Muyni
← Back to Palatine

Planning Commission

Regular Meeting

Palatine, IL · December 7, 2021

AgendaMinutes

Minutes

VILLAGE OF PALATINE VILLAGE HALL - COUNCIL CHAMBERS 200 E. WOOD STREET PALATINE, IL 60067-5339 – (847) 359-9050 http://www.palatine.il.us PLAN COMMISSION MINUTES ● DECEMBER 7, 2021 Village Hall - Council Chambers Regular Meeting 7:00 PM I. CALL TO ORDER Attendee Name Title Status Arrived Dennis Dwyer Chairman Present Patrick Noonan Plan Commissioner Present Teri Williams Plan Commissioner Present Eric Friedman Plan Commissioner Present Rodney Bettenhausen Plan Commissioner Present Robert Kolososki Plan Commissioner Absent Stephen Fedota Plan Commissioner Present II. APPROVAL OF MINUTES 1. Plan Commission - Regular Meeting - Nov 16, 2021 7:00 PM RESULT: ACCEPTED AS AMENDED [UNANIMOUS] MOVER: Patrick Noonan, Plan Commissioner SECONDER: Rodney Bettenhausen, Plan Commissioner AYES: Dwyer, Noonan, Williams, Friedman, Bettenhausen ABSENT: Kolososki, Fedota VILLAGE OF PALATINE Page 1 Minutes Plan Commission December 7, 2021 III. PUBLIC HEARING IV. CASE STAFF STATEMENTS 1. 874-920 N. Quentin Road - Preliminary Planned Development to allow a 2-story, 40-unit apartment building. Chairman Dwyer read the notice of public hearing that was published in the Daily Herald on November 22nd, 2021 and mailed to the owners of the surrounding properties. The following petitioner’s exhibits were introduced: 1. Letter & Description of Project Changes 2. Palatine Parking & Traffic Narrative 3. 9-27-21 Combined Drawing 4. Revised Elevation & Floor Plan 11-24-21 5. Initially Revised Rendering 2nd Submission 6. Proposed Unit Mix - Density Analysis 7. Quentin Apartments - Project Description 8. PPD Application 9. Previously Proposed Elevations 10. Previously Proposed - Initial Site Plan 11. Site Plan & Elevation Changes 12. Resident Email Documents 12 thru 36 13. Public Notice 14. Additional Resident Emails not in Packet 15. Updated Petition and Map of households in the immediate neighborhood opposed to development - submitted to Plan Commission as of 12/07/21. Sworn in Petitioners: Jake Victor with Northpoint Development and Andy Dumke of Alliance Development. Mr. Victor presents the site plan and explains that over the last 6 months revisions have been made to incorporate the feedback they received from the neighbors, staff, and the Plan Commission. He provides information on the revisions and a summary of the concerns that have been addressed, which includes changes to the parking, removing the entrance on Poplar Street, reducing the structure from three stories to two stories with a flat roof, instead of a pitched roof, landscaping improvements and installing an 8-foot fence. The changes also include removing balconies facing the single family homes and removing the retaining walls. Mr. Victor presents the new proposal and 3-D animation. He states it would be a high-end development and finishes for the units and community room and provides details regarding the units available in the complex. He states that the three bedroom option has been reduced significantly to address the concerns VILLAGE OF PALATINE Page 2 Minutes Plan Commission December 7, 2021 from the surrounding neighbors regarding the number of children that this development could potentially attract. He summarized the reductions and characteristics of the units in the revised plan. He indicated that the site plan remains overparked. The plan also removed the trees within the 20-foot setback and maintained some that are existing, based upon neighbor feedback and reviewed the animation presentation of the building. Mr. Victor indicated that traffic was raised as a concern, their plan projects 15 vehicles during the peak traffic hour. This is a green building, with significant investment in stormwater controls. Tenant storage and patios would also be included. The density is comparable to the Clayson development, approved in unincorporated Cook County, but adjacent to the site. Mr. Victor states that they would consider adding a second entrance from Quentin Road and reducing the number of units from 40 units to 36 unit, as part of a condition of review. He also notes that this would create more room between the detention pond and the playground and the road. He states that the detention pond is a dry basin. Mr. Victor addresses the concern regarding the 20-foot setback off Quentin Road and states they would be willing to provide further setback, if necessary. Mr. Victor believes the density is appropriate for the site and the R-3 Zoning is being met. Their plan also address tenant storage and a snow removal plan. He noted that not many other properties on Quentin Road have deceleration lanes. Mr. Victor provides information on the tax incentive program. He explains that The State of Illinois is providing a $15 million investment for this site and it would be providing needed housing for the Palatine work force. He explains that tenants would have to pass background checks, have stable income, and prove to be good tenants. They have also secured $1 million from the Federal Home Loan bank of Chicago. He provides typical income information and the expected rates for the rental units. Mr. Dumke states that the Illinois State Agency identified Palatine as a community with a high demand for affordable work force housing. The area is typical of where apartment complexes like this would be built, based upon their review of the area. Mr. Bettenhausen asks about the staff recommendation for a 2nd entrance off Quentin Road, because the site looks very tight. Mr. Dumke states it would be closer to Poplar Street with a right in and a right out. He explains that they would probably have to shrink the building to the 36 units in order to achieve this request which would also adjust the density of the project. Mr. Bettenhausen asks if they would consider reducing the capacity of the building. Mr. Dumke states the state agency has made considerable accommodations and feels that any more reductions in units could affect their funding and the economics of the site. Mr. Victor adds that they had to compete for the tax credit and have pushed the State in this process. Mr. Dumke confirms that almost 50% of the units are one bedroom and notes that this change also minimizes the density. STAFF SUMMARY AND RECOMMENDATION: VILLAGE OF PALATINE Page 3 Minutes Plan Commission December 7, 2021 Mr. Vyverberg provides the staff statement and explains the subject property is 2.53 acres and addresses the revised changes. He presents the revised site plans and confirms that engineering plans were reviewed by the village engineer and accepted, with some conditions. He also confirms that the infrastructure is existing and in place around the Subject Property. Stormwater detention is provided on the north and south sides of the site. He states that revised plans have not been submitted to the village or reviewed by Staff for any changes to the number of entrances to the site or any reduction in units. He noted that a singular full access off Quentin Road is a concern for staff. He confirms the landscaping changes that have been submitted. Mr. Vyverberg addresses the proposed parking spaces, Quentin Road site access, and concerns with the singular full access. He spoke about accessibility, with the plans being amended to include elevator access to 20% of the units, as required by Code. This would include a 2nd story on the common area. The surrounding density and dimensional information is also reviewed. Staff sees the Clayson development as a different standard, as it was developed in unincorporated Cook County and annexed into the Village. He noted concerns about the confluence of the emergency turnaround, two-way driveway access to the underground parking, and the existing parking lot drive aisle. He spoke about the landscaping plan changes, including an 8-foot fence, and the installation of 10-foot evergreen trees along the western side of the property. The provided parking is 2.53 spaces per unit, where the typical townhouse development provides between 4 and 4.5 spaces/unit. Staff remains concerned about the traffic constraints. In response to a Plan Commission question, Staff noted a carryover density information did not reflect the current 15.81, as it should have. Mr. Friedman questions the access to information on the Clayson development to determine bedrooms per acre at that development. Mr. Vyverberg indicates that states that the information for this property was processed and developed in unincorporated Cook County, prior to annexation into the village of Palatine in the early 90’s. The bedroom count and unit information wasn’t included with the annexation materials that Staff reviewed. Mr. Dwyer requested that Staff provide the recommendation for the proposal. Mr. Vyverberg summarized that the Petitioners reduced the overall density and provided additional landscaping and screening for the west side of the property. Additionally, the height of the building was lowered to 2-stories and 26 feet. Staff notes that the Future Land Use and previous approvals for the property contemplated a multi-family memory care use and is consistent with the designation for both Greencastle and the Grand. Also, the proposed is denser than the other multi-family and townhouse uses. As the Clayson apartments were planned, approved, and constructed in Cook County, Staff views that circumstance dissimilar from the proposed. There is also no access to public transportation, park district facilities, or recreational facilities, within a vicinity of the property. The plan indicates one VILLAGE OF PALATINE Page 4 Minutes Plan Commission December 7, 2021 outdoor 1,200 square foot fenced recreation area on the west side of the building. This area is located along the entrance drive to the surface parking lot and further speaks to the constraints of the site plan, as it is straddled by the drive aisle and parking lot. Staff also raised questions and concerns about snowplowing and adequate snow storage. The Petitioner indicates that snow could be hauled off site, which would have to be further determined to accommodate. The proposed site plan and property dimensions of the Subject Property do not likely allow for onsite plowing. Staff also questions the one access point into the site. A deceleration lane should also be reviewed coming from Quentin Road into the site. As a condition of review, Staff recommends 2 separate access points to accommodate turns onto Quentin Road. The elimination of the Poplar Street access may have addressed previous resident and Staff concerns about the access and traffic, but the single access point raises additional questions and access and turning movement concerns within the site plan. Such things as deliveries, maintenance, moving trips will be forced to use the single access point, which is also shared by the residents. The dual access plan and reduced unit count referenced at tonight’s meeting, were also not submitted for Staff review. The interior of the building has a 1,988 square foot common area space on the first floor of the area between the buildings, for use by the residents of the 40- units, which the narrative indicates would have a fitness room. The underground parking area provides approximately 221 square feet of storage areas and 60 square feet noted for bike storage. This does not seem sufficient for the additional storage needs for 40 units. While the elimination of the second access to Poplar Street addressed neighbor and Staff concerns from the initial Petition, the revised site plan and singular access point on the south side of the property create additional access and turning movement concerns with the site plan. The site plan could potentially relieve potential congestion and turning conflicts by providing a second access onto Quentin Road. Staff sees the confluence of the access drive to the underground parking garage, fire department emergency hammerhead turnaround, and the singular drive to the surface parking lot, as creating unnecessary traffic conflicts. It also further bespeaks the dimensional limitations of the proposed site and underlying property acreage. As proposed, Staff believes that the site plan does not adequately address or comply with the traffic circulation design standards for Planned Developments. Ultimately, Staff cannot support the proposed site plan. If the Plan Commission recommends approval, Staff recommends the following conditions: 1. The Preliminary Planned Development shall substantially conform to the Engineering Plans prepared by Vierbicher dated 09/27/2021, and the Architectural Plans prepared by Knothe Bruce Architects dated 09/27/2021 last VILLAGE OF PALATINE Page 5 Minutes Plan Commission December 7, 2021 revised 11/24/2021, except as such plans may be revised to comply with all of the accessibility requirements for multi-story buildings and residential facilities, as required within the building codes, and to conform to Village Codes and Ordinances. 2. A Plat of Consolidation/Subdivision shall be submitted in a manner acceptable to the Village Engineer and include all necessary easement language, including a 10-foot easement along the Quentin Road frontage. The plat shall reflect that the property-owner shall be responsible for all utilities on the property including storm water maintenance. 3. The Final Engineering plans and Engineers of Probable Cost shall be submitted in a manner acceptable to the Village Engineer. 4. The Final Landscape Plan shall be submitted in a manner acceptable to the Director of Planning and Zoning. The final plantings on the west side of the property should also include additional types of trees and bushes to present a more natural appearance to promote the vibrancy and health of the plantings. This could include the use of understory trees and bushes. 5. An Auto-Turn Exhibit shall be submitted in a manner acceptable to the Fire Marshal. 6. The required Public Improvement and Planned Development Letters of Credit and other all fees shall be submitted in a manner acceptable to the Director of Planning and Zoning and Village Engineer. 7. MWRD, Cook County, and NCCSWC permits are required. 8. In conjunction with the Final Planned Development application process, the Petitioner shall submit a construction management plan and schedule in a manner acceptable to the Village of Palatine. 9. If deemed necessary by the Village Engineer and in conjunction with the Final Planned Development application process, the Petitioner shall submit a Traffic Impact Study in a manner acceptable to the Village Engineer and Director of Planning and Zoning. The developer should anticipate possible road improvements along Quentin Road, including a deceleration lane along and second access to Quentin Road. The full access point should include two exit lanes to accommodate left and right turns. 10. A final fencing and screening plan shall be submitted in a manner acceptable to the Director of Planning and Zoning. The final floorplan and site plan for the fenced play area shall be submitted in a manner acceptable to the Director of Planning and Zoning. 11. The Petitioner shall submit a stormwater management and maintenance plan in a manner acceptable to the Village Engineer. 12. The playground location will be reconsidered to provide additional separation from the detention basin. 13. The petitioner shall provide a detailed sign plan for the entire site. Information on the freestanding sign and wayfinding signage for the property shall be provided in the plan. VILLAGE OF PALATINE Page 6 Minutes Plan Commission December 7, 2021 Chairman Dwyer addresses the petitioner and asks Mr. Dumpke if plan commission recommends approval, would he abide by the conditions that staff has noted. Mr. Dumke states that there is one concern regarding the deceleration lane and states all other conditions would be accommodated. Chairman Dwyer opens floor to the audience and explains that they’ve heard staff recommendations and asks them not to be redundant. He states that all emails have been read and would like the conversation to not be repetitive. Mr. Noonan discloses his in-laws are in the audience and states that he can be unbiased and will vote. Sworn in Mr. Robert Lettecci - 998 N Glenview Court - States he received a registered letter from the Village of Palatine but post marked in Osh Kosh, WI. Mr. Vyverberg explained that the letter is drafted by Staff and sent the petitioner for mailing to the required properties. It is the responsible of the petitioner to send out. The petitioner resides in Osh Kos, WI. Mr. Lettecci states his concerns for 94 parking spaces, 56 underground and 38 surface. His opinion is that it is too many vehicles for this area. He also noted another property on Northwest Highway that is vacant and approximately 2 acres. Sworn in Julie Jesso - 939 N Franklin Avenue. Ms. Jesso lives behind development and explains she spent the last 2 weeks meeting with neighbors and has accumulated over 360 signatures opposing the planned development. The developer scaled back the proposal, but the main concerns are density, increased traffic, and quality of life. The meeting with developer didn’t address the number of units. She urged the plan commission to reject the current proposal. It is not the right development for the neighborhood, as it is too many units. The neighborhood never felt or indicated the revisions were adequate to address the density concerns. The impact to the single-family homes behind the proposed development cannot be addressed with landscaping or screening, as the property is too dense and not in line with the other Village densities. Sworn in Kathy Cortez - 141 S Fremont Street. Ms. Cortez states she attended the last meeting and would like to address how affordable housing could be accommodated for this site. She believes that people don’t understand how bad it is. She spoke to her belief that there is a lot of noise and biases in the Staff report. She spoke to the proximity of the Clayson and how it is in the neighborhood and should be considered such. She speaks to the antiquated zoning practices that do not allow affordable housing in the village and affordability issues, which disallow the possibility to create affordable housing in the Village. She requests the commissioners vote to approve the plan. Mr. Robert Lettecci inquired as to how far away Ms. Cortez lives from the development. Sworn in Maria Galo - 117 N Cedar Street. Has lived in the neighborhood since 1996. She talks about the changes that have taken place in her neighborhood since she moved there. She states that there VILLAGE OF PALATINE Page 7 Minutes Plan Commission December 7, 2021 have been a variety of housing projects in the neighborhood and the changes have been positive, with the surrounding development and infrastructure improvements. She is confident the developer is working to make this a better place. Urges plan commission to recommend the proposed plan. Sworn in Nathaniel Groh - 1480 N. Benton Avenue. Advocates for the development and would like to see it happen. He talks about his own upbringing by a single mom and believes the affordable housing is a benefit to those in need. He states this development can give hope to the young factory workers in Palatine. He would like the Plan Commission to approve the proposal. Sworn in Marcus Orofino - 913 N Franklin Ave. He addresses the fair housing in the area. He states they are not against affordable housing, but is saying no to the dynamics associated to this project. Noted that the Clayson is a large and sprawling property and not comparable to the site proposed for this development. He states that the property is not the right size property for this project. He appreciates the efforts to reduce the size, but the development is still twice the density. Sworn in Lori Grainawi - 227 S Vail Avenue - Arlington Heights, IL. Resident of Arlington Heights - lives less than a mile from an affordable housing project in Arlington Heights. She used to live in unincorporated Cook County on Echo Lane, across the street. She is co-president of a housing task force and worked with the Village of Palatine on the Spruce Village apartment complex, which is for disabled residents and is also an affordable housing project. She invites anyone from the Village to visit the site and states it’s a beautiful project. Village Attorney Brankin interjects that the Commission’s job and focus is upon land usage and the policy discussions are not relevant not a discussion about affordable housing, for everyone here and for the record. This is a discussion about land use. Chairman Dwyer addresses Ms. Grainawi and states this discussion is for land use. Mr. Brankin indicates that it is inappropriate to make accusations about biases. Staff has prepared a professional report and recommendations, based upon the land use factors and provided testimony related to the land use factors before you. Sworn in Kathleen Bolger - 320 E Tall Trees Lane. Lives in unincorporated palatine. States that the previous land use for a memory care facility was not a concern for the neighbors at the time, but the proposed project is being opposed. Mr. Vyverberg addresses the previous approved land use and explains it was approved for the memory care facility, but never implemented. Mr. Friedman inquired about the conditions related to the access points. Discussion about the Cook County Highway Department. Mr. Noonan made a motion to close the public hearing. Mr. Fedota VILLAGE OF PALATINE Page 8 Minutes Plan Commission December 7, 2021 seconded. Motion approved. DISCUSSION: Discussion about a 36-unit development, with a 2nd access off Quentin. Mr. Brankin indicates that the 2nd access and unit count reduction has not been presented or applied for by the developer or submitted for Staff review. That plan is not before the Plan Commission, nor has been evaluated by Staff. These changes would then have to be evaluated through a process. Discussion about the scope of review. Mr. Dwyer comments about conditions. Mr. Vyverberg reads condition #9 from the staff recommendations for clarification that addresses the access points. Mr. Brankin clarified that the developer is welcome to submit a plan reflective of those changes, but this is not what was submitted or is before the plan commission. Mr. Fedota commented that the unit reduction and 2nd access point make sense. Lot density and frontage were previous concerns discussed. Mr. Friedman spoke to density, land use, and affordable housing and their respective linkages. Mr. Bettenhausen clarified that no one denies the need for affordable housing, but that does not mean that it should be located on any vacant property available. The resident deserve a safe quality development, including the neighboring residents. Mr. Noonan makes a motion to deny. Mr. Brankin recommended that the motion should be in the affirmative Mr. Noonan made a motion to approve with the 13 Staff condition. Seconded by Ms. Williams. Communication: LPC Development on Algonquin will go before Village Council on Monday 12/13/21 Meeting anticipated for the first Tuesday in January, 2022 RESULT: NO RECOMMENDATION [3 TO 3] AYES: Dwyer, Friedman, Fedota NAYS: Noonan, Williams, Bettenhausen ABSENT: Kolososki VILLAGE OF PALATINE Page 9 Minutes Plan Commission December 7, 2021 V. COMMUNICATIONS VI. ADJOURNMENT VILLAGE OF PALATINE Page 10

Agenda

VILLAGE OF PALATINE VILLAGE HALL - COUNCIL CHAMBERS 200 E. WOOD STREET PALATINE, IL 60067-5339 – (847) 359-9050 http://www.palatine.il.us PLAN COMMISSION AGENDA ● DECEMBER 7, 2021 Village Hall - Council Chambers Regular Meeting 7:00 PM I. CALL TO ORDER II. APPROVAL OF MINUTES 1. Plan Commission - Regular Meeting - Nov 16, 2021 7:00 PM III. PUBLIC HEARING IV. CASE STAFF STATEMENTS 1. 874-920 N. Quentin Road - Preliminary Planned Development to allow a 2-story, 40-unit apartment building. V. COMMUNICATIONS VI. ADJOURNMENT VILLAGE OF PALATINE Page 1 2.1 VILLAGE OF PALATINE VILLAGE HALL - COUNCIL CHAMBERS 200 E. WOOD STREET PALATINE, IL 60067-5339 – (847) 359-9050 http://www.palatine.il.us PLAN COMMISSION MINUTES ● NOVEMBER 16, 2021 Village Hall - Council Chambers Regular Meeting 7:00 PM I. CALL TO ORDER Attendee Name Title Status Arrived Minutes Acceptance: Minutes of Nov 16, 2021 7:00 PM (Approval of Minutes) Dennis Dwyer Chairman Present Patrick Noonan Plan Commissioner Present Teri Williams Plan Commissioner Present Eric Friedman Plan Commissioner Present Rodney Bettenhausen Plan Commissioner Present Robert Kolososki Plan Commissioner Present Stephen Fedota Plan Commissioner Present II. APPROVAL OF MINUTES 1. Plan Commission - Regular Meeting - Nov 2, 2021 7:00 PM - Tabled RESULT: TABLED [UNANIMOUS] AYES: Dwyer, Noonan, Williams, Friedman, Bettenhausen, Kolososki, Fedota VILLAGE OF PALATINE Page 1 Packet Pg. 2 2.1 Minutes Plan Commission November 16, 2021 III. PUBLIC HEARING 1. Logistics Property Company - Preliminary Planned Development - Preliminary Plat of Subdivision - 607 E. Algonquin Road; 613 E. Algonquin Road; 623 E. Algonquin Road; and 1825 S. Roselle Road - Recommended to Approve Chairman Dwyer read the notice of public hearing that was published in the Daily Herald on November 1st, 2021 and mailed to the owners of the surrounding properties. Minutes Acceptance: Minutes of Nov 16, 2021 7:00 PM (Approval of Minutes) The following petitioner’s exhibits were introduced: 1. Project narrative 2. Engineer Plans - Jacob Hefner and Associates - last revised on 10/28/21 3. Traffic Impact Study and 10/25/21 update - Gewalt Hamilton and Associates 4. Storm water management report 5. Site Data Site Plan - 11/01/21 6. Preliminary Plat of Subdivision - Jacob & Hefner Associates - revised on 10/29/21 7. ALTA Survey - Jacob & Hefner Associates - revised on 10/29/21 8. Landscaping Plans - Gary Weber and Associates - dated 10/28/21 9. Architectural plans, rendering, and elevations - Architects Plus - dated 9/22/21 10. Preliminary Planned Development and Subdivision applications and Real Estate Disclosure 11. Objections (Roddell, Kirsten, Lee, O’Reilly, Bentz, Roddell, Horn, Bogozinski, Kraska, McCardle, Lig, Megabuna, Shah, Kirsten, Dan, and Myers) 12. Legal notice 13. Revised site plan dated 11/15/21 14. Objection - Yesenia Baltierres 15. Objection - Karen McHale - 1st Ward Alderman - Rolling Meadows 16. Objection - Phil Strider Robinson 17. Objection - Residents of Town Homes of College Hill Sworn in Petitioner: Mark Schuster - Attorney - Bazos, Freeman, Schuster & Pope, LLC Law Firm, representing Logistics Property Co., LLC Mr. Schuster provides introductions to the team that is present tonight which include: Wil Freve - Logistics Property Co., LLC - Senior Vice President - Midwest Region Ryan Blocker - Site Engineer Daniel Brinkman - Traffic Engineer John White - Architect Mr. Schuster explained that they will be presenting a Preliminary Plat of VILLAGE OF PALATINE Page 2 Packet Pg. 3 2.1 Minutes Plan Commission November 16, 2021 Subdivision for Lot F and a Preliminary Development Plan for the building, layout, parking and drainage. Mr. Freve is introduced and will provide the presentation. Mr. Freve provided the background on Logistics Property Co. (will be referred to as “LPC”) and explains that their headquarters are located in in Chicago. LPC has had 13 industrial projects in the Chicago market and hopes that this location will be their next project. The plan for the site is to build a 368,000 square foot, Class A Warehouse/Light Industry facility. He states that a tenant has not been secured and this is considered a “speculative” project. The design will have the flexibility and ability to accommodate a single tenant or up to four tenants. He explains that LPC constructs what is considered as “Best in Class” projects. The building design intent is to have 36’ interior clear height, extra wide column Minutes Acceptance: Minutes of Nov 16, 2021 7:00 PM (Approval of Minutes) spacing, best in class truck court depths, pavement sections that would provide exclusive concrete pavement versus asphalt, which would stand the test of time, along with ample car and trailer parking and a top of the line roofing system. He also states that the property is adjacent to a MWRD Flood Control Facility and realizes that the proximity to a flood plain may have drainage issues. Their plan would provide oversized storm water detection and would be at least 20% more than code requirements. He states they would target top of the line tenants and hopes that the project would be received favorably by the marketplace. Mr. Freve presents site plan drawings and explains that there will be car parking on one side and dock parking on the other side of the structure. This would be a benefit as it would allow for the ability to separate car and truck traffic. He explains that the dock parking is planned to face the existing industrial park to the east. He talks about access points to the facility and explains that there is a 360 degree access around the facility which is a benefit for emergency vehicles, loading dock access, and for multi-tenant usage. He explains that there is also a right-in, right-out access point on the eastern side of the property. Mr. Freve introduces Mr. Daniel Brinkman to discuss the traffic studies. Daniel Brinkman, Assistant Director of Transportation for Gewalt Hamilton Associates, Inc. Mr. Brinkman presented the Traffic Impact Study and provides information on how the studies are prepared and the parameters that were used for the conclusions. The study started with traffic counts from September of this year and also presented the traffic impact charts. He explains that a State requirement is to review the build-out and expected traffic outlook 5 years from the building’s anticipated completion date. He states that the Algonquin Rd study projects to have a growth rate of approximately ¾ % per year between now and 2050. Mr. Brinkman states that in 2019 the vehicle count per day between Roselle & Quentin Rd was 31,000 vehicles and it is anticipated that it will increase to 33,000 by 2028. He provides further information on the project impact, relevant to the anticipated traffic changes. He states that the amount of traffic generated during peak hours from a project like this does not move the needle much or have a significant impact. VILLAGE OF PALATINE Page 3 Packet Pg. 4 2.1 Minutes Plan Commission November 16, 2021 Mr. Noonan asks if the traffic study was based on traffic on Algonquin Road between Quentin and Roselle Roads. Mr. Brinkman confirms that this is correct and also indicates that it is based upon IDOT published information. Mr. Freve returns to the podium to discuss staff’s conditions. He requests that LPC be allowed to revise Condition #7, which states that the landscape plan shall include a minimum 8-foot tall evergreens. He requested a revision to allow the 8’ trees along Algonquin Road and 6’ trees within the site that is not in public view. He also requests revisions to Condition #8 and would like to submit a revised plan. He explains the revisions and the changes to the screening walls. He Minutes Acceptance: Minutes of Nov 16, 2021 7:00 PM (Approval of Minutes) explains that the screen walls along with the landscaping would be an additional sound barrier to the proposed project. He states that all other conditions were reviewed and have no additional requests. He is requesting Staff Recommendation for the Preliminary Plat of Subdivision and Preliminary Planned Development. Mr. Kolososki questions the building design and asks if it could be flipped to allow the docks to face west. Mr. Freve states that it was considered, but was ultimately ruled out because of conditions stipulated, during the sale of the property. The property purchase was approved by the Archdiocese, the owner of the purchased property and the property adjacent, St. Michaels Cemetery. It was their request to have docks on the eastern side as a courtesy to families that are attending services or visiting loved ones. Therefore, docks facing to the west is not an option. Mr. Bettenhausen requests clarification of the site traffic study and specifically the access points for truck and car traffic. Mr. Brinkman states that the intent is to have an eastbound right turn lane and westbound left turn lane which would be provided at the full access. Existing traffic at the full access will have separate left and right turn lanes, under stop sign control. Mr. Bettenhausen asks if other routes to enter and exit property were considered. Mr. Freve states that other options are not viable due to the stipulations of the contract. Mr. Bettenhausen inquires if the hours of operation will be 24/7 Mr. Freve states they would adhere to whatever the Village Code allows. Mr. Vyverberg clarifies that the Village Code does not have specific hours of operations for the manufacturing facility. He cites the code and conditions. There are not specific hours of limitations for truck driving in the manufacturing district. He also states that once tenants are identified, the village would require a business plan submission and review for compliance. Staff Statement: VILLAGE OF PALATINE Page 4 Packet Pg. 5 2.1 Minutes Plan Commission November 16, 2021 Mr. Vyverberg states that the petitioner has summarized the plans and confirms the property was annexed into the village in September, 2020. He explains about the surrounding properties and explains the surrounding zoning maps and existing properties. He provides information on the proposed building and states the site area is 28.55 acres, 367,696 square feet with 34 proposed truck docks and 22 future docks. There would be 363 parking spots for cars and provides the building height and set back information. Commissioner Dwyer inquires if the comprehensive plan consistent with the zoning. Minutes Acceptance: Minutes of Nov 16, 2021 7:00 PM (Approval of Minutes) Mr. Vyverberg states that he is not sure what the current comprehensive plan is for the residential to the north of the property. The manufacturing uses east of the subject property is in Schaumburg. He does not know what the Schaumburg comprehensive plan shows for that area. Commissioner Dwyer talks about zoning and how it determines how a property will be developed. He states that properties annexed into the village are generally zoned R-1 by default. Mr. Vyverberg confirms that information is correct and is zoned R1 as a holding pattern. The Comprehensive Plan is amended later to show the preferred use for the annexed area. Mr. Vyverberg continues and provides further information on the overall site plan. He explains the parking, sewer, utility, grading, and engineering plans. He talks about the landscaping plans and traffic plans. He reviews the rendering and site elevations, along with a tentative floor plan. The right-of-way setback from the residential properties is reviewed compared to the Weber. The proposed setback with the right-of-way is 210 feet. Mr. Fedota questions how noise complaints would be handled since the property is straddled between two municipalities. Mr. Vyverberg responds that complaints would be referred to the 911 emergency system and then routed to the Village of Palatine. Not aware of any cross agreements between villages. Mr. Fedota and Commissioner Dwyer state there may be confusion as to who would handle the complaints. Commissioner Dwyer opens the audience for statements and provides a summary of the concerns from emails that have been submitted. He states that the main concerns notes were noise, view from the residences adjacent to property, property values, traffic, changes to zoning, and location of exits. Residents providing comments: Ms. Sylvia Folette 2653 College Hill Circle Ms. Folette states her concerns regarding emission and air quality. VILLAGE OF PALATINE Page 5 Packet Pg. 6 2.1 Minutes Plan Commission November 16, 2021 Mr. David Niederhorn 522 E Algonquin Road Mr. Niederhorn states his concerns regarding traffic and the planned developments impact on the residential area Ms. Iga Pycinska 522 E Algonquin Rd. States concerns regarding sound, pollution issues, family environment, landscaping and view. Mr. Allen Miller Minutes Acceptance: Minutes of Nov 16, 2021 7:00 PM (Approval of Minutes) 2591 College Hill Circle States concerns about exit area and light spill. Ms. Jan Albert 2620 College Hill Circle States her reservations on the validity of the studies. States plans are speculative since tenants have not been identified. Concerns about the studies that are only looking 5 years out and seems short-sighted. Mr. Bill Horn 895 Harrison States he believes this type of business should be located off arterial highways and requests the commission listen to the voice of the people Ms. Joyce McCardle 522 E Algonquin States the annexation should not be allowed and also spoke to the traffic issues she believes will incur due to this project Ms. Colleen O’Reilly 522 E Algonquin Rd. States her traffic concerns and engine breaking noises. Ms. Michelle Curran 2641 College Hill Drive States her concerns regarding hours of operation and traffic Mr. Nico (Unknown) 3605 College Hill Circle States his concern regarding noise and requested that the access drives take into account the grading, so as not to have the headlights at the same grade as the residential parking lot across the street. Ms. Marianne Roddell 522 E Algonquin Rd VILLAGE OF PALATINE Page 6 Packet Pg. 7 2.1 Minutes Plan Commission November 16, 2021 States her concerns about the proposed project and the land usage Mr. Dwyer indicated that many of these have been addressed during the meeting and requested that the petitioner, Mr. Freve, clarify the noise resolutions. Mr. Freve states that Algonquin Rd is a 5-lane IDOT classified arterial road with a 45 mph speed limit with 31,000 vehicles per day. The chief generator of noise is the traffic that is generated from the project. States the project would increase traffic by 2%, which is not significant. The site plan indicates that the dock plan shows that first dock position is more than 350’ feet away from the closest Minutes Acceptance: Minutes of Nov 16, 2021 7:00 PM (Approval of Minutes) residential building; equivalent to a football field away. The traffic would not be a significant increase. He confirms that the project is warehouse, dry storage and is not a processing or manufacturing plant and the noise generated would be insubstantial. Commissioner Dwyer requests Mr. Vyverberg address the concerns about the view. Mr. Vyverberg states that he has viewed the property and explains that the property is not dissimilar to the current adjacent properties in Schaumburg, which are zoned for Planned Manufacturing uses. Commissioner Dwyer states that the requirements for landscaping and the berm on the west side would provide an impactful solution to the view and noise concerns. He also talks about property values and states that it is difficult to estimate the property values. He states that this is the job of a licensed appraiser. He addresses the traffic concerns and states that impact on traffic is not a legitimate reason for denying a petition. He also talks about the zoning & comprehensive changes and asks Mr. Vyverberg to clarify. Mr. Vyverberg states that the property was unincorporated Cook County prior to September 2020. The Archdiocese contacted the village about annexation and access to infrastructure. Per Code, all property is annexed into the Village under an R-1 designation. The Petitioner, of their own accord, reached a contract agreement to purchase the property from the Archdiocese and approached the Village. Commissioner Dwyer addresses the concern of the right in and right out access being right across from the condominium building. He states the screen walls would help to mitigate the concern and talks about the possibility of relocation. He request Mr. Freve to clarify or provide any recommendations. Mr. Freve states that they would work with staff to possibly move the access points to the east but it would need to be evaluated by the traffic study and refers to the traffic engineer, Mr. Brinkman. Mr. Brinkman provides information about access points and states moving access points have ridged restrictions. STAFF RECOMMENDATION: VILLAGE OF PALATINE Page 7 Packet Pg. 8 2.1 Minutes Plan Commission November 16, 2021 The Subject Property is a vacant and undeveloped portion of the cemetery property. It was previously located in unincorporated Cook County and annexed into the Village of Palatine in September 2020. The owner of the property entered into a contract to sell 28.55-acre property to the Petitioner. Although the Subject Property is vacant and unimproved, it is immediately adjacent (east) to property in Schaumburg, which is zoned for Planned Manufacturing uses. Those uses include several food development and distribution facilities, with associated truck and trailer parking. There is also a self-storage facility and other associated similar uses on the south side of Algonquin Road in Schaumburg. As noted, IL- Route 62 is designated as a Strategic Regional Arterial (SRA) and is also Minutes Acceptance: Minutes of Nov 16, 2021 7:00 PM (Approval of Minutes) designated as a Class II Truck Route (State designated with at least 11-foot lanes). The Traffic Impact Study was reviewed and its conclusions accepted by the Village Engineer. The anticipated traffic generated from the site will not have any affect upon the Peak Hour operations of the road network in the area. The site plan complies with the bulk standard requirements in the manufacturing district and the engineering plans and Traffic Impact Study have been conditionally accepted by the Village. As a condition of review, Staff is recommending additional/enhanced landscaping and the inclusion of additional screening along the north/east side of the property. Therefore, Staff recommends approval of the Preliminary Planned Development, subject to the following conditions: 1. The Final Engineering Plans shall be revised in a manner acceptable to the Village Engineer, including the following: a. All watermain, regardless of pipe material shall have a #10 tracing wire taped or tied to the top of the pipe and a whip end brought to the surface at all valve vaults and fire hydrants. b. MWRD/WMO permit - as discharge is shown into an MWRD easement, this shall be clearly identified in the WMO permit and indicated on the plans. 2. An Engineer’s Estimate of Probable Cost shall be submitted in a manner acceptable to the Village Engineer. 3. Uses shall be governed by the Manufacturing district use lists in the Village of Palatine Zoning Ordinance (note - this includes all of the required performance standards). Sign plans shall follow the Manufacturing district sign regulations. 4. Review fees in the amount of 1.5% of total project improvement costs shall be submitted in a manner acceptable to the Village Engineer. 5. As a component of the Final Planned Development, a Planned Development letter of credit in an amount acceptable to the Village Council shall be VILLAGE OF PALATINE Page 8 Packet Pg. 9 2.1 Minutes Plan Commission November 16, 2021 submitted in a manner acceptable to the Director of Planning and Zoning. 6. A Public Improvement Letter of Credit shall be submitted to insure the completion of all public improvements, as defined within the Village Code, for an amount of 115% of the approved EEOC, along with a cash bond of 10% for the required one-year maintenance period. 7. The final landscape plan and screening plans shall be revised in a manner acceptable to the Director of Planning and Zoning and shall include additional landscaping to screen the truck activities. All evergreen trees shall be installed at a minimum height of 8 feet on the northern side of the Minutes Acceptance: Minutes of Nov 16, 2021 7:00 PM (Approval of Minutes) property, adjacent to the residential properties across Algonquin Road. 8. The final landscaping/screening plan along the northern and eastern property lines (proximate to the truck docks) shall be revised in a manner acceptable to the Director of Planning and Zoning, to reduce any noise impact from trucks traffic and headlight sweeps. As part of these revisions, the front yard landscaped area north of the building, should provide an additional berm, to further provide additional landscaping and screening. The use of an additional screening could also be a component of the revisions on the northeast and eastern sides of the property. 9. The final photometric and lighting plan shall be revised in a manner acceptable to the Village Engineer. Light shields shall be required for all lights proximate to residential properties, at the determination of the Village Engineer. The use of pole mounted fixtures should also be evaluated on the north side of the property to ensure the appropriate cut- off from any additional light spillage. 10. The Petitioners shall submit a Subdivision Improvement Agreement in a manner acceptable to the Village Attorney. 11. MWRD/WMO, IEPA water permit, and NPDES (National Pollutant Discharge Elimination System) shall be submitted in a manner acceptable to the Village Engineer. 12. The final traffic directional signage plan shall be submitted in a manner acceptable to the Village Engineer. 13. The Plat of Subdivision shall be revised in a manner acceptable to the Village Engineer and Director of Planning and Zoning. All utilities shall be owned and maintained by the property owner. This shall be noted on the plat, along with the statement that the Village shall have the right, but not the obligation, to enter the site to repair a utility and change the property owner for the repair costs. 14. Cross access easements, declarations and a Reciprocal Easement Agreement for the entire property governing the maintenance of VILLAGE OF PALATINE Page 9 Packet Pg. 10 2.1 Minutes Plan Commission November 16, 2021 access points, stormwater areas and any other common areas shall be submitted in a manner acceptable to the Village Attorney and Village Engineer as part of the Final Planned Development application process. 15. The monotony code shall apply to all building elevations: Sec. 6-42.1 Exterior Building Design: When rear and side elevations are visible from public streets or neighboring properties, exterior building design and detail on all elevations shall be coordinated with regard to color, types of materials, number of materials, architectural form, and detailing to achieve harmony and Minutes Acceptance: Minutes of Nov 16, 2021 7:00 PM (Approval of Minutes) continuity of design. 16. The final dumpster locations and required screening materials shall be submitted in compliance with Village Code, pursuant to Sec. 6-42.2 Screening: (a) Trash containers and outdoor storage areas shall be screened from public streets, pedestrian areas, and neighboring properties. The screens should be designed to be compatible with the architectural character of the development. Trash screens shall also meet the requirements of Chapter 12 of this code. These screens shall be constructed of durable materials similar to those of the building and shall have solid (opaque) walls and doors, as part of the Final Planned Development application process. The final locations could also require the submission of a revised auto-turn, in a manner acceptable to the Director of Fire Prevention. 17. All rooftop equipment shall be screened in compliance with Code: (b) Roof-top equipment screening: 1. New Construction. All mechanical equipment and other similar devices located on any roof shall be visually and acoustically screened on all sides. Design and detail of such screening on all elevations shall be coordinated with regard to color, types of materials, number of materials, architectural form, and detailing to achieve harmony and continuity of design with the major portions of the building. 18. All of the loading docks shall utilize a dock seal mounting to the exterior of the building, in a manner acceptable to the Community Development Director. The dock seals would then allow for the trailers to connect and provide interior loading and unloading activities and thereby reduce exterior noises. 19. As part of the Final Planned Development and pursuant to the revised project narrative, the Petitioner shall submit the proposed business and operations’ plans (identified tenants) for Staff review for compliance with the manufacturing use list and standards. VILLAGE OF PALATINE Page 10 Packet Pg. 11 2.1 Minutes Plan Commission November 16, 2021 Mr. Friedman inquires if the condition regarding lighting on the north side of the building and the use of light poles. Mr. Vyverberg states that is correct and the condition was to ensure that in addition to light shields it was to ensure there would be no other light spillage to the residential properties. Mr. Friedman asks if sidewalks are being considered. Mr. Vyverberg states that the sidewalk was required and were part of the revised submitted plans. Mr. Bettenhausen inquires if an IDOT permit will be required. Minutes Acceptance: Minutes of Nov 16, 2021 7:00 PM (Approval of Minutes) Mr. Vyverberg states the petitioner is aware it is required and application has been submitted. Mr. Noonan made a motion to close the public hearing. DISCUSSION: Mr. Kolososki states his concerns regarding the size of the building. Chairman Dwyer notes that traffic increase is inevitable. Mr. Fedota talks about noise concerns and also states that a residential application would probably not be a solution for this parcel. Mr. Friedman states that based on the zoning that is already in place he feels that continuing the existing use type for this parcel makes sense to him. Mr. Fedota makes a motion to approve Case #21-83 with 21 conditions Motion 2nd by Mr. Noonan Vote taken Mr. Friedman - Yes Mr. Fedota - Yes Mr. Noonan - Yes Mr. Bettenhausen - No Mr. Kolososki - No Ms. Williams - Yes Chairman Dwyer - Yes Motion is approved by a vote of 5-2 Mr. Noonan makes a separate motion to suggest that the Petitioner consider removing (1) structural grid, approximately 54 feet, from the north side of the building. Motion 2nd by Mr. Friedman VILLAGE OF PALATINE Page 11 Packet Pg. 12 2.1 Minutes Plan Commission November 16, 2021 Vote taken: Mr. Friedman - Yes Mr. Fedota - Yes Mr. Noonan - Yes Mr. Bettenhausen - Yes Mr. Kolososki - Yes Ms. Williams - Yes Chairman Dwyer - Yes Motion is approved by a vote of 7-0 Minutes Acceptance: Minutes of Nov 16, 2021 7:00 PM (Approval of Minutes) Communication: Mr. Vyverberg states Village Council approved the Final Plan Development for Architects Corner. Confirmation will be provided regarding the meeting scheduled for 12/7/21 and states the meeting for 12/21 has been cancelled. Introduces Alex Bradshaw - a welcome addition to the Planning & Zoning Department for the Village of Palatine. Mr. Friedman made a motion to adjourn; seconded by Mr. Noonan. Unanimously passed. RESULT: RECOMMENDED TO APPROVE [UNANIMOUS] AYES: Dwyer, Noonan, Williams, Friedman, Bettenhausen, Kolososki, Fedota VILLAGE OF PALATINE Page 12 Packet Pg. 13 2.1 Minutes Plan Commission November 16, 2021 IV. COMMUNICATIONS V. ADJOURNMENT Minutes Acceptance: Minutes of Nov 16, 2021 7:00 PM (Approval of Minutes) VILLAGE OF PALATINE Page 13 Packet Pg. 14 4.1 VILLAGE OF PALATINE Plan Commission SCHEDULED 12/07/21 07:00 PM CASE STAFF STATEMENT (ID # 7261) 874-920 N. Quentin Road - Preliminary Planned Development to allow a 2-story, 40-unit apartment building. CASE NUMBER: 21-89 PETITIONER: Andy Dumke, Alliance Development LOCATION: 874-920 N. Quentin Road PROPOSAL: Preliminary Planned Development to permit a 2-story, 40-unit apartment building ZONING AND LAND USE: Planned Development - vacant property SURROUNDING CONDITIONS: North: Planned Development - The Clayson apartments - across Poplar Street South: B-2 General Business - real estate office East: Unincorporated Cook County (Lake Park Estates) and R-1 single-family residential (2-lots are incorporated into the Village) West: R-1 single-family residential – (minimum required 20,000 square foot lots) BACKGROUND: The Petitioner and contract purchaser of the property submitted a revised Petition for a 40-unit, 2-story apartment building, with associated below-ground and surface parking lots.  The Subject Property is 2.53-acres (110,333 square feet) and consists of 6 vacant lots and 1 lot, with an unoccupied building.  The revised plan includes 40 apartments, consisting of 19-1-beroom units, 14-2- bedroom units, and 7-3-bedroom units. The initial and subsequent revisions are identified below from the Petitioner’s response: Page 1 Packet Pg. 15 4.1 Case Staff Statement (ID # 7261) Meeting of December 7, 2021 Historical Land Uses and Previous Development approvals  920 N. Quentin Road property (existing building on the NE corner of the property) was annexed in 1994 and 874-896 N. Quentin Road were annexed in 2002. These properties historically operated as a single-family home, commercial nursery, and a legal/real estate office. They were initially zoned R-1, due to annexation, and subsequently rezoned to Planned Development in 2002.  In 2002, the initial commercial Planned Development (Ordinance #O-43-02) identified the commercial uses on the property: o Landscaping contractor’s yard; o Retail landscaping facility; and o Professional offices.  920 N. Quentin Road was a single-family home and a contractor’s office, during the Willow Glen Planned Development (1996) construction. It later functioned as a professional office and has been unoccupied and listed for sale.  In 2009, the property was rezoned to B-2 General Business district, subject to certain conditions, which was also not activated.  In 2011, the Subject Property (not including 920 N. Quentin Road) applied for a Planned Development (Ordinance #O-136-11) - institutional use (75-room Alzheimer’s/memory care) and associated parking. In 2012, the plan was amended, reducing the room count to 69. The proposed facility was 3 stories and had 58 parking spaces. This Planned Development was also not implemented and the approvals expired. ANALYSIS:  The subject property is 2.53 acres. The Petitioners previously applied for an Page 2 Packet Pg. 16 4.1 Case Staff Statement (ID # 7261) Meeting of December 7, 2021 apartment building for the Subject Property in July 2021. The Petition and plans were withdrawn from consideration, subsequent to the Plan Commission recommendation to deny the Petition.  In the revised submission, the Petitioners held a neighborhood meeting on August 25, 2021 to discuss the plan changes. The revised plans reduced the unit count by 18 (31% of previously 58 units) to 40 units, the FAR was lowered to below .5, and further reduced the surface parking from 57 spaces to 38 spaces. Note - there are 56 underground parking stalls between the two buildings, for a total parking count of 94 spaces or 2.35 spaces/unit  The revised plans also removed the full access to Poplar Street and relies upon one full access onto Quentin Road on the south side of the property. This access point enters and moves around a stormwater detention basin and the proposed fenced play area (40 feet by 30 feet), which is located in between the drive aisle/parking lot and detention basin. The drive terminates into the parking lot and provides a 2-way access to the underground parking.  The Petitioners submitted a parking and traffic narrative indicating that the proposed housing typically needs 1.5 to 1.6 spaces/unit. Ten surface guest parking spaces are proposed for the 40-units. Further, based upon two recent traffic studies for similar housing examples (Machesney Park, IL and McFarland, WI) produced the following number of trips: Page 3 Packet Pg. 17 4.1 Case Staff Statement (ID # 7261) Meeting of December 7, 2021    The linear layout of the parking lot would also not provide for a directed delivery access and would require vehicles to enter the site and then return to the same Quentin Road access point.             The table below summarizes the site characteristics and bulk standards for the previously proposed apartment building, and the revised apartment submission, Page 4 Packet Pg. 18 4.1 Case Staff Statement (ID # 7261) Meeting of December 7, 2021 and previously approved memory care use: Subject Unit count & Density/ Building height Setbacks (Front yard, Side Acreage memory care acre yard abutting a street, rooms Side yard, and Rear Yard) Initial 2.53 58 22.92 units 3 story; 36-feet F-(Poplar Street) – 64 feet application SYAS (Quentin) -25 feet SY – 75 feet RY – 176 feet Revised 2.53 40 15.8 units 2-story; 26 feet Front- (Poplar Street) 104 application feet Side yard abutting a street (Quentin Road) -20 feet Side yard - 85 feet Rear yard - 103 feet Memory 1.96 69 NA 3-story; Front- (Poplar Street) 137 care use feet Side yard abutting a street (Quentin Road) -51.3 feet Side yard - 85 feet Rear yard - 17.9 feet    The proposed 20-foot setback is inconsistent with the surrounding setbacks in the area. As noted, the Clayson apartments are set back approximately 28 feet from the Quentin Road property line. This would have complied with the Cook County requirements and provided a comparable corner side yard setback to the R-3 district minimum requirement of 25 feet. The proposed setback is also narrower than the Clayson and would provide the smallest residential corner side yard or functional front yard setback in the block. Additionally, Staff notes that the setback is too narrow for the approximately 410-foot wide building.  The unit mix was also revised to comply with the minimum required R-3 lot area Page 5 Packet Pg. 19 4.1 Case Staff Statement (ID # 7261) Meeting of December 7, 2021 per dwelling unit limitations (Zoning Ordinance). The proposed unit count and mix requires a minimum of 2.49 acres, with the Subject Property containing 2.53 acres. The plans were also revised to provide elevator access to a minimum of 20% (8-units) between the first and second floors.  The landscaping plans were also revised to provide sections of 8-foot fencing on the west side of the property, with continuous 10-foot evergreens (84 total to further screen the single-family residential properties to the west.  The Site Plan contemplates a 1,200 square-foot fenced play area, within 5 feet of the proposed stormwater detention area. Staff questions its placement 3 feet from the eastern curb of the drive aisle to the parking lot. Engineering and Traffic  The proposed storm sewer connects to existing manholes on the west side of Quentin Road and the southern side of Poplar Street. A Cook County permit would be required.  Sanitary lines will connect to services on the south side of Poplar Street.  The water service will connect to existing services on the south side of Poplar Street.  Quentin Road is under the jurisdiction of the Cook County Highway Department and requires permit approval to access the site. The posted speed limit in this area is 40 miles per hour.  One access point to the site is planned on the south side of the property. The full access point is approximately 26 feet wide and enters the property heading west, until transitioning around the fenced play area, within the parking lot. The drive then enters a 2-way drive aisle descending into the underground parking areas. There is also a partial hammerhead planned on the north side of the property to allow emergency vehicles to complete the necessary turning movements.  This full access would have to provide two access lanes to accommodate both left and right turns. Additionally, the 2-way access drive terminates into an emergency access hammerhead. The proposed hammerhead shares entrance drive access to the underground parking; including a 6-foot grade descent into the underground parking area. Page 6 Packet Pg. 20 4.1 Case Staff Statement (ID # 7261) Meeting of December 7, 2021  Page 7 Packet Pg. 21 4.1 Case Staff Statement (ID # 7261) Meeting of December 7, 2021  The proposed project will have 94 parking spaces total - 56 underground parking spaces and 38 surface parking spaces. The parking ratio is 2.35 stalls/unit. Multi-family requires 2 space per unit without garages, and 2.25 spaces with garages. A trash enclosure in the parking garage is also included in the plan.  While it did not include the 920 N. Quentin Road property, the previous memory care Planned Development derived access from two Quentin Road curb cuts. This included a full access on the northern end the development and a one-way exit only on the southern side. The anticipated traffic associated with the memory care use would have been low volume, as the residents would not have vehicle access. The traffic generated would have consisted of employees, service vehicles, and visitors.  Staff again notes the absence of any public transportation in proximity to the Page 8 Packet Pg. 22 4.1 Case Staff Statement (ID # 7261) Meeting of December 7, 2021 development. There are no existing or proposed PACE bus service lines anywhere proximate to the development. The Metra Station is not proximate to the proposed development, at 1.5 miles from the Subject Property.  Staff also questioned how school bus traffic would enter and exit the site. The Petitioner indicates that school bus traffic would access students from Poplar Street. SURROUNDING LAND USES:  The subject site is surrounded by single-family residential properties to the east and west and multi-family properties to the north, across Poplar Street. Now known as the Clayson apartments (constructed in unincorporated Cook County).  The property south of the Subject Property is zoned B-2 General Business and operates as a real estate office. With the exception of the homes at 897 and 907 N Quentin Road, the properties east of Quentin Road are all in unincorporated Cook County and part of the Lake Park Estates Subdivision. Comprehensive Plan Recommendation  The Village of Palatine Future Land Use map identifies business uses for 920 N. Quentin Road and multi-family for 896 N. Quentin Road, as the adjacent properties were approved for the memory care use through Planned Development in 2011. This development was ultimately never developed or implemented and the entitlement approval has lapsed. The future land use categories do not include senior housing or memory care uses, the designation was a reflection of the approved use. This is consistent with the other similar uses in the Village including Greencastle of Palatine, Grand at Twin Lakes, and Solstice Senior Living at Palatine. SUBJECT AND SURROUNDING DENSITY  The Subject Property is 2.53 acres. With 40 proposed units, the overall gross density is 15.8 units per acre. Excepting downtown developments (TOD area) and Spruce Village along Rand Road, the typical multi-family and townhouse densities in the Village range between 7-8 units per acre.  There are other multi-family developments, located north of Poplar Street and south of Dundee Road, as follows: Page 9 Packet Pg. 23 4.1 Case Staff Statement (ID # 7261) Meeting of December 7, 2021 o The Clayson apartments (north of Poplar Street) were already completed, prior to being annexed from Cook County. Known then as the Deer Grove apartments, the 448-units on 28.4 acres and equates to 15.7 units/acre. This development is a mixture of 2-story and 3-story buildings and includes a swimming pool, walking trails, and various outdoor activity areas. It was annexed into the Village in 1985. o Northwest of the Subject Property (off of Poplar Street) is the Willow Glen townhouse development. It contains 40 units and is located on 10.56 acres. This provides an overall density of 3.78 units/acre. o Knollwood is west of Willow Glen (access from Dundee Road) and has 236 units on 24.281 acres, for an overall density of 9.791 units/acre. RECOMMENDATION: The Petitioners reduced the overall density and provided additional landscaping and screening for the west side of the property. Additionally, the height of the building was lowered to 2-stories and 26 feet. Staff notes that the Future Land Use and previous approvals for the property contemplated a multi-family memory care use. Also, the proposed is denser than the other multi-family and townhouse uses. As the Clayson apartments were planned, approved, and constructed in Cook County, Staff views that circumstance dissimilar from the proposed. There is also no access to public transportation, park district, or recreational facilities within the vicinity of the property. The plan indicates one outdoor 1,200 square foot fenced recreation area on the west side of the building. This area is located along the entrance drive to the surface parking lot and further speaks to the constraints of the site plan. Staff has also raised questions and concerns about snowplowing and adequate snow storage. The Petitioner indicates that snow could be hauled off site, which would have to be further determined to accommodate. The proposed site plan and property dimensions of the Subject Property do not likely allow for onsite plowing. Staff also questions the one access point into the site. A deceleration lane should also be reviewed coming from Quentin Road into the site. As a condition of review, Staff recommends 2 separate access points to accommodate turns onto Quentin Road. The interior of the building has a 1,988 square foot common area space on the first floor of the area between the buildings, for use by the residents of the 40-units, Page 10 Packet Pg. 24 4.1 Case Staff Statement (ID # 7261) Meeting of December 7, 2021 which the narrative indicates would have a fitness room. The underground parking area provides approximately 221 square feet of storage areas and 60 square feet noted for bike storage. This does not seem sufficient for the additional storage needs for 40 units. While the elimination of the second access to Poplar Street addressed neighbor and Staff concerns from the initial Petition, the revised site plan and singular access point on the south side of the property create additional access and turning movement concerns with the site plan. Such things as delivery, moving, and maintenance trucks will be forced to use the single shared resident access and traverse through the site, returning through the same sole access point. The site plan could potentially relieve potential congestion and turning conflicts by providing a second access onto Quentin Road. Staff sees the confluence of the access drive to the underground parking garage, fire department hammerhead, and the singular drive to the surface parking lot, as creating unnecessary traffic conflicts. It also further bespeaks the dimensional limitations of the proposed site and underlying property acreage. As proposed, Staff believes that the site plan does not adequately address or comply with the traffic circulation design standards for Planned Developments. Ultimately, Staff cannot support the proposed site plan. If the Plan Commission recommends approval, Staff recommends the following conditions: 1. The Preliminary Planned Development shall substantially conform to the Engineering Plans prepared by Vierbicher dated 09/27/2021, and the Architectural Plans prepared by Knothe Bruce Architects dated 09/27/2021 last revised 11/24/2021, except as such plans may be revised to comply with all of the accessibility requirements for multi-story buildings and residential facilities, as required within the building codes, and to conform to Village Codes and Ordinances. 2. A Plat of Consolidation/Subdivision shall be submitted in a manner acceptable to the Village Engineer and include all necessary easement language, including a 10-foot easement along the Quentin Road frontage. The plat shall reflect that the property-owner shall be responsible for all utilities on the property including storm water maintenance. 3. The Final Engineering plans and Engineers of Probable Cost shall be submitted in a manner acceptable to the Village Engineer. 4. The Final Landscape Plan shall be submitted in a manner acceptable to the Page 11 Packet Pg. 25 4.1 Case Staff Statement (ID # 7261) Meeting of December 7, 2021 Director of Planning and Zoning. The final plantings on the west side of the property should also include additional types of trees and bushes to present a more natural appearance to promote the vibrancy and health of the plantings. This could include the use of understory trees and bushes. 5. An Auto-Turn Exhibit shall be submitted in a manner acceptable to the Fire Marshal. 6. The required Public Improvement and Planned Development Letters of Credit and other all fees shall be submitted in a manner acceptable to the Director of Planning and Zoning and Village Engineer. 7. MWRD, Cook County, and NCCSWC permits are required. 8. In conjunction with the Final Planned Development application process, the Petitioner shall submit a construction management plan and schedule in a manner acceptable to the Village of Palatine. 9. If deemed necessary by the Village Engineer and in conjunction with the Final Planned Development application process, the Petitioner shall submit a Traffic Impact Study in a manner acceptable to the Village Engineer and Director of Planning and Zoning. The developer should anticipate possible road improvements along Quentin Road, including a deceleration lane along and second access to Quentin Road. The full access point should include two exit lanes to accommodate left and right turns. 10. A final fencing and screening plan shall be submitted in a manner acceptable to the Director of Planning and Zoning. The final floorplan and site plan for the fenced play area shall be submitted in a manner acceptable to the Director of Planning and Zoning. 11. The Petitioner shall submit a stormwater management and maintenance plan in a manner acceptable to the Village Engineer. 12. The playground location will be reconsidered to provide additional separation from the detention basin. 13. The petitioner shall provide a detailed sign plan for the entire site. Information on the freestanding sign and wayfinding signage for the property shall be provided in the plan. Page 12 Packet Pg. 26 4.1 Case Staff Statement (ID # 7261) Meeting of December 7, 2021 ATTACHMENTS:  Aerial Map  Petitioner - Letter + Description of Project Changes  Petitioner - Palatine Parking and Traffic Narrative  Petitioner - 2021-09-27 COMBINED DRAWINGS  Petitioner - Revised elevation and floorplan - 11-24-21 base-A-1.1  Petitioner - Initally Revised rendering 2nd submission - 2021-10-14 - Northpointe Palatine Renders (1)  Petitioner - Proposed Unit Mix - Density Analysis  Petitioner - Quentin Apartments - Project Description - 9.10.2021  PPD application  Petitioner - Previously proposed elevations  Petitioner - Previously proposed - Initial Site Plan  Site plan and elevation changes  Diaz email Quentin Road apartments  Galo email  Gintowt letter Quentin apartments  Martin LWV email of support  Wojdyla email - Quentin Road apartments  Support Quentin Project - to BV from Cortez  Paciga email 11-27-21  Harder email 11-26-21  Piazza - Palatine Letter Plan Commission RE-Public Notice ID 1295  Kramer email  Novak email  Thompson email  Erickson email  Murphy File 21-89 (002)  Marelli email  Magoncia email  Picchiotto email  Pichhiotti email describing Petition  Pichhiotti Petition  Orofino email  Willow Glen Petition  ToshikoLinLTR Page 13 Packet Pg. 27 4.1 Case Staff Statement (ID # 7261) Meeting of December 7, 2021  Wallace email 11-26-21  DeRosa email  LWilliamsAffordableHousingLtr  Public Notice Page 14 Packet Pg. 28 4.1.a Packet Pg. 29 Attachment: Aerial Map (874-920 N. Quentin Road - Quentin apartments) 4.1.b September 28, 2021 Ben Vyverberg Village of Palatine Department of Planning and Zoning 200 E. Wood Street Attachment: Petitioner - Letter + Description of Project Changes (874-920 N. Quentin Road - Quentin apartments) Palatine, IL 60067 RE: 874-920 N Quentin Road Site Drawings Dear Mr. Vyverberg Northpointe Development is pleased to re-submit our plans, in response to both staff comments and neighborhood feedback received at Plan Commission and during a neighborhood meeting held on August 25, 2021. Attached you will find both a detailed description of project changes and updated drawings including the site, grading, utility, landscaping, and elevations of the building. We believe that these changes will address concerns raised by both staff and neighbors, delivering a high-quality development that the Village of Palatine will be proud of. The following pages include a detailed review of feedback received and revisions made. Updated Unit Mix Initial Unit Mix Revised Unit Mix One-Bedrooms 24 18 Two-Bedrooms 19 12 Three-Bedroom 15 10 Totals 58 40 Density Concerns Staff detailed in their report to Plan Commission that the density initially proposed far exceeded the apartment complex to the north and the other existing multi-family developments in the area. In addition, it was noted that the proposed FAR exceeds the maximum allowed in the multi-family district of .5 FAR and that 3.93 acres would be required to meet the minimum lot area/dwelling unit. Our team worked to reduce density to the extent possible. Further reductions were limited due to complying with Illinois Housing Development Authority’s program requirements. Our plan makes the following changes to the initial proposal, including: • Significant reduction in overall density, bringing the initial proposed 58 units down by over 30% to 40 units. This also resulted in a surface stall parking reduction from 57 to 38 stalls. FAR has been reduced to below 0.50. • Under R-3 Zoning, the initially proposed development would require 3.93 acres to meet the minimum lot area/dwelling unit requirements. The revised proposal is a much better fit on the subject’s 2.53 acres and closely aligns with R-3 requirements. Impact on Resident Privacy There is a grade difference between the proposed building foundation and the single-family residential to the west. Staff concluded that when combined with the building height of 36 feet, the building being setback approximately 50 feet from the west property line, the view and impact of this building will be substantial. Neighbors expressed this concern loud and clear. Packet Pg. 30 4.1.b Our team feels confident that we have identified every opportunity to limit the impact of the proposed development on existing residents. These changes include: • Revisions to building structure o The building has been moved an additional five feet east towards Quentin Road o Three-story, 36’ structure has been reduced to a two-story 26’ tall structure Attachment: Petitioner - Letter + Description of Project Changes (874-920 N. Quentin Road - Quentin apartments) o Replacement of pitched roof to a flat roof o Balconies on the western portion of the building have been removed • Revisions to landscaping plan o Removal of the retaining wall – although a significant amount of tree line will remain, at request of planning commission, we can add back some amount of retaining wall to save additional trees as outlined in the landscaping plan o Installation of an 8-foot fence – relocated to 20’ off of the west property line o Preservation of trees (as shown in landscaping plan) to the extent allowed with site grading. Over 80 new 10’ tall evergreens will be planted along the 8’ fencing. o Stormwater management system will mitigate adverse impact on surrounding properties likely resulting in an improvement to flooding issues experienced in the immediate area Impact on Traffic Patterns A lot of concerns were raised, from both staff and neighbors regarding the potential impact of the proposed development on traffic patterns. Specifically, • Staff reported that the previously approved memory care/assisted living facility was a more passive use, with limited traffic, whereas the proposed development will generate much more traffic. • The access onto Poplar Street could potentially create conflicts and impact the existing single-family residential traffic, as the only ingress/egress to Quentin Road for residences on Poplar, Franklin, and Maple is via Poplar Street. Furthermore, Quentin Road has a maximum speed limit of 40 mph. And, a deceleration lane coming from Quentin Road is not a component of the preliminary plans. Per the Planned Development Design Standards, principal vehicular access points shall be designed to promote smooth traffic flow with controlled turning movements and minimum hazards to vehicular, bicycle, and/or pedestrian traffic. • The development does not provide any substantive guest parking and the one car queuing area from Poplar Street to the underground parking area, has the potential to create access and turning conflicts. Our team revised our proposal to address many of these concerns. • Ingress/Egress has been removed from Poplar Street – with one entrance to the site located on Quentin Road and additional site features added to accommodate emergency vehicles. Site access on Quentin Road has been shifted to prevent any residents from driving over the existing median or driving through Franklin for access to the property. • 10 spaces, over 10%, have been reserved for guest parking only We are confident that after collaborating with staff and neighbors, the changes incorporated in the new proposal will result in the success of Quentin Apartments. Further, through the revisions outlined above – we are confident that we’ve taken every step possible to mitigate the impact of the proposed development on existing neighbors. Please let us know if you have any questions regarding our submission. Sincerely, Jake Victor Vice President of Development Northpointe Development Corporation Packet Pg. 31 4.1.c September 28, 2021 Ben Vyverberg Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Village of Palatine Department of Planning and Zoning 200 E Wood Street Palatine IL 60067 RE: Parking and Traffic Narrative 874-920 N. Quentin Road Dear Mr. Vyverberg, Please accept this Parking and Traffic Narrative for our proposed multifamily development. This memo is intended to detail the appropriateness of the amount of parking provided and the number of daily trips generated from our site. Since being established in 2009, Northpointe Development has developed over 1,100 units of housing. Approximately 800 of those units are family workforce like our proposal for N. Quentin Road. Our portfolio is currently over 98% occupied which not only gives us great data on the amount of parking being utilized at our projects but also shows that we offer the proper amount of amenities (including parking), quality housing, and management to keep our properties full and well maintained over the long term. The housing tax credit program was created in 1987 and has built over 2.3 million units throughout the county. Best practices show that a workforce housing property generally needs a 1.5 or 1.6 ratio on parking spaces to units for residents and visitors. However, we have studied the parking uses of our portfolio and have developed a more detailed formula. This formula calculates resident parking needs based on unit size and tenant income and has been attached for our proposed project. This formula shows that the residents, not including spaces for visitors, will need approximately 53 total parking stalls. Our proposal includes 94 total spaces including 56 underground spaces. At 2.35 spaces per unit our proposal maybe over parked and our total green space could be increased. Also, if the residents are expected to need approximately 53 stalls most of the residents will be parked underneath the building reducing the neighborhood visual impact of the development. To estimate the project’s effect on traffic and number of trips we referenced two recent Traffic Studies that have been completed for Northpointe. Both Studies have been attached for your reference. The most recent and most comparable study was completed in January of 2021 for a 64 unit, 3-story multifamily building in Machesney Park, Illinois. That study used the ITE Manual to generate new trips from the property in both Peak AM and PM times. Based on the numbers from that study our project is estimated to produce the following number of trips. Dwelling PM Land Use ITE Code Units AM Peak Hour Peak Hour In Out In Out Multifamily Housing 220 40 4 15 16 9 Total New Trips 4 15 16 9 The Machesney Park Study showed that the project was going to add a relatively few number of additional trips overall and that they effect of these trips would have on the studied intersections would be minimal. The general location of this site was business commercial area with access to a residential neighborhood. The second study submitted analyzed a two-way stop-controlled intersection in the Village of McFarland, WI and the effects of that control and traffic with the addition of 110 multifamily units and Public Safety Building. This site is in a majority residential area at the intersection of a major and minor street. Packet Pg. 32 4.1.c The two-way stop sign was on the minor street and no stop sign on the major street somewhat similar to the corner of W Poplar Road and N Quentin Road. This study showed that the two-way stop was sufficient in both a current and future build scenarios. In our opinion, both of these studies should give the Village comfort that our proposed use will have a relatively low and insignificant impact to traffic and would not add delays are the need for any road modifications or intersection controls. Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Please let me know if you have any questions or comments. Sincerely, Jake Victor Vice President of Development Northpointe Development Corporation www.northpointedev.com Packet Pg. 33 4.1.c Housing Tax Credit FAMILY PARKING Palatine, IL 1 Bedroom Stalls Per Unit Units Total Needed 30% 0.4 7 2.8 50% 0.82 8 6.56 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) 60% 1 1 1 80% 1.09 2 2.18 2 Bedroom 30% 0.8 2 1.6 50% 1.58 7 11.06 60% 1.8 0 0 80% 2 3 6 3 Bedroom 50% 1.53 3 4.59 60% 1.6 1 1.6 80% 2.5 6 15 Stalls Needed 52.39 Packet Pg. 34 4.1.c Technical Report Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Traffic Impact Study Northpointe Development Machesney Park, Illinois Prepared By: January 2021 HR Green Job No.: 201649 Packet Pg. 35 4.1.c Introduction A comprehensive review of a proposed residential development was completed to estimate the traffic impacts of the development on nearby, connecting roadways. The development includes Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) the construction of an apartment building in a currently undeveloped lot west of IL 251. The site is located in Machesney Park, Illinois between N 2nd Street/West Frontage Road and Mall Drive. This technical report will provide brief discussions on the existing conditions of the site and the expected traffic impacts associated with the proposed redevelopment, including: trip generation, traffic assignment and distribution, and traffic analysis. Development Site Figure 1 (Project Location) January 2021 1 Packet Pg. 36 4.1.c Northpointe Traffic Impact Study HRG 201649 Machesney Park, Illinois Existing Conditions As part of overall site assessment, a description of the street network, existing land use, and traffic Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) characteristics is provided in the following sections. LEGEND Proposed Site Study Intersections Copper Dr Machesney Town Center Figure 2 (Study Area) Existing Street Network The existing development site is a currently undeveloped lot west of IL 251/N 2nd Street. The site is located northwest of Frontage Road, north of Copper Drive, and east of Mall Drive. Primary access to the development site will be provided via both Mall Drive and Frontage Road. It is anticipated that the majority of site traffic will reach the development site either via the signalized January 2021 2 Packet Pg. 37 4.1.c Northpointe Traffic Impact Study HRG 201649 Machesney Park, Illinois intersection of IL 251 at Copper Drive, or via the signalized intersection of Ralston Road at Frontage Road. IL 251 is a north/south principal arterial roadway which serves local and regional traffic in Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Machesney Park. The road provides access to commercial and residential areas throughout Machesney Park, as well as into neighboring communities in the greater Rockford area. The facility is two lanes in each direction, divided by an approximately 50’ grass median in the study area. Auxiliary turn lanes are provided at the Copper Drive intersection, including dual left turn lanes in the northbound direction. The posted speed limit on IL 251 is 55 miles per hour. Copper Drive is an east/west local road, stretching from the residential neighborhood east of IL 251 to Mall Drive. There are two through lanes in each direction in the study area separated by a raised median. A dedicated left turn lane and a dedicated, channelized right turn lane are provided in the eastbound direction at the IL 251 intersection. At the Frontage Road intersection, the westbound direction is free-flowing to prevent queues from backing to the signalized intersection, while the eastbound, northbound, and southbound directions are stop controlled. Frontage Road is a service road running parallel with IL 251 on its west side. The roadway stretches from Copper Drive north, to Ralston Road/IL 173 and beyond. Frontage Road has a single lane in each direction and serves local traffic wishing to access commercial and residential areas west of IL 251. It is often used by locals as an alternate route to avoid traffic signals along the IL 251 corridor. The speed limit on Frontage Road is 35 mph. Mall Drive is a local road which serves as a ring road for the Machesney Town Center shopping mall. The roadway has a single lane in each direction with a median turn lane. January 2021 3 Packet Pg. 38 4.1.c Northpointe Traffic Impact Study HRG 201649 Machesney Park, Illinois Existing Traffic Volumes Peak hour turning movement counts were collected a sub-consultant on Tuesday December 15, 2020 from 7-9:00 am and 4-6:00 pm for the following intersections: Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) • IL 251/N 2nd Street and Copper Drive • Copper Drive and Frontage Road • Copper Drive and Mall Drive • Frontage Road and Ralston Road Due to the effects of the COVID-19 pandemic on traffic volumes, the traffic counts were compared to historic traffic volumes and adjusted as necessary to reflect more typical traffic volumes. After comparing with IDOT’s historical hourly volumes, adjustment factors were applied to the collected traffic data to increase the turning movement counts to more appropriate volume levels. These factors vary based on roadway and peak hour and are shown in Table 1. The factors are generally consistent with other traffic adjustment factors HR Green has used on collected traffic data during the pandemic. The Copper Drive adjustment factors are higher than at other locations, likely because of the commercial land uses surrounding the facility, which have been more greatly affected by the pandemic. Adjustment Factor (% increase) Roadway AM Peak Hour PM Peak Hour IL 251 40% 10% Copper Dr 100% 40% Frontage Rd 40% 30% Ralston Rd 40% 10% Table 1 (Volume Adjustment Factors) The raw traffic count information is provided in Appendix A, and the resulting baseline 2020 peak hour traffic volumes are depicted in Figure 3. January 2021 4 Packet Pg. 39 HR Green # 201649 Northpointe Development 4.1.c Traffic Analysis Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Development Site 0(1) 45(30) 30(40) 15(45) Copper Dr Mall Dr 0(1) 15(30) Copper Dr Frontage Rd 5(15) 25(75) 1(0) 50(60) 45(60) 20(1) Copper Dr 25(20) 15(50) 1(1) 0(0) 2(0) 8(0) LEGEND PM Peak xx(xx) AM Peak Figure 3 2020 Existing TrafficPacket VolumesPg. 40 4.1.c Northpointe Traffic Impact Study HRG 201649 Machesney Park, Illinois Existing Traffic Operations The intersection capacity analysis was completed with Synchro software to measure the effectiveness of the intersections in terms of vehicle delay and expected queuing. Analysis was Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) completed at each of the intersections with existing traffic volumes and lane configurations during morning and evening peak hours of commuter traffic. Intersection Capacity Analysis…The study intersections were each analyzed to determine how they would operate, known as Level-of-Service (LOS). LOS criteria are outlined in the 6th Edition of the Highway Capacity Manual (HCM) for signalized and unsignalized intersections. The HCM defines LOS as a measure of the quality of traffic flow. There are six different levels of service for each facility type, each representing a range of operating conditions as indicated by amounts of average delay expected per entering vehicle. Each level of service is designated a letter from “A” to “F”, with “A” being the least congested (free flow condition) and “F” being the highest congestion (least desirable condition). Average Control Delay LOS thresholds for stop controlled Level of (Seconds/vehicle) intersections differ from those with Service Signalized Unsignalized (LOS)* traffic signal control to reflect different Intersection Intersection driver expectations with respect to A ≤10 ≤10 B >10 and ≤20 >10 and ≤15 delay. C >20 and ≤35 >15 and ≤25 D >35 and ≤55 >25 and ≤35 Table 3 summarizes the criteria for E >55 and ≤80 >35 and ≤50 both signalized and unsignalized F >80 >50 intersections, as defined in the Highway * LOS = F when volume to capacity ratio is greater than 1 Capacity Manual. LOS C, which is Table 3 (Level of Service - Highway Capacity Manaual 2010) normally used for highway design, represents a roadway with volumes ranging from 70% to 80% of its capacity. However, Level D is considered acceptable for peak period conditions in urban and suburban areas. The delay values in this study were computed using Synchro analysis, with the exception of the Copper Drive at Frontage Road intersection. The Copper Drive/Frontage Road intersection, with the non-standard free-flowing westbound traffic and the other three legs under stop control, is not compatible with Synchro analysis methodology. Therefore, the analysis at this intersection was performed by averaging ten simulations in Synchro’s microsimulation software package, SimTraffic. The estimated 95th percentile queues reported by Synchro and SimTraffic were also reviewed to identify any operational deficiencies along the corridor in terms of available turn bay storage, or blockage of upstream intersections. It should be noted that the 95th percentile queue calculation represents the worst case scenario, and queues exceeding this value can be expected only five percent of the time. The intersections of Copper Drive with IL 251, Frontage Road, and Mall Drive, as well as the intersection of Ralston Road with Frontage Road are the locations analyzed as part of the existing and future conditions analysis of this study. January 2021 6 Packet Pg. 41 4.1.c Northpointe Traffic Impact Study HRG 201649 Machesney Park, Illinois The baseline timing plans for the traffic signals at the two study intersections were obtained from IDOT. These same baseline timing plans will be used when analyzing additional site traffic to quantitatively measure the difference in intersection performance. The additional site traffic will be discussed in the “Future Conditions” section of this report. Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) IL 251 and Copper Drive…Traffic operations for this intersection indicate that the intersection is currently operating at an acceptable level. The overall intersection LOS values are LOS B for the AM and PM peak hours. The northbound and southbound left turns reach LOS D and LOS E during the peak hours, as do the Copper Drive left and thru movements. This is typical at intersections with principal arterial routes. Traffic signals are usually timed to provide the most green time to the through movements on the state routes, while the side streets and major route protected left turns are allocated less time. 95th percentile queue lengths were analyzed and are shown to be less than the dedicated storage lengths for all turning movements, except the westbound left/thru lane on Copper Drive. The westbound storage length is constrained by the close spacing of IL 251 and its eastern frontage road, and the queue is likely longer because the left and thru movements are together in a shared lane. Copper Drive and Frontage Road…Overall traffic operations for this intersection operate at a very good LOS A, with all lanes maintaining LOS A in both peak hours. The simulation indicates that queue lengths are less than 2 vehicles long in each lane. Copper Drive and Mall Drive…Overall traffic operations, as well as each lane for this intersection operate at a very good LOS A in both peak hours. Queues are again very short at all approaches. Ralston Road and Frontage Road…Overall traffic operations for this intersection operate at LOS C for the AM peak hour and LOS E for the PM peak hour. All movements operate at LOS D or better during both peak hours, except for the southbound shared lane during the PM peak. This movement is analyzed at LOS F. Traffic count observations of the site showed that the southbound queue during the PM peak hour does not always fully clear each traffic signal cycle, leading to higher delay values and indicating this movement is over capacity. Queues for the dedicated left turn lanes on Ralston Road are well within the lengths of the storage lanes. The Baseline traffic conditions for the aforementioned intersections during the peak hours are summarized in Table 4, with detailed Synchro outputs in Appendix B. The delay, LOS, and queuing information are shown for the critical movements at each intersection. . January 2021 7 Packet Pg. 42 4.1.c Northpointe Traffic Impact Study HRG 201649 Machesney Park, Illinois Baseline Conditions 2020 (No Build) Location / Critical AM Peak Hour PM Peak Hour Movements Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Delay LOS Queue Delay LOS Queue IL 251 and Copper Drive EB Left 38.1 D 34’ 51.7 D 58’ EB Thru 35.4 D 14’ 47.4 D 39’ EB Right 5.8 A 21’ 4.1 A 12’ WB Left/Thru 50.9 D 107’ 62.0 E 110’ WB Right 0.8 A 0’ 1.1 A 0’ NB Left 44.5 D 19’ 55.2 E 34’ NB Thru 8.9 A 168’ 8.7 A 240’ NB Right 0.1 A 0’ 1.1 A 12’ SB Left 45.5 D 31’ 57.1 E 49’ SB Thru 9.8 A 244’ 9.2 A 222’ SB Right 0.1 A 0’ 0.1 A 0’ OVERALL 11.9 B 12.6 B Copper Drive and Frontage Road EB Left/Thru 4.4 A 37’ 5.0 A 40’ EB Thru/Right 4.9 A 34’ 5.5 A 42’ WB Left/Thru 0.9 A 0’ 1.0 A 0’ WB Thru/Right 2.9 A 0’ 2.8 A 3’ NB Left/ 2.5 A 25’ - - - Thru/Right SB Left/ 4.3 A 35’ 4.1 A 39’ Thru/Right OVERALL 3.4 A 3.6 A January 2021 8 Packet Pg. 43 4.1.c Northpointe Traffic Impact Study HRG 201649 Machesney Park, Illinois Copper Drive and Mall Drive WB Left 8 A 2.5’ 8.3 A 5’ Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) WB Right 7.1 A 5’ 6.8 A 2.5’ NB Thru/Right 6.6 A 2.5’ 6.7 A 2.5’ SB Left/Thru 7.6 A 5’ 7.6 A 5’ OVERALL 7.3 A 7.5 A Ralston Road and Frontage Road EB Left 14.2 B 29’ 27.2 C 34’ EB Thru/Right 25.5 C 216’ 40.2 D 260’ WB Left 14.2 B 20’ 28.6 C 63’ WB Thru/Right 16.8 B 98’ 52.2 D 474’ NB Left/ 21.4 C 32’ 51.9 D 103’ Thru/Right SB Left/ 53.4 D 127’ 105.5 F 430’ Thru/RIght OVERALL 24.5 C 56.0 E Table 4 (Baseline Conditions for Critical Peak Hour Movements) January 2021 9 Packet Pg. 44 4.1.c Northpointe Traffic Impact Study HRG 201649 Machesney Park, Illinois Future Conditions Proposed Redevelopment Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) This study considers the proposed construction of a 3-story, 64-residence apartment building. Access to the apartment building will be via driveways from Frontage Road and Mall Drive. The site plan is pictured in Figure 4. Mall Dr Figure 4 (Proposed Site Plan) January 2021 10 Packet Pg. 45 4.1.c Northpointe Traffic Impact Study HRG 201649 Machesney Park, Illinois Traffic Projections 2020 Build Year Trip Generation…Additional traffic generated by the proposed development can be estimated by utilizing the 10th edition of the Institute of Transportation Engineers (ITE) Trip Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Generation Manual. The tables in the ITE Trip Generation Manual estimate the ingress and egress traffic for both morning and evening peak traffic conditions for various types of land uses. The ITE manual classifies this development under Land Use Code 220 – Multifamily Housing (Low-Rise). Trip generations for the proposed development can be seen in Table 5. AM PM ITE Dwelling Peak Hour Peak Hour Land Use Code Units In Out In Out Multifamily Housing 220 64 7 24 25 15 (Low-Rise) TOTAL NEW 7 24 25 15 TRIPS Table 5 (Trip Generation) No reductions were made to these trip generation estimates, as this type of land use does not experience pass-by trips (vehicles who were already on the roadway to another destination that decide to stop as they pass by the development). Construction of the development is anticipated to be complete in October 2022, with the building fully leased within 3-6 months. Traffic Distribution and Assignment… Traffic distribution to and from the proposed site typically depends on the actual land use, population centers, employment centers, and major transportation corridors. IL 251 is classified as a principal arterial route and provides good connectivity to the surrounding residential areas and neighboring communities, which will likely attract the majority of trips. Based on local traffic patterns, it is anticipated that a significant number of trips will also utilize Frontage Road, particularly when traveling to and from northeast and northwest of the site along Ralston Road/IL 173. A small amount of traffic was also assigned to and from the southwest via Mall Drive. The assumed directional distribution for the site traffic is shown in Figure 5 with the resulting site-generated volumes assigned to the street network in Figure 6. January 2021 11 Packet Pg. 46 HR Green # 201649 Northpointe Development 4.1.c Traffic Analysis Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Development Site Copper Dr LEGEND PM Peak xx(xx) AM Peak Figure 5 Site-Generated Traffic Packet Distribution Pg. 47 HR Green # 201649 Northpointe Development 4.1.c Traffic Analysis Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) 9(5) 7(5) 2(8) East Access 0(0) 0(0) 8(5) 3(9) Frontage Rd West Access Mall Dr 2(9) 1(0) 2(8) 7(5) Copper Dr Mall Dr 0(1) Copper Dr Frontage Rd 3(9) 2(8) 9(5) Copper Dr 7(5) LEGEND PM Peak xx(xx) AM Peak Figure 6 Site-GeneratedPacket VolumesPg. 48 4.1.c Northpointe Traffic Impact Study HRG 201649 Machesney Park, Illinois Future Traffic Volumes… It is reasonable to expect the existing background traffic volumes to increase due to area growth factors such as new development, population growth, and more drivers per average household. For the purposes of this traffic engineering study, a 3-year planning horizon was considered based on the anticipated construction schedule and leasing of Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) the development. In addition to the baseline 2020 analysis performed, a 2023 no-build analysis and a 2023 build-out analysis will be completed. The 2023 no-build traffic volumes will account for the background traffic growth not attributed to the studied development. A least-squares analysis of IDOT’s historical traffic volumes in the study area indicate that traffic has grown in the study area at a rate of approximately 0.3% annually since 2013. To be conservative, a 1% annual growth rate was assumed for future traffic growth to 2023. This study will expand on the baseline traffic analysis by reviewing the following traffic volume scenarios during the morning and evening peak traffic hours of commuter traffic: 1. Future 2023 (No-Build) – This scenario will consider future traffic volumes without the impact of the proposed site generated trips (Figure 7). 2. Future 2023 (Build) – This scenario will consider future traffic volumes with the impact of the proposed site generated trips (Figure 8). January 2021 14 Packet Pg. 49 HR Green # 201649 Northpointe Development 4.1.c Traffic Analysis Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Development Site 0(1) 46(30) 30(41) 15(46) Copper Dr Mall Dr 0(1) 15(30) Copper Dr Frontage Rd 5(15) 25(76) 1(0) 51(61) 46(61) 20(1) Copper Dr 25(20) 15(51) 1(1) 0(0) 2(0) 8(0) LEGEND PM Peak xx(xx) AM Peak Figure 7 2023 No Build TrafficPacket VolumesPg. 50 HR Green # 201649 Northpointe Development 4.1.c Traffic Analysis Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) 9(5) 7(5) 2(8) East Access 30(42) 52(76) 0(0) 0(0) 3(9) Frontage Rd 8(5) West Access 50(96) Mall Dr 46(31) 2(9) 1(1) 48(38) 37(46) 15(46) Copper Dr Mall Dr 0(2) 15(30) Copper Dr Frontage Rd 5(15) 28(85) 1(0) 53(69) 55(66) 20(1) Copper Dr 25(20) 22(56) 1(1) 0(0) 2(0) 8(0) LEGEND PM Peak xx(xx) AM Peak Figure 8 2023 Build TrafficPacket VolumesPg. 51 4.1.c Northpointe Traffic Impact Study HRG 201649 Machesney Park, Illinois Future Traffic Operations Discussion regarding the existing intersection capacity and queueing analysis was provided in the “Existing Conditions” section of this report. Additional analysis was completed to provide an Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) operational comparison between the baseline traffic conditions, and the baseline conditions with the added site development traffic. The same existing traffic signal timing plans used for the baseline traffic for each peak traffic period were also used for the future No-Build and Build scenarios to measure the quantitative increases in vehicle delay of the intersections with and without proposed site traffic. Similarly, a comparison between the future traffic conditions with and without the impacts of the proposed site development were reviewed. Future 2023 (No-Build)… Intersection capacity and queueing analysis of this scenario will consider future traffic volumes and baseline lane configurations, without the impact of the proposed site generated trips. The same traffic signal timing information as in the existing analysis was used in this scenario. Table 6 shows the critical movements at each intersection for the Future, No Build traffic volume scenario. IL 251 and Copper Drive…Traffic growth between 2020 and 2023 is anticipated to have minimal effects on this intersection. Overall average delay values are within 0.1 second of the 2020 existing analysis. Individual movements are predicted to be similarly close in delay to the existing condition, with queue increases of no more than 5’ for any movement. Copper Drive and Frontage Road…Traffic operations and queues at this intersection are again predicted to be very similar to the 2020 analysis. Slight increases in traffic volume lead to slightly different simulation results, though all movements are anticipated to be within 0.5 seconds and 5 feet of the existing condition. Copper Drive and Mall Drive…This low volume intersection is expected to be minimally impacted by traffic growth. Delays are predicted to be the same as in the existing condition, with only minor increases to 95th percentile queue lengths. All queue lengths are predicted at less than 10’. Ralston Road and Frontage Road…Background traffic growth is anticipated to add 0.2 seconds of average delay during the AM peak, and 1.5 seconds during the PM peak, primarily to the westbound thru/right movement and the southbound movement. All level of service grades are unchanged. Queues are predicted to increase by no more than 10 feet for all movements. January 2021 17 Packet Pg. 52 4.1.c Northpointe Traffic Impact Study HRG 201649 Machesney Park, Illinois Future Conditions 2023 (No Build) Location / Critical AM Peak Hour PM Peak Hour Movements Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Delay LOS Queue Delay LOS Queue IL 251 and Copper Drive EB Left 38.1 D 34’ 51.5 D 57’ EB Thru 35.2 D 14’ 47.2 D 38’ EB Right 6.0 A 21’ 4.2 A 12’ WB Left/Thru 51.1 D 107’ 62.0 E 111’ WB Right 0.8 A 0’ 1.1 A 0’ NB Left 44.5 D 19’ 55.1 E 34’ NB Thru 8.9 A 170’ 8.8 A 244’ NB Right 0.1 A 0’ 1.2 A 13’ SB Left 45.5 D 31’ 57.1 E 49’ SB Thru 9.9 A 247’ 9.3 A 223’ SB Right 0.1 A 0’ 0.1 A 0’ OVERALL 11.9 B 12.7 B Copper Drive and Frontage Road EB Left/Thru 4.3 A 37’ 5.3 A 39’ EB Thru/Right 4.9 A 34’ 5.3 A 42’ WB Left/Thru 0.9 A 0’ 1.0 A 0’ WB Thru/Right 2.7 A 0’ 2.9 A 0’ NB Left/ 2.3 A 26’ 3.9 A 8’ Thru/Right SB Left/ 4.4 A 37’ 4.3 A 40’ Thru/Right OVERALL 3.3 A 3.6 A January 2021 18 Packet Pg. 53 4.1.c Northpointe Traffic Impact Study HRG 201649 Machesney Park, Illinois Copper Drive and Mall Drive WB Left 8 A 2.5’ 8.3 A 5’ Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) WB Right 7.1 A 7.5’ 6.8 A 2.5’ NB Thru/Right 6.6 A 2.5’ 6.7 A 2.5’ SB Left/Thru 7.6 A 5’ 7.6 A 5’ OVERALL 7.3 A 7.5 A Ralston Road and Frontage Road EB Left 14.2 B 29’ 27.2 C 34’ EB Thru/Right 25.7 C 218’ 40.4 D 262’ WB Left 14.2 B 20’ 28.9 C 64’ WB Thru/Right 16.9 B 100’ 53.4 D 482’ NB Left/ 21.4 C 32’ 51.7 D 103’ Thru/Right SB Left/ 54.4 D 128’ 110.9 F 436’ Thru/RIght OVERALL 24.7 C 57.5 E Table 6 (Future Conditions for Critical Peak Hour Movements) Future 2023 (Build)… Intersection capacity and queueing analysis of this scenario will consider future traffic volumes, and baseline lane configurations, with the impact of the proposed site generated trips. Similar to the procedures used for the no build traffic analysis, existing timing plans were used with the analysis for the future build scenario to provide a direct comparison to the traffic impacts associated with the proposed development. Table 7 shows the critical movements at each intersection for the Future, Build scenario. IL 251 and Copper Drive…The addition of site-generated traffic is predicted to add less than 1 second of overall delay to the intersection. The eastbound right movement is anticipated to increase in delay the most, with approximately 2.3 seconds of added delay in the AM peak hour. All LOS grades are predicted to stay the same. All 95th percentile queues are expected to increase by no more than 10’, and the eastbound, southbound, and northbound queues that will experience increased traffic are expected to remain within the storage lengths provided. Copper Drive and Frontage Road…Overall intersection delays are predicted to increase by 0.2 second with the addition of development traffic, and delays in individual lanes and movements January 2021 19 Packet Pg. 54 4.1.c Northpointe Traffic Impact Study HRG 201649 Machesney Park, Illinois are predicted to increase by no more than 0.7 second. All movements are expected to maintain grades of LOS A. Copper Drive and Mall Drive…This low volume intersection is again expected to be minimally Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) impacted by development traffic. Delays are predicted to be within 0.1 of the no build condition, with only minor increases to 95th percentile queue lengths. All queue lengths are predicted at less than 10’. Frontage Road and East Access…This new access intersection is expected to operate very well. Delays for the minor approach leaving the development are predicted at LOS A, with very minimal queues. Average delays for left-turning traffic from Frontage Road into the development are predicted at less than one second. Mall Drive and West Access…The West Access intersection is also expected to operate well, with exiting delays of approximately 9 seconds and 95th percentile queues of less than a single vehicle. Significant southbound left-turning traffic into the parking lot from Mall Drive is not anticipated, and did not produce a predicted delay value. Ralston Road and Frontage Road…Development traffic is anticipated to add up to 4 seconds of delay for individual movements in the PM peak hour. The northbound approach is expected to add approximately 4 seconds of delay, which just places the approach over the 55-second threshold between LOS D and LOS E. The westbound left is likely to add less than 1 second of delay due to development traffic. Due to some quirks of signal actuation associated with a free- running traffic signal, overall intersection delay is actually predicted to decrease while some individual movements increase in delay. This is partially due to the instability of the southbound traffic flow, which was previously noted to be over capacity in the existing condition scenario. However, because this is a fully-actuated signal running in free mode, it is able to allocate green times according to traffic demand, and can respond to increased traffic demand more easily than coordinated signals. Queues are predicted to increase by no more than 10 feet for all movements, and are expected to remain within the queue storage lengths. January 2021 20 Packet Pg. 55 4.1.c Northpointe Traffic Impact Study HRG 201649 Machesney Park, Illinois Future Conditions 2023 (Build) Location / Critical AM Peak Hour PM Peak Hour Movements Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Delay LOS Queue Delay LOS Queue IL 251 and Copper Drive EB Left 38.8 D 39’ 52.2 D 61’ EB Thru 35.2 D 14’ 47.2 D 38’ EB Right 8.3 A 31’ 5.7 A 19’ WB Left/Thru 51.1 D 107’ 62.0 E 111’ WB Right 0.8 A 0’ 1.1 A 0’ NB Left 44.5 D 21’ 55.4 E 41’ NB Thru 8.9 A 170’ 8.8 A 244’ NB Right 0.1 A 0’ 1.2 A 13’ SB Left 45.5 D 31’ 57.1 E 49’ SB Thru 11.3 A 248’ 9.5 A 229’ SB Right 0.1 A 0’ 0.3 A 2’ OVERALL 12.8 B 13.1 B Copper Drive and Frontage Road EB Left/Thru 4.4 A 37’ 5.4 A 39’ EB Thru/Right 5.4 A 38’ 5.5 A 43’ WB Left/Thru 0.9 A 0’ 1.0 A 0’ WB Thru/Right 2.8 A 2’ 3.0 A 3’ NB Left/ 2.4 A 24’ 4.6 A 8’ Thru/Right SB Left/ 4.5 A 38’ 4.1 A 36’ Thru/Right OVERALL 3.5 A 3.7 A January 2021 21 Packet Pg. 56 4.1.c Northpointe Traffic Impact Study HRG 201649 Machesney Park, Illinois Copper Drive and Mall Drive WB Left 8.1 A 2.5’ 8.3 A 5’ Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) WB Right 7.1 A 7.5’ 6.9 A 2.5’ NB Thru/Right 6.7 A 2.5’ 6.7 A 2.5’ SB Left/Thru 7.7 A 5’ 7.6 A 5’ OVERALL 7.4 A 7.5 A Frontage Road and East Access SB Left/Right 8.9 A 1’ 9.2 A 1’ EB Left/Thru 0.4 A 0’ 0.7 A 1’ Mall Drive and West Access WB Left/Right 9.0 A 1’ 9.0 A 0’ Ralston Road and Frontage Road EB Left 14.2 B 29’ 27.2 C 34’ EB Thru/Right 25.7 C 218’ 40.5 D 265’ WB Left 14.3 B 21’ 29.7 C 69’ WB Thru/Right 16.9 B 100’ 53.4 D 482’ NB Left/ 21.0 C 35’ 55.7 E 113’ Thru/Right SB Left/ 52.2 D 127' 106.1 F 433’ Thru/RIght OVERALL 24.5 C 56.8 E Table 7 (Future Conditions for Critical Peak Hour Movements) January 2021 22 Packet Pg. 57 4.1.c Northpointe Traffic Impact Study HRG 201649 Machesney Park, Illinois Summary A comprehensive review was completed to estimate the impacts to the adjacent street network Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) associated with the proposed Northpointe development plans. This traffic review consisted of existing traffic data, trip generation and traffic assignment, intersection operation levels-of- service, and expected vehicle queues. Analysis was completed for three volume scenarios: existing (or baseline), future (no build), and future plus site (build). Each scenario was reviewed during the morning and evening peak hours of adjacent street traffic. The proposed development will be a 64-unit apartment building located in a vacant lot north of Copper Drive, northwest of Frontage Road, and east of Mall Drive. Access to the building will be new access intersections on Frontage Road and Mall Drive. For the purposes of this traffic engineering study, a three-year planning horizon was considered, consistent with the construction and leasing timeline anticipated by the developer. Baseline 2020 volumes were based on existing traffic volumes, and adjusted up based on historical traffic volumes to account for the drop in traffic volumes caused by the COVID-19 pandemic. Future 2023 traffic volumes were derived from the 2020 baseline volumes, plus normal background traffic growth as predicted by historical growth trends. The 2023 build analysis considered the addition of the development traffic on top of normal background traffic growth. The development is projected to add a fairly low number of trips to the study intersections, and the increase to delay and LOS at the study intersections is expected to be nominal. The addition of site traffic only adds minimal delay to the study intersections, and the vast majority of movements are expected to remain at the same LOS grade as in the existing and no build analyses. In most cases, delays are only anticipated to increase by less than a second, and in some cases up to 4 seconds for movements that experience added development traffic. Only one movement, the northbound approach of Frontage Road at Ralston Road, is expected to drop a LOS grade from LOS D to LOS E. This is a result of a predicted 4-second increase in delay, which will be automatically mitigated by the traffic signal’s free mode setting. Queuing analysis revealed that there are predicted to be modest increases in the queue lengths between the no build and build traffic scenarios. Most queues are expected to be within 10’ of the no build scenario queues. The new site access intersections are predicted to operate with delays less than 10 seconds for traffic leaving the development, and minimal queueing. The analysis indicates that the study intersections are likely to have sufficient remaining capacity to accommodate the development. No intersection improvements are anticipated to be necessary based on the findings of this report. However, the Village should monitor the intersections to ensure that efficient operations are maintained as traffic grows throughout the corridor. January 2021 23 Packet Pg. 58 4.1.c Northpointe Traffic Impact Study HRG 201649 Machesney Park, Illinois Appendix A – Traffic Count Data Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) January 2021 A Packet Pg. 59 4.1.c 8788 N 2nd St - TMC Tue Dec 15, 2020 Full Length (7 AM-9 AM, 4 PM-6 PM) All Classes (Lights, Articulated Trucks, Buses and Single-Unit Trucks) Provided by: Gewalt Hamilton Associates Inc. All Movements 625 Forest Edge Drive, Vernon Hills, IL, 60061, US ID: 804972, Location: 42.351203, -89.047817 Leg Copper Copper 2nd 2nd Direction Eastbound Westbound Northbound Southbound Time L T R U App L T R U App L T R U App L T R U App Int Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) 2020-12-15 7:00AM 2 0 2 0 4 7 0 3 0 10 3 83 6 0 92 5 130 3 0 138 244 7:15AM 0 0 11 0 11 9 1 5 0 15 2 88 8 0 98 2 142 3 0 147 271 7:30AM 2 0 13 0 15 11 0 5 0 16 6 118 4 0 128 3 184 5 0 192 351 7:45AM 6 2 13 0 21 13 3 2 0 18 5 137 5 0 147 2 174 10 0 186 372 Hourly Total 10 2 39 0 51 40 4 15 0 59 16 426 23 0 465 12 630 21 0 663 1238 8:00AM 1 1 1 0 3 6 1 5 0 12 3 104 11 0 118 4 119 7 0 130 263 8:15AM 0 1 7 0 8 8 2 2 0 12 3 99 4 0 106 2 111 3 0 116 242 8:30AM 1 2 12 0 15 2 2 1 0 5 5 94 5 0 104 1 97 5 0 103 227 8:45AM 1 1 6 0 8 6 2 2 0 10 3 103 5 0 111 0 122 7 0 129 258 Hourly Total 3 5 26 0 34 22 7 10 0 39 14 400 25 0 439 7 449 22 0 478 990 4:00PM 6 3 8 0 17 8 4 4 0 16 7 211 11 1 230 4 192 7 0 203 466 4:15PM 5 4 5 0 14 13 2 4 0 19 6 210 19 0 235 7 204 9 0 220 488 4:30PM 8 2 9 0 19 12 4 9 0 25 9 184 14 0 207 7 210 10 0 227 478 4:45PM 3 2 11 0 16 11 1 8 0 20 8 220 18 0 246 4 201 11 0 216 498 Hourly Total 22 11 33 0 66 44 11 25 0 80 30 825 62 1 918 22 807 37 0 866 1930 5:00PM 7 6 15 0 28 10 3 5 0 18 15 207 18 0 240 7 172 10 0 189 475 5:15PM 7 3 7 0 17 8 2 5 0 15 12 219 15 0 246 6 178 11 0 195 473 5:30PM 2 0 6 0 8 5 4 6 0 15 6 184 8 0 198 7 148 9 0 164 385 5:45PM 7 2 5 0 14 9 2 7 0 18 9 150 7 0 166 5 126 12 0 143 341 Hourly Total 23 11 33 0 67 32 11 23 0 66 42 760 48 0 850 25 624 42 0 691 1674 Total 58 29 131 0 218 138 33 73 0 244 102 2411 158 1 2672 66 2510 122 0 2698 5832 % Approach 26.6% 13.3% 60.1% 0% - 56.6% 13.5% 29.9% 0% - 3.8% 90.2% 5.9% 0% - 2.4% 93.0% 4.5% 0% - - % Total 1.0% 0.5% 2.2% 0% 3.7% 2.4% 0.6% 1.3% 0% 4.2% 1.7% 41.3% 2.7% 0% 45.8% 1.1% 43.0% 2.1% 0% 46.3% - Lights 58 29 129 0 216 136 29 73 0 238 99 2354 154 1 2608 66 2451 120 0 2637 5699 % Lights 100% 100% 98.5% 0% 99.1% 98.6% 87.9% 100% 0% 97.5% 97.1% 97.6% 97.5% 100% 97.6% 100% 97.6% 98.4% 0% 97.7% 97.7% Articulated Trucks 0 0 0 0 0 0 0 0 0 0 0 15 0 0 15 0 22 1 0 23 38 % Articulated Trucks 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0.6% 0% 0% 0.6% 0% 0.9% 0.8% 0% 0.9% 0.7% Buses and Single-Unit Trucks 0 0 2 0 2 2 4 0 0 6 3 42 4 0 49 0 37 1 0 38 95 % Buses and Single-Unit Trucks 0% 0% 1.5% 0% 0.9% 1.4% 12.1% 0% 0% 2.5% 2.9% 1.7% 2.5% 0% 1.8% 0% 1.5% 0.8% 0% 1.4% 1.6% * L: Left, R: Right, T: Thru, U: U-Turn 1 of 6 Packet Pg. 60 4.1.c 8788 N 2nd St - TMC Tue Dec 15, 2020 Full Length (7 AM-9 AM, 4 PM-6 PM) All Classes (Lights, Articulated Trucks, Buses and Single-Unit Trucks) Provided by: Gewalt Hamilton Associates Inc. All Movements 625 Forest Edge Drive, Vernon Hills, IL, 60061, US ID: 804972, Location: 42.351203, -89.047817 [N] 2nd Total: 5240 In: 2698 Out: 2542 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) 122 2510 66 Total: 475 Out: 253 In: 244 [W] Copper [E] Copper 73 33 138 In: 218 Out: 257 58 Total: 497 29 131 1 158 102 2411 Out: 2780 In: 2672 Total: 5452 [S] 2nd 2 of 6 Packet Pg. 61 4.1.c 8788 N 2nd St - TMC Tue Dec 15, 2020 AM Peak (7:15 AM - 8:15 AM) All Classes (Lights, Articulated Trucks, Buses and Single-Unit Trucks) Provided by: Gewalt Hamilton Associates Inc. All Movements 625 Forest Edge Drive, Vernon Hills, IL, 60061, US ID: 804972, Location: 42.351203, -89.047817 Leg Copper Copper 2nd 2nd Direction Eastbound Westbound Northbound Southbound Time L T R U App L T R U App L T R U App L T R U App Int Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) 2020-12-15 7:15AM 0 0 11 0 11 9 1 5 0 15 2 88 8 0 98 2 142 3 0 147 271 7:30AM 2 0 13 0 15 11 0 5 0 16 6 118 4 0 128 3 184 5 0 192 351 7:45AM 6 2 13 0 21 13 3 2 0 18 5 137 5 0 147 2 174 10 0 186 372 8:00AM 1 1 1 0 3 6 1 5 0 12 3 104 11 0 118 4 119 7 0 130 263 Total 9 3 38 0 50 39 5 17 0 61 16 447 28 0 491 11 619 25 0 655 1257 % Approach 18.0% 6.0% 76.0% 0% - 63.9% 8.2% 27.9% 0% - 3.3% 91.0% 5.7% 0% - 1.7% 94.5% 3.8% 0% - - % Total 0.7% 0.2% 3.0% 0% 4.0% 3.1% 0.4% 1.4% 0% 4.9% 1.3% 35.6% 2.2% 0% 39.1% 0.9% 49.2% 2.0% 0% 52.1% - PHF 0.375 0.375 0.731 - 0.595 0.750 0.417 0.850 - 0.847 0.667 0.816 0.636 - 0.835 0.688 0.841 0.625 - 0.853 0.845 Lights 9 3 38 0 50 39 4 17 0 60 16 423 27 0 466 11 600 25 0 636 1212 % Lights 100% 100% 100% 0% 100% 100% 80.0% 100% 0% 98.4% 100% 94.6% 96.4% 0% 94.9% 100% 96.9% 100% 0% 97.1% 96.4% Articulated Trucks 0 0 0 0 0 0 0 0 0 0 0 7 0 0 7 0 8 0 0 8 15 % Articulated Trucks 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 1.6% 0% 0% 1.4% 0% 1.3% 0% 0% 1.2% 1.2% Buses and Single-Unit Trucks 0 0 0 0 0 0 1 0 0 1 0 17 1 0 18 0 11 0 0 11 30 % Buses and Single-Unit Trucks 0% 0% 0% 0% 0% 0% 20.0% 0% 0% 1.6% 0% 3.8% 3.6% 0% 3.7% 0% 1.8% 0% 0% 1.7% 2.4% * L: Left, R: Right, T: Thru, U: U-Turn 3 of 6 Packet Pg. 62 4.1.c 8788 N 2nd St - TMC Tue Dec 15, 2020 AM Peak (7:15 AM - 8:15 AM) All Classes (Lights, Articulated Trucks, Buses and Single-Unit Trucks) Provided by: Gewalt Hamilton Associates Inc. All Movements 625 Forest Edge Drive, Vernon Hills, IL, 60061, US ID: 804972, Location: 42.351203, -89.047817 [N] 2nd Total: 1128 In: 655 Out: 473 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) 25 619 11 Total: 96 Out: 42 In: 61 [W] Copper [E] Copper 17 5 39 In: 50 Out: 46 9 Total: 103 3 38 16 447 28 Out: 696 In: 491 Total: 1187 [S] 2nd 4 of 6 Packet Pg. 63 4.1.c 8788 N 2nd St - TMC Tue Dec 15, 2020 PM Peak (4:15 PM - 5:15 PM) - Overall Peak Hour All Classes (Lights, Articulated Trucks, Buses and Single-Unit Trucks) Provided by: Gewalt Hamilton Associates Inc. All Movements 625 Forest Edge Drive, Vernon Hills, IL, 60061, US ID: 804972, Location: 42.351203, -89.047817 Leg Copper Copper 2nd 2nd Direction Eastbound Westbound Northbound Southbound Time L T R U App L T R U App L T R U App L T R U App Int Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) 2020-12-15 4:15PM 5 4 5 0 14 13 2 4 0 19 6 210 19 0 235 7 204 9 0 220 488 4:30PM 8 2 9 0 19 12 4 9 0 25 9 184 14 0 207 7 210 10 0 227 478 4:45PM 3 2 11 0 16 11 1 8 0 20 8 220 18 0 246 4 201 11 0 216 498 5:00PM 7 6 15 0 28 10 3 5 0 18 15 207 18 0 240 7 172 10 0 189 475 Total 23 14 40 0 77 46 10 26 0 82 38 821 69 0 928 25 787 40 0 852 1939 % Approach 29.9% 18.2% 51.9% 0% - 56.1% 12.2% 31.7% 0% - 4.1% 88.5% 7.4% 0% - 2.9% 92.4% 4.7% 0% - - % Total 1.2% 0.7% 2.1% 0% 4.0% 2.4% 0.5% 1.3% 0% 4.2% 2.0% 42.3% 3.6% 0% 47.9% 1.3% 40.6% 2.1% 0% 43.9% - PHF 0.719 0.583 0.667 - 0.688 0.885 0.625 0.722 - 0.820 0.633 0.933 0.908 - 0.943 0.893 0.937 0.909 - 0.938 0.973 Lights 23 14 40 0 77 45 9 26 0 80 36 814 67 0 917 25 777 40 0 842 1916 % Lights 100% 100% 100% 0% 100% 97.8% 90.0% 100% 0% 97.6% 94.7% 99.1% 97.1% 0% 98.8% 100% 98.7% 100% 0% 98.8% 98.8% Articulated Trucks 0 0 0 0 0 0 0 0 0 0 0 2 0 0 2 0 1 0 0 1 3 % Articulated Trucks 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0.2% 0% 0% 0.2% 0% 0.1% 0% 0% 0.1% 0.2% Buses and Single-Unit Trucks 0 0 0 0 0 1 1 0 0 2 2 5 2 0 9 0 9 0 0 9 20 % Buses and Single-Unit Trucks 0% 0% 0% 0% 0% 2.2% 10.0% 0% 0% 2.4% 5.3% 0.6% 2.9% 0% 1.0% 0% 1.1% 0% 0% 1.1% 1.0% * L: Left, R: Right, T: Thru, U: U-Turn 5 of 6 Packet Pg. 64 4.1.c 8788 N 2nd St - TMC Tue Dec 15, 2020 PM Peak (4:15 PM - 5:15 PM) - Overall Peak Hour All Classes (Lights, Articulated Trucks, Buses and Single-Unit Trucks) Provided by: Gewalt Hamilton Associates Inc. All Movements 625 Forest Edge Drive, Vernon Hills, IL, 60061, US ID: 804972, Location: 42.351203, -89.047817 [N] 2nd Total: 1722 In: 852 Out: 870 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) 40 787 25 Total: 165 Out: 108 In: 82 [W] Copper [E] Copper 26 10 46 In: 77 Out: 88 23 Total: 190 14 40 38 821 69 Out: 873 In: 928 Total: 1801 [S] 2nd 6 of 6 Packet Pg. 65 4.1.c 8638 N 2nd St - TMC Tue Dec 15, 2020 Full Length (7 AM-9 AM, 4 PM-6 PM) All Classes (Lights, Articulated Trucks, Buses and Single-Unit Trucks) Provided by: Gewalt Hamilton Associates Inc. All Movements 625 Forest Edge Drive, Vernon Hills, IL, 60061, US ID: 804973, Location: 42.35152, -89.049384 Leg Copper Copper Access Frontage Direction Eastbound Westbound Northbound Southbound Time L T R U App L T R U App L T R U App L T R U App Int Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) 2020-12-15 7:00AM 2 2 0 0 4 2 1 3 0 6 0 0 2 0 2 0 0 0 0 0 12 7:15AM 3 1 0 0 4 0 3 3 0 6 1 0 0 0 1 9 0 0 0 9 20 7:30AM 3 2 0 0 5 3 5 3 0 11 1 0 2 0 3 11 1 2 0 14 33 7:45AM 2 5 0 0 7 4 12 2 0 18 0 0 3 0 3 12 0 0 0 12 40 Hourly Total 10 10 0 0 20 9 21 11 0 41 2 0 7 0 9 32 1 2 0 35 105 8:00AM 2 1 0 0 3 1 6 4 0 11 0 0 0 0 0 2 0 0 0 2 16 8:15AM 5 0 1 0 6 1 3 3 0 7 0 0 1 0 1 8 0 1 0 9 23 8:30AM 0 1 0 0 1 1 5 7 0 13 0 0 1 0 1 13 0 2 0 15 30 8:45AM 0 3 0 0 3 2 3 6 0 11 1 1 0 0 2 4 0 2 0 6 22 Hourly Total 7 5 1 0 13 5 17 20 0 42 1 1 2 0 4 27 0 5 0 32 91 4:00PM 4 8 0 0 12 0 7 11 0 18 0 0 0 0 0 7 0 5 0 12 42 4:15PM 3 4 0 0 7 0 8 7 1 16 0 0 2 0 2 7 0 2 0 9 34 4:30PM 6 11 0 0 17 0 10 12 0 22 0 0 0 0 0 9 0 1 0 10 49 4:45PM 2 4 0 0 6 0 9 12 0 21 0 0 0 0 0 12 0 4 0 16 43 Hourly Total 15 27 0 0 42 0 34 42 1 77 0 0 2 0 2 35 0 12 0 47 168 5:00PM 4 10 0 0 14 0 13 15 0 28 0 0 0 0 0 18 0 3 0 21 63 5:15PM 4 9 0 0 13 1 10 14 0 25 1 0 0 0 1 8 0 2 0 10 49 5:30PM 3 1 0 0 4 0 7 13 0 20 0 0 0 0 0 7 0 1 0 8 32 5:45PM 2 6 0 0 8 0 9 14 0 23 0 0 0 0 0 9 0 2 0 11 42 Hourly Total 13 26 0 0 39 1 39 56 0 96 1 0 0 0 1 42 0 8 0 50 186 Total 45 68 1 0 114 15 111 129 1 256 4 1 11 0 16 136 1 27 0 164 550 % Approach 39.5% 59.6% 0.9% 0% - 5.9% 43.4% 50.4% 0.4% - 25.0% 6.3% 68.8% 0% - 82.9% 0.6% 16.5% 0% - - % Total 8.2% 12.4% 0.2% 0% 20.7% 2.7% 20.2% 23.5% 0.2% 46.5% 0.7% 0.2% 2.0% 0% 2.9% 24.7% 0.2% 4.9% 0% 29.8% - Lights 44 67 1 0 112 15 106 125 1 247 4 1 11 0 16 134 1 26 0 161 536 % Lights 97.8% 98.5% 100% 0% 98.2% 100% 95.5% 96.9% 100% 96.5% 100% 100% 100% 0% 100% 98.5% 100% 96.3% 0% 98.2% 97.5% Articulated Trucks 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 % Articulated Trucks 0% 0% 0% 0% 0% 0% 0.9% 0% 0% 0.4% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0.2% Buses and Single-Unit Trucks 1 1 0 0 2 0 4 4 0 8 0 0 0 0 0 2 0 1 0 3 13 % Buses and Single-Unit Trucks 2.2% 1.5% 0% 0% 1.8% 0% 3.6% 3.1% 0% 3.1% 0% 0% 0% 0% 0% 1.5% 0% 3.7% 0% 1.8% 2.4% * L: Left, R: Right, T: Thru, U: U-Turn 1 of 6 Packet Pg. 66 4.1.c 8638 N 2nd St - TMC Tue Dec 15, 2020 Full Length (7 AM-9 AM, 4 PM-6 PM) All Classes (Lights, Articulated Trucks, Buses and Single-Unit Trucks) Provided by: Gewalt Hamilton Associates Inc. All Movements 625 Forest Edge Drive, Vernon Hills, IL, 60061, US ID: 804973, Location: 42.35152, -89.049384 [N] Frontage Total: 339 In: 164 Out: 175 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) 136 27 1 129 Total: 256 Out: 216 In: 256 111 [W] Copper [E] Copper 15 1 In: 114 Out: 142 Total: 472 45 68 1 4 1 11 Out: 17 In: 16 Total: 33 [S] Access 2 of 6 Packet Pg. 67 4.1.c 8638 N 2nd St - TMC Tue Dec 15, 2020 AM Peak (7:30 AM - 8:30 AM) All Classes (Lights, Articulated Trucks, Buses and Single-Unit Trucks) Provided by: Gewalt Hamilton Associates Inc. All Movements 625 Forest Edge Drive, Vernon Hills, IL, 60061, US ID: 804973, Location: 42.35152, -89.049384 Leg Copper Copper Access Frontage Direction Eastbound Westbound Northbound Southbound Time L T R U App L T R U App L T R U App L T R U App Int Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) 2020-12-15 7:30AM 3 2 0 0 5 3 5 3 0 11 1 0 2 0 3 11 1 2 0 14 33 7:45AM 2 5 0 0 7 4 12 2 0 18 0 0 3 0 3 12 0 0 0 12 40 8:00AM 2 1 0 0 3 1 6 4 0 11 0 0 0 0 0 2 0 0 0 2 16 8:15AM 5 0 1 0 6 1 3 3 0 7 0 0 1 0 1 8 0 1 0 9 23 Total 12 8 1 0 21 9 26 12 0 47 1 0 6 0 7 33 1 3 0 37 112 % Approach 57.1% 38.1% 4.8% 0% - 19.1% 55.3% 25.5% 0% - 14.3% 0% 85.7% 0% - 89.2% 2.7% 8.1% 0% - - % Total 10.7% 7.1% 0.9% 0% 18.8% 8.0% 23.2% 10.7% 0% 42.0% 0.9% 0% 5.4% 0% 6.3% 29.5% 0.9% 2.7% 0% 33.0% - PHF 0.600 0.400 0.250 - 0.750 0.563 0.542 0.750 - 0.653 0.250 - 0.500 - 0.583 0.688 0.250 0.375 - 0.661 0.700 Lights 12 8 1 0 21 9 24 12 0 45 1 0 6 0 7 33 1 3 0 37 110 % Lights 100% 100% 100% 0% 100% 100% 92.3% 100% 0% 95.7% 100% 0% 100% 0% 100% 100% 100% 100% 0% 100% 98.2% Articulated Trucks 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 % Articulated Trucks 0% 0% 0% 0% 0% 0% 3.8% 0% 0% 2.1% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0.9% Buses and Single-Unit Trucks 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 % Buses and Single-Unit Trucks 0% 0% 0% 0% 0% 0% 3.8% 0% 0% 2.1% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0.9% * L: Left, R: Right, T: Thru, U: U-Turn 3 of 6 Packet Pg. 68 4.1.c 8638 N 2nd St - TMC Tue Dec 15, 2020 AM Peak (7:30 AM - 8:30 AM) All Classes (Lights, Articulated Trucks, Buses and Single-Unit Trucks) Provided by: Gewalt Hamilton Associates Inc. All Movements 625 Forest Edge Drive, Vernon Hills, IL, 60061, US ID: 804973, Location: 42.35152, -89.049384 [N] Frontage Total: 61 In: 37 Out: 24 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) 3 1 33 12 In: 47 Total: 51 26 [W] Copper [E] Copper Total: 94 9 In: 21 Out: 30 12 Out: 47 8 1 1 6 Out: 11 In: 7 Total: 18 [S] Access 4 of 6 Packet Pg. 69 4.1.c 8638 N 2nd St - TMC Tue Dec 15, 2020 PM Peak (4:30 PM - 5:30 PM) - Overall Peak Hour All Classes (Lights, Articulated Trucks, Buses and Single-Unit Trucks) Provided by: Gewalt Hamilton Associates Inc. All Movements 625 Forest Edge Drive, Vernon Hills, IL, 60061, US ID: 804973, Location: 42.35152, -89.049384 Leg Copper Copper Access Frontage Direction Eastbound Westbound Northbound Southbound Time L T R U App L T R U App L T R U App L T R U App Int Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) 2020-12-15 4:30PM 6 11 0 0 17 0 10 12 0 22 0 0 0 0 0 9 0 1 0 10 49 4:45PM 2 4 0 0 6 0 9 12 0 21 0 0 0 0 0 12 0 4 0 16 43 5:00PM 4 10 0 0 14 0 13 15 0 28 0 0 0 0 0 18 0 3 0 21 63 5:15PM 4 9 0 0 13 1 10 14 0 25 1 0 0 0 1 8 0 2 0 10 49 Total 16 34 0 0 50 1 42 53 0 96 1 0 0 0 1 47 0 10 0 57 204 % Approach 32.0% 68.0% 0% 0% - 1.0% 43.8% 55.2% 0% - 100% 0% 0% 0% - 82.5% 0% 17.5% 0% - - % Total 7.8% 16.7% 0% 0% 24.5% 0.5% 20.6% 26.0% 0% 47.1% 0.5% 0% 0% 0% 0.5% 23.0% 0% 4.9% 0% 27.9% - PHF 0.667 0.773 - - 0.735 0.250 0.808 0.883 - 0.857 0.250 - - - 0.250 0.653 - 0.625 - 0.679 0.810 Lights 16 34 0 0 50 1 41 51 0 93 1 0 0 0 1 47 0 10 0 57 201 % Lights 100% 100% 0% 0% 100% 100% 97.6% 96.2% 0% 96.9% 100% 0% 0% 0% 100% 100% 0% 100% 0% 100% 98.5% Articulated Trucks 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Articulated Trucks 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% Buses and Single-Unit Trucks 0 0 0 0 0 0 1 2 0 3 0 0 0 0 0 0 0 0 0 0 3 % Buses and Single-Unit Trucks 0% 0% 0% 0% 0% 0% 2.4% 3.8% 0% 3.1% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 1.5% * L: Left, R: Right, T: Thru, U: U-Turn 5 of 6 Packet Pg. 70 4.1.c 8638 N 2nd St - TMC Tue Dec 15, 2020 PM Peak (4:30 PM - 5:30 PM) - Overall Peak Hour All Classes (Lights, Articulated Trucks, Buses and Single-Unit Trucks) Provided by: Gewalt Hamilton Associates Inc. All Movements 625 Forest Edge Drive, Vernon Hills, IL, 60061, US ID: 804973, Location: 42.35152, -89.049384 [N] Frontage Total: 126 In: 57 Out: 69 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) 10 47 53 Total: 103 Out: 81 In: 96 [W] Copper [E] Copper 42 1 In: 50 Out: 53 Total: 177 16 34 1 Out: 1 In: 1 Total: 2 [S] Access 6 of 6 Packet Pg. 71 4.1.c 8634 N 2nd St - TMC Tue Dec 15, 2020 Full Length (7 AM-9 AM, 4 PM-6 PM) All Classes (Lights, Articulated Trucks, Buses and Single-Unit Trucks) Provided by: Gewalt Hamilton Associates Inc. All Movements 625 Forest Edge Drive, Vernon Hills, IL, 60061, US ID: 804976, Location: 42.351389, -89.050289 Leg Copper Mall Dr Mall Dr Direction Westbound Northbound Southbound Time L R U App T R U App L T U App Int Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) 2020-12-15 7:00AM 0 1 0 1 0 2 0 2 2 0 0 2 5 7:15AM 1 3 0 4 0 3 0 3 1 0 0 1 8 7:30AM 1 7 0 8 0 2 0 2 3 0 0 3 13 7:45AM 2 10 0 12 0 2 0 2 6 0 0 6 20 Hourly Total 4 21 0 25 0 9 0 9 12 0 0 12 46 8:00AM 3 3 0 6 0 1 0 1 2 0 0 2 9 8:15AM 1 3 0 4 0 3 0 3 3 0 0 3 10 8:30AM 3 4 0 7 1 1 0 2 0 0 0 0 9 8:45AM 3 3 0 6 0 1 0 1 2 0 0 2 9 Hourly Total 10 13 0 23 1 6 0 7 7 0 0 7 37 4:00PM 7 5 1 13 0 4 0 4 6 0 0 6 23 4:15PM 7 3 0 10 0 3 0 3 4 1 0 5 18 4:30PM 5 5 0 10 1 6 0 7 11 0 0 11 28 4:45PM 8 5 0 13 0 3 0 3 3 0 0 3 19 Hourly Total 27 18 1 46 1 16 0 17 24 1 0 25 88 5:00PM 10 5 0 15 0 6 0 6 8 0 0 8 29 5:15PM 8 6 0 14 0 5 0 5 8 1 0 9 28 5:30PM 3 5 0 8 0 1 0 1 3 0 0 3 12 5:45PM 4 6 0 10 0 2 0 2 6 0 0 6 18 Hourly Total 25 22 0 47 0 14 0 14 25 1 0 26 87 Total 66 74 1 141 2 45 0 47 68 2 0 70 258 % Approach 46.8% 52.5% 0.7% - 4.3% 95.7% 0% - 97.1% 2.9% 0% - - % Total 25.6% 28.7% 0.4% 54.7% 0.8% 17.4% 0% 18.2% 26.4% 0.8% 0% 27.1% - Lights 66 68 1 135 2 45 0 47 66 2 0 68 250 % Lights 100% 91.9% 100% 95.7% 100% 100% 0% 100% 97.1% 100% 0% 97.1% 96.9% Articulated Trucks 0 1 0 1 0 0 0 0 0 0 0 0 1 % Articulated Trucks 0% 1.4% 0% 0.7% 0% 0% 0% 0% 0% 0% 0% 0% 0.4% Buses and Single-Unit Trucks 0 5 0 5 0 0 0 0 2 0 0 2 7 % Buses and Single-Unit Trucks 0% 6.8% 0% 3.5% 0% 0% 0% 0% 2.9% 0% 0% 2.9% 2.7% * L: Left, R: Right, T: Thru, U: U-Turn 1 of 6 Packet Pg. 72 4.1.c 8634 N 2nd St - TMC Tue Dec 15, 2020 Full Length (7 AM-9 AM, 4 PM-6 PM) All Classes (Lights, Articulated Trucks, Buses and Single-Unit Trucks) Provided by: Gewalt Hamilton Associates Inc. All Movements 625 Forest Edge Drive, Vernon Hills, IL, 60061, US ID: 804976, Location: 42.351389, -89.050289 [N] Mall Dr Total: 146 In: 70 Out: 76 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) 2 68 74 Out: 114 In: 141 [E] Copper 66 1 Total: 255 2 45 Out: 68 In: 47 Total: 115 [S] Mall Dr 2 of 6 Packet Pg. 73 4.1.c 8634 N 2nd St - TMC Tue Dec 15, 2020 AM Peak (7:30 AM - 8:30 AM) All Classes (Lights, Articulated Trucks, Buses and Single-Unit Trucks) Provided by: Gewalt Hamilton Associates Inc. All Movements 625 Forest Edge Drive, Vernon Hills, IL, 60061, US ID: 804976, Location: 42.351389, -89.050289 Leg Copper Mall Dr Mall Dr Direction Westbound Northbound Southbound Time L R U App T R U App L T U App Int Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) 2020-12-15 7:30AM 1 7 0 8 0 2 0 2 3 0 0 3 13 7:45AM 2 10 0 12 0 2 0 2 6 0 0 6 20 8:00AM 3 3 0 6 0 1 0 1 2 0 0 2 9 8:15AM 1 3 0 4 0 3 0 3 3 0 0 3 10 Total 7 23 0 30 0 8 0 8 14 0 0 14 52 % Approach 23.3% 76.7% 0% - 0% 100% 0% - 100% 0% 0% - - % Total 13.5% 44.2% 0% 57.7% 0% 15.4% 0% 15.4% 26.9% 0% 0% 26.9% - PHF 0.583 0.575 - 0.625 - 0.667 - 0.667 0.583 - - 0.583 0.650 Lights 7 21 0 28 0 8 0 8 14 0 0 14 50 % Lights 100% 91.3% 0% 93.3% 0% 100% 0% 100% 100% 0% 0% 100% 96.2% Articulated Trucks 0 1 0 1 0 0 0 0 0 0 0 0 1 % Articulated Trucks 0% 4.3% 0% 3.3% 0% 0% 0% 0% 0% 0% 0% 0% 1.9% Buses and Single-Unit Trucks 0 1 0 1 0 0 0 0 0 0 0 0 1 % Buses and Single-Unit Trucks 0% 4.3% 0% 3.3% 0% 0% 0% 0% 0% 0% 0% 0% 1.9% * L: Left, R: Right, T: Thru, U: U-Turn 3 of 6 Packet Pg. 74 4.1.c 8634 N 2nd St - TMC Tue Dec 15, 2020 AM Peak (7:30 AM - 8:30 AM) All Classes (Lights, Articulated Trucks, Buses and Single-Unit Trucks) Provided by: Gewalt Hamilton Associates Inc. All Movements 625 Forest Edge Drive, Vernon Hills, IL, 60061, US ID: 804976, Location: 42.351389, -89.050289 [N] Mall Dr Total: 37 In: 14 Out: 23 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) 14 23 Out: 22 In: 30 [E] Copper 7 Total: 52 8 Out: 7 In: 8 Total: 15 [S] Mall Dr 4 of 6 Packet Pg. 75 4.1.c 8634 N 2nd St - TMC Tue Dec 15, 2020 PM Peak (4:30 PM - 5:30 PM) - Overall Peak Hour All Classes (Lights, Articulated Trucks, Buses and Single-Unit Trucks) Provided by: Gewalt Hamilton Associates Inc. All Movements 625 Forest Edge Drive, Vernon Hills, IL, 60061, US ID: 804976, Location: 42.351389, -89.050289 Leg Copper Mall Dr Mall Dr Direction Westbound Northbound Southbound Time L R U App T R U App L T U App Int Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) 2020-12-15 4:30PM 5 5 0 10 1 6 0 7 11 0 0 11 28 4:45PM 8 5 0 13 0 3 0 3 3 0 0 3 19 5:00PM 10 5 0 15 0 6 0 6 8 0 0 8 29 5:15PM 8 6 0 14 0 5 0 5 8 1 0 9 28 Total 31 21 0 52 1 20 0 21 30 1 0 31 104 % Approach 59.6% 40.4% 0% - 4.8% 95.2% 0% - 96.8% 3.2% 0% - - % Total 29.8% 20.2% 0% 50.0% 1.0% 19.2% 0% 20.2% 28.8% 1.0% 0% 29.8% - PHF 0.775 0.875 - 0.867 0.250 0.833 - 0.750 0.682 0.250 - 0.705 0.897 Lights 31 20 0 51 1 20 0 21 30 1 0 31 103 % Lights 100% 95.2% 0% 98.1% 100% 100% 0% 100% 100% 100% 0% 100% 99.0% Articulated Trucks 0 0 0 0 0 0 0 0 0 0 0 0 0 % Articulated Trucks 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% Buses and Single-Unit Trucks 0 1 0 1 0 0 0 0 0 0 0 0 1 % Buses and Single-Unit Trucks 0% 4.8% 0% 1.9% 0% 0% 0% 0% 0% 0% 0% 0% 1.0% * L: Left, R: Right, T: Thru, U: U-Turn 5 of 6 Packet Pg. 76 4.1.c 8634 N 2nd St - TMC Tue Dec 15, 2020 PM Peak (4:30 PM - 5:30 PM) - Overall Peak Hour All Classes (Lights, Articulated Trucks, Buses and Single-Unit Trucks) Provided by: Gewalt Hamilton Associates Inc. All Movements 625 Forest Edge Drive, Vernon Hills, IL, 60061, US ID: 804976, Location: 42.351389, -89.050289 [N] Mall Dr Total: 53 In: 31 Out: 22 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) 1 30 21 Out: 50 In: 52 [E] Copper 31 Total: 102 1 20 Out: 32 In: 21 Total: 53 [S] Mall Dr 6 of 6 Packet Pg. 77 4.1.c 1020 Ralston Rd - TMC Tue Dec 15, 2020 Full Length (7 AM-9 AM, 4 PM-6 PM) All Classes (Lights, Articulated Trucks, Buses and Single-Unit Trucks) Provided by: Gewalt Hamilton Associates Inc. All Movements 625 Forest Edge Drive, Vernon Hills, IL, 60061, US ID: 804978, Location: 42.367339, -89.037857 Leg Ralston Ralston Road Road Direction Eastbound Westbound Northbound Southbound Time L T R U App L T R U App L T R U App L T R U App Int Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) 2020-12-15 7:00AM 3 103 1 0 107 1 35 18 0 54 0 0 3 0 3 10 0 2 0 12 176 7:15AM 12 98 0 0 110 6 28 26 1 61 1 2 7 0 10 11 0 6 0 17 198 7:30AM 6 141 1 0 148 2 51 19 0 72 2 1 2 0 5 17 1 5 0 23 248 7:45AM 9 137 1 0 147 5 64 37 0 106 2 0 1 0 3 16 0 3 0 19 275 Hourly Total 30 479 3 0 512 14 178 100 1 293 5 3 13 0 21 54 1 16 0 71 897 8:00AM 3 86 0 0 89 6 43 18 0 67 1 2 5 0 8 12 2 3 0 17 181 8:15AM 4 83 2 0 89 2 34 23 0 59 2 0 7 0 9 12 0 3 0 15 172 8:30AM 3 98 2 0 103 4 48 16 0 68 1 1 2 0 4 10 1 8 0 19 194 8:45AM 3 111 2 0 116 4 46 14 0 64 1 0 4 0 5 14 5 1 0 20 205 Hourly Total 13 378 6 0 397 16 171 71 0 258 5 3 18 0 26 48 8 15 0 71 752 4:00PM 2 122 3 0 127 15 149 25 0 189 6 4 9 0 19 35 2 12 0 49 384 4:15PM 7 97 2 0 106 7 157 25 0 189 2 4 10 0 16 36 3 12 0 51 362 4:30PM 7 139 1 0 147 21 168 30 0 219 7 2 8 0 17 53 3 15 0 71 454 4:45PM 5 112 1 0 118 11 166 21 0 198 3 1 9 0 13 34 7 7 0 48 377 Hourly Total 21 470 7 0 498 54 640 101 0 795 18 11 36 0 65 158 15 46 0 219 1577 5:00PM 5 94 1 0 100 11 138 23 0 172 7 3 11 0 21 46 3 9 0 58 351 5:15PM 7 110 0 0 117 9 152 16 1 178 4 3 9 0 16 20 3 9 0 32 343 5:30PM 0 87 3 0 90 9 130 19 0 158 4 1 5 0 10 11 2 10 0 23 281 5:45PM 5 65 1 0 71 5 126 16 0 147 5 0 3 0 8 13 0 11 0 24 250 Hourly Total 17 356 5 0 378 34 546 74 1 655 20 7 28 0 55 90 8 39 0 137 1225 Total 81 1683 21 0 1785 118 1535 346 2 2001 48 24 95 0 167 350 32 116 0 498 4451 % Approach 4.5% 94.3% 1.2% 0% - 5.9% 76.7% 17.3% 0.1% - 28.7% 14.4% 56.9% 0% - 70.3% 6.4% 23.3% 0% - - % Total 1.8% 37.8% 0.5% 0% 40.1% 2.7% 34.5% 7.8% 0% 45.0% 1.1% 0.5% 2.1% 0% 3.8% 7.9% 0.7% 2.6% 0% 11.2% - Lights 80 1652 20 0 1752 116 1509 329 2 1956 48 23 91 0 162 326 30 113 0 469 4339 % Lights 98.8% 98.2% 95.2% 0% 98.2% 98.3% 98.3% 95.1% 100% 97.8% 100% 95.8% 95.8% 0% 97.0% 93.1% 93.8% 97.4% 0% 94.2% 97.5% Articulated Trucks 0 9 0 0 9 0 2 6 0 8 0 0 0 0 0 5 0 1 0 6 23 % Articulated Trucks 0% 0.5% 0% 0% 0.5% 0% 0.1% 1.7% 0% 0.4% 0% 0% 0% 0% 0% 1.4% 0% 0.9% 0% 1.2% 0.5% Buses and Single-Unit Trucks 1 22 1 0 24 2 24 11 0 37 0 1 4 0 5 19 2 2 0 23 89 % Buses and Single-Unit Trucks 1.2% 1.3% 4.8% 0% 1.3% 1.7% 1.6% 3.2% 0% 1.8% 0% 4.2% 4.2% 0% 3.0% 5.4% 6.3% 1.7% 0% 4.6% 2.0% * L: Left, R: Right, T: Thru, U: U-Turn 1 of 6 Packet Pg. 78 4.1.c 1020 Ralston Rd - TMC Tue Dec 15, 2020 Full Length (7 AM-9 AM, 4 PM-6 PM) All Classes (Lights, Articulated Trucks, Buses and Single-Unit Trucks) Provided by: Gewalt Hamilton Associates Inc. All Movements 625 Forest Edge Drive, Vernon Hills, IL, 60061, US ID: 804978, Location: 42.367339, -89.037857 [N] Road Total: 949 In: 498 Out: 451 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) 116 32 350 346 In: 2001 Total: 3484 1535 [W] Ralston Total: 4131 [E] Ralston 118 2 In: 1785 Out: 1699 81 1683 Out: 2130 21 48 24 95 Out: 171 In: 167 Total: 338 [S] Road 2 of 6 Packet Pg. 79 4.1.c 1020 Ralston Rd - TMC Tue Dec 15, 2020 AM Peak (7:15 AM - 8:15 AM) All Classes (Lights, Articulated Trucks, Buses and Single-Unit Trucks) Provided by: Gewalt Hamilton Associates Inc. All Movements 625 Forest Edge Drive, Vernon Hills, IL, 60061, US ID: 804978, Location: 42.367339, -89.037857 Leg Ralston Ralston Road Road Direction Eastbound Westbound Northbound Southbound Time L T R U App L T R U App L T R U App L T R U App Int Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) 2020-12-15 7:15AM 12 98 0 0 110 6 28 26 1 61 1 2 7 0 10 11 0 6 0 17 198 7:30AM 6 141 1 0 148 2 51 19 0 72 2 1 2 0 5 17 1 5 0 23 248 7:45AM 9 137 1 0 147 5 64 37 0 106 2 0 1 0 3 16 0 3 0 19 275 8:00AM 3 86 0 0 89 6 43 18 0 67 1 2 5 0 8 12 2 3 0 17 181 Total 30 462 2 0 494 19 186 100 1 306 6 5 15 0 26 56 3 17 0 76 902 % Approach 6.1% 93.5% 0.4% 0% - 6.2% 60.8% 32.7% 0.3% - 23.1% 19.2% 57.7% 0% - 73.7% 3.9% 22.4% 0% - - % Total 3.3% 51.2% 0.2% 0% 54.8% 2.1% 20.6% 11.1% 0.1% 33.9% 0.7% 0.6% 1.7% 0% 2.9% 6.2% 0.3% 1.9% 0% 8.4% - PHF 0.625 0.819 0.500 - 0.834 0.792 0.727 0.676 0.250 0.722 0.750 0.625 0.536 - 0.650 0.824 0.375 0.708 - 0.826 0.820 Lights 30 454 1 0 485 19 175 95 1 290 6 4 14 0 24 52 3 16 0 71 870 % Lights 100% 98.3% 50.0% 0% 98.2% 100% 94.1% 95.0% 100% 94.8% 100% 80.0% 93.3% 0% 92.3% 92.9% 100% 94.1% 0% 93.4% 96.5% Articulated Trucks 0 3 0 0 3 0 0 4 0 4 0 0 0 0 0 1 0 0 0 1 8 % Articulated Trucks 0% 0.6% 0% 0% 0.6% 0% 0% 4.0% 0% 1.3% 0% 0% 0% 0% 0% 1.8% 0% 0% 0% 1.3% 0.9% Buses and Single-Unit Trucks 0 5 1 0 6 0 11 1 0 12 0 1 1 0 2 3 0 1 0 4 24 % Buses and Single-Unit Trucks 0% 1.1% 50.0% 0% 1.2% 0% 5.9% 1.0% 0% 3.9% 0% 20.0% 6.7% 0% 7.7% 5.4% 0% 5.9% 0% 5.3% 2.7% * L: Left, R: Right, T: Thru, U: U-Turn 3 of 6 Packet Pg. 80 4.1.c 1020 Ralston Rd - TMC Tue Dec 15, 2020 AM Peak (7:15 AM - 8:15 AM) All Classes (Lights, Articulated Trucks, Buses and Single-Unit Trucks) Provided by: Gewalt Hamilton Associates Inc. All Movements 625 Forest Edge Drive, Vernon Hills, IL, 60061, US ID: 804978, Location: 42.367339, -89.037857 [N] Road Total: 211 In: 76 Out: 135 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) 17 3 56 100 Total: 703 In: 306 186 [W] Ralston [E] Ralston 19 Out: 209 Total: 840 1 30 In: 494 462 Out: 534 2 6 5 15 Out: 24 In: 26 Total: 50 [S] Road 4 of 6 Packet Pg. 81 4.1.c 1020 Ralston Rd - TMC Tue Dec 15, 2020 PM Peak (4 PM - 5 PM) - Overall Peak Hour All Classes (Lights, Articulated Trucks, Buses and Single-Unit Trucks) Provided by: Gewalt Hamilton Associates Inc. All Movements 625 Forest Edge Drive, Vernon Hills, IL, 60061, US ID: 804978, Location: 42.367339, -89.037857 Leg Ralston Ralston Road Road Direction Eastbound Westbound Northbound Southbound Time L T R U App L T R U App L T R U App L T R U App Int Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) 2020-12-15 4:00PM 2 122 3 0 127 15 149 25 0 189 6 4 9 0 19 35 2 12 0 49 384 4:15PM 7 97 2 0 106 7 157 25 0 189 2 4 10 0 16 36 3 12 0 51 362 4:30PM 7 139 1 0 147 21 168 30 0 219 7 2 8 0 17 53 3 15 0 71 454 4:45PM 5 112 1 0 118 11 166 21 0 198 3 1 9 0 13 34 7 7 0 48 377 Total 21 470 7 0 498 54 640 101 0 795 18 11 36 0 65 158 15 46 0 219 1577 % Approach 4.2% 94.4% 1.4% 0% - 6.8% 80.5% 12.7% 0% - 27.7% 16.9% 55.4% 0% - 72.1% 6.8% 21.0% 0% - - % Total 1.3% 29.8% 0.4% 0% 31.6% 3.4% 40.6% 6.4% 0% 50.4% 1.1% 0.7% 2.3% 0% 4.1% 10.0% 1.0% 2.9% 0% 13.9% - PHF 0.750 0.845 0.583 - 0.847 0.643 0.952 0.842 - 0.908 0.643 0.688 0.900 - 0.855 0.745 0.536 0.767 - 0.771 0.868 Lights 21 462 7 0 490 52 637 98 0 787 18 11 34 0 63 151 15 46 0 212 1552 % Lights 100% 98.3% 100% 0% 98.4% 96.3% 99.5% 97.0% 0% 99.0% 100% 100% 94.4% 0% 96.9% 95.6% 100% 100% 0% 96.8% 98.4% Articulated Trucks 0 4 0 0 4 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 5 % Articulated Trucks 0% 0.9% 0% 0% 0.8% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0.6% 0% 0% 0% 0.5% 0.3% Buses and Single-Unit Trucks 0 4 0 0 4 2 3 3 0 8 0 0 2 0 2 6 0 0 0 6 20 % Buses and Single-Unit Trucks 0% 0.9% 0% 0% 0.8% 3.7% 0.5% 3.0% 0% 1.0% 0% 0% 5.6% 0% 3.1% 3.8% 0% 0% 0% 2.7% 1.3% * L: Left, R: Right, T: Thru, U: U-Turn 5 of 6 Packet Pg. 82 4.1.c 1020 Ralston Rd - TMC Tue Dec 15, 2020 PM Peak (4 PM - 5 PM) - Overall Peak Hour All Classes (Lights, Articulated Trucks, Buses and Single-Unit Trucks) Provided by: Gewalt Hamilton Associates Inc. All Movements 625 Forest Edge Drive, Vernon Hills, IL, 60061, US ID: 804978, Location: 42.367339, -89.037857 [N] Road Total: 352 In: 219 Out: 133 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) 158 46 15 101 Total: 1202 Out: 664 In: 795 640 [W] Ralston [E] Ralston 54 In: 498 Out: 704 21 470 Total: 1459 7 18 11 36 Out: 76 In: 65 Total: 141 [S] Road 6 of 6 Packet Pg. 83 4.1.c LEAST SQUARES WORKSHEET SEGMENT A1 ROUTE: CR SP#: DATE : 01/18/21 LOCATION: IL 251 Miles : BASE YEAR: 2020 FORECAST YEAR: 2023 Seq # # of lanes COUNTED FLOW MAP 20000 YEAR AADT (SEG A) Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) 850 19500 880 880 19000 1350 1150 18500 1000 1150 18000 1100 1100 17500 1100 1000 17000 2013 17100 16500 2015 18500 2012 2014 2016 2018 2020 2022 2024 2017 19500 2019 17100 Historical AADT Least Squares LEAST SQUARES BASED FORECASTS: Year AADT Calc ADT Calc 2019 18200 -1100 17100 2020 18250 17150 17150.00 2023 18400 17300 17100.00 Raw Least Squares Statistics AADT Forecasts R2 0.01 YEAR AADT SLOPE 50.00 2019 17100 INTERCEPT -82750 2020 17150 N 4 2023 17300 NOTE: Slope Over Base Year County Adjustment Factors were 0.29% developed to Apply to Projected AADT. They are based on 1992-2007 VMT, Population, Labor Force, Household, and Employment Data. Packet Pg. 84 4.1.c Northpointe Traffic Impact Study HRG 201649 Machesney Park, Illinois Appendix B – Synchro Outputs Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) January 2021 B Packet Pg. 85 4.1.c Lanes, Volumes, Timings Timing Plan: AM Peak 4: IL 251 & Copper Dr 01/16/2021 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 20 5 75 80 10 35 20 625 40 15 865 35 Future Volume (vph) 20 5 75 80 10 35 20 625 40 15 865 35 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 100 0 50 200 325 225 225 Storage Lanes 1 1 0 1 2 1 1 1 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.97 0.95 1.00 1.00 0.95 1.00 Frt 0.850 0.850 0.850 0.850 Flt Protected 0.950 0.958 0.950 0.950 Satd. Flow (prot) 1805 1900 1615 0 1820 1615 3502 3539 1615 1805 3574 1615 Flt Permitted 0.689 0.746 0.950 0.950 Satd. Flow (perm) 1309 1900 1615 0 1417 1615 3502 3539 1615 1805 3574 1615 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 116 116 120 120 Link Speed (mph) 30 30 30 30 Link Distance (ft) 451 617 1232 2051 Travel Time (s) 10.3 14.0 28.0 46.6 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 0% 2% 0% 0% 1% 0% Adj. Flow (vph) 24 6 88 94 12 41 24 735 47 18 1018 41 Shared Lane Traffic (%) Lane Group Flow (vph) 24 6 88 0 106 41 24 735 47 18 1018 41 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 12 12 50 50 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Turn Type Perm NA Perm Perm NA Perm Prot NA Perm Prot NA Perm Protected Phases 8 4 1 6 5 2 Permitted Phases 8 8 4 4 6 2 Detector Phase 8 8 8 4 4 4 1 6 6 5 2 2 Switch Phase Minimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 5.0 20.0 20.0 5.0 20.0 20.0 Minimum Split (s) 22.5 22.5 22.5 22.5 22.5 22.5 12.1 26.2 26.2 12.1 26.5 26.5 Total Split (s) 25.0 25.0 25.0 25.0 25.0 25.0 16.0 59.0 59.0 16.0 59.0 59.0 Total Split (%) 25.0% 25.0% 25.0% 25.0% 25.0% 25.0% 16.0% 59.0% 59.0% 16.0% 59.0% 59.0% Maximum Green (s) 18.1 18.1 18.1 18.1 18.1 18.1 8.9 52.8 52.8 8.9 52.5 52.5 Yellow Time (s) 4.4 4.4 4.4 4.4 4.4 4.4 4.6 4.3 4.3 4.6 4.6 4.6 All-Red Time (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 1.9 1.9 2.5 1.9 1.9 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.9 6.9 6.9 6.9 6.9 7.1 6.2 6.2 7.1 6.5 6.5 Lead/Lag Lead Lag Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 2.0 2.0 3.5 2.0 2.0 Recall Mode None None None None None None None C-Max C-Max None C-Max C-Max Northpointe Development TIS 01/14/2021 2020 Existing Synchro 10 Report TAY Page 1 Packet Pg. 86 4.1.c Lanes, Volumes, Timings Timing Plan: AM Peak 4: IL 251 & Copper Dr 01/16/2021 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Act Effct Green (s) 13.5 13.5 13.5 13.5 13.5 6.7 67.3 67.3 7.1 67.3 67.3 Actuated g/C Ratio 0.14 0.14 0.14 0.14 0.14 0.07 0.67 0.67 0.07 0.67 0.67 v/c Ratio 0.14 0.02 0.28 0.55 0.13 0.10 0.31 0.04 0.14 0.42 0.04 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Control Delay 38.1 35.4 5.8 50.9 0.8 44.5 8.9 0.1 45.5 9.8 0.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 38.1 35.4 5.8 50.9 0.8 44.5 8.9 0.1 45.5 9.8 0.1 LOS D D A D A D A A D A A Approach Delay 13.9 36.9 9.4 10.1 Approach LOS B D A B Queue Length 50th (ft) 14 3 0 64 0 7 68 0 11 107 0 Queue Length 95th (ft) 34 14 21 107 0 19 168 0 31 244 0 Internal Link Dist (ft) 371 537 1152 1971 Turn Bay Length (ft) 100 50 200 325 225 225 Base Capacity (vph) 236 343 387 256 387 311 2380 1125 160 2404 1125 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.10 0.02 0.23 0.41 0.11 0.08 0.31 0.04 0.11 0.42 0.04 Intersection Summary Area Type: Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 0 (0%), Referenced to phase 2:SBT and 6:NBT, Start of Green Natural Cycle: 65 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.55 Intersection Signal Delay: 11.9 Intersection LOS: B Intersection Capacity Utilization 57.5% ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 4: IL 251 & Copper Dr Northpointe Development TIS 01/14/2021 2020 Existing Synchro 10 Report TAY Page 2 Packet Pg. 87 4.1.c Lanes, Volumes, Timings Timing Plan: AM Peak 11: Frontage Rd/Banyon Dr & Ralston Rd/IL 173 01/16/2021 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 40 645 5 25 260 140 10 5 20 80 5 25 Future Volume (vph) 40 645 5 25 260 140 10 5 20 80 5 25 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 250 0 225 0 0 0 0 0 Storage Lanes 1 0 1 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.999 0.947 0.923 0.970 Flt Protected 0.950 0.950 0.986 0.965 Satd. Flow (prot) 1805 3571 0 1805 3371 0 0 1729 0 0 1753 0 Flt Permitted 0.400 0.218 0.857 0.373 Satd. Flow (perm) 760 3571 0 414 3371 0 0 1503 0 0 678 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 1 132 24 18 Link Speed (mph) 35 35 35 35 Link Distance (ft) 543 746 298 237 Travel Time (s) 10.6 14.5 5.8 4.6 Peak Hour Factor 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 Heavy Vehicles (%) 0% 1% 0% 0% 0% 4% 0% 0% 0% 2% 0% 0% Adj. Flow (vph) 49 787 6 30 317 171 12 6 24 98 6 30 Shared Lane Traffic (%) Lane Group Flow (vph) 49 793 0 30 488 0 0 42 0 0 134 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 12 12 0 0 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Turn Type pm+pt NA pm+pt NA Perm NA Perm NA Protected Phases 1 6 5 2 4 3 Permitted Phases 6 2 4 3 Detector Phase 1 6 5 2 4 4 3 3 Switch Phase Minimum Initial (s) 5.0 15.0 5.0 15.0 8.0 8.0 8.0 8.0 Minimum Split (s) 10.9 21.1 10.9 21.1 14.1 14.1 14.1 14.1 Total Split (s) 11.0 26.8 11.0 26.8 14.2 14.2 23.0 23.0 Total Split (%) 14.7% 35.7% 14.7% 35.7% 18.9% 18.9% 30.7% 30.7% Maximum Green (s) 5.1 20.7 5.1 20.7 8.1 8.1 16.9 16.9 Yellow Time (s) 3.6 4.3 3.6 4.3 3.6 3.6 3.6 3.6 All-Red Time (s) 2.3 1.8 2.3 1.8 2.5 2.5 2.5 2.5 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.9 6.1 5.9 6.1 6.1 6.1 Lead/Lag Lead Lag Lead Lag Lag Lag Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.5 3.5 3.5 3.5 4.0 4.0 4.0 4.0 Recall Mode None Max None Max Max Max Max Max Northpointe Development TIS 01/14/2021 2020 Existing Synchro 10 Report TAY Page 3 Packet Pg. 88 4.1.c Lanes, Volumes, Timings Timing Plan: AM Peak 11: Frontage Rd/Banyon Dr & Ralston Rd/IL 173 01/16/2021 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Act Effct Green (s) 25.0 22.9 23.9 20.8 8.1 17.0 Actuated g/C Ratio 0.35 0.32 0.34 0.29 0.11 0.24 v/c Ratio 0.14 0.68 0.12 0.45 0.22 0.76 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Control Delay 14.2 25.5 14.2 16.8 21.4 53.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 14.2 25.5 14.2 16.8 21.4 53.4 LOS B C B B C D Approach Delay 24.9 16.6 21.4 53.4 Approach LOS C B C D Queue Length 50th (ft) 13 138 8 70 8 51 Queue Length 95th (ft) 29 216 20 98 32 #127 Internal Link Dist (ft) 463 666 218 157 Turn Bay Length (ft) 250 225 Base Capacity (vph) 345 1158 241 1087 194 176 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.14 0.68 0.12 0.45 0.22 0.76 Intersection Summary Area Type: Other Cycle Length: 75 Actuated Cycle Length: 70.6 Natural Cycle: 75 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.76 Intersection Signal Delay: 24.5 Intersection LOS: C Intersection Capacity Utilization 50.1% ICU Level of Service A Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 11: Frontage Rd/Banyon Dr & Ralston Rd/IL 173 Northpointe Development TIS 01/14/2021 2020 Existing Synchro 10 Report TAY Page 4 Packet Pg. 89 4.1.c SimTraffic Performance Report AM Peak 2020 Existing 01/16/2021 6: Baking Grounds Access/Frontage Rd & Copper Dr Performance by lane Lane EB EB WB WB NB SB All Movements Served LT TR LT TR LTR LTR Denied Del/Veh (s) 0.1 Total Del/Veh (s) 4.4 4.9 0.9 2.9 2.5 4.3 3.4 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Northpointe Development TIS SimTraffic Report TAY Page 1 Packet Pg. 90 4.1.c Queuing and Blocking Report AM Peak 2020 Existing 01/16/2021 Intersection: 6: Baking Grounds Access/Frontage Rd & Copper Dr Movement EB EB NB SB Directions Served LT TR LTR LTR Maximum Queue (ft) 32 30 28 39 Average Queue (ft) 15 11 7 20 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) 95th Queue (ft) 37 34 25 35 Link Distance (ft) 180 180 109 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Northpointe Development TIS SimTraffic Report TAY Page 2 Packet Pg. 91 4.1.c HCM 6th AWSC Timing Plan: AM Peak 3: Mall Dr & Copper Dr 01/17/2021 Intersection Intersection Delay, s/veh 7.3 Intersection LOS A Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 15 45 0 15 30 0 Future Vol, veh/h 15 45 0 15 30 0 Peak Hour Factor 0.65 0.65 0.65 0.65 0.65 0.65 Heavy Vehicles, % 0 4 0 0 0 0 Mvmt Flow 23 69 0 23 46 0 Number of Lanes 1 1 1 0 0 1 Approach WB NB SB Opposing Approach SB NB Opposing Lanes 0 1 1 Conflicting Approach Left NB WB Conflicting Lanes Left 1 0 2 Conflicting Approach Right SB WB Conflicting Lanes Right 1 2 0 HCM Control Delay 7.3 6.6 7.6 HCM LOS A A A Lane NBLn1 WBLn1 WBLn2 SBLn1 Vol Left, % 0% 100% 0% 100% Vol Thru, % 0% 0% 0% 0% Vol Right, % 100% 0% 100% 0% Sign Control Stop Stop Stop Stop Traffic Vol by Lane 15 15 45 30 LT Vol 0 15 0 30 Through Vol 0 0 0 0 RT Vol 15 0 45 0 Lane Flow Rate 23 23 69 46 Geometry Grp 2 7 7 2 Degree of Util (X) 0.022 0.033 0.077 0.055 Departure Headway (Hd) 3.494 5.122 3.988 4.278 Convergence, Y/N Yes Yes Yes Yes Cap 1013 699 897 832 Service Time 1.556 2.851 1.718 2.329 HCM Lane V/C Ratio 0.023 0.033 0.077 0.055 HCM Control Delay 6.6 8 7.1 7.6 HCM Lane LOS A A A A HCM 95th-tile Q 0.1 0.1 0.2 0.2 Northpointe Development TIS 01/14/2021 2020 Existing Synchro 10 Report TAY Page 1 Packet Pg. 92 4.1.c Lanes, Volumes, Timings Timing Plan: PM Peak 4: IL 251 & Copper Dr 01/16/2021 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 35 20 55 65 15 35 40 905 75 25 865 45 Future Volume (vph) 35 20 55 65 15 35 40 905 75 25 865 45 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 100 0 50 200 325 225 225 Storage Lanes 1 1 0 1 2 1 1 1 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.97 0.95 1.00 1.00 0.95 1.00 Frt 0.850 0.850 0.850 0.850 Flt Protected 0.950 0.961 0.950 0.950 Satd. Flow (prot) 1805 1900 1615 0 1826 1615 3502 3574 1615 1805 3574 1615 Flt Permitted 0.704 0.751 0.950 0.950 Satd. Flow (perm) 1338 1900 1615 0 1427 1615 3502 3574 1615 1805 3574 1615 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 96 96 100 100 Link Speed (mph) 30 30 30 30 Link Distance (ft) 451 617 1232 2051 Travel Time (s) 10.3 14.0 28.0 46.6 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 0% 1% 0% 0% 1% 0% Adj. Flow (vph) 36 21 57 67 15 36 41 933 77 26 892 46 Shared Lane Traffic (%) Lane Group Flow (vph) 36 21 57 0 82 36 41 933 77 26 892 46 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 12 12 50 50 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Turn Type Perm NA Perm Perm NA Perm Prot NA Perm Prot NA Perm Protected Phases 8 4 1 6 5 2 Permitted Phases 8 8 4 4 6 2 Detector Phase 8 8 8 4 4 4 1 6 6 5 2 2 Switch Phase Minimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 5.0 20.0 20.0 5.0 20.0 20.0 Minimum Split (s) 22.5 22.5 22.5 22.5 22.5 22.5 12.1 26.2 26.2 12.1 26.5 26.5 Total Split (s) 29.0 29.0 29.0 29.0 29.0 29.0 16.0 75.0 75.0 16.0 75.0 75.0 Total Split (%) 24.2% 24.2% 24.2% 24.2% 24.2% 24.2% 13.3% 62.5% 62.5% 13.3% 62.5% 62.5% Maximum Green (s) 22.1 22.1 22.1 22.1 22.1 22.1 8.9 68.8 68.8 8.9 68.5 68.5 Yellow Time (s) 4.4 4.4 4.4 4.4 4.4 4.4 4.6 4.3 4.3 4.6 4.6 4.6 All-Red Time (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 1.9 1.9 2.5 1.9 1.9 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.9 6.9 6.9 6.9 6.9 7.1 6.2 6.2 7.1 6.5 6.5 Lead/Lag Lead Lag Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 2.0 2.0 3.5 2.0 2.0 Recall Mode None None None None None None None C-Max C-Max None C-Max C-Max Northpointe Development TIS 01/14/2021 2020 Existing Synchro 10 Report TAY Page 1 Packet Pg. 93 4.1.c Lanes, Volumes, Timings Timing Plan: PM Peak 4: IL 251 & Copper Dr 01/16/2021 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Act Effct Green (s) 13.2 13.2 13.2 13.2 13.2 7.3 88.8 88.8 7.8 86.3 86.3 Actuated g/C Ratio 0.11 0.11 0.11 0.11 0.11 0.06 0.74 0.74 0.06 0.72 0.72 v/c Ratio 0.24 0.10 0.22 0.53 0.14 0.19 0.35 0.06 0.22 0.35 0.04 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Control Delay 51.7 47.4 4.1 62.0 1.1 55.2 8.7 1.1 57.1 9.2 0.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 51.7 47.4 4.1 62.0 1.1 55.2 8.7 1.1 57.1 9.2 0.1 LOS D D A E A E A A E A A Approach Delay 27.1 43.4 9.9 10.1 Approach LOS C D A B Queue Length 50th (ft) 26 15 0 61 0 15 159 0 20 150 0 Queue Length 95th (ft) 58 39 12 110 0 34 240 12 49 222 0 Internal Link Dist (ft) 371 537 1152 1971 Turn Bay Length (ft) 100 50 200 325 225 225 Base Capacity (vph) 246 349 375 262 375 259 2646 1221 136 2569 1189 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.15 0.06 0.15 0.31 0.10 0.16 0.35 0.06 0.19 0.35 0.04 Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 0 (0%), Referenced to phase 2:SBT and 6:NBT, Start of Green Natural Cycle: 65 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.53 Intersection Signal Delay: 12.6 Intersection LOS: B Intersection Capacity Utilization 58.3% ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 4: IL 251 & Copper Dr Northpointe Development TIS 01/14/2021 2020 Existing Synchro 10 Report TAY Page 2 Packet Pg. 94 4.1.c Lanes, Volumes, Timings Timing Plan: PM Peak 11: Frontage Rd/Banyon Dr & Ralston Rd/IL 173 01/16/2021 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 25 515 10 60 705 110 25 10 45 205 20 60 Future Volume (vph) 25 515 10 60 705 110 25 10 45 205 20 60 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 250 0 225 0 0 0 0 0 Storage Lanes 1 0 1 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.997 0.980 0.924 0.972 Flt Protected 0.950 0.950 0.984 0.965 Satd. Flow (prot) 1805 3564 0 1805 3538 0 0 1728 0 0 1769 0 Flt Permitted 0.128 0.254 0.772 0.390 Satd. Flow (perm) 243 3564 0 483 3538 0 0 1355 0 0 715 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 2 15 44 14 Link Speed (mph) 35 35 35 35 Link Distance (ft) 543 746 298 237 Travel Time (s) 10.6 14.5 5.8 4.6 Peak Hour Factor 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 Heavy Vehicles (%) 0% 1% 0% 0% 0% 0% 0% 0% 0% 1% 0% 0% Adj. Flow (vph) 29 592 11 69 810 126 29 11 52 236 23 69 Shared Lane Traffic (%) Lane Group Flow (vph) 29 603 0 69 936 0 0 92 0 0 328 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 12 12 0 0 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Turn Type pm+pt NA pm+pt NA Perm NA Perm NA Protected Phases 1 6 5 2 4 3 Permitted Phases 6 2 4 3 Detector Phase 1 6 5 2 4 4 3 3 Switch Phase Minimum Initial (s) 5.0 15.0 5.0 15.0 8.0 8.0 8.0 8.0 Minimum Split (s) 10.9 21.1 10.9 21.1 14.1 14.1 14.1 14.1 Total Split (s) 11.2 36.2 11.4 36.4 14.4 14.4 53.0 53.0 Total Split (%) 9.7% 31.5% 9.9% 31.7% 12.5% 12.5% 46.1% 46.1% Maximum Green (s) 5.3 30.1 5.5 30.3 8.3 8.3 46.9 46.9 Yellow Time (s) 3.6 4.3 3.6 4.3 3.6 3.6 3.6 3.6 All-Red Time (s) 2.3 1.8 2.3 1.8 2.5 2.5 2.5 2.5 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.9 6.1 5.9 6.1 6.1 6.1 Lead/Lag Lead Lag Lead Lag Lag Lag Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.5 3.5 3.5 3.5 4.0 4.0 4.0 4.0 Recall Mode None Max None Max Max Max Max Max Northpointe Development TIS 01/14/2021 2020 Existing Synchro 10 Report TAY Page 3 Packet Pg. 95 4.1.c Lanes, Volumes, Timings Timing Plan: PM Peak 11: Frontage Rd/Banyon Dr & Ralston Rd/IL 173 01/16/2021 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Act Effct Green (s) 34.6 30.2 36.0 32.6 8.3 47.0 Actuated g/C Ratio 0.31 0.27 0.32 0.29 0.07 0.42 v/c Ratio 0.20 0.63 0.32 0.91 0.66 1.08 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Control Delay 27.2 40.2 28.6 52.2 51.9 105.5 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 27.2 40.2 28.6 52.2 51.9 105.5 LOS C D C D D F Approach Delay 39.6 50.6 51.9 105.5 Approach LOS D D D F Queue Length 50th (ft) 14 208 34 360 35 ~269 Queue Length 95th (ft) 34 260 63 #474 #103 #430 Internal Link Dist (ft) 463 666 218 157 Turn Bay Length (ft) 250 225 Base Capacity (vph) 148 955 218 1032 140 305 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.20 0.63 0.32 0.91 0.66 1.08 Intersection Summary Area Type: Other Cycle Length: 115 Actuated Cycle Length: 112.8 Natural Cycle: 130 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 1.08 Intersection Signal Delay: 56.0 Intersection LOS: E Intersection Capacity Utilization 65.0% ICU Level of Service C Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 11: Frontage Rd/Banyon Dr & Ralston Rd/IL 173 Northpointe Development TIS 01/14/2021 2020 Existing Synchro 10 Report TAY Page 4 Packet Pg. 96 4.1.c SimTraffic Performance Report PM Peak 2020 Existing 01/16/2021 6: Baking Grounds Access/Frontage Rd & Copper Dr Performance by lane Lane EB EB WB WB NB SB All Movements Served LT TR LT TR LTR LTR Denied Del/Veh (s) 0.1 Total Del/Veh (s) 5.0 5.5 1.0 2.8 4.1 3.6 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Northpointe Development TIS SimTraffic Report TAY Page 1 Packet Pg. 97 4.1.c Queuing and Blocking Report PM Peak 2020 Existing 01/16/2021 Intersection: 6: Baking Grounds Access/Frontage Rd & Copper Dr Movement EB EB WB NB SB Directions Served LT TR TR LTR LTR Maximum Queue (ft) 38 30 4 7 47 Average Queue (ft) 18 20 0 0 23 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) 95th Queue (ft) 40 42 3 5 39 Link Distance (ft) 180 180 346 109 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Northpointe Development TIS SimTraffic Report TAY Page 2 Packet Pg. 98 4.1.c HCM 6th AWSC Timing Plan: PM Peak 3: Mall Dr & Copper Dr 01/17/2021 Intersection Intersection Delay, s/veh 7.5 Intersection LOS A Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 45 30 1 30 40 1 Future Vol, veh/h 45 30 1 30 40 1 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Heavy Vehicles, % 0 0 0 0 0 0 Mvmt Flow 50 33 1 33 44 1 Number of Lanes 1 1 1 0 0 1 Approach WB NB SB Opposing Approach SB NB Opposing Lanes 0 1 1 Conflicting Approach Left NB WB Conflicting Lanes Left 1 0 2 Conflicting Approach Right SB WB Conflicting Lanes Right 1 2 0 HCM Control Delay 7.7 6.7 7.6 HCM LOS A A A Lane NBLn1 WBLn1 WBLn2 SBLn1 Vol Left, % 0% 100% 0% 98% Vol Thru, % 3% 0% 0% 2% Vol Right, % 97% 0% 100% 0% Sign Control Stop Stop Stop Stop Traffic Vol by Lane 31 45 30 41 LT Vol 0 45 0 40 Through Vol 1 0 0 1 RT Vol 30 0 30 0 Lane Flow Rate 34 50 33 46 Geometry Grp 2 7 7 2 Degree of Util (X) 0.033 0.071 0.036 0.054 Departure Headway (Hd) 3.495 5.139 3.938 4.264 Convergence, Y/N Yes Yes Yes Yes Cap 1009 697 908 832 Service Time 1.569 2.87 1.669 2.328 HCM Lane V/C Ratio 0.034 0.072 0.036 0.055 HCM Control Delay 6.7 8.3 6.8 7.6 HCM Lane LOS A A A A HCM 95th-tile Q 0.1 0.2 0.1 0.2 Northpointe Development TIS 01/14/2021 2020 Existing Synchro 10 Report TAY Page 1 Packet Pg. 99 4.1.c Lanes, Volumes, Timings Timing Plan: AM Peak 4: IL 251 & Copper Dr 01/16/2021 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 20 5 76 81 10 35 20 631 41 15 874 35 Future Volume (vph) 20 5 76 81 10 35 20 631 41 15 874 35 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 100 0 50 200 325 225 225 Storage Lanes 1 1 0 1 2 1 1 1 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.97 0.95 1.00 1.00 0.95 1.00 Frt 0.850 0.850 0.850 0.850 Flt Protected 0.950 0.957 0.950 0.950 Satd. Flow (prot) 1805 1900 1615 0 1818 1615 3502 3539 1615 1805 3574 1615 Flt Permitted 0.688 0.746 0.950 0.950 Satd. Flow (perm) 1307 1900 1615 0 1417 1615 3502 3539 1615 1805 3574 1615 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 116 116 120 120 Link Speed (mph) 30 30 30 30 Link Distance (ft) 451 617 1232 2051 Travel Time (s) 10.3 14.0 28.0 46.6 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 0% 2% 0% 0% 1% 0% Adj. Flow (vph) 24 6 89 95 12 41 24 742 48 18 1028 41 Shared Lane Traffic (%) Lane Group Flow (vph) 24 6 89 0 107 41 24 742 48 18 1028 41 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 12 12 50 50 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Turn Type Perm NA Perm Perm NA Perm Prot NA Perm Prot NA Perm Protected Phases 8 4 1 6 5 2 Permitted Phases 8 8 4 4 6 2 Detector Phase 8 8 8 4 4 4 1 6 6 5 2 2 Switch Phase Minimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 5.0 20.0 20.0 5.0 20.0 20.0 Minimum Split (s) 22.5 22.5 22.5 22.5 22.5 22.5 12.1 26.2 26.2 12.1 26.5 26.5 Total Split (s) 25.0 25.0 25.0 25.0 25.0 25.0 16.0 59.0 59.0 16.0 59.0 59.0 Total Split (%) 25.0% 25.0% 25.0% 25.0% 25.0% 25.0% 16.0% 59.0% 59.0% 16.0% 59.0% 59.0% Maximum Green (s) 18.1 18.1 18.1 18.1 18.1 18.1 8.9 52.8 52.8 8.9 52.5 52.5 Yellow Time (s) 4.4 4.4 4.4 4.4 4.4 4.4 4.6 4.3 4.3 4.6 4.6 4.6 All-Red Time (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 1.9 1.9 2.5 1.9 1.9 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.9 6.9 6.9 6.9 6.9 7.1 6.2 6.2 7.1 6.5 6.5 Lead/Lag Lead Lag Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 2.0 2.0 3.5 2.0 2.0 Recall Mode None None None None None None None C-Max C-Max None C-Max C-Max Northpointe Development TIS 01/14/2021 2023 No Build Synchro 10 Report TAY Page 1 Packet Pg. 100 4.1.c Lanes, Volumes, Timings Timing Plan: AM Peak 4: IL 251 & Copper Dr 01/16/2021 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Act Effct Green (s) 13.6 13.6 13.6 13.6 13.6 6.7 67.2 67.2 7.1 67.2 67.2 Actuated g/C Ratio 0.14 0.14 0.14 0.14 0.14 0.07 0.67 0.67 0.07 0.67 0.67 v/c Ratio 0.14 0.02 0.28 0.56 0.13 0.10 0.31 0.04 0.14 0.43 0.04 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Control Delay 38.1 35.2 6.0 51.1 0.8 44.5 8.9 0.1 45.5 9.9 0.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 38.1 35.2 6.0 51.1 0.8 44.5 8.9 0.1 45.5 9.9 0.1 LOS D D A D A D A A D A A Approach Delay 13.9 37.1 9.4 10.1 Approach LOS B D A B Queue Length 50th (ft) 14 3 0 65 0 7 70 0 11 108 0 Queue Length 95th (ft) 34 14 21 107 0 19 170 0 31 247 0 Internal Link Dist (ft) 371 537 1152 1971 Turn Bay Length (ft) 100 50 200 325 225 225 Base Capacity (vph) 236 343 387 256 387 311 2378 1124 160 2403 1125 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.10 0.02 0.23 0.42 0.11 0.08 0.31 0.04 0.11 0.43 0.04 Intersection Summary Area Type: Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 0 (0%), Referenced to phase 2:SBT and 6:NBT, Start of Green Natural Cycle: 65 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.56 Intersection Signal Delay: 11.9 Intersection LOS: B Intersection Capacity Utilization 57.7% ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 4: IL 251 & Copper Dr Northpointe Development TIS 01/14/2021 2023 No Build Synchro 10 Report TAY Page 2 Packet Pg. 101 4.1.c Lanes, Volumes, Timings Timing Plan: AM Peak 11: Frontage Rd/Banyon Dr & Ralston Rd/IL 173 01/16/2021 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 41 651 5 25 263 141 10 5 20 81 5 25 Future Volume (vph) 41 651 5 25 263 141 10 5 20 81 5 25 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 250 0 225 0 0 0 0 0 Storage Lanes 1 0 1 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.999 0.948 0.923 0.970 Flt Protected 0.950 0.950 0.986 0.965 Satd. Flow (prot) 1805 3571 0 1805 3375 0 0 1729 0 0 1753 0 Flt Permitted 0.396 0.213 0.856 0.372 Satd. Flow (perm) 752 3571 0 405 3375 0 0 1501 0 0 676 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 1 131 24 18 Link Speed (mph) 35 35 35 35 Link Distance (ft) 543 746 298 237 Travel Time (s) 10.6 14.5 5.8 4.6 Peak Hour Factor 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 Heavy Vehicles (%) 0% 1% 0% 0% 0% 4% 0% 0% 0% 2% 0% 0% Adj. Flow (vph) 50 794 6 30 321 172 12 6 24 99 6 30 Shared Lane Traffic (%) Lane Group Flow (vph) 50 800 0 30 493 0 0 42 0 0 135 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 12 12 0 0 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Turn Type pm+pt NA pm+pt NA Perm NA Perm NA Protected Phases 1 6 5 2 4 3 Permitted Phases 6 2 4 3 Detector Phase 1 6 5 2 4 4 3 3 Switch Phase Minimum Initial (s) 5.0 15.0 5.0 15.0 8.0 8.0 8.0 8.0 Minimum Split (s) 10.9 21.1 10.9 21.1 14.1 14.1 14.1 14.1 Total Split (s) 11.0 26.8 11.0 26.8 14.2 14.2 23.0 23.0 Total Split (%) 14.7% 35.7% 14.7% 35.7% 18.9% 18.9% 30.7% 30.7% Maximum Green (s) 5.1 20.7 5.1 20.7 8.1 8.1 16.9 16.9 Yellow Time (s) 3.6 4.3 3.6 4.3 3.6 3.6 3.6 3.6 All-Red Time (s) 2.3 1.8 2.3 1.8 2.5 2.5 2.5 2.5 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.9 6.1 5.9 6.1 6.1 6.1 Lead/Lag Lead Lag Lead Lag Lag Lag Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.5 3.5 3.5 3.5 4.0 4.0 4.0 4.0 Recall Mode None Max None Max Max Max Max Max Northpointe Development TIS 01/14/2021 2023 No Build Synchro 10 Report TAY Page 3 Packet Pg. 102 4.1.c Lanes, Volumes, Timings Timing Plan: AM Peak 11: Frontage Rd/Banyon Dr & Ralston Rd/IL 173 01/16/2021 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Act Effct Green (s) 25.0 22.9 23.9 20.8 8.1 17.0 Actuated g/C Ratio 0.35 0.32 0.34 0.29 0.11 0.24 v/c Ratio 0.15 0.69 0.13 0.45 0.22 0.77 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Control Delay 14.2 25.7 14.2 16.9 21.4 54.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 14.2 25.7 14.2 16.9 21.4 54.4 LOS B C B B C D Approach Delay 25.0 16.8 21.4 54.4 Approach LOS C B C D Queue Length 50th (ft) 13 140 8 71 8 52 Queue Length 95th (ft) 29 218 20 100 32 #128 Internal Link Dist (ft) 463 666 218 157 Turn Bay Length (ft) 250 225 Base Capacity (vph) 343 1158 238 1088 194 176 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.15 0.69 0.13 0.45 0.22 0.77 Intersection Summary Area Type: Other Cycle Length: 75 Actuated Cycle Length: 70.6 Natural Cycle: 80 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.77 Intersection Signal Delay: 24.7 Intersection LOS: C Intersection Capacity Utilization 50.3% ICU Level of Service A Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 11: Frontage Rd/Banyon Dr & Ralston Rd/IL 173 Northpointe Development TIS 01/14/2021 2023 No Build Synchro 10 Report TAY Page 4 Packet Pg. 103 4.1.c SimTraffic Performance Report AM Peak 2023 No Build 01/16/2021 6: Baking Grounds Access/Frontage Rd & Copper Dr Performance by lane Lane EB EB WB WB NB SB All Movements Served LT TR LT TR LTR LTR Denied Del/Veh (s) 0.1 Total Del/Veh (s) 4.3 4.9 0.9 2.7 2.3 4.4 3.3 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Northpointe Development TIS SimTraffic Report TAY Page 1 Packet Pg. 104 4.1.c Queuing and Blocking Report AM Peak 2023 No Build 01/16/2021 Intersection: 6: Baking Grounds Access/Frontage Rd & Copper Dr Movement EB EB NB SB Directions Served LT TR LTR LTR Maximum Queue (ft) 31 30 28 40 Average Queue (ft) 15 11 7 20 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) 95th Queue (ft) 37 34 26 37 Link Distance (ft) 180 180 109 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Northpointe Development TIS SimTraffic Report TAY Page 2 Packet Pg. 105 4.1.c HCM 6th AWSC Timing Plan: AM Peak 3: Mall Dr & Copper Dr 01/17/2021 Intersection Intersection Delay, s/veh 7.3 Intersection LOS A Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 15 46 0 15 30 0 Future Vol, veh/h 15 46 0 15 30 0 Peak Hour Factor 0.65 0.65 0.65 0.65 0.65 0.65 Heavy Vehicles, % 0 4 0 0 0 0 Mvmt Flow 23 71 0 23 46 0 Number of Lanes 1 1 1 0 0 1 Approach WB NB SB Opposing Approach SB NB Opposing Lanes 0 1 1 Conflicting Approach Left NB WB Conflicting Lanes Left 1 0 2 Conflicting Approach Right SB WB Conflicting Lanes Right 1 2 0 HCM Control Delay 7.3 6.6 7.6 HCM LOS A A A Lane NBLn1 WBLn1 WBLn2 SBLn1 Vol Left, % 0% 100% 0% 100% Vol Thru, % 0% 0% 0% 0% Vol Right, % 100% 0% 100% 0% Sign Control Stop Stop Stop Stop Traffic Vol by Lane 15 15 46 30 LT Vol 0 15 0 30 Through Vol 0 0 0 0 RT Vol 15 0 46 0 Lane Flow Rate 23 23 71 46 Geometry Grp 2 7 7 2 Degree of Util (X) 0.022 0.033 0.078 0.055 Departure Headway (Hd) 3.496 5.122 3.988 4.28 Convergence, Y/N Yes Yes Yes Yes Cap 1012 699 897 832 Service Time 1.558 2.851 1.718 2.331 HCM Lane V/C Ratio 0.023 0.033 0.079 0.055 HCM Control Delay 6.6 8 7.1 7.6 HCM Lane LOS A A A A HCM 95th-tile Q 0.1 0.1 0.3 0.2 Northpointe Development TIS 01/14/2021 2023 No Build Synchro 10 Report TAY Page 1 Packet Pg. 106 4.1.c Lanes, Volumes, Timings Timing Plan: PM Peak 4: IL 251 & Copper Dr 01/16/2021 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 35 20 56 66 15 35 41 914 76 25 874 46 Future Volume (vph) 35 20 56 66 15 35 41 914 76 25 874 46 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 100 0 50 200 325 225 225 Storage Lanes 1 1 0 1 2 1 1 1 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.97 0.95 1.00 1.00 0.95 1.00 Frt 0.850 0.850 0.850 0.850 Flt Protected 0.950 0.961 0.950 0.950 Satd. Flow (prot) 1805 1900 1615 0 1826 1615 3502 3574 1615 1805 3574 1615 Flt Permitted 0.703 0.750 0.950 0.950 Satd. Flow (perm) 1336 1900 1615 0 1425 1615 3502 3574 1615 1805 3574 1615 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 96 96 100 100 Link Speed (mph) 30 30 30 30 Link Distance (ft) 451 617 1232 2051 Travel Time (s) 10.3 14.0 28.0 46.6 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 0% 1% 0% 0% 1% 0% Adj. Flow (vph) 36 21 58 68 15 36 42 942 78 26 901 47 Shared Lane Traffic (%) Lane Group Flow (vph) 36 21 58 0 83 36 42 942 78 26 901 47 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 12 12 50 50 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Turn Type Perm NA Perm Perm NA Perm Prot NA Perm Prot NA Perm Protected Phases 8 4 1 6 5 2 Permitted Phases 8 8 4 4 6 2 Detector Phase 8 8 8 4 4 4 1 6 6 5 2 2 Switch Phase Minimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 5.0 20.0 20.0 5.0 20.0 20.0 Minimum Split (s) 22.5 22.5 22.5 22.5 22.5 22.5 12.1 26.2 26.2 12.1 26.5 26.5 Total Split (s) 29.0 29.0 29.0 29.0 29.0 29.0 16.0 75.0 75.0 16.0 75.0 75.0 Total Split (%) 24.2% 24.2% 24.2% 24.2% 24.2% 24.2% 13.3% 62.5% 62.5% 13.3% 62.5% 62.5% Maximum Green (s) 22.1 22.1 22.1 22.1 22.1 22.1 8.9 68.8 68.8 8.9 68.5 68.5 Yellow Time (s) 4.4 4.4 4.4 4.4 4.4 4.4 4.6 4.3 4.3 4.6 4.6 4.6 All-Red Time (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 1.9 1.9 2.5 1.9 1.9 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.9 6.9 6.9 6.9 6.9 7.1 6.2 6.2 7.1 6.5 6.5 Lead/Lag Lead Lag Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 2.0 2.0 3.5 2.0 2.0 Recall Mode None None None None None None None C-Max C-Max None C-Max C-Max Northpointe Development TIS 01/14/2021 2023 No Build Synchro 10 Report TAY Page 1 Packet Pg. 107 4.1.c Lanes, Volumes, Timings Timing Plan: PM Peak 4: IL 251 & Copper Dr 01/16/2021 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Act Effct Green (s) 13.3 13.3 13.3 13.3 13.3 7.4 88.8 88.8 7.8 86.2 86.2 Actuated g/C Ratio 0.11 0.11 0.11 0.11 0.11 0.06 0.74 0.74 0.06 0.72 0.72 v/c Ratio 0.24 0.10 0.22 0.53 0.14 0.20 0.36 0.06 0.22 0.35 0.04 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Control Delay 51.5 47.2 4.2 62.0 1.1 55.1 8.8 1.2 57.1 9.3 0.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 51.5 47.2 4.2 62.0 1.1 55.1 8.8 1.2 57.1 9.3 0.1 LOS D D A E A E A A E A A Approach Delay 26.9 43.6 10.0 10.2 Approach LOS C D B B Queue Length 50th (ft) 26 15 0 62 0 16 162 0 20 152 0 Queue Length 95th (ft) 57 38 12 111 0 34 244 13 49 226 0 Internal Link Dist (ft) 371 537 1152 1971 Turn Bay Length (ft) 100 50 200 325 225 225 Base Capacity (vph) 246 349 375 262 375 259 2643 1220 136 2566 1187 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.15 0.06 0.15 0.32 0.10 0.16 0.36 0.06 0.19 0.35 0.04 Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 0 (0%), Referenced to phase 2:SBT and 6:NBT, Start of Green Natural Cycle: 65 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.53 Intersection Signal Delay: 12.7 Intersection LOS: B Intersection Capacity Utilization 58.6% ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 4: IL 251 & Copper Dr Northpointe Development TIS 01/14/2021 2023 No Build Synchro 10 Report TAY Page 2 Packet Pg. 108 4.1.c Lanes, Volumes, Timings Timing Plan: PM Peak 11: Frontage Rd/Banyon Dr & Ralston Rd/IL 173 01/16/2021 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 25 520 10 61 712 111 25 10 46 207 20 61 Future Volume (vph) 25 520 10 61 712 111 25 10 46 207 20 61 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 250 0 225 0 0 0 0 0 Storage Lanes 1 0 1 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.997 0.980 0.923 0.971 Flt Protected 0.950 0.950 0.985 0.965 Satd. Flow (prot) 1805 3564 0 1805 3538 0 0 1727 0 0 1768 0 Flt Permitted 0.128 0.250 0.773 0.387 Satd. Flow (perm) 243 3564 0 475 3538 0 0 1356 0 0 709 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 2 15 45 14 Link Speed (mph) 35 35 35 35 Link Distance (ft) 543 746 298 237 Travel Time (s) 10.6 14.5 5.8 4.6 Peak Hour Factor 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 Heavy Vehicles (%) 0% 1% 0% 0% 0% 0% 0% 0% 0% 1% 0% 0% Adj. Flow (vph) 29 598 11 70 818 128 29 11 53 238 23 70 Shared Lane Traffic (%) Lane Group Flow (vph) 29 609 0 70 946 0 0 93 0 0 331 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 12 12 0 0 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Turn Type pm+pt NA pm+pt NA Perm NA Perm NA Protected Phases 1 6 5 2 4 3 Permitted Phases 6 2 4 3 Detector Phase 1 6 5 2 4 4 3 3 Switch Phase Minimum Initial (s) 5.0 15.0 5.0 15.0 8.0 8.0 8.0 8.0 Minimum Split (s) 10.9 21.1 10.9 21.1 14.1 14.1 14.1 14.1 Total Split (s) 11.2 36.2 11.4 36.4 14.4 14.4 53.0 53.0 Total Split (%) 9.7% 31.5% 9.9% 31.7% 12.5% 12.5% 46.1% 46.1% Maximum Green (s) 5.3 30.1 5.5 30.3 8.3 8.3 46.9 46.9 Yellow Time (s) 3.6 4.3 3.6 4.3 3.6 3.6 3.6 3.6 All-Red Time (s) 2.3 1.8 2.3 1.8 2.5 2.5 2.5 2.5 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.9 6.1 5.9 6.1 6.1 6.1 Lead/Lag Lead Lag Lead Lag Lag Lag Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.5 3.5 3.5 3.5 4.0 4.0 4.0 4.0 Recall Mode None Max None Max Max Max Max Max Northpointe Development TIS 01/14/2021 2023 No Build Synchro 10 Report TAY Page 3 Packet Pg. 109 4.1.c Lanes, Volumes, Timings Timing Plan: PM Peak 11: Frontage Rd/Banyon Dr & Ralston Rd/IL 173 01/16/2021 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Act Effct Green (s) 34.6 30.2 36.0 32.6 8.3 47.0 Actuated g/C Ratio 0.31 0.27 0.32 0.29 0.07 0.42 v/c Ratio 0.20 0.64 0.32 0.92 0.66 1.09 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Control Delay 27.2 40.4 28.9 53.4 51.7 110.9 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 27.2 40.4 28.9 53.4 51.7 110.9 LOS C D C D D F Approach Delay 39.8 51.7 51.7 110.9 Approach LOS D D D F Queue Length 50th (ft) 14 211 34 ~366 35 ~275 Queue Length 95th (ft) 34 262 64 #482 #103 #436 Internal Link Dist (ft) 463 666 218 157 Turn Bay Length (ft) 250 225 Base Capacity (vph) 148 955 216 1032 141 303 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.20 0.64 0.32 0.92 0.66 1.09 Intersection Summary Area Type: Other Cycle Length: 115 Actuated Cycle Length: 112.8 Natural Cycle: 130 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 1.09 Intersection Signal Delay: 57.5 Intersection LOS: E Intersection Capacity Utilization 65.4% ICU Level of Service C Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 11: Frontage Rd/Banyon Dr & Ralston Rd/IL 173 Northpointe Development TIS 01/14/2021 2023 No Build Synchro 10 Report TAY Page 4 Packet Pg. 110 4.1.c SimTraffic Performance Report PM Peak 2023 No Build 01/16/2021 6: Baking Grounds Access/Frontage Rd & Copper Dr Performance by lane Lane EB EB WB WB NB SB All Movements Served LT TR LT TR LTR LTR Denied Del/Veh (s) 0.1 Total Del/Veh (s) 5.3 5.3 1.0 2.9 3.9 4.3 3.6 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Northpointe Development TIS SimTraffic Report TAY Page 1 Packet Pg. 111 4.1.c Queuing and Blocking Report PM Peak 2023 No Build 01/16/2021 Intersection: 6: Baking Grounds Access/Frontage Rd & Copper Dr Movement EB EB NB SB Directions Served LT TR LTR LTR Maximum Queue (ft) 33 32 10 51 Average Queue (ft) 18 19 1 23 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) 95th Queue (ft) 39 42 8 40 Link Distance (ft) 180 180 109 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Northpointe Development TIS SimTraffic Report TAY Page 2 Packet Pg. 112 4.1.c HCM 6th AWSC Timing Plan: PM Peak 3: Mall Dr & Copper Dr 01/17/2021 Intersection Intersection Delay, s/veh 7.5 Intersection LOS A Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 46 30 1 30 41 1 Future Vol, veh/h 46 30 1 30 41 1 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Heavy Vehicles, % 0 0 0 0 0 0 Mvmt Flow 51 33 1 33 46 1 Number of Lanes 1 1 1 0 0 1 Approach WB NB SB Opposing Approach SB NB Opposing Lanes 0 1 1 Conflicting Approach Left NB WB Conflicting Lanes Left 1 0 2 Conflicting Approach Right SB WB Conflicting Lanes Right 1 2 0 HCM Control Delay 7.7 6.7 7.6 HCM LOS A A A Lane NBLn1 WBLn1 WBLn2 SBLn1 Vol Left, % 0% 100% 0% 98% Vol Thru, % 3% 0% 0% 2% Vol Right, % 97% 0% 100% 0% Sign Control Stop Stop Stop Stop Traffic Vol by Lane 31 46 30 42 LT Vol 0 46 0 41 Through Vol 1 0 0 1 RT Vol 30 0 30 0 Lane Flow Rate 34 51 33 47 Geometry Grp 2 7 7 2 Degree of Util (X) 0.033 0.073 0.036 0.055 Departure Headway (Hd) 3.497 5.141 3.94 4.266 Convergence, Y/N Yes Yes Yes Yes Cap 1008 697 907 832 Service Time 1.574 2.872 1.67 2.332 HCM Lane V/C Ratio 0.034 0.073 0.036 0.056 HCM Control Delay 6.7 8.3 6.8 7.6 HCM Lane LOS A A A A HCM 95th-tile Q 0.1 0.2 0.1 0.2 Northpointe Development TIS 01/14/2021 2023 No Build Synchro 10 Report TAY Page 1 Packet Pg. 113 4.1.c Lanes, Volumes, Timings Timing Plan: AM Peak 4: IL 251 & Copper Dr 01/19/2021 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 25 5 87 81 10 35 24 631 41 15 874 36 Future Volume (vph) 25 5 87 81 10 35 24 631 41 15 874 36 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 100 0 50 200 325 225 225 Storage Lanes 1 1 0 1 2 1 1 1 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.97 0.95 1.00 1.00 0.95 1.00 Frt 0.850 0.850 0.850 0.850 Flt Protected 0.950 0.957 0.950 0.950 Satd. Flow (prot) 1805 1900 1615 0 1818 1615 3502 3539 1615 1805 3574 1615 Flt Permitted 0.688 0.746 0.950 0.950 Satd. Flow (perm) 1307 1900 1615 0 1417 1615 3502 3539 1615 1805 3574 1615 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 116 116 120 120 Link Speed (mph) 30 30 30 30 Link Distance (ft) 451 617 1232 2051 Travel Time (s) 10.3 14.0 28.0 46.6 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 0% 2% 0% 0% 1% 0% Adj. Flow (vph) 29 6 102 95 12 41 28 742 48 18 1028 42 Shared Lane Traffic (%) Lane Group Flow (vph) 29 6 102 0 107 41 28 742 48 18 1028 42 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 12 12 50 50 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Turn Type Perm NA Perm Perm NA Perm Prot NA Perm Prot NA Perm Protected Phases 8 4 1 6 5 2 Permitted Phases 8 8 4 4 6 2 Detector Phase 8 8 8 4 4 4 1 6 6 5 2 2 Switch Phase Minimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 5.0 20.0 20.0 5.0 20.0 20.0 Minimum Split (s) 22.5 22.5 22.5 22.5 22.5 22.5 12.1 26.2 26.2 12.1 26.5 26.5 Total Split (s) 25.0 25.0 25.0 25.0 25.0 25.0 16.0 59.0 59.0 16.0 59.0 59.0 Total Split (%) 25.0% 25.0% 25.0% 25.0% 25.0% 25.0% 16.0% 59.0% 59.0% 16.0% 59.0% 59.0% Maximum Green (s) 18.1 18.1 18.1 18.1 18.1 18.1 8.9 52.8 52.8 8.9 52.5 52.5 Yellow Time (s) 4.4 4.4 4.4 4.4 4.4 4.4 4.6 4.3 4.3 4.6 4.6 4.6 All-Red Time (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 1.9 1.9 2.5 1.9 1.9 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.9 6.9 6.9 6.9 6.9 7.1 6.2 6.2 7.1 6.5 6.5 Lead/Lag Lead Lag Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 2.0 2.0 3.5 2.0 2.0 Recall Mode None None None None None None None C-Max C-Max None C-Max C-Max Northpointe Development TIS 01/14/2021 2023 Build Synchro 10 Report TAY Page 1 Packet Pg. 114 4.1.c Lanes, Volumes, Timings Timing Plan: AM Peak 4: IL 251 & Copper Dr 01/19/2021 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Act Effct Green (s) 13.6 13.6 13.6 13.6 13.6 6.8 67.2 67.2 7.1 64.4 64.4 Actuated g/C Ratio 0.14 0.14 0.14 0.14 0.14 0.07 0.67 0.67 0.07 0.64 0.64 v/c Ratio 0.16 0.02 0.32 0.56 0.13 0.12 0.31 0.04 0.14 0.45 0.04 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Control Delay 38.8 35.2 8.3 51.1 0.8 44.5 8.9 0.1 45.5 11.3 0.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 38.8 35.2 8.3 51.1 0.8 44.5 8.9 0.1 45.5 11.3 0.1 LOS D D A D A D A A D B A Approach Delay 15.9 37.1 9.6 11.5 Approach LOS B D A B Queue Length 50th (ft) 17 3 0 65 0 8 70 0 11 182 0 Queue Length 95th (ft) 39 14 31 107 0 21 170 0 31 248 0 Internal Link Dist (ft) 371 537 1152 1971 Turn Bay Length (ft) 100 50 200 325 225 225 Base Capacity (vph) 236 343 387 256 387 311 2378 1124 160 2301 1082 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.12 0.02 0.26 0.42 0.11 0.09 0.31 0.04 0.11 0.45 0.04 Intersection Summary Area Type: Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 0 (0%), Referenced to phase 2:SBT and 6:NBT, Start of Green Natural Cycle: 65 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.56 Intersection Signal Delay: 12.8 Intersection LOS: B Intersection Capacity Utilization 57.7% ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 4: IL 251 & Copper Dr Northpointe Development TIS 01/14/2021 2023 Build Synchro 10 Report TAY Page 2 Packet Pg. 115 4.1.c Lanes, Volumes, Timings Timing Plan: AM Peak 11: Frontage Rd/Banyon Dr & Ralston Rd/IL 173 01/19/2021 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 41 651 6 26 263 141 12 5 25 81 5 25 Future Volume (vph) 41 651 6 26 263 141 12 5 25 81 5 25 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 250 0 225 0 0 0 0 0 Storage Lanes 1 0 1 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.999 0.948 0.921 0.970 Flt Protected 0.950 0.950 0.986 0.965 Satd. Flow (prot) 1805 3571 0 1805 3375 0 0 1725 0 0 1753 0 Flt Permitted 0.396 0.213 0.853 0.380 Satd. Flow (perm) 752 3571 0 405 3375 0 0 1493 0 0 690 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 1 131 30 18 Link Speed (mph) 35 35 35 35 Link Distance (ft) 543 746 298 237 Travel Time (s) 10.6 14.5 5.8 4.6 Peak Hour Factor 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 Heavy Vehicles (%) 0% 1% 0% 0% 0% 4% 0% 0% 0% 2% 0% 0% Adj. Flow (vph) 50 794 7 32 321 172 15 6 30 99 6 30 Shared Lane Traffic (%) Lane Group Flow (vph) 50 801 0 32 493 0 0 51 0 0 135 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 12 12 0 0 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Turn Type pm+pt NA pm+pt NA Perm NA Perm NA Protected Phases 1 6 5 2 4 3 Permitted Phases 6 2 4 3 Detector Phase 1 6 5 2 4 4 3 3 Switch Phase Minimum Initial (s) 5.0 15.0 5.0 15.0 8.0 8.0 8.0 8.0 Minimum Split (s) 10.9 21.1 10.9 21.1 14.1 14.1 14.1 14.1 Total Split (s) 11.0 26.8 11.0 26.8 14.2 14.2 23.0 23.0 Total Split (%) 14.7% 35.7% 14.7% 35.7% 18.9% 18.9% 30.7% 30.7% Maximum Green (s) 5.1 20.7 5.1 20.7 8.1 8.1 16.9 16.9 Yellow Time (s) 3.6 4.3 3.6 4.3 3.6 3.6 3.6 3.6 All-Red Time (s) 2.3 1.8 2.3 1.8 2.5 2.5 2.5 2.5 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.9 6.1 5.9 6.1 6.1 6.1 Lead/Lag Lead Lag Lead Lag Lag Lag Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.5 3.5 3.5 3.5 4.0 4.0 4.0 4.0 Recall Mode None Max None Max Max Max Max Max Northpointe Development TIS 01/14/2021 2023 Build Synchro 10 Report TAY Page 3 Packet Pg. 116 4.1.c Lanes, Volumes, Timings Timing Plan: AM Peak 11: Frontage Rd/Banyon Dr & Ralston Rd/IL 173 01/19/2021 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Act Effct Green (s) 25.0 22.9 23.9 20.8 8.1 17.0 Actuated g/C Ratio 0.35 0.32 0.34 0.29 0.11 0.24 v/c Ratio 0.15 0.69 0.13 0.45 0.26 0.75 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Control Delay 14.2 25.7 14.3 16.9 21.0 52.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 14.2 25.7 14.3 16.9 21.0 52.2 LOS B C B B C D Approach Delay 25.1 16.8 21.0 52.2 Approach LOS C B C D Queue Length 50th (ft) 13 141 8 71 9 52 Queue Length 95th (ft) 29 218 21 100 35 #127 Internal Link Dist (ft) 463 666 218 157 Turn Bay Length (ft) 250 225 Base Capacity (vph) 343 1158 238 1088 199 179 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.15 0.69 0.13 0.45 0.26 0.75 Intersection Summary Area Type: Other Cycle Length: 75 Actuated Cycle Length: 70.6 Natural Cycle: 75 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.75 Intersection Signal Delay: 24.5 Intersection LOS: C Intersection Capacity Utilization 50.4% ICU Level of Service A Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 11: Frontage Rd/Banyon Dr & Ralston Rd/IL 173 Northpointe Development TIS 01/14/2021 2023 Build Synchro 10 Report TAY Page 4 Packet Pg. 117 4.1.c SimTraffic Performance Report AM Peak 2023 Build 01/19/2021 6: Baking Grounds Access/Frontage Rd & Copper Dr Performance by lane Lane EB EB WB WB NB SB All Movements Served LT TR LT TR LTR LTR Denied Del/Veh (s) 0.0 Total Del/Veh (s) 4.4 5.4 0.9 2.8 2.4 4.5 3.5 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Northpointe Development TIS SimTraffic Report TAY Page 1 Packet Pg. 118 4.1.c Queuing and Blocking Report AM Peak 2023 Build 01/19/2021 Intersection: 6: Baking Grounds Access/Frontage Rd & Copper Dr Movement EB EB WB NB SB Directions Served LT TR TR LTR LTR Maximum Queue (ft) 29 30 2 25 48 Average Queue (ft) 16 14 0 6 20 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) 95th Queue (ft) 37 38 2 24 38 Link Distance (ft) 180 180 346 109 400 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Northpointe Development TIS SimTraffic Report TAY Page 2 Packet Pg. 119 4.1.c HCM 6th AWSC Timing Plan: AM Peak 3: Mall Dr & Copper Dr 01/17/2021 Intersection Intersection Delay, s/veh 7.4 Intersection LOS A Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 15 48 0 15 37 1 Future Vol, veh/h 15 48 0 15 37 1 Peak Hour Factor 0.65 0.65 0.65 0.65 0.65 0.65 Heavy Vehicles, % 0 4 0 0 0 0 Mvmt Flow 23 74 0 23 57 2 Number of Lanes 1 1 1 0 0 1 Approach WB NB SB Opposing Approach SB NB Opposing Lanes 0 1 1 Conflicting Approach Left NB WB Conflicting Lanes Left 1 0 2 Conflicting Approach Right SB WB Conflicting Lanes Right 1 2 0 HCM Control Delay 7.3 6.7 7.7 HCM LOS A A A Lane NBLn1 WBLn1 WBLn2 SBLn1 Vol Left, % 0% 100% 0% 97% Vol Thru, % 0% 0% 0% 3% Vol Right, % 100% 0% 100% 0% Sign Control Stop Stop Stop Stop Traffic Vol by Lane 15 15 48 38 LT Vol 0 15 0 37 Through Vol 0 0 0 1 RT Vol 15 0 48 0 Lane Flow Rate 23 23 74 58 Geometry Grp 2 7 7 2 Degree of Util (X) 0.023 0.033 0.082 0.07 Departure Headway (Hd) 3.511 5.143 4.01 4.28 Convergence, Y/N Yes Yes Yes Yes Cap 1006 695 891 831 Service Time 1.579 2.882 1.748 2.334 HCM Lane V/C Ratio 0.023 0.033 0.083 0.07 HCM Control Delay 6.7 8.1 7.1 7.7 HCM Lane LOS A A A A HCM 95th-tile Q 0.1 0.1 0.3 0.2 Northpointe Development TIS 01/14/2021 2023 Build Synchro 10 Report TAY Page 1 Packet Pg. 120 4.1.c HCM Unsignalized Intersection Capacity Analysis Timing Plan: AM Peak 17: Frontage Rd & East Access 01/19/2021 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Volume (veh/h) 3 50 52 2 7 9 Future Volume (Veh/h) 3 50 52 2 7 9 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 3 54 57 2 8 10 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 59 118 58 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 59 118 58 tC, single (s) 4.1 6.4 6.2 tC, 2 stage (s) tF (s) 2.2 3.5 3.3 p0 queue free % 100 99 99 cM capacity (veh/h) 1545 876 1008 Direction, Lane # EB 1 WB 1 SB 1 Volume Total 57 59 18 Volume Left 3 0 8 Volume Right 0 2 10 cSH 1545 1700 945 Volume to Capacity 0.00 0.03 0.02 Queue Length 95th (ft) 0 0 1 Control Delay (s) 0.4 0.0 8.9 Lane LOS A A Approach Delay (s) 0.4 0.0 8.9 Approach LOS A Intersection Summary Average Delay 1.4 Intersection Capacity Utilization 15.1% ICU Level of Service A Analysis Period (min) 15 Northpointe Development TIS 01/14/2021 2023 Build Synchro 10 Report TAY Page 1 Packet Pg. 121 4.1.c HCM Unsignalized Intersection Capacity Analysis Timing Plan: AM Peak 20: Mall Dr & West Access 01/16/2021 Movement EBL EBT EBR WBL WBT WBR NBL NBR SEL SER Lane Configurations Traffic Volume (veh/h) 0 0 0 8 0 0 46 2 0 30 Future Volume (Veh/h) 0 0 0 8 0 0 46 2 0 30 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 0 0 0 9 0 0 50 2 0 33 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 84 85 33 84 84 51 52 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 84 85 33 84 84 51 52 tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 tC, 2 stage (s) tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 p0 queue free % 100 100 100 99 100 100 100 cM capacity (veh/h) 903 805 1041 903 806 1017 1554 Direction, Lane # WB 1 NB 1 SE 1 Volume Total 9 52 33 Volume Left 9 0 0 Volume Right 0 2 0 cSH 903 1700 1554 Volume to Capacity 0.01 0.03 0.00 Queue Length 95th (ft) 1 0 0 Control Delay (s) 9.0 0.0 0.0 Lane LOS A Approach Delay (s) 9.0 0.0 0.0 Approach LOS A Intersection Summary Average Delay 0.9 Intersection Capacity Utilization 20.0% ICU Level of Service A Analysis Period (min) 15 Northpointe Development TIS 01/14/2021 2023 Build Synchro 10 Report TAY Page 3 Packet Pg. 122 4.1.c Lanes, Volumes, Timings Timing Plan: PM Peak 4: IL 251 & Copper Dr 01/19/2021 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 38 20 63 66 15 35 52 914 76 25 874 52 Future Volume (vph) 38 20 63 66 15 35 52 914 76 25 874 52 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 100 0 50 200 325 225 225 Storage Lanes 1 1 0 1 2 1 1 1 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.97 0.95 1.00 1.00 0.95 1.00 Frt 0.850 0.850 0.850 0.850 Flt Protected 0.950 0.961 0.950 0.950 Satd. Flow (prot) 1805 1900 1615 0 1826 1615 3502 3574 1615 1805 3574 1615 Flt Permitted 0.703 0.750 0.950 0.950 Satd. Flow (perm) 1336 1900 1615 0 1425 1615 3502 3574 1615 1805 3574 1615 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 96 96 100 100 Link Speed (mph) 30 30 30 30 Link Distance (ft) 451 617 1232 2051 Travel Time (s) 10.3 14.0 28.0 46.6 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 0% 1% 0% 0% 1% 0% Adj. Flow (vph) 39 21 65 68 15 36 54 942 78 26 901 54 Shared Lane Traffic (%) Lane Group Flow (vph) 39 21 65 0 83 36 54 942 78 26 901 54 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 12 12 50 50 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Turn Type Perm NA Perm Perm NA Perm Prot NA Perm Prot NA Perm Protected Phases 8 4 1 6 5 2 Permitted Phases 8 8 4 4 6 2 Detector Phase 8 8 8 4 4 4 1 6 6 5 2 2 Switch Phase Minimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 5.0 20.0 20.0 5.0 20.0 20.0 Minimum Split (s) 22.5 22.5 22.5 22.5 22.5 22.5 12.1 26.2 26.2 12.1 26.5 26.5 Total Split (s) 29.0 29.0 29.0 29.0 29.0 29.0 16.0 75.0 75.0 16.0 75.0 75.0 Total Split (%) 24.2% 24.2% 24.2% 24.2% 24.2% 24.2% 13.3% 62.5% 62.5% 13.3% 62.5% 62.5% Maximum Green (s) 22.1 22.1 22.1 22.1 22.1 22.1 8.9 68.8 68.8 8.9 68.5 68.5 Yellow Time (s) 4.4 4.4 4.4 4.4 4.4 4.4 4.6 4.3 4.3 4.6 4.6 4.6 All-Red Time (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 1.9 1.9 2.5 1.9 1.9 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.9 6.9 6.9 6.9 6.9 7.1 6.2 6.2 7.1 6.5 6.5 Lead/Lag Lead Lag Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 2.0 2.0 3.5 2.0 2.0 Recall Mode None None None None None None None C-Max C-Max None C-Max C-Max Northpointe Development TIS 01/14/2021 2023 Build Synchro 10 Report TAY Page 1 Packet Pg. 123 4.1.c Lanes, Volumes, Timings Timing Plan: PM Peak 4: IL 251 & Copper Dr 01/19/2021 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Act Effct Green (s) 13.3 13.3 13.3 13.3 13.3 7.7 88.8 88.8 7.8 85.8 85.8 Actuated g/C Ratio 0.11 0.11 0.11 0.11 0.11 0.06 0.74 0.74 0.06 0.72 0.72 v/c Ratio 0.27 0.10 0.25 0.53 0.14 0.24 0.36 0.06 0.22 0.35 0.05 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Control Delay 52.2 47.2 5.7 62.0 1.1 55.4 8.8 1.2 57.1 9.5 0.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 52.2 47.2 5.7 62.0 1.1 55.4 8.8 1.2 57.1 9.5 0.3 LOS D D A E A E A A E A A Approach Delay 27.2 43.6 10.6 10.3 Approach LOS C D B B Queue Length 50th (ft) 28 15 0 62 0 21 162 0 20 154 0 Queue Length 95th (ft) 61 38 19 111 0 41 244 13 49 229 2 Internal Link Dist (ft) 371 537 1152 1971 Turn Bay Length (ft) 100 50 200 325 225 225 Base Capacity (vph) 246 349 375 262 375 263 2643 1220 136 2556 1183 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.16 0.06 0.17 0.32 0.10 0.21 0.36 0.06 0.19 0.35 0.05 Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 0 (0%), Referenced to phase 2:SBT and 6:NBT, Start of Green Natural Cycle: 65 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.53 Intersection Signal Delay: 13.1 Intersection LOS: B Intersection Capacity Utilization 58.6% ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 4: IL 251 & Copper Dr Northpointe Development TIS 01/14/2021 2023 Build Synchro 10 Report TAY Page 2 Packet Pg. 124 4.1.c Lanes, Volumes, Timings Timing Plan: PM Peak 11: Frontage Rd/Banyon Dr & Ralston Rd/IL 173 01/19/2021 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 25 520 13 66 712 111 27 10 49 207 20 61 Future Volume (vph) 25 520 13 66 712 111 27 10 49 207 20 61 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 250 0 225 0 0 0 0 0 Storage Lanes 1 0 1 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.996 0.980 0.923 0.971 Flt Protected 0.950 0.950 0.984 0.965 Satd. Flow (prot) 1805 3561 0 1805 3538 0 0 1726 0 0 1768 0 Flt Permitted 0.128 0.247 0.770 0.392 Satd. Flow (perm) 243 3561 0 469 3538 0 0 1350 0 0 718 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 2 15 45 14 Link Speed (mph) 35 35 35 35 Link Distance (ft) 543 746 298 237 Travel Time (s) 10.6 14.5 5.8 4.6 Peak Hour Factor 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 Heavy Vehicles (%) 0% 1% 0% 0% 0% 0% 0% 0% 0% 1% 0% 0% Adj. Flow (vph) 29 598 15 76 818 128 31 11 56 238 23 70 Shared Lane Traffic (%) Lane Group Flow (vph) 29 613 0 76 946 0 0 98 0 0 331 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 12 12 0 0 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Turn Type pm+pt NA pm+pt NA Perm NA Perm NA Protected Phases 1 6 5 2 4 3 Permitted Phases 6 2 4 3 Detector Phase 1 6 5 2 4 4 3 3 Switch Phase Minimum Initial (s) 5.0 15.0 5.0 15.0 8.0 8.0 8.0 8.0 Minimum Split (s) 10.9 21.1 10.9 21.1 14.1 14.1 14.1 14.1 Total Split (s) 11.2 36.2 11.4 36.4 14.4 14.4 53.0 53.0 Total Split (%) 9.7% 31.5% 9.9% 31.7% 12.5% 12.5% 46.1% 46.1% Maximum Green (s) 5.3 30.1 5.5 30.3 8.3 8.3 46.9 46.9 Yellow Time (s) 3.6 4.3 3.6 4.3 3.6 3.6 3.6 3.6 All-Red Time (s) 2.3 1.8 2.3 1.8 2.5 2.5 2.5 2.5 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.9 6.1 5.9 6.1 6.1 6.1 Lead/Lag Lead Lag Lead Lag Lag Lag Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.5 3.5 3.5 3.5 4.0 4.0 4.0 4.0 Recall Mode None Max None Max Max Max Max Max Northpointe Development TIS 01/14/2021 2023 Build Synchro 10 Report TAY Page 3 Packet Pg. 125 4.1.c Lanes, Volumes, Timings Timing Plan: PM Peak 11: Frontage Rd/Banyon Dr & Ralston Rd/IL 173 01/19/2021 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Act Effct Green (s) 34.6 30.2 36.0 32.6 8.3 47.0 Actuated g/C Ratio 0.31 0.27 0.32 0.29 0.07 0.42 v/c Ratio 0.20 0.64 0.36 0.92 0.70 1.08 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Control Delay 27.2 40.5 29.7 53.4 55.7 106.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 27.2 40.5 29.7 53.4 55.7 106.1 LOS C D C D E F Approach Delay 39.9 51.6 55.7 106.1 Approach LOS D D E F Queue Length 50th (ft) 14 212 37 ~366 39 ~273 Queue Length 95th (ft) 34 265 69 #482 #113 #433 Internal Link Dist (ft) 463 666 218 157 Turn Bay Length (ft) 250 225 Base Capacity (vph) 148 954 214 1032 141 307 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.20 0.64 0.36 0.92 0.70 1.08 Intersection Summary Area Type: Other Cycle Length: 115 Actuated Cycle Length: 112.8 Natural Cycle: 130 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 1.08 Intersection Signal Delay: 56.8 Intersection LOS: E Intersection Capacity Utilization 65.4% ICU Level of Service C Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 11: Frontage Rd/Banyon Dr & Ralston Rd/IL 173 Northpointe Development TIS 01/14/2021 2023 Build Synchro 10 Report TAY Page 4 Packet Pg. 126 4.1.c SimTraffic Performance Report PM Peak 2023 Build 01/19/2021 6: Baking Grounds Access/Frontage Rd & Copper Dr Performance by lane Lane EB EB WB WB NB SB All Movements Served LT TR LT TR LTR LTR Denied Del/Veh (s) 0.0 Total Del/Veh (s) 5.4 5.5 1.0 3.0 4.6 4.1 3.7 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Northpointe Development TIS SimTraffic Report TAY Page 1 Packet Pg. 127 4.1.c Queuing and Blocking Report PM Peak 2023 Build 01/19/2021 Intersection: 6: Baking Grounds Access/Frontage Rd & Copper Dr Movement EB EB WB NB SB Directions Served LT TR TR LTR LTR Maximum Queue (ft) 36 30 2 17 41 Average Queue (ft) 19 22 0 1 22 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) 95th Queue (ft) 39 43 3 8 36 Link Distance (ft) 180 180 346 109 400 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Northpointe Development TIS SimTraffic Report TAY Page 2 Packet Pg. 128 4.1.c HCM 6th AWSC Timing Plan: PM Peak 3: Mall Dr & Copper Dr 01/19/2021 Intersection Intersection Delay, s/veh 7.5 Intersection LOS A Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 46 38 2 30 46 1 Future Vol, veh/h 46 38 2 30 46 1 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Heavy Vehicles, % 0 0 0 0 0 0 Mvmt Flow 51 42 2 33 51 1 Number of Lanes 1 1 1 0 0 1 Approach WB NB SB Opposing Approach SB NB Opposing Lanes 0 1 1 Conflicting Approach Left NB WB Conflicting Lanes Left 1 0 2 Conflicting Approach Right SB WB Conflicting Lanes Right 1 2 0 HCM Control Delay 7.7 6.7 7.6 HCM LOS A A A Lane NBLn1 WBLn1 WBLn2 SBLn1 Vol Left, % 0% 100% 0% 98% Vol Thru, % 6% 0% 0% 2% Vol Right, % 94% 0% 100% 0% Sign Control Stop Stop Stop Stop Traffic Vol by Lane 32 46 38 47 LT Vol 0 46 0 46 Through Vol 2 0 0 1 RT Vol 30 0 38 0 Lane Flow Rate 36 51 42 52 Geometry Grp 2 7 7 2 Degree of Util (X) 0.035 0.073 0.046 0.062 Departure Headway (Hd) 3.535 5.153 3.951 4.282 Convergence, Y/N Yes Yes Yes Yes Cap 996 695 903 828 Service Time 1.616 2.89 1.688 2.352 HCM Lane V/C Ratio 0.036 0.073 0.047 0.063 HCM Control Delay 6.7 8.3 6.9 7.6 HCM Lane LOS A A A A HCM 95th-tile Q 0.1 0.2 0.1 0.2 Northpointe Development TIS 01/14/2021 2023 Build Synchro 10 Report TAY Page 1 Packet Pg. 129 4.1.c HCM Unsignalized Intersection Capacity Analysis Timing Plan: PM Peak 17: Frontage Rd & East Access 01/19/2021 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Volume (veh/h) 9 96 76 8 5 5 Future Volume (Veh/h) 9 96 76 8 5 5 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 10 104 83 9 5 5 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 92 212 88 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 92 212 88 tC, single (s) 4.1 6.4 6.2 tC, 2 stage (s) tF (s) 2.2 3.5 3.3 p0 queue free % 99 99 99 cM capacity (veh/h) 1503 772 971 Direction, Lane # EB 1 WB 1 SB 1 Volume Total 114 92 10 Volume Left 10 0 5 Volume Right 0 9 5 cSH 1503 1700 860 Volume to Capacity 0.01 0.05 0.01 Queue Length 95th (ft) 1 0 1 Control Delay (s) 0.7 0.0 9.2 Lane LOS A A Approach Delay (s) 0.7 0.0 9.2 Approach LOS A Intersection Summary Average Delay 0.8 Intersection Capacity Utilization 22.2% ICU Level of Service A Analysis Period (min) 15 Northpointe Development TIS 01/14/2021 2023 Build Synchro 10 Report TAY Page 2 Packet Pg. 130 4.1.c HCM Unsignalized Intersection Capacity Analysis Timing Plan: PM Peak 20: Mall Dr & West Access 01/19/2021 Movement EBL EBT EBR WBL WBT WBR NBL NBR SEL SER Lane Configurations Traffic Volume (veh/h) 0 0 0 5 0 0 31 9 0 42 Future Volume (Veh/h) 0 0 0 5 0 0 31 9 0 42 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 0 0 0 5 0 0 34 10 0 46 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 85 90 46 85 85 39 44 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 85 90 46 85 85 39 44 tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 tC, 2 stage (s) tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 p0 queue free % 100 100 100 99 100 100 100 cM capacity (veh/h) 901 800 1023 901 805 1033 1564 Direction, Lane # WB 1 NB 1 SE 1 Volume Total 5 44 46 Volume Left 5 0 0 Volume Right 0 10 0 cSH 901 1700 1564 Volume to Capacity 0.01 0.03 0.00 Queue Length 95th (ft) 0 0 0 Control Delay (s) 9.0 0.0 0.0 Lane LOS A Approach Delay (s) 9.0 0.0 0.0 Approach LOS A Intersection Summary Average Delay 0.5 Intersection Capacity Utilization 20.0% ICU Level of Service A Analysis Period (min) 15 Northpointe Development TIS 01/14/2021 2023 Build Synchro 10 Report TAY Page 3 Packet Pg. 131 4.1.c PHASE I: ICE MEMORANDUM To: Village of McFarland From: Lee Gibbs, PE, PTOE Date: 7/23/2020 RE: Traffic Impact Analysis (TIA) Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Broadhead Street and Holscher Road Village of McFarland Dane County Project Description: This intersection is a four-legged intersection located on the periphery of the Village of McFarland. Broadhead Street (also known as County MN and running east-west) serves as the major street and Holscher Road (running north-south) serves as the minor street with all movements from Holscher Road under stop control. Exclusive left-turn lanes are provided on both approaches of Holscher Road and an exclusive right-turn lane is provided on the west leg of Broadhead Street. Bike lanes and sidewalks are provided on the north, south, and west intersection legs while crosswalks are provided on all intersection legs. A multi-use path runs on the north side of the east intersection leg. Several developments are proposed in the immediate vicinity of the intersection: a residential development of 80 dwelling units, a residential development of 32 units, and a new Village public safety building. These sites, in addition to long-range Village growth east of the study intersection, will increase traffic volumes at this location. This condition, coupled with existing concerns of stop-sign noncompliance on Holscher Road and upcoming reconstruction of Broadhead Street east of Holscher Road, has introduced consideration of evaluating the existing intersection control and to investigate potential intersection control improvements. Description of Alternatives: The following intersection control was investigated: • Two-way stop-control (TWSC) – existing condition • All-way stop-control (AWSC) • Traffic signal control • Roundabout control Safety Considerations: Observed Crash History Years: 2015 through 2019 Crash Type Fatal Injury A Injury B Injury C KABC PDO Total Fixed Object 0 0 0 0 0 2 2 Angle 0 0 0 1 1 0 1 Total 0 0 0 1 1 2 3 Injury A: crash resulting in incapacitating injury Injury B: crash resulting in non-incapacitating injury Injury C: crash resulting in minor injury KABC: sum of fatal and injury crashes PDO: property damage only crashes Packet Pg. 132 4.1.c PHASE I: ICE MEMORANDUM Crash Trends: No crash trends identified in observed crash history Contributing Factors: One PDO crash was alcohol-related; the other PDO crash occurred in a work zone Operational Considerations: Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Peak period (6-9a and 3-6p) intersection turning movement counts were collected at the intersection in July 2020. Due to the COVID-19 pandemic altering traffic patterns, the collected traffic data was adjusted using historical counts in the area to project more representative (i.e. pre COVID-19) traffic conditions. Year 2009 and 2018 traffic counts along County MN (east of the study intersection) were reviewed to generate an average annual growth rate (AAGR) for the roadway. This AAGR was projected to extrapolate Year 2020 traffic volumes at this count site. The extrapolated count data was compared to observed intersection counts at Broadhead / Holscher and intersection volumes were increased to reflect the extrapolated data. Observed turning movement proportions for each intersection approach were used to apply the increase in traffic volumes to each turning movement at the intersection. This process produced the existing-year intersection turning movement volumes used for analysis purposes. Existing (Year 2020) and future-year (Year 2030) traffic conditions were evaluated. Background growth (2 percent per year), site traffic from adjacent properties, and site traffic from long-range growth areas were included in the future-year conditions. The Highway Capacity Manual (HCM) module of Synchro11 was used to develop measures of effectiveness (MOEs) for all traffic operations analysis scenarios. The results can be found below: Year: 2020 Existing Conditions (TWSC) EB WB NB SB AM Peak L/T - R - All - L - T/R L - T/R # Lanes 1 1 1 1 1 1 1 LOS A A A B B B B Delay (s) 7.6 0.0 7.5 11.6 12.1 13.2 10.3 v/c 0.02 0.00 0.01 0.05 0.19 0.10 0.08 Queue (ft.) 5 0 0 5 20 10 10 Storage (ft.) 100 100 100 EB WB NB SB PM Peak L/T - R - All - L - T/R L - T/R # Lanes 1 1 1 1 1 1 1 LOS A A A B B B B Delay (s) 7.5 0.0 7.5 11.7 11.0 12.1 11.2 v/c 0.02 0.00 0.01 0.04 0.10 0.08 0.12 Queue (ft.) 5 0 0 5 10 5 10 Storage (ft.) 100 100 100 Additional Information Packet Pg. 133 4.1.c PHASE I: ICE MEMORANDUM Year: 2030 Future No-Build Conditions EB WB NB SB AM Peak L/T - R L/T - R L - T/R L - T/R Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) # Lanes 1 1 1 1 1 1 1 1 LOS A A A A B B B B Delay (s) 7.6 0.0 7.5 0.0 11.6 12.1 12.6 10.0 v/c 0.02 0.00 0.01 0.00 0.05 0.19 0.09 0.07 Queue (ft.) 5 0 0 0 5 20 10 5 Storage (ft.) 100 100 100 100 EB WB NB SB PM Peak L/T - R L/T - R L - T/R L - T/R # Lanes 1 1 1 1 1 1 1 1 LOS A A A A B B B B Delay (s) 7.5 0.0 7.5 0.0 11.7 11.0 11.9 11.1 v/c 0.02 0.00 0.01 0.00 0.04 0.10 0.07 0.12 Queue (ft.) 5 0 0 0 5 10 5 10 Storage (ft.) 100 100 100 100 As part of the Broadhead Street reconstruction, the WB approach will be reconstructed to provide a through/left- Additional turn lane and an exclusive right-turn lane. This update is reflected in this, and other relevant, future-year Information alternatives. Year: 2030 Future Build Conditions (AWSC Alternative) EB WB NB SB AM Peak L/T - R L/T - R L - T/R L - T/R # Lanes 1 1 1 1 1 1 1 1 LOS B A B A B B B B Delay (s) 11.4 8.7 14.2 9.7 10.3 11.5 11.0 10.0 v/c 0.26 0.07 0.47 0.24 0.07 0.28 0.14 0.15 Queue (ft.) 25 5 65 20 5 30 15 15 Storage (ft.) 100 100 100 100 EB WB NB SB PM Peak L/T - R L/T - R L - T/R L - T/R # Lanes 1 1 1 1 1 1 1 1 LOS B A B A B B B B Delay (s) 13.9 8.7 13.0 8.7 10.5 10.8 11.5 10.5 v/c 0.45 0.09 0.39 0.08 0.07 0.21 0.20 0.19 Queue (ft.) 60 10 45 10 5 20 20 20 Storage (ft.) 100 100 100 100 Per guidance in Section 2B.07 of the Manual of Uniform Traffic Control Devices (MUTCD), Year 2030 AM and PM Additional projected peak-hour volumes at this intersection would meet minimum volume thresholds for AWSC consideration Information to implement. Year 2020 volumes would not meet these thresholds. Packet Pg. 134 4.1.c PHASE I: ICE MEMORANDUM Year: 2030 Future Build Conditions (Traffic Signal Alternative) Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) EB WB NB SB AM Peak L/T - R L/T - R L - T/R L - T/R # Lanes 1 1 1 1 1 1 1 1 LOS A A A A A A A A Delay (s) 5.0 4.7 5.6 5.4 7.2 7.4 8.0 6.9 v/c 0.18 0.08 0.35 0.32 0.06 0.39 0.13 0.24 Queue (ft.) 10 5 20 10 5 20 10 10 Storage (ft.) 100 100 100 100 EB WB NB SB PM Peak L/T - R L/T - R L - T/R L - T/R # Lanes 1 1 1 1 1 1 1 1 LOS A A A A A A A A Delay (s) 5.8 5.1 5.6 5.0 6.8 6.6 7.4 6.5 v/c 0.34 0.13 0.29 0.10 0.06 0.29 0.17 0.26 Queue (ft.) 20 5 15 5 5 10 10 10 Storage (ft.) 100 100 100 100 Additional Per Section 4C of the MUTCD, Year 2030 AM and PM peak-hour volumes would not meet minimum volume Information thresholds for traffic signal consideration to implement. Year: 2030 Future Build Conditions (Roundabout Alternative) EB WB NB SB AM Peak - All - - All - - All - - All - # Lanes 1 1 1 1 LOS A A A A Delay (s) 4.8 8.4 5.0 5.3 v/c 0.17 0.43 0.18 0.16 Queue (ft.) 25 50 25 25 Storage (ft.) EB WB NB SB PM Peak - All - - All - - All - - All - # Lanes 1 1 1 1 LOS A A A A Delay (s) 6.4 5.5 5.5 5.5 v/c 0.30 0.25 0.17 0.21 Queue (ft.) 25 25 25 25 Storage (ft.) Additional Information Packet Pg. 135 4.1.c PHASE I: ICE MEMORANDUM Other Considerations: A cemetery is located in the northwest quadrant of the intersection. A public safety center – with firehouse – is proposed in the southeast quadrant; it is anticipated that emergency vehicles will exit Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) onto Broadhead Street. Feasibility of Alternatives: The TWSC, AWSC, and traffic signal alternatives can be implemented with minimal impacts to the surrounding areas; the roundabout alternative may require right of way acquisition and/or roadway realignment due to sensitive land uses adjacent to the intersection. Conclusion: All alternatives maintain adequate (LOS C or better) traffic operations during Year 2030 peak traffic periods. Due to existing land uses, the roundabout alternative may require right of way acquisition and realignment of roadway approaches; therefore, the roundabout alternative should not be considered a feasible alternative for consideration. Due to the low traffic volumes currently at the intersection, the intersection should maintain TWSC upon reconstruction of the east leg of Broadhead Street. Traffic conditions should be monitored at this intersection as development occurs to determine when AWSC should be implemented (see attachment for volume thresholds for AWSC consideration). It is unlikely that traffic volumes will meet minimum thresholds to warrant traffic signalization; therefore, traffic signal control is not recommended at this time (see attachment for volume thresholds for traffic signal consideration). Attachments: Intersection turning movement counts collected in July 2020 Crash Diagram Intersection Traffic Operations Analysis Worksheets Section 2B.07 of MUTCD (AWSC volume thresholds) Section 4C of MUTCD (traffic signal volume thresholds) Packet Pg. 136 4.1.c Intersection Traffic Volume Report Count Basics Start Date: Thursday, July 9, 2020 Version 2013.J4.1 Weekday Schools Not in Session Page 1 of 11 Total Number of Hours Counted: 6 Non-Holiday No Special Events Base Information, Observed (6) Hour and Estimated (24) Hour Volume Summaries Intersection of: Holscher Road and Broadhead Street Site Information Count Information Municipality McFarland Hrs Counted: 6:00 AM-9:00 AM and 3:00 PM-6:00 PM County Dane WisDOT Region SW-M 1st Day of Count Thursday, July 9, 2020 Weather Traffic Control Partial Stop Control AM Peak Period Thursday, July 9, 2020 Clear & Dry Roadway Names North Direction ↑ Midday Peak Period Clear & Dry Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) North Leg Holscher Road PM Peak Period Thursday, July 9, 2020 Clear & Dry East Leg Broadhead Street Calculated Peak Hours South Leg Holscher Road AM 7:15-8:15am MD PM 4:15-5:15pm West Leg Broadhead Street Peak Hours Selected for Analysis Special Considerations AM 7:15-8:15am MD PM 4:15-5:15pm Schools Not in Session Daily/Seasonal Adjustment Group Holidays None Count Expansion Group Special Events None Daily/Seasonal Adjustment Factor 1 Count Expansion Factor 2.330 Special Pedestrians Observed Company Name SRF Consulting, Inc. Manual Adj. 1.000 Pre-school children None Observers AM Peak Period Elementry school age children None Midday Peak Period Visually impaired (white cane/helper dog) None PM Peak Period Elderly/disabled (except wheelchairs) None Comments Wheelchairs/electric scooters None Other (describe) None None Observed 6 Hour Volume Summary OBSERVED 6 Holscher Road TOTAL ENTERING VOLUME HOUR VOLUMES PED: 13 781 BIKE: 26 1,639 358 79 149 130 0 423      PED:  134 PED: 26 313 20 Broadhead Street Broadhead Street  477   68 515  0 898 ↑ 932 0  North 85  BIKE: 421 231   417 BIKE: 13 105  12      322 0 85 204 56 345 PED: 10 667 BIKE: 4 Holscher Road Total Entering Hourly Volume Motor Vehicle 1,000 413 Volume 318 254 238 257 159 0 0 0 0 0 0 0 0 0 0 0 6:00 AM 7:00 AM 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM 7:00 PM 8:00 PM 9:00 PM One-Hour Time Period Start Time (For example, 6am represents volume from 6am to 7am) Estimated 24 Hour AADT ESTIMATED Holscher Road TOTAL ENTERING VOLUME 24 HOUR AADT 1,820 3,819 834 184 347 303 0 986       312 729 Broadhead Street Broadhead Street  1111   158 1200  0 2,092 ↑ 2,172 0  North 198  981 538   972 245       Daily/Seasonal Factor 1 750 0 198 475 130 Count Expansion Factor 2.330 804 Manual Adjustment Factor 1.000 1,554 Total 24 Hr Expansion Factor 2.330 Holscher Road Packet Pg. 137 4.1.c Intersection Traffic Volume Report Count Basics Start Date: Thursday, July 9, 2020 Weekday Page 3 of 11 Schools Not in Session Total Number of Hours Counted: 6 Non-Holiday No Special Events Peak Hour Volume Summary All Motor Vehicles Holscher Road and Broadhead Street Peak Hour Volumes, Truck Percentages, and PHFs Thursday, July 9, 2020     From North From East From South From West AM Peak Hour Holscher Road Broadhead Street Holscher Road Broadhead Street Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Right Thru Left U-Tn Total Right Thru Left U-Tn Total Totals 7:15 AM 2 4 4 0 10 10 9 1 0 20 4 9 5 0 18 3 6 3 0 12 60 7:30 AM 4 1 6 0 11 7 21 4 0 32 2 21 2 0 25 3 8 6 0 17 85 AM Peak Hour 7:45 AM 6 3 8 0 17 5 10 2 0 17 4 6 4 0 14 1 5 2 0 8 56 8:00 AM 4 3 5 0 12 17 8 3 0 28 2 11 3 0 16 3 9 4 0 16 72 Peak Hour Volume 16 11 23 0 50 39 48 10 0 97 12 47 14 0 73 10 28 15 0 53 273 Rounded Hourly Volume 15 10 25 0 50 40 50 10 0 100 10 45 15 0 70 10 30 15 0 55 275 % Single Unit Trucks 0.0 0.0 8.7 0.0 4.0 15.4 4.2 0.0 0.0 8.2 0.0 2.1 0.0 0.0 1.4 0.0 0.0 6.7 0.0 1.9 4.4 % Heavy Trucks 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 % Trucks (Total) 0.0 0.0 8.7 0.0 4.0 15.4 4.2 0.0 0.0 8.2 0.0 2.1 0.0 0.0 1.4 0.0 0.0 6.7 0.0 1.9 4.4 Peak Hour Factor (PHF) 0.67 0.69 0.72 0.00 0.74 0.57 0.57 0.62 0.00 0.76 0.75 0.56 0.70 0.00 0.73 0.83 0.78 0.62 0.00 0.78 0.80 N/A     From North From East From South From West MD Peak Hour Holscher Road Broadhead Street Holscher Road Broadhead Street Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Right Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Midday (MD) Peak Hour 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Peak Hour Volume 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Rounded Hourly Volume 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Single Unit Trucks 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 % Heavy Trucks 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 % Trucks (Total) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Peak Hour Factor (PHF) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Thursday, July 9, 2020     From North From East From South From West PM Peak Hour Holscher Road Broadhead Street Holscher Road Broadhead Street Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Right Thru Left U-Tn Total Right Thru Left U-Tn Total Totals 4:15 PM 6 11 14 0 31 5 22 5 0 32 4 8 5 0 17 9 14 5 0 28 108 4:30 PM 4 8 8 0 20 8 21 3 0 32 2 15 6 0 23 9 18 9 0 36 111 PM Peak Hour 4:45 PM 6 11 10 0 27 3 12 4 0 19 6 11 2 0 19 14 22 4 0 40 105 5:00 PM 6 16 4 0 26 6 16 6 0 28 4 9 5 0 18 7 15 8 0 30 102 Peak Hour Volume 22 46 36 0 104 22 71 18 0 111 16 43 18 0 77 39 69 26 0 134 426 Rounded Hourly Volume 20 45 35 0 100 20 70 20 0 110 15 45 20 0 80 40 70 25 0 135 425 % Single Unit Trucks 0.0 2.2 5.6 0.0 2.9 0.0 1.4 0.0 0.0 0.9 0.0 2.3 11.1 0.0 3.9 0.0 4.3 0.0 0.0 2.2 2.3 % Heavy Trucks 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 % Trucks (Total) 0.0 2.2 5.6 0.0 2.9 0.0 1.4 0.0 0.0 0.9 0.0 2.3 11.1 0.0 3.9 0.0 4.3 0.0 0.0 2.2 2.3 Peak Hour Factor (PHF) 0.92 0.72 0.64 0.00 0.84 0.69 0.81 0.75 0.00 0.87 0.67 0.72 0.75 0.00 0.84 0.70 0.78 0.72 0.00 0.84 0.96 Peak Hour Pedestrian and Bicyclist Volumes Pedestrians and Bicyclists Crossing Crossing Crossing Crossing Total North Approach East Approach South Approach West Approach Ped & Holscher Road Broadhead Street Holscher Road Broadhead Street Bike 15-Minute Start Time Pedestrian Bicyclist Total Pedestrian Bicyclist Total Pedestrian Bicyclist Total Pedestrian Bicyclist Total Volume 7:15 AM 0 0 0 0 0 0 0 0 0 0 1 1 1 7:30 AM 1 3 4 0 0 0 0 0 0 2 2 4 8 AM 7:45 AM 3 1 4 0 4 4 2 0 2 1 0 1 11 8:00 AM 1 3 4 0 0 0 0 0 0 3 1 4 8 Total 5 7 12 0 4 4 2 0 2 6 4 10 28 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 MD 12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 0 0 4:15 PM 0 4 4 0 0 0 0 0 0 0 3 3 7 4:30 PM 0 4 4 0 0 0 0 0 0 1 0 1 5 PM 4:45 PM 0 1 1 0 2 2 1 0 1 0 0 0 4 5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 0 9 9 0 2 2 1 0 1 1 3 4 16 Packet Pg. 138 4.1.c Intersection Traffic Volume Report Count Basics Start Date: Thursday, July 9, 2020 Weekday Page 5 of 11 Schools Not in Session Total Number of Hours Counted: 6 Non-Holiday No Special Events 15-Minute Motor Vehicle Data All Motor Vehicles Holscher Road and Broadhead Street 15-Minute Motor Vehicle Data     15-Minute From North From East From South From West Time Period Holscher Road Broadhead Street Holscher Road Broadhead Street 15-Min Hourly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Right Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum PHF Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) 6:00 AM 0 3 1 0 4 4 8 1 0 13 3 2 2 0 7 1 4 1 0 6 30 159 0.71 6:15 AM 0 2 3 0 5 5 11 2 0 18 1 9 2 0 12 2 1 2 0 5 40 182 0.81 6:30 AM 2 1 1 0 4 3 10 0 0 13 0 7 3 0 10 1 3 2 0 6 33 202 0.84 6:45 AM 1 2 5 0 8 4 12 2 0 18 5 12 4 0 21 2 6 1 0 9 56 254 0.75 7:00 AM 5 1 5 0 11 6 10 1 0 17 2 9 5 0 16 1 7 1 0 9 53 254 0.75 AM Peak Period 7:15 AM 2 4 4 0 10 10 9 1 0 20 4 9 5 0 18 3 6 3 0 12 60 273 0.80 7:30 AM 4 1 6 0 11 7 21 4 0 32 2 21 2 0 25 3 8 6 0 17 85 264 0.78 7:45 AM 6 3 8 0 17 5 10 2 0 17 4 6 4 0 14 1 5 2 0 8 56 239 0.83 8:00 AM 4 3 5 0 12 17 8 3 0 28 2 11 3 0 16 3 9 4 0 16 72 238 0.83 8:15 AM 2 7 4 0 13 4 10 3 0 17 2 6 2 0 10 2 7 2 0 11 51 8:30 AM 2 5 6 0 13 6 12 4 0 22 3 14 5 0 22 2 0 1 0 3 60 8:45 AM 2 4 0 0 6 4 11 1 0 16 2 9 3 0 14 5 11 3 0 19 55 9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Midday Peak Period 11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:00 PM 2 5 4 0 11 2 13 0 0 15 1 5 4 0 10 3 8 3 0 14 50 257 0.72 3:15 PM 1 6 6 0 13 5 10 4 0 19 1 10 3 0 14 5 8 5 0 18 64 296 0.83 3:30 PM 1 4 5 0 10 2 8 2 0 12 2 4 3 0 9 9 13 1 0 23 54 340 0.79 3:45 PM 6 11 10 0 27 5 21 5 0 31 1 3 2 0 6 4 19 2 0 25 89 397 0.89 4:00 PM 3 9 4 0 16 7 18 5 0 30 2 7 6 0 15 5 18 5 0 28 89 413 0.93 4:15 PM 6 11 14 0 31 5 22 5 0 32 4 8 5 0 17 9 14 5 0 28 108 426 0.96 4:30 PM 4 8 8 0 20 8 21 3 0 32 2 15 6 0 23 9 18 9 0 36 111 401 0.90 4:45 PM 6 11 10 0 27 3 12 4 0 19 6 11 2 0 19 14 22 4 0 40 105 348 0.83 5:00 PM 6 16 4 0 26 6 16 6 0 28 4 9 5 0 18 7 15 8 0 30 102 318 0.78 PM Peak Period 5:15 PM 8 11 5 0 24 7 16 6 0 29 1 7 5 0 13 7 9 1 0 17 83 5:30 PM 4 7 6 0 17 4 9 0 0 13 1 6 2 0 9 3 10 6 0 19 58 5:45 PM 2 14 6 0 22 5 15 4 0 24 1 4 2 0 7 4 10 8 0 22 75 6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Totals 79 149 130 0 358 134 313 68 0 515 56 204 85 0 345 105 231 85 0 421 1639 Peak Hour All Vehicle Volume Summary     Hourly From North From East From South From West Total Time Period Holscher Road Broadhead Street Holscher Road Broadhead Street Hourly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Right Thru Left U-Tn Total Right Thru Left U-Tn Total Volume PHF AM 7:15 AM 16 11 23 0 50 39 48 10 0 97 12 47 14 0 73 10 28 15 0 53 273 0.80 MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PM 4:15 PM 22 46 36 0 104 22 71 18 0 111 16 43 18 0 77 39 69 26 0 134 426 0.96 Packet Pg. 139 4.1.c Intersection Traffic Volume Report Count Basics Start Date: Thursday, July 9, 2020 Weekday Page 9 of 11 Schools Not in Session Total Number of Hours Counted: 6 Non-Holiday No Special Events 15-Minute Heavy Vehicle Data Heavy Vehicles (Single-Unit Trucks, Buses & Semi-Trucks) Holscher Road and Broadhead Street 15-Minute Heavy Vehicle Data     15-Minute From North From East From South From West Time Period Holscher Road Broadhead Street Holscher Road Broadhead Street 15-Min Hourly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Right Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) 6:00 AM 0 1 0 0 1 2 2 1 0 5 0 0 0 0 0 0 0 0 0 0 6 15 6:15 AM 0 1 0 0 1 0 1 1 0 2 0 0 0 0 0 0 0 0 0 0 3 12 6:30 AM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 11 6:45 AM 0 0 2 0 2 0 3 0 0 3 0 0 0 0 0 0 0 0 0 0 5 13 7:00 AM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 2 0 0 2 3 10 AM Peak Period 7:15 AM 0 0 0 0 0 2 0 0 0 2 0 0 0 0 0 0 0 0 0 0 2 12 7:30 AM 0 0 0 0 0 0 1 0 0 1 0 1 0 0 1 0 0 1 0 1 3 10 7:45 AM 0 0 1 0 1 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 2 13 8:00 AM 0 0 1 0 1 4 0 0 0 4 0 0 0 0 0 0 0 0 0 0 5 14 8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:30 AM 0 1 1 0 2 1 1 0 0 2 0 1 0 0 1 1 0 0 0 1 6 8:45 AM 0 1 0 0 1 1 1 0 0 2 0 0 0 0 0 0 0 0 0 0 3 9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Midday Peak Period 11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:00 PM 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 1 0 0 1 2 6 3:15 PM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 7 3:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 2 2 11 3:45 PM 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 1 10 4:00 PM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 2 0 0 2 3 11 4:15 PM 0 1 1 0 2 0 1 0 0 1 0 1 1 0 2 0 0 0 0 0 5 10 4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 7 4:45 PM 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 2 7 5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0 1 0 0 1 2 6 PM Peak Period 5:15 PM 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 2 5:30 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 5:45 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Totals 0 9 8 0 17 11 13 2 0 26 0 4 2 0 6 2 10 1 0 13 62 Peak Hour Heavy Vehicle Volume Summary     Hourly From North From East From South From West Total Time Period Holscher Road Broadhead Street Holscher Road Broadhead Street Hourly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Right Thru Left U-Tn Total Right Thru Left U-Tn Total Volume AM 7:15 AM 0 0 2 0 2 6 2 0 0 8 0 1 0 0 1 0 0 1 0 1 12 MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PM 4:15 PM 0 1 2 0 3 0 1 0 0 1 0 1 2 0 3 0 3 0 0 3 10 Packet Pg. 140 4.1.c Broadhead Street Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Holscher Road Holscher Road Broadhead Street DOCUMENTATION CONVENTION CRASH FREQUENCY/SEVERITY 0 Fatal Crash (K) CRASH FREQUENCY (2015 - 2019) 3 0 Incapacitating (A-level) 0 Non-Incapacitating (B-level) Crashes 1 Possible Injury (C-level) 2 Property Damage Only Moving Vehicle Stop/Yield Sign Angle (Right Angle) Head-On Backing Vehicle Tree Angle (Left Turn) Rear-End Pedestrian Utility Pole Angle (Right Turn) Out of Control Bicyclist Fixed Object Sideswipe-Same Overtake Parked Vehicle Non-Fixed Object Sideswipe-Opposite Overturn Figure X.X COLLISION DIAGRAM HOLSCHER ROAD & BROADHEAD STREET Years: 2015- 2019 MCFARLAND, Packet WISCONSIN Pg. 141 4.1.c HCM 6th TWSC 3: Holscher Road (AM) & Broadhead Street 07/21/2020 Intersection Int Delay, s/veh 6.1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Lane Configurations Traffic Vol, veh/h 24 45 16 16 78 63 22 76 20 37 18 26 Future Vol, veh/h 24 45 16 16 78 63 22 76 20 37 18 26 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length - - 100 - - - 100 - - 100 - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 80 80 80 80 80 80 80 80 80 80 80 80 Heavy Vehicles, % 2 2 2 8 8 8 1 1 1 4 4 4 Mvmt Flow 30 56 20 20 98 79 28 95 25 46 23 33 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 177 0 0 76 0 0 322 333 56 364 314 138 Stage 1 - - - - - - 116 116 - 178 178 - Stage 2 - - - - - - 206 217 - 186 136 - Critical Hdwy 4.12 - - 4.18 - - 7.11 6.51 6.21 7.14 6.54 6.24 Critical Hdwy Stg 1 - - - - - - 6.11 5.51 - 6.14 5.54 - Critical Hdwy Stg 2 - - - - - - 6.11 5.51 - 6.14 5.54 - Follow-up Hdwy 2.218 - - 2.272 - - 3.509 4.009 3.309 3.536 4.036 3.336 Pot Cap-1 Maneuver 1399 - - 1486 - - 633 589 1013 588 598 905 Stage 1 - - - - - - 891 802 - 819 748 - Stage 2 - - - - - - 798 725 - 811 780 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 1399 - - 1486 - - 575 567 1013 486 576 905 Mov Cap-2 Maneuver - - - - - - 575 567 - 486 576 - Stage 1 - - - - - - 871 784 - 801 737 - Stage 2 - - - - - - 735 714 - 680 763 - Approach EB WB NB SB HCM Control Delay, s 2.2 0.8 12 11.6 HCM LOS B B Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT EBR WBL WBT WBR SBLn1 SBLn2 Capacity (veh/h) 575 624 1399 - - 1486 - - 486 734 HCM Lane V/C Ratio 0.048 0.192 0.021 - - 0.013 - - 0.095 0.075 HCM Control Delay (s) 11.6 12.1 7.6 0 - 7.5 0 - 13.2 10.3 HCM Lane LOS B B A A - A A - B B HCM 95th %tile Q(veh) 0.1 0.7 0.1 - - 0 - - 0.3 0.2 Broadhead and Holscher ICE Study Year 2020 1:39 pm 07/21/2020 Synchro 11 Report SRF Consulting Group Page 1 Packet Pg. 142 4.1.c HCM 6th TWSC 8: Holscher Road (PM) & Broadhead Street 07/21/2020 Intersection Int Delay, s/veh 5.6 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Lane Configurations Traffic Vol, veh/h 29 78 44 20 79 25 20 48 18 40 51 24 Future Vol, veh/h 29 78 44 20 79 25 20 48 18 40 51 24 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length - - 100 - - - 100 - - 100 - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 96 96 96 96 96 96 96 96 96 96 96 96 Heavy Vehicles, % 2 2 2 1 1 1 4 4 4 3 3 3 Mvmt Flow 30 81 46 21 82 26 21 50 19 42 53 25 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 108 0 0 127 0 0 317 291 81 336 324 95 Stage 1 - - - - - - 141 141 - 137 137 - Stage 2 - - - - - - 176 150 - 199 187 - Critical Hdwy 4.12 - - 4.11 - - 7.14 6.54 6.24 7.13 6.53 6.23 Critical Hdwy Stg 1 - - - - - - 6.14 5.54 - 6.13 5.53 - Critical Hdwy Stg 2 - - - - - - 6.14 5.54 - 6.13 5.53 - Follow-up Hdwy 2.218 - - 2.209 - - 3.536 4.036 3.336 3.527 4.027 3.327 Pot Cap-1 Maneuver 1483 - - 1465 - - 632 616 973 616 592 959 Stage 1 - - - - - - 857 776 - 864 781 - Stage 2 - - - - - - 821 769 - 801 743 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 1483 - - 1465 - - 556 593 973 549 570 959 Mov Cap-2 Maneuver - - - - - - 556 593 - 549 570 - Stage 1 - - - - - - 838 759 - 845 769 - Stage 2 - - - - - - 733 757 - 718 727 - Approach EB WB NB SB HCM Control Delay, s 1.4 1.2 11.2 11.5 HCM LOS B B Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT EBR WBL WBT WBR SBLn1 SBLn2 Capacity (veh/h) 556 664 1483 - - 1465 - - 549 655 HCM Lane V/C Ratio 0.037 0.104 0.02 - - 0.014 - - 0.076 0.119 HCM Control Delay (s) 11.7 11 7.5 0 - 7.5 0 - 12.1 11.2 HCM Lane LOS B B A A - A A - B B HCM 95th %tile Q(veh) 0.1 0.3 0.1 - - 0 - - 0.2 0.4 Broadhead and Holscher ICE Study Year 2020 1:39 pm 07/21/2020 Synchro 11 Report SRF Consulting Group Page 2 Packet Pg. 143 4.1.c HCM 6th TWSC 3: Holscher Road (AM) & Broadhead Street 07/21/2020 Intersection Int Delay, s/veh 6 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Lane Configurations Traffic Vol, veh/h 24 45 16 16 78 63 22 76 20 37 18 26 Future Vol, veh/h 24 45 16 16 78 63 22 76 20 37 18 26 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length - - 100 - - 100 100 - - 100 - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 80 80 80 80 80 80 80 80 80 80 80 80 Heavy Vehicles, % 2 2 2 8 8 8 1 1 1 4 4 4 Mvmt Flow 30 56 20 20 98 79 28 95 25 46 23 33 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 177 0 0 76 0 0 322 333 56 324 274 98 Stage 1 - - - - - - 116 116 - 138 138 - Stage 2 - - - - - - 206 217 - 186 136 - Critical Hdwy 4.12 - - 4.18 - - 7.11 6.51 6.21 7.14 6.54 6.24 Critical Hdwy Stg 1 - - - - - - 6.11 5.51 - 6.14 5.54 - Critical Hdwy Stg 2 - - - - - - 6.11 5.51 - 6.14 5.54 - Follow-up Hdwy 2.218 - - 2.272 - - 3.509 4.009 3.309 3.536 4.036 3.336 Pot Cap-1 Maneuver 1399 - - 1486 - - 633 589 1013 625 630 953 Stage 1 - - - - - - 891 802 - 860 779 - Stage 2 - - - - - - 798 725 - 811 780 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 1399 - - 1486 - - 577 567 1013 517 607 953 Mov Cap-2 Maneuver - - - - - - 577 567 - 517 607 - Stage 1 - - - - - - 871 784 - 841 767 - Stage 2 - - - - - - 737 714 - 680 763 - Approach EB WB NB SB HCM Control Delay, s 2.2 0.8 12 11.2 HCM LOS B B Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT EBR WBL WBT WBR SBLn1 SBLn2 Capacity (veh/h) 577 624 1399 - - 1486 - - 517 773 HCM Lane V/C Ratio 0.048 0.192 0.021 - - 0.013 - - 0.089 0.071 HCM Control Delay (s) 11.6 12.1 7.6 0 - 7.5 0 - 12.6 10 HCM Lane LOS B B A A - A A - B B HCM 95th %tile Q(veh) 0.1 0.7 0.1 - - 0 - - 0.3 0.2 Broadhead and Holscher ICE Study Year 2020 1:39 pm 07/21/2020 Synchro 11 Report SRF Consulting Group Page 1 Packet Pg. 144 4.1.c HCM 6th TWSC 8: Holscher Road (PM) & Broadhead Street 07/21/2020 Intersection Int Delay, s/veh 5.5 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Lane Configurations Traffic Vol, veh/h 29 78 44 20 79 25 20 48 18 40 51 24 Future Vol, veh/h 29 78 44 20 79 25 20 48 18 40 51 24 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length - - 100 - - 100 100 - - 100 - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 96 96 96 96 96 96 96 96 96 96 96 96 Heavy Vehicles, % 2 2 2 1 1 1 4 4 4 3 3 3 Mvmt Flow 30 81 46 21 82 26 21 50 19 42 53 25 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 108 0 0 127 0 0 317 291 81 323 311 82 Stage 1 - - - - - - 141 141 - 124 124 - Stage 2 - - - - - - 176 150 - 199 187 - Critical Hdwy 4.12 - - 4.11 - - 7.14 6.54 6.24 7.13 6.53 6.23 Critical Hdwy Stg 1 - - - - - - 6.14 5.54 - 6.13 5.53 - Critical Hdwy Stg 2 - - - - - - 6.14 5.54 - 6.13 5.53 - Follow-up Hdwy 2.218 - - 2.209 - - 3.536 4.036 3.336 3.527 4.027 3.327 Pot Cap-1 Maneuver 1483 - - 1465 - - 632 616 973 628 602 975 Stage 1 - - - - - - 857 776 - 878 791 - Stage 2 - - - - - - 821 769 - 801 743 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 1483 - - 1465 - - 557 593 973 560 580 975 Mov Cap-2 Maneuver - - - - - - 557 593 - 560 580 - Stage 1 - - - - - - 838 759 - 859 779 - Stage 2 - - - - - - 734 757 - 718 727 - Approach EB WB NB SB HCM Control Delay, s 1.4 1.2 11.2 11.4 HCM LOS B B Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT EBR WBL WBT WBR SBLn1 SBLn2 Capacity (veh/h) 557 664 1483 - - 1465 - - 560 666 HCM Lane V/C Ratio 0.037 0.104 0.02 - - 0.014 - - 0.074 0.117 HCM Control Delay (s) 11.7 11 7.5 0 - 7.5 0 - 11.9 11.1 HCM Lane LOS B B A A - A A - B B HCM 95th %tile Q(veh) 0.1 0.3 0.1 - - 0 - - 0.2 0.4 Broadhead and Holscher ICE Study Year 2020 1:39 pm 07/21/2020 Synchro 11 Report SRF Consulting Group Page 2 Packet Pg. 145 4.1.c HCM 6th AWSC 3: Holscher Road (AM) & Broadhead Street 07/21/2020 Intersection Intersection Delay, s/veh 11.6 Intersection LOS B Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 40 75 35 45 175 130 30 95 30 55 25 45 Future Vol, veh/h 40 75 35 45 175 130 30 95 30 55 25 45 Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 Heavy Vehicles, % 2 2 2 8 8 8 1 1 1 4 4 4 Mvmt Flow 50 94 44 56 219 163 38 119 38 69 31 56 Number of Lanes 0 1 1 0 1 1 1 1 0 1 1 0 Approach EB WB NB SB Opposing Approach WB EB SB NB Opposing Lanes 2 2 2 2 Conflicting Approach Left SB NB EB WB Conflicting Lanes Left 2 2 2 2 Conflicting Approach Right NB SB WB EB Conflicting Lanes Right 2 2 2 2 HCM Control Delay 10.8 12.5 11.3 10.4 HCM LOS B B B B Lane NBLn1 NBLn2 EBLn1 EBLn2 WBLn1 WBLn2 SBLn1 SBLn2 Vol Left, % 100% 0% 35% 0% 20% 0% 100% 0% Vol Thru, % 0% 76% 65% 0% 80% 0% 0% 36% Vol Right, % 0% 24% 0% 100% 0% 100% 0% 64% Sign Control Stop Stop Stop Stop Stop Stop Stop Stop Traffic Vol by Lane 30 125 115 35 220 130 55 70 LT Vol 30 0 40 0 45 0 55 0 Through Vol 0 95 75 0 175 0 0 25 RT Vol 0 30 0 35 0 130 0 45 Lane Flow Rate 38 156 144 44 275 162 69 88 Geometry Grp 7 7 7 7 7 7 7 7 Degree of Util (X) 0.073 0.274 0.257 0.067 0.468 0.24 0.136 0.15 Departure Headway (Hd) 7.001 6.322 6.43 5.543 6.121 5.31 7.123 6.157 Convergence, Y/N Yes Yes Yes Yes Yes Yes Yes Yes Cap 511 567 558 644 589 674 503 581 Service Time 4.755 4.076 4.184 3.296 3.865 3.053 4.88 3.913 HCM Lane V/C Ratio 0.074 0.275 0.258 0.068 0.467 0.24 0.137 0.151 HCM Control Delay 10.3 11.5 11.4 8.7 14.2 9.7 11 10 HCM Lane LOS B B B A B A B A HCM 95th-tile Q 0.2 1.1 1 0.2 2.5 0.9 0.5 0.5 Broadhead and Holscher ICE Study Year 2030 1:39 pm 07/21/2020 AWSC Synchro 11 Report SRF Consulting Group Page 1 Packet Pg. 146 4.1.c HCM 6th AWSC 8: Holscher Road (PM) & Broadhead Street 07/21/2020 Intersection Intersection Delay, s/veh 11.9 Intersection LOS B Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 50 200 60 45 170 50 35 65 50 95 65 40 Future Vol, veh/h 50 200 60 45 170 50 35 65 50 95 65 40 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Heavy Vehicles, % 2 2 2 1 1 1 4 4 4 3 3 3 Mvmt Flow 52 208 63 47 177 52 36 68 52 99 68 42 Number of Lanes 0 1 1 0 1 1 1 1 0 1 1 0 Approach EB WB NB SB Opposing Approach WB EB SB NB Opposing Lanes 2 2 2 2 Conflicting Approach Left SB NB EB WB Conflicting Lanes Left 2 2 2 2 Conflicting Approach Right NB SB WB EB Conflicting Lanes Right 2 2 2 2 HCM Control Delay 12.9 12.2 10.7 11 HCM LOS B B B B Lane NBLn1 NBLn2 EBLn1 EBLn2 WBLn1 WBLn2 SBLn1 SBLn2 Vol Left, % 100% 0% 20% 0% 21% 0% 100% 0% Vol Thru, % 0% 57% 80% 0% 79% 0% 0% 62% Vol Right, % 0% 43% 0% 100% 0% 100% 0% 38% Sign Control Stop Stop Stop Stop Stop Stop Stop Stop Traffic Vol by Lane 35 115 250 60 215 50 95 105 LT Vol 35 0 50 0 45 0 95 0 Through Vol 0 65 200 0 170 0 0 65 RT Vol 0 50 0 60 0 50 0 40 Lane Flow Rate 36 120 260 62 224 52 99 109 Geometry Grp 7 7 7 7 7 7 7 7 Degree of Util (X) 0.073 0.211 0.448 0.093 0.389 0.079 0.194 0.19 Departure Headway (Hd) 7.171 6.352 6.196 5.385 6.251 5.435 7.047 6.268 Convergence, Y/N Yes Yes Yes Yes Yes Yes Yes Yes Cap 498 563 581 663 573 657 508 570 Service Time 4.936 4.117 3.95 3.139 4.007 3.19 4.81 4.03 HCM Lane V/C Ratio 0.072 0.213 0.448 0.094 0.391 0.079 0.195 0.191 HCM Control Delay 10.5 10.8 13.9 8.7 13 8.7 11.5 10.5 HCM Lane LOS B B B A B A B B HCM 95th-tile Q 0.2 0.8 2.3 0.3 1.8 0.3 0.7 0.7 Broadhead and Holscher ICE Study Year 2030 1:39 pm 07/21/2020 AWSC Synchro 11 Report SRF Consulting Group Page 2 Packet Pg. 147 4.1.c HCM 6th Signalized Intersection Summary 3: Holscher Road (AM) & Broadhead Street 07/21/2020 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 40 75 35 45 175 130 30 95 30 55 25 45 Future Volume (veh/h) 40 75 35 45 175 130 30 95 30 55 25 45 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1781 1781 1781 1885 1885 1885 1841 1841 1841 Adj Flow Rate, veh/h 50 94 44 56 219 162 38 119 38 69 31 56 Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 Percent Heavy Veh, % 2 2 2 8 8 8 1 1 1 4 4 4 Cap, veh/h 335 449 538 279 503 513 587 306 98 530 131 237 Arrive On Green 0.34 0.34 0.34 0.34 0.34 0.34 0.22 0.22 0.22 0.22 0.22 0.22 Sat Flow, veh/h 294 1322 1585 201 1481 1510 1321 1369 437 1210 588 1062 Grp Volume(v), veh/h 144 0 44 275 0 162 38 0 157 69 0 87 Grp Sat Flow(s),veh/h/ln 1616 0 1585 1682 0 1510 1321 0 1806 1210 0 1650 Q Serve(g_s), s 0.0 0.0 0.4 0.0 0.0 1.6 0.5 0.0 1.5 1.1 0.0 0.9 Cycle Q Clear(g_c), s 1.1 0.0 0.4 2.5 0.0 1.6 1.4 0.0 1.5 2.6 0.0 0.9 Prop In Lane 0.35 1.00 0.20 1.00 1.00 0.24 1.00 0.64 Lane Grp Cap(c), veh/h 784 0 538 782 0 513 587 0 403 530 0 368 V/C Ratio(X) 0.18 0.00 0.08 0.35 0.00 0.32 0.06 0.00 0.39 0.13 0.00 0.24 Avail Cap(c_a), veh/h 3194 0 3195 3494 0 3043 2185 0 2588 1994 0 2363 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 4.9 0.0 4.6 5.3 0.0 5.0 7.1 0.0 6.8 7.9 0.0 6.6 Incr Delay (d2), s/veh 0.1 0.0 0.1 0.3 0.0 0.4 0.0 0.0 0.6 0.1 0.0 0.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(95%),veh/ln 0.4 0.0 0.1 0.8 0.0 0.4 0.2 0.0 0.7 0.3 0.0 0.4 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 5.0 0.0 4.7 5.6 0.0 5.4 7.2 0.0 7.4 8.0 0.0 6.9 LnGrp LOS A A A A A A A A A A A A Approach Vol, veh/h 188 437 195 156 Approach Delay, s/veh 4.9 5.5 7.4 7.4 Approach LOS A A A A Timer - Assigned Phs 2 4 6 8 Phs Duration (G+Y+Rc), s 11.5 9.1 11.5 9.1 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 41.5 29.5 41.5 29.5 Max Q Clear Time (g_c+I1), s 3.1 4.6 4.5 3.5 Green Ext Time (p_c), s 1.2 0.7 2.5 1.0 Intersection Summary HCM 6th Ctrl Delay 6.1 HCM 6th LOS A Broadhead and Holscher ICE Study Year 2030 1:39 pm 07/21/2020 Traffic Signal Synchro 11 Report SRF Consulting Group Page 1 Packet Pg. 148 4.1.c HCM 6th Signalized Intersection Summary 8: Holscher Road (PM) & Broadhead Street 07/21/2020 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 50 200 60 45 170 50 35 65 50 95 65 40 Future Volume (veh/h) 50 200 60 45 170 50 35 65 50 95 65 40 Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1885 1885 1885 1841 1841 1841 1856 1856 1856 Adj Flow Rate, veh/h 52 208 62 47 177 52 36 68 52 99 68 42 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 2 2 2 1 1 1 4 4 4 3 3 3 Cap, veh/h 280 478 494 283 477 498 596 232 177 589 257 159 Arrive On Green 0.31 0.31 0.31 0.31 0.31 0.31 0.24 0.24 0.24 0.24 0.24 0.24 Sat Flow, veh/h 208 1533 1585 210 1532 1598 1263 968 740 1262 1073 663 Grp Volume(v), veh/h 260 0 62 224 0 52 36 0 120 99 0 110 Grp Sat Flow(s),veh/h/ln 1741 0 1585 1741 0 1598 1263 0 1708 1262 0 1736 Q Serve(g_s), s 0.0 0.0 0.6 0.0 0.0 0.5 0.5 0.0 1.2 1.4 0.0 1.0 Cycle Q Clear(g_c), s 2.2 0.0 0.6 1.9 0.0 0.5 1.5 0.0 1.2 2.5 0.0 1.0 Prop In Lane 0.20 1.00 0.21 1.00 1.00 0.43 1.00 0.38 Lane Grp Cap(c), veh/h 758 0 494 760 0 498 596 0 409 589 0 416 V/C Ratio(X) 0.34 0.00 0.13 0.29 0.00 0.10 0.06 0.00 0.29 0.17 0.00 0.26 Avail Cap(c_a), veh/h 3598 0 3202 3575 0 3227 2215 0 2597 2206 0 2641 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 5.5 0.0 4.9 5.4 0.0 4.9 6.8 0.0 6.2 7.3 0.0 6.2 Incr Delay (d2), s/veh 0.3 0.0 0.1 0.2 0.0 0.1 0.0 0.0 0.4 0.1 0.0 0.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(95%),veh/ln 0.7 0.0 0.2 0.6 0.0 0.1 0.1 0.0 0.4 0.4 0.0 0.4 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 5.8 0.0 5.1 5.6 0.0 5.0 6.8 0.0 6.6 7.4 0.0 6.5 LnGrp LOS A A A A A A A A A A A A Approach Vol, veh/h 322 276 156 209 Approach Delay, s/veh 5.6 5.5 6.7 6.9 Approach LOS A A A A Timer - Assigned Phs 2 4 6 8 Phs Duration (G+Y+Rc), s 10.7 9.3 10.7 9.3 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 40.5 30.5 40.5 30.5 Max Q Clear Time (g_c+I1), s 4.2 4.5 3.9 3.5 Green Ext Time (p_c), s 2.0 1.0 1.7 0.8 Intersection Summary HCM 6th Ctrl Delay 6.1 HCM 6th LOS A Broadhead and Holscher ICE Study Year 2030 1:39 pm 07/21/2020 Traffic Signal Synchro 11 Report SRF Consulting Group Page 2 Packet Pg. 149 4.1.c HCM 6th Roundabout 3: Holscher Road (AM) & Broadhead Street 07/21/2020 Intersection Intersection Delay, s/veh 6.5 Intersection LOS A Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Approach EB WB NB SB Entry Lanes 1 1 1 1 Conflicting Circle Lanes 1 1 1 1 Adj Approach Flow, veh/h 188 437 195 156 Demand Flow Rate, veh/h 192 472 196 162 Vehicles Circulating, veh/h 164 209 219 335 Vehicles Exiting, veh/h 333 206 137 346 Ped Vol Crossing Leg, #/h 0 0 0 0 Ped Cap Adj 1.000 1.000 1.000 1.000 Approach Delay, s/veh 4.8 8.4 5.0 5.3 Approach LOS A A A A Lane Left Left Left Left Designated Moves LTR LTR LTR LTR Assumed Moves LTR LTR LTR LTR RT Channelized Lane Util 1.000 1.000 1.000 1.000 Follow-Up Headway, s 2.800 2.800 2.800 2.800 Critical Headway, s 4.200 4.200 4.200 4.200 Entry Flow, veh/h 192 472 196 162 Cap Entry Lane, veh/h 1132 1093 1084 991 Entry HV Adj Factor 0.980 0.927 0.994 0.962 Flow Entry, veh/h 188 437 195 156 Cap Entry, veh/h 1109 1013 1078 953 V/C Ratio 0.170 0.432 0.181 0.164 Control Delay, s/veh 4.8 8.4 5.0 5.3 LOS A A A A 95th %tile Queue, veh 1 2 1 1 Broadhead and Holscher ICE Study Year 2030 1:39 pm 07/21/2020 Roundabout Synchro 11 Report SRF Consulting Group Page 1 Packet Pg. 150 4.1.c HCM 6th Roundabout 8: Holscher Road (PM) & Broadhead Street 07/21/2020 Intersection Intersection Delay, s/veh 5.8 Intersection LOS A Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin apartments) Approach EB WB NB SB Entry Lanes 1 1 1 1 Conflicting Circle Lanes 1 1 1 1 Adj Approach Flow, veh/h 322 276 156 209 Demand Flow Rate, veh/h 328 279 162 215 Vehicles Circulating, veh/h 219 161 367 263 Vehicles Exiting, veh/h 259 368 180 177 Ped Vol Crossing Leg, #/h 0 0 0 0 Ped Cap Adj 1.000 1.000 1.000 1.000 Approach Delay, s/veh 6.4 5.5 5.5 5.5 Approach LOS A A A A Lane Left Left Left Left Designated Moves LTR LTR LTR LTR Assumed Moves LTR LTR LTR LTR RT Channelized Lane Util 1.000 1.000 1.000 1.000 Follow-Up Headway, s 2.800 2.800 2.800 2.800 Critical Headway, s 4.200 4.200 4.200 4.200 Entry Flow, veh/h 328 279 162 215 Cap Entry Lane, veh/h 1084 1134 966 1048 Entry HV Adj Factor 0.981 0.990 0.965 0.972 Flow Entry, veh/h 322 276 156 209 Cap Entry, veh/h 1064 1123 932 1018 V/C Ratio 0.302 0.246 0.168 0.205 Control Delay, s/veh 6.4 5.5 5.5 5.5 LOS A A A A 95th %tile Queue, veh 1 1 1 1 Broadhead and Holscher ICE Study Year 2030 1:39 pm 07/21/2020 Roundabout Synchro 11 Report SRF Consulting Group Page 2 Packet Pg. 151 Packet Pg. 152 4.1.c Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin Packet Pg. 153 4.1.c Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin Packet Pg. 154 4.1.c Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin Packet Pg. 155 4.1.c Attachment: Petitioner - Palatine Parking and Traffic Narrative (874-920 N. Quentin Road - Quentin 4.1.d PALATINE APARTMENTS 40 UNIT APARTMENT BUILDING NORTH QUENTIN ROAD PALATINE, IL 60067 ABBREVIATIONS GRAPHIC SYMBOLS PROJECT INFO CONTACTS SHEET INDEX @ A.B. AT ANCHOR BOLT LLH LLV LONG LEG HORIZONTAL LONG LEG VERTICAL PROJECT: PALATINE APARTMENTS ADDRESS: N. QUENTIN RD., PALATINE, IL 60067 ARCHITECT: T-1.1 TITLE SHEET ARCHITECTURAL NORTH ARROW Knothe & Bruce Architects, LLC A/C AIR CONDITIONER LS## LAZY SUSAN WORK DESCRIPTION: 2-STORY, 40 UNIT APARTMENT BUILDINGS W/ BASEMENT ACCESS. ACCESSIBLE LVP LUXURY VINYL PLANK PARKING 7601 University Avenue, Suite 201 A-1.1 ELEVATION AND FLOOR PLANS ACT ACOUSTICAL CEILING TILE LVT LUXURY VINYL TILE Middleton, WI 53562 SITE ADJ. ADJACENT MATL. MATERIAL X A-3.1 BUILDING SECTION ADJ. R. & S. ADJUSTABLE ROD AND SHELF MAX. MAXIMUM APPLICABLE CODES AND STANDARDS: Contact: Kevin Burow A.F.F. ABOVE FINISH FLOOR MC MEDICINE CABINET INTERNATIONAL BUILDING CODE (IBC) 2009 Phone: (608) 836-3690 PLAT OF SURVEY MATERIAL BOARD AL ALUMINUM MECH. MECHANICAL X A-X.X X INTERIOR ELEVATIONS C-0.1 EXISTING CONDITIONS PLAN ADA 2010, ICC/ANSI A117.1-2009 E-mail: kburow@knothebruce.com ALT. ALTERNATE MFR. MANUFACTURER('S) NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 13 AND 13R C-1.1 SITE PLAN ALUM. ALUMINUM MH. MANHOLE X C-2.1 GRADING AND EROSION CONTROL PLAN APPROX. APPROXIMATE MIN. MINIMUM B## BASE CABINET M.O. MASONRY OPENING BUILDING SUMMARY: C-2.2 GRADING PLAN - NORTH BD. BOARD MOD. MODULE X RESIDENTIAL, GROUP R-2, VA CONSTRUCTION, WOOD FRAMED C-2.3 GRADING PLAN - CENTER BIT. BITUMINOUS M.R. MOISTURE RESISTANT DETAIL CALLOUT STORAGE GROUP S-2, 1 LEVEL BASEMENT PARKING DEVELOPER: C-2.4 GRADING PLAN - SOUTH Attachment: Petitioner - 2021-09-27 COMBINED DRAWINGS (874-920 N. Quentin Road - Quentin apartments) A-X.X BLDG. BUILDING MTL. METAL Northpointe Development C-3.1 UTILITY PLAN BRG. BEARING N.I.C. NOT IN CONTRACT CAB. CABINET N.T.S. NOT TO SCALE BUILDING HEIGHT & AREAS: 230 Ohio St., Ste. 200 ISSUED CJ CONTROL JOINT O.C. ON CENTER R-2 MODIFIED ALLOWABLE HEIGHT=(VA) 4 STORIES Oshkosh, WI 54902 Reissued City Submittal - September 27, 2021 CLG. CEILING O.D. OVERFLOW DRAIN BUILDING HEIGHT = 2 STORIES Contact: Sean O'Brien L1.0 LANDSCAPE PLAN CMU CONCRETE MASONRY UNIT O.S.B. ORIENTED STRAND BOARD X SECTION CUT R-2/A MODIFIED ALLOWABLE AREA (VA) = 21,000 SF Phone: (608) 332-5665 SITE AND LANDSCAPE PLAN COL. COLUMN OPP. OPPOSITE HAND A-X.X COMN. COMMUNICATION P.C. PRECAST CONCRETE CONT. CONTINUOUS P.D.F. POWER DRIVEN FASTENER FLOOR AREAS: CORR. CORRIDOR PLBG. PLUMBING BASEMENT FLOOR (R-2) = 25,891SF CPT CARPET P.T. PRESSURE TREATED COMMON SPACE = 1,988 SF CT CERAMIC TILE PLWD. PLYWOOD X 1ST FLOOR (R-2) = 11,587 + 11,361 SF D DB## DRYER DRAWER BASE CABINET PSF PSI POUNDS PER SQUARE FOOT POUNDS PER SQUARE INCH A-X.X EXTERIOR ELEVATION 2ND FLOOR (R-2) = TOTAL AREA: 11,587 + 11,361 SF 73,775 SF CIVIL ENGINEER: D.F. DRINKING FOUNTAIN Q.T. QUARRY TILE (INCL BASEMENT) Vierbicher Associates, Inc. DIA. DIAMETER ##R NUMBER OF STAIR RISERS 999 Fourier Drive, Ste 201 DIM. DIMENSION R.D. ROOF DRAIN DN DOWN REINF. REINFORCING OR REINFORCED Madison, WI 53717 D.S. DOWN SPOUT REM. REMOVABLE X COLUMN FIRE RATINGS: Contact:Justin Zampardi D.T. DRAIN TILE REQ'D. REQUIRED REFERENCE GRID STRUCTURAL FRAME = 1 HR, 2 HR (S-2) Phone: (608) 821-5970 DW DISHWASER R.O. ROUGH OPENING EXTERIOR WALLS = 1 HR EA. EACH R. & S. ROD AND SHELF BEARING WALLS = 1 HR, 2 HR (S-2) E-mail: jzam@vierbicher.com ELEC. ELECTRIC SB## SINK BASE CABINET FLOOR CONSTRUCTION = 2 HR ABOVE S-2 ELEV. ELEVATION OR ELEVATOR SCW SOLID CORE WOOD FLOOR CONSTRUCTION = 1 HR ABOVE R-2 EJ EXPANSION JOINT SF SQUARE FEET ROOF CONSTRUCTION = 1 HR EQ. EQUAL SH. SHELF OR SHELVES X WALL TYPE STAIR ENCLOSURES = 2 HR E.W.C. ELECTRIC WATER COOLER SIM. SIMILAR ELEVATOR SHAFT = 2 HR EXIST. EXISTING S.M. SHEET METAL CORRIDOR WALLS = 1/2 HR MIN. EXP. EXPANSION SPECS. SPECIFICATIONS UNIT SEPARATIONS = 1 HR EXT. F.E. EXTERIOR FIRE EXTINGUISHER SQ. STD. SQUARE STANDARD FIRE WALL = 2 HR LANDSCAPE DESIGNER: FEC FIRE EXTINGUISHER CABINET STL. STEEL DOOR TAG Vierbicher Associates, Inc. 0000 F.D. FLOOR DRAIN STOR. STORAGE 999 Fourier Drive, Ste 201 FIN. FINISHED S.V. SHEET VINYL FLOORING Madison, WI 53717 FLR. FLOOR ##T NUMBER OF STAIR TREADS Contact:Justin Zampardi FNDN. FOUNDATION T&B TOP AND BOTTOM PROJECT TITLE Phone: (608) 821-5970 F.O.C. F.O.M. F.O.S. FACE OF CONCRETE FACE OF MASONRY FACE OF STUD T&G T.B. TBM TONGUE AND GROOVE TOP OF BEAM TRAFFIC BEARING MEMBRANE X WINDOW TAG E-mail: jzam@vierbicher.com Palatine, IL F.R.P. FT. FTG. FIBERGLASS REINFORCED PANEL FOOT OR FEET FOOTING T.O.A. T.O.CMU T.O.F. TOP OF COLUMN TOP OF CMU TOP OF FOOTING Site Concept GA. GAUGE T.O.L. TOP OF LEDGE G.C. GENERAL CONTRACTOR T.O.P. TOP OF PIER ALUM. / WOOD WINDOW G.T. G.W.B. GYP. GIRDER TRUSS GYPSUM WALL BOARD GYPSUM T.O.W. THRU. TWF TOP OF WALL THROUGH THROUGH WALL FLASHING ALX WDX TAG Northpointe H.B. HCW HGT. HOSE BIB HOLLOW CORE WOOD HEIGHT TYP. UNEXC. U.N.O. TYPICAL UNEXCAVATED UNLESS NOTED OTHERWISE X Development H.M. HOLLOW METAL VB## VANITY BASE CABINET REVISION CLOUD & TAG HORZ. HORIZONTAL VCT VINYL COMPOSITION TILE HR HOUR VERT. VERTICAL HTG. HEATING VWC VINYL WALL COVERING HVAC HEATING/VENTILATION/AIR CONDITIONING W WASHER IBC INTERNATIONAL BUILDING CODE W## WALL CABINET IFC INTERNATIONAL FIRE CODE WCC## WALL CORNER CABINET EXTERIAL FINISH MATERIAL IMC INTERNATIONAL MECHANICAL CODE W/ WITH X TAG INSUL. INSULATION WD. WOOD INT. INTERIOR W/D STACKED WASHER / DRYER INV. INVERT W.H. WATER HEATER JT. JOINT W/O WITHOUT LAV. LAVATORY WP WATERPROOF WT WEIGHT W.W.F. WIRE WELDED FABRIC N. Quentin Rd SHEET TITLE Title Sheet SHEET NUMBER T-1.1 PROJECT NO. 2133 © Knothe & Bruce Architects, LLC Packet Pg. 156 Packet Pg. 157 4.1.d Attachment: Petitioner - 2021-09-27 COMBINED DRAWINGS (874-920 N. Quentin Road - Quentin apartments) Packet Pg. 158 4.1.d Attachment: Petitioner - 2021-09-27 COMBINED DRAWINGS (874-920 N. Quentin Road - Quentin apartments) 4.1.d Attachment: Petitioner - 2021-09-27 COMBINED DRAWINGS (874-920 N. Quentin Road - Quentin apartments) ISSUED Reissued City Submittal - September 27, 2021 20' SETBACK 8' TALL PRIVACY FENCE 15 PARKING STALLS 10 VISITOR STALLS 13 PARKING STALLS FIRE TRUCK HAMMER 9' 8' 8' 8' 8' 5' HEAD W. POPLAR STREET FENCED PLAY AREA 40' X 30' RETAINING WALL RETAINING WALL STORMWATER PROPOSED APARTMENT BUILDING PROPOSED APARTMENT BUILDING 10' SETBACK UNDERGROUND 20 UNIT COMMON AREA 20 UNIT GARAGE 28 UNDERGROUND STALLS 28 UNDERGROUND STALLS PARKING ENTRY STORMWATER 2 STORIES - 26' TO ROOF PARAPET 2 STORIES - 26' TO ROOF PARAPET 30' PROJECT TITLE 20' SETBACK SETBACK Palatine, IL 20' SETBACK MONUMENT Site Concept SIGN Northpointe N. QUENTIN ROAD Development 38 SURFACE PARKING STALLS 56 UNDERGROUND PARKING STALLS 94 TOTAL PARKING STALLS N. Quentin Rd SHEET TITLE Site Plan SHEET NUMBER 1 C-1.1 SITE PLAN 1" = 30'-0" 0 GRAPHIC SCALE 30 60 90 C-1.1 1 INCH =30 FT (24X36 SHEET) PROJECT NO. 2133 © Knothe & Bruce Architects, LLC Packet Pg. 159 Packet Pg. 160 4.1.d Attachment: Petitioner - 2021-09-27 COMBINED DRAWINGS (874-920 N. Quentin Road - Quentin apartments) Packet Pg. 161 4.1.d Attachment: Petitioner - 2021-09-27 COMBINED DRAWINGS (874-920 N. Quentin Road - Quentin apartments) Packet Pg. 162 4.1.d Attachment: Petitioner - 2021-09-27 COMBINED DRAWINGS (874-920 N. Quentin Road - Quentin apartments) Packet Pg. 163 4.1.d Attachment: Petitioner - 2021-09-27 COMBINED DRAWINGS (874-920 N. Quentin Road - Quentin apartments) Packet Pg. 164 4.1.d Attachment: Petitioner - 2021-09-27 COMBINED DRAWINGS (874-920 N. Quentin Road - Quentin apartments) Packet Pg. 165 4.1.d Attachment: Petitioner - 2021-09-27 COMBINED DRAWINGS (874-920 N. Quentin Road - Quentin apartments) 4.1.d N 8’ Tall Privacy Fence and Evergreen Screening W Poplar Street Fenced Play Area 9 Stalls Proposed Apartment Building Common Proposed Apartment Building Area Stormwater Stormwater Attachment: Petitioner - 2021-09-27 COMBINED DRAWINGS (874-920 N. Quentin Road - Quentin apartments) Document Path: M:\Northpointe Development\210032_Palatine IL\LandArch\Site Rendering Monument Sign N Quentin Road 0 20 40 80 Feet Site and Landscape Plan Palatine, Ill September 27, 2021 Packet Pg. 166 4.1.d THREE BEDROOM 1,210 SF STAIR ONE BEDROOM 780 SF ONE BEDROOM 780 SF STAIR TWO BEDROOM 1,130 SF STAIR TWO BEDROOM 1,266 SF THREE BEDROOM 1,266 SF STAIR TWO BEDROOM 1,130 SF STAIR ONE BEDROOM 780 SF ONE BEDROOM 780 SF STAIR THREE BEDROOM 1,210 SF ROOF BELOW THREE BEDROOM 1,210 SF STAIR ONE BEDROOM 780 SF ONE BEDROOM 780 SF STAIR TWO BEDROOM 1,130 SF STAIR TWO BEDROOM 1,122 SF TWO BEDROOM 1,180 SF STAIR ONE BEDROOM 780 SF STAIR ONE BEDROOM 780 SF ONE BEDROOM 780 SF STAIR THREE BEDROOM 1,210 SF 4 SECOND FLOOR PLAN A-1.1 1/8" = 1'-0" THREE BEDROOM STAIR ONE BEDROOM ONE BEDROOM STAIR TWO BEDROOM STAIR TWO BEDROOM THREE BEDROOM STAIR TWO BEDROOM STAIR ONE BEDROOM ONE BEDROOM STAIR THREE BEDROOM Attachment: Petitioner - 2021-09-27 COMBINED DRAWINGS (874-920 N. Quentin Road - Quentin apartments) 1,210 SF 780 SF 780 SF 1,130 SF 1,210 SF 1,266 SF 1,130 SF 780 SF 780 SF 1,210 SF ISSUED Reissued City Submittal - September 27, 2021 COMMON AREA 1,988 SF THREE BEDROOM 1,210 SF STAIR ONE BEDROOM 780 SF ONE BEDROOM 780 SF STAIR TWO BEDROOM 1,130 SF STAIR TWO BEDROOM 1,210 SF TWO BEDROOM 1,180 SF STAIR ONE BEDROOM 780 SF STAIR ONE BEDROOM 780 SF ONE BEDROOM 780 SF STAIR THREE BEDROOM 1,210 SF 3 FIRST FLOOR PLAN 18 ONE BEDROOM UNITS A-1.1 1/8" = 1'-0" 12 TWO BEDROOM UNITS 10 THREE BEDROOM UNITS 40 TOTAL UNITS PROJECT TITLE Palatine, IL MECH 29 28 STAIR 27 26 25 24 23 STAIR 22 21 20 19 STAIR 18 17 16 BIKES 15 14 13 STAIR 12 11 10 9 STAIR 8 7 6 5 4 STAIR 3 2 1 MECH Site Concept STORAGE Northpointe BASEMENT GARAGE Development 60 STALLS 25,891 SF MECH 30 31 STAIR 32 33 34 35 36 STAIR 37 38 39 40 STAIR 41 42 43 44 45 46 STAIR 47 48 49 STAIR 50 51 52 53 54 STAIR 55 56 TRASH STORAGE N. Quentin Rd 2 BASEMENT FLOOR PLAN SHEET TITLE A-1.1 1/8" = 1'-0" Elevation And Floor Plans SHEET NUMBER A-1.1 1 EXTERIOR ELEVATION 1/8" = 1'-0" A-1.1 PROJECT NO. 2133 © Knothe & Bruce Architects, LLC Packet Pg. 167 4.1.d PITCHED ROOF SYSTEM (1 HR): · MEMBRANE ROOF - SEE GENERAL NOTES FOR IFA REQUIREMENTS · ROOF INSULATION - R-49 MIN Attachment: Petitioner - 2021-09-27 COMBINED DRAWINGS (874-920 N. Quentin Road - Quentin apartments) ·1/2" OSB SHEATHING · ENGINEERED ROOF TRUSSES @ 24" O.C. · 6 MIL POLY VAPOR BARRIER ISSUED ·1/2" RESILIENT CHANNELS @ 12" O.C. Reissued City Submittal - September 27, 2021 · (1) LAYER 5/8" TYPE 'C' GYP. BOARD SECURED WITH 1" MAX. SCREWS SMOKE TRUSS COMPARTMENTALIZATION ABOVE PARTY WALL. 1/2" GYP. BOARD OR O.S.B. ONE SIDE OF TRUSS, EAVE TO EAVE. -SEE SHEET A-1.4 FOR LOCATIONS -SEE I.B.C. SECTION 718.4.2 EXCEPTION (3) FOR ADDITIONAL INFO. TYPICAL RAILING SYSTEM: · ALUMINUM · RAILING SUPPLIER TO PROVIDE ATTACHMENT DETAILS FOR REVIEW · SEE I.B.C. SECT. 1013 FOR ADDITIONAL INFORMATION R21 MIN. SPRAY-FOAM INSULATION @ EXTERIOR WALL WITHIN TRUSS CAVITY, TYP. TYPICAL SECOND & THIRD FLOOR SYSTEM (U.L. L521 1-HR) · 1" GYPSUM CONCRETE W/ 1/4" SOUND MAT THROUGHOUT TYPICAL CORRIDOR FLOOR SYSTEM (U.L. L512 1-HR) · 3/4" T&G PLYWOOD SUB-FLOOR GLUED AND NAILED ·1" GYPSUM CONCRETE W/ 1/4" SOUND MAT · ENGINEERED FLOOR TRUSSES · 3 1/2" (MAX.) SOUND INSULATION (NOT SHOWN) · 3/4" T&G PLYWOOD SUB-FLOOR GLUED AND NAILED CORRIDOR · RESILIENT CHANNEL AT 16" O.C., MAX. 5'-6" · 2x10 JOISTS W/ CROSS BRIDGING 9'-118" · 5/8" TYPE 'C' GYP. BD. 1 HOUR · 5/8" TYPE 'C' GYP. BD. (SEE UL SYSTEM FOR SCREW REQUIREMENTS) 7'-0" (SEE UL SYSTEM FOR SCREW REQUIREMENTS) 26'-0" 2'-6" TYPICAL EXTERIOR BALCONY: 10" · 5/4x6 TREATED DECK BOARDS 2'-034" TYPICAL EXTERIOR WALL (1 HR.): PROJECT TITLE Palatine, IL · TREATED JOISTS. SEE FRAMING PLANS · HORIZONTAL SIDING OR BRICK VENEER w/ · EXTEND SPRINKLER PROTECTION TO BALCONIES MASONRY TIES @ 16" O.C. HORIZ. & 24" O.C. VERT. A.C.T. · BUILDING WRAP ("TYVEK" OR EQUIV.) TYPICAL DROPPED CORRIDOR CEILING: (INSTALLED BELOW RATED CEILING ASSEMBLY) CEILING · 7/16" O.S.B. SHEATHING, SEE STRUCTURAL ·· (CONTINUE TO TOP OF PARAPET FRAMING, TYP.) Site Concept · NON-COMBUSTIBLE CONSTRUCTION UNLESS SPACE 5'-6" · R-5 1" RIGID INSULATION ABOVE DROPPED CEILING IS SPRINKLERED 10'-378" CORRIDOR · 2x6 STUDS @ 16" O.C. 9'-118" Northpointe · ACOUSTIC CEILING TILE 1 HOUR · R-20 BATT INSULATION TYPICAL FIRST FLOOR SYSTEM (2 HR.) 6'-8" · FINISHED FLOORING · 6 MIL POLY VAPOR RETARDER 1 · 5/8" TYPE 'X' GYP. BOARD Development · 3" STRUCTURAL CONCRETE (SEE U.L. # U356 FOR ADDITIONAL DETAILS) TOPPING A-4.6 · PRECAST CONCRETE PLANK (2 HR) 2'-6" 8'-4" CLEAR HEADROOM MIN. TYPICAL GARAGE FLOOR SYSTEM: CAST IN PLACE FOUNDATION WALLS: ·4" CONCRETE SLAB ·R-10 MIN. DRAINAGE BOARD ·6 x 6 x W1.4 x W1.4 W.W.F ·FOUNDATION WATERPROOFING TO PARKING GARAGE ·10 MIL POLY VAPOR BARRIER, SINGLE TOP OF WALL LAYER w/ TAPED SEAMS ·POURED CONCRETE FOUNDATION ·GRANULAR FILL COMPACTED TO 95% DRY (SEE STRUCTURAL PLANS) DENSITY N. Quentin Rd SHEET TITLE Building Section SHEET NUMBER BUILDING SECTION A-3.1 A A-3.1 1/4"=1'-0" PROJECT NO. 2133 © Knothe & Bruce Architects, LLC Packet Pg. 168 4.1.d 3 1 2 4 5 1 3 8 4 1 2 3 6 4 2 1 4 15'-0" THIRD FLOOR 22'-3 3/4" Phone: 37'-3 3/4" Attachment: Petitioner - 2021-09-27 COMBINED DRAWINGS (874-920 N. Quentin Road - Quentin apartments) 608.836.3690 11'-1 7/8" KEY PLAN SECOND FLOOR 11'-1 7/8" 11'-1 7/8" FIRST FLOOR 0" 1 PARTIAL NORTH ELEVATION - COLOR A-2.4 1/8" = 1'-0" 5 8 4 1 2 5 4 1 2 3 1 2 4 5 1 3 ISSUED THIRD FLOOR 22'-3 3/4" SECOND FLOOR 11'-1 7/8" PROJECT TIT JAMES HARDIE GRAY SLATE JAMES HARDIE NAVAJO BEIGE FIRST FLOOR 0" JAMES HARDIE NIGHT GRAY NORT DEVEL 2 PARTIAL NORTH ELEVATION - COLOR A-2.4 1/8" = 1'-0" 1-COMPOSITE SIDING & TRIM 2-COMPOSITE SIDING & TRIM COMPOSITE PANEL 3 4 1 5 2 1 4 8 6 2 2 1 4 3 EAST M 15'-0" MACHES BLACK IL THIRD FLOOR 22'-3 3/4" SHEET TITLE 37'-3 3/4" EXTER 11'-1 7/8" ELEVA CLOUD CERAMICS ROCKCAST EXTERIOR MATERIAL SCHEDULE CORONADO GRAY-MODULAR-VELOUR RIESLING WINDOWS| DOORS SECOND FLOOR BUILDING ELEMENT MANUFACTURER COLOR COLOR ALUMINUM RAILINGS 11'-1 7/8" 1 6" COMPOSITE SIDING COMPOSITE TRIM JAMES HARDIE GRAY SLATE MATCH ADJ. BRICK VENEER 11'-1 7/8" CAST STONE SILLS & BANDS ALUMINUM STOREFRONT 2 4" COMPOSITE SIDING JAMES HARDIE NAVAJO BEIGE SHEET NUM COMPOSITE TRIM MATCH ADJ. 3 COMPOSITE PANEL JAMES HARDIE NIGHT GRAY FIRST FLOOR 4 BRICK VENEER CLOUD CERAMICS CORONADO GRAY - MODULAR - VELOUR A- 0" 5 COMPOSITE WINDOWS TBD BLACK MATERIAL BOARD 6 ALUM. STOREFRONT TBD BLACK 7 METAL DOORS/FRAMES TBD MATCH ADJ. 3 EAST ELEVATION - COLOR CAST STONE SILLS & BANDS NORTHPOINTE DEVELOPMENT ROCKCAST RIESLING A-2.4 1/8" = 1'-0" 8 RAILINGS TBD BLACK PROJECT NU © Knothe & Bru EAST MALL North DRIVE Quentin Rd MACHESNEY Palatine, PARK, IL IL JANUARY 7, 2021 January13, 20, 2021 April September 202127, 2021 Packet Pg. 169 4.1.e THREE BEDROOM STAIR ONE BEDROOM ONE BEDROOM STAIR TWO BEDROOM STAIR TWO BEDROOM TWO BEDROOM STAIR TWO BEDROOM STAIR ONE BEDROOM ONE BEDROOM STAIR TWO BEDROOM 1,210 SF 780 SF 780 SF 1,130 SF 1,158 SF TYPE A UNIT STAIR OPEN BELOW 1,006 SF TYPE A UNIT ADAPTABLE 1,130 SF 780 SF 780 SF 1,126 SF ELEV CORRIDOR COMMON AREA 1,063 SF STAIR THREE BEDROOM 1,066 SF STAIR ONE BEDROOM 780 SF ONE BEDROOM 780 SF STAIR TWO BEDROOM 1,130 SF STAIR TWO BEDROOM 1,230 SF TYPE A UNIT ADAPTABLE THREE BEDROOM 1,180 SF TYPE A UNIT STAIR ONE BEDROOM 780 SF STAIR ONE BEDROOM 780 SF ONE BEDROOM 780 SF STAIR TWO BEDROOM 1,150 SF 4 SECOND FLOOR PLAN A-1.1 1/8" = 1'-0" Attachment: Petitioner - Revised elevation and floorplan - 11-24-21 base-A-1.1 (874-920 N. Quentin Road - Quentin apartments) STAIR STAIR STAIR STAIR STAIR STAIR OFFICE / THREE BEDROOM ONE BEDROOM ONE BEDROOM TWO BEDROOM TWO BEDROOM STORAGE ONE BEDROOM TWO BEDROOM ONE BEDROOM ONE BEDROOM THREE BEDROOM 1,210 SF 780 SF 780 SF 1,130 SF 1,158 SF TYPE A UNIT STAIR LOBBY 726 SF TYPE A UNIT 1,130 SF 780 SF 780 SF 1,210 SF ISSUED ELEV Reissued City Submittal - September 27, 2021 Reissued City Submittal - November 24, 2021 CORRIDOR COMMON AREA 1,063 SF STAIR THREE BEDROOM 1,066 SF STAIR ONE BEDROOM 780 SF ONE BEDROOM 780 SF STAIR TWO BEDROOM 1,130 SF STAIR TWO BEDROOM 1,230 SF TYPE A UNIT ADAPTABLE THREE BEDROOM 1,180 SF TYPE A UNIT ADAPTABLE STAIR ONE BEDROOM 780 SF STAIR ONE BEDROOM 780 SF ONE BEDROOM 780 SF STAIR TWO BEDROOM 1,066 SF PATIO 3 FIRST FLOOR PLAN 19 ONE BEDROOM UNITS A-1.1 1/8" = 1'-0" 14 TWO BEDROOM UNITS 7 THREE BEDROOM UNITS 40 TOTAL UNITS PROJECT TITLE Palatine, IL MECH STAIR STAIR STAIR BIKES STAIR STAIR STAIR MECH Site Concept STAIR 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 STORAGE ELEV Northpointe BASEMENT GARAGE Development 60 STALLS 25,891 SF MECH 30 31 STAIR 32 33 34 35 36 STAIR 37 38 39 40 STAIR 41 42 43 44 45 46 STAIR 47 48 49 STAIR 50 51 52 53 54 STAIR 55 56 TRASH STORAGE N. Quentin Rd 2 BASEMENT FLOOR PLAN SHEET TITLE A-1.1 1/8" = 1'-0" Elevation And Floor Plans SHEET NUMBER A-1.1 1 EXTERIOR ELEVATION 1/8" = 1'-0" A-1.1 PROJECT NO. 2133 © Knothe & Bruce Architects, LLC Packet Pg. 170 Packet Pg. 171 4.1.f Attachment: Petitioner - Initally Revised rendering 2nd submission - 2021-10-14 - Northpointe Palatine Renders (1) (874-920 N. Packet Pg. 172 4.1.f Attachment: Petitioner - Initally Revised rendering 2nd submission - 2021-10-14 - Northpointe Palatine Renders (1) (874-920 N. Packet Pg. 173 4.1.f Attachment: Petitioner - Initally Revised rendering 2nd submission - 2021-10-14 - Northpointe Palatine Renders (1) (874-920 N. Packet Pg. 174 4.1.f Attachment: Petitioner - Initally Revised rendering 2nd submission - 2021-10-14 - Northpointe Palatine Renders (1) (874-920 N. Packet Pg. 175 4.1.f Attachment: Petitioner - Initally Revised rendering 2nd submission - 2021-10-14 - Northpointe Palatine Renders (1) (874-920 N. Packet Pg. 176 4.1.f Attachment: Petitioner - Initally Revised rendering 2nd submission - 2021-10-14 - Northpointe Palatine Renders (1) (874-920 N. Packet Pg. 177 4.1.f Attachment: Petitioner - Initally Revised rendering 2nd submission - 2021-10-14 - Northpointe Palatine Renders (1) (874-920 N. 4.1.g Minimum Lot Area: Bedroom Type SF/Unit 1 Bedroom & Efficiency 2,100 2 Bedroom 2,400 3 & 4 Bedroom 5,000 Attachment: Petitioner - Proposed Unit Mix - Density Analysis (874-920 N. Quentin Road - Quentin apartments) Proposed Unit Mix: Bedroom Type # Units Efficiency 0 One-Bedroom 19 Two-Bedroom 14 Three-Bedroom 7 Total Units 40 Minimum Acreage: 2.49 Site Acreage: 2.53 Packet Pg. 178 4.1.h Quentin Road Apartments – Project Description Northpointe Development (“Developer”) is proposing the new construction of Quentin Road Attachment: Petitioner - Quentin Apartments - Project Description - 9.10.2021 (874-920 N. Quentin Road - Quentin apartments) Apartments, a forty-unit Section 42 Low Income Housing Tax Credit (“LIHTC”) multi-family rental housing development located on the northwest side of the City of Palatine, Illinois. More specifically, the subject site is located at 920 Quentin Road, Palatine, Illinois, 60067. Upon completion, the proposed Quentin Road Apartments will consist of the new construction of 2, two-story buildings connected by a community room that will contain forty units of multi-family housing. Units will be marketed towards residents of all ages. Common spaces will also include a playground and fitness room. The Developer proposes to set aside all units for residents earning 30, 50, 60, or 80 percent or less of the prevailing Cook County Area Median Income (“AMI”) using an allocation of Section 42 LIHTCs from the Illinois Housing Development Authority’s (“IHDA’s”) rental housing tax credit program. The subject site is rectangular in shape, flat in topography, and mainly consists of grass covered land with limited trees lining the edges of the site as well as a small office building to be razed as part of the site redevelopment. The subject site is located approximately twenty-seven miles northwest of downtown Chicago within the Village of Palatine, IL. The subject site is bordered by North Quentin Road to the east, West Poplar Street to the north, and single-family uses to the west and south. The general area surrounding the subject site is made up primarily of single-family and multi-family residential uses, both rental and owner-occupied. Areas to the south are also made up of a limited amount of commercial development around the intersection of North Quentin Road and West Northwest Highway. Packet Pg. 179 Packet Pg. 180 4.1.i Attachment: PPD application (874-920 N. Quentin Road - Quentin apartments) Packet Pg. 181 4.1.i Attachment: PPD application (874-920 N. Quentin Road - Quentin apartments) Packet Pg. 182 4.1.i Attachment: PPD application (874-920 N. Quentin Road - Quentin apartments) Packet Pg. 183 4.1.j Attachment: Petitioner - Previously proposed elevations (874-920 N. Quentin Road - Quentin apartments) Packet Pg. 184 4.1.j Attachment: Petitioner - Previously proposed elevations (874-920 N. Quentin Road - Quentin apartments) Packet Pg. 185 4.1.j Attachment: Petitioner - Previously proposed elevations (874-920 N. Quentin Road - Quentin apartments) Packet Pg. 186 4.1.j Attachment: Petitioner - Previously proposed elevations (874-920 N. Quentin Road - Quentin apartments) Packet Pg. 187 4.1.j Attachment: Petitioner - Previously proposed elevations (874-920 N. Quentin Road - Quentin apartments) Packet Pg. 188 4.1.j Attachment: Petitioner - Previously proposed elevations (874-920 N. Quentin Road - Quentin apartments) Packet Pg. 189 4.1.k Attachment: Petitioner - Previously proposed - Initial Site Plan (874-920 N. Quentin Road - Quentin 4.1.l Previous Site Plan - 874-920 N. Quentin Road Attachment: Site plan and elevation changes (874-920 N. Quentin Road - Quentin Proposed FAR = .62 R-3 Max. FAR = .5 Packet Pg. 190 Revised Site Plan - 874-920 N. Quentin Road 4.1.l Attachment: Site plan and elevation changes (874-920 N. Quentin Road - Quentin Revisions - Quentin Road apartments 2nd access point to Poplar Street removed. • Unit count reduced from 58 to 40. • Poplar Street access eliminated. • Building height reduced from 3-story 36-feet tall to 2-story 26-foot tall building. • Parking count reduced from 131 to 96 parking spaces. • 8- foot privacy fence & 84 -10-foot Arbor Vitae added to west side (adjacent to Franklin Street homes) 1. f Packet Pg. 191 4.1.l Previous Elevations - 874-920 N. Quentin Road Attachment: Site plan and elevation changes (874-920 N. Quentin Road - Quentin 3-story – 36-foot building Packet Pg. 192 4.1.l Revised Elevations - 874-920 N. Quentin Road Attachment: Site plan and elevation changes (874-920 N. Quentin Road - Quentin • 2-story – 26-foot tall building Packet Pg. 193 4.1.m Ben Vyverberg Subject: FW: 874-920 N Quentin Road From: Patricia Diaz <> Sent: Tuesday, October 19, 2021 10:55 AM Attachment: Diaz email Quentin Road apartments (874-920 N. Quentin Road - Quentin apartments) To: Ben Vyverberg <BVyverberg@palatine.il.us> Subject: 874-920 N Quentin Road Caution: This is an external email, Please take care when clicking links or opening attachments. When in doubt, please talk with the sender or check with VOP IT Dear Mr. Vyverber, I am a resident of Palatine. I am writing to you today to express my support for the economically inclusive housing development proposed by Northpoint Development located at 874-920 N Quentin Road, Palatine, IL. Economically inclusive housing is vital to the stability of Palatine. The lack of reasonably priced housing negatively impacts Seniors, the Disabled, Blue Collar workers, recent college graduates, and minimum wage employees, as well as others. As a senior citizen, I too am impacted. Zoning discrimination is alive and well if not on the rise. Having attended the last public meeting regarding this proposal, I was appalled by the exclusionary and hostile attitudes I encountered. Apparently, Palatine likes to keep moderate income workers behind the counter and cash registers, and in their bars/restaurants, but not include working class people as neighbors. I was disgusted. The suggestion that reasonably priced housing will bring in crime was particularly abhorrent. Palatine has been accused of mis-managing the construction of numerous clustered apartment complexes in the North East Section of the township. I have read many, many complaints from citizens of Palatine who fear Palatine will again make the mistakes of the past and then do nothing to correct it. Such as, pressure on the owners of those complexes to keep them up etc. There is so much blight in Palatine, as well as vacant buildings you need to be doing something about it. But instead you engage a firm to propose the widening of Palatine Road. Get the priorities in order. It's people, unless you plan to round up all of us old, disabled and less fortunate citizens and throw us out of town. Because that is exactly what you are doing. The citizens have lost trust in the township to do the plan properly, and therefore they blankedly oppose reasonably priced housing developments. I have talked to my Palatine neighbors who are also negatively affected by the lack of reasonably priced housing. Fully employed individuals earning $50,000/yr are living with family members because they are unable to locate an affordable, safe place to live in Palatine. We don't need another gas station, 7-11, pizza parlor or hair salon. We need reasonably priced housing. Thank you for your time. 1 Packet Pg. 194 Patricia Diaz Sincerely, 322 N Brockway St Palatine, IL 60067 2 4.1.m Packet Pg. 195 Attachment: Diaz email Quentin Road apartments (874-920 N. Quentin Road - Quentin apartments) 4.1.n Ben Vyverberg Subject: FW: Approve Affordable Housing Project on Quentin From: Jim Schwantz <JSchwantz@palatine.il.us> Sent: Saturday, October 16, 2021 9:11 AM To: Maria Galo - Ben Vyverberg <BVyverberg@palatine.il.us>; Michael Jacobs <MJacobs@palatine.il.us> Subject: Re: Approve Affordable Housing Project on Quentin Maria, Attachment: Galo email (874-920 N. Quentin Road - Quentin apartments) Thank you for your email. I have copied staff on this response so that they can keep make this part of the official record JS On Oct 15, 2021 9:52 PM, Maria Galo <wrote: Caution: This is an external email, Please take care when clicking links or opening attachments. When in doubt, please talk with the sender or check with VOP IT Dear Mayor Jim Schwantz, Please approve the proposed affordable housing development at 874-920 N. Quentin Road. Years ago, an older neighbor of mine lost his home. A development like this would have helped him live his older years in dignity. I am speaking up now, for his memory, and for other residents like him. I've lived on Cedar Street since 1996. Steve was a long-time neighbor who grew up in the house where he lived. In middle age he had moved back home to care for his mother. After she died, he worked as a delivery driver for many years, but a heart attack caused him to lose his job. Despite working many jobs after his recovery, he could not maintain the level of income he needed, and he had to sell his home. I ran into him just before he moved, and he told me he needed to move out in three weeks, but he had no idea where to go. This was a heartbreaking situation. Palatine should have affordable housing for people like my neighbor Steve. 1 Packet Pg. 196 4.1.n I attended the July 20 Plan Commission hearing where a previous Quentin Road affordable housing plan was rejected amid a great deal of negative opinion from people living near the project. Northpointe Development has submitted a new plan to the Village that addresses the objections. The developers cut the number of units by 30 percent to 40 units of mixed income housing. The property now will have 10 three-bedroom units, 12 two-bedroom units, and 18 one-bedroom units, among many other changes in response to the July feedback. Attachment: Galo email (874-920 N. Quentin Road - Quentin apartments) The higher number of one-bedroom units tells me that they expect these units to be used for seniors. Local seniors, like my former neighbor Steve, need this type of housing. Please approve this project. Palatine residents should have the security of knowing they have the option of staying in Palatine even if their fortunes change for the worse. Sincerely, -- -- Maria Galo she/her/hers cell: "You must do the things you think you cannot do." --Eleanor Roosevelt 2 Packet Pg. 197 Packet Pg. 198 4.1.o Attachment: Gintowt letter Quentin apartments (874-920 N. Quentin Road - Quentin apartments) 4.1.p Ben Vyverberg Subject: FW: Affordable housing From: Vicki Martin Sent: Monday, October 25, 2021 11:32 AM To: Ben Vyverberg <BVyverberg@palatine.il.us> Attachment: Martin LWV email of support (874-920 N. Quentin Road - Quentin apartments) Subject: Affordable housing Caution: This is an external email, Please take care when clicking links or opening attachments. When in doubt, please talk with the sender or check with VOP IT Dear Mr. Vyverberg, For many years, you and your predecessors have given generously of your time and talent to make Palatine a wonderful place to live. Our city is beautiful and safe. The schools and parks make Palatine a mecca for families. We have easy access to transportation, plenty of shopping alternatives, and an array of community activities that give us much to be proud of. Unfortunately, due to many factors, including decisions made in the past, Palatine is also lacking in housing that many of our neighbors can afford. Think of the people you know—your children who are recent graduates, or have an entry level job. Consider your parents who are now on a fixed income. What about your sister who is recently divorced and has been out of the work force for years while raising her three kids-all of whom attend Palatine Schools? All of these people, and many others like them who have lived for years in Palatine all are struggling to remain here in our village due to the high price of housing. Rent and property taxes have all increased in recent years, while many wages have not. The rule of thumb has always been that your rent or mortgage should not exceed one third of your income. Rents and home prices in our area have far exceeded that guideline for many people, forcing members of our community to struggle to remain here and still make ends meet. These people work at our schools, our grocery stores, hospitals and many institutions that serve all of us every day. As Co-Presidents of the League of Women Voters of the Palatine Area, we urge you to approve the revised plan for Northpointe Development’s mixed income development on Quentin Road. This would not only be helpful for contributing members of our community; it would be one more reason to be proud of the Village of Palatine. Sincerely, Vicki Martin and Kim Inman Co Presidents, League of Women Voters of the Palatine Area Vicki Martin Co-President The link ed image cannot be display ed. The file may hav e been mov ed, renamed, or deleted. Verify that the link points to the correct file and location. 1 Packet Pg. 199 2 Packet Pg. 200 4.1.p Attachment: Martin LWV email of support (874-920 N. Quentin Road - Quentin apartments) 4.1.q Ben Vyverberg Subject: FW: Mixed-Income Development From: Cindy Wojdyla Attachment: Wojdyla email - Quentin Road apartments (874-920 N. Quentin Road - Quentin apartments) Sent: Tuesday, November 2, 2021 12:07 PM To: Ben Vyverberg <BVyverberg@palatine.il.us>; Jim Schwantz <JSchwantz@palatine.il.us>; Brad Helms <BHelms@palatine.il.us>; Kollin Kozlowski <KKozlowski@palatine.il.us>; Greg Solberg <GSolberg@palatine.il.us>; Doug Myslinski <dmyslinski@palatine.il.us>; Scott Lamerand <SLamerand@palatine.il.us>; Tim Millar <TMillar@palatine.il.us> Subject: Mixed-Income Development Caution: This is an external email, Please take care when clicking links or opening attachments. When in doubt, please talk with the sender or check with VOP IT Good Morning! I am writing to show my support for the proposed affordable housing development at 874-920 N Quentin Road. I understand the new proposal also addresses all of the other design recommendations made by the Village. We have lived in Palatine for almost 30 years, we raised our three children, all attending Palatine schools and thriving. We welcome the opportunity to provide affordable housing to all! In support! :) Cynthia Wojdyla 112 E. Garden Ave. 1 Packet Pg. 201 4.1.r October 21, 2021 Ben Vyverberg, Director of Planning and Zoning 200 E Wood St Attachment: Support Quentin Project - to BV from Cortez (874-920 N. Quentin Road - Quentin apartments) Palatine, IL 60067 Dear Mr. Vyverberg, I am writing to request your support for the recently resubmitted affordable housing project for Quentin Road in Palatine. The Quentin Road development proposed by Northpointe is good for Palatine residents. You are undoubted aware that some 30% of working and fixed-income Palatine residents struggle with the cost of housing, spending 30% or more of their incomes to keep a roof over their heads. The moderate size of the development along with the wide range of family incomes it targets should make it a model for future projects in Palatine. And, the project stands to help so many more residents than those who have voiced opposition to it. You will recall that the Department of Planning and Zoning recommended against the original proposal because of density and other design issues. As a result, the Plan Commission voted the project down during their July 20th meeting. Prior to resubmitting its recently revised proposal, Northpointe Development coordinated two meetings with neighbors (one in person and one on Zoom), both of which I attended out of interest in the project. Despite some continued opposition, neighbors voiced a number of very strong, practical solutions that would address their concerns. To my knowledge, Northpointe has accommodated nearly every recommendation. For example, they reduced the proposed density of the development by 30% to 40 units, reduced the building from 3 to 2 stories, and removed balconies from the rear of the building. They are also agreeing to add 80+ trees along the fenced property line – all to create the separation and privacy the neighborhood residents sought. The new proposal also addresses other design recommendations made by the Village. I am aware that the original project was met with strong opposition from many of the nearby neighbors. Some of their objections were valid, others were simply based on unfounded notions about affordable housing. Valid objections are fixable, and have been fixed in the new proposal. The unfounded objections should have no impact on the Village’s decision. I ask for your approval of the Quentin Road project. Respectfully, Kathy Cortez 141 S Fremont St Palatine, IL 60067 cc: Palatine Plan Commission; Greg Solberg, Councilman Packet Pg. 202 4.1.s Ben Vyverberg Subject: FW: 874-920 N. Quentin Road Property From: ANNETTE PACIGA <> Sent: Saturday, November 27, 2021 1:10 PM To: Ben Vyverberg <BVyverberg@palatine.il.us>; Jim Schwantz <JSchwantz@palatine.il.us>; Tim Millar <TMillar@palatine.il.us> Attachment: Paciga email 11-27-21 (874-920 N. Quentin Road - Quentin apartments) Subject: 874-920 N. Quentin Road Property Caution: This is an external email, Please take care when clicking links or opening attachments. When in doubt, please talk with the sender or check with VOP IT We would like to state our objection to the proposal to build a 40 or 45 unit apartment building on this property. The revised proposal submitted by the developer still does not adequately address several major issues related to this project including, but not limited to density, parking, traffic and safety. These issues were extensively discussed at the last building commission meeting. The revised proposal does not significantly impact these issues despite a small reduction in the number of units and possibly changing from a 3 story structure to a 2 story one. The land is not large enough to incorporate the needs of this number of units/occupants. There is not adequate green space and safe entrance/egress from the property. We attended the presentation at the planning meeting and, although the developer provided information relative to parking for residents (which barely meets the minimal standards), visitor parking presents additional challenges for the community and the residents. There will be a significant need for visitor parking on a regular basis. This need will increase significantly during celebratory events (birthdays, graduations, BBQs, holidays, etc.). Where will these vehicles park? I doubt the retailers in the shopping area on the other side of Quentin will welcome non-customers in their lot. Additionally, there is a significant safety issue if visitors do use that lot and need to cross busy Quentin Rd., especially at night and with children. Traffic and speed limit on Quentin Ave was also discussed at the last commission meeting. These are very real issues that have not been adequately addressed. The speed limit on Quentin is often exceeded and the parking entrance/egress on Poplar will cause significant back ups on Quentin as both community and apartment residents use Poplar Street to get to their homes. It will be difficult (and unsafe) to make a left turn on to Quentin from Poplar with increased traffic turning into Poplar from both directions on Quentin. Increased vehicular traffic from the complex will significantly impact traffic on Franklin and Maple as drivers seek to avoid the traffic back up and traffic lights on Quentin to access Northwest Highway. John and Annette Paciga 867 N Maple Ave Palatine, Il 60067 1 Packet Pg. 203 4.1.t Ben Vyverberg Subject: FW: Preliminary Planned Development: 874-920 N. Quentin Rd From: LORENE HARDER <l> Sent: Friday, November 26, 2021 12:47 PM To: Jim Schwantz <JSchwantz@palatine.il.us>; Tim Millar <TMillar@palatine.il.us>; Ben Vyverberg <BVyverberg@palatine.il.us> Attachment: Harder email 11-26-21 (874-920 N. Quentin Road - Quentin apartments) Subject: Re: Preliminary Planned Development: 874-920 N. Quentin Rd Caution: This is an external email, Please take care when clicking links or opening attachments. When in doubt, please talk with the sender or check with VOP IT Good morning Ben, Jim and Tim, My name is Lorene Harder and I live at 872 N. Maple Ave, Palatine. I am writing as my husband Jim and I are concerned about the Preliminary Planned Development to construct a new 2-story 40 unit apartment building at 874-920 N. Quentin Road in Palatine. We are very much against this proposal. Poplar Street is a very quiet side street and I am VERY concerned about the additional traffic it will bring to our neighborhood. Basically, I feel it will change the nice quite neighborhood we had when we initially purchased our townhouse due to the added traffic. Additionally, the density of 40 units on a plot of land that is most likely 2 acres or less is not a good thing for the neighborhood. I'd appreciate if you would consider our concerns and reject this proposal. If you need any additional information from me, please let me know. Thank you all very much, I appreciate your consideration. Take care. Lorene and Jim Harder 872 N. Maple Ave 1 Packet Pg. 204 4.1.u November 27, 2021 Attachment: Piazza - Palatine Letter Plan Commission RE-Public Notice ID 1295 (874-920 N. Quentin Road - Quentin apartments) Mr. Dennis Dwyer and Mr. Ben Vyverberg Village of Palatine Plan Commission RE: Public Notice ID 1295 Mr. Dwyer, Mr. Vyverberg and Plan Commission Members: We live at 856 N Maple Ave and have lived here for nearly seven (7) years. We purchased this home because of the low population density and the low volume of traffic on Maple Ave. We have 3 grandsons that live with us along with their dad. Because of the low volume of traffic on Maple Ave, our grandsons have been able to play safely along the sidewalks and up and down the street. We are strongly opposed to the Planned Development of the 2-story, 40-unit apartment building on the 874-920 N. Quentin Road property. This development will greatly increase the traffic along W Poplar St. onto Maple Ave. because residents of the apartment will use Maple Ave as a short-cut to Northwest Highway, both coming and going from the apartments. Over the years we have owned two properties, located in other cities, where city officials have dis-regarded the concerns of local residents and approved developments that turned a once quite, low volume streets into busy unsafe streets and caused property values to fall. We urge you not to approve this apartment development at 874-920 Quentin Road. Thank you for listening to our concerns. Sincerely, Tom Piazza Melody Piazza David Piazza 856 Maple Ave Palatine, IL 847-907-4651 Packet Pg. 205 4.1.v Ben Vyverberg Subject: FW: Opposition to Planned Development for 874-920 N Quentin Rd From: Ken Kramer <> Sent: Monday, November 29, 2021 9:35 PM To: Ben Vyverberg <BVyverberg@palatine.il.us>; Jim Schwantz <JSchwantz@palatine.il.us>; Tim Millar <TMillar@palatine.il.us> Subject: Opposition to Planned Development for 874-920 N Quentin Rd Attachment: Kramer email (874-920 N. Quentin Road - Quentin apartments) Caution: This is an external email, Please take care when clicking links or opening attachments. When in doubt, please talk with the sender or check with VOP IT Gentlemen, I am writing to record my strong opposition to the proposed plan for this property. I have lived in Palatine since 1969 when Quentin Rd was a two lane country road. Now it is a route 53 by-pass which is enough of a problem for those of us that live on Quentin and now have to put with the possibility of another multi-unit over populated piece of property. My, wife, son and daughter in law along with three granddaughters live 24 hrs a day with the extreme amount of noise generated by a 430 unit apartment complex directly across the street from our home. Starting a 5AM most mornings the steady stream of cars leaving the southern exit of the complex we live across from begins. Many of the vehicles have illegally modified or faulty exhaust systems that are so loud the whole household is awakened by them, including my 2 year old granddaughter who’s room along with mine are on Quentin road. I have complained to police department and was told there is nothing “we”can do about it by Sgt Bratcher several years ago. He suggested that I sit in front yard and get license plate numbers of vehicles…really? The police can’t have a patrol car sit out in front of the complex on Bayer or Poplar St and listen for loud vehicles? I have seen patrol cars skiing in he exit checking for Palaine vehicle stickers, so why can’t the police spend a couple hours a week doing the same for noisy, illegal autos? Over a week ago I took a picture of one particularly loud Honda Accord along with the exhaust pipe hanging out the rear and the license plate; I have yet to receive a response to my email to the area commander to my email. Could it be because the vehicle is not registered to an address across the street? If so, go find he vehicle in the complex and ticket it for no village vehicle license at least Now add in 3 garbage pickups a week that usually take place between 6-6:15 Am with a dumpster directly across the street from our bedrooms. I have complained to village about that and was told, there’s nothing “we” can do about it because apparently it is lawful to wake residents at 6am banging dumpsters around to empty them. Many times the driver has shake and bounce the LARGE dumpster creating the sound like someone banging on the side with 16 lb sledge hammer with all their might. This includes Saturday mornings. Often times these dumpsters are overflowing and garbage consistently blows out the uncovered dumpsters into my yard. I have repeatedly filed complaints with the village about all to no avail other than a short resolution enacted by the property manager until the heat blows over and the pattern repeats Then there is steady of stream of cars going in and out all day and night. I have lived in this home for 21 years and when you see the same car going in and repeatedly on the same day one can assume it has something to do with drug dealing. Then there’s 4th of July when the fireworks start 3 days ahead of the holiday until 2am in the morning sometimes. One time we had fireworks land on the roof of our home and a car parked in our driveway, which we called the police and complex manager about that pleasant issue that thankfully did end with our house or 1 Packet Pg. 206 4.1.v car catching fire. Add in the numerous police and fire calls at all hours especially during the summer and we live in the noisiest neighborhood in Palatine that will only be made worse with 40 more units, 90 more cars, and 100 more people on the opposite corner of my home. My family will essentially be living between 1500-2000 people on what will be the noisiest, busiest 300 ft strip of roadway in what is supposed to be a neighborhood of single family residences. Adding 40 units to 6 “lots” that now would be 6 homes is simply not in keeping with the character of the neighborhood. We all pay some of the highest property taxes in Palatine and we have the least desirable location due to constant noise created by an already overused roadway. Adding another apartment complex to this area will only further destroy our already poor quality of life in he once quiet neighborhood on Quentin Rd. We all understand the property owner wants to sell his property and capitalize on his investment, but that will not and should not be at the expensive of quality of life to the surrounding neighbors. 60 years ago that property was unincorporated on the outskirts of town on rarely traveled country road. That is no longer the case with this neighborhood of highly taxed and residential neighborhood. We all take risk investing sometimes they pay off more often hey don’t and it NOT the responsibility of the village or its Attachment: Kramer email (874-920 N. Quentin Road - Quentin apartments) residents on Quentin Rd to bail the property owner out. We all know he village needs revenue but this development is not the best answer for that need or the needs of the residents on Quentin Rd. All of us respectfully ask that you carefully consider how your decision will affect our lives and rule against this development. Respectfully Ken Kramer 949 N Quentin rd -- Ken Kramer 2 Packet Pg. 207 4.1.w Ben Vyverberg Subject: FW: Quentin Road Development 874-920 N. Quentin Rd From: John R Novak <> Sent: Tuesday, November 30, 2021 11:05 AM To: Ben Vyverberg <BVyverberg@palatine.il.us>; Jim Schwantz <JSchwantz@palatine.il.us>; Tim Millar <TMillar@palatine.il.us> Subject: Quentin Road Development 874-920 N. Quentin Rd Attachment: Novak email (874-920 N. Quentin Road - Quentin apartments) Caution: This is an external email, Please take care when clicking links or opening attachments. When in doubt, please talk with the sender or check with VOP IT Gentlemen: I am writing on behalf of the Dagan Park Estates Townhome Association, 24 homes bounded on the east by Franklin, the west by Maple, located between Poplar and Northwest Highway. We are happy to see that the developer (Northpointe) listened to the Plan Commission members, the Department of Planning and Zoning staff, and the community owners and members. Coming back with a modified plan is encouraging. However, there are still elements in the proposed plan that do not address Village, community, resident and neighborhood concerns. We are happy to see that the developer is: • Reducing the number of units to 40 and the height of the building from 3 to 2 stories. • Reducing the number of parking spots from 120 to 80. • Reducing the density from 22.9 units per acre to 16 units per acre. However, the developer ignores and in no way addresses the additional concerns as follows: • Exceeds the Village's historic density standard of units per acre. Though the density is reduced from 22.9 units per acre to 16 units per acre (40 units), this is still twice the density of the Village average of 7 to 8 units per acre. Just because there are other older exceptions within the Village, where density is closer to this number (Clayson at 15.7), this should not automatically mean that 16 units per acre is now the standard, and automatically acceptable. Starting from the "exception" is not the proper nor logical way to approach this. Start with the Village historic average of 7 to 8 units per acre and then work with the Village and community to determine the appetite for an exception to this starting point. • Does not address the increased traffic issues on Franklin, Maple, Poplar and Quentin that this development will bring. • Does not address a "slow down" lane on Quentin, a 40 mph road, where most traffic generally exceeds this speed in the 5 - 10 mph range. • Does not address the ambulatory impact to community members walking in the neighborhood, along Franklin, Maple, Poplar and Quentin, many portions of which lack sidewalks. The new development will add additional pedestrian traffic and needs. 1 Packet Pg. 208 4.1.w • Does not address the lack of nearby basic services for the proposed development, especially for potential residents without access to transportation. This lack of basic services includes: no grocery stores, no banks, no public amenities (parks, library, etc.) and most importantly, lack of public transportation. • Does not address the increase in light and noise pollution such a development would bring to the neighborhood. It appears that the developer listened to those points they wanted to hear, and ignored those they cannot or are unwilling to address. If the developer is truly interested in a plan that would more closely meet all party's needs, there should be a true listening and planning group, comprised of the owners included in the original group, as well as other nearby owners and community members and leaders, with the goal of coming up with a plan that addresses significantly more points than the current plan addresses. Sincerely Attachment: Novak email (874-920 N. Quentin Road - Quentin apartments) John R. Novak Board President, Dagan Park Estates Townhome Association Virus-free. www.avast.com 2 Packet Pg. 209 4.1.x Ben Vyverberg Subject: FW: 874 - 920 N Quentin Rd Development From: Stephen Thompson <> Sent: Tuesday, November 30, 2021 12:06 PM To: Ben Vyverberg <BVyverberg@palatine.il.us> Subject: 874 - 920 N Quentin Rd Development Attachment: Thompson email (874-920 N. Quentin Road - Quentin apartments) Caution: This is an external email, Please take care when clicking links or opening attachments. When in doubt, please talk with the sender or check with VOP IT My. Vyverberg, We are writing to express my strong concern and opposition to the proposed development on 874-920 N Quentin Road. Having been a resident of this community for some time now, the concerns previously voiced regarding the prior proposal for this same development, still remain - mainly those of density and traffic. Stephen and Terri Thompson 874 W Goodrich Pl Palatine, IL 60067 1 Packet Pg. 210 4.1.y Ben Vyverberg Subject: FW: Preliminary Planned Development to permit a 2-Story, 40-unit apartment building - 874-920 N. Quintin Road From: John <> Sent: Wednesday, December 1, 2021 12:09 PM To: Ben Vyverberg <BVyverberg@palatine.il.us>; Tim Millar <TMillar@palatine.il.us> Subject: Preliminary Planned Development to permit a 2-Story, 40-unit apartment building - 874-920 N. Quintin Road Attachment: Erickson email (874-920 N. Quentin Road - Quentin apartments) Caution: This is an external email, Please take care when clicking links or opening attachments. When in doubt, please talk with the sender or check with VOP IT Village of Palatine Planning Commission Members, We own a home on Franklin Avenue, north of Northwest Hwy. We are opposed to the proposed Northpointe development known as 874-920 N. Quintin Road. The reasons for this opposition are as follows: 1. Exceeds the village historic density standard of 7 to 8 units per acre. The proposed development of 40 units is more than twice the historic village standard. 2. Increases traffic on Franklin, Popular, Maple and Quentin. The residents that have homes on Franklin Ave will experience noise pollution problems 24 X 7. 3. Creates a high risk of traffic accidents on Quentin because of the hill crests just south of Popular Street. Vehicles traveling at north on Quentin will not slow down and they will have trouble seeing vehicles leaving or entering the facility. This accident risk will increase during poor weather conditions. 4. No assurance that the 40 units will not have more occupants than the units are designed to accommodate. The property should not be rezoned for this proposed developer. There are many other sites that are better suited for this type of development which are closer to basic services such as grocery stores, health care, public transportation. John and Cher Erickson 1 Packet Pg. 211 4.1.z Ben Vyverberg Director Village of Palatine 200 W Wood Street Palatine, IL 60067 1 December 2021 Dear Mr. Vyverberg: We are writing to express our great concern with the current proposal to develop 920/874 N. Quentin, Attachment: Murphy File 21-89 (002) (874-920 N. Quentin Road - Quentin apartments) as a two-story, multifamily residential development with 40 units. We have visited the Village in order to view the plan under consideration. The homes on Franklin and Maple, including our own, are in a small section of longstanding single-family properties on large, near half-acre lots, with a rural and private feel. We strongly oppose the proposed development plan, which would negatively impact our property and the neighborhood. Negative impact on our property • Density: the proposed development, with a minimal 20-foot setback, would be up to 7 times the resident and household density of some 13 residents and six households that reside in the single-family properties that face it, including our own. • Privacy: the proposed 2-story building would have a significantly taller elevation due to an underground parking garage and its location uphill from our property to the east of our home with multiple apartments facing our backyards and our balcony from our master bedroom. The development would remove the well-established trees on the parcel which currently provide a wall of green behind our home. No privacy fence nor evergreen screening could restore the privacy we will lose for our home and our backyard due to the size and elevation of this building on an already elevated parcel. • Noise: the proposed building will have 38 surface parking stalls and 56 underground. All of the vehicles parked underground and the majority of the vehicles using the surface parking, including visitors, will be entering and exiting the complex directly behind our home at all hours, activating/deactivating car alarms as they come and go. The traffic of 94 vehicles and presence of approximately 100 residents and their visitors would guarantee noise, activity, and disturbance emanating from this large development that would be entirely disproportionate to the neighborhood and six single-family homes behind it. • Light Pollution: the proposed building will require lighting in the surface parking lot; in the winter, this will mean continual light pollution as there is nothing to stop these lights from shining directly into our home and backyard. • Character of our home: we purchased a home on a large, near half-acre lot. A highly-visible “downtown” apartment building, large surface parking lot, and access road behind our home will alter the character of our lot. The size and height of this apartment building have no place behind single family homes. Packet Pg. 212 4.1.z Negative effects on our neighborhood • Pedestrian and Vehicle Traffic: We currently share our streets with the townhome developments to our north and south, and their residents add to the pedestrian traffic on our street, as Quentin and NW Highway are not pedestrian friendly. There are no sidewalks in our neighborhood. This development would result in up to 90 additional vehicles using Franklin and Maple as a thruway and would make both existing and additional pedestrian use of the neighborhood unsafe. It would further complicate and cause safety concerns for resident vehicles exiting the area, with Poplar an already-hazardous exit north onto Quentin, as is the exit from Franklin east onto NW Highway. Attachment: Murphy File 21-89 (002) (874-920 N. Quentin Road - Quentin apartments) • Character of the Neighborhood: The apartment building itself has no place backing to a single- family area on large half acre lots. The land, previously home to a garden nursery, would be covered in its near entirety by the building and surface parking. The plan includes little landscaping or green space. This development, as currently conceived, is too big, and belongs in a downtown area of Palatine. We urge the Village to reject this proposal. Its approval would undisputedly result in the loss of our quality of life, privacy, and use of our home. We look forward to supporting the Village’s approval of a significantly scaled-back project, ideally one for the senior population. Any project selected should respect the density, size, and elevation of this development with regard to the surrounding housing, the greenery and character of the neighborhood, and the limitations of its infrastructure. It should also demonstrate much more clearly the developer’s commitment to and professional pride in being allowed the opportunity to partner with the Village and its residents to build property within our community. Sincerely, Sarah Murphy and Schalk van der Walt 925 N Franklin Ave Palatine, IL 60067 CC Ben Vyverberg, Head of Zoning at Village of Palatine; Jim Schwantz, Mayor; Tim Millar, District 1 Councilmember; Scott Lamerand, District 2 Councilmember; Doug Myslinski, District 3 Councilmember; Greg Solberg, District 4 Councilmember; Kollin Kozlowski, District 5 Councilmember; Brad Helms, District 6 Councilmember Packet Pg. 213 4.1.aa Ben Vyverberg Subject: FW: 874-920 N. Quentin Road Planned Development From: <> Sent: Wednesday, December 1, 2021 5:14 PM To: Ben Vyverberg <BVyverberg@palatine.il.us>; Tim Millar <TMillar@palatine.il.us>; Jim Schwantz <JSchwantz@palatine.il.us> Subject: 874-920 N. Quentin Road Planned Development Attachment: Marelli email (874-920 N. Quentin Road - Quentin apartments) Caution: This is an external email, Please take care when clicking links or opening attachments. When in doubt, please talk with the sender or check with VOP IT To: J Schwantz, T. Miller, B Vyverberg From: Joseph Marelli RE: 874-920 N. Quentin Road Planned Development Good day all I am writing regarding the above subject development. I want to go on record of being against this development. While I commend the investor group for wanting to support a low income housing option in the community, given my past experience with housing of this nature I have to come forward against the project in this location. Kind regards, Joe Marelli Glenview Ct. 1 Packet Pg. 214 4.1.ab Ben Vyverberg Subject: FW: 58 Unit Planned Housing Development at Poplar and Quinten From: Magoncia <> Sent: Wednesday, December 1, 2021 6:10 PM To: Ben Vyverberg <BVyverberg@palatine.il.us> Cc: Katie Rivard <KRivard@palatine.il.us>; bvyverbery@palatine.il.us; jschawntz@palatine.il.us; tmiller@palatine.il.us; Scott Lamerand <SLamerand@palatine.il.us>; Doug Myslinski <dmyslinski@palatine.il.us>; Greg Solberg Attachment: Magoncia email (874-920 N. Quentin Road - Quentin apartments) <GSolberg@palatine.il.us>; Kollin Kozlowski <KKozlowski@palatine.il.us>; Brad Helms <BHelms@palatine.il.us>; abetterpalatine@gmail.com Subject: Re: 58 Unit Planned Housing Development at Poplar and Quinten Caution: This is an external email, Please take care when clicking links or opening attachments. When in doubt, please talk with the sender or check with VOP IT Download Attachment Available until Dec 31, 2021 Board members I am writing on belay of my husband and my self, Larry and Christine Magoncia. I, Christine is the treasure of the Erin’s Glen Townhome Association. I am also writing on behalf of our association. First I am sending this letter individually because I have included the adjacent creek and the proposed project. I also have included a practical example of the traffic issues the some 90 cars this project will exacerbate. 1. The video of the creek shows during a rain event how high and fast the water flows. These videos are taken off Franklin Ave properly then off Quentin in between Kinder Kate and the Nutrition center. I hope all of you see the reality we live daily. We hope the creek stays shallow and no one falls in because it is hidden from them street. 2. The second picture is at the cross walk at Quentin and northwest hwy. Just one snap shop shows you how cars stop in the crosswalk. I am an epileptic with a service dog. When we walk we are very visible and I still have almost been hit by drivers rushing to make free right turns. Last meeting it was stated most residents would have cars, I would certainly expect that given the amount of parking allowed. Adding traffic to this intersection will make even more dangerous for pedestrians like me whom have no choice but to walk. Not to mention the cars exiting north on Quentin will create confused and erratic driving. Do all the traffic studies you want. I walk in all directions and all ready see near misses from Popular. Finally, please keep in mind while a complex is noble, however, is it to put it i our neighborhood? This plan commission was formed to respect both the environment of Palatine and respect its citizens objection’s when they believe the actions of their commissions are misguided. Click to Download Video.MOV 0 bytes 1 Packet Pg. 215 4.1.ab Click to Download Video_1.MOV 0 bytes Thank you for time. Christine Magoncia Sent from my iPhone On Jul 14, 2021, at 4:26 PM, Christine Magoncia <magoncia@comcast.net> wrote: Council Members and Palatine Residents: Attachment: Magoncia email (874-920 N. Quentin Road - Quentin apartments) My name is Christine Magoncia. I am the Treasurer of ERIN’S GLEN TOWN HOME ASSOCIATION; I have been asked to speak for our association. We are collectively AGAINST the planned housing unit of 58 units at the corner of Poplar and Quentin. was malled to death as well as the possible permanent injuries she might have. Finally, this planned development will do nothing for improving our neighborhood, traffic, local economy or shops Thank you for considering our position. Erins Glen Townhome Association Christine Magoncia 2 Packet Pg. 216 4.1.ac Ben Vyverberg Subject: FW: 874-920 N Quentin Road Planned Development From: Julie <> Sent: Wednesday, December 1, 2021 8:00 PM To: Ben Vyverberg <BVyverberg@palatine.il.us>; Tim Millar <TMillar@palatine.il.us>; Jim Schwantz <JSchwantz@palatine.il.us> Subject: 874-920 N Quentin Road Planned Development Attachment: Picchiotto email (874-920 N. Quentin Road - Quentin apartments) Caution: This is an external email, Please take care when clicking links or opening attachments. When in doubt, please talk with the sender or check with VOP IT Plan Commission and Village Council Members: My husband and I are opposed to the planned development on Quentin Road. We feel the 2 story, 40 unit apartment building is too big for the space and have density concerns. Currently, there are 6 single family homes on the same acreage of land behind the development. For every one home you are adding 6 families. Putting a large, high density building next to homes on half acre lots does not match the rural aesthetics of the neighborhood and looks like patchwork. Additionally, we have traffic and safety concerns for the entire neighborhood with the increased foot traffic in our neighborhood and Quentin road traffic for 90 cars. Franklin and Maple Ave are already cut through streets, this will create additional cut through traffic. Both of these streets are on steep inclines more prone to accidents and we do not have sidewalks. We live directly behind the planned development and spend a majority of our time in the rooms that face our backyard with our windows blinds open. We are avid gardeners, spend a lot of time in our yard and our kids are outside daily to burn off energy. Additionally, we are concerned about the following that impact our quality of life: • This development is 10 ft+ higher elevation than our home and a 2 story building with a parking garage will allow all levels of residents to see into our backyard through their windows and for us to see them. A 6 ft fence will provide no privacy to the upper levels of such a large structure and any trees will take 20 years or more to get to a size where any additional privacy will be available. • The parking lot will be 20 feet from our property line. 20 FEET. We have noise concerns such as car alarms, vehicles entering and exiting, car music, illegal fireworks and late night parties affecting our quality of sleep and enjoyment in our yards. We have a neighbor who leaves for work at 6am and when they start their pick-up truck in the morning it wakes us, even with a white noise machine on in our bedroom. Imagine the noise impact of 90 vehicles in your backyard throughout the day. 1 Packet Pg. 217 4.1.ac • Light pollution will be increased. The building lights, car headlights, stairwells and parking lot lights face our yard. We will be directly impacted and we will no longer be able to use our telescope for stargazing with our children on our own property. • Air pollution and gas emission with so many cars will affect the air quality in our yard. We spend our mornings in the garden before going to work and after work we take the kids outside and we love to have our windows open for fresh air. • We are on well water and are concerned about the construction contamination, and lack of green space impacting our well quality and quantity. The developer shared with us and our neighbors that they knew this development would impact the 6 homes we live in the most and we would not be happy, and that seemed to be okay from their perspective. Please put yourself in our shoes. How would that make you feel? Attachment: Picchiotto email (874-920 N. Quentin Road - Quentin apartments) Lastly, the developer did reach out to the homes closest to the development for input. We want to make it very clear, as we did with them, that we do not support this development for all the reasons already listed. We specifically stated the development should be aligned with the recent ranch townhome development on Hicks Road by Walgreens, where a similar acreage had only 12 townhomes built and the distance between the property building were significantly greater than 20 ft. That is the only density we would support. They asked for input under the worst case scenario where the village would approve this despite our concerns. It is an awful situation to feel like you have to provide input for something you are firmly against. Thank you for your time. Regards, Julie & Mitch Picchiotti 2 Packet Pg. 218 4.1.ad Ben Vyverberg Subject: FW: 874-920 N Quentin Road Development - Petition Attachments: Petition 874-920 N. Quentin Road Planned Development to 12.1.21.pdf; sigs 1dec21 again.PNG Attachment: Pichhiotti email describing Petition (874-920 N. Quentin Road - Quentin apartments) From: Julie <> Sent: Wednesday, December 1, 2021 8:22 PM To: Ben Vyverberg <BVyverberg@palatine.il.us>; Tim Millar <TMillar@palatine.il.us>; Jim Schwantz <JSchwantz@palatine.il.us> Subject: 874-920 N Quentin Road Development - Petition Caution: This is an external email, Please take care when clicking links or opening attachments. When in doubt, please talk with the sender or check with VOP IT To All, I have the attached petition that to date 229 of our neighbors have signed against the current planned development on Quentin Road. Additionally, I have included a map so you can visually see the support against this development in our local community. My neigbors and I would like these included in the record. Given the time of the year with the holidays and cold weather we had to do our petitioning electronically. We provided a clean copy for your reference. If you prefer to have the full excel petition export we are happy to provide it upon request. The petition numbers continue to grow and we plan to submit the additional signatures at the Plan Commission meeting. As a reference, the last time this developer submitted plans for this location we had 180 signatures that were sent in advance and an additional 100 were submitted the night of the Plan Commission meeting. Last July, when the same developer submitted similar plans for a 59 unit building we connected with all the HOA presidents and obtained contact information for our community members. It made reaching everyone easier this time around. We are encouraged by the support the community has shown against this development and hope the Plan Commission and Council will listen to our concerns and vote against the development. Thank you, Julie Picchiotti 1 Packet Pg. 219 4.1.ae Petition: 874-920 N. Quentin Road Planned Development We the undersigned are against the 40-unit apartment building on the parcel 874/920 N. Quentin as proposed by the petitioner Alliance/Northpointe Development. We call on the village to reject the planned development due to its density and impact on the surrounding area. We are requesting the opportunity to be involved in additional dialogue with the Village of Palatine to determine an appropriate use plan which is more aligned with the existing characteristics of the neighborhood. Resident Name Resident Street Address 1 Danielle McCready 1057 N Quentin Road, Palatine, IL 2 Jill Dreyer 722 W Lakeside Dr, Palatine, IL Attachment: Pichhiotti Petition (874-920 N. Quentin Road - Quentin apartments) 3 Dan Suwinski 1152 N Perry Dr, Palatine, IL 4 Cathy Umlauf-Schulz 882 N Martin Dr Palatine 5 Susan Reindl 653 W. Lakeside Dr., Palatine, IL 6 Alexandra Vikartofsky 910 N Martin Dr, Palatine, IL 7 Tom Chambers 765 W Bayer Dr. Palatine, IL 60067 8 Jeanne Szewczyk 972 N Martin Drive, Palatine, IL 9 Jason Dreyer 722 W Lakeside Drive, Palatine, IL 10 Nate Hess 988 N Martin Dr., Palatine, IL 11 Anna Hess 988 N Martin Dr., Palatine, IL 12 Belle Pery 1142 N Perry Drive, Palatine, IL 13 Heidi Flatebo 646 W LAKESIDE DR, Palatine IL 60067 14 Sue Blair 1033 N. Quentin Rd., Palatine, IL 15 Sandra Clark 907 N. Quentin Rd., Palatine, IL 16 John Novak 852 North Franklin Avenue, Palatine, IL 17 LOUIE GATZIOLIS 845 N MAPLE AVE PALATINE, IL 18 Andrew golletz 648 W Bayer Dr, Palatine, IL 19 Christine Magoncia 835 N. Franklin St., Palatine, IL 20 Claire Langell 871 N Maple Ave Palatine IL 60067 21 Peter pasek 847 n Franklin palatine IL 60067 22 Holly Millan 910 N Maple Ave, Palatine, IL 23 Edgar Millan 910 N Maple Ave, Palatine, IL 24 Debra Gutman 928 N Franklin Ave, Palatine, IL 25 Melissa Bixby 917 N Coolidge Ave, Palatine, IL 26 Pamela Olander 921 N. Martin Drive, Palatine, IL 27 Joshua Kalfus 921 N. Martin Drive, Palatine, IL 28 Ryan Gallagher 752 W Lakesdie Dr., Palatine, IL 29 Vincent Di Cristofano 1201 N Lakeview Drive, Palatine, IL 30 Frank Sullivan 1223 N. Lakeview Ct, Palatine, IL 31 Rachel Groenwald 852 Martin Drive, Palatine, IL 32 Vicki Bowman 1119 N Perry Drive, Palatine, IL 60067 33 robert stoltz 1305 N Laguna Ct, Palatine, IL 34 pamela stoltz 1305 N Laguna Ct, Palatine, IL 35 Alyssa Alden 662 W Bayer Dr, Palatine, IL 36 Troy Heinritz 1043 N. Glenview Ct. Palatine 37 Karen DeSalvo 942 N. Maple Ave., Palatine 38 David Di Cristofano 900 N. Maple Avenue Palatine IL 60067 39 Aaron Del Mar 1165 n Lakeside, Palatine, IL Packet Pg. 220 4.1.ae Petition: 874-920 N. Quentin Road Planned Development We the undersigned are against the 40-unit apartment building on the parcel 874/920 N. Quentin as proposed by the petitioner Alliance/Northpointe Development. We call on the village to reject the planned development due to its density and impact on the surrounding area. We are requesting the opportunity to be involved in additional dialogue with the Village of Palatine to determine an appropriate use plan which is more aligned with the existing characteristics of the neighborhood. Resident Name Resident Street Address 40 Betty Del Mar 890 N Maple, Palatine, IL 41 Patricia kudla 852 N maple ave, Palatine, IL Attachment: Pichhiotti Petition (874-920 N. Quentin Road - Quentin apartments) 42 Mike Carpenter 1028 N. Glenview Ct. Palatine, IL 60067 43 Mary Carpenter 1028 N. Glenview Ct. Palatine, IL 60067 44 Paul DeSalvo 942 N Maple Ave Palatine, IL 60067 45 Annette Paciga 867 N Maple Ave, Palatine, IL 46 John Paciga 867 N Maple Ave, Palatine, IL 47 Patricia A Fluhler 816 N Franklin Avenue, Palatine, IL 48 James Fluhler 816 N Franklin Ave, Palatine, IL 49 Julie Jesso 939 N Franklin Ave Palatine IL 60067 50 Mitchell Picchiotti 939 N Franklin Ave Palatine IL 60067 51 Schalk van der Walt 925 N Franklin Ave, Palatine, IL 52 Sarah Murphy 925 N Franklin Ave, Palatine, IL 53 Carl Gutman 928 n Franklin ave, Palatine, IL 54 Marcus Orofino 913 N Franklin Ave, Palatine, IL 55 Grace Orofino 913 N Franklin Ave, Palatine, IL 56 Danielle Crisp 1039 N Glenview Ct Palatine, IL 60067 57 Guoxing Chai 1048 N Glenview Ct, Palatine IL 58 Jim Marthaler 884 W Goodrich Pl, Palatine, IL 59 Evelyn Marathaler 884 W Goodrich Pl, Palatine, IL 60 chunlei yang 20287 n Ela Rd deer park il 61 Gina Bekeleski 906 , South boardwalk Court, Palatine, IL 62 Nick Bekeleski 906 , South boardwalk Court, Palatine, IL 63 Joseph Marelli 1034 N Glenview Ct, Palatine, IL 64 Marzena Nowak 1034 N Glenview Ct, Palatine, IL 65 Ron and Amanda Klezek 1010 N. Glenview Court, Palatine, IL 66 William McLenahan 848 N. Franklin Ave., Palatine, IL 67 Sharon E. McLenahan 848 N. Franklin Ave., Palatine, IL 68 Kaitlyn Sprenzel 900 N Maple Ave, Palatine, IL 69 Rita Ginocchio 1126 M. Lakeside Drive, Palatine, IL 70 Stephen Fahrner 1114 N. Lakeside Drive, Palatine, IL 71 Mike Gyetvay 1038 N. Glenview Ct., Palatine, IL 72 Mark Paulsen 1112 N Lakeside Dr, Palatine, IL 73 Kindra Hayes 1109 N Perry Dr, Palatine, IL 74 CAROLYN dalton 762 LAKESIDE drive, Palatine, IL 75 Carol Buck 680 W Lakeside dr, Palatine, IL 76 Noreen Fahrner 1114 Lakeside Dr. Palatine 77 Brenda Golletz 648 W Bayer Dr, Palatine, IL 78 Pamela Nolan 728 West Northwest Highway, Palatine, IL Packet Pg. 221 4.1.ae Petition: 874-920 N. Quentin Road Planned Development We the undersigned are against the 40-unit apartment building on the parcel 874/920 N. Quentin as proposed by the petitioner Alliance/Northpointe Development. We call on the village to reject the planned development due to its density and impact on the surrounding area. We are requesting the opportunity to be involved in additional dialogue with the Village of Palatine to determine an appropriate use plan which is more aligned with the existing characteristics of the neighborhood. Resident Name Resident Street Address 79 Karen Smusz 1143 N. Perry, Palatine, IL 80 Mark Smusz 1143 N. Perry, Palatine, IL Attachment: Pichhiotti Petition (874-920 N. Quentin Road - Quentin apartments) 81 Katerina Smusz-Moore 1143 N. Perry, Palatine, IL 82 Josef Mikulcik 885 N. Quentin Rd., Palatine, IL 83 Adriana Vankova 885 N. Quentin Rd., Palatine, IL 84 Brigita Mikulcikova 885 N. Quentin Rd., Palatine, IL 85 Robert Allen 732 W Lakeside Dr Palatine IL 60067 86 matthew hayes 1109 n perry dr, Palatine, IL 87 Christine Hickey 734 W. Bayer Dr., Palatine, IL 88 Natalie Nisivaco 1185 N Lakeside Drive Palatine IL 60067 89 Joseph V Nisivaco 1185 N Lakeside Drive Palatine IL 60067 90 Carolyn Alexander 895 N Martin Drive, Palatine 60067 91 Christopher Bonk 1052 N Glenview Ct Palatine 92 James Blair 1033 north Quentin rd, Palatine, IL 93 Hitoshi Saito 984 N Glenview Ct, Palatine, IL 94 Mayumi Saito 984 N Glenview Ct, Palatine, IL 95 Ken Saito 984 N Glenview Ct, Palatine, IL 96 Thomas Schulz 882 N Martin Drive, Palatine, IL 60067 97 Marcela oneal 1006 n glenview court palatine il 60067 98 Raphael Imhof 1042 n glenview ct, Palatine, IL 99 Kelsey Paulsen 1112 N Lakeside Dr, Palatine, IL 100 Jacqueline Chiang 864 N Franklin Ave, Palatine, IL 101 Laurie Booth 868 N. Franklin Avenue, Palatine, IL 102 Jamie L. Booth 868 N. Franklin Avenue, Palatine, IL 103 Denise Green 1013 west elm street, Palatine, IL 104 Lorene Harder 872 N. Maple Ave, Palatine, IL 60067 105 James Harder 872 N. Maple Ave, Palatine, IL 60067 106 Jenn Demos 981 N Cove Dr, Palatine, IL 107 Katy Garchie 891 N Maple Avenue Palatine,IL 60067 108 Robert Cantarutti 828 N Franklin Ave, Palatine, IL 60067 109 James Johnson 626 N Quentin Road, Palatine IL 60067 110 Justine Samuels 825 N Maple Ave, Palatine, IL 111 Joseph Origer 825 N Maple Ave, Palatine, IL 112 Rachel Brad 1053 N Glenview Ct, Palatine, IL 113 Andrew Brad 1053 N Glenview Ct, Palatine, IL 114 Lynn S Ishizuka 1125 n. Quentin Rd., Palatine, IL 115 Tom Piazza and Melody Piazza 856 N Maple Ave, Palatine, IL 60067 116 Max Simampo 1018 N Glenview Ct Palatine IL 60067 117 Seung Julia Choi 853 N. Maple, Palatine, IL Packet Pg. 222 4.1.ae Petition: 874-920 N. Quentin Road Planned Development We the undersigned are against the 40-unit apartment building on the parcel 874/920 N. Quentin as proposed by the petitioner Alliance/Northpointe Development. We call on the village to reject the planned development due to its density and impact on the surrounding area. We are requesting the opportunity to be involved in additional dialogue with the Village of Palatine to determine an appropriate use plan which is more aligned with the existing characteristics of the neighborhood. Resident Name Resident Street Address 118 Michelle Velmont 775 W Peder Ln, Palatine, IL 119 Barbara Davis 617 N Deer Run Dr, Palatine, IL Attachment: Pichhiotti Petition (874-920 N. Quentin Road - Quentin apartments) 120 Mike Velmont 775 W Peder Ln, Palatine, IL 121 Robert Lettecci 998 North Glenview Court Palatine, 60067 122 Sally Lettecci 998 N Glenview Ct, Palatine, IL 123 Laura Wilen 1052 N Glenview Ct, Palatine, IL 124 Nannette Harris 825 W Poplar Street, Palatine, IL 125 Julia Harris 825 W Poplar Street, Palatine, IL 126 Imelda Sondak-Simampo 1018 N Glenview Ct, Palatine, IL 60067 127 Michael Krainski 872 N Coolidge Avenue, Palatine, IL 128 Nancy Trujillo 895 W Goodrich Place, Palatine Il. 60067 129 Vernon Alexander 895 N. Martin Dr., Palatine, IL 130 Sarah Kramer 545 West Kenilworth Ave, Palatine, IL 131 Kenneth M Kramer 545 W Kenilworth Ave, Palatine, IL, 60067 132 Kim Vander Steen 841 N. Martin Dr., Palatine 133 Joseph Kramer 949 Quentin Rd, Palatine IL 60067 134 Natalia Kramer 949 Quentin Rd, Palatine IL 60067 135 Kenneth M Kramer 949 N Quentin Rd Palatine IL 136 Nancy Kramer 949 N QUENTIN RD, Palatine, IL 137 Caleb Bennett 901 N MAPLE AVE, Palatine, IL 138 Karen schell 732 n Franklin ave, Palatine, IL 139 Thomas Schell 732 n Franklin ave, Palatine, IL 140 Maggie Schell 732 n franklin ave, Palatine, IL 141 Daniel Kent 724 N. Franklin Ave., Palatine, IL 142 Thomas Graning 1008 N Glenview Ct, Palatine, IL 143 Carolyn Gralewski 883 N Maple Ave, Palatine, IL 144 Charles Fisher III 727 N Franklin Ave, Palatine, IL 145 Thomas R. Klaus 697 N Mart Ct., Palatine, IL 146 Karen A. Klaus 697 N Mart Ct., Palatine, IL 147 Jacqueline Perno 1044 W Sutton Ct, Palatine, IL 148 Denise Morin 710 W. Bayer Drive, Palatine 149 John Erickson 860 N Franklin Ave, Palatine, IL 150 Cheryl Erickson 860 N Franklin Ave, Palatine, IL 151 Steve Breese 716 N Franklin Ave, Palatine, IL 60067 152 Ed Stacy 1044 N. Glenview Court, Palatine, IL 60067 153 Elizabeth Skibinski 1037 N. Glenview Ct, Palatine, IL 154 Connie Ponce 885 North Cove Drive, Palatine, IL 155 Stephanie Schmidt 881 N cove dr, Palatine, IL 156 Michael Garchie 891 N Maple Ave, Palatine, IL Packet Pg. 223 4.1.ae Petition: 874-920 N. Quentin Road Planned Development We the undersigned are against the 40-unit apartment building on the parcel 874/920 N. Quentin as proposed by the petitioner Alliance/Northpointe Development. We call on the village to reject the planned development due to its density and impact on the surrounding area. We are requesting the opportunity to be involved in additional dialogue with the Village of Palatine to determine an appropriate use plan which is more aligned with the existing characteristics of the neighborhood. Resident Name Resident Street Address 157 Michael Vendafreddo 762 N Franklin Ave, Palatine, IL 158 Lori Vendafreddo 762 N Franklin Ave, Palatine, IL Attachment: Pichhiotti Petition (874-920 N. Quentin Road - Quentin apartments) 159 Jessica Brown 907 north maple avenue, Palatine, IL 160 Tim Allyn 878 N. Franklin Ave, Palatine, IL 161 Judeanne Caputo 956 N. Franklin Avenue, Palatine, IL 162 Joshua Langell 871 N Maple Ave, Palatine, IL 163 Tina leiss 840 n Franklin Palatine, IL 164 Mucia A Burke 879 N maple ave, Palatine, il 165 Tracey Cantarutti 828 N Franklin Ave. Palatine 166 Stephen Thompson 874 W Goodrich Pl, Palatine, IL 167 Beth Long 1061 W Myrtle Street, Palatine, IL 168 Peter Meyer 844 N. Franklin Ave., Palatine, IL 169 Carol Collins 846 N Maple Ave, Palatine, IL 170 Kathy Wallace 875 W Poplar St, Palatine, IL 171 Barb Zailyk 1019 W Sutton Ct, Palatine, IL 172 Terri Thompson 874 W Goodrich Pl, Palatine, IL 173 Vito Ponce 885 north cove drive, Palatine, IL 174 Cerisa Roulston 1223 N. Lakeview CT, Palatine, IL 175 Sana Shaikh 1250 n Lakeview dr, Palatine, IL 176 Carol Morris 1255 N. Sterling Avenue, Unit 112, Palatine 177 Jesse Villarreal 915 n Palos ave, Palatine, IL 178 Rosa Villarreal 915 n Palos ave, Palatine, IL 179 Cristal Gonzalez 923 N Palos Ave, Palatine, IL 180 Anthony Cinquegrani 841N Martin Drive Palatine IL 60067 181 David Piazza 856 N Maple Ave, Palatine, IL 60067 182 Mucia Marie Burke 879 N Maple Ave, Palatine, IL 183 Judy Aleksiak 1022 N Glenview Ct, Palatine, IL 184 Krissy McMahon 1222 Lakeview Dr Palatine 185 Patricia Sowder 1238 N Rosewood Ct Palatine, IL 186 Emily Gallagher 752 W Lakeside Dr, Palatine, IL 187 Clare Harder 872 N. Maple Ave, Palatine, IL 60067 188 Michael P Merchut 1269 N Lakeview Drive, Palatine, IL 189 Sam G Haddad 1232 N. Rosewood Court, Palatine, IL 190 Barbara Black 755 West Bayer, Palatine, IL 191 Joseph Murphy 1275 N Lakeview Drive, Palatine, Illinois 60067 192 Andrew Lysaker 1241 N Lakeview Dr, Palatine, IL 193 Palak Desai 1209 N. Lakeview Dr. Palatine 194 Sarah Roche 1218 N Lakeview drive, Palatine, IL 195 Jeff & Rebecca Buchholtz 1229 N. Lakeview Ct, Palatine, IL Packet Pg. 224 4.1.ae Petition: 874-920 N. Quentin Road Planned Development We the undersigned are against the 40-unit apartment building on the parcel 874/920 N. Quentin as proposed by the petitioner Alliance/Northpointe Development. We call on the village to reject the planned development due to its density and impact on the surrounding area. We are requesting the opportunity to be involved in additional dialogue with the Village of Palatine to determine an appropriate use plan which is more aligned with the existing characteristics of the neighborhood. Resident Name Resident Street Address 196 Scott Matzke 1307 N Laguna Ct, Palatine, IL 197 Niraj Desai 1209 N Lakeview Dr, Palatine, IL 60067 Attachment: Pichhiotti Petition (874-920 N. Quentin Road - Quentin apartments) 198 Susan McBride 1127 N Perry Dr, Palatine, IL 199 Tricia McGinn 1309 N. Laguna Ct, Palatine, IL 200 Rodney Sowder 1238 North Rosewood Court, Palatine, IL 60067 201 Jeffrey McMahon 1222 North Lakeview Drive Palatine IL 60067 202 Michael Roche 1218 N Lakeview, Palatine, IL 203 Judith Y Gaston 982 N Glenview Court, Palatine, IL 204 Sarah Wippman 1276 N Lakeview Drive, Palatine, IL 205 Robert Wippman 1276 N Lakeview Drive, Palatine, IL 206 Nithya Stephen 1263 N Lakeview Dr , Palatine 207 William Ravikumar 1263 N Lakeview Dr, Palatine 208 Paul Buck 680 w lakeside dr, Palaitine, IL 209 Tina Di Cristofano 1201 N. Lakeview Dr. Palatine, IL 60068 210 Anthony Di Cristofano 1201 N. Lakeview Dr., Palatine, IL 60067, 211 Neil Soni 1031 n Glenview Ct, Palatine, IL 212 Nicole Soni 1031 N Glenview Ct, Palatine, IL 213 Don Kronberg 1233 N. Lakeview Drive, Palatine 214 Suzanne Terranova 1251 N Lakeview Drive Palatine IL 60067 215 Ross Shrestha 1259 n lakeview dr, Palatine, IL 216 Toshiko Lin 901 N Franklin Ave, Palatine, IL 217 Meghan Haddad 1232 N Rosewood Ct, Palatine, IL 218 Lois Kurowski 920 N. Sterling Ave, Palatine, IL 219 Judy Dann 1266 Forest View Circle, Palatine, IL 220 Chad Bobbit 1160 N Old Bridge, Palatine, IL 221 Mark Gallegos 1277 N Lakeview Dr, Palatine, IL 60067 222 Jaclyn Castellanet 1307 N Laguna Ct., Palatine, IL 223 Deepika Syal 1210 N Oakridge Ct, Palatine, IL 224 Narinder K Syal 1210 N Oakridge Ct, Palatine, IL 225 SAVITRI MEHTA 1210 N OAKRIDGE CT, Palatine, IL 226 YASH SYAL 1210 N OAKRIDGE CT, Palatine, IL 227 Min Sun 1205 N. Lakeview Drive, Palatine, IL 60067 228 Liang Tang 1205 N. Lakeview Drive, Palatine, IL 60067 229 Freddie Tang 1205 N. Lakeview Drive, Palatine, IL 60067 Packet Pg. 225 4.1.ae Petition Map of Households in the Immediate Neighborhood Opposed to the Proposed Quentin Ave Development (as of December 1, 2021) Attachment: Pichhiotti Petition (874-920 N. Quentin Road - Quentin apartments) Packet Pg. 226 4.1.af Ben Vyverberg Subject: FW: Public Hearings: 874-920 N. Quentin Road - File No. 21-89 From: Marcus Orofino <> Sent: Wednesday, December 1, 2021 10:00 PM To: Tim Millar <TMillar@palatine.il.us>; Ben Vyverberg <BVyverberg@palatine.il.us> Cc: Michael Jacobs <MJacobs@palatine.il.us>; Jim Schwantz <JSchwantz@palatine.il.us>; Scott Lamerand <SLamerand@palatine.il.us>; Doug Myslinski <dmyslinski@palatine.il.us>; Greg Solberg <GSolberg@palatine.il.us>; Kollin Kozlowski <KKozlowski@palatine.il.us>; Brad Helms <BHelms@palatine.il.us>; > Attachment: Orofino email (874-920 N. Quentin Road - Quentin apartments) Subject: Public Hearings: 874-920 N. Quentin Road - File No. 21-89 Caution: This is an external email, Please take care when clicking links or opening attachments. When in doubt, please talk with the sender or check with VOP IT Tim and Ben, We are emailing you regarding the Public Hearings: 874-920 N. Quentin Road - File No. 21-89 on Tuesday December 7th at 7PM. Our understanding of the proposal is that a two-story 40-unit apartment complex with an underground parking garage is proposed to be built directly behind our home. Adding a 40-unit apartment would increase the population of the neighborhood in a very concentrated way. We’ve been in our home at 913 Franklin Avenue since January 2018 and have enjoyed it and the neighborhood quite a lot. We’ve tried our best to beautify the neighborhood as well as create a good home for our future family. When we purchased a home next to a vacant lot, we realized that there would be construction and a structure erected at some point. However, given the size of the lot we never imagined that an apartment complex with so many units would be proposed. When we met with the developer, we expressed our concerns; some of which were addressed, however we strongly discouraged the proposed number of units for this site because of concerns of overcrowding. The density of this proposed development is 15.81 units/acre, which exceeds that of other apartment complexes in the area: The Clayson - 15.70 units/acre Knollwood - 9.79 units/acre Willow Glen - 3.78 units/acre This is the first home that we have owned and we’re just beginning to get situated with life and this is calling into question the implications this could have on our future. We have concerns with the population density increase, changes to the dynamics of the neighborhood, impacts it could have to traffic patterns, increased potential for crime due to so many individuals in a small area, light pollution, a loss of privacy, and potential impacts to our home value which could put significant financial strain our ability to sell the home in the future. We plan to make all these concerns known during the hearing, but we wanted to share some of our thoughts with you leading up to the hearing given time seems to move so fast these days. Thank you for hearing our concerns, your time, and your consideration. If you have any questions, we would be more than happy to talk with you on the phone and we would greatly appreciate any support/perspective you have on this matter. 1 Packet Pg. 227 Thank you, Grace and Marcus Orofino 2 4.1.af Packet Pg. 228 Attachment: Orofino email (874-920 N. Quentin Road - Quentin apartments) 4.1.ag Willow Glen Homeowners Association 980 - 1054 N. Glenview Ct. December 1, 2021 Ben Vyverberg, Director of Planning and Zoning Village of Palatine 200 E Wood Street Palatine, IL 60067 RE: Proposed Development 896 - 920 N Quentin Road Attachment: Willow Glen Petition (874-920 N. Quentin Road - Quentin apartments) Dear Mr. Vyverberg: On behalf of the Willow Glen Homeowners Association, a 40-unit townhouse community located on N. Glenview Ct., I am writing you to express the Association’s disfavor of the proposed development planned for 896 - 920 N Quentin Road. At issue: Increased traffic on Franklin, Maple and Poplar: We already have an overabundance of traffic due to the car cutting through Maple and Franklin streets to avoid the traffic light at Northwest Highway and Quentin. As the entrance and exit of the parking garage for the new development will be off Poplar, it will add to the congestion in this area. In addition, with the proximity of the exit to Quentin, it will create chaos in trying to get out onto Quentin Road. Neighborhood Continuity This high-density project does not fit into the surrounding neighborhood and would better-suited amongst like buildings. Homeowners who back-up to the planned development sure didn’t expect to have their privacy infringed upon by a multi-unit building overlooking their property. Property Values As our area has not recovered from the last market downturn, this will add to the the negative impact on the surrounding property values. Willow Glen has experienced the effects from low-income housing for 15+ years from the former owners of the Clayton Apartments and we do not wish to repeat those issues again. A better use of this land can be optimal for the neighborhood and the Village of Palatine by approving a development utilizing a 1-story structures such as a medical building or independent business. Packet Pg. 229 4.1.ag Willow Glen continues its opposition to this project. Sincerely, Willow Glen Board Distribution: Katie Rivard Jim Schwantz Attachment: Willow Glen Petition (874-920 N. Quentin Road - Quentin apartments) Tim Millar abetterpalatine@gmail.com Packet Pg. 230 4.1.ah Packet Pg. 231 Attachment: ToshikoLinLTR (874-920 N. Quentin Road - Quentin apartments) 4.1.ai Ben Vyverberg Subject: FW: Planned development to a 2 story 40 unit apartment on Quentin Road. From: Kathy Wallace <> Sent: Friday, November 26, 2021 4:06 PM To: Jim Schwantz <JSchwantz@palatine.il.us>; Ben Vyverberg <BVyverberg@palatine.il.us>; Tim Millar <TMillar@palatine.il.us> Attachment: Wallace email 11-26-21 (874-920 N. Quentin Road - Quentin apartments) Subject: re: Planned development to a 2 story 40 unit apartment on Quentin Road. Caution: This is an external email, Please take care when clicking links or opening attachments. When in doubt, please talk with the sender or check with VOP IT I live on Poplar ST and I think this is a bad idea to put up and apartment building there. I have called the police at least 3x re: traffic driving so fast they ended up in the ditch on Poplar St. People cut through here to miss light at Northwest Hwy and Quentin. They speed through. We have a very nice neighbor hood and don't think adding at least 40 cars to the area is a good idea. The traffic is bad enough without more traffic especially during rush hour. I have difficulty returning from work onto Poplar ST because of traffic . In higher income areas low income housing causes the price of our houses to drop. The houses on Franklin that would back up the building would be difficult for those houses the lighting, flooding and we are on wells. That definitely would affect the function of our wells. It can increase neighbor hood crime we very seldom see Police on our street because it is a very safe neighborhood. We help each other as needed. . It definitly affects health. Low income housing has negative effects on health outcomes. Exposure to hazards increase in respiratory illness and other diseases especially with Covid issues, influenza RSV etc., There are burdens that cut corners on spending in health care and nutrition. Low income housing also affects educational achievement. Poorer scores on reading and math tests and many HS drop outs in low income housing. It can also affect dependence on public service dependence and could eventually increase our taxes. I do not need anyone else with pets walking their animals in my yard. We don't have sidewalks, walkways or lights so many animals use my yard and kill my grass especially from the Clayson apartments.. Don't need anymore animals in the area ruining my yard. I feel there are better places to place this building and it is not on Quentin and Poplar St.. . I am definitely not in favor of building this affordable housing in this area. Kathy Wallace 875 W Poplar St 1 Packet Pg. 232 4.1.aj Ben Vyverberg Subject: FW: Northpointe Development Proposal for Affordable Housing in Palatine On Dec 2, 2021 4:31 PM, Frank De Rosa wrote: Caution: This is an external email, Please take care when clicking links or opening attachments. When in doubt, please talk with the sender or check with VOP IT Attachment: DeRosa email (874-920 N. Quentin Road - Quentin apartments) To: Mr. Jim Schwantz Mayor, Village of Palatine Village of Palatine Plan Commission 200 E. Wood Street Palatine, IL 60067 From: Frank and Maureen De Rosa 456 South Abbey Hill Lane Palatine, IL 60067 Date: December 2, 2021 The purpose of this letter is to express our support for the Northpointe Development affordable housing proposal to be constructed along Quentin Road southwest of Poplar Street. The Northpointe Development proposal was originally presented last July. In response to a number of concerns raised by village officials and residents, Northpointe Development has made significant revisions that strengthen their proposal and express respect for the concerns of neighbors and community. The new plan reduces the building from three to two stories, and from 58 to 40 units. The structure is moved east, closer to Quentin Road and farther from existing homes. The clubhouse is relocated and the plan for balconies facing west is removed. The landscaping plan includes tall trees on its western perimeter. Traffic concerns are addressed, including the elimination of a Poplar Street entrance. According to Northpointe Development, the new plan conforms with Palatine’s multi-family district standards. We are long-time Palatine residents. We are grateful that Palatine has been such a wonderful place to raise our family. We like the idea that a new group of neighbors, many of whom are employed in Palatine, could find an affordable place to live and could enjoy our community just as our family has. We are convinced that the Northpointe Development proposal, which would provide affordable housing for people and families of varying incomes in low density settings, is an excellent example of the kinds of ventures that Palatine should consider. Such a development could only enhance an already great place to live and work. Frank and Maureen De Rosa 456 Abbey Hill Lane Palatine Sent from my iPad 1 Packet Pg. 233 4.1.ak October 18, 2021 Mr. Ben Vyverberg Director of Planning and Zoning Attachment: LWilliamsAffordableHousingLtr (874-920 N. Quentin Road - Quentin apartments) Palatine Village Hall 200 E Wood Street Palatine, IL 60067 Re: Support for Northpointe Development proposed affordable housing in Palatine Mr. Vyverberg: I am writing to you to voice my general support of affordable housing developments in our community, and specifically in support of the one planned for 874-920 N Quentin Road in Palatine. Restaurants and retail businesses in the northwest suburbs are increasingly finding it difficult to attract and retain employees. Part of the problem is related to low wages and the lack of benefits: But an even larger issue is the lack of affordable housing in this area. The cost of housing has increased exponentially over the years, while wages have remained largely stagnant. If we want to fill available entry-level jobs in our community, we must be able to provide those workers with an affordable place to live. It is not realistic to expect that someone making $18 per hour ($2,500 per month, full time, before taxes) will be able to afford the current average rent of $1,200/month per person in this community. And for those workers with families, the financial realities are even more dire. Please assess the value of this project on facts and research, which show the value that local affordable housing will bring to our community. Sincerely, Lisa R. Williams 19 S Linden Ave, Palatine IL 847-359-2459 Cc: Mr. Brad Helms, District 6 Illinois Representative Mr. Reed Ottesen, Palatine Village Manager Mr. Jim Schwantz, Palatine Village Mayor Packet Pg. 234 4.1.al Packet Pg. 235 Attachment: Public Notice (874-920 N. Quentin Road - Quentin apartments)