Waterfront Working Group
Regular MeetingPortland, ME · March 28, 2019
Agenda
Waterfront Working Group
7th Meeting Agenda
March 28, 2019
Room 24, City Hall
3:00pm to 5:00pm
*************************************
1. Welcome and Introductions:
Jon Jennings, City Manager, Chair
2. Review Meeting Notes from
a. Meeting 6, 32119
3. Working Group discussion on unresolved zoning issues
a. See Summary Table of Issues and Approaches, attached and Zoning Memo
from Meeting #3
4. Working Group discussion on Schedule moving forward
a. Meeting Materials
Packet
Waterfront Working Group
7th Meeting Agenda
March 28, 2019
Room 24, City Hall
3:00pm to 5:00pm
*************************************
1. Welcome and Introductions:
Jon Jennings, City Manager, Chair
2. Review Meeting Notes from
a. Meeting 6, 32119
3. Working Group discussion on unresolved zoning issues
a. See Summary Table of Issues and Approaches, attached and Zoning Memo
from Meeting #3
4. Working Group discussion on Schedule moving forward
a. Meeting Materials
Agenda 2
WWG Meeting 6 Notes
3-21-19
City of Portland
Waterfront Working Group
Meeting #6
Thursday, March 21, 2019
3:00 - 5:00 p.m.
Attendance
Becky Rand
Mike Alfiero
Bill Coopersmith
Willis Spear
Togue Brawn
Dory Waxman - made it!
Charlie Poole
Steve Dimillo
Cyrus Hagge
John Bisnette here in place of Keith Lane
Staff: Jon Jennings, Bill Needleman, Christine Grimando, Greg Mitchell, Ethan Strimling, Matthew
Grooms, Bruce Hyman
Meeting Summary:
There were 3 major components of this week’s meeting: 1) John Jennings’ (City Council’s) response to
concerns of pier owners, which were received only this morning; 2) Continued TIF discussion with Greg
Mitchell and survey amongst PWWG of most desired TIF money distribution; and 3) Continued
discussion on waterfront zoning issues and ordinance language, again emphasizing the non-consensus of
percentages of marine v non-marine use (70/30 was emphatically opposed by pier owners), nmouz
distances and ordinance language.
It was also determined during this meeting that good and necessary work is being done by the PWWG
and that meeting more often could help hammer out contentious issues in a productive, positive and very
civil manner. As such the next meeting of the PWWG will be next Thursday, March 28 from 3-5 pm.
Issue 1 - Concerns of Pier Owners:
The morning of this meeting, John Jennings received information from pier owners, (a few of whom are
members of PWWG and some of whom are not) who had met separately from PWWG. The pier owners
informed him of their concerns regarding “decisions” being made by PWWG. John Jennings clarified
that the PWWG is not making decisions, but recommendations that will be taken to City Council, and
also noted that some pier owners expressing concerns were not at the PWWG meetings. Mr. Jennings
also noted that this was the 1st the City had heard of these specific concerns and stated that the progress
he thought was being made in the PWWG meetings seems to have been set back by the information he
received this morning. Clearly this is a frustration for the City, as there are issues he thought were clear
and had agreement (or agreement to disagree) amongst PWWG members. That said, Mr. Jennings stated
that the PWWG is doing good work and believes that the recommendations it will put forth to the City
1
Agenda 2
WWG Meeting 6 Notes
3-21-19
Council will bear positive outcomes -- although no one will get everything they want, compromises will
be fair and will benefit the future of both fishermen’s futures and commercial development. Mr. Poole,
Mr. Dimillo, and Mr. Alfiero each expressed the desire to continue the work of the PWWG recognizing
that complete consensus was not going to be possible.
Issue #2: Continued TIF Discussion with Greg Mitchell:
Bill Needleman and Greg Mitchell conducted an “exercise” to determine the PWWG’s most desired
distribution of TIF funds (currently about $600,000 -- much more will be available in future as captured
properties generate significantly more anticipated revenue). Based on previous data collected from
PWWG, the categories for potential TIF funds distribution are as follows -- including the highest votes
for 1st, 2nd and 3rd from PWWG:
1. Pier and Wharf Structural Repair (Public Piers)
2 and 3) Street Studies and Improvements, Pedestrian and Multi-Modal Circulation - 2 #1 votes, 6
#2 votes, 4 #3 votes
4) New Publicly owned pier = 1 # 1 vote
5) Surface and structural parking
6) Utilities Infrastructure
7) Environmental Improvements, Including Sea Level Adaptation
8 and 9) Dredging of Commercial Vessel Berthing, Dredge Sediment Disposal and CAD Cell
Development - 6 #1 votes, 3 #2 votes, 1 #3 vote
10) Workforce Training Fund
11) Credit Enhancement Agreements (required development on-site)
12) Other…
13) Professional Services Costs
14) City Staff Salaries
15) Local Match for Ocean Gateway Project
Dredging of commercial vessel berthing and dredge sediment disposal overwhelmingly received the most
#1 votes with Street Studies/Improvements and Pedestrian/Multi-Modal Circulation receiving the
majority of #2 and #3 votes. Mr. Needleman and Mr. Mitchell emphasized that this was a general survey,
but that they wanted to have a good idea of preferences to take to City Council for an April 8 budget
meeting.
It was noted that the current TIF pot is at about $600,000, which is not enough to fund complete dredging
projects or a new pedestrian bridge on Commercial Street, but that it is enough to fund studies and to
begin projects that will seek federal matching money, DOT funding and other grant money. It was also
noted that future TIF funds should be significantly more substantial, once captured properties in the
waterfront TIF zone generate their potential funds. It was noted, again, that Credit Enhancement
Agreements require development on-site, which is an issue that will need to be addressed.
Issue #3 - Continued Discussion on Zoning Issues and Percentages:
It was noted that the fishermen are extremely concerned about what they have already lost to commercial
development on the waterfront and that they are emphatic about specific city ordinances and strict zoning
restrictions going forward. The fishermen are not willing to allow loopholes in ordinance language for
2
Agenda 2
WWG Meeting 6 Notes
3-21-19
development (most specifically for hotels) and will stand strong for marine vs non marine percentages to
stay at least 55/45.
It was emphasized that marketing requirements need to be left in any ordinance as a safety valve. It was
offered that 6 months of required marketing vs. 2 months could be more effective in bringing in marine
use tenants.
Abbreviated Dialog
Issue 1 - Pier owners:
JJ: This morning city made aware of concerns by pier owners. 1st city had heard of these concerns.
CP: We understand there will be public process. We are mostly concerned about where we sit with
current zoning. There is good work being done by group, and we don’t want to derail….having said that,
we felt this group needed to know the concerns of pier owners.
SD: In 2010 we dealt with Commercial Street traffic and a hotel. Property owners believed there were
ample protections in existing language for fishermen. There may need to be better enforcement but we
need to continue to put money back into properties, which will not happen with the restrictions wanted by
lobsterman.
MA: (To fishermen) Where are you being squeezed? What’s going to happen to businesses on the
corridor? 150 was ok, then 125 -- I didn’t understand, but ok. The 3 properties -- Long Wharf, Union
Wharf, Fisherman’s Pier are the elephants in the room, I don’t know what the solution is.
CP: All the fishermen are in the room, property owners are not. We felt it important to let it be known
that when it comes time for the public process, there will be pushback to restrictions. Parking and
commercial use are 2 biggest problems.
BC: What we’re worried about as fishermen is stuff we’ve lost . We’re losing space all the time. The
future is our concern. We’re being squeezed all the time. We don’t want to lose future. Now our day
starts at 3 o’clock because access to the boats is harder. 6:30 to 3 was our old day. The hotel was the
straw that broke camel’s back, that’s why we’re here today. Moratorium is near, June 17. Do we double
up? If we need to, we will. We understand it has to go to the Planning Board, then City Council, but
we’re hoping that you see and meet the fisherman. We have no other place to go except the water and
that’s why we’re sitting here today.
TB: Is there a better way to get these things done? Hire a professional facilitator, hammer something
out? Reasonable people are here, but there are many other players, who are not so reasonable.
BC: Do we need another moratorium? Double up -- twice as many meetings?
3
Agenda 2
WWG Meeting 6 Notes
3-21-19
JJ: We take a step forward, then some group members take us a step back. I thought we had moved on,
then the phone call from the pier owners this morning was a step back. We will never have complete
agreement. What we have been focused on is a balanced approach that is a compromise that everyone
can live with and go forward and that is fair for all sides.
CP: Agree to have some disagreements. Compromise. There was no overlay zone in 2008. I don’t want
it to go away. However, we’re at a point where we have to have the most balanced ---- we can have. This
is an excellent group, proud to be part of it, but there are issues we haven’t addressed yet and we need to
hammer out these issues as a group, I hope.
Most of group wants to continue with meetings, probably more often.
WS: Can we have another moratorium?
JJ: If need be, but I hope not. We are taking steps to alleviate traffic congestion, some things you aren’t
aware of yet.
BC: Give the TIF money back to the wharves.
Abbreviated Dialog Issue 2: TIF Discussion - Greg Mitchell
BN: See handout from Greg Mitchell. It is the wish list. Waterfront TIF district covers entire
waterfront. It’s spine is Commercial St. On map/chart the green are the revenue generators.
GM: We listened to what you said. 3 priorities. 3 Different areas for consideration for TIF money. We
felt it was better to look at a small number of big ticket items than lots of smaller ticket items,
GM: City Council needs budget by April 8, so we need to get answers now.
CP: How about a pedestrian bridge to alleviate problems with crosswalks?
BN: We need to prioritize generally, not specifically to see what the group thinks as a whole. Note that
CEA requires development. If you don’t build anything there is nothing to be returned.
JJ: This is just informative, it’s really up to the group.
BN: This does not replace a conversation it is a prompt for conversation.
(See categories above in meeting summary.)
Is there funding to enhance commercial fishing ventures?
GM: In 1991, we established a non-profit with 11 members who make decisions regarding commercial
lending. Not supposed to replace a bank, lend up to $250,000 in combination with bank financing and
other sources. It is supposed to complement existing options (traditional lending.) There is a small
4
Agenda 2
WWG Meeting 6 Notes
3-21-19
amount of grant money available that is intended to stimulate new investment like Charlie did on Union
Wharf.
TIF money really needs to go to public infrastructure. If you cross the line into private investment, you
need a CEA.
What about a staging area for bait trucks?
JJ: There are places along Commercial Street that are designated for bait.
BN: Priority Exercise -- 1st priority on green, 2nd on blue, 3rd on yellow
Results: Dredging and Street Improvements win overwhelmingly.
JJ: What does $600,000 get us?
BN: Dredging costs upwards of 30 million dollars.
JJ: DOT has to come into play because city will never come up with 30 million on its own.
JJ: I know this group needs to see some tangible results -- 200,000 won’t show tangible results
BN: Sediments involved not good for open disposal -- we’ll have to involve federal funding.
BN: We’re as poised as we’re going to be in terms of permitting -- getting a permit within next months
gets us in a better position for funding when it becomes available.
JJ: We have a Commercial Street study that should be wrapping up within a few months.
CP: If a small amount of money helps getting us over the permitting hump...
BC: That stuff is coming back -- I don’t want to lose it.
JJ: WE have significant economic development tools available to us. We have CEA.
Overview of PDC Commercial Loan and Grant Programs
JJ: We going to create a bucket of $600,000 now. We’ll work with you regarding multi-modal
circulation.
We feel TIF money should be set aside for PWWG. Capturing all of this new development has been
critical for us. Example, WEX building. We captured Wex at dirt, we will see significant TIF revenue
from WEX
Non Agended Item Discussion - Zoning 55/45
5
Agenda 2
WWG Meeting 6 Notes
3-21-19
BN: RE: Non-Marine use parking. If a car is parked in support of marine use it counts toward 55%; if
car is not there in support of marine use it does not count.
In overlay zone, it can be 100% non-marine, we don’t use percentages, but performance standards do
apply.
Gear storage is considered an exterior marine use.
BN: Gulf of Maine has a parking lot with a lot of space. Not allowed to lease space to hotels or
restaurants because commercial parking is non-marine use and it is not included on the permitted use list
in the zone. Commercial parking lots that exist are legal if they existed prior to zoning of 1993 (meaning
it existed before 1987).
JJ: We need a parking discussion. It can be dealt with on a pier to pier basis.
WS: What about last week’s discussion regarding doing away with 45%? I think we should leave that.
We need that marketing as a safety valve. We’d like to see it remain.
BC: Keep a building designated for marine use.
CP: I think keeping marine use percentage is a priority and the marketing is happening.
BN: The other approach is to strengthen it (marketing requirement). It doesn’t appear to be doing
anything now. How can it be more effective? (see last week’s notes regarding marketing requirement)
BC: What is the difference between generating vs. keeping marine use?
BN: It does not require a permit change.
CH: Hotel lobby does not convert back easily into marine use -- whatever gets built needs to have the
flexibility to move back and forth, markets will change, new industries will come in, buildings have to be
adaptable to what comes in.
SD: I can support that concern of Cyrus.
MA: Inside the nmouz there needs to be flexibility. Outside the nmouz definitely.
CP: We need truck access and berth access.
BN: Does this conversation bring us any closer to the percentages?
CP: We have to go back to the marine priority.
BN: Is 2 months too short for marketing?
CP: Yes, we need at least 6.
6
Agenda 2
WWG Meeting 6 Notes
3-21-19
BN: That’s a significant change that we can put into zoning text. Need to think about verbage for
“targeted media” and its meaning for 21st century
CP: Likes 6 month marketing.
7
Waterfront Working Group
Summary Table of Zoning Issues, Approaches, and Status Agenda 3, Zoning Issues
Zoning Issue Approaches Under Status Next Steps
Consideration
Contract/Conditional Eliminate option for site specific Resolved. The WWG Staff to recommend
Rezoning zoning within the WCZ will likely not have to Planning Board
complete agreement on
elimination of the tool
Non-marine Use Revise line to 125 ft offset from Likely to Remain Staff ready to
Overlay Zone Commercial St with 300 ft at recommend to
Long Wharf
Un-Resolved. The Planning Board
WWG will likely not have
complete agreement.
55% first floor and Separate open areas from first Apparently Staff ready to
open area Marine floor. recommend No
Resolved. Percentages changes to Planning
Use Requirement Lobstering group suggests 70/30 discussed by WWG on 3-
split for open areas Board, subject to
7-19 and 3-21-19.
Require marine use occupancy Parking discussion
General support for the
as a condition for non-marine results
status quo. Lobsterman’s
occupancy letter suggests 70/30
First floors marketed Eliminate the requirement, Rejected by the Staff ready to
to marine use as a subject to agreement that the recommend to
Marine/N-M use split has been
WWG on 3-21-19 Planning Board
condition for non-
marine use adequately addressed extending the
Strengthen the requirement Resolved. Extend marking time from
occupancy
marketing time to 180 60 days to 180 days
days
Marine Use Replace with annual report of General agreement Staff ready to
Inventory “significant development.” Add recommend to
periodic broad “assessment of Planning Board
the marine economy”
Parking Some issues to be covered with Not yet discussed Needs a dedicated
the Performance Standards meeting
Permitted Uses Restricting some uses from areas Not yet discussed WWG discussion
subject to marine use
requirements (outside of more
permissive Overlay areas)
Performance Combine NM parking, functional Not yet discussed WWG discussion
Standards utility, and Marine/N-M
compatibility standards under a
single standard. Create a
submission requirement for an
“access management plan”
Suggestion to limit pier edge
occupancy by Non-Marine uses
Lot Coverage, Suggestion to limit both Not yet discussed WWG discussion
Building size
Enforcement Likely, no ordinance changes, but Not yet discussed WWG discussion
will explore better reporting and
education
Non-zoning issues to be addressed separately
Item 3, Zoning
Economic Development Department
Memorandum
Date: February 4, 2019
To: Waterfront Working Group
RE: Meeting #3, February 7, 2019
Zoning Issues
From: Bill Needelman, Waterfront Coordinator
CC: Jon Jennings, City Manager
Greg Mitchell, Economic Development Director
Jeff Levine, Planning and Urban Development Director
Christine Grimando, Acting Planning Director
Matt Grooms, Planner
Jennifer Thompson, Associate Corporation Counsel
John Peverada, Parking Manager
__________________________________________________________________________
Introduction:
At the January 17 meeting of the Waterfront Working Group (WWG,) City staff was directed to
develop a suite of zoning issues and approaches for consideration at the February 7 meeting.
Following the January 17 meeting, members of the fishing community, including WWG
members, provided staff with a document titled, Selected Issues Proposed for Review by the
Working Waterfront Group (attached to this memo.)
The Selected Issues list is introduced by 10 zoning related issues. This staff memo concentrates
on zoning issues and will follow the order and structure of the Selected Issues document. Below,
the zoning portion of the Selected Issues text is pasted in full in red italics followed by a staff
response or suggested approach in standard type. Other, non-zoning issues will be addressed
during following meetings on topics such as Waterfront TIF allocation, the Commercial Street
Operations and Master Plan, and other processes.
As noted in previous meetings, it is the intent to use the current process to identify zoning issues
and approaches that have the support of WWG members. Staff will then bring these issues and
approaches to the Planning Board for review and assimilation into zoning code language.
1
Item 3, Zoning
Zoning Issues:
1. Contract/Condition Rezoning must be eliminated for all prohibited uses in
all waterfront zones.
City Staff Suggested Approach.
At the January 22, 2019 workshop of the Portland Planning Board, city staff
from Planning and Economic Development presented a proposal to
eliminate contract and conditional (C/C) rezoning from the Waterfront
Central Zone (WCZ) consistent with the Selected Issues letter. At the
workshop, members of the WWG and supporting legal representatives
spoke against this approach, suggesting as an alternative that standards for
C/C be tightened, but that the tool remains as an option within the zone.
City staff continues to recommend eliminating the C/C option, but only
within the WCZ, as consistent with the parameters of the WWG process.
2. Non-Marine Use Overlay Zone (NMUOZ) must be eliminated.
City Staff Suggested Approach.
Based on the discussion at the previous WWG meeting, staff is suggesting a
‘north/south’ reduction of the NMUOZ in the areas between Long Wharf and Union
Wharf. The suggested approach is to retain the 150 foot strip of NMOUZ along the
entire Commercial Street sideline, while allowing for a 300 foot portion only on Long
Wharf. Long Wharf’s development history, its current use, and limited potential to
support marine industry warrant its unique treatment. As recommended by staff, the
proposed amendments would remove +/-4 acres of land from the NMUOZ. A map
illustrating the proposed approach is provided below. Other ‘east/west’ reductions in
the extent of the NMOUZ did not appear to have support at the previous WWG
meeting.
2
Item 3, Zoning
3. The 55% marine use/45% non-marine use designation for ground floors and open
areas. (14-311). To enforce the 55%/45% split, the City is interpreting this so that
vacant counts as marine use. This gives owners an incentive to keep areas vacant
rather than leasing to marine uses. This presumption should be reversed so that
vacant counts as non-marine in the calculation of allowable percentages. 14-311(a)(3).
The ratio should be amended to 70%/30%.
City Staff Suggested Approach.
Clarifying the assertion above, staff does not interpret vacant space to be marine. The
inventory process accounts for vacant space as available to marine use. The marine use
marketing requirement outside of the NMUOZ warrants such a designation. To count
vacant space as having any use is self-contradictory.
Regarding the percentage split, staff looks to the WWG for guidance. The 55%/45%
split was a negotiated number resulting from the 2010 process. There are 3 significant
projects that we can look to for examples of application: Merrill’s Wharf (Pierce
Atwood,) Maine Wharf (Scales,) and 60 Portland Pier (Lukes.) Note: Proprietors of Union
Wharf constructed their project under the NMUOZ standards.
Merrill’s Wharf: Constructed after the 2006 WCZ amendments, the Pierce Atwood
renovations originally required 100% of the first floor to house a marine use. With five
floors of useable space, the property managers were able to reinvest in the pier with no
guarantee of non-marine use on the ground level. Additionally, as demonstration of
adherence to the Development Standards, the project improved berthing access at the
pier edge. The project additionally improved storm water quality outletting into the
harbor with site improvements. After 2010, the property managers were able to house
non-marine uses on the first floor – such as the King’s Head Pub. Currently, +/-10% of
the first floor is vacant, 45% is in marine office use, and 45% is in non-marine use. Used
for self-storage for many years, current marine use of the facility is an expansion over
the pre-development condition.
Maine Wharf: The construction of the Scales building on Maine Wharf was the first,
and remains the largest, application of the 55%/45% standards. The pier was in failed
structural condition prior to the project with the subject building condemned and the
southerly end of the pier abandoned due to structural failure. Coincident with
construction of the Scales building, utilities were improved and berthing expanded by
rebuilding the southerly end and bringing in new floats. Clearly the value of the non-
marine ground floor use (Scales) was an important contributor to the property owner’s
decision to take on the rehabilitation of the pier. If the percentage of non-marine use
were less, it is unclear whether investment in the marine components of the pier would
have been undertaken.
60 Portland Pier: Similar to the Maine Wharf example above, but smaller in scale, the
rehabilitation of the southerly end of Portland Pier was premised on the potential for a
high value tenant (Luke’s Lobster restaurant.) Previously, public portions of the pier
3
Item 3, Zoning
were in active failure and the New Meadow’s Lobster Pound had been inactive for
several seasons. The Luke’s project is using almost all of the non-marine first floor
allowance available for the building (43%), and nearly all allowed for open areas (39%.)
Given the deferred maintenance needs of the pier, it is unclear that any investor would
have taken on the project without the prospect of the restaurant use. With Luke’s, the
lobster pound is renewed, berthing improved, and public access secured.
The above examples do not suggest that 45% non-marine use is needed for all piers.
The Maine Wharf and Portland Pier examples, however, demonstrate that 45% was
sufficient to spur investment where investment was critically needed. The Pierce
Atwood project had sufficient value in upper floors alone; but the historic 5-story,
100,000 sq ft structure is unique within the zone.
Given that fishing community members have spoken most often regarding pressures
placed on open areas (parking and storage,) it may be prudent to look at first floor
building space differently from open space and pier deck area. Staff asks that the WWG
discuss the 70%/30% request in the Selected Issues separately for building space and
open areas. Given that a lack of marine use parking continually surfaces as a problem
(an open space issue) and first floor vacancies currently exist (a building issue) it is
reasonable to consider using different percentage requirements for each.
Planning staff recommends that further study and analysis be undertaken prior to a
decision on the marine/non-marine percentage recommendation.
4. Revise the provisions which were intended to give marine uses first option to rent
vacant ground floor space. In non-NMUOZ areas 14-311(a)(3) requires ground floor
vacancies and change of occupancy to be offered to water dependent/marine uses.
Any time there is a change in occupant, it is to be "made available to new marine
occupants." The 60 day marketing period and methods, the terms and rates for
comparable marine use space, etc. need to be reexamined, as well as how to put a limit
on how much the space can be "improved" or changed (e.g. carpet, removal of exterior
doors and loading docks, cosmetic finishes, etc.) so that it is no longer realistically
usable by water-dependent uses. The standards should require it to remain usable by
active water-dependent uses, not marine office uses, and TIF funds should be allocated
toward making these occupancies affordable for these non-office marine uses.
City Staff Suggested Approach.
Staff agrees that the 60-day marketing provision within the WCZ warrants
examination. To staff’s knowledge, no marine use has taken advantage of the
requirement, nor have any non-marine proposals failed to meet the test. It is unclear
whether the provision should be abandoned or tightened. The requirement is unique
in the City’s land use code and unusual for zoning generally.
Regarding the suggestion that interior finishes be limited to those “realistically
useable by water dependent uses,” staff recommends caution. Marine offices are
permitted as are non-marine uses. For the City to dictate that they may not be
4
Item 3, Zoning
carpeted, as an example, appears overly prescriptive. Finish treatments can be
removed in the future as needed.
The dimensional requirements already dictate 15 feet of floor to ceiling clearance to
promote industrial use and potential conversion to marine use for the future. Staff
recommends tightening the performance standards to ensure that buildings can be
accessible for loading as an additional measure – a measure not employed in the
Pierce Atwood building on Maine Wharf with the lack of loading potential possibly
contributing to long-standing vacancy.
Planning Staff will research alternatives for possible presentation at the February 7
meeting or at a future meeting.
5. The provision on the required City inventory should be examined and enforced. (14-
311((a)(3)(d).
City Staff Suggested Approach.
Staff agrees that the marine economy needs to be regularly assessed as a measure of
success for land use regulations. The current inventory requirement is two-fold.
Firstly, at time of site plan projects must demonstrate their adherence to the 55%/45%
requirements. This is a necessary step and has been successful in understanding the
application of zoning on individual piers and wharfs at the time of regulatory review.
Secondly, the City is responsible for creating an aggregate inventory for all areas outside
of the NMUOZ on an annual basis. Given the effort of a building-by-building accounting
for all properties (with no data to aggregate unless there is an active site plan,) staff asks
the WWG is there an alternative to the current process? Data is needed; but, is the
current process producing the data set that is most useful for future decision making?
The current inventory could be replaced with an alternative assessment of the marine
economy with a broader use than the narrow version on the books. The current
inventory is limited to only a portion of the WCZ, does not count the number of
commercial vessels, is silent on marine employment, and provides no indication of the
value of economic impact of marine industries. It does capture projects and change,
excluding the NMUOZ; however, those are changes that are largely evident from more
casual observation. All careful observers of the WCZ knew that the Scales building was
the biggest project between 2012 and 2018 and that the vacancy of Berlin Mills Wharf
was a major event worth paying attention to.
In 2010, the City Council was right to hold the community accountable to changes on
the Waterfront. However, an annual report of “significant development” would be far
more achievable than the current requirement and likely as informative. If coupled with
a regularly funded “state of the waterfront” assessment of broad marine industry
5
Item 3, Zoning
indicators every 2-5 years, the community would likely be far better informed than
provided for in the current WCZ language.
6. Reinforce exclusive marine use of the pier edge. The pier edge reserved for marine uses
is only defined as a 5 foot setback from the edge of the pier, bulkhead, or engineered
shoreline. It says that area may only be used by marine uses, but there is no
requirement that it affirmatively be made available for that use. In theory, it could be
kept vacant and as it is now written, this vacant space is allocated toward the 55%
requirement for marine uses. This needs to be amended and enforced so that the 5-foot
setback (or the current physically available setback) is not reduced or eliminated. The 5-
foot setback area (or the current physically available setback) should be combined with
dockage rental.
City Staff Suggested Approach.
The current 5-foot pier edge set back is both a dimensional requirement for building
placement, and a performance standard for development outside of the NMOUZ. It was
originally established to ensure pedestrian access to berthed vessels. Staff is aware of
no instances where such spaces have been kept vacant or cordoned off to exclude
vessel access. Staff does not recommend requiring leased space on the pier deck to be
dedicated to the adjacent berth. Such a relationship is best negotiated between land
lord and tenant. To require that deck space be tied to the berth would cause berthing
rates to increase on those piers where such a relationship has not been negotiated
between the pier owner and berthing tenant. One should note, that many piers do offer
space adjacent to the berth, while other provide or allow for floats. Access to berthed
vessels, however, is important and best addressed through the performance standards.
See below.
The primary pier edge use running contrary to the 5-foot rule is non-marine parking –
much of which has been in constant use for decades and is legally non-conforming
(grandfathered.) Newer pier edge non-marine use parking, not covered by any
grandfathering status, has expanded incrementally over the years and staff agrees that
increased enforcement against such expansion is warranted. See the discussion on
Parking (section 8) and Enforcement (section 9) below. An outright ban on new non-
marine pier edge parking is worth considering to strengthen the language of the
performance standards.
7. Reexamine and revise contract or conditional rezoning standards in all waterfront
zones to make sure they further retention of the working waterfront. In addition
to meeting the performance standards, the intent is that it a proposed non-marine
development is only justifiable and will only be allowed if it produces a net benefit
for one or more water dependent uses -- "without the development the site could
not otherwise support an economically viable water-dependent use." There are
several other standards. These standards should be reviewed and strengthened to
make sure they further the retention of the working waterfront.
City Staff Suggested Approach.
6
Item 3, Zoning
Staff continues to recommend eliminating Contract and Conditional rezoning in the
WCZ. Consistent with the tasks for the WWG, other waterfront zones are not
currently under evaluation.
8. Analyze parking provisions to clarify what parking should be allowed in the WCZ and
amend as necessary. Parking is a major competitor for space that is otherwise needed by
WDUs to function adequately. 14-311 (d)(8), the performance standard for off-street
parking and loading, and the interpretation of permitted uses, should be strengthened to
provide a priority for permissible parking for various uses (permitted, conditional,
accessory, located inside or outside the zone, on or off the lot) and to determine under
what conditions, if ever, a parking structure should be allowed in the WCZ. Parking for
any uses not permitted in the zone should be made available only if the parking needs of
permitted uses and island parking needs have been satisfied. Enforcement of two
parking spots on the piers for captain and crew per commercial fishing boat.
City Staff Suggested Approach.
NOTE: Parking is a complex and extensive issue. Staff suggests taking an entire
future meeting, or more, to adequately cover. The following discussion is provided
as an introduction to the topics raised in the Selected Issues letter.
Authors of the Selected Issues letter are right to identify parking as a critical issue to
address. Parking is a problem in both its lack and its abundance – too few spaces for
some, too many spaces occupying area otherwise useful for industry or access. Parking
draws unwanted traffic to the waterfront at the same time it is needed for the
waterfront to survive. The revenues generated by parking are predictable, low cost,
and needed by many pier owners, dissuading improvements for marine industry.
Parking rules are also wickedly difficult to enforce on private properties where the City
has no authority to ticket or tow. How does one determine if a car is associated with a
marine use? One can make assumptions based on vehicle appearance, but zoning
enforcement needs a stronger basis prior to taking municipal action against a property
owner or tenant.
Taking the Issues, one at a time:
a. provide a priority for permissible parking for various uses (permitted, conditional,
accessory, located inside or outside the zone, on or off the lot)
Currently, the WCZ standards prioritize marine and water dependent use parking.
• Non-marine parking is subject to the 55%/45% rule – either inside or outside a
structure.
• All new non-marine parking is subject to an evaluation of adequacy for marine use.
• Water dependent uses “shall be located as close as reasonably possible to associated
vessels and/or ground floor lease areas.” wcz 14-311(d)8d
7
Item 3, Zoning
Staff is open to hearing suggestions for further prioritizing parking uses, but cautions that
overly complex hierarchies will likely be difficult or impossible to enforce - a criticism that
has reasonably been leveled at the current hierarchy by many.
As noted in the 55%/45% discussion above, parking is a major component of both
marine and non-marine use for open areas. One approach to prioritizing marine use
parking, is to prioritize marine use of open areas generally – leaving it to pier owner and
tenant to allocate space as needed for tenant needs, but to further limit non-marine use
in open areas of the zone. The Selected Issues letter suggests 70%/30% as noted above.
b. determine under what conditions, if ever, a parking structure should be allowed in
the WCZ.
There are no parking structures in the WCZ. Currently, new parking developed in
the zone is only allowed to serve on-site use (for either permitted or conditional
uses.) Commercial parking – as a primary use serving off-site uses or daily transient
parkers - is currently not a permitted use. All lots providing such services are either
older legal non-conforming (grandfathered) lots or are in violation of zoning. For
example, the Portland Fish Pier has a commercial parking lot providing significant
revenue for the pier operations and maintenance – this lot was developed prior to
the 1987 referendum and is therefore grandfathered to serve off-site uses. Newer
lots, such as at the Gulf of Maine Research Institute, are only allowed to serve their
own employees, tenants and visitors.
Staff seeks guidance from the WWG as to whether an on-site parking use should be
prohibited from developing a garage for permitted uses.
c. Parking for any uses not permitted in the zone should be made available only if the
parking needs of permitted uses and island parking needs have been satisfied.
The WCZ performance standards for parking currently provide the following:
Non-marine use parking shall only be located on a lot where, based on the parking
and traffic circulation plan and a parking analysis to be submitted for planning
authority review, the marine use parking supply is reasonably sufficient to serve
marine use space located on the subject lot. wcz 14-311(d)8c
The significant issues appear to occur on piers where grandfathered non-marine
parking is extensive or on piers where little parking is available for any use. Illegal
non-conforming parking exacerbates shortages but does not appear to be a primary
source of conflict on most piers.
Islander parking is currently considered parking for an off–site use and therefore not
permitted in the zone as a distinct use. Islanders can and do make use of the
grandfathered non-conforming commercial lots within the WCZ, but they compete
8
Item 3, Zoning
within the general parking market for these spaces. Making the limited parking
supply available in the WCZ beyond the grandfathered commercial lots available to
islanders will further compete with on-site marine use, which appears contradictory
to the priorities of the zone and the concerns expressed by fishing interests.
Extinguishing grandfathered rights for commercial parking is worth discussing, but is
a significant issue and not taken lightly. Dozens of businesses and hundreds of
individuals have relied on legal grandfathered parking in the WCZ for decades.
Revenue from these lots has been a significant contribution to the financial stability
of the Portland Fish Pier as well as other private piers. City Corporation Counsel will
need to opine on the advisability, legality, liability (regulatory taking?) and
mechanism for such an approach, if suggested. If extinguishing legal non-
conforming status of existing parking lots is to be considered, the WWG should
provide City Corporation Counsel and other staff sufficient time to research the issue
and take the topic up as a separate agenda item at a future meeting.
Adding new permitted parking uses
If expanding islander parking is considered within the WWG process, the permitted
use section of the zone (14-307) could be amended to add Islander Parking as a
permitted use. Staff suggests caution on such an approach. The supply of Islanders
hungry for waterfront parking could well place significant strains on an already
strained parking supply. It would be an unfortunate outcome of the WWG process if
marine uses were left with fewer parking options due to competition from Islanders.
Other off-site parking uses may be considered, included creation of a Marine Use
Parking category. Technically, under current rules, one pier cannot rent parking
space to a marine tenant on another pier (as an off-site use) except within the
grandfathered commercial lots. A marine use parking category could allow lease of
parking on piers by marine users located on different piers.
d. Enforcement of two parking spots on the piers for captain and crew per commercial
fishing boat.
Currently the WCZ does not require any specific number of parking spaces to be
dedicated to each vessel. See subsection c. above for how water dependent uses
are prioritized. Mandating reservation of two parking spaces per berth will likely
result in a significant cost increase for berthing for some, or many commercial
vessels.
The City is considering several ways to provide parking for marine uses outside of
zoning, such as hang tag systems and prioritized access to the municipal parking
9
Item 3, Zoning
supply. Such options lie outside of zoning and should be thoroughly explored by the
WWG during an agenda item dedicated to that topic at a future meeting.
9. Reexamine/revise key performance standards to make certain they are adequate to
protect Water Dependent Uses (WDUs). Performance standards 15 and 16 (14-311(d)
(15 and (16)) are critical for protecting marine uses, particularly WDUs, and giving them
priority in the zone. They need to be reexamined to determine how the City is applying
them, and to make certain they are adequate and to determine whether it is possible to
use these provisions to require that pier owners, where possible, provide the minimum
needed by commercial fishing tenants (e.g., a dedicated parking space, access to
utilities, storage, loading and offloading space, etc.) and whether they are being used
to protect the ability to accommodate potential future WDUs even if WDUs are not
currently occupying the space.
City Staff Suggested Approach.
Planning Staff will provide a memo under separate cover addressing Performance
Standards
10. Enforcement of zoning.
City Staff Suggested Approach.
Enforcement of the code is important and staff looks to the WWG for a discussion
on appropriate mechanisms for reporting violations for City follow up. City
Corporation Counsel cautions that enforcement of ordinance is a municipal function
subject to local and state statute with an assumption of discretion in application –
not all violations rise to the level of an enforcement action.
It is hoped that better communication between pier owners and tenants and a
wider understanding of applicable rules can foster better land use compliance prior
to municipal action.
Attachments:
Selected Issues Proposed for Review, provided by Sandra Guay, by email to the
Economic Development Department by email on January 24, 2019
10
Item 3, Performance Standards
Memorandum
Planning and Urban Development Department
Planning Division
To: Waterfront Working Group Members
From: Matthew Grooms, Planner
Date: February 4, 2019
Re: Waterfront Central Zone (WCZ) Performance Standards
Meeting Date: Meeting #3, February 7, 2019
I. Introduction:
In response to feedback from the Waterfront Working Group at the January 17, 2019 meeting,
Planning staff in coordination with the Economic Development Department have drafted
responses to ten concerns raised regarding Waterfront Central Zone standards. Broadly speaking,
these concerns focus on finding a sustainable balance, fostered through zoning standards, between
marine and non-marine uses, wherein non-marine uses are leveraged to support marine uses
through revenue and infrastructure investment. Marine uses meanwhile are subject to fewer
restrictions and permitted across the entire zone. The memo as drafted by Mr. Needelman,
Waterfront Coordinator, identifies conceptual first approaches in addressing these issues, and is
intended as the basis for a follow-up discussion with the WWG.
As part of this response package, Planning staff are providing a memo under separate cover that
discusses performance standards in greater detail. Performance standards were specifically
identified by members of the fishing community and their legal representatives as an area of
concern and should be looked at as a critically important tool for ensuring compatibility between
marine and non-marine uses. The discussion found herein is not intended as a prescriptive or fully
flushed out recommendation, but as an overview of staff’s initial response to these concerns. Staff
will be seeking feedback from members of the group before preparing draft amendments to the
zone for presentation and review by the Planning Board.
II. Approach
From a zoning perspective, the goal of this process is to rectify substantive issues with the
Waterfront Central Zone (WCZ), shore up language that is unclear or easily misinterpreted and
remove redundancy and out of date language where it exists. The existing WCZ framework will
remain; however staff have identified several possible improvements worth further consideration
that fall outside the scope of the WWG process. This includes general formatting, standards that
function as intended (though may be more appropriately located in another section of the City’s
code), and other standards subject to future change in accordance with studies or planning
processes currently being completed.
Simultaneous with the WWG process, the City is undertaking a rewrite of the City’s Land Use Code
which aims to significantly streamline the document and create a more flexible regulatory
framework that is in harmony with the Comprehensive Plan. The ‘ReCode Portland’ process,
(https://www.recodeportland.me/), is well underway and may be the appropriate vehicle for
1|Page
Item 3, Performance Standards
addressing organizational or clarifying changes that are outside the scope of the WWG’s top
priorities. Any ReCode changes proposed would be consistent with the feedback received from this
process, and would be available for input prior to implementation.
III. Performance Standards
A. Overview of Performance Standards
The Waterfront Central Zone (WCZ) like many zones across the City takes a hybrid approach to
regulating uses. This is accomplished through traditional “Euclidean” zoning (use and dimensional
restrictions) and performance-based zoning, which regulates the impact of uses, ensuring that
disparate uses are compatible with one another. Existing performance standards apply to all uses,
regardless of whether or not they are permitted by-right or conditionally. For the reference of the
WWG, the list of performance standards are as follows (See Section 14-311(d) for complete
description):
• Outdoor storage of materials • Shoreland and Flood-Plain Management
• Noise • Lighting
• Vibration • Signs
• Federal and state regulations • Storage of Pollutants
• Discharges into harbor areas • Urban Design
• Storage of vehicles • Pier and Wharf Extension
• Landfill of docking and berthing areas • Compatibility of Non-Marine Uses
• Off-street parking and loading • Functional Utility of Piers
• Public view protection
B. Discussion of WWG Concerns Related to Performance Standards
At prior WWG meetings, members of the group raised concerns regarding impacts related to
parking and traffic and those generated by non-marine uses. As noted above, members of the
fishing community and their legal representatives also provided staff with a document titled,
“Selected Issues Proposed for Review by the Waterfront Working Group”, which stated the
following:
Reexamine/revise key performance standards to make certain they are adequate to
protect Water Dependent Uses (WDUs). Performance standards 15 and 16 (14-311(d)(15 and
16)) are critical for protecting marine uses, particularly WDUs, and giving them priority in the
zone. They need to be reexamined to determine how the City is applying them, and to make
certain they are adequate and to determine whether it is possible to use these provisions to
require that pier owners, where possible, provide the minimum needed by commercial fishing
tenants (e.g., a dedicated parking space, access to utilities, storage, loading and offloading
space, etc.) and whether they are being used to protect the ability to accommodate potential
future WDUs even if WDUs are not currently occupying the space.
In reviewing performance standards, the staff have considered not only the two standards
identified by the WWG, but how they work in combination with the other fifteen (15) standards as
well. In beginning this discussion, it is worth mentioning that zoning is not applied retroactively to
existing uses that pre-date the WCZ performance standards. New development, at time of site plan
2|Page
Item 3, Performance Standards
review (and certain changes of use) are required to demonstrate compliance with the zoning as
written. The review authority must determine that these seventeen (17) standards as written are
being met before approval of a site plan application may be granted. Uses in existence prior to the
adoption of this ordinance that do not comply with these standards are considered legally non-
conforming (grandfathered), and so long as the level of non-conformity is not increased and the
use continues to operate, that use is exempt from meeting these standards. Since adoption in 2010,
the following projects were reviewed under the current standards; Pierce Atwood Building, Union
Wharf Office Building, Scales Restaurant, and Lukes Lobster. There have also been several smaller
‘changes of use’ not identified here that were reviewed against the noticing standards as part of the
building permit review.
Below is a summary of performance standards fifteen (15) and sixteen (16), and some potential
improvements to make these two, and the performance standards overall, operate more
effectively. As everyday users of the working waterfront, the zoning necessarily relies upon input
from stakeholders and additional input is welcome about what aspects of the standards, if any,
could be improved. The February 7th meeting is an opportunity to gather feedback and incorporate
additional restrictions as necessary to a future draft amendment.
1. #15: Compatibility of Non-Marine Uses with Marine Uses
This standard requires that non-marine uses and activities associated with those uses shall
carefully and thoughtfully take into consideration the ongoing needs of marine uses, whether
that be maintaining necessary travel-ways, access to berthing areas or general operations,
when designing a site to accommodate a non-marine use.
Staff Discussion: This standard is open-ended, and reinforced throughout the zoning (see other
applicable standards listed under Section 14-311(a and b) regarding the NMUOZ and non-
marine standards). The standard itself does not attempt to foresee every eventuality, and
instead provides the developer with some flexibility in designing their site. A possible way to
retain this flexibility while strengthening the standard is to explicitly outline the requirement for
an Operations and Access Management Plan (a narrative and visual) from applicants to
demonstrate how the non-marine use would not impede the operation of an existing marine
use. This could be incorporated into a stand-alone requirement related to access management
combining several items from 14-311, and that option is discussed below.
2. #16: Functional Utility of Piers
Standard #16 (a-d) applies to new development’s impact on the functional and operational
needs of water-dependent pier tenants to access the water’s edge for the transfer of goods,
including provisions for storage and movement of goods; retention of adequate circulation
areas abutting and near pier edges; limitations on new non-commercial berthing; and retention
of access, parking, and loading areas for marine uses. Portland’s working waterfront depends
on the efficient transfer of goods between vessels and the shore, and then from the shore to
our street system. The functional utility of piers standard applies to both marine and non-
marine uses, and requires that those uses not interfere with a water dependent use’s ability to
complete this transfer of goods.
3|Page
Item 3, Performance Standards
Staff Discussion: Standard #16 is an extensive, multi-part requirement. Staff will run through
the individual criteria at the February 7th meeting and will be seeking feedback from the WWG
based on practical experience to see if #16 needs changes. Given the prescriptive nature of this
standard, and the existing overlap between several of the performance standards, staff are
contemplating combining a few of the standards into a new required Operations and Access
Management Plan, that would be required of all projects located in the WCZ. This is discussed
in greater detail below. If a project is otherwise subject to a site plan review, performance
standard requirements of the zone are to be incorporated into the submitted material.
C. Operations and Access Management Plan
One concept that is being considered is a new standard that may be incorporated as a
performance standard, being called an Operations and Access Management Plan. This standard
would seek to condense several existing standards, namely standards eight (8), fifteen (15) and
sixteen (16) into a new requirement that any proposed development in the zone provide a detailed
plan and accompanying narrative that describes how a proposed use accommodates reasonable
access for pedestrians, vehicles and freight transfer to and from berthed vessels. The intent is that
a proposed use would need to clearly identify travel ways (existing and proposed), areas for
material storage, parking, and public access points to the water’s edge. The standard requiring this
plan would likely be less prescriptive than the existing set of standards, providing greater flexibility
to the developer in designing their site and accommodating the needs of water dependent uses. It
also would combine several related standards by bringing them together under one submission
requirement.
D. Other Recommendations
As mentioned in the introduction, the staff envisions removing several redundant and or
unnecessary standards, namely the ‘federal and state environmental regulations’, ‘shoreland and
floodplain management’ and ‘signs’ standards, as they are applicable city-wide, in all zones, and are
not performance standards and are not unique to the WCZ. Similarly, language may be cleaned up
to read more clearly, while maintaining the substance of the standard. Some initial observations
were that the lighting standard may make more sense in the City’s Technical Manual for site lighting
and that the parking standards, in line with other zones, may be relocated to the City’s Off-Street
Parking and Loading section of the zoning code. These are preliminary observations and may
warrant further discussion as we continue on in this process.
IV. Next Steps
The purpose of the February 7th meeting is first to respond to concerns raised by the Waterfront
Working Group, and to discuss potential zoning tools to further the goals of the group. Based on
feedback of staff approaches to zoning, as well as further discussion at the February 7th meeting,
we will begin to incorporate the feedback received from the group into a comprehensive
amendment to the WCZ, which would then be taken to the Planning Board for review. At the
January 22nd meeting of the Planning Board, the Board indicated that they would prefer to see this
process with the WWG as it relates to zoning conclude, and then review all proposed changes at
one time to the extent possible. Staff will continue to provide updates on zoning at future meetings
of the WWG, and encourage active participation of group members at future Planning Board
meetings. All meetings of the Planning Board would include opportunities for public input. The goal
is to complete the Planning Board process before the moratorium on new non-marine uses in the
WCZ end in May of 2019.
4|Page
Item 3, Performance Standards
V. Attachments
a. WCZ Performance Standards
5|Page