may affect the site master planning
recommendations. Exiting rules and regulations affecting Mathews Park will be
reviewed and modifications recommended as appropriate to improve park user and
visitor experience.
Heritage Landscapes, Norwalk CT, Charlotte VT ◾ Page 4
Mathews Park Master Site Plan Attachment A
1e Observe Park Uses and Record Observations
Heritage Landscapes staff will spend time observing park activities to learn more
about uses and the interactions between the users within the park. This includes
Norwalk residents, local and regional visitors to the park, Lockwood Mathews
Mansion, Stepping Stones Museum for Children, The Center for Contemporary Print
Making, Fairfield County Cultural Alliance CRIS Radio and Devon’s Place playground
for children. Vehicular and pedestrian movement functionality, issues and potential
conflicts will be observed overall and to better understand the Norwalk River Valley
Trail users and uses within the park
1f Conduct Tenant Telephone/Video Conference Interviews, Gain Input
Interviews will be carried out with the various tenants in the park to gain their input
on a variety of issues affecting their use and needs within the park and how that
may affect other tenants, visitors and guests. The questions will be framed to
address data sought in the request for proposal responding to the following:
How are Mathews Park and its facilities currently used, for what uses, and who are
the users, including the tenants in the park, as well as the general public?
How is Mathews Park accessed and traversed and by what modes of
transportation?
What improvements or changes can be made to better serve the needs of the
tenants within the park?
How can multimodal transportation access to, through and around the site be
improved to support existing and future users?
What current programmed events occur in the park and are these appropriate
uses to continue and support?
What kind of partnerships and funding opportunities will support the Master Plan
recommendations in the Park?
How are current conditions (i.e. COVID-19) expected to dictate future use of the
site?
Are there opportunities for development within or immediately surrounding the
site?
How the history of the park influenced or can better influence park use, circulation
and overall perception of the campus and context of the setting for the Mansion
and related structures?
1g Prepare and Submit Report on Tasks 1a through 1f, Findings and Products
Findings of tasks 1a through 1f will be compiled in a concise report to share with the
Mathews Park Oversight Committee and Public. Identifying the evolution of the park
landscape over time, existing features and uses, potential impact of earlier planning
studies, observed use, park user and tenant impacts form a basis for making
decisions and site planning recommendations. The report will be provided to the
Oversight Committee in advance of the work session.
Heritage Landscapes, Norwalk CT, Charlotte VT ◾ Page 5
Mathews Park Master Site Plan Attachment A
1h Hold MPOC Work Session and Community Listening Session
Heritage Landscapes will present the report of tasks 1a. through 1f, via video
conference or in person as determined by public heath protocols, to the Mathews
Park Oversight Committee during the day with a Public Community Listening
Session in the early evening. A work session during the day with the MPOC allows
sufficient time to incorporate any desired modifications in advance of sharing the
presentation with the community.
The Community Listening Session will focus on sharing the information gathered
during the earlier tasks with the community, allowing them to share their thoughts
and issues regarding Mathews Park. Inputs will be noted and considered in
considering alternatives and developing the recommendations in the next task.
Deliverables Task 1
The report will be organized in an 8.5” by 11” page document with 11” by 17” inch fold out
plans of related graphics to be provided in draft to the MPOC. This report of introductory
findings will become part of the final Site Planning reporting for Mathews Park. The report
will be provided in digital formats as PDF and Word files, for ease of review comment, with
plans prepared in AutoCAD provided as PDF files. A summary memo of the inputs that
relate to the refinement of the draft will be provided to the MPOC for review and comment.
Heritage Landscapes, Norwalk CT, Charlotte VT ◾ Page 6
Mathews Park Master Site Plan Attachment A
2 Prepare, Present, Refine Draft and Final Mathews Park Master Plan
The subtasks to be carried out in Task 2 include:
2a Prepare Draft Mathews Park Master Plan
2b Revise Draft with Traffic Engineer and Consulting LA
2c Provide Refined Draft Mathews Park Master Plan
2d Hold MPOC Work Session and Community Input Session
2e Prepare and Submit Final Mathews Park Site Master Plan
2a Prepare Draft Mathews Park Master Plan
Prepare a preliminary Master Plan that includes including graphic representations
of the potential build-out. The draft Park Master Plan will incorporate findings and
address issues raised during the Task 1 effort and community input. The plan will
reflect any proposed regulation amendments as well as examples of any new design
standards. Prepare and present draft Mathews Park Master Plan, which will include
the requested elements of:
Prepare a visual simulation concept rendering of the park, and a site plan
Guide design within the context of this historic site
Evaluate current parking capacity and estimation of future parking demand as a
result of future use, as indicated by the tenants – identify need of future parking
analysis and studies where appropriate
Recommend infrastructure improvements and determine potential economic
impacts
Identify improved pedestrian connectivity with adjacent commercial/residential
developments
Recommend improved internal park circulation and Multi-modal trail access and
connection to Oyster Shell Park
Identify opportunities to enhance the West Avenue frontage, create a Gateway
on Butler Street and presence of the park along Crescent Street.
2b Revise Draft Plan with Traffic Engineer and Consulting LA
The draft Master Plan will be shared with the consulting traffic engineer to review
and assess safety and operational issues regarding proposed pedestrian street
crossings and interface with multi modal and vehicular movements with park
entrances and within the park. The consulting Landscape Architect will share his
knowledge working with the City and Community on earlier design and
implementation projects within the park and the adjacent Oyster Shell Park.
2c Provide Refined Draft Mathews Park Master Plan
A Draft Mathews Park Master Plan will be provided to the MPOC in advance of the
work session. The plan will address all issues, planning guidance and
recommendations developed in tasks 2a and 2b. The draft plan may include design
alternatives in response to issues to obtain direction from the committee.
Heritage Landscapes, Norwalk CT, Charlotte VT ◾ Page 7
Mathews Park Master Site Plan Attachment A
Deliverables Task 2a, b, c: The Draft Mathews Park Site Plan report will be
organized as a standard page-size document with fold out plans of related graphics
to be shared with the MPOC. The draft report will be provided in digital formats for
review and comment.
2d Hold MPOC Work Session and Norwalk Community Input Session
Heritage Landscapes will present the draft site plan report from tasks 2a and 2b via
video conference or in person as determined by public heath protocols. The MPOC
will provide their thoughts and direction in the first meeting. The community input
session will follow to gain reactions and inputs. Both sessions will include questions
about priorities and next steps.
Heritage Landscapes will note the inputs received from the community session. A
follow up discussion with the MPOC will discuss public comments to be highlighted
in refining and finalizing the park site plan
2e Prepare and Submit Final Mathews Park Master Plan
Heritage Landscapes will refine the draft plan in accord with the input received to
shape a Final Mathews Park Master Plan that incorporates comments provided by
the MPOC, tenants and community members.
Based on inputs and direction form the MPOC project priorities, phasing and next
steps toward implementation of recommendations will be developed for this
submittal to include:
Outline a timeframe for implementation, prioritizing short- and long- term goals,
and identify incremental and/or phased steps
Identify and strategies opportunities for public/private partnerships
Identify possible organizations needed to complete tasks.
A draft of these items will be provided to the MPOC for review and comment.
Comments received will be incorporated within the Final Mathews Park Master
Plan.
Deliverables Task 2: The Final Mathews Park Master Plan will be organized in an
8.5” by 11” document with 11” by 17” inch fold out plans of related graphics. It will
be provided as a PDF file organized to print on two-sides. All the original digital files
will be provided in original digital formats which may include AutoCAD, Word, In-
Design, and Photoshop. PDF files of all plans will also be provided at full size, for 24”
by 36” printing. All historic images, and documents acquired in digital formats will
be compiled and provided on digital media. Hard copies of products can be
provided if a budget for those direct expenses or direct reimbursement is approved
beyond the budget presented in this proposal.
Heritage Landscapes, Norwalk CT, Charlotte VT ◾ Page 8
Mathews Park Master Site Plan Attachment A
DESIGN AND PLANNING SCHEDULE
The Heritage Landscapes Team anticipates a five to six-month planning project schedule.
The project will commence on Monday February 22 and reach completion by Friday 20
August 2021. Under this sequence, final deliverables responding to comments received,
would be submitted in accord with the tasks. The schedule may be revised as the project
progresses at the direction of the MPOC and agreement of the team.
STAFFING AND EXPENSES
On the following page the Heritage Landscapes Team has developed staffing fees and
expenses to reflect the proposal as detailed above. The Heritage Landscapes Team
members participation in the tasks shown yields a staffing budget of $ 24,170. Office
expenses for internal printing and data collection are budgeted at $400.00 for a total of
$24,570.
Heritage Landscapes, Norwalk CT, Charlotte VT ◾ Page 9
Mathews Park Site Master Plan Agreement (draft for review)
This agreement is made on the 10th day of February 2021 between the (Client) Norwalk
Redevelopment Agency, --- address -Represented by _________________ email: ______________________
NRA name--- will serve as Project Manager and NRA name or designee will be
responsible for executing this agreement and any amendments to the work scope and budget, and
Heritage Landscapes LLC, (Consultant), represented by Patricia M. O'Donnell, Founder and Partner,
at email: odonnell@heritagelandscapes.com and phone 802-425-4330
Peter Viteretto, Principal and Project team leader at email: viteretto@heritagelandscapes.com,
physical location 34 Wall Street Norwalk CT office, and phone 203-852-9966
Project contract and billing materials will be sent to Patricia O’Donnell, Heritage Landscapes LLC,
PO Box 321, Charlotte VT 05445-0321 or via email as shown above, or via express to 501 Lake
Road, Charlotte VT 05445 VT office phone is 802-425-4330 for voice contact.
The Client desires a site master plan for historic Mathews Park and requests that Heritage
Landscapes LLC (HL) lead that effort with their team members in a collaborative process, and
Heritage Landscapes is fully able to prepare that plan. This planning effort will be informed by a
cooperative dialogue with the Client. The project scope, and fees and expenses are detailed in
Attachment A: Scope of Work and Attachment B: Staffing and Expenses, that become a part of this
agreement.
Whereas, the Consultant has the experience and ability to prepare such and is willing to provide the
necessary professional services to the Client, now, therefore in consideration of the terms and
conditions herein provided, the parties agree as follows:
1. Term: The term of the agreement shall commence on the date noted above and continue to
completion under an agreed schedule unless extended or terminated in accordance with the terms
set forth below. An approximate February 22, 2021 to August 20, 2021 schedule, will be adapted to
conform to the desires of the client and the best efforts of the consultant. Any adjustment to the
project schedule will be reviewed and approved by the Client in writing, which can be via email.
2. Services: The Consultant agrees to provide the desired planning professional services with the
scope set forth in Attachment A, appended and made a part of this agreement. Such services shall
include those described with the products and deliverables noted. The consultant team includes
only HL professional staff, as shown on Attachment B, Staffing and Expenses chart. There is also a
subconsultant for the development of a cost estimate for the proposed work.
3. Payments: In consideration of the services to be performed by the consultant in accordance
with the provisions of this agreement, the Client shall pay the Consultant a sum not to exceed
$24,570 full sum to HL, inclusive of all staffing and direct expenses as shown on Attachment B.
Payments to HL shall be made in the following manner:
a. Payment shall be made by the Client upon receipt and approval of each invoice covering HL
efforts to complete the itemized tasks and provide related deliverables over the prior month.
For simplicity and ease of bookkeeping, the billing for professional services and expenses will
be equally divided for five payments of $4,914. The first billing will be dated April 1, 2021 for
Norwalk Redevelopment Agency and Heritage Landscapes LLC Agreement Page 1
the start-up period of five weeks, and then each month following, prepared early in that month
for the prior month efforts. Payment shall be made in a timely manner not to exceed 30
calendar days. Client shall make the final payment upon HL completion of all deliverables and
sending of a final billing anticipated to be provided not later than 20 August, 2021. Payment
shall be sent to Heritage Landscapes LLC, attention Patricia O’Donnell, at the Vermont mailing
address of Patricia O’Donnell, Heritage Landscapes LLC, PO Box 321, Charlotte VT 05445 or by
direct bank deposit as agreed.
4. Relation of The Client and Consultant: The Client and the Consultant will work jointly and
amicably in this undertaking. The Client will provide the Consultant with all available data, will
assist the Consultant in each task of the Scope of Work as required and will review, comment upon
and approve the Consultant's work as necessary to complete the work. The relationship of the
Consultant to the Client is that of an independent contractor and not an employee or agent of the
Client, therefore, all employment benefits or similar provisions are expressly excluded from this
agreement. The Consultant represents that it has and shall secure at its own expense, all personnel
required in performing the services of this agreement. With respect to Consultant's personnel,
Consultant as employer shall provide all employment benefits and shall withhold and pay all
income, social security, worker's compensation, vacation and sick compensation or similar costs.
5. Termination: If the Consultant fails for any reason to fulfill its contractual obligations, the Client
shall have the right to terminate this agreement upon fifteen days written notice. Failure to perform
in accordance with the contract shall attempt to be remedied prior to termination.
The Client may also terminate this Agreement without cause upon 30 days written notice to
Consultant. In such an event the Consultant shall receive compensation only for completed tasks
and all work in accord with the scope completed to that time. Compensation shall be forwarded
promptly by the Client.
6. Ownership, Use and Copyright of Documents and Other Materials: The Client and the
Consultant will share in a joint copyright for all products of this work that will be incorporated into
the project report itemized in Attachment A of this agreement. The Client and the Consultant shall
both be granted unrestricted use of the products. Typical Consultant uses are for project
information sheet, website, conference papers and professional articles. The Consultant will retain
rights to use any and all materials prepared by the Consultant predating this agreement or
performed under other agreements, which may be used during the course of this work. The
Consultant shall not include in any submissions to the Client any copyrighted matter. Both Clients
and Consultant shall give appropriate credit to each other for material produced under this
Agreement and used in publications and the like. Typical copyright statement used in prior work
adapted for this project could read: © 2021 All rights reserved. Norwalk Redevelopment Agency and
Heritage Landscapes LLC, principal authors (listed names of HL authors). This document may be used
and cited with credits given to the copyright holders and principal authors as noted in a complete
bibliographic citation. The copyright statement to be shown on the document will be reviewed,
refined and agreed by the Client to prior to finalization.
Norwalk Redevelopment Agency and Heritage Landscapes LLC Agreement Page 2
7. Insurance and Liability: The Consultant shall carry and keep in force commercial general
liability insurance to an aggregate level of $2,000,000 and professional liability and errors and
omissions insurance to a minimum limit of $1,000,000 and Workers' Compensation Insurance for
all of its employees physically on site at Mathews Park. Consultant shall provide the Client
satisfactory evidence of such insurance upon execution hereof and annually as coverage is renewed
for the project duration. ACORD certificates will be issued with the client name as additional
insured.
8. Minority Business: Heritage Landscapes LLC is a woman-owned firm. We have minority
registration in Vermont and Virginia at present.
9. Notices: Contract related notices shall be sent by certified mail, return receipt requested,
Federal Express with tracking numbers to 501 Lake Road, Charlotte, VT 05445, via a secure web
transfer platform, via email to the above addresses pending acknowledgment of receipt by the
representatives noted, or personally delivered. If to the Consultant, notice shall be mailed to the
Vermont office, Heritage Landscapes, PO Box 321, Charlotte, VT. If to the Client, notice shall be
mailed or delivered to its designated representative at the address set forth above.
10. Additional Tasks: The Client will determine the need for any tasks beyond the agreed work
scope. These tasks will be undertaken only upon a formally executed amendment to this agreement
authorized by the Client to proceed that clarifies the scope and fees for the desired additional tasks.
11. Confidentiality: Information, other than publicly available information, transmitted from the
Client to the Consultant during the course of this project, is confidential in nature. The Consultant
will perform in a discreet manner and agree not to disclose such information to outside parties.
Any inquiries for confidential information will be directed to the Client. Notwithstanding the above,
the Consultant acknowledges that all communications and work products surrounding this
agreement are subject to disclosure in accordance with relevant Connecticut legislation.
12. Arbitration: All claims, disputes and other matters in question between the parties of this
Agreement or the breach thereof, shall be decided by arbitration in accordance with Rules of the
American Arbitration Association, unless the parties mutually agree otherwise.
13. Assignment & Modification: This Agreement may not be assigned and may be modified only in
writing and as executed by Consultant and The Client. This agreement shall be governed by
Connecticut state law and shall bind and benefit the Consultant and the Client.
In Witness Thereof, the parties have duly executed this agreement hereto, made on the 10th day of
February 2021, as signed below:
__________________________________________________
Type name of person who signs above
Norwalk Redevelopment Agency
Norwalk Redevelopment Agency and Heritage Landscapes LLC Agreement Page 3
Patricia M. O'Donnell, FASLA, AICP
Founder and Partner, Heritage Landscapes LLC
Attachments: A and B as cited
Norwalk Redevelopment Agency and Heritage Landscapes LLC Agreement Page 4
Attachment B: Historic Mathews Park Site Master Plan Report
Heritage Landscapes LLC, Preservation Landscape Architects & Planners
and Team Members Staffing and Expenses
Founder PLA Proj Mgr PLA
Project Staff Project Consulting Subtotals
ODonnell Viteretto Traffic LA, Aris
PROJECT STAFF Engineer
MASTER PLAN TASKS
1 Research, Base Mapping, Observations, Interviews, Work Session, Public Listening Session 93
1a Hold Project Start-up Virtual Meeting 1 1 1
1b Research Park History and Evolution 4 4 8
1c Prepare Park and adjacent area Base Map 1 6 10
1d Review Relevant Plans, Studies, Regulations 2 2 4
1e Observe park uses and record observations 3 3
1f Carry out tenant telecon interviews, gain inputs 6 2
1g Prepare report on 1a-1f findings and products, submit 4 10 12
1h Hold MPOC Work Session and Community Listening Session 2 3 4
2 Prepare and Present Draft and Final Mathews Park Master Plan 141
2a Prepare draft Mathews Park Master Plan 6 12 32 3 3
2b Provide draft to M&J Eng, Aris Land, receive comments 2 2 2 2
2c Provide refined draft Mathews Park Master Plan 4 10 30
2d Hold MPOC Work Session and Community Input Session 2 3 4
2e Prepare and submit final Mathews Park Master Plan 2 6 12 2 2
HL Staff and Team Hours 28 68 124 7 7 234
Hourly Rates $ 190 $ 125 $ 75 $ 150 $ 150
Subtotals $ 5,320 $ 8,500 $ 9,300 $ 1,050 $ 1,050
TOTAL STAFFING $ 24,170
DIRECT EXPENSE ALLOWANCE $ 400
Inhouse printing, check plots, and services $ 400
TOTAL STAFFING AND EXPENSES $ 24,570
CHAIRMAN
John E. Igneri
COMMISSIONERS
Kelly Bloom
Lisa M. Cooper
William R. Speirs
David G. Westmoreland
EXECUTIVE DIRECTOR
Brian T. Bidolli
Memo regarding 3rd Party Façade Improvement Design Review for 637 West Avenue
February 5, 2021
Norwalk Redevelopment Agency
3 Belden Avenue
Norwalk, CT 06850
Dear Norwalk Redevelopment Agency Chairman and Commissioners,
637 West Avenue is a 1.12-acre property at the corner of West Avenue and Chapel Street in the
Wall-West Neighborhood of Norwalk. The Norwalk Union Trust Bank built a 25,000 two-story
brick commercial office building on the site in 1955. The building is designed in a colonial
revival style with a prominent columned pediment modeled off 41 North Main Street, the former
Norwalk City Hall built in 1912. Most recently, 637 West Avenue was occupied by a tenant bank
branch office. 637 West Avenue is listed on the local Norwalk Historic Resources Inventory List.
The current owner is renovating the existing building in order to make is usable for a medical
office use. The project requires 3rd Party Façade Improvement Design Review in order to
determine if the following façade improvements comply with the Norwalk Redevelopment
Agency’s Wall-West Neighborhood Design Guidelines:
New exterior lighting, site paving, and canopies;
Enclosure of the front entrance in a two-story glass atrium;
Removal of a drive-thru window and rebuilding of the window opening and brick wall;
Installation of new doors and windows throughout; and
Creation of a new rooftop mechanical structure.
Andriopoulos Design Associates has been selected as the 3rd Party Design Reviewer to comment
on the compliance of these proposed Façade Improvement with the Wall-West Neighborhood
Design Guidelines. ADA recommends that the Commission approve the design review as
compliant with the Wall-West Design Guidelines pending satisfactory reconciliation of any
concerns of the Commission (please see attachments for ADA’s commentary).
Brian Bidolli
Executive Director
3 BELDEN AVENUE, NORWALK, CT 06850 • (203) 854‐7810 • WWW.NORWALKREDEVELOPMENTAGENCY.ORG
November 24, 2020
Brian Bidolli, Executive Director
Norwalk Redevelopment Agency
City of Norwalk
3 Belden Avenue
Norwalk, CT 06850
RE: Application for Zoning Approval & Zoning Compliance
Applicant: Waypointe Partners LLC (c/o Seligson Properties)
Parcels: 637 West Avenue and 6 & 10 Chapel Street, Norwalk, CT
Dear Mr. Bidolli,
We are submitting the enclosed package to the Redevelopment Agency for administrative
review and approval in conjunction with a Zoning Permit application being filed for administrative
review and approval concerning work at parcels 637 West Avenue and 6 & 10 Chapel Street. The
application, submitted on behalf of our client and current owner of the parcels, Waypointe Partners
LLC, is for tenant fit up activities and exterior building modifications to the existing building at 637
West Avenue, as well as a parking lot reconfiguration across 6 and 10 Chapel Street. As the property
fronts on West Avenue and is located within the West Avenue Redevelopment Plan Area, the
modifications to the aesthetics of the building and site must be found by the Norwalk Redevelopment
Agency to be consistent with their guidelines prior to the issuance of a Zoning Permit.
The existing building has historically been used for office uses, including medical office use
and bank offices. The building is about 25,000 square feet with usable floor area in the basement, on
the first floor, on a first-floor mezzanine, and on the second floor. It was occupied by a bank from its
construction in 1955 through the 2000’s. Currently, Neurology Associates of Norwalk occupies about
4,000 square feet of the second floor as medical office and Wells Fargo occupies about 8,500 square
feet between the first floor and the basement. The owner is proposing to lease space in the existing
building to a tenant that would use most (about 90%) of the building for medical offices and the bank
would remain in a reduced space (about 10%) of the building. Exterior modifications include
aesthetic modifications to the exterior windows, enclosing the existing front covered entryway,
upgraded rooftop mechanical systems, an entry canopy at the rear entrances of the building, and a
reconfigured parking area to accommodate the increase in required parking.
Refer to the Architectural for the exterior modifications to the building and to the Site
Planting and Lighting Plan for proposed site landscaping.
Two (2) copies, Architectural and Structural Plans, prepared and certified by Pustola &
Associates Consulting Engineers, LLC, dated November 24, 2020;
22 First Street | Stamford, CT 06905 | Tel: 203.327.0500 | Fax: 203.357.1118 | www.rednissmead.com
Brian Bidolli
November 24, 2020
Page 2 of 2
Two (2) copies, Site Planting and Lighting Plan, prepared and certified by Eric Rains
Landscape Architecture, dated November 24, 2020
Two (2) copies, Property & Topographic Survey, prepared and certified by Ryan and
Faulds, dated November 24, 2020;
Two (2) copies, Site Civil Engineering Plans, prepared and certified by Redniss &
Mead, Inc., dated November 24, 2020;
Based on the above and attached, we trust you will find the application documents in
conformance with the Wall Street - West Avenue Neighborhood Plan and look forward to your
approval. In the interim, do not hesitate to call with any questions or requests for information.
Sincerely,
Craig J. Flaherty, P.E.
copy: Planning and Zoning, Steven Kleppin
Waypointe Partners LLC (c/o Seligson Properties)
26th January 2021
Mr. Jonathan Hopkins
Director of Program Development
Norwalk Redevelopment Agency
3 Belden Avenue
Norwalk, CT 06851
jhopkins@norwalkct.org
Re: 637 West Avenue – Design of Proposed Exterior Improvements
Dear Mr. Hopkins,
The building located at 637 West Avenue was designed as a bank building and features a Greek revival
front entry. This was a common architectural treatment of bank buildings during the 20th century to
symbolize the stature and security of the institutions.
We were asked by Seligson Properties to prepare a design study of a new entry for a potential medical
tenant that was interested in rebranding the building to reflect their 21st century image. In response to
that request, we directed a professional renderer to develop the attached drawing. The design is
characterized by simple clean lines that presents a fresh image to the street and maintains the building’s
overall substance and prominence. The new entry dramatically increases the transparency of building
façade as recommended in the design guidelines. The adaptive reuse of the existing building maintains
the historic scale of the building with a gracious front yard. The recycling of the existing building is a far
more sensitive and sustainable approach than the alternative approach of demolishing the existing
building and replacing it with a much larger building on the site.
We believe that the proposed exterior design comports with the Norwalk Redevelopment Agency’s
vision for the Wall Street and West Avenue neighborhoods for “A healthy and vibrant Urban Core
Neighborhood with a strong economy driven by innovation and collaboration that is accessible,
authentic, lively and affordable for residents and businesses.” Allowing the existing building to be re-
used, but modernized, respects the existing building and makes sure it will be a part of the streetscape
for years to come.
Sincerely
Bruce Beinfield, FAIA
President
Cc: Stanley Seligson, Michael Serrao (Waypointe Partners LLC),
Craig Flaherty, Vincent Hynes (Redniss & Mead)
Page 1 of 1
U E
E N
(4) UA
A V
WV
E E T
S T R (8) LS
STOPBAR
GV
TRAF (2) UA
BOXE FIC
A P E L
LK
S CRO
TRAFFIC
SSW
A
C H
20.11.24
POLE TRAFF
DATE
SIGNA IC
L MAS
T
DWS
CROSS
WALK
SITE LIGHTING - DOUBLE
STOP
LUMINAIRE (TYP.)
BAR
S T (26) OL
(3) UA
(7) OL
W E
(1) QR
(8) IM
(7) OL
ISSUE
ZONING SUBMISSION
EDGE OF ASPHALT
(2) UA
FFsil x (TYP.,ON CORNICE AROUND
l=43. BL1
3 ENTIRE BUILDING PERIMETER)
(5) RA
(12) MS
GAS
METER
NO. 7 6 5 4 3 2 1
(7) OL RELOCATED
FLAGPOLE
GV
NEW
FLAGPOLE
FFE=
4
T x 3.31
IRON PIPE FOUND
N 11°51' W (14) LF
0.9' TO CORNER
DR IV E (2) UA
-
ATM O UP
NLY
BASE
M
ACC ENT
ESS
(9) RA
(6) IM
(17) OL (1) MG
SITE LIGHTING - SINGLE
LUMINAIRE (TYP.) (7) OL
(1) QR
(2) UA
637 WEST AVE
NORWALK, CT
PROJECT
DWG TITLE
SITE PLANTING
AND LIGHTING
PLAN
JOB NO.
DATE
NOTES: 2020.11.24
1. REFER TO PHOTOMETRIC PLAN FOR MORE INFORMATION. SCALE
2. REFER TO DETAIL SHEET FOR PLANTING SCHEDULE. 1"=20'-0"
GRAPHIC SCALE
20 0 10 20 40 80 SPL-1.0
SCALE: 1" = 20'-0"
PLANTING SCHEDULE
SYM QTY BOTANICAL NAME COMMON NAME ROOT MIN. SIZE COMMENTS
TREES
UA 15 Ulmus americana 'Valley Forge' Valley Forge American Elm B&B 3-1/2"-4" cal. Full, 7' Clear Branching
LS 8 Liquidambar styraciflua 'Rotundiloba' Fruitless Sweetgum B&B 3"- 3-1/2" cal. Full and Nicely Shaped
LF 14 Liquidambar styraciflua 'Fastigiate' Fastigiate Sweetgum B&B 3"- 3-1/2" cal. Full and Nicely Shaped
QR 2 Quercus robur f. 'Fastigiate' English Oak B&B 3"- 3-1/2" cal. Full and Nicely Shaped
LEADER MUST REMAIN INTACT. DO NOT PRUNE HEAD
MG 1 Metasequoia glyptostroboides Dawn Readwood B&B 3-1/2"-4" cal. Full and Nicely Shaped UNLESS SPECIFICALLY INSTRUCTED BY LANDSCAPE
SHRUBS / GROUNDCOVER ARCHITECT
IM 14 Ilex x meserveae 'Blue Princess' Blue Princess Holly B&B 24" - 30" Full, Heavy; Hedged NOTES:
1. DIG WIDE SHALLOW HOLE WITH TAPERED SIDES
OL 71 Otto Luyken Cherry Laurel Prunus laurocerasus 'Otto Luyken' B&B 24" Ht. 30" O.C. 2. PLANT SO THAT ROOTBALL 2-3" HIGHER OR FLUSH WITH
MS 12 Miscanthus sinensis 'Yakushima Dwarf' Chinese Silver Grass B&B #1 30" O.C. GRADE
RA 14 Rhus aromatica 'Gro-Low' Gro-Low Fragrant Sumac B&B #1 30" O.C. 3. IN POORLY DRAINED SOILS SET ROOTBALL SEVERAL
INCHES HIGHER THAN GRADE
4. DO NOT STAKE OR WRAP TREES
5. CUT TOP BANDS OF WIRE BASKET AND FOLD AWAY FROM
BUILDING FACADE LIGHTING SCHEDULE TOP OF ROOT BALL
6. REMOVE ALL NYLON AND WIRE STRAPPING FROM
SYM QTY DESCRIPTION AROUND TRUNK AND ROOT BALL
7. FOR CONTAINER GROWN TREES, PULL OUT ROOTS FROM
MODEL: STR9-SLIM-BM-3W-3000K-10-PS-W40. BY GVA LIGHTING. CONTACT CLIFF GILBERT. OUTER LAYER OF POTTING SOIL, CUT ANY CIRCLING ROOTS
BL1 TBD (203) 788-0814 8. TEST SOIL FOR PH AND NUTRIENT LEVELS, ADJUST AS
REQUIRED
9. PRUNE ONLY CROSSING LIMBS, CO-DOMINANT LEADERS,
BROKEN OR DEAD BRANCHES, AND ANY BRANCHES THAT
POSE A HAZARD TO PEDESTRIANS
4" BUILT-UP EARTH SAUCER
3" DEEP SHREDDED BARK MULCH. DO NOT
PLACE MULCH AGAINST TRUNK OF TREE
DATE 20.11.24
PRIOR TO PLANTING ADD MYCORRHIZA SPORES
AND 3-4" OF WELL COMPOSTED LEAVES OR
COMPOST TO HOLE. MIX THOROUGHLY WITH
PREPARED SOIL
4-6" DEEPER
THAN ROOT BALL FINISHED GRADE
LUMINAIRE POLE
FOLD BURLAP AWAY FROM TOP HALF OF ROOT
5 PARKING / AREA LIGHT
BALL. 18 OF ROOT BALL SHALL BE ABOVE SPL-2.0 SCALE: NTS
EXISTING GRADE
PARTIALLY BACKFILL WITH SCREENED TOPSOIL
FOR TREES, WATER TO SETTLE SOIL, FINISH
TWICE WIDTH OF
BACKFILLING
ISSUE
ROOTBALL = MIN. WIDTH
OF PREPARED SET ROOT BALL ON FIRM PAD OF COMPACTED
PLANT SPACING AS PER PLAN SOIL FOR TREES SUBGRADE
ZONING SUBMISSION
PINE BARK MULCH INSTALLED BEFORE PLANTING
3" 3 TREE PLANTING
SPL-2.0 SCALE: NTS
SCREENED TOPSOIL
NO. 7 6 5 4 3 2 1
LIGHT POLE AND BASE
1 GROUNDCOVER PLANTING H.D. GALV. ANCHOR BOLTS W/ GALV. MOUNTING AND
LEVELING NUTS AND WASHERS - INSTALLED PER
SPL-2.0 SCALE: NTS MANUFACTURER'S SPECIFICATIONS AND TEMPLATE
FINISHED GRADE AT LAWN
SPACING VARIES -
PLANT TYPE
SPECIFIC
4-#5
6 FACADE / CORNICE LIGHTING
MULCH CLASS 'F' CONCRETE SPL-2.0 SCALE: NTS
4'-0" (MIN.)
2"
3-#3 TIES (TOP, BOTTOM
637 WEST AVE
AND MIDDLE)
18" MIN. SCREENED TOPSOIL
1-1/2"Ø PVC (UNLESS
NOTED OTHERWISE)
NORWALK, CT
1/2" PVC FOR
GROUND
UNDISTURBED SUBGRADE
NOTE: PLANTS ARE TO BE SPACED AS REQUIRED BY PLANTING SCHEDULE PROJECT
1'-6" DWG TITLE
DETAILS
2 SHRUB PLANTING 4 LIGHT POLE BASE
SPL-2.0 SCALE: NTS SPL-2.0 SCALE: NTS JOB NO.
DATE
2020.11.24
SCALE
NTS
SPL-2.0
1.3 1.3 1.4 1.5
1.8 1.7 1.7 1.9 1.9
99401 99401
1.1 1.5 1.8 1.8 1.5 1.1 1.1 1.4 2.0 2.0 1.8 2.0 2.0
99401 99401
0.9 1.0 1.3 1.7 1.8 1.4 1.1 0.9 1.0 1.2 1.5 1.4 1.0 0.7 1.1 1.3 2.0 1.9 1.7 1.6 1.7
99401
1.4 1.0 0.9 1.1 1.4 1.7 1.7 1.4 1.0 0.9 0.9 1.1 1.4 1.4 1.2 0.9 0.8 0.8 1.0 1.1 1.1 1.0 0.9 1.0 1.1 1.4 1.3 1.3 1.2 1.1 0.9 0.8 0.7
99401
1.2 1.3 1.5 1.9 1.9 1.4 1.0 0.9 1.1 1.4 1.7 1.7 1.3 1.0 0.9 0.9 1.1 1.3 1.3 1.1 0.9 0.8 0.8 0.8 0.9 0.9 0.8 0.7 0.7 0.7 0.7 0.8 0.8 0.8 0.8 0.8 0.9 1.0 1.1 1.1 1.0 1.0 1.0 0.9 0.9 0.9 0.8
99401
1.7 1.5 1.6 2.0 2.1 2.0 1.7 1.3 1.6 1.5 1.2 0.9 0.8 0.9 1.1 1.3 1.2 1.0 0.8 0.8 0.8 0.8 0.9 0.9 0.8 0.7 0.7 0.6 0.7 0.7 0.7 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.7 0.7 0.8 0.8 0.9 0.9 0.9 0.9 0.9 0.9 0.9 1.0 1.1 1.1
99401
2.0 1.7 1.7 2.0 2.1 1.9 1.6 1.4 1.4 1.3 1.0 0.8 0.8 0.8 0.8 0.9 0.9 0.8 0.7 0.7 0.7 0.7 0.7 0.6 0.6 0.6 0.6 0.5 0.5 0.6 0.6 0.5 0.5 0.5 0.5 0.5 0.6 0.6 0.6 0.7 0.8 0.8 0.9 0.9 0.9 0.8 0.8 0.8 0.9 1.1 1.4 1.5
99401
1.8 1.5 1.5 1.6 1.7 1.5 1.3 1.1 1.0 0.9 0.8 0.7 0.7 0.6 0.7 0.7 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.5 0.6 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.6 0.6 0.6 0.8 0.9 1.0 1.1 1.0 0.9 0.8 0.8 0.8 0.9 1.2 1.7 1.7
99401
1.4 1.2 1.2 1.2 1.2 1.1 1.0 0.9 0.8 0.7 0.6 0.6 0.6 0.6 0.6 0.6 0.5 0.6 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.6 0.6 0.6 0.7 0.7 0.9 1.0 1.3 1.5 1.4 1.1 0.9 0.8 0.8 0.9 1.2 1.6 1.7
1.1 1.0 0.9 0.9 0.9 0.8 0.8 0.7 0.7 0.6 0.5 0.6 0.5 0.5 0.5 0.6 0.5 0.6 0.6 0.6 0.6 0.6 0.6 0.5 0.6 0.6 0.6 0.6 0.6 0.6 0.7 0.5 0.7 0.7 0.6 0.7 0.7 0.7 0.9 1.1 1.3 1.7 1.9 1.7 1.3 1.0 0.8 0.8 0.8 1.0 1.2
1.2 1.2 1.1 1.0 1.0 0.9 0.8 0.7 0.7 0.7 0.6 0.6 0.6 0.6 0.5 0.6 0.6 0.6 0.6 0.6 0.7 0.7 0.7 0.7 0.7 0.7 0.8 0.6 0.8 0.8 0.8 0.8 0.8 0.9 0.9 0.7 0.9 0.9 0.9 0.9 1.0 1.1 1.1 1.3 1.5 1.8 99401
2.0 1.9 1.4 1.0 0.8 0.8 0.8 0.9 1.0
1.7 1.6 1.3 1.0 0.9 0.8 0.7 0.7 0.6 0.6 0.6 0.6 0.6 0.7 0.5 0.7 0.7 0.7 0.8 0.8 0.9 0.9 0.9 0.9 0.9 1.0 1.0 1.1 1.1 1.1 1.1 1.1 1.1 1.2 1.2 1.0 1.2 1.1 1.1 1.2 1.4 1.6 1.4 1.6 1.5 1.7 1.8 1.6 1.2 0.9 0.8 0.8 0.8 0.9 0.9
1.8 1.4 1.1 1.0 0.8 0.7 0.7 0.6 0.6 0.6 0.7 0.8 0.8 0.6 0.9 0.9 1.0 1.0 1.1 1.2 0.8 1.2 1.2 1.2 1.3 1.4 1.6 1.7 1.6 1.4 1.4 1.4 1.6 1.8 1.4 1.7 1.5 1.4 1.5 1.9 2.3 1.9 1.9 1.6 1.5 1.4 1.3 1.0 0.8 0.8 0.8 0.8 0.9 1.0
99401
1.7 1.4 1.2 1.1 1.0 0.8 0.7 0.6 0.6 0.7 0.8 0.9 1.1 0.8 1.3 1.3 1.3 1.3 1.4 1.7 1.2 1.8 1.6 1.5 1.6 1.9 2.4 2.6 2.3 1.9 1.7 1.7 2.1 2.6 2.7 2.3 1.8 1.6 1.8 2.2 2.6 2.0 2.3 1.8 1.5 1.3 1.1 0.9 0.8 0.7 0.8 0.9 1.1 1.4
99401
1.4 1.3 1.3 1.4 1.2 1.0 0.8 0.7 0.7 0.8 0.9 1.2 1.6 1.2 1.9 1.7 1.6 1.6 1.9 2.4 1.7 2.6 2.1 1.8 1.9 2.4 3.2 3.4 3.0 2.3 1.9 2.0 2.5 3.1 3.2 2.7 2.0 1.7 1.8 2.2 2.8 2.9 2.5 1.9 1.5 1.3 1.1 0.9 0.8 0.7 0.8 1.0 1.3 1.8
99401
994033.2 99401
1.6 1.2 0.9 0.8 0.8 0.9 1.1 1.5 2.3 2.9 2.8 2.3 1.9 1.8 2.3 3.1 1.9 3.3 2.5 1.9 2.0 2.5 3.3 3.4 2.3 1.9 2.0 2.5 3.2 3.2 2.7 2.0 1.7 1.7 2.1 2.7 2.9 2.6 2.0 1.6 1.3 1.1 0.9 0.8 0.7 0.8 1.0 1.3 1.8
99401
99403 99401
1.9 1.4 1.0 0.8 0.8 0.9 1.2 1.7 2.7 3.3 3.4 2.6 2.0 1.9 2.3 3.1 3.5 3.2 2.4 1.9 1.8 2.1 2.7 1.8 2.6 2.0 1.7 1.8 2.1 2.6 1.9 2.3 1.8 1.6 1.6 1.9 2.4 2.1 2.4 2.0 1.7 1.4 1.2 1.0 0.8 0.8 0.8 0.9 1.1 1.4
99401 99403
1.7 1.2 0.9 0.8 0.8 0.9 1.1 1.6 2.5 3.2 3.1 2.4 1.9 1.7 1.9 2.4 2.7 2.4 2.0 1.6 1.5 1.6 1.8 1.3 1.8 1.6 1.5 1.5 1.6 1.9 1.4 1.7 1.5 1.3 1.4 1.5 1.8 1.8 2.0 1.9 1.9 1.8 1.5 1.1 0.9 0.8 0.8 0.8 1.0 1.1
1.3 1.2 1.0 0.8 0.7 0.7 0.8 1.0 1.3 1.8 2.2 2.2 1.9 1.6 1.5 1.5 1.7 1.7 1.6 1.4 1.3 1.3 1.3 1.3 1.3 1.3 1.2 1.2 1.2 1.3 1.3 1.0 1.3 1.1 1.1 1.0 1.1 1.4 1.3 1.6 1.8 2.1 2.1 1.7 1.2 0.9 0.8 0.8 0.8 0.9 1.0
99401
1.0 1.0 1.0 0.8 0.7 0.7 0.6 0.7 0.8 1.0 1.3 1.4 1.5 1.3 1.2 1.2 1.2 1.2 1.2 1.2 1.1 1.0 1.0 1.0 1.0 1.0 1.0 0.9 0.9 1.0 1.0 1.1 0.9 1.0 0.9 0.9 0.9 1.0 1.1 1.0 1.3 1.6 2.0 2.0 1.7 1.2 0.9 0.8 0.8 0.9 1.0 1.1
1.1 1.0 1.0 0.9 0.8 0.7 0.6 0.6 0.6 0.7 0.8 0.9 1.0 0.7 1.0 0.9 0.9 0.9 0.9 0.9 0.6 0.8 0.8 0.8 0.8 0.8 0.8 0.6 0.7 0.8 0.8 0.9 0.9 0.8 0.9 0.9 0.8 0.8 0.8 0.9 0.9 1.0 1.2 1.5 1.6 1.3 1.0 0.8 0.8 0.8 0.9 1.2 1.5
1.3 1.2 1.1 1.0 0.8 0.7 0.6 0.6 0.6 0.6 0.7 0.7 0.8 0.6 0.8 0.7 0.7 0.7 0.7 0.7 0.6 0.7 0.7 0.7 0.6 0.6 0.6 0.6 0.7 0.7 0.8 0.9 1.0 0.9 0.9 0.9 0.8 0.8 0.7 0.7 0.7 0.8 0.9 1.0 1.1 1.0 0.8 0.7 0.7 0.8 1.0 1.4 1.7
99401
1.7 1.4 1.2 1.1 0.9 0.8 0.7 0.6 0.5 0.5 0.6 0.6 0.6 0.5 0.6 0.6 0.6 0.6 0.7 0.7 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.7 0.7 0.8 0.9 1.2 1.3 1.2 1.1 0.9 0.8 0.7 0.7 0.7 0.7 0.7 0.8 0.8 0.8 0.7 0.7 0.7 0.7 0.9 1.3 1.6
2.0 1.7 1.5 1.4 1.2 0.9 0.8 0.6 0.6 0.6 0.6 0.5 0.6 0.6 0.6 0.6 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.8 1.1 1.5 1.8 1.7 1.3 1.0 0.9 0.8 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.6 0.6 0.6 0.6 0.7 0.9 1.1
99401
2.1 1.9 1.8 1.9 1.9 1.6 1.2 0.9 0.7 0.7 0.6 0.6 0.6 0.7 0.7 0.7 0.7 0.8 0.8 0.8 0.8 0.8 0.9 0.9 0.9 0.9 0.9 0.9 0.8 0.8 0.8 0.9 1.2 1.6 1.8 1.9 1.5 1.1 1.0 0.9 0.8 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.6 0.6 0.6 0.6 0.7 0.7
99401
1.2 1.1 0.9 2.1 2.0 1.9 1.3 1.0 0.8 0.8 0.8 0.8 0.9 0.9 0.9 0.9 0.9 0.9 1.0 1.1 1.1 1.2 1.1 1.1 1.2 1.3 1.4 1.3 1.1 0.9 0.9 0.9 1.1 1.4 1.8 1.7 1.4 1.2 1.1 1.1 1.0 0.8 0.8 0.7 0.7 0.8 0.8 0.8 0.7 0.6
99401
1.2 1.4 1.6 1.9 2.1 1.8 1.3 1.0 0.9 0.9 1.0 0.7 1.1 1.2 1.2 1.2 1.1 1.2 1.4 1.5 1.7 1.6 1.5 1.4 1.5 1.7 1.9 1.8 1.4 1.1 0.9 0.9 1.0 1.1 1.3 1.4 1.3 1.3 1.4 1.5 1.3 1.1 0.9 0.8 0.9 1.0 1.1 1.0 0.8 0.6
0.9 1.1 1.2 1.4 1.6 1.6 1.5 1.2 1.0 1.0 1.1 1.2 0.8 1.6 1.8 1.8 1.5 1.3 1.5 1.8 2.0 2.4 2.1 1.9 1.8 1.8 2.1 2.2 2.1 1.6 1.1 0.9 0.8 0.9 0.9 1.0 1.1 1.2 1.4 1.8 1.9 1.7 1.3 1.0 0.9 1.1 1.4 1.6 1.4 1.0 0.7
99401
0.9 1.0 1.1 1.2 1.3 1.3 1.2 1.1 1.1 1.1 1.3 1.6 1.0 2.1 2.3 2.3 1.7 1.6 1.6 1.9 1.9 2.6 2.5 2.3 2.3 2.2 2.2 2.1 2.0 1.5 1.1 0.8 0.8 0.8 0.9 1.0 1.1 1.2 1.0 1.1 1.5 1.7 1.6 1.1 0.7
99401 99401
99401
1.0 1.1 1.2 1.3 1.4 1.3 1.1 1.1 1.1 1.2 1.6 2.1 2.3 2.4 2.5 99401
2.4 2.0 1.8 1.8 2.1 1.9 2.5 1.7 2.6 2.6 2.4 2.1 1.8 1.5 1.2 0.9 0.8 0.7 0.8 0.9 0.8 1.1 1.2
99401
1.1 1.2 1.4 1.7 1.7 1.4 1.2 1.1 1.1 1.3 1.8 2.2 2.4 2.3 2.2 2.1 1.9 1.8 1.9 2.2 2.4 1.5 2.3 2.5 2.6 2.4 1.9 1.5 0.7 1.0 0.8 0.7 0.7 0.8 0.9 1.0 1.3 1.3
99401
1.4 1.0 0.8 1.7 2.0 2.0 1.5 1.2 1.0 1.0 1.0 1.5 2.0 2.1 1.9 1.7 1.6 1.6 1.8 2.2 2.5 2.5 1.8 2.1 2.1 2.2 1.9 1.5 1.1 0.6 0.8 0.7 0.7 0.7 0.8 1.0 1.3 1.6
99401
1.9 1.7 1.6 1.8 2.1 2.0 1.6 1.2 0.9 0.9 1.0 1.2 1.4 1.5 1.4 1.3 0.9 1.4 1.7 2.2 2.499401
2.5 1.8 1.9 1.8 1.7 1.5 1.2 1.0 0.6 0.7 0.6 0.6 0.7 0.8 1.1 1.5 1.8
99401
0.6 0.8 0.9 0.8 2.0 1.9 1.5 1.5 1.6 1.6 1.3 1.0 0.8 0.8 0.8 0.9 1.0 1.0 1.0 1.0 0.7 1.1 1.4 1.8 2.2 2.2 1.8 1.8 1.6 1.4 1.2 1.0 0.8 0.5 0.6 0.6 0.6 0.7 0.8 1.1 1.5 1.8
99401
0.5 0.9 1.3 1.5 1.3 0.9 0.7 0.7 0.7 0.8 1.9 1.7 1.4 1.2 1.2 1.2 1.0 0.8 0.7 0.7 0.6 0.7 0.7 0.7 0.8 0.8 0.6 0.8 0.9 1.4 1.6 1.8 1.7 1.9 1.7 1.4 1.1 0.9 0.7 0.5 0.5 0.5 0.6 0.7 0.8 1.0 1.3
1.5 1.5 1.1 0.8 0.8 0.9 1.2 1.3 1.2 1.0 0.8 0.7 1.3 1.1 1.0 1.0 0.9 0.8 0.7 0.6 0.6 0.5 0.5 0.6 0.6 0.6 0.6 0.6 0.8 0.9 1.1 0.8 0.8 1.8 2.1 2.0 1.5 1.1 0.8 0.7 0.6 0.5 0.5 0.6 0.7 0.8 1.0 1.1
99401
1.1 1.5 1.7 1.6 1.2 0.9 0.8 0.9 1.0 1.1 1.0 0.9 1.1 1.0 0.9 0.8 0.8 0.7 0.6 0.6 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.6 0.7 0.9 1.1 1.4 1.8 99401
2.0 2.0 1.5 1.0 0.8 0.6 0.5 0.5 0.6 0.6 0.8 0.9 1.1 1.1
99401 0.9 0.9 1.0 1.3 1.6 1.5 1.1 0.9 0.9 0.9 1.1 1.0 0.9 0.8 0.8 0.8 0.7 0.6 0.6 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.6 0.7 0.9 1.1 1.5 1.7 1.5 1.2 0.9 0.7 0.6 0.6 0.6 0.6 0.7 0.9 1.2 1.4
1.7 1.3 1.0 0.9 1.0 1.3 1.5 1.4 1.2 1.0 0.9 0.9 0.8 0.7 0.7 0.6 0.6 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.6 0.7 0.8 0.9 1.1 1.2 1.1 0.9 0.8 0.7 0.6 0.6 0.6 0.7 0.8 1.1 1.5 1.8
99401
1.1 1.5 1.8 1.8 1.4 1.0 1.1 0.9 0.8 0.7 0.7 0.6 0.6 0.6 0.6 0.6 0.5 0.5 0.6 0.6 0.7 0.8 0.8 0.8 0.8 0.8 0.7 0.7 0.7 0.7 0.7 0.8 0.9 1.1 1.5 1.8 99401
1.5 1.5 1.3 1.0 0.8 0.8 0.8 0.9 0.8 0.7 0.7 0.6 0.6 0.6 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.8 0.8 0.9 1.0 1.0 1.1 1.3 1.5
99401
1.8 1.8 1.5 1.1 0.9 1.0 1.1 1.3 1.2 1.0 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.7 0.7 0.7 0.7 0.8 0.8 0.9 1.1 1.3 1.3 1.2 1.1 1.0
99401
1.0 1.1 1.5 1.7 1.7 1.3 1.0 0.9 0.9 1.0 1.1 1.0 0.9 0.8 0.8 0.8 0.8 0.9 1.0 1.1 1.4 1.8 1.8 1.4 1.1 0.9
1.4 1.0 1.0 1.1 1.4 1.6 1.4 1.1 0.9 0.9 0.9 1.0 1.1 1.1 1.3 1.6 1.9 1.9 1.5 1.0 0.8
99401
99401
1.7 1.7 1.3 1.0 0.9 1.1 1.3 1.5 1.4 1.4 1.5 1.8
99401
1.0 1.2 1.7 1.9 1.8 1.4 1.3
1.3 1.0
99401
Calculation Summary
Label CalcType Units Avg Max Min Avg/Min Max/Min
Parking Lot Illuminance Fc 1.16 3.5 0.5 2.32 7.00
Project:
637 West Avenue
Luminaire Schedule
Symbol Qty Label Arrangement Total Lamp Lumens LLF Description
45 99401 SINGLE N.A. 0.900 Symmetric Single Pole Top Contact: Detail: Photometric Calculation
3 99403 BACK-BACK N.A. 0.900 Symmetric Twin Pole Top Cliff Gilbert Date: 11/25/2020
Specifications - Southern CT Revision:----
(203) 788-0814 Scale: 1/16" = 1'-0"
cgilbert@illuminatene.com Drawn By: ----
Drawing Number:
44 Sixth Road
Woburn, MA 01801
(781) 935-8500
333 Pleasant Valley Road
SL-1
South Windsor, CT 06074
(860) 282-0597 Sheet 1 of 1
DEMOLITION NOTES
REVISIONS
B DESIGN REVIEW COMMENTS 2/2/2021
A ISSUED FOR REVIEW 9/9/2020
REV DESCRIPTION DATE
CONSULTANTS
LLC
Design and Construction Services
Fax (203) 720-2816
E N G I N E E R S,
Naugatuck, Connecticut 06770
www.pustola.com
CONSULTING
Licensed Professionals
(203) 729-6675
185 Meadow Street
PROPOSED
MEDICAL
SPACE
637 WEST AVE.
NORWALK, CONNECTICUT 06850
PREPARED FOR
STANLEY SELIGSON
PROPERTIES
605 WEST AVE.
NORWALK, CONNECTICUT 06850
PROPOSED
ROOF
DEMOLITION
PLAN
DATE: 9/9/2020
E
SCALE: AS NOTED
PROPOSED ROOF DEMOLITION PLAN PROJECT NO.: 18137.00
N S
DRAWN BY: BZ
ASBESTOS REMOVAL NOTES CHECKED BY:
W
· CHECKED BY:
·
D1.04
DEMOLITION NOTES
REVISIONS
D DESIGN REVIEW COMMENTS 2/2/2021
C MISC REVISIONS 11/24/20
B MISC REVISIONS 9/23/2020
A ISSUED FOR REVIEW 9/9/2020
REV DESCRIPTION DATE
CONSULTANTS
LLC
Design and Construction Services
Fax (203) 720-2816
E N G I N E E R S,
PROPOSED NORTH ELEVATION LOOKING SOUTH EXTERIOR DEMOLITION ELEVATION
Naugatuck, Connecticut 06770
www.pustola.com
CONSULTING
Licensed Professionals
(203) 729-6675
185 Meadow Street
STOREFRONT & DOORS NOTES
PROPOSED
MEDICAL
SPACE
637 WEST AVE.
NORWALK, CONNECTICUT 06850
PREPARED FOR
STANLEY SELIGSON
PROPERTIES
605 WEST AVE.
NORWALK, CONNECTICUT 06850
PROPOSED
EXTERIOR
DEMOLITION
ELEVATION
PROPOSED WEST ELEVATION LOOKING EAST EXTERIOR DEMOLITION ELEVATION
DATE: 9/9/2020
SCALE: AS NOTED
PROJECT NO.: 18137.00
DRAWN BY: BZ
ASBESTOS REMOVAL NOTES CHECKED BY:
CHECKED BY:
·
D2.00
DEMOLITION NOTES
REVISIONS
D DESIGN REVIEW COMMENTS 2/2/2021
C MISC REVISIONS 11/24/20
B MISC REVISIONS 9/23/2020
A ISSUED FOR REVIEW 9/9/2020
REV DESCRIPTION DATE
CONSULTANTS
LLC
Design and Construction Services
Fax (203) 720-2816
E N G I N E E R S,
PROPOSED SOUTH ELEVATION LOOKING NORTH EXTERIOR DEMOLITION ELEVATION
Naugatuck, Connecticut 06770
www.pustola.com
CONSULTING
Licensed Professionals
(203) 729-6675
185 Meadow Street
STOREFRONT & DOORS NOTES
PROPOSED
MEDICAL
SPACE
637 WEST AVE.
NORWALK, CONNECTICUT 06850
PREPARED FOR
STANLEY SELIGSON
PROPERTIES
605 WEST AVE.
NORWALK, CONNECTICUT 06850
PROPOSED
EXTERIOR
DEMOLITION
ELEVATION
PROPOSED EAST ELEVATION LOOKING WEST EXTERIOR DEMOLITION ELEVATION
DATE: 9/9/2020
SCALE: AS NOTED
PROJECT NO.: 18137.00
DRAWN BY: BZ
ASBESTOS REMOVAL NOTES CHECKED BY:
CHECKED BY:
·
D2.01
GENERAL NOTES
REVISIONS
·
·
·
·
REV DESCRIPTION DATE
CONSULTANTS
PL L C
Design and Construction Services
Fax (203) 720-2816
E N G I N E E R S,
Naugatuck, Connecticut 06770
www.pustola.com
CONSULTING
Licensed Professionals
(203) 729-6675
185 Meadow Street
E E
PROPOSED OVERALL FIRST FLOOR PLAN PROPOSED PARTIAL FIRST FLOOR PLAN
N S N S
PROPOSED
W W
MEDICAL
SPACE
637 WEST AVE.
NORWALK, CONNECTICUT 06850
PREPARED FOR
STANLEY SELIGSON
PROPERTIES
605 WEST AVE.
NORWALK, CONNECTICUT 06850
PROPOSED
PARTIAL
FIRST
FLOOR
PLAN
DATE: 11/24/20
SCALE: AS NOTED
PROJECT NO.: 18137.00
DRAWN BY: BZ
CHECKED BY:
CHECKED BY:
A1.01
REVISIONS
B DESIGN REVIEW COMMENTS 2/2/2021
A MISC REVISIONS 1/22/2021
REV DESCRIPTION DATE
CONSULTANTS
LLC
LIGHTING SPECIFICATION
Design and Construction Services
Fax (203) 720-2816
E N G I N E E R S,
Naugatuck, Connecticut 06770
www.pustola.com
PROPOSED SOUTH ELEVATION LOOKING NORTH
CONSULTING
Licensed Professionals
(203) 729-6675
185 Meadow Street
STOREFRONT & DOORS NOTES
PROPOSED
MEDICAL
SPACE
637 WEST AVE.
NORWALK, CONNECTICUT 06850
PREPARED FOR
STANLEY SELIGSON
PROPERTIES
605 WEST AVE.
NORWALK, CONNECTICUT 06850
PROPOSED
EXTERIOR
637 ELEVATIONS
DATE: 11/24/20
SCALE: AS NOTED
PROJECT NO.: 18137.00
DRAWN BY: BZ
CHECKED BY:
CHECKED BY:
PROPOSED WEST ELEVATION LOOKING EAST
A2.00
REVISIONS
B DESIGN REVIEW COMMENTS 2/2/2021
A MISC REVISIONS 1/22/2021
REV DESCRIPTION DATE
CONSULTANTS
LLC
LIGHTING SPECIFICATION
Design and Construction Services
Fax (203) 720-2816
E N G I N E E R S,
Naugatuck, Connecticut 06770
www.pustola.com
PROPOSED NORTH ELEVATION LOOKING SOUTH
CONSULTING
Licensed Professionals
(203) 729-6675
185 Meadow Street
STOREFRONT & DOORS NOTES
PROPOSED
MEDICAL
SPACE
637 WEST AVE.
NORWALK, CONNECTICUT 06850
PREPARED FOR
STANLEY SELIGSON
PROPERTIES
605 WEST AVE.
NORWALK, CONNECTICUT 06850
PROPOSED
EXTERIOR
ELEVATIONS
DATE: 11/24/20
SCALE: AS NOTED
PROJECT NO.: 18137.00
DRAWN BY: BZ
PROPOSED EAST ELEVATION LOOKING WEST CHECKED BY:
CHECKED BY:
A2.01
GENERAL NOTES
REVISIONS
·
·
·
·
·
C DESIGN REVIEW COMMENTS 2/2/2021
B MISC REVISIONS 10/19/20
A ISSUED FOR REVIEW 9/9/2020
REV DESCRIPTION DATE
CONSULTANTS
LLC
Design and Construction Services
Fax (203) 720-2816
E N G I N E E R S,
Naugatuck, Connecticut 06770
www.pustola.com
CONSULTING
Licensed Professionals
(203) 729-6675
185 Meadow Street
PROPOSED
MEDICAL
SPACE
637 WEST AVE.
NORWALK, CONNECTICUT 06850
PREPARED FOR
STANLEY SELIGSON
PROPERTIES
605 WEST AVE.
NORWALK, CONNECTICUT 06850
PROPOSED
DUNNAGE
FRAMING
PLAN
DATE: 9/9/2020
SCALE: AS NOTED
PROJECT NO.: 18137.00
DRAWN BY: BZ
E
CHECKED BY:
PROPOSED DUNNAGE FRAMING PLAN CHECKED BY:
N S
W
S1.05
REVISIONS
BLOCKING AND FLASHING DETAILS BASE & CAP PLATE DETAILS
B DESIGN REVIEW COMMENTS 2/2/2021
A ISSUED FOR REVIEW 9/9/2020
REV DESCRIPTION DATE
CONSULTANTS
TYPICAL ROOF OPENING FRAME DETAIL TYPICAL OWSJ REINFORCING DETAIL BEAM BEARING POCKET SECTION AT PROPOSED COLUMN
LLC
Design and Construction Services
Fax (203) 720-2816
E N G I N E E R S,
Naugatuck, Connecticut 06770
www.pustola.com
CONSULTING
Licensed Professionals
(203) 729-6675
185 Meadow Street
SECTION AT PROPOSED COLUMN SECTION AT DUNNAGE POST AND BRACE TYPICAL SECTION AT DUNNAGE SCREEN
PROPOSED
MEDICAL
SPACE
637 WEST AVE.
NORWALK, CONNECTICUT 06850
PREPARED FOR
STANLEY SELIGSON
PROPERTIES
605 WEST AVE.
NORWALK, CONNECTICUT 06850
PROPOSED
SECTIONS
& DETAILS
DATE: 9/9/2020
SCALE: AS NOTED
PROJECT NO.: 18137.00
DRAWN BY: BZ
CHECKED BY:
CHECKED BY:
S2.00
REVISIONS
REV DESCRIPTION DATE
CONSULTANTS
PROPOSED REAR ENTRANCE CANOPY FRAMING PLAN
PL L C
Design and Construction Services
Fax (203) 720-2816
E N G I N E E R S,
Naugatuck, Connecticut 06770
www.pustola.com
CONSULTING
Licensed Professionals
(203) 729-6675
185 Meadow Street
PROPOSED
E
MEDICAL
PROPOSED OVERALL FLOOR PLAN
N S
PROPOSED MAIN ENTRANCE CANOPY FRAMING PLAN AT ELEVATION 107'-8" SPACE
637 WEST AVE.
NORWALK, CONNECTICUT 06850
W PREPARED FOR
STANLEY SELIGSON
PROPERTIES
605 WEST AVE.
NORWALK, CONNECTICUT 06850
PROPOSED
FRAMING
PLANS
DATE: 11/24/20
SCALE: AS NOTED
PROJECT NO.: 18137.00
DRAWN BY: BZ
CHECKED BY:
CHECKED BY:
PROPOSED MAIN ENTRANCE CANOPY FRAMING PLAN AT ELEVATION 116'-3" PROPOSED MAIN ENTRANCE CANOPY FRAMING PLAN AT ELEVATION 124'-10"
S2.10
REVISIONS
REV DESCRIPTION DATE
CONSULTANTS
CONNECTION DETAIL CONNECTION DETAIL CONNECTION DETAIL CONNECTION DETAIL
PROPOSED BRACE FRAME ELEVATION
PL L C
Design and Construction Services
Fax (203) 720-2816
E N G I N E E R S,
Naugatuck, Connecticut 06770
www.pustola.com
DETAIL "A" DETAIL "B" DETAIL "C"
CONSULTING
Licensed Professionals
(203) 729-6675
185 Meadow Street
PROPOSED
MEDICAL
SPACE
637 WEST AVE.
NORWALK, CONNECTICUT 06850
PREPARED FOR
STANLEY SELIGSON
PROPERTIES
605 WEST AVE.
NORWALK, CONNECTICUT 06850
PROPOSED
FRAMING
SECTIONS
DATE: 11/24/20
SCALE: AS NOTED
PROJECT NO.: 18137.00
DRAWN BY: BZ
PROPOSED SECTION AT REMOVABLE WALL CHECKED BY:
CHECKED BY:
S2.11
REVISIONS
A ISSUED FOR REVIEW 9/9/2020
REV DESCRIPTION DATE
CONSULTANTS
TYPICAL CMU WALL REINFORCEMENT
TYPICAL MASONRY WALL CONTROL JOINT LOCATIONS
LLC
Design and Construction Services
Fax (203) 720-2816
E N G I N E E R S,
Naugatuck, Connecticut 06770
www.pustola.com
CONSULTING
TYPICAL MASONRY WALL CONTROL JOINT DETAILS BOND BEAM REINFORCING Licensed Professionals
(203) 729-6675
185 Meadow Street
PROPOSED
MEDICAL
SPACE
637 WEST AVE.
NORWALK, CONNECTICUT 06850
PREPARED FOR
STANLEY SELIGSON
PROPERTIES
605 WEST AVE.
NORWALK, CONNECTICUT 06850
PROPOSED
MASONRY
MASONRY NOTES SECTIONS
TYPICAL MASONRY WALL CONTROL JOINT LOCATIONS TYPICAL LINTEL SCHEDULE
& DETAILS
BRICK VENEER INFILL DETAIL DATE: 9/9/2020
SCALE: AS NOTED
PROJECT NO.: 18137.00
DRAWN BY: BZ
CHECKED BY:
CHECKED BY:
S3.00
Andriopoulos Design Assoc., LLC
32 Main Street, Ste. 203
Norwalk, CT 06851
P: 203-853-8006
E: ADA@andriopoulosdesign.com
February 5, 2021
Mr. Jonathan Hopkins
c/o City of Norwalk
Redevelopment Agency
3 Belden Avenue
Norwalk, CT 06850
Re: 3rd Party Peer Review - Final Report for
Waypointe Partners LLC (c/o Seligson Properties)
637 West Avenue and 6&10 Chapel Street
Norwalk, CT
Dear Jonathan;
I have reviewed the design documents for the proposed site work, landscaping and
exterior elevation/ facade renovation work prepared and submitted by Redniss and Mead
for the applicant Waypointe Partners LLC (c/o Seligson Properties) located at 637 West
Avenue and 6&10 Chapel Street, Norwalk, CT.
The project has met the intent of the design regulations, as outlined in the Wall Street-
West Avenue Neighborhood Plan, Design Guidelines for Neighborhood Improvements.
Specifically the Site Design and Building/ Architectural Design Specifications. This area
of West Avenue is characterized as a commercial corridor.
When reviewing the Site/Civil drawings prepared by Redniss & Mead, dated 11/24/20,
the design intends to replace the apron of the one-way existing driveway (directly off of
West Ave.) with new painted directional arrow, along with the revised parking layout
will improve vehicular traffic flow on the site. The design is eliminating the ATM drive-
thru and curb cut, decreasing the curb-cuts to 2, on Chapel Street.
When reviewing the Landscaping drawings prepared by Eric Rains, L.S. dated 11/24/20,
they intend to add ample amounts of new trees, shrubs and new site lighting to the
existing re-configured site. Which will be reduce the heat infiltration in the parking lot
and improve the visual appearance of the parking area.
When reviewing the Architectural drawings provided by Pustola Associates, Consulting
Engineers, dated 11/24/20 (revised 1/26/21). The west (Front Facade) Elevation the
developer has chosen to replace the vintage 2 story tall "Greek Revival" Open/ Entry
Portico with a new 2-story enclosed aluminum and glass entry vestibule with flat roof
line. This vestibule addition and window frame changes (on the entire building) will
create a new look at the street level facing West Ave., and Chapel St. The East (rear
facing) elevation is generally unchanged with the exception of new/entry door location,
window/frame color changes and new flat roof canopy to provide shelter to the entries.
Our suggestions for Redevelopment Agency approval are as follows:
1.) Site Lighting Plans need clarification of direction, function and attachment of the
proposed perimeter lighting fixture on building, Dwg. SPL-2.0, Lighting Type: BL-1.
2) Architectural Dwg. A2.00 requires clarification regarding the new equipment height
on roof top and corresponding minimum height required of proposed aluminum wall
panel (screening). The proposed wall panel should not exceed the height of the existing
brick utility structure. The open bottom of the wall panel should be no higher than the
top of the existing parapet.
3) Architectural Dwg. A2.00, We would encourage the applicant to reduce the roof top
"screen" fencing in length equally by approx. +/- 6'-0" (from the left and right), as will
be seen in the West (Front facing-West Avenue) elevation.
4.) Architectural Roof Plan, requires clarification of the dimensions of the metal wall
panel "screen" from the roof top edge.
5.) Architectural Dwg. A2.00 requires clarification of proposed new 2-story aluminum
glass entry enclosure relating to the clear glass and spandrel glass composition. As
shown, it is unclear as to the amount of transparency that will be provided in the new
vestibule enclosure.
It is my opinion that this application for Site Parking Lot changes, landscaping,
pedestrian accessibility improvements, fenestration improvements and new Front & rear
Facade Entry improvements are in keeping with the design guidelines as defined in the
Wall Street-West Avenue Neighborhood Plan.
If you have any questions, please feel free to contact our office.
Thank you,
William N. Andriopoulos, R.A./AIA
Andriopoulos Design Associates, LLC
WNA/mg
cc: V. Hynes, Redniss and Mead
P ustola & A ssociates
CONSULTING ENGINEERS, LLC
(203) 729-6675 • Fax (203) 720-2816
Licensed Professional Engineers 185 Meadow Street
New York & Connecticut Naugatuck, Connecticut 06770
February 3, 2021 Job No. 18137.00
Mr. Jonathan Hopkins
c/o City of Norwalk
Redevelopment Agency
3 Belden Ave.
Norwalk, CT 06850
RE: 637 West Ave Design Review Comments
This letter is in response to the questions and comments posed in a January 28th, 2021 letter from William N.
Andriopoulos regarding the existing building at the above referenced address. These responses are specifically for the
comments listed below regarding Pustola & Associates drawings.
C. Removals plans, Structural Plans Architectural Plan, prepared by Pustola Eng.:
Comment 1) On Dwg. D1.04 or S1.05, please provide all "new proposed" and "existing
to remain" roof top equipment locations as accurately as possible, including the approx.
heights of to the top of the equipment from the roof deck, for review.
Response: The revised drawings attached to this letter now contain this information.
Comment 2a) Dwg. A2.00: Please provide photo imagery of similar glass enclosure
system (as built elsewhere) from the specific manufacture with frame and glass finish
sample, for review/ the record.
Response: Photos will be included with this submission. Physical samples are being prepared for presentation.
Comment 2b) Please provide clarification of where spandrel panels are located along
with sample of spandrel color/ glazing for the record.
Response: The revised drawings contain this dimensional information, and physical samples are being prepared for
presentation.
Comment 2c) Please confirm orientation of North Elevation.
Response: The revised drawings clarify the elevation directions
Comment 2d) Metal wall panel "screen" at roof. Concern with the proposed height of
screen wall and proximity to roof edge. (Zoning requires equipment/ screen panels to be
10ft back from the roof edge.) Suggestion to development team to consider lowering the
top of the screen panel to align with the existing height of the "dog house" with bottom of
the screen panel align with existing top of cornice/ parapet. This will decrease any
(visual) negative impact of screen wall significantly.
Response: The location and elevation of the screens has been adjusted as requested, see the revised drawings.
Comment 2e.) Please provide sample of "Charcoal grey color", for review.
Response: Physical samples are being prepared for presentation.
1|Page
Comment 3) Dwg. A2.01: Please confirm orientation of South Elevation.
Response: The revised drawings clarify the elevation directions
Comment 4) Dwg. S3.00 "Brace Frame" - Will the "X" bracing be visible to the public
from the exterior view?
Response: Currently the X bracing will be visible from the exterior.
Thank you,
Kyle Pustola, EIT
2|Page
e r i c r a i n s
l a n d s c a p e
11a N Main Street
a r c h i t e c t u r e ,
SoNo, Connecticut 06854
l l c
o 203.354.6500
(mailing) 33 N Water Street suite 710 f 203-853-7601 ericrains.com
03 February 2021
Mr. Jonathan Hopkins
City of Norwalk Redevelopment Agency
3 Belden Avenue
Norwalk, Connecticut 06850
Re: 637 West Avenue Design Review Comments
Dear Mr. Hopkins,
This letter in in response to the questions and comment provided by Andriopoulos Design Associates
in their letter dated 28th January 2021 specifically those in section A.
Below are responses to each point.
A.1 – BL1 is a continuous up light around the perimeter. For clarity, the “cornice” means the band
that wraps the upper building all the way around. This low output fixture would be wall mounted
above that and illuminate the upper few feet of the building. We are requesting approval of this
lighting affect with the understanding that it may be installed at some point in the future beyond the
completion of this initial renovation. We ask that we have the latitude to install it as part of a future
effort should the building ownership team decide it is necessary to wait.
A.1a – See comment above and refer to the revised Architectural drawings prepared by Pustola &
Associates and also the attached mounting detail.
A.1b – Fixture BL1 can be placed on a timer.
A.1c – Regarding public art, the team feels that the building modifications are in effect an artistic
statement. The steeple / bell tower as part of the church architecture (across Chapel Street) is very
attractive and visually dominant, thus additional accent pieces would be lost.
In addition to these comments, we would like to point out that we are revisiting the “Site Lighting”.
The goal is to provide the necessary lighting levels with more efficiency resulting in fewer fixtures. A
revised photometric analysis is underway.
Please contact our office with any questions regarding this matter.
Best Regards,
C. Eric Rains, RLA, ASLA
Principal
STR9 SLIM ®
Low Profile Monochromatic Linear Wall Washing and Grazing LED Lighting
2020-11-25
PRODUCT SPECIFICATION SHEET
ORDERING LOGIC: STR9 MOUNTING ACCESSORIES
WXX - ADJUSTABLE WALL MOUNT BRACKET KIT W40 ADJUSTABLE WALL MOUNT
40mm COLOR PART NUMBER WEIGHT
1.6in
Clear Matte Anodized 121128 0.10kg / 0.21lbs
Black Matte Anodized 121129
17mm 36mm
57mm 0.7in 1.4in
2.2in
6mm
0.3in
25° W80 ADJUSTABLE WALL MOUNT
80mm COLOR PART NUMBER WEIGHT
3.2in
Clear Matte Anodized 121130 0.12kg / 0.27lbs
27mm 47mm
144° 69mm 1.1in 1.9in Black Matte Anodized 121131
57mm 2.7in
2.2in
91mm 6mm
3.6in 0.3in
130mm
37° W130 ADJUSTABLE WALL MOUNT
5.1in
COLOR PART NUMBER WEIGHT
144° 27mm 47mm Clear Matte Anodized 121132 0.15kg / 0.32lbs
71mm 1.1in 1.9in
57mm 2.8in Black Matte Anodized 121133
2.2in
6mm
135mm 0.3in
5.3in
155mm
40° W155 ADJUSTABLE WALL MOUNT
6.1in
COLOR PART NUMBER WEIGHT
144° 27mm 47mm Clear Matte Anodized 121134 0.16kg / 0.35lbs
71mm 1.1in 1.9in
57mm 2.8in Black Matte Anodized 121135
2.2in
159mm 6mm
6.3in 0.3in
43° W180 ADJUSTABLE WALL MOUNT
180mm
7.1in COLOR PART NUMBER WEIGHT
144° 27mm 47mm Clear Matte Anodized 121136 0.17kg / 0.38lbs
71mm 1.1in 1.9in
57mm 2.8in Black Matte Anodized 121137
2.2in
6mm
183mm 0.3in
7.2in
SMA-I - INSIDE ADJUSTABLE SURFACE MOUNT BRACKET KIT
6mm COLOR PART NUMBER WEIGHT
.2in
Clear Matte Anodized 121138 0.09kg / 0.20lbs
94°
30mm Black Matte Anodized 121139
1.2in
62mm 51mm
2.4in 2.0in 25mm
1.0in
47mm
47mm 91mm 1.9in
1.9in 3.5in
SMA-O - OUTSIDE ADJUSTABLE SURFACE MOUNT BRACKET KIT
6mm COLOR PART NUMBER WEIGHT
.2in
Clear Matte Anodized 121825 0.09kg / 0.20lbs
97°
30mm Black Matte Anodized 121826
1.2in
62mm 50mm
2.4in 2.0in 25mm
1.0in
47mm
81mm 61mm 1.9in
3.2in 2.4in
SML - SURFACE MOUNT BRACKET KIT, NON-ADJUSTABLE
COLOR PART NUMBER WEIGHT
6mm Clear Matte Anodized 121140 0.08kg / 0.18lbs
0.2in
53mm Black Matte Anodized 121141
2.1in
56mm 38mm
2.2in 1.5in
75mm
3.0in
GVA Lighting, Inc. 2771 Bristol Circle, Oakville, ON L6H 6X5, Canada SP STR9 SLIM | Page 4 / 8
Tel: + 1 905 569 6044 Email: info@gvalighting.com gvalighting.com
Andriopoulos Design Assoc., LLC
32 Main Street, Ste. 203
Norwalk, CT 06851
P: 203-853-8006
E: ADA@andriopoulosdesign.com
January 28, 2021
Mr. Jonathan Hopkins
c/o City of Norwalk
Redevelopment Agency
3 Belden Avenue
Norwalk, CT 06850
Re: Preliminary Design Review Comments for
Waypointe Partners LLC (c/o Seligson Properties)
637 West Avenue an 6&10 Chapel Street
Norwalk, CT
Dear Jonathan;
I have reviewed the design documents prepared for the Waypointe Partners design. My
review comments are in accordance with the guiding criteria, as outlined in the
Redevelopment Agency, Wall Street- West Avenue Neighborhood Plan and the Design
Guidelines.
We have received the developers revised drawings supplied to our office 1/27/21 and
narrative from Bruce Beinfield dated 1/26/21.
Below please find my review questions and comments for this project:
A. Site planting and Site Lighting drawings, prepared by Eric Rains, L.A.:
Question 1.) Does perimeter lighting fixture BL1 (callout at the perimeter at cornice)
provide a continuous up lighting affect?
Comment 1a) Dwg. SPL-2.0 : No architectural detail is sown as to how this lighting
fixture BL1, is attached to the cornice.
Comment 1b) Dwg. SL-1: No data is provided for the perimeter cornice lighting. Will
this fixture be on a timer?
Comment 1c) Suggestion to the development team. As this site is located on the
prominent corner of West Avenue an Chapel Street, please consider including some form
of public art (i.e., sculptural art pieces for the lawn area, etc) at the exterior or in the front
lobby. Please contact the Norwalk Arts Commission to collaborate for art ideas and artist
availability.
B. Site/ Civil engineering plans, prepared by Redness and Mead:
We have no comment for drawings SE-1 thru SE-4 at this time.
C. Removals plans, Structural Plans Architectural Plan, prepared by Pustola Eng.:
Comment 1) On Dwg. D1.04 or S1.05, please provide all "new proposed" and "existing
to remain" roof top equipment locations as accurately as possible, including the approx.
heights of to the top of the equipment from the roof deck, for review.
Comment 2a) Dwg. A2.00: Please provide photo imagery of similar glass enclosure
system (as built elsewhere) from the specific manufacture with frame and glass finish
sample, for review/ the record.
Comment 2b) Please provide clarification of where spandrel panels are located along
with sample of spandrel color/ glazing for the record.
Comment 2c) Please confirm orientation of North Elevation.
Comment 2d) Metal wall panel "screen" at roof. Concern with the proposed height of
screen wall and proximity to roof edge. (Zoning requires equipment/ screen panels to be
10ft back from the roof edge.) Suggestion to development team to consider lowering the
top of the screen panel to align with the existing height of the "dog house" with bottom of
the screen panel align with existing top of cornice/ parapet. This will decrease any
(visual) negative impact of screen wall significantly.
Comment 2e.) Please provide sample of "Charcoal grey color", for review.
Comment 3) Dwg. A2.01: Please confirm orientation of South Elevation.
Comment 4) Dwg. S3.00 "Brace Frame" - Will the "X" bracing be visible to the public
from the exterior view?
Suggestion: Have you considered any sustainable and green infrastructure initiatives for
this rehabilitation project. Perhaps infrastructure could include a greenwall design in
certain areas including the new front entry portico enclosure.
The above comments are provided for our initial review. Once our office has received
the additional information/ revised drawings, if any, I will review this information and
can then make our recommendation for approval and submit my final report to your
office.
If you have any questions, please feel free to contact our office.
Thank you,
William N. Andriopoulos, R.A./AIA
Andriopoulos Design Associates, LLC
WNA/mg
cc: V. Hynes, Redness and Mead