Plan Commission
Regular MeetingSkokie, IL · October 18, 2018
Agenda
STAFF REPORT 2018-39P: Special Use Permit
Community Development Department Council Chambers, 7:30 PM, October 18, 2018
To: Paul Luke, Chairman, Skokie Plan Commission
From: Steve Marciani, AICP, Planning Supervisor
Re: 2018-39P: Special Use Permit
WashU car wash
3250 Touhy Avenue
Related Cases – 2018-36P: Zoning Map Amendment
2018-37P: Site Plan Approval
2018-38P: Parking Determination
2018-39P: Special Use Permit – car wash
General Information
Location 3250 Touhy
Purpose To request a special use permit for a car wash in a B3 Business
zoning district, plus relief from §82-28(b)(1)b. to allow an east
wall sign and a west wall sign in addition to the allowable south
wall sign, and any other relief that may be discovered during the
review of this case.
Petitioner Metro Storage Skokie OP, LLC, on behalf of Car Wash
Development, LLC
Size of Site 41,134 ft2 with 142 feet of frontage on Touhy Avenue
Existing Zoning & M2 Light Industry – self-storage facility
Land Use B2 Commercial – bank with drive-through and second story
offices, vacant undeveloped land
Adjacent Zoning & North M3 Industry – landscaping company, welding supply
Land Use business
South P Public Open Space (Village of Lincolnwood) – vacant
open space
East RS-2 Residential (City of Chicago) – detached
residences
RS-3 Residential (City of Chicago) – 3- or more unit
multifamily residences
B1-1 Business (City of Chicago) – convenience store,
cleaners, limited service restaurant
West M3 Industry – North Shore Channel, multiuse path
Comprehensive Plan The site is designated as retail/service employment.
VOSDOCS-#543558-v2-Staff_Report_for_2018-39P__Special_use_permit_for_car_wash_at_3250_Touhy
1 of 8
SITE INFORMATION
See case 2018-37P for site and Complete Streets information.
PETITIONER’S SUBMITTAL
The petitioner is requesting a special use permit for a 4,526 ft2 automatic conveyor car
wash with 14 vacuum stations and 7 off-street parking spaces in a B3 Business zoning
district, plus relief from §82-28(b)(1)b. to allow an east wall sign and a west wall sign in
addition to the allowable south wall sign, and any other relief that may be discovered
during the review of this case.
The petitioner submits:
We believe the WashU project will not only increase the value of our neighboring properties it will
provide a vibrant, new refreshing and inviting service to the Skokie community that isn’t presently
offered.
The WashU project of nearly $5 million dollars will also bring to the community a much more
environmentally sustainable car wash facility, along with new and more employment.
All WashU circulation is contained and handled within its property. Stacking runs along the western,
north / south side of this property.
WashU also provides free central vacuum services. The vacuums are located on the eastern side of
the property. The central vacuum system WashU invests in generates low noise levels.
A person using this service can have a relatively normal conversation with another at the vacuum
stall.
Noise level studies place this decibel level just above the normal conversation that is between 60-65
db.
Our vacuum system generates 68 decibels per 10’. General traffic noise of Touhy and Kedzie Avenue
is likely higher than that.
WashU is a new and unique customer experience along with being close to the customer and the
communities in which it operates. This will entail not only premium customer service, but also
community involvement. …
Thank you for your consideration and we respectfully seek to work with you, staff and elected
officials to develop this WashU facility on this site.
Statement regarding Hours of Operation, Peak Times, Man Hours & Team-mate Parking Needs:
Our Car Washes are designed to be run efficiently by 3 Teammates during operating hours. We are
typically open from 7 AM to 8 PM , 7 days a week. There may be occasions where we are open
later—to 9 PM.
In our very highest traffic volume days (typically fewer than 12 days per year) we may have as many
as 5 Teammates on site to manage traffic and processing, but this is not the norm.
Peak times in the Car Wash industry are somewhat weather related, however we will generally see a
spike in traffic from 11 AM to 1 PM and again from 3:30 PM to 6:30 PM, which is commensurate with
lunch time and home from work traffic.
Busiest days of the week are typically Friday, Saturday & Sundays as one would associate with more
people doing errands on these days. Saturdays and Sundays typically peak between 10 AM and 2 PM.
VOSDOCS-#543558-v2-Staff_Report_for_2018-39P__Special_use_permit_for_car_wash_at_3250_Touhy
2 of 8
In the Midwest, the busiest time of year for the Car Wash industry is winter time—specifically January
through March, when driveway car washing doesn’t happen and the need for salt removal is at its
peak.
In our experience, we will see 12 or less days per year where traffic spikes are such that we would
process more than 150 cars per hour. Our systems and processing allow for efficiently and safely
washing cars at a rate of 190 cars per hour or one car every 19 seconds. To a layperson, that might
sound extraordinarily high, but to our trained and experienced Teams, this is part of a routine that is
embraced by us and by other top car washing operators in the Country.
Our business model is an exterior express car wash. Our focus is on quality, quick, convenient way
for customers to maintain the exterior of their cars while offering free vacuums on a do it yourself
basis.
Our Customers remain in their vehicles, which glide through the wash tunnel in neutral on a dual belt
conveyor system (eliminating the steel guide rails, and the push & shove of a traditional chain &
roller conveyor system)
Our typical operation functions with a “Greeter” working at the pay-station lanes, getting customers
familiar with the touchscreens; a “Loader” who guides the customers on to the dual belt conveyor as
they enter the wash tunnel and assures the vehicle is safely in neutral; and a “Site Manager” who
monitors overall operations, cameras, quality and safety control. Our Skokie site-plan incorporates
five employee parking spaces at the north end of our site, which is ample for operations.
Vacuuming and drying of vehicles:
Our Skokie site plan implements (14) free vacuum stations.
We use stainless steel vacuum arches so that quality and cleanliness is always represented.
With the investment in stainless steel we eliminate any powder coat fading, chipping and/or rusting
of other systems. Stainless steel is easy to clean, looks great, doesn’t rust and adds a cleaner
architectural aesthetic that complements our overall design.
Our vacuum system is a central vacuum system. Quiet enough for anyone standing in one of the
vacuum parking stalls to have a normal conversation without having to raise their voice.
Wash U has invested in a heated blower drying system providing a very dry car. There isn’t a need
for vehicles to be hand dried, thus we can operate with fewer team-mates on site than other legacy
washes that have fewer automated processes.
STAFF ANALYSIS
Staff Comment and Review requests were sent to all pertinent departments and were
received from Forestry, Engineering, and Planning. All other departments returned the
requests with no comments regarding the subject case. Comments related to the
overall development are included in site plan approval case 2018-37P, and comments
that specifically impact this car wash case are included below.
Forestry
The Forestry Division commented that a tree removal permit is required prior to the
start of the project for the pines on-site and the 2 small oaks in parkway that are in
decline. If interested, Forestry would waive private property removal permit if 1 tree
was planted back.
VOSDOCS-#543558-v2-Staff_Report_for_2018-39P__Special_use_permit_for_car_wash_at_3250_Touhy
3 of 8
Civil Engineering
The Engineering Division would like to note that when applying for building permits, the
petitioner must provide a comprehensive site plan set, showing existing and proposed
features and improvements, dimensioned and showing proposed elements.
Other information included:
1. Existing conditions/grades
2. Proposed grading of property (Spot grades, pavement slopes, TF & FF)
3. Proposed Site Plan
4. Stormwater Management Plan
5. Utility Connection Plan (Sewer & Water Service)
6. Details and Notes
The project will need to go through the full WMP permitting process from the MWRD,
and the Village will endorse the application as the Permittee only after local
requirements are met. Also, any work in the Touhy Avenue right-of-way will need a
permit from IDOT.
The petitioner will also be responsible for contacting and coordinating with private utility
service providers for buried services to the site and account for any reconfigurations of
private utilities on the perimeter of the site and adjacent, as required.
A building sewer permit shall only be issued and a sewer connection shall only be
permitted if it is demonstrated that the downstream sewerage facilities, including
sewers, pump stations and wastewater treatment facilities, have sufficient reserve
capacity to adequately and efficiently handle the additional anticipated waste load.
Finally, a licensed civil engineer, landscape architect, land surveyor or architect, hired
by the property owner, shall inspect and certify that the work was completed in
compliance with approved plans.
Traffic Engineering
In addition to the comments in the site plan approval case for this site (2018-37P), the
Engineering Division states that the overall site provides adequate parking and exceeds
the number of required spaces. There will be room to stack and queue 33-39 vehicles
within the immediate car wash area. The stacking capacity is adequate for the site.
Further, flexibility in stacking is provided by having 3 queue lanes and storage capacity
between the pay stations and entrance to the tunnel.
Staff has reviewed the traffic study and overall agrees with its conclusions. The traffic
projected to be generated by the car wash consists of a majority of "pass-by" or
diverted trips from the existing traffic along Touhy and Kedzie. Access to the car wash
will be sufficient by the existing access system that serves the overall commercial
development. The existing access points consist of a right-in/right-out driveway off of
Touhy, two full access drives from Kedzie, and a fully signalized intersection at Touhy
and Kedzie. The internal shared drive aisles on the site provides further flexibility for
circulation within the site.
VOSDOCS-#543558-v2-Staff_Report_for_2018-39P__Special_use_permit_for_car_wash_at_3250_Touhy
4 of 8
The area roadways and intersections experience some existing delay and queueing
during normal peak periods, these intersections will generally maintain the same
acceptable level of service. The proposed amount of generated traffic from the car
wash may be reduced due to the nature of the pass-by trips.
Planning
A car wash is allowed with a special use permit in the B3 Business district. The car wash
property line is approximately 350’ away from the residentially-used property to the
east. Bicycle parking will be included as a condition of case 2018-37P. Planning does
not anticipate any issues with negative externalities from this user. Staff is agreeable to
the proposed development of this long-vacant parcel.
The petitioner has requested relief from §82-28(b)(1)b. to allow an east wall sign and a
west wall sign in addition to the allowable south wall sign. Staff has concerns about the
relief requested. The ability to see the sign on the west side of the building will be
obscured by trees until a vehicle is almost in front of the property, and the sign on the
east side of the building will be obscured by the existing Byline Bank building, where
the front wall sign and large electronic east-west facing ground sign are in clear view.
In addition, the ground sign is very near the proposed east wall sign.
The sign package as proposed does not meet several sections of the Signs Chapter of
the Village Code. Although the Appearance Commission approved the sign package at
its June 2018 meeting, staff recommends modifications to reduce sign clutter for the
site and minimize the need for relief from the Village Code.
Recommended Option
Minimize visual clutter by limiting the number of signs in the overall sign package to the
minimum necessary to properly direct traffic. Please see case 2018-37P for a discussion
on the overall sign package for the site. Staff recommends allowing only the south wall
sign for WashU. Although the south wall sign area is 102.5 ft2 which meets regulations,
the sign should be reduced in size to be in better proportion with the façade to which it
is attached (a reduction of the overall sign height from 6’ to 5’ is recommended).
Alternate Option
If the Plan Commission is amenable to supporting the Appearance Commission’s
support of the south, west, and east wall signs as proposed (see the “Appearance
Commission” section for details), relief from the Village Code will be necessary:
§82-28(b)(1)b. to allow wall signs on the west and east elevations, as sign
regulations only allow 1 sign on a street-facing frontage, which is the south
elevation facing Touhy.
§82-28(d)(1) to allow total wall sign area of 307.5 ft2, as sign regulations allow a
total wall sign area of 112.5 ft2 (or 3 x 37.5’ total building frontage).
VOSDOCS-#543558-v2-Staff_Report_for_2018-39P__Special_use_permit_for_car_wash_at_3250_Touhy
5 of 8
APPEARANCE COMMISSION
At its June 13, 2018, meeting, the Appearance Commission approved the proposed
WashU development, (case 2018-039A), with the following WashU-specific conditions:
Allowing the south, west, and east elevation wall signs, as presented
Sign relief granted by the Plan Commission
STAFF RECOMMENDATIONS
Staff recommends that the petitioner’s request for a special use permit for a car wash
at 3250 Touhy Avenue in a B3 Business zoning district be APPROVED, based upon the
Proposed Positive Findings of Fact and subject to the Staff Recommended Conditions
below.
Staff further recommends that the petitioner’s request for relief from §82-28(b)(1)b. to
allow an east wall sign and a west wall sign in addition to the allowable south wall sign
be DENIED, allowing only the south wall sign with a recommended overall sign height
of 5’ so it is in better proportion with the façade to which it is attached.
RECOMMENDED SPECIAL USE PERMIT CONDITIONS
In addition to the condition of case 2018-37P, the following conditions shall apply to
this special use:
1. Prior to the hearing of this case before the Board of Trustees, the petitioner must
submit to the Planning Division a revised WashU wall sign package.
2. The petitioner shall develop the Subject Property in substantial conformance with
the final Site dated <insert date of final approved plan>, landscape plan dated
<insert date of final approved plan>, elevations dated <insert date of final
approved plan>, and ground sign rendering dated June 19, 2018. (Standard)
3. A building sewer permit shall only be issued and a sewer connection shall only be
permitted if it is demonstrated that the downstream sewerage facilities, including
sewers, pump stations and wastewater treatment facilities, have sufficient
reserve capacity to adequately and efficiently handle the additional anticipated
waste load.
4. Trash containers shall be provided by the vacuuming and drying areas.
5. Any outdoor sound systems or car wash noise shall at all times maintain audio
levels that are compliant with the Skokie Village Code.
6. There shall be no washing of vehicles from 10:00 p.m. to 7:00 a.m.
7. Outside storage and display of items for sale or lease, tools, equipment, vehicles,
parts, or supplies is prohibited.
8. Vehicles and boats are prohibited to be sold, advertised for sale, or, other than
operational licensed vehicles owned by the establishment, remain outdoors on
the property for more than 10 days, except at vehicle dealers.
VOSDOCS-#543558-v2-Staff_Report_for_2018-39P__Special_use_permit_for_car_wash_at_3250_Touhy
6 of 8
9. The Plan Commission will determine the appropriate number and location of
drying spaces. Due to the heated blower drying system at the exit, a quick towel
dry is not expected to occur at the car wash exit and/or at one of the 14 vacuum
stations.
10. The operation of the use must minimize excessive water from collecting outside
the building openings to a wash bay, and in the adjacent public rights-of-way.
11. The petitioner shall comply with all Federal and State statutes, laws, rules and
regulations and all Village codes, ordinances, rules, and regulations. (Standard)
12. Failure to abide by any and all terms of this Ordinance shall be cause for the
Village to initiate hearings to determine whether the subject Ordinance, as well
as any applicable business licenses, should be revised or revoked. The petitioner
shall pay all costs related to any hearings conducted as a result of non-
compliance with any of the provisions of the enabling ordinance. The costs shall
include but not be limited to court reporter fees, attorney fees, and staff time
required researching and conducting said hearing. (Standard)
ATTACHMENTS
1. Proposed Positive Findings of Fact
2. Site Plan, dated September 6, 2018
3. Floor Plan, dated May 10, 2018
4. Building Elevations, dated May 10, 2018
5. Sign Elevations, dated May 25, 2018
6. Ground sign rendering, dated June 19, 2018
7. Wash-U Skokie Signage Plan, dated May 29, 2018
8. Land Use and Zoning Map
VOSDOCS-#543558-v2-Staff_Report_for_2018-39P__Special_use_permit_for_car_wash_at_3250_Touhy
7 of 8
Proposed Positive Findings of Fact 2018-39P: Special Use Permit
Community Development Department Council Chambers, 7:30 PM, October 18, 2018
Consideration Finding
The request is consistent with The site is designated as retail/service employment in
the intent of the the Comprehensive Plan, and the proposed use is
Comprehensive Plan. consistent with this designation.
The request will not adversely The proposed use is not expected to adversely affect
affect adjacent properties. adjacent properties, as a vacant property will be
redeveloped, landscaping will be provided, and noise
levels will comply with the Village Code.
The request is compatible with The proposed use is compatible with the existing or
the existing or allowable uses allowable uses of adjacent properties, as adjacent
of adjacent properties. properties also provide goods and services to the
neighborhood and the traveling public.
The request demonstrates that Adequate public facilities, including roads, drainage,
adequate public facilities, utilities, and police and fire protection exist or will
including roads, drainage, exist to serve the requested use at the time such
utilities, and police and fire facilities are needed.
protection exist or will exist to
serve the requested use at the
time such facilities are needed.
The request demonstrates The request demonstrates adequate provision for
adequate provision for maintenance and use of the associated structures, as
maintenance and use of the there is ample room to maintain the interior and
associated structures. exterior of the structures.
The request has considered The request has considered and is expected to
and, to the degree possible, address any adverse effects on the natural
addressed the adverse effects environment, as the car wash will meet Illinois EPA
on the natural environment. regulations.
The request will not create Per the traffic impact analysis, the use is not
undue traffic congestion. expected to create undue traffic congestion, as most
of the patrons are expected to be pass-by trips.
The request will not adversely The request will not adversely affect public health,
affect public health, safety, and safety, and welfare.
welfare.
The request conforms to all The request conforms to all applicable provisions of
applicable provisions of this this code, except where relief is granted with the
code, except where relief is request.
granted with the request.
VOSDOCS-#543558-v2-Staff_Report_for_2018-39P__Special_use_permit_for_car_wash_at_3250_Touhy
8 of 8