Stormwater Management Task Force
Regular MeetingSpringfield, MO · February 7, 2013
Minutes
City of Springfield - Greene County, Missouri
Stormwater Management Task Force
Meeting Notes – February 7, 2013
Welcome & Introductions
The Springfield/Greene County, Missouri Stormwater Management Task Force met in the Springfield-
Greene County Public Safety Center. The meeting commenced at 5:00 p.m.
Task Force Co-chair Dan Hoy welcomed the Task Force members and community members in attendance.
Those present included the following:
Task Force
Brain Perdue Dave Murray Ronda Headland
Rick Scarlet Chris Carson Casey Haynes
Daniel Beckman Stacey Armstrong Dan Hoy
Fred Palmerton Tiffany Frey Chris Macioce
Matthew Pierson Fred Schlegel Tom DeWitt
Eric Dove Andy Hosmer
Absent: Aaron Wahliquist, Karen Spence, Jerany Jackson, Geoffrey Butler, Dana Elwell, Patrick
Harrington, Patty Hamilton, Erik Fjeseth, King Coltrin, Harlan Hill, Matt Bailey, Tom Kissee, Bill Bretall
City and County Staff
Kevin Barnes Chris Coulter Sheila Shockey
Vanessa Brandon Tim Davis Fred Marty
Phil Broyles Carrie Lamb Todd Wagner
Greg Burris Barbara Lucks Kimberly White
Karen Elmer Jan Millington Jon Williams
Rob Dixon
Visitors
Mike Kromrey
Sarah Okeson
Mike Pessina
Affordability Task Force Presentation
Rob Dixon, Chamber, summarized the City/County Unfunded Environment Mandates Affordability Task
Force Recommendations. The City/County is facing billions of dollars of deficit and it will impact all
citizens. Concerns include environmental protection, least able to afford, and protecting economic growth.
Affordability & Integrated Planning can provide a solution. The US Environmental Protection Agency
(USEPA) may or may not implement. Their charge was to review the Missouri Department of Natural
Resources (MDNR) affordability policy. The task force recommended that all environmental mandates be
considered in the affordability for the community. MDNR is looking only at water quality (stormwater +
wastewater) for the 2% of median household income affordability target.
Stormwater Management Task Force 6 February 28, 2013
Agenda Packet
Mr. Dixon presented 2013-2020-2030 trajectories on income levels. The following recommendations were
made by the Affordability Task Force to MDNR:
1. Ask communities for information.
2. Don’t penalize for good financial stewardship.
3. Consider all mandates together.
4. Consider law of diminishing returns.
5. Older technology should be allowed to finish its life cycle if still effective.
6. Study the wide impact on lower income residents.
7. Consider environmental investments already made.
8. Consider good faith efforts to maintain environmental compliance.
Questions: Any update on EPA-TMDL decision in Virginia and how does that affect us?
Response: We think USEPA will withdraw from the lawsuit. They will likely start again and use better
science to create the TMDL on the stream.
Question: Is HB89 the appropriate the avenue for modifications?
Response: Affordability Task Force recommendations are for agency implementation of HB89.
Funding Discussion
Sheila Shockey presented revenue options and how those correlate with the City/County needs, and
priorities established by the Task Force. Considering City and County expenditures together, Sheila
shared expenditure projections for 2018 as an example scenario for the discussion.
She reported that the costs for City/County expenses together in 2018 would range from $6 million - $17
million to $35 million. This is for water quality, flood risk minimization and infrastructure replacement
totaled together.
Question: How do you estimate mandate if we don’t know?
Response: Based on other city’s TMDL costs and it is a guess. There was a discussion about whether
the City/County could implement a funding source that would only be triggered when TMDL’s kick in.
Sheila showed graphs of City and County expenditures through 2021 for 5 different scenarios as examples:
1) minimum mandate, 2) maximum mandate, 3) minimum mandate plus proactive, 4) minimum mandate
plus reactive plus flood control, 5) minimum mandate plus proactive plus flood control.
Sheila reviewed priorities established by task force surveys:
1. Protect Water Quality
2. Reduce injury/death caused by flooding events
3. Projects with multiple benefits
4. Reduce property damage caused by flooding events
5. Life cycle replacements for infrastructure
The Task Force discussed how much of each circle they want to fund from each of these priority areas.
Sheila offered some potential funding sources: utility, property tax or sales tax and gave the amount of
revenue for each.
Stormwater Management Task Force 7 February 28, 2013
Agenda Packet
utility: She explained that utility user fees are usually based on equivalent residential units (ERU’s). No
entities are exempt.
Question: How was the 3,200 ERU figured?
Response: We took the impervious area of the average residence (roof, driveways, sheds, etc.) which
was 3,200 square feet.
Question: Are incentives for good stewardship provided with a utility?
Response: Yes, it is common. She explained several different methods for providing incentives.
Comment: Incentives could be very complicated based on various site scenarios.
Sheila showed what the statutorily available revenue sources would provide as compared to projected
expenditure.
1 cent property tax- 8% of Water Quality minimum
1/10 cent – 75% of Water Quality minimum
1/8 cent- 95% of Water Quality minimum, 71% of WQ & 44% of Water Quality maximum
¼ cent- 100% Water Quality minimum, 88% of flood mid service level
$3/month- 100% of Water Quality minimum, 92% of flood mid-point
$5/month- 100% of Water Quality min, 100% flood mid, 98% Infrastructure mid-point
½ cent sales tax provides: 100% of Water Quality minimum, 100% of flood mid-point, or 100% of
infrastructure mid-point and some extra available revenue.
Question: What is the administrative cost of utility?
Response: There are startup and ongoing costs associated with administering a utility.
Question: Would utility revenue only be collected from CU customers?
Response: Because the stormwater program is county-wide, it would probably be charged to all county
residents or charged to Springfield + urban service area property owners.
Sheila discussed the funding options. They are:
Use multiple sources of revenue which is a common practice.
Determine whether the community could enact an escalating funding source since it doesn’t need
the full amount right away.
Set a dedicated source for mandated portions of the program and a tax that sunset for capital
projects.
Stormwater Management Task Force 8 February 28, 2013
Agenda Packet
Sheila reviewed the latest survey results. She presented the various pros and cons of the different funding
sources, and facilitated a task force discussion to identify others.Con: Utility is burden for municipalities and
non-profits to pay for their own imperviousness.
Con: High cost of utility for churches, which is politically unfavorable.
Con: City would have no incentive to add more impervious surfaces such as streets and sidewalks if they
had to pay a utility fee. Response: You could choose to exempt roads/sidewalks.
Con: For property tax or sales tax, it is a burden on consumers and not businesses. “No new taxes” is the
current mantra.
Pro: Utility is a disincentive for expanding impervious surfaces.
Pro: Sales tax is easy to administer.
Pro: The utility option has more opportunity to provide incentives to those that implement good stormwater
practices, going above and beyond the required levels. Comment: For any options, we should require new
development to pay for its impact on the watershed
Con: Sales tax has negative perception of no new taxes.
Con: A sales tax is burdensome for lower income households. It has a bigger negative effect on the poor.
Comment: The hotel/motel tax is not making enough money now. Springfield in the middle on tax rates
compared to benchmark communities.
Comment: Utility could create conflict over arguments on credits plus burden of administering the program
is too complicated and bureaucratic. We’ve had success with sales tax and so that seems to be path of
least resistance and most chance of success.
Question: Some communities have a maximum cap for ERU. Have we considered this?
Response: No, because we feel it opens up the utility for lawsuit, makes it less a fee and more of a tax.
Comment: With a sales tax, incentives are not easy.
Question: Do current standards prevent future problems?
Response: Detention has evolved and water quality control is evolving. Mimicking the predevelopment
hydrology is where USEPA is headed and we’re not there yet. For all the different levels of mitigation
that exist, depending on when a development was built and if they went above and beyond, a utility fee
can be assessed to reflect that.
Comment: That connection and incentivizing good behavior seems important to our community.
Comment: Retrofits are coming, also as part of mandates.
Comment: Incentives are possible with property tax and sales tax as well, in the form of cash incentives,
assistance, permitting fast forward, and public/private partnerships, etc. You could implement incentives
through cost-sharing, by allocating revenue for a cost-share program in the budget. This is a way of
leveraging private funds with public money.
Question: Structure of utility. How is it set up? Would it have a board of directors?
Response: Not usually. It is typically set up similar to a wastewater utility.
Comment: I’m concerned about using sales tax as that takes away the option to fund certain other
community priorities.
Stormwater Management Task Force 9 February 28, 2013
Agenda Packet
Sheila asked Task Force how much water quality protection they want to budget for when we bring certain
scenarios back at the next meeting.
Comments: We need to budget more than the minimum in case mandate is higher. If unknown, go with
minimum.
Question: What is administrative cost to set up and operate a utility?
Response: We will bring more information next time.
Comment: Administering a TMDL could be more costly than we think. We don’t want to have zero in
reserve for water quality mandates. We should look at the middle level of funding instead of the minimum.
Question: Would a sales tax have to be tied to specific items or generally anything stormwater-related?
Response: Could be generally water quality, flooding, or infrastructure replacement.
Comment: Being able to shift money between the three if mandate cost fluctuates, can increase or
decrease funds for the other two. Fund water quality at the maximum level and if not as expensive as
expected, funds can be shifted to other two areas.
Comment: Not in support of that, gives too much latitude to staff and that doesn’t serve citizens well.
Sheila asked, ‘if there is extra left from mandates, could that be used for incentives?
Question: What is water quality mandate money spent on?
Response: Programs for MS4 and study or projects for TMDLs. Detail on this was provided in meeting
#3 but we will bring that back next meeting.
Question: Are credits one time or ongoing?
Response: They can be both.
Question: Can utility be modified to ease burden on commercial?
Response: Again, this could spark a legal challenge of it as a utility fee.
MS4 permit requirements will require an annual BMP self-inspection report. This could also serve as the
ongoing verification for a credited BMP. This eases administration.
Question: Can we get clarification on what is mandated? If we are told we need to spend $7 million but
only spend $3 million and EPA says this is fine, then $7 million wasn’t a mandate. Is the mandate
subject to interpretation and ability to pay?
Question: What does city feel is the most likely cost of mandates?
Response: We will bring back a breakdown of MS4 permit vs. TMDL costs for the next meeting.
Comment: Businesses generate revenue. Don’t lose sight of the bigger picture.
Stormwater Management Task Force 10 February 28, 2013
Agenda Packet
Comment: Just because our mandate expenditures don’t match up, doesn’t mean water quality is not
important.
Comment: We shouldn’t consider a funding level that we can’t pass. Then it doesn’t matter what we want.
What matters is what we can get (by voters). Decide what we can get and then decided where to spend it
(how to divvy it up).
Comments: We would like to see a utility and small sales tax scenario.
Question: Which has most effect on economic growth? (sales tax, property tax or utility) Comment:
We will ask Chamber their opinion.
Question: How much funding for infrastructure? Response: Somewhere in between minimum and
middle 200 year, middle 100 year. Bring both back.
Next meeting: February 28, 2013, 5:00-7:00 p.m. at the Springfield- Greene County Public Safety
Center.
The meeting was adjourned at 7:15 p.m.
Stormwater Management Task Force 11 February 28, 2013
Agenda Packet
Agenda
City of Springfield - Greene County, Missouri
Stormwater Management Task Force Meeting
Date: Thursday, February 7, 2013
5:00 to 7:00 p.m.
Location: Public Safety Center
330 West Scott Street
Springfield, Missouri 65802
Meeting purposes:
Select guiding principles to assist the Task Force members in their role, process, and issues to be
addressed.
Provide background on revenue sources.
Where should the City and the County focus their efforts to address needs?
What are the pros and cons of each revenue source?
AGENDA
5:00 p.m. Welcome Co-Chair Fred Palmerton
Co-Chair Dan Hoy
5:10 p.m. Survey Results & Task Force Discussion Sheila Shockey
5:30 p.m. Revenue Options Discussion All
6:45 p.m. Next steps - Information needed for upcoming meetings Sheila Shockey
6:55 p.m. Closing Remarks Co-Chair Fred Palmerton
Co-Chair Dan Hoy
7:00 p.m. Adjourn
In accordance with ADA guidelines, if you need special accommodations when attending any City meeting, please
notify the City Clerk's office at 864-1443 at least three days prior to the scheduled meeting.
Stormwater Management Task Force February 7, 2012
Agenda Packet
Springfield/Greene County, Missouri
Stormwater Management Task Force Meeting #4
Meeting Notes
January 17, 2013
Welcome & Introductions
The Springfield/Greene County, Missouri Stormwater Management Task Force met in the Springfield – Greene
County Public Safety Center. The meeting commenced at 5:00 p.m.
Task Force Co-chair Dan Hoy welcomed the Task Force members and community members in attendance. Those
present included the following.
Task Force
Daniel Beckman Dave Murray Ronda Headland
Fred Palmerton Patrick Harrington Casey Haynes
Matthew Pierson Chris Carson Dan Hoy
Karen Spence Stacey Armstrong Tom Kissee
Jerany Jackson Tiffany Frey Bill Bretall
Geoffery Butler Fred Schlegel Chris Macioce
Dana Elwell Andy Hosmer Tom DeWitt
Absent: Brian Perdue, Rick Scarlet, Aaron Wahlquist, Patty Hamilton, Erik Fjeseth, King Coltrin, Harlan Hill, Matt
Bailey
City and County Staff
Kevin Barnes Tim Davis Todd Wagner
Vanessa Brandon Carrie Lamb Kimberly White
Phil Broyles Barbara Lucks Jon Williams
Greg Burris Fred Marty Jan Millington
Chris Coulter Steve Meyer Sheila Shockey
Sarah Davis Tim Smith Shelby Ferguson
Community Stakeholders:
Michael Pinkley
Milton Dickensheet
Mike Pessina
Stormwater Management Task Force February 7, 2012
Agenda Packet
Repair and Replacement Infrastructure
Todd Wagner, Stormwater Engineer, City of Springfield, began by focusing on infrastructure repair and
replacement, including the age and size of the infrastructure.
He reviewed the three areas of stormwater management: flood risk and damage reduction, water quality
protection, and maintenance infrastructure investment. Mr. Wagner said he would present what has been
done in the City. Kevin Barnes Stormwater Engineer, Greene County, will talk about what has been done in
the County.
Currently, the City has a drainage system map which includes the City’s entire infrastructure, with the exception of a
few older areas. The infrastructure system is made up of open systems, grass or concrete channels, box culverts,
inlet structures and junction box structures.
The majority of the infrastructure is 0-20 years-old, making up 46 percent of the system. Infrastructure 20-50 years-
old comprises 27 percent of the system, and infrastructure more than 50 years-old also comprises 27 percent.
Although the majority of infrastructure is 20 years of age or less, the system size has doubled with newer, small pipes
and inlets. In addition, replacement cost is greater for areas 50 years of age and older. The older infrastructure has
larger pipes and requires more work to replace, with a replacement cost of $160 million. The estimated replacement
cost of the current constructed system is $500 million, an average of $5 million for the next 100 years.
The following is an inventory breakdown of the infrastructure system by category and maintenance requirements:
Pipes – 294 miles
o Erosion around the pipe, generally on the top
Box Culverts – 59 miles
o Size-width and height cause problems for crews to efficiently access with vehicles
Grass and Concrete Open Channels – 321 miles
o Concrete channels require restoration of walls, concrete repair and removal of debris and sediment
o Grass channels require frequent mowing and removal of debris
Inlet Structures – 13,324
o Damage from maintenance vehicles and traffic
Junction Boxes – 1,947
o Damage from maintenance vehicles and traffic
Flood Control/Walter Quality Basins – 1,050
o Regular maintenance, sometimes specialized
Best Management Practices - 250
o Regular maintenance, sometimes specialized
Maintenance of these systems is a continuous effort on the City and County’s part with no long-term dedicated
source to fund maintenance of the stormwater system. Currently, maintenance of the system is broken down into two
general categories: Reactive Maintenance and Vegetation Maintenance.
Reactive Maintenance – These are areas of routine maintenance with concerns about sediment, weeds and other
debris. These are maintained by street crews and the majority of these areas are in the right-of-way. This type of
maintenance is funded through the gas tax, use tax and transportation fund.
Vegetative Maintenance – These are areas of routine maintenance including mowing, bush/weed control and
planting of trees and other natural vegetation. This type of maintenance is funded through the gas tax, use tax and
transportation fund.
Kevin Barnes, Greene County, gave a brief overview of similar infrastructure, located in the urban services area,
which is development served by the sanitary sewer and rural areas outside of the city limits. The system in these
areas was mostly built since 1990. Areas built before 1990 had minimal consideration for stormwater management.
Stormwater Management Task Force February 7, 2012
Agenda Packet
The value of Greene County’s stormwater system is approximately $100 million, of which $40 million is private
infrastructure needing retrofitting consideration as the structures age. The remaining $60 million is highway
funds/right-of-way.
The following is the breakdown of infrastructure by category for the county:
Box Culverts - 126
Inlets and Junction Structures – 4,809
Pipe – 85 miles
Detention Basins – 400
Open Channels – 22 miles
Maintenance of the County infrastructure is inspected during construction phases to ensure functionality and
maximize serviceable life before repairs are necessary. In systems within the right-of-way, crews replace and repair
as necessary, while also removing debris and sediment from large box culverts and bridges. The County’s
maintenance for private properties is minimal due to the inability to enforce maintenance codes on properties
containing pipes, inlets and other hard structures.
Questions and Answers
Task Force members asked questions and the following answers were given by the support team:
Question: Of those 13,324 inlet structures, how many are precast?
Response: Almost all have precast lids, but there are some which have precast bases.
Question: Is all of the vegetation maintenance done by the City and City employees?
Response: Yes.
Question: Is there a human health concern for young adults, kids and maintenance crews who go into box
culverts and get hurt? Is there contact with police or hospitals to keep track of how many incidents occur in or
around the culverts?
Response: This is a concern, but we do not keep records or notifications of these incidents involving residents
who have entered the box culverts.
Question: Are you able to teach homeowners how to maintain the channels? If so how do you educate them?
Response: We are able to educate homeowners with basic maintenance guidelines for mowing and keeping the
channel free of debris.
Question: Is maintaining the channel the property owner’s responsibility?
Response: When the channel is located behind their home, yes, they are responsible. Unfortunately it’s difficult
to enforce maintenance, due to drainage laws.
Question: Are there property maintenance codes?
Response: No.
Stormwater Management Task Force February 7, 2012
Agenda Packet
Task Force Survey Results Discussion
Sheila Shockey reported that 23 members of the Task Force participated in a Guiding Principles survey. The purpose
of the survey was to gain initial input and help guide decision-making regarding the City of Springfield & Greene
County’s stormwater management programs. The survey was comprised of nine questions, all of which asked
respondents to provide their “level of agreement.” Five response options were provided: strongly agree, agree,
neutral, disagree and strongly disagree.
The results showed agreement on the Public Acceptance and Ease of Administration survey topics with some of
them showing “neutral” responses. The survey results showed some disagreement on the survey topics: Economic
Development, Equity/Fairness and Ability to Pay.
Economic Development:
The Task Force discussed rewording the Economic Development guiding principle:
“Tax rates and/or fees should be competitive with other jurisdictions to help attract and retain businesses and
citizens.” The following points were discussed:
1. Don’t try to be the cheapest and miss out on the opportunities.
2. Economic energy drives everything. If you don’t have that then you can’t pay for anything.
3. It would be more appealing if it said “was adequate to services.”
4. What’s important is: as long as you can do the things that you need to--- balance the needs.
5. If we are going to make a statement about economic development we need to have a statement about
striving for competitive tax rates and another about the value of what we receive.
Task Force members generally agreed to add “We safeguard our water resources” and to change “should be
competitive” to “while keeping tax rates and fees competitive.”
“We safeguard our water resources while keeping tax rates and fees competitive with other jurisdictions to attract and
retain businesses and citizens.”
There was also general agreement to add a second principle for Economic Development:
“We attract businesses and citizens to our community because of the value gained through investments made in
environmental stewardship.”
Equity/Fairness
The Task Force talked about rewording the Equity/Fairness guiding principle:
“Everyone in the community should pay their fair share for stormwater management.”
1. Fair share is the issue in this statement.
2. Just because it’s controversial doesn’t mean we shouldn’t use it.
3. It doesn’t matter who is at the bottom or top and/or has the problem, everyone should pay.
4. We need to consider those who have made infrastructure improvements and are proactive in helping
stormwater issues.
5. We need to consider incentives for those who go above and beyond.
There was a general agreement to take out “fair share” and leave the guiding principle intact otherwise.
“Everyone in the community should pay for stormwater management.”
The Task Force talked about rewording the Equity/Fairness guiding principle:
5
“The funding of stormwater management should be linked directly to the amount of runoff a property produces. Those
who cause more of the problem pay more for the stormwater services management.”
Comments included:
1. This one is difficult as you are going to have runoff no matter what, but it just depends on the factors and
what type of conditions you have.
2. How we fund the stormwater utility is the ultimate question.
3. What about using the word “negatively” impact?
4. We need to consider that we all own the watershed and not just the small section we live on or own. It’s our
responsibility as a whole.
The Task Force agreed to put this guiding principle on hold and continue the discussion at the next meeting.
Ability to Pay
The Task Force discussed rewording the Ability to Pay guiding principle:
“A program should be developed to reduce the burden of paying for the stormwater management on low-income
households, spreading the subsidy across to other citizens.”
Comments included:
1. Many households would have difficulties paying more for stormwater. Maybe we should look at the 2% of
median household income that regulatory agencies use to determine affordability.
2. Consider that many low-income families rent. The property owners are the ones affected.
There was a general agreement to put this guiding principle on hold and continue the discussion at the next Task
Force meeting.
Equity/Fairness
The Task Force talked about rewording the Equity/Fairness guiding principle:
“The funding of stormwater management should be linked directly to use of the service. Those who need the services
pay more.”
The Task Force agreed to delete this guiding principle.
Equity/Fairness
The Task Force discussed rewording the Equity/Fairness guiding principle:
“New development and redevelopment should not cause downstream impacts. The costs should be fully recovered.”
1. There is the issue that you can’t make everyone fix something.
2. “As known by current science” should be added to this statement, allowing for the principle to evolve as
science does.
There was general agreement for the time to add “negative” before impacts. The following sentence was also added:
“This should consider water quality and flooding using sounds science.”
“New development and redevelopment should not cause negative downstream impacts. This should consider water
quality and flooding using sound science” in the revised statement, which is still under discussion with potential
deletion of the complete statement.
6
Ms. Shockey wrapped up the meeting with a quick session of five keypad polling statements regarding Priorities. She
asked the Task Force to rate their level of importance for each Priority. Five options were provided: “very important,”
“important,” “neutral,” “not important,” “should not be funded.”
The following are the Priority statements the Task Force participated in and the results listed in priority order:
1. How important is it to fund projects/programs that reduce the risk of injury or death due to flooding those
that keep streets from flooding and bridges from overtopping? (very important 54%, important 46%)
2. How important is it to fund projects that have multiple benefits: those that reduce flood damage and risk,
improve water quality and help main existing infrastructure while creating community amenities? (very
important 41%, important 59%)
3. How important are projects and programs that protect water quality and help our community comply with
water quality regulations? (very important 53%, important 67%, neutral 6%)
4. How important is it to make sure the system we have in place to manage stormwater is in good repair by
investing in proactive rather than reactive maintenance of the system? (very important 28%, important 67%,
neutral 6%)
5. How important are projects that reduce property damage due to flooding - those projects/programs that
keep buildings from flooding? (very important 57%, important 36%, neutral 7%)
After the Task Force rated their level of importance for the Priority statements they were asked to finish by ranking
their top two priorities from the following statements. The statements are listed in the order in which they were ranked
by the Task Force.
1. Projects and programs that protect water quality and help our community comply with regulations should be
the highest priority. (12 votes)
2. Projects that reduce the risk of injury or death due to flooding should be the highest priority. (9 votes)
3. Projects that have multiple benefits should be the highest priority. (6 votes)
4. Projects that reduce property damage due to flooding should be the highest priority. (5 votes)
5. Our community’s highest priority is to make sure the system we have in place to manage stormwater is in
good repair by investing in proactive rather than reactive maintenance of the system. It is important to
protect our investment in the existing stormwater management systems. (4 votes)
Next Steps and Closing Remarks
Ms. Shockey and Mr. Hoy thanked the Task Force for their participation and reminded them the next meeting would
cover funding mechanisms next month: February 7, 2013, 5:00-7:00 p.m. at the Springfield – Greene County
Public Safety Center.
The meeting was adjourned at 7:05 p.m.
7
Stormwater Funding: History & Options
Introduction
This report focuses on potential major funding sources. Supplemental revenue sources do not provide enough funds
to cover the basic costs of the stormwater program. Revenue estimates provided in the following discussion are
estimates and based on available data. This report also provides expenditure projections based upon various
service levels. The Task Force is charged with identifying funding source(s) and recommending the amount of each
stormwater program area represented by the "circles" below.
Historical Funding Sources and Levels
The City of Springfield has funded stormwater management using several sources of revenue:
Property Tax
o Level Property Tax used to pay back bond issues for capital projects
Gas Tax & Use Tax (from Street Maintenance Fund)
Sales Tax from general sales tax and a revenue allocation from two specific sales taxes.
o The primary source of revenue in the General Fund is sales tax.
o ¼ cent City Capital Improvement Sales Tax (subject to voter approval and internal appropriation
every three years)
o County Parks & Stormwater Sales Tax – 1/8 cent with a portion allocated by County to City with a
5-year term expired July 2012
Greene County has funded stormwater management using two prim ary sources of revenue:
County Parks & Stormwater Sales Tax
General Fund (comprised of sales & property tax)
Both programs have also received state/federal grant funds. Grants typically require a local match of 20 to 50
percent local funds. They are not a consistent source of revenue. The following is a description of primary funding
sources and historical levels.
8
Level Property Tax:
The City of Springfield has used level property tax revenues in the past to pay back $56 million in General Obligation
(GO) bonds issued between 1995 – 2011. The bonds for stormwater projects will be paid off in 2031. The tax is 26
cents per $100 of assessed valuation which generates $8 million per year. Sixty-percent (60%) or 16 cents,
generating $4.8 million annually, is used to pay back the debt for stormwater projects. As capacity is available the
City can ask voters to approve new projects without raising property tax. The annual surplus or capacity is $800,000
in 2014, $1 million in 2016 and goes up to $8.1 million in 2031. The City is currently planning to use the available
level property tax funds beginning in 2016 to fund replacement of equipment and major repairs to city buildings.
Gas Tax & Use Tax (from Street Maintenance Fund):
The City of Springfield uses funds from the Street Maintenance Fund to pay for maintenance staff and expenses.
This would include repairs, minor capital improvements, and channel cleanouts. Gas Tax & Use Tax go into the
Street Maintenance Fund. A Gas Tax is a tax on fuel. A Use Tax is a tax on goods and services over $2,000
purchased out-of-state.
General Fund:
The City’s General fund contributions are approximately $500,000 per year. This is used for administrative costs of
operating the stormwater program and maintenance activities such as repairs, minor capital improvements, channel
cleanouts, mowing and tree maintenance. The source of General Fund dollars is primarily sales tax, payment in-lieu
of taxes and use tax.
The County’s General Revenue Fund contributions are approximately $250,000 per year. This was used for
operations of the stormwater program. The source of revenue for the General Revenue Fund is primarily sales tax
and property tax.
City Capital Improvement ¼ cent Sales Tax:
This sales tax was passed in 2010 and generates about $8 million per year for the City of Springfield. For the three
year period, 2010 – 2012, the City has allocated a total of $2 million for stormwater improvements from this source;
specifically for flood control projects. This sales tax will sunset in 2013. Voters will be asked to renew it in April 2013
for three more years. The proposal is to have $4.5 million of revenue over next 3 years for stormwater if the sales tax
is approved by voters.
County Parks/Stormwater Sales Tax:
Collected from July 1, 2007 to June 30, 2012, the ¼ cent sales tax was used to fund park and stormwater
improvements. One half of the total tax or 1/8 cent was used for stormwater improvements benefitting parks. The
1/8th cent portion generated a total of $24.2 million, or $5.15 million annually and the revenue was allocated to
stormwater management for the cities and county based upon population. Springfield’s total was $16.2 million over
that time period or approximately $3.24 million annually. The County’s total was $ 7.7 million over that time period or
approximately $ 1.54 million annually. This funded operations and capital projects.
The Springfield/Greene County Parks Board received half of the ¼ cent sales tax. There was no sunset on Parks’
portion and this tax is still in place. Stormwater programs received half of the sales tax or 1/8th cent and this portion
had a sunset ending in 2012. Missouri law allows counties to enact a maximum of ½ cent sales tax for parks and/or
stormwater management.
Historical Summary:
The following tables show revenue sources and totals historically for the City and County stormwater management
programs.
9
Table 1. City of Springfield Annual Funding Summary
Revenue Source 2008 2009 2010 2011 2012
General Fund – Stormwater $500,000 $500,000 $500,000 $500,000 $500,000
Division
Level Property Tax - Mowing $200,000 $200,000 $200,000 $200,000 $200,000
City Gas/Use Tax -- Maintenance. $800,000 $800,000 $800,000 $800,000 $800,000
City Level Property Tax – System $4,000,000 $4,000,000 $4,000,000 $4,000,000 $4,000,000
Improvements
County Parks/Stormwater Sales $3,000,000 $3,000,000 $3,000,000 $3,000,000 $3,000,000
Tax (1/8th)
City Capital Improvement Tax (1/4 $0 $0 $500,000 $500,000 $500,000
cent-part to Stormwater)
Total $8,500,000 $8,500,000 $9,000,000 $9,000,000 $9,000,000
Table 2. County Stormwater Program Funding Breakdown (2000-2012)
Revenue Source 2000-2012 Average Annual
Federal/State Funds $ 700,000 $ 53,846
Parks/Stormwater Sales Tax (2007-2012) $7,700,000 $ 592,307
General Fund (approx. $250,000/year 2007-2012) $1,500,000 $ 250,000
TOTAL 1995 - 2012 $9,900,000 $896,153
The County received only two grants, one in 2000 to buy flooded homes in the FEMA floodplain, and a smaller one in
2006 for stream stabilization. These totaled $700,000, but federal/state grants are not an ongoing funding source.
Potential Sources Moving Forward
The City of Springfield has three (3) primary sources of revenue available to fund stormwater management in the
future: property tax, sales tax and utility. The following are some options available for each revenue source.
Property Tax
o Use a portion of existing property tax revenue from property tax;
o Increase property taxes through a public vote; and
o Use a portion of Level Property Tax as existing stormwater debt is paid off.
Sales Tax
o Use a portion of existing sales tax revenue from General Fund;
o Use a portion of City Capital Improvement Sales Tax on the ballot in 2013;
o Use a portion of County Parks & Stormwater Sales Tax;
o Increase the County Parks & Stormwater Sales Tax; and
o Enact a new 1/10th cent Sales Tax authorized by the State to address water quality.
10
Utility
o Enact a user-fee based stormwater utility related to the level of usage of the system, typically
measured by the amount of runoff that leaves a property.
Greene County has three (3) primary sources of revenue available to fund stormwater management in the future:
property tax, sales tax and utility. The following are some options available for each revenue source.
Property Tax
o Use a portion of existing property tax revenue from General Revenue Fund; and
o Increase property taxes through a public vote.
Sales Tax
o Use a portion of existing sales tax revenue from General Fund;
o Use a portion of County Parks & Stormwater Sales Tax; and
o Increase the County Parks & Stormwater Sales Tax
o Enact a new 1/10th cent Sales Tax authorized by the State to address water quality.
Utility
o Enact a user-fee based stormwater utility related to the level of usage of the system, typically
measured by the amount of runoff that leaves a property.
The following describes each revenue source in more detail and provides an indication of the revenue that could be
generated with each source.
Property Tax
Property tax is levied on real estate and personal property, such as automobiles, boats and equipment. Many
programs and capital projects compete for City and County property tax funding. These competing uses must be
considered when choosing to use property taxes to pay for stormwater management. A permanent dedicated
property tax levy could be approved by voters for stormwater management.
A $0.01 cent of $100 assessed valuation increase in county-wide property tax would generate approximately
$400,000 annually. A $0.01 cent of $100 assessed valuation increase in property tax generates $300,000 annually
for the City. An example of a tax bill for a $120,000 residential property is listed in Table 3 to show the relative tax
levy for each taxing entity.
Table 3. Example Tax Bill
Residential Property Inside Springfield City Limits, $120,000 Value
2012
Taxing District Levy Amount
Springfield R12 School District 3.6999 $843.58
City of Springfield 0.6083 $138.69
Springfield-Greene County Library 0.2433 $55.47
Ozarks Community Technical College 0.1408 $32.10
County Road & Bridge 0.1206 $27.50
County General Revenue 0.1206 $27.50
County Senior Citizens' Services 0.0496 $11.31
County Developmental Disability Programs 0.0466 $10.62
State of Missouri 0.03 $6.84
Total $1,153.61
11
Residential Property In Northern Greene
County, $120,000 Value
2012
Taxing District Levy Amount
Pleasant Hope School District 4.054 $924.31
Ebenezer Fire District 0.8579 $195.60
Springfield-Greene County Library 0.2433 $55.47
Ozarks Community Technical College 0.1408 $32.10
County Road & Bridge 0.1206 $27.50
County General Revenue 0.1206 $27.50
County Senior Citizens' Services 0.0496 $11.31
County Developmental Disability Programs 0.0466 $10.62
State of Missouri 0.03 $6.84
Total $1,291.26
A comparison of property tax rates for benchmark communities is provided in Table 7 near the end of this paper.
Sales Tax
Sales taxes dedicated to stormwater are common revenue sources for local governments. All sales taxes in Missouri
are subject to the Hancock Amendment and must be approved by voters.
Table 4 includes revenue estimates for four sales rate tax options for Springfield and Greene County. Nearly 100
Missouri cities have implemented local sales taxes for stormwater programs. A comparison of sales tax rates for
benchmark communities is provided in Table 7 near the end of this paper.
Table 4. Estimated Annual Revenue - Summary
Various Sales Tax Rates
1/10th 1/8th 1/4th 1/2
Sales Tax Sales Tax Sales Tax Sales Tax
Greene County, $ 4,035,359.22 $ 5,147,110.98 $ 10,088,398.06 $ 20,176,796.12
Missouri
Stormwater Utility
Municipalities and governmental entities create stormwater utilities so that dedicated funds are available to operate,
maintain, manage, construct or reconstruct their municipal stormwater drainage systems. A stormwater utility is a
dedicated revenue source intended to alleviate the burden on general funds. Essentially, the stormwater utility is
identical to a water or sanitary sewer utility, in which the utility’s users finance the utility’s infrastructure costs. The
stormwater utility charge is not associated in any way with property value, property taxes, or the owner's income.
Typically, the municipality charges a stormwater utility fee to all users within the city based on the amount of runoff
that each property generates and contributes to the stormwater system. As a rule, the runoff generated relates
directly to the amount of hard surface, or impervious area, found on the property. Hard surfaces such as roof-tops,
driveways, and parking lots prevent rainfall from infiltrating into the ground, thus increasing the amount of runoff that
a property generates. Consequently, a property with more impervious area uses the stormwater system to a greater
12
extent than a property with less hard surface. For estimation purposes, we calculated an average amount of hard
surface a single-family residential property would have at 3,200 square feet. All other properties would pay a fee
based upon the amount of hard surface they have divided by 3,200 square feet which is an Equivalent Residential
Unit (ERU). Table 5 shows the estimated annual revenue generated by a stormwater utility, based on various rate
levels. Three rate levels are selected for demonstration purposes, $2 per month, $3 per month and $5 per month.
These are within the range of stormwater utility rates in other communities (see Table 7). A stormwater utility can be
implemented in a variety of ways to meet the community’s needs, such as phasing in the rate over a period of time
and allowing credits for installation of BMPs and good practices.
Table 5. Estimated Annual Revenue By Area at Various Levels
Impervious Areas Revenue/Year @ Revenue/Year @ Revenue/Year @
Covered $2/month/ERU $3/month/ERU $5/month/ERU
Springfield $4,219,314 $6,328,972 $10,548,286
Urban Service Area $948,861 $ 1,423,292 $2,372,154
Greene County $2,040,278 $3,060,416 $5,100,694
Total $7,118,453 $10,812,680 $18,021,134
A stormwater utility is often viewed as a tax but it is not a tax. It is a user fee. It is based upon the amount of
impervious surface on a property and does not consider ability to pay or property classifications. For example,
government and nonprofit tax payers do not pay sales tax. Properties owned by government or non-profit entities are
not subject to paying property tax. A stormwater utility charges all properties with hard surfaces, even government
and nonprofit entities because they generate stormwater runoff. Government and nonprofit entities pay for other
utilities such as water, sewer, gas and electric. Table 6 on the next page provides a few examples of the annual fees
that would be paid by a few example properties.
Table 6. Examples of Commercial and Institutional Rates By Area at Various Rate Levels
Equivalent
Property Number of Residential Base Monthly Annual
Example Properties Size Parcels Units, ERU Rate Fee Fee
Ridgecrest Baptist Church 12.9 acres 1 175 $ 3.00 $ 525 $ 6,300
Price Cutter - Republic Road 6.3 acres 1 85.8 $ 3.00 $ 257 $ 3,089
Battlefield Mall 90 acres 1 1225 $ 3.00 $ 3,675 $44,100
Greene County 27.4 acres 2 373 $ 3.00 $ 1,119 $13,428
City of Springfield 890 acres 1+ 12,115 $ 3.00 $36,345 $436,140
Ridgecrest Baptist Church 12.9 acres 1 175 $ 5.00 $ 875 $10,500
Price Cutter - Republic Road 6.3 acres 1 85.8 $ 5.00 $ 429 $ 5,148
Battlefield Mall 90 acres 1 1225 $ 5.00 $ 6,125 $73,500
Greene County 27.4 acres 2 373 $ 5.00 $ 1,865 $22,380
City of Springfield 890 acres 1+ 12,115 $ 5.00 $ 60,575 $726,900
13
Comparisons of Tax/Utility Rate Levels to Benchmark Communities
The following table compares Springfield to their benchmark cities in terms of sales tax, property tax, income tax and
stormwater utility levels.
Table 7. Rate Comparisons of Selected Municipalities
Sales Tax, Property Tax, Stormwater Utility, Income Tax
Property Tax
Stormwater
Median RET
Community Sales Tax Rate Utility State Income Tax Rate
Rate per $1000
Monthly Fee
Value
Kalamazoo, MI 6.00% 19.33 N/A 4.35%*
Grand Rapids, MI 6.00% 13.08 N/A 4.35%*
Salt Lake City, UT 6.85% 6.49 $3.00 5%
Savannah, GA 7.00% 6.58 N/A 6%
Evansville, IN 7.00% 7.65 N/A 3.4%*
Fort Wayne, IN 7.00% 9.37 $3.65 3.4%*
Columbia, SC 7.00% 7.19 $3.95 7%
Springfield, MO 7.60% 7.50 N/A 6%
Columbus, GA 8.00% 4.50 N/A 6%
Huntsville, AL 8.00% 4.58 N/A 5%
Abilene, TX 8.25% 14.99 $2.45 0
Amarillo, TX 8.25% 17.65 N/A 0
Waco, TX 8.25% 15.91 N/A 0
Wichita Falls, TX 8.25% 17.23 $1.75 0
Chattanooga, TN 9.25% 10.19 $3.00 6%
Knoxville, TN 9.25% 10.18 N/A 6%
Notes:
1. * percent of Federal adjusted gross income with modification
2. Sales Tax Rates are from www.sale-tax.com
3. Property Tax information is from NAHB study and represents 2009 effective property tax rates
4. Stormwater Utility information is from the "Western Kentucky University Stormwater Utility Survey 2007"
5. State Income Tax information is from www.taxfoundation.org. Rates are for a household income of $40,000 as
of July 1, 2012.
14
There are a pros and cons to each type of funding source considered. Table 9 below lists them.
Table 8. Pros and Cons of Funding Sources
Pros & Cons to Consider Property Tax Sales Tax Utility
All entities in the community pay. No No Yes
Visitors from outside the community pay. No Yes No
Those who generate more stormwater runoff pay more. No No Yes
Cost to establish billing system is minimal. Yes Yes No
Easy to administer billing system. Yes Yes No
Requires a vote of the people. Yes Yes Yes
Stable source of revenue -- doesn't fluctuate with the No No Yes
economy.
Voters have approved in the past. Yes Yes No
Structure considers ability to pay. No No No
Stormwater competes with other funding needs unless Yes Yes No
dedicated specifically to stormwater
Supplemental Funds
Supplemental funding sources are those that can enhance stormwater program elements when funds are available
or economic forces make them feasible. These include the following:
Permit fees – funds permit application review and approval.
State & Federal Grants
U.S. Army Corps of Engineers – federal budget earmark projects.
15
Expenditure Projections by Various Service Levels
Table 9 provides estimates through 2021 for the following service levels for the City of Springfield’s Stormwater
Program:
Meet Water Quality Mandate (low estimate based upon current understanding of regulations);
Meet Water Quality Mandate (high estimate based upon current understanding of regulations);
Mandate (low) + Current Infrastructure Repair & Replacement Level which is minimal & reactive in nature;
Mandate (low) + more Proactive Infrastructure Repair & Replacement Level;
Mandate(low) + Current Infrastructure Repair & Replacement Level (reactive & minimal) + Current Flood
Reduction Investment level (about $5 million per year);
Mandate (low)+ Proactive Infrastructure Repair & Replacement of Old System ($5 - $5.5 million per year) +
Current Flood Reduction Service Level ($5 million per year)
Table 9. City of Springfield Projected Expenses by Service Level.
Mandate (low) + Proactive Mandate (low) + Reactive Mandate (low) + Proactive
WQ Mandate (Minimum) WQ Mandate (Maximum)
Infrastructure Repair & Infrastructure Repair &
Infrastructure Repair &
Annual Revenue
Replacement & Current Replacement + Current
Revenue
Surplus
Replacement Flooding Service Level Flooding Service Level
(Shortfall -
Year Max)
2013 $850,000 $1,000,000 $5,850,000 $7,050,000 $10,850,000 $5,000,000 $(5,850,000)
2014 $950,000 $1,300,000 $6,000,000 $7,200,000 $11,000,000 $4,500,000 $(6,500,000)
2015 $1,300,000 $2,812,500 $6,370,000 $7,570,000 $11,370,000 $3,000,000 $(8,370,000)
2016 $1,950,000 $4,325,000 $7,050,000 $8,250,000 $12,050,000 $3,000,000 $ (9,050,000)
2017 $ 2,212,500 $5,500,000 $7,362,500 $8,562,500 $12,362,500 $1,500,000 $(10,862,500)
2018 $3,075,000 $6,675,000 $8,275,000 $9,475,000 $13,275,000 $1,500,000 $(11,775,000)
2019 $ 3,167,250 $6,875,250 $8,467,250 $9,667,250 $13,467,250 $1,500,000 $(11,967,250)
2020 $ 3,262,268 $7,081,508 $8,662,268 $9,862,268 $13,662,268 $1,500,000 $(12,162,268)
2021 $3,360,136 $7,293,953 $8,860,136 $10,060,136 $13,860,136 $1,500,000 $(12,360,136)
The City’s revenue estimate for 2014 – 2016 if the City Capital Improvements Sales Tax is passed on the April 2013
ballot includes $1.5 million per year for capital projects. In 2021, the shortfall is between $5.5 million to $12.5 million.
The future numbers to meet mandates are based upon the best information available at this time. They assume the
City and County reach agreement on the MS4 permit and current and future TMDLs that ultimately result in actions to
improve waters on the 303d list and hold to requirements of the CWA and current and future rules and standards of
DNR and EPA.
16
Chart 1 shows the current revenue levels and projected expenses for stormwater by service level for the City of
Springfield, Missouri.
Chart 1. City of Springfield Current Revenue Levels and Projected Expenses by Service Level.
16000000
Mandate (low) +
Proactive
Infrastructure Repair
& Replacement +
Current Flooding
14000000
Service Level
Mandate (low) +
Reactive
Infrastructure Repair
12000000 & Replacement &
Current Flooding
Service Level
Mandate (low) +
10000000 Proactive
Infrastructure Repair &
Replacement
8000000
WQ Mandate
(Maximum)
6000000
WQ Mandate
(Minimum)
4000000
Existing with
2000000 April1/4 Portion
0 Existing Revenue
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021
17
Table 10 provides estimates through 2021 for the following service levels for the Greene County’s Stormwater
Program:
Meet Water Quality Mandate;
Meet Mandate + Current Flood Reduction Service Level which is minimal & reactive in nature;
Mandate + Proactive Infrastructure Repair & Replacement of Old System ($900,000 per year) + Current
Flood Reduction Service Level.
Table 10. Greene County Stormwater Expenses By Service Level, Annual Revenue and Shortfall
Meet Mandates
Meet (min) +
Meet Mandates Proactive
Projected (min) + Repair &
Water Maintain Replacement +
Meet Projected Quality Flood Current Flood Revenue
Water Quality Mandates Service Reduction Annual Surplus
Year Mandates (min) (max) Level Service Level Revenue (Shortfall)
2013 $417,000 $500,000 $817,000 $1,717,000 $750,000 ($967,000)
2014 $577,000 $792,000 $1,084,500 $1,984,500 $750,000 ($1,234,500)
2015 $1,042,000 $2,167,000 $2,004,500 $2,907,720 $250,000 ($2,657,720)
2016 $1,467,000 $3,267,000 $2,770,510 $3,676,973 $250,000 ($3,426,973)
2017 $1,892,000 $4,217,000 $3,461,625 $4,371,353 $250,000 ($4,121,353)
2018 $2,317,000 $5,167,000 $4,152,849 $5,065,865 $250,000 ($4,815,865)
2019 $2,266,000 $5,201,500 $4,265,435 $5,217,841 $250,000 ($4,967,841)
2020 $2,333,980 $5,357,545 $4,381,398 $5,374,376 $250,000 ($5,124,376)
2021 $2,531,848 $5,646,120 $4,500,839 $5,535,608 $250,000 ($5,285,608)
Current revenue levels for Greene County are $250,000 per year. Revenue shortfall is $967,000 in 2013 to
$5,200,000 in 2021.
Chart 2 shows the current revenue levels and projected expenses by service level.
18
Chart 2. Greene County Current Revenue Levels and Projected Expenses by Service Level.
$16,000,000
Mandates (min)
$14,000,000 + Proactive
Repair &
Replacement +
Current Flood
Reduction
$12,000,000
Service Level
Meet Mandates
(min) + Maintain
$10,000,000 Flood Service
Level
$8,000,000
Meet Projected
Mandates (max)
$6,000,000
$4,000,000 Meet Projected
Manadates (min)
$2,000,000
Annual Revenue
$0
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021
19
Summary
Table 11. shows the revenue estimated from various sources for Springfield and Greene County.
Table 11. Sources of and Annual Projected Revenue for City of Springfield & Greene County.
Unincorporated
County Annual Total Annual
Source City Annual Revenue Urban Service Area Revenue Revenue
1 Cent increase property tax $300,000 $440,000
1/10th cent sales tax $4,035,359
1/8th cent sales tax $5,147,110
1/4 cent sales tax $10,088,398
1/2 cent sales tax $20,176,796
$2/month utility $4,219,314 $948,861 $2,040,278 $7,118,453
$3/month utility $6,328,972 $1,423,392 $3,060,416 $10,812,780
$5/month utility $10,548,286 $2,372,154 $5,100,694 $18,021,134
NOTE: In the past, the City of Springfield has received approximately 60% of the sales tax revenue (allocated based
upon population) collected by Greene County when distributed to multiple taxing jurisdictions.
20
City of Springfield - Greene County, Missouri
Stormwater Management Task Force
Guiding Principles Survey Results
GUIDING PRINCIPLES
As part of the stormwater management process, the Stormwater Management Task Force had the opportunity to
respond to a survey to develop a discussion regarding guiding principles for stormwater management.
Twenty seven Stormwater Management Task Force members completed the survey, which comprised of a series of
9 questions, all of which were statements respondents were asked their “level of agreement.” Five response options
were provided strongly agree, agree, neutral, disagree and strongly disagree.
The following statements were asked of the Stormwater Management Task Force members:
Ability to Pay: A program should be developed to reduce the burden of paying the stormwater
management programs on low income households, spreading that subsidy across other citizens
Economic Development: Being good environmental stewards, to include attention to water quality
measures, will be increasingly important to the community's ability to attract and retain businesses
and citizens in the future.
Funding Strategy: A permanent, dedicated funding source should be put in place to cover the costs
of required programs and maintenance activities.
Funding Strategy: A capital funding source should have a sunset and specific project list identified.
Funding Strategy: The funding source for ongoing and required costs should be reliable and not
fluctuate greatly from year to year.
Innovation Planning: Projects that best address the problem for the entire county should be funded
jointly by jurisdictions benefiting.
Intergenerational Equity: Stormwater improvements should be paid for over time, to distribute costs
over multiple-generations who will use the system.
Equity/Fairness: New development and redevelopment should not cause negative downstream
impacts.
Fairness/Equity: The funding of stormwater management should be linked directly to the amount of
runoff a property produces. Those who cause more of the problem, pay more for stormwater
management.
Ability to Pay: A program should be developed to reduce the burden of paying for stormwater
management on low-income households: spreading the subsidy across to other households who
can afford to pay more.
21
Ability to Pay: A program should be developed to reduce the burden
of paying the stormwater management programs on low income
households, spreading that subsidy across other citizens
Strongly Strongly Agree
Disagree 15% 4%
Agree 29%
Disagree 22%
Neutral 30%
Economic Development: Being good environmental stewards, to
include attention to water quality measures, will be increasingly
important to the community's ability to attract and retain businesses
and citizens in the future.
Strongly
Disagree 4%
Disagree 7%
Neutral 11% Strongly Agree
37%
Agree 41%
22
Funding Strategy: A permanent, dedicated funding source should be
put in place to cover the costs of required programs and maintenance
activities.
Strongly
Disagree 7%
Disagree 15% Strongly Agree
26%
Neutral 7%
Agree 45%
Funding Strategy: A capital funding source should have a sunset and
specific project list identified.
Strongly
Disagree 4%
Strongly Agree
Disagree 15%
18%
Neutral 22%
Agree 41%
23
Funding Strategy: The funding source for ongoing and required costs
should be reliable and not fluctuate greatly from year to year.
Strongly Agree
7%
Disagree 19%
Neutral 11%
Agree 63%
Innovation Planning: Projects that best address the problem for the
entire county should be funded jointly by jurisdictions benefiting.
Neutral 4%
Strongly Agree
29%
Agree 67%
24
Intergenerational Equity: Stormwater improvements should be paid
for over time, to distribute costs over multiple-generations who will
use the system.
Strongly
Strongly Agree
Disagree 11% Disagree 4%
11%
Neutral 22%
Agree
52%
Equity/Fairness: New development and redevelopment should not
cause negative downstream impacts.
Disagree 7%
Neutral 11% Strongly Agree
30%
Agree 52%
25
Fairness/Equity: The funding of stormwater management should be
linked directly to the amount of runoff a property produces. Those
who cause more of the problem, pay more for stormwater
management.
Strongly
Disagree 8%
Strongly Agree
Disagree 22% 22%
Neutral 11%
Agree 37%
Ability to Pay: A program should be developed to reduce the burden
of paying for stormwater management on low-income households:
spreading the subsidy across to other households who can afford to
pay more.
Strongly
Disagree 18%
Agree 30%
Disagree 22%
Neutral 30%
26
EMAILS FROM TASK FORCE MEMBERS TO SHARE:
On Feb 4, 2013, at 8:42 AM, "dave murray" <dave@rbmurray.com> wrote:
Shelia,
If you didn't see the USA Today article, suggest you take a peak. I note this because retail development is still a
struggle and if these folks are having trouble it explains why so many others are too. This is obvious to yours truly but
the public has a tendency to not pay attention, unless of course it’s t he poor soul that works for one of these
companies
Why bring this up, well whatever is done with SW needs it must be done gently or we stand the risk that future new
development will not stand a chance. It’s hard now due to the econo mic conditions, make too difficult there will not be
any revenue generators, can you say sales tax?
http://www.usatoday.com/story/money/business/2013/02/01/retailers-close-stores-24-7/1873745/
David C. Murray SIOR CCIM
Vice President
R.B. Murray Company
2225 S Blackman Rd
Springfield MO 65809
417 881 0600 - phone
417 882 0541 fax
dave@rbmurray.com
www.rbmurray.com
From: Ronda Headland [mailto:Ronda.Headland@mdc.mo.gov]
Sent: Monday, January 28, 2013 8:37 PM
To: Sheila Shockey
Cc: Bill White
Subject: RE: Stormwater Management Task Force Survey - Please Respond
Sheila,
In regard to question #8 – Equity/Fairness: New development and redevelopment should not cause negative
downstream or upstream impacts.
Negative impacts due to development and redevelopment practices can occur upstream as well as downstream. If
the elevation of a stream channel is changed it may create head-cuts upstream of where the change was made as
the energy of the stream seeks to regain its equilibrium. I recommend that we modify this statement to reflect that
possibility.
The following was typed mostly for my benefit as I needed to “think out loud” so to speak on the funding issue:
27
Has the City/County conducted any type of Benefit-Cost Analysis in regard to its stormwater program? If the benefits
of the stormwater program can be shown to outweigh the expense then it makes economic sense to fund it…up to
the point that additional money does not result in additional worthwhile benefits.
I’m going to pull some information from book Environmental Policy because A. Myrick Freeman III makes some good
points in his chapter titled, “Economics, Incentives, and Environmental Regulation”. He states that, “We should
undertake environmental protection and pollution control only if the results are worth more, in terms of individuals’
values, than what is given up by diverting resources form other uses. This is the underlying principle of the economic
approach to environmental policy. Benefit-cost analysis is a set of analytical tools designed to measure the net
contribution of any public policy to the economic well-being of the members of society. The term, benefit-cost
analysis, is used to describe a more narrowly defined, technical economic calculation that attempts to reduce all
benefits and costs to a common monetary measure (that is, dollars). It seeks to determine if the aggregate of the
gains that accrue to those made better off is greater than the aggregate of losses to those made worse off by the
policy choice. The gains and losses are both measured in dollars and are defined as the sums of each individual’s
willingness to pay to receive the gain or to prevent the policy-imposed losses. If the gains exceed the losses, the
policy should be accepted according to the logic of benefit-cost analysis. Policies where the aggregate gains
outweigh the aggregate costs can be justified on ethical grounds because the gainers could fully compensate the
losers with monetary payments and still they are better off with the policy. Thus, if the compensation were actually
made, there would be no losers, only gainers. The logic of benefit-cost analysis does not require that those who
benefit pay for those benefits or that those who ultimately bear the cost of meeting a standard be compensated for
those costs. Whether compensation should be paid is considered to be a question of equity or distributive
fairness. Benefit-cost analysis is concerned exclusively with economic efficiency as represented by the aggregate of
benefits and costs.
If standards are set to maximize the net benefits, then the gainers could fully compensate the losers and still come
out ahead. But when beneficiaries do not compensate losers, there is political asymmetry. Those who benefit call
for ever-stricter standards and more cleanup because they obtain the benefits and bear none of the costs, while
those who must bear the costs of controlling pollution call for less strict standards. Even if one objects, for either
philosophical or pragmatic reasons, to basing environmental policy on benefit-cost analysis, it still makes good sense
to favor cost-effective environmental policies. Cost-effectiveness means the stated environmental quality standards
are achieved at the lowest possible total cost.” He goes on to state that if polluters are not required to compensate
those who are harmed, they have no incentive to alter their practices. I’ll end my summary with this last point he
makes on how, “it is not true that benefit-cost analysis is always biased against environmental protection. For many
years decisions on funding for federal water resource development projects …used techniques that systematically
overstated the benefits of development; understated the economic costs; and ignored the environmental costs of
building dams, diverting water for irrigation, and so forth. As a consequence, a number of economically wasteful and
environmentally damaging projects were undertaken. A comparison of the benefits to recreational fishing expected
to come from removal of an existing dam with the costs of removal, including the forgone hydroelectric power
generation, was used by the Federal Energy Regulatory Commission to help justify its order to remove the Edwards
Dam on the Kennebec River in Maine.”
And just to remind myself of some of the funding mechanisms mentioned at previous meetings: a stormwater utility
fee (such as a bill a homeowner or renter pays for water and sewer services), permit fees (such as paid by
developers at the Planning and Zoning Department), user fees (paid by a property owner based on the amount of
runoff from the property – may be calculated based on the percentage of the property covered by impervious
surfaces), sales tax (paid by all who spend money within our jurisdiction). We’ve also discussed equity issues in
regard to low-income residents and have considered strategies such as setting fees based on percentages of income
versus flat rates. A sales tax is not equitable in that low-income people pay in a higher percentage of their income to
a sales tax than do higher-income people.
Thanks (and sorry for the long ramble),
RONDA HEADLAND
28
COMMUNITY CONSERVATION PLANNER // PRIVATE LAND SERVICES DIVISION // MISSOURI DEPARTMENT
OF CONSERVATION
320 N. MAIN AVENUE, SPRINGFIELD, MO 65806 // 417-866-1127 EXT. 150 // RONDA.HEADLAND@MDC.MO.GOV
The book I referenced can be cited as:
Freeman, A. M. III (2000). Economics, incentives, and environmental regulation. In M. E. Kraft & N. J. Vig (Eds.),
Environmental Policy (4th ed. pp. 190-209). Washington, D.C.: CQ P ress.
From: Pierson, Matthew C [mailto:MatthewPierson@MissouriState.edu]
Sent: Friday, January 25, 2013 5:09 PM
To: Sheila Shockey
Subject: RE: Stormwater Management Task Force Survey - Please Respond
Hi Sheila,
Let’s please have a survey question or a discussion on the merits of incentivizing good behavior. Since development
similar to the Habitat for Humanity development won’t be required, there isn’t much of a reward structure for
developing in a way that is better for the environment and for public awareness of water quality issues.
The upside:
I strongly feel that it should be up to the developer to decide how to develop their property, within the bounds of the
law. If incentives can get even a few developments to go above and beyond the standard, maybe that can keep the
EPA off everyone’s back when future regulations come down which would potentially require this type of low impact
development. At the least the development community will have better learned how to implement these best
management practices before they become required by law. In the future this would potentially expand Springfield
companies’ customer bases to other communities who now need expertise in implementing practices required by
law, which our companies would already have lead the way on implementing here in Greene county.
At the least:
No one would take the incentive and nothing would be lost or gained.
Thank you for your consideration,
Matt
P.S. I just read through this and if you feel like that will derail or distract from your intended purposes please
disregard my request.
Have a good weekend,
Matthew C. Pierson, Ph.D.
Assistant Professor of Civil Engineering
Missouri State Cooperative Engineering Program
901 S. National
Springfield, MO 65898
785-393-2427 (cell)
417-836-4947 (office)
MatthewPierson@MissouriState.edu
29
From: Geoffrey Butler [mailto:butler@brpae.com]
Sent: Friday, January 18, 2013 10:26 AM
To: Lamb, Carrie (CLamb@springfieldmo.gov); twagner@springfieldmo.gov; Kevin Barnes
(kbarnes@greenecountymo.org); TSmith@greenecountymo.org; Broyles, Phil (PBroyles@springfieldmo.gov); Burris,
Greg; fmarty@springfieldmo.gov
Cc: Sheila Shockey
Subject: Storm Water Management Guiding Principals
I came away last night feeling a little conflicted. While the discussion was healthy, I do not think we really got into the
meat of the matter or solved anything. For what it is worth, below are my suggestions and some discussion points
1. Public Acceptance: It is important to identify, prioritize, plan, source appropriate funding & build projects showing
progress to the public.
There has always been reluctance in this community to hand a blank check to anyone. It might be the conservative
nature of the community coupled with a natural distrust (rightly or wrongly) of government. The most successful
means of funding public improvements has been through the Capital Improvements Tax. Identify the problem,
determine the solution and propose it to the community as a CIP sales tax. So this Public Acceptance principal
needs to be drafted with that in mind.
2. Ease of Administration: The cost related to collecting the funding for to administrate the storm water
management maintenance and improvements should be minimized and uncomplicated.
No one wants to increase the City or County bureaucracy. Figure out how to do what needs to be done with the staff
we have so any dollars available for public improvements can be committed to that work.
3. Economic Development: Tax rates and/or fees should be competi tive with other jurisdictions to help attract and
retain businesses and citizens. A community which has good long term plans for managing and protecting its
resources at a nominal cost can promote the Economic Development of the area.
Economic Development is driven not just by tax rates but and existence of good planning and management of these
issues at a reasonable cost.
4. Equity/Fairness: Everyone in the community should pay their fair share for contribute to the effort to manage our
storm water issues..
It is not a matter of paying their fair share (which is difficult to define), it is a matter of contributing to the effort to
manage it. Some can do it with proper planning and development of their properties, other can pay a fee to help fund
work to solve existing problems. The equity thing will take a lot of work but we need to all agree that everyone needs
to contribute in some fashion.
5. Equity/Fairness: The costs to administer & review permits should be fully recovered from the applicant
and not subsidized by other customers.
I think we all understand that the City now does this. It does not need to be addressed.
6. Equity/Fairness: The funding of storm water management should be linked directly to the amount of
runoff a property produces. Those who cause more of the problem pay more for the storm water
30
services management
There are three components to this Storm Water Management issue:
1. Mandates from EPA/DNR – these are generally raising the bar on water quality and pollution control. They
are a community wide burden and need to be funded by the community as a whole.
2. Maintenance of existing systems – we have a significant investment in our City/County storm water
management infrastructure. As has been demonstrated, we have to maintain it or face huge future costs to
replace deteriorated elements of the system. Like the Fram Oil Filter Guy said: “Pay me now or pay me
MORE later.”
3. Public Improvements - Without a doubt, there are areas of the community which have problems due to old
development which failed to address storm water adequately or due to the growth of the city where the new
developments added storm water that even with required detention systems. Regional approaches to
solving these problems is often the best means of addressing this. There is also a need to anticipate the
needs and provide this infrastructure BEFORE development occurs.
The funding of each elements might be better addressed separately rather that with one single funding source.
7. Ability to Pay: A program should be developed to reduce the burden of paying for the storm water
management programs on low income households, spreading that subsidy across other citizens.
This community does not favor subsidies. While it is easy for everyone to vote for taxes and fees that the other guy
pays, it is really difficult to get the voting public to agree to pay for the other guy.
8. Equity/Fairness: The funding of storm water management should be related to the source of the problem or
benefactors of the management effort. linked directly to use of the service. Those who need the services pay more.
While this sounds logical, HOW you determine and measure the nature of the service they use is a snake pit of
problems. Particularly water quality. Does a golf course using well water and spraying lots of nutrients need to pay
for water quality controls any more than the Battlefield Mall with its huge parking lot? How do you measure the
impacts? And the treatment for maintenance is different from the mandates or public improvements.
9. Equity/Fairness: New development and redevelopment should not cause increase downstream
problems. impacts. The costs should be fully recovered
This is basically current City Council policy. We have ordinances written designed to do this, though Todd did
mention that it does not say this, the ordinances are written prescriptively in a manner which is supposed to do this.
Bottom line, I you are driving this bus looking for a single silver bullet, I don’t think you will find it. This will take
several different approaches to solving the problem and each needs to be easy to explain and sell. The last Task
Force finally ended up agreeing that the best bet was to tag onto a very popular and easier to sell issue (the Parks
Tax) to fund this. The lost opportunity was passing on the Parks Tax renewal….
I will only be able to attend the first part of our next meeting on Feb 7th. I have a zoning meeting which I might need
to attend. Accordingly you might want to adjust the program so the fun stuff or controversial stuff happens when I am
there or when I am gone – whatever you think suits your goals.
Geoffrey H. Butler AIA l Architect & President
Butler, Rosenbury & Partners
31