Muyni
← Back to Taylor

City Council

Regular Meeting

Taylor, MI · March 3, 2026

Agenda

Agenda

MAYOR Timothy Woolley CITY OF TAYLOR COUNCIL Charley Johnson CHAIRMAN Cynthia A. Bower CLERK Ron Thiede CHAIR PRO-TEM Nicone Dragone Sr. TREASURER Christian Armstrong 23555 Goddard Road Chris Clark Taylor, MI 48180 William Patts (734) 287 6550 Gerald P. Thomas www.cityoftaylor.com Dan Wallace The Regular Council Meeting of the Taylor City Council will be held on Tuesday March 03, 2026 in the Taylor Municipal Building at 23555 Goddard Rd., Taylor, MI to begin promptly at 6:30 PM AGENDA 1. Call to order 2. Pledge of Allegiance 3. Roll Call 4. AGENDA AND MINUTES 4.1 Motion to approve the Agenda. 4.2 Motion to approve the acceptance of the minutes of the meeting held February 17, 2026 and dispense with oral reading. 2026_02_17 Final.pdf 5. MAYOR COMMUNICATIONS 6. CONSENT AGENDA 6.1 Motion to approve authorizing the City Clerk to sign the Michigan Charitable Gaming License application recognizing Fish & Loaves as a nonprofit organization. 2006, 07-26 Bylaws of Fish & Loaves (1).pdf Fish and Loaves 501c3 Status Letter.pdf 6.2 Motion to receive & file Taylor Police & Fire Retirement System Report dated December 31, 2025. 2025-12-31 Taylor P&F Quarterly Supplement.pdf 6.3 Motion to receive & file Taylor General Employees Retirement System dated December 31,2025. 2025-12-31 Taylor General Supp Qtrly.pdf 7. REGULAR AGENDA 1 7.1 Motion to approve creating a development area of LDFA (Local Development Finance Authority) of Detroit Region Aerotropolis Development Corporation. LOCAL DEVELOPMENT FINANCE AUTHORITY BY AEROTROPOLIS DEVELOPMENT CORPORATION.pdf Letter regarding TIF capture.pdf Aerotropolis LDFA Plan.pdf Resolution of approval and Procedural Outline of the Plan.pdf 7.2 Motion to approve authorizing the Mayor to sign the Purchase Agreement on behalf of the City of Taylor for the sale of Parcel# 60-027-99-0001-000 for an amount of $25,000, plus all costs associated with closing. Proceeds go to the General Fund. Vacant Champaign-Telegraph.pdf 7.3 Motion to approve the Collective Bargaining Agreement between the City of Taylor and the Taylor Professional Fire Fighters Association, Local 1252, IAFF, AFL-CIO. 7.4 Motion to approve Flock Safety, sole source, for renewal of two (2) year agreement in an amount of $69,600 for the first year and $69,600 for the second year. Funded through General Fund - Contractual Services. Flock 2 year renewal Quote.pdf Flock Sole Source Justification.pdf Flock Sole Source Provider.pdf 7.5 Motion to approve Bidigare Contractors, current vendor, for contract extension to the water main improvement projects, for the amounts to be determined and approved at a future meeting by the Administration and City Council. Funded through City of Taylor Infrastructure Bonding. 2026 Water Main Project Extension Letter (Bidigare Contractors) 12-01-2025.pdf Reference (City of Taylor BID) - 2022 City of Taylor Water Main Project (Bid Tab) 12-21- 2022.pdf 7.6 Motion to amend CCR # 10.465-25 for Decima LLC, low bid, for additional required work at the Greenwald Historical House, located at Heritage Park in an amount not to exceed $404,035 Funded through TBA Capital Outlay. 2025_10_07 draft (2).pdf Greenwald Historic Home Rehab.pdf 7.7 Motion to approve Audia Concrete Construction, Inc., current vendor, for the current Concrete Panel Replacement for the 2026-2027 Fiscal Year in an amount not to exceed $1,565,000. Funded through Local and Major Street Funds. 2023 Concrete Panel Replacement Contract (Bid Tab) 06-13-2023 CLG.pdf IFB-DG-2023-05-25-001 Concrete Panel Replacement Contract 2023 (51 Pages).pdf Taylor 2026 Concrete Panel Price Letter.pdf 7.8 Motion to approve Al’s Asphalt Paving Company, current vendor, for extension to the current Asphalt Pavement 2 Resurfacing Contract for the 2026-2027 Fiscal Year in an amount not to exceed $2,145,000. Funded through Local Street Fund and Major Street Fund. RFP - (022825-001) BID TAB (03-28-2025) CLG.pdf RFP-022825-001_2025 Asphalt Pavement Resurfacing Program (Official Bidnet Posting 03- 04-2025) 58 Pages.pdf Taylor 2026 Asphalt Resurfacing Price Letter (02-03-2026).pdf 7.9 Motion to approve Wade Trim to perform the second Design portion of the proposed 2025 Water Distribution System Project Design for an amount not to exceed $600,000. Funded though Water Supply System Fund Capital Outlay. 2025 Water Main Improvement Project (WTA) Design (02-20-2026).pdf Reference - 2025 Water Main Improvement Project (WTA) Design (05-22-2025).pdf Supporting Documents (CLG).pdf 7.10 Motion to approve Dell Technologies, State bid/low bid, for the purchase of five (5) Interactive Touch Monitors with wall mounts in an amount not to exceed $23,315, funded through 2024 JAG Grant and General Fund Police IT. Dell Technologies - State Bid Quote.pdf Dell Quote.pdf CDW Quote.pdf 7.11 Motion to approve Concord, Current Vendor, for renewal and upgrade of cloud fax services, in the amount of $6,482, funded through General Fund IT Contractual Services. Bisom (Fax) Renewal.pdf 7.12 Motion to approve Ricoh, Current Vendor, for Kofax Scanning Software Licensing and Support annual renewal for an amount of $10,143. Funded through General Fund IT Contractual Services. CITY OF TAYLOR_Kofax.pdf 7.13 Motion to approve Ricoh, Current Vendor, for Docuware one (1) year renewal in an amount of $12,613, funded through General Fund IT Contractual Services. Ricoh Docuware Renewal.pdf 7.14 Motion to approve Ricoh, low quote, for Purchase of 150 Tungsten Power PDF 5 Perpetual Licenses with one (1) year Maintenance in an amount not to exceed $21,576 funded through General Fund IT Contractual Services. rQuote_36365393_Quote (1).pdf CDWG_Tungsten.pdf Data Capture Group_Tungsten.pdf 7.15 Motion to approve one (1) year renewal of worker's compensation excess insurance policy with Midwest Employers Casualty for the period of 1/1/26 through 12/31/26 in the amount of $114,803. Funded through Risk Management Contractual Services. 3 7.16 Motion to approve to direct Corporation Counsel to draft a ballot proposal to amend the City of Taylor Charter, Chapter 4, Section 4.5 Filling Vacancies in Elective Office, per the attached document. Ballot Proposal Motion_Vacancy.pdf 7.17 Motion to approve to direct Corporation Counsel to draft a ballot proposal to amend the City of Taylor Charter, Chapter 15, Section 15.2, Section 15.3 and Section 15.4 (a), per the attached document. Ballot Proposal Motion_Budget Limitations.pdf 8. OPEN BUSINESS 9. ADJOURNMENT 4 CITY OF TAYLOR COUNCIL Timothy Woolley Charley Johnson MAYOR CHAIRMAN Cynthia A. Bower Ron Thiede CLERK CHAIR PRO-TEM Nicone Dragone Sr. 23555 Goddard Road Christian Armstrong TREASURER Taylor, MI 48180 Chris Clark (734) 287 6550 William Patts www.cityoftaylor.com Gerald P.Thomas Dan Wallace MINUTES The regular meeting of the Taylor City Council was held on Tuesday, February 17, 2026 at 6:30 p.m. in the Taylor Municipal Building at 23555 Goddard Road, Taylor, Michigan. Council Chairman Charley Johnson called the meeting to order. Present: Charley Johnson, Christian Armstrong, Chris Clark, Williams Patts, Gerald Thomas, Dan Wallace, Ron Thiede Also Present: Mayor Woolley, Deputy Clerk Sara El-Rifaai, Treasurer Nicone Dragone Sr., Corporation Counsel Ed Plato, Council Secretary Tiarra Swain Excused: None Motion By: Gerald Thomas Supported By: Chris Clark Ayes: Charley Johnson, Chris Clark, Dan Wallace, William Patts, Ron Thiede, Christian Armstrong, Gerald Thomas Nays: None Resolved: To approve the Agenda. Unanimously carried CCR #: 2.64-26 Motion By: Dan Wallace Supported By: Christian Armstrong Ayes: Charley Johnson, Chris Clark, Dan Wallace, William Patts, Ron Thiede, Christian Armstrong, Gerald Thomas Nays: None Resolved: To approve the acceptance of the minutes of the meeting held February 3, 2026 and dispense with oral reading. Unanimously carried CCR #: 2.65-26 5 Motion By: Christian Armstrong Supported By: Dan Wallace Ayes: Charley Johnson, Chris Clark, Dan Wallace, William Patts, Ron Thiede, Christian Armstrong, Gerald Thomas Nays: None Resolved: To approve the re-appointments of Ronald Bentley and Nick Dmitruchina to the Museum Commission for a three (3) year term to expire on February 17, 2029. Unanimously carried CCR #: 2.66-26 Motion By: Christian Armstrong Supported By: Ron Thiede Ayes: Charley Johnson, Chris Clark, Dan Wallace, William Patts, Ron Thiede, Christian Armstrong, Gerald Thomas Nays: None Resolved: To approve authorizing the City Clerk to sign the Michigan Charitable Gaming Licenses application recognizing St Joseph's Helpers as a nonprofit organization. Unanimously carried CCR #: 2.67-26 Motion By: Christian Armstrong Supported By: Ron Thiede Ayes: Charley Johnson, Chris Clark, Dan Wallace, William Patts, Ron Thiede, Christian Armstrong, Gerald Thomas Nays: None Resolved: To receive & file the January 2026 Budget Performance Report. Unanimously carried CCR #: 2.68-26 Motion By: Christian Armstrong Supported By: Ron Thiede Ayes: Charley Johnson, Chris Clark, Dan Wallace, William Patts, Ron Thiede, Christian Armstrong, Gerald Thomas Nays: None Resolved: To receive & file the January 2026 Paid Invoice Report. Unanimously carried CCR #: 2.69-26 Motion By: Christian Armstrong Supported By: Ron Thiede Ayes: Charley Johnson, Chris Clark, Dan Wallace, William Patts, Ron Thiede, Christian Armstrong, Gerald Thomas Nays: None Resolved: To receive & file 0 % interest deferred loan for project #2025-07 for work performed by Optimum Contracting Solutions per qualified low quote for Emergency Roof Replacement in the amount of $13,250. Funded through the Community Development Block Grant Home Rehabilitation account. Not to exceed program limits. Unanimously carried CCR #: 2.70-26 6 Motion By: Christian Armstrong Supported By: Ron Thiede Ayes: Charley Johnson, Chris Clark, Dan Wallace, William Patts, Ron Thiede, Christian Armstrong, Gerald Thomas Nays: None Resolved: To approve KCI Printing for the postage associated with mailing the 2026 Assessment Change Notices for Real Property, in an amount not to exceed $13,479. Unanimously carried CCR #: 2.71-26 Motion By: Chris Clark Supported By: Christian Armstrong Ayes: Charley Johnson, Chris Clark, Dan Wallace, William Patts, Ron Thiede, Christian Armstrong, Gerald Thomas Nays: None Resolved: To approve the issuance of an Amusement Device permit to Kudos Taproom & Fieldhouse, 14100 Pardee, for nineteen (19) amusement device machines pursuant to Chapter 4, Article III of the City of Taylor Code of Ordinances. Unanimously carried CCR #: 2.72-26 Motion By: Gerald Thomas Supported By: Chris Clark Ayes: Charley Johnson, Chris Clark, Dan Wallace, William Patts, Ron Thiede, Christian Armstrong, Gerald Thomas Nays: None Resolved: To amend CCR 6.220-25 to increase authority to blanket purchase order for Med-Tech Resource by $20,000, funded through General Fund, Fire Department- ALS Transporting Account. Unanimously carried CCR #: 2.73-26 Motion By: William Patts Supported By: Dan Wallace Ayes: Charley Johnson, Chris Clark, Dan Wallace, William Patts, Ron Thiede, Christian Armstrong, Gerald Thomas Nays: None Resolved: To approve Superior Comfort Heating and Cooling, low bid, for the installation of two (2) Electrical Vehicle battery chargers in an amount not to exceed $5,173, funded through Community Energy Management Grant. Unanimously carried CCR #: 2.74-26 Motion By: Christian Armstrong Supported By: Chris Clark Ayes: Charley Johnson, Chris Clark, Dan Wallace, William Patts, Ron Thiede, Christian Armstrong, Gerald Thomas Nays: None Resolved: To approve the Proclamation honoring Southeast Michigan Community Alliance (SEMCA). Unanimously carried CCR #: 2.75-26 7 Motion By: Christian Armstrong Supported By: Gerald Thomas Ayes: Charley Johnson, Chris Clark, Dan Wallace, William Patts, Ron Thiede, Christian Armstrong, Gerald Thomas Nays: None Resolved: To approve payment to Michigan Police Training for providing Commercial Vehicle Enforcement Trainings to two (2) Police Officers, in an amount not to exceed $4,370, funded through the Act 302 Police Training Fund. Unanimously carried CCR #: 2.76-26 Motion By: Christian Armstrong Supported By: Gerald Thomas Ayes: Charley Johnson, Chris Clark, Dan Wallace, William Patts, Ron Thiede, Christian Armstrong, Gerald Thomas Nays: None Resolved: To approve the renewal of the Law Enforcement State Accreditation module through Lexipol, in the amount of $31,300, funded through General Fund Police Contractual Services. Unanimously carried CCR #: 2.77-26 Motion By: William Patts Supported By: Dan Wallace Ayes: Charley Johnson, Chris Clark, Dan Wallace, William Patts, Ron Thiede, Christian Armstrong, Gerald Thomas Nays: None Resolved: To approve Hennessey Engineers, lowest qualified bidder, for Community Development Engineering, Planning & Support Services, amount not to exceed $26,700 and authorize the Mayor to sign the contract. Funded through Community Development Block Grant account. Unanimously carried CCR #: 2.78-26 Motion By: Ron Thiede Supported By: Gerald Thomas Ayes: Charley Johnson, Chris Clark, Dan Wallace, William Patts, Ron Thiede, Christian Armstrong, Gerald Thomas Nays: None Resolved: To approve Department of Public Works employees to attend the 2026 American Public Works Association (APWA) Great Lakes Expo in an amount not to exceed $6,700. Funded through Water Supply System Fund. Unanimously carried CCR #: 2.79-26 8 Motion By: Gerald Thomas Supported By: Dan Wallace Ayes: Charley Johnson, Chris Clark, Dan Wallace, William Patts, Ron Thiede, Christian Armstrong, Gerald Thomas Nays: None Resolved: To approve engagement with Miller, Canfield, Paddock and Stone, PLLC to provide bond counsel services related to the proposed issuance of capital improvement bonds. The contingent fee for services is based on the size of the bonds, but not to exceed $59,500. Funded through bond proceeds. Unanimously carried CCR #: 2.80-26 Motion By: Gerald Thomas Supported By: Dan Wallace Ayes: Charley Johnson, Chris Clark, Dan Wallace, William Patts, Ron Thiede, Christian Armstrong, Gerald Thomas Nays: None Resolved: To approve engagement with PFM Financial Advisors LLC to provide financial advisory services related to the proposed capital improvement bond issuance. The contingent fee for services is based on an $8,000 base fee, plus $0.90 per $1,000 of bonds issued. Funded through bond proceeds. Unanimously carried CCR #: 2.81-26 Motion By: William Patts Supported By: Gerald Thomas Ayes: Charley Johnson, Chris Clark, Dan Wallace, William Patts, Ron Thiede, Christian Armstrong, Gerald Thomas Nays: None Resolved: To approve setting the public hearing for the City's Fiscal Year 2026/2027 proposed budget for April 23, 2026 at 6:30 p.m. The property tax millage rate proposed to be levied to support the budget will be subject to this hearing. Unanimously carried CCR #: 2.82-26 Motion By: Chris Clark Supported By: Christian Armstrong Ayes: Charley Johnson, Chris Clark, Dan Wallace, William Patts, Ron Thiede, Christian Armstrong, Gerald Thomas Nays: None Resolved: To approve CivicPlus, current website vendor, to provide licensing and installation of DocAccess, an Americans Disabilities Act-related component, for a Year 1 amount of $13,724, and a Year 2 amount of $14,411, for a total amount not to exceed $28,135. Funded through General Fund Admin Account. Unanimously carried CCR #: 2.83-26 9 Motion By: Dan Wallace Supported By: Christian Armstrong Ayes: Charley Johnson, Chris Clark, Dan Wallace, William Patts, Ron Thiede, Christian Armstrong, Gerald Thomas Nays: None Resolved: To approve adjournment at 6:54 p.m. Unanimously carried CCR #: 2.84-26 _____________________________________ ________________________________ Charley Johnson, Chairman Cynthia A. Bower, City Clerk 10 11 12 13 14 15 16 17 18 19 20 <CBDoc TenantId="2" EntityTypeId="3100" EntityId="1487" DocumentTypeId="1" EffectiveDate="12/31/2025" Interval="3" Description="Supplemental Quarterly Report" /> Taylor Police & Fire Retirement System Investment Performance Review Period Ending December 31, 2025 21 Asset Allocation Summary Taylor Police & Fire Total Fund As of December 31, 2025 Dec-2025 : $152,666,717 Allocation Market Value Allocation ¢ Fidelity Lrg Cap Gro Idx (FSPGX) 25,981,965 17.0 ¢ PNC Large Cap Value 14,017,904 9.2 ¢ Fidelity Mid Cap Index (FSMDX) 23,041,268 15.1 ¢ Federated MDT Small Cap Core (QISCX) 6,768,433 4.4 ¢ Brandywine Large Cap Value 13,602,157 8.9 ¢ Fidelity 500 Index Institutional (FXAIX) 21,548,588 14.1 ¢ WCM Focused Int'l Growth 8,728,829 5.7 ¢ PNC Core Fixed Income 6,031,547 4.0 ¢ PNC Hi Yield Fixed (PIHBX) 174,784 0.1 ¢ Bloomfield Cap Inc Fund V-A 94,031 0.1 ¢ Bloomfield Cap Inc Fund V-B 983,963 0.6 ¢ Bloomfield Cap Inc Fund V-C 647,187 0.4 ¢ Bloomfield Cap Inc Fund V-D 1,161,851 0.8 Fidelity Lrg Cap Gro Idx (FSPGX) 17% Sturbridge Diversified III 1% ¢ Metropolitan RE Secondaries 355,230 0.2 Abbott Secondary Opportunites II LP 3% ¢ American Strategic Val Realty 2,697,470 1.8 TA Realty Core Property 3% American Strategic Val Realty 2% ¢ TA Realty Core Property 3,959,084 2.6 Metropolitan RE Secondaries 0% ¢ Abbott Secondary Opportunites II LP 4,904,398 3.2 Bloomfield Cap Inc Fund V-D 1% PNC Large Cap Value 9% Bloomfield Cap Inc Fund V-C 0% ¢ Sturbridge Diversified III 2,134,776 1.4 Bloomfield Cap Inc Fund V-B 1% ¢ Terracap Partners V LP 1,284,619 0.8 Bloomfield Cap Inc Fund V-A 0% PNC Hi Yield Fixed (PIHBX) 0% ¢ Portfolio Advisors Secondary Fund IV 4,704,286 3.1 PNC Core Fixed Income 4% ¢ Cash Account 9,683,713 6.3 WCM Focused Int'l Growth 6% Fidelity Mid Cap Index (FSMDX) 15% ¢ Commingled Fund Cash 160,636 0.1 Fidelity 500 Index Institutional (FXAIX) 14% Federated MDT Small Cap Core (QISCX) 4% Brandywine Large Cap Value 9% Page 1 22 Asset Allocation Summary Taylor Police & Fire Total Fund As of December 31, 2025 Asset Allocation vs. Target Allocation Total Domestic Equity Composite 4.8% Total International/Global Equity -2.3 % Total Fixed Income Composite 0.0% Total Real Estate Composite -4.6 % Total Private Equity Composite -2.3 % Total Cash Composite 4.4% -10.0 % -8.0 % -6.0 % -4.0 % -2.0 % 0.0% 2.0% 4.0% 6.0% 8.0% 10.0% Allocation Differences Asset Allocation vs. Target Allocation Market Value$ Allocation (%) Target (%) Total Domestic Equity Composite 104,960,314 68.8 64.0 Total International/Global Equity 8,728,829 5.7 8.0 Total Fixed Income Composite 9,093,362 6.0 6.0 Total Real Estate Composite 8,296,403 5.4 10.0 Total Private Equity Composite 11,743,460 7.7 10.0 Total Cash Composite 9,844,349 6.4 2.0 Total Fund 152,666,717 100.0 100.0 Page 2 23 Financial Reconciliation Total Fund 1 Quarter Ending December 31, 2025 Market Value Net Contribution Management Other Apprec./ Market Value Distributions Income 10/01/2025 Transfers s Fees Expenses Deprec. 12/31/2025 Total Domestic Equity Composite 109,156,536 -5,706,337 - - -26,336 - 1,061,461 474,990 104,960,314 Fidelity Lrg Cap Gro Idx (FSPGX) 28,720,887 -3,000,000 - - - - 88,978 172,100 25,981,965 PNC Large Cap Value 13,439,436 - - - -11,603 - 64,208 525,863 14,017,904 Fidelity Mid Cap Index (FSMDX) 23,004,519 - - - - - 199,179 -162,430 23,041,268 Brandywine Large Cap Value 13,483,628 14,734 - - -14,734 - 78,241 40,288 13,602,157 Champlain Small Company (CIPNX) 2,873,419 -2,721,071 - - - - - -152,348 - Federated MDT Small Cap Core (QISCX) 6,642,339 - - - - - 504,783 -378,689 6,768,433 Fidelity 500 Index Institutional (FXAIX) 20,992,309 - - - - - 126,074 430,206 21,548,588 Total International Equity Composite 9,155,485 - - - - - - -426,656 8,728,829 WCM Focused Int'l Growth Fund LP 9,155,485 - - - - - - -426,656 8,728,829 Total Fixed Income Composite 9,038,179 -47,376 - - - - 111,391 -8,832 9,093,362 PNC Core Fixed Income 5,954,309 3,757 - - - - 50,317 23,164 6,031,547 PNC High Yield Fixed Income (PIHBX) 176,186 -3,757 - - - - 3,757 -1,402 174,784 Total Non-Core Fixed Composite 2,907,683 -47,376 - - - - 57,317 -30,593 2,887,032 Bloomfield Capital Income Fund V Series - A 93,231 - - - - - - 800 94,031 Bloomfield Capital Income Fund V Series - B 1,012,839 -19,892 - - - - 25,651 -34,635 983,963 Bloomfield Capital Income Fund V Series - C 793,710 -162,567 - - - - 14,692 1,352 647,187 Bloomfield Capital Income Fund V Series - D 1,007,903 135,083 - - - - 16,975 1,889 1,161,851 Total Real Estate Composite 8,264,728 - - - -15,387 - 54,774 -7,712 8,296,403 Metropolitan Real Estate Partners Secondaries & Co-Investments Fund, L.P. 355,230 - - - - - - - 355,230 American Strategic Value Realty 2,688,881 - - - -8,499 - 8,526 8,563 2,697,470 TA Realty Core Property Fund LP 3,935,999 - - - -6,888 - 46,248 -16,274 3,959,084 Terracap Partners V LP 1,284,619 - - - - - - - 1,284,619 Total Private Equity Composite 11,852,169 -108,709 - - - - 4,584 -4,584 11,743,460 Abbott Secondary Opportunites II LP 4,979,398 -75,000 - - - - 4,584 -4,584 4,904,398 Portfolio Advisors Secondary Fund IV 4,737,995 -33,709 - - - - - - 4,704,286 Sturbridge Diversified III 2,134,776 - - - - - - - 2,134,776 Total Cash Composite 3,111,600 5,862,422 4,986,572 -4,141,702 - -47,804 73,262 - 9,844,349 Cash Account 2,718,821 6,099,116 4,986,572 -4,141,702 - -47,804 68,710 - 9,683,713 Cash Account from Commingled Fund 392,779 -236,695 - - - - 4,551 - 160,636 Total Fund Composite 150,578,696 - 4,986,572 -4,141,702 -41,724 -47,804 1,305,472 27,205 152,666,717 Page 3 24 Comparative Performance Total Fund As of December 31, 2025 Comparative Performance Inception QTR 1 YR 3 YR 5 YR 7 YR 10 YR Inception Date Total Fund Composite (Gross) 0.89 (97) 11.26 (86) 12.72 (41) 8.33 (16) 10.83 (8) 9.75 (5) 8.30 (31) 04/01/2003 Total Fund Policy 2.33 (26) 15.66 (16) 16.84 (1) 9.98 (2) 12.70 (1) 11.02 (1) 9.73 (1) Difference -1.44 -4.40 -4.12 -1.65 -1.87 -1.27 -1.42 All Public Plans-Total Fund Median 2.07 13.75 12.36 7.20 9.60 8.53 8.01 Total Fund Composite (Net) 0.86 11.05 12.46 8.02 10.50 9.37 8.11 04/01/2008 Total Fund Policy 2.33 15.66 16.84 9.98 12.70 11.02 8.84 Difference -1.47 -4.60 -4.38 -1.96 -2.20 -1.65 -0.73 Total Domestic Equity Composite 1.43 13.53 18.18 10.72 13.83 11.73 9.91 04/01/2008 Total Domestic Equity Policy 2.40 17.15 22.25 13.15 16.60 14.18 11.44 Difference -0.97 -3.62 -4.06 -2.43 -2.77 -2.44 -1.53 Total International/Global Equity -4.66 21.25 14.07 6.18 9.93 8.18 5.50 04/01/2008 Total International Equity Policy 5.05 32.39 17.33 7.91 10.15 8.41 4.62 Difference -9.71 -11.13 -3.27 -1.72 -0.21 -0.23 0.88 Total Fixed Income Composite 1.14 5.93 7.13 4.13 4.92 5.62 5.10 07/01/2014 Total Fixed Income Policy 1.20 6.97 5.06 0.96 2.67 2.44 2.29 Difference -0.06 -1.03 2.07 3.18 2.24 3.19 2.82 Total Real Estate Composite 0.57 -7.66 -9.87 0.33 1.58 4.24 5.78 07/01/2014 Total Real Estate Policy 0.91 3.79 -3.45 3.40 3.35 4.80 6.02 Difference -0.35 -11.45 -6.43 -3.07 -1.78 -0.56 -0.24 Returns for periods greater than one year are annualized. Returns are expressed as percentages. Page 4 25 Comparative Performance Total Fund As of December 31, 2025 Inception QTR 1 YR 3 YR 5 YR 7 YR 10 YR Inception Date Total Domestic Equity Composite 1.43 13.53 18.18 10.72 13.83 11.73 9.91 04/01/2008 Fidelity Lrg Cap Gro Idx (FSPGX) 1.11 (48) 18.53 (29) N/A N/A N/A N/A N/A 06/01/2023 Russell 1000 Growth Index 1.12 (47) 18.56 (28) 31.15 (31) 15.32 (10) 21.25 (11) 18.13 (10) 27.37 (26) Difference -0.02 -0.03 N/A N/A N/A N/A N/A Large Growth Median 0.98 16.03 28.37 11.78 17.94 15.52 24.96 PNC Large Cap Value 4.39 (36) 20.10 (17) 15.39 (46) 13.61 (41) 13.15 (64) 10.61 (83) 11.06 (56) 06/01/2013 Russell 1000 Value Index 3.81 (45) 15.91 (53) 13.90 (63) 11.33 (76) 12.10 (82) 10.53 (86) 10.12 (85) Difference 0.58 4.19 1.49 2.28 1.06 0.09 0.94 IM U.S. Large Cap Value Equity (SA+CF) Median 3.41 16.17 14.93 13.09 13.93 11.86 11.20 Fidelity Mid Cap Index (FSMDX) 0.16 (72) 10.57 (39) 14.34 (34) N/A N/A N/A 6.38 (68) 12/01/2021 Russell Midcap Index 0.16 (72) 10.60 (38) 14.36 (34) 8.67 (69) 12.75 (48) 11.01 (51) 6.37 (68) Difference 0.00 -0.03 -0.01 N/A N/A N/A 0.00 Mid-Cap Blend Median 1.50 8.84 13.13 9.32 12.63 11.03 6.89 Brandywine Large Cap Value 0.88 (87) 8.90 (88) 10.20 (93) 10.47 (87) 12.49 (76) N/A 11.03 (59) 04/01/2017 Russell 1000 Value Index 3.81 (45) 15.91 (53) 13.90 (63) 11.33 (76) 12.10 (82) 10.53 (86) 9.69 (87) Difference -2.93 -7.00 -3.70 -0.85 0.39 N/A 1.34 IM U.S. Large Cap Value Equity (SA+CF) Median 3.41 16.17 14.93 13.09 13.93 11.86 11.40 Federated MDT Small Cap Core (QISCX) 1.90 (50) 14.14 (12) 16.48 (8) 9.62 (20) N/A N/A 11.02 (16) 12/01/2019 Russell 2000 Index 2.19 (39) 12.81 (18) 13.73 (24) 6.09 (72) 10.60 (52) 9.62 (41) 8.68 (51) Difference -0.29 1.33 2.75 3.53 N/A N/A 2.35 Small Blend Median 1.89 8.22 11.95 7.19 10.65 9.35 8.73 Fidelity 500 Index Institutional (FXAIX) 2.65 (43) 17.86 (37) 22.99 (35) N/A N/A N/A 12.05 (38) 12/01/2021 S&P 500 Index 2.66 (41) 17.88 (35) 23.01 (33) 14.42 (33) 17.29 (37) 14.82 (34) 12.07 (34) Difference -0.01 -0.02 -0.01 N/A N/A N/A -0.01 Large Blend Median 2.55 17.15 22.37 13.85 17.01 14.48 11.57 Returns for periods greater than one year are annualized. Returns are expressed as percentages. Page 5 26 Comparative Performance Total Fund As of December 31, 2025 Inception QTR 1 YR 3 YR 5 YR 7 YR 10 YR Inception Date Total International/Global Equity -4.66 21.25 14.07 6.18 9.93 8.18 5.50 04/01/2008 WCM Focused Int'l Growth Fund LP -4.66 (100) 21.25 (97) 15.08 (76) 5.01 (94) 12.65 (6) N/A 10.05 (5) 09/01/2018 MSCI AC World ex USA (Net) 5.05 (29) 32.39 (37) 17.33 (40) 7.91 (54) 10.15 (62) 8.41 (38) 7.93 (53) Difference -9.71 -11.13 -2.25 -2.90 2.50 N/A 2.13 MSCI EAFE Growth Index 1.89 (95) 21.12 (97) 13.51 (91) 4.76 (96) 9.79 (71) 7.80 (63) 7.19 (74) Difference -6.55 0.14 1.57 0.25 2.86 N/A 2.86 Foreign Large Blend Median 4.36 31.18 16.98 8.06 10.46 8.12 7.99 Total Fixed Income Composite 1.14 5.93 7.13 4.13 4.92 5.62 5.10 07/01/2014 Total PNC Fixed Income Composite 1.24 (52) 7.31 (48) 5.86 (23) 1.56 (31) 3.36 (14) 3.03 (17) 3.62 (45) 04/01/2003 Bloomberg Intermediate US Govt/Credit Idx 1.20 (69) 6.97 (75) 5.06 (87) 0.96 (90) 2.54 (91) 2.29 (91) 3.10 (94) Difference 0.04 0.34 0.80 0.61 0.81 0.75 0.51 IM U.S. Intermediate Duration (SA+CF) Median 1.24 7.26 5.47 1.33 2.90 2.61 3.57 Total Real Estate Composite 0.57 -7.66 -9.87 0.33 1.58 4.24 5.78 07/01/2014 American Strategic Value Realty 0.64 (67) 3.09 (80) -3.13 (63) 3.65 (56) 4.46 (27) N/A 6.12 (N/A) 06/01/2016 NCREIF Fund Index-ODCE (VW) 0.91 (57) 3.79 (69) -3.45 (70) 3.40 (63) 3.35 (65) 4.80 (64) 4.77 (N/A) Difference -0.28 -0.70 0.32 0.26 1.11 N/A 1.35 IM U.S. Open End Private Real Estate (SA+CF) Median 1.13 5.11 -2.45 3.75 3.98 5.37 N/A TA Realty Core Property Fund LP 0.76 (61) 4.44 (62) -0.97 (34) N/A N/A N/A 6.65 (N/A) 05/01/2021 NCREIF Fund Index-ODCE (VW) 0.91 (57) 3.79 (69) -3.45 (70) 3.40 (63) 3.35 (65) 4.80 (64) 3.18 (N/A) Difference -0.15 0.66 2.48 N/A N/A N/A 3.46 IM U.S. Open End Private Real Estate (SA+CF) Median 1.13 5.11 -2.45 3.75 3.98 5.37 N/A Returns for periods greater than one year are annualized. Returns are expressed as percentages. Page 6 27 Comparative Performance - IRR Total Fund As of December 31, 2025 Comparative Performance - IRR Inception QTD 1 YR 3 YR Inception Date Bloomfield Capital Income Fund V Series - A 0.86 -18.20 -4.10 9.82 12/21/2018 Bloomfield Capital Income Fund V Series - B -0.90 -1.33 5.89 6.49 04/20/2021 Bloomfield Capital Income Fund V Series - C 2.05 9.62 N/A 9.23 03/31/2023 Bloomfield Capital Income Fund V Series - D 1.88 7.95 N/A 7.49 11/06/2024 Metropolitan Real Estate Partners Secondaries & Co-Investments Fund, L.P. 0.00 -3.77 -18.18 1.50 12/30/2015 Abbott Secondary Opportunites II LP 0.00 9.92 9.27 15.47 07/23/2021 Portfolio Advisors Secondary Fund IV 0.00 1.46 2.90 7.16 08/09/2021 Sturbridge Diversified III 0.00 8.65 10.85 23.91 12/16/2022 Terracap Partners V LP 0.00 -42.10 -32.89 -25.28 05/03/2022 Page 7 28 Disclosures Mariner Institutional compiled this report for the sole use of the client for which it was prepared. Mariner Institutional is responsible for evaluating the performance results of the Total Fund along with the investment advisors by comparing their performance with indices and other related peer universe data that is deemed appropriate. Mariner Institutional uses the results from this evaluation to make observations and recommendations to the client. Mariner Institutional uses time-weighted calculations which are founded on standards recommended by the CFA Institute. The calculations and values shown are based on information that is received from custodians. Mariner Institutional analyzes transactions as indicated on the custodian statements and reviews the custodial market values of the portfolio. As a result, this provides Mariner Institutional with a reasonable basis that the investment information presented is free from material misstatement. This methodology of evaluating and measuring performance provides Mariner Institutional with a practical foundation for our observations and recommendations. Nothing came to our attention that would cause Mariner Institutional to believe that the information presented is significantly misstated. This performance report is based on data obtained by the client’s custodian(s), investment fund administrator, or other sources believed to be reliable. While these sources are believed to be reliable, the data providers are responsible for the accuracy and completeness of their statements. Clients are encouraged to compare the records of their custodian(s) to ensure this report fairly and accurately reflects their various asset positions. The strategies listed may not be suitable for all investors. We believe the information provided here is reliable, but do not warrant or guarantee its accuracy or completeness. Past performance is not an indication of future performance. Any information contained in this report is for informational purposes only and should not be construed to be an offer to buy or sell any securities or any investment advisory services. Please note that Neuberger Berman (NB) owns a non-controlling minority stake in Mariner. Certain NB strategies may hold an allocation to the investment in Mariner. For specific impacted strategies, please reach out to your investment consultant or Mariner Institutional at institutionalcompliance@mariner.com Additional information included in this document may contain data provided by index databases, public economic sources, and the managers themselves. This document may contain data provided by Bloomberg. This document may contain data provided by Standard and Poor’s. Nothing contained within any document, advertisement or presentation from S&P Indices constitutes an offer of services in jurisdictions where S&P Indices does not have the necessary licenses. All information provided by S&P Indices is impersonal and is not tailored to the needs of any person, entity or group of persons. Any returns or performance provided within any document is provided for illustrative purposes only and does not demonstrate actual performance. Past performance is not a guarantee of future investment results. This document may contain data provided by MSCI, Inc. Copyright MSCI, 2017. Unpublished. All Rights Reserved. This information may only be used for your internal use, may not be reproduced or disseminated in any form and may not be used to create any financial instruments or products or any indices. This information is provided on an “as is” basis and the user of this information assumes the entire risk of any use it may make or permit to be made of this information. Neither MSCI, any of its affiliates or any other person involved in or related to compiling, computing or creating this information makes any express or implied warranties or representations with respect to such information or the results to be obtained by the use thereof, and MSCI, its affiliates and each such other person hereby expressly disclaim all warranties (including, without limitation, all warranties of originality, accuracy, completeness, timeliness, non-infringement, merchantability and fitness for a particular purpose) with respect to this information. Without limiting any of the foregoing, in no event shall MSCI, any of its affiliates or any other person involved in or related to compiling, computing or creating this information have any liability for any direct, indirect, special, incidental, punitive, consequential or any other damages (including, without limitation, lost profits) even if notified of, or if it might otherwise have anticipated, the possibility of such damages. This document may contain data provided by Russell Investment Group. Russell Investment Group is the source owner of the data contained or reflected in this material and all trademarks and copyrights related thereto. The material may contain confidential information and unauthorized use, disclosure, copying, dissemination or redistribution is strictly prohibited. This is a user presentation of the data. Russell Investment Group is not responsible for the formatting or configuration of this material or for any inaccuracy in presentation thereof. This document may contain data provided by Morningstar. All rights reserved. Use of this content requires expert knowledge. It is to be used by specialist institutions only. The information contained herein: (1) is proprietary to Morningstar and/or its content providers; (2) may not be copied, adapted or distributed; and (3) is not warranted to be accurate, complete or timely. Neither Morningstar nor its content providers are responsible for any damages or losses arising from any use of this information, except where such damages or losses cannot be limited or excluded by law in your jurisdiction. Past financial performance is not guarantee of future results. *IMPORTANT DISCLOSURE INFORMATION RE COALITION GREENWICH BEST INVESTMENT CONSULTANT AWARD (formerly known as the Greenwich Quality Leader Award): The awards are not indicative of any future performance. The awards or any other rankings and/or recognition by unaffiliated rating services and/or publications should not be construed as a guarantee that a client will experience a certain level of results or satisfaction, nor should it be construed as a current or past endorsement by any of our clients. No fee was paid to participate in this award survey. The 2024-25 award was issued in February 2025, based on data from February to September of 2024. The 2023 award was issued in April 2024, based on data from Feb to November of 2023. The 2022 award was issued in April 2023, based on data from Feb to November of 2022. The 2021 award was issued in April of 2022, based on data from July to October 2021. Data was collected via interviews conducted by Coalition Greenwich. The 2024 and 2023 awards were issued to Mariner Institutional (formerly AndCo Consulting). The 2021 and 2022 awards were issued to AndCo, prior to becoming Mariner Institutional. The methodology: For the 2024-25 Coalition Greenwich Best Investment Consultant Award for Overall U.S. Investment Consulting – Midsize Consultants – Between February and September 2024, Crisil Coalition Greenwich conducted interviews with 699 individuals from 563 of the largest tax-exempt funds in the United States. For the 2023 Greenwich Best Investment Consultant Award for Overall U.S. Investment Consulting – Midsize Consultants – Between February and November 2023, Coalition Greenwich conducted interviews with 708 individuals from 575 of the largest tax-exempt funds in the United States. For the 2022 Greenwich Best Investment Consultant Award for Overall U.S. Investment Consulting – Midsize Consultants – Between February and November 2022, Coalition Greenwich conducted interviews with 727 individuals from 590 of the largest tax- exempt funds in the United States. For the 2021 Greenwich Best Investment Consultant Award – Overall U.S. Investment Consulting – Midsize Consultants – Between July and October 2021, Coalition Greenwich conducted interviews with 811 individuals from 661 of the largest tax-exempt funds in the United States. These U.S.-based institutional investors are corporate, public, union, and endowment and foundation funds with either pension or investment pool assets greater than $150 million. Study participants were asked to provide quantitative and qualitative evaluations of their asset management and investment consulting providers, including qualitative assessments of those firms soliciting their business and detailed information on important market trends. 29 Page 8 Access to a wealth of knowledge and solutions. 30 <CBDoc TenantId="2" EntityTypeId="3100" EntityId="1491" DocumentTypeId="1" EffectiveDate="12/31/2025" Interval="3" Description="Supplemental Quarterly Report" /> Taylor General Employees Retirement System Investment Performance Review Period Ending December 31, 2025 31 Asset Allocation Summary Taylor General As of December 31, 2025 Dec-2025 : $51,934,277 Allocation Market Value Allocation ¢ Fidelity Mid Cap Index (FSMDX) 2,584,578 5.0 ¢ Clarkston 2,590,942 5.0 ¢ Granite 2,682,790 5.2 Cash Account 4% Fidelity Mid Cap Index (FSMDX) 5% ¢ Fidelity 500 Index Institutional (FXAIX) 17,027,874 32.8 Bloomfield V Series - D 1% Clarkston 5% ¢ WCM Focused Int'l G (WCMIX) 3,903,178 7.5 Marathon 1% Granite 5% Amer Strat Val Realty 3% ¢ HGK Trinity Street 3,994,521 7.7 PIMCO Diversified (PDIIX) 3% ¢ Garcia Int Fixed 13,129,017 25.3 ¢ PIMCO Diversified (PDIIX) 1,618,411 3.1 Garcia Int Fixed 25% ¢ Amer Strat Val Realty 1,458,450 2.8 ¢ Marathon 455,805 0.9 ¢ Bloomfield V Series - D 524,852 1.0 Fidelity 500 Index Institutional (FXAIX) 33% ¢ Cash Account 1,963,861 3.8 HGK Trinity Street 8% WCM Focused Int'l G (WCMIX) 8% Asset Allocation vs. Target Allocation Domestic Equity 0.3% International Equity 0.2% Core Fixed Income 2.9% Alternative Fixed -3.1 % Non Core Fixed -0.9 % Real Estate -2.2 % Cash Equivalent 2.8% -6.0 % -4.0 % -2.0 % 0.0% 2.0% 4.0% 6.0% Asset Allocation vs. Target Allocation Market Value Allocation (%) Target (%) $ Domestic Equity 24,554,013 47.3 47.0 International Equity 7,897,699 15.2 15.0 Core Fixed Income 13,464,670 25.9 23.0 Alternative Fixed 455,805 0.9 4.0 Non Core Fixed 1,618,411 3.1 4.0 Real Estate 1,458,450 2.8 5.0 Cash Equivalent 2,485,230 4.8 2.0 Total Fund 51,934,277 100.0 100.0 Page 1 32 Financial Reconciliation Total Fund 1 Quarter Ending December 31, 2025 Market Value Net Management Other Apprec./ Market Value Contributions Distributions Income 10/01/2025 Transfers Fees Expenses Deprec. 12/31/2025 Total Domestic Equity Composite 24,825,190 -488,391 - - -11,609 - 138,136 422,857 24,886,183 Fidelity Mid Cap Index (FSMDX) 2,580,456 - - - - - 22,342 -18,220 2,584,578 Clarkston 2,616,769 5,232 - - -5,232 - 10,331 -36,158 2,590,942 Granite 2,551,793 6,377 - - -6,377 - 4,431 126,566 2,682,790 Fidelity 500 Index Institutional (FXAIX) 17,076,173 -500,000 - - - - 101,032 350,670 17,027,874 Total International Equity Composite 7,950,971 - - - -9,007 - 211,638 -255,902 7,897,699 WCM Focused Int'l Growth Fund (WCMIX) 4,090,383 - - - - - 211,638 -398,842 3,903,178 HGK Trinity Street 3,860,588 - - - -9,007 - - 142,940 3,994,521 Total Domestic Fixed Income Composite 12,444,735 507,666 - - -7,666 - 107,879 76,402 13,129,017 Garcia Int Fixed 12,444,735 507,666 - - -7,666 - 107,879 76,402 13,129,017 Alternative Fixed Income Composite 1,299,899 -334,844 - - - - 14,302 1,300 980,657 Marathon 503,455 -47,650 - - - - - - 455,805 Bloomfield Capital Income Fund V Series - D 796,444 -287,194 - - - - 14,302 1,300 524,852 Total Non Core Fixed Income Composite 1,582,485 - - - - - 23,221 12,705 1,618,411 PIMCO Diversified (PDIIX) 1,582,485 - - - - - 23,221 12,705 1,618,411 Total Real Estate Composite 1,453,806 - - - -4,595 - 4,610 4,630 1,458,450 American Strategic Value Realty Fund 1,453,806 - - - -4,595 - 4,610 4,630 1,458,450 Cash Account 181,002 315,569 3,774,177 -2,297,237 - -29,291 19,642 - 1,963,861 Total Fund Composite 49,738,088 - 3,774,177 -2,297,237 -32,877 -29,291 519,427 261,991 51,934,277 Page 2 33 Comparative Performance Total Fund As of December 31, 2025 Comparative Performance Inception QTR 1 YR 3 YR 5 YR 7 YR 10 YR Inception Date Total Fund Composite 1.54 (83) 13.53 (54) 13.00 (34) 7.84 (29) 10.66 (12) 9.42 (9) 7.71 (57) 11/01/1995 Total Fund Policy 2.26 (32) 15.36 (20) 14.51 (8) 7.98 (23) 10.70 (10) 9.38 (11) N/A Difference -0.71 -1.82 -1.51 -0.15 -0.04 0.04 N/A All Public Plans-Total Fund Median 2.07 13.72 12.30 7.09 9.58 8.52 7.82 Total Domestic Equity Composite 2.30 (49) 13.21 (60) 18.15 (59) 11.29 (68) 15.03 (60) 13.07 (52) 9.99 (100) 01/01/1996 Total Domestic Equity Policy 2.40 (47) 17.15 (34) 22.25 (24) 13.15 (41) 16.64 (35) 14.29 (30) 10.10 (100) Difference -0.10 -3.94 -4.10 -1.86 -1.61 -1.21 -0.11 IM U.S. All Cap Core Equity (SA+CF) Median 2.28 15.51 20.00 12.52 15.62 13.17 11.34 Total International Equity Composite -0.56 (100) 26.89 (77) 15.69 (69) 7.21 (68) 12.52 (7) 10.49 (2) 4.73 (96) 04/01/2001 Total International Equity Policy 5.05 (29) 32.39 (37) 17.33 (40) 7.91 (54) 10.15 (62) 8.41 (38) 6.12 (51) Difference -5.61 -5.50 -1.65 -0.69 2.37 2.08 -1.40 Foreign Large Blend Median 4.36 31.18 16.98 8.06 10.46 8.12 6.14 Total Domestic Fixed Income Composite 1.47 (10) 8.07 (12) 5.11 (85) 1.32 (51) 2.61 (83) 2.42 (77) 4.03 (93) 01/01/1996 Total Fixed Income Policy 1.20 (69) 6.97 (75) 5.06 (87) 0.96 (90) 2.54 (91) 2.29 (91) 4.14 (87) Difference 0.28 1.10 0.05 0.37 0.07 0.14 -0.11 IM U.S. Intermediate Duration (SA+CF) Median 1.24 7.26 5.47 1.33 2.90 2.61 4.41 Total Non Core Fixed Income Composite 2.27 (10) 10.52 (31) 9.05 (1) 2.31 (3) 1.18 (45) 2.07 (35) 1.78 (41) 10/01/2015 Total Global Fixed Income Policy 0.35 (49) 8.42 (65) 4.29 (55) -1.87 (50) 0.87 (56) 1.50 (55) 1.38 (57) Difference 1.92 2.11 4.76 4.18 0.31 0.57 0.40 Global Bond Median 0.34 8.93 4.43 -1.97 0.99 1.60 1.48 Total Real Estate Composite 0.64 (67) 3.09 (80) -3.12 (63) 3.64 (57) 4.44 (30) N/A 5.80 (16) 01/01/2017 NCREIF Fund Index-ODCE (VW) 0.91 (57) 3.79 (69) -3.45 (70) 3.40 (63) 3.35 (65) 4.80 (64) 4.36 (66) Difference -0.28 -0.70 0.32 0.24 1.08 N/A 1.44 IM U.S. Open End Private Real Estate (SA+CF) Median 1.13 5.11 -2.45 3.75 3.98 5.37 4.95 Returns for periods greater than one year are annualized. Returns are expressed as percentages. Page 3 34 Comparative Performance Total Fund As of December 31, 2025 Inception QTR 1 YR 3 YR 5 YR 7 YR 10 YR Inception Date Domestic Equity Fidelity Mid Cap Index (FSMDX) 0.16 (68) 10.56 (31) 14.34 (24) N/A N/A N/A 6.36 (37) 05/01/2021 Russell Midcap Index 0.16 (68) 10.60 (30) 14.36 (24) 8.67 (48) 12.75 (24) 11.01 (17) 6.36 (37) Difference 0.00 -0.03 -0.01 N/A N/A N/A -0.01 Mid-Cap Blend Median 1.27 8.00 12.37 8.62 11.83 10.16 5.77 Clarkston -0.99 (84) -7.45 (100) 1.85 (100) 2.97 (100) 8.34 (98) N/A 8.05 (97) 07/01/2016 Russell 2500 Index 2.22 (38) 11.91 (27) 13.75 (31) 7.26 (67) 11.75 (63) 10.40 (63) 10.53 (63) Difference -3.20 -19.36 -11.90 -4.29 -3.41 N/A -2.48 IM U.S. SMID Cap Core Equity (SA+CF) Median 1.75 7.66 12.47 7.54 12.52 10.94 11.16 Granite 5.13 (9) 8.85 (52) 8.32 (84) 2.31 (100) 10.19 (80) N/A 10.21 (68) 07/01/2016 Russell 2000 Index 2.19 (50) 12.81 (28) 13.73 (44) 6.09 (77) 10.60 (77) 9.62 (84) 9.89 (78) Difference 2.94 -3.96 -5.41 -3.78 -0.41 N/A 0.32 IM U.S. Small Cap Core Equity (SA+CF) Median 2.19 9.23 13.39 8.40 12.31 10.90 10.98 Fidelity 500 Index Institutional (FXAIX) 2.65 (33) 17.86 (25) 22.99 (23) N/A N/A N/A 12.78 (17) 05/01/2021 S&P 500 Index 2.66 (33) 17.88 (24) 23.01 (23) 14.42 (19) 17.29 (15) 14.82 (10) 12.79 (17) Difference -0.01 -0.02 -0.01 N/A N/A N/A -0.01 Large Blend Median 2.42 16.43 21.48 13.09 16.10 13.60 11.31 International Equity WCM Focused Int'l Growth Fund (WCMIX) -4.58 (96) 20.90 (40) 14.65 (34) 4.63 (33) 12.29 (6) 10.68 (1) N/A 12/01/2015 MSCI AC World ex USA (Net) 5.05 (3) 32.39 (6) 17.33 (12) 7.91 (6) 10.15 (36) 8.41 (27) 8.14 (29) Difference -9.63 -11.49 -2.68 -3.28 2.15 2.26 N/A MSCI EAFE Growth Index 1.89 (37) 21.12 (39) 13.51 (49) 4.76 (32) 9.79 (43) 7.80 (42) 7.65 (41) Difference -6.47 -0.21 1.14 -0.13 2.50 2.88 N/A Foreign Growth Median 0.92 19.48 13.42 2.86 9.47 7.48 7.27 HGK Trinity Street 3.71 (56) 33.42 (37) 16.77 (60) 9.95 (38) 12.68 (25) 10.26 (24) 10.26 (24) 01/01/2016 MSCI EAFE (Net) Index 4.86 (36) 31.22 (52) 17.22 (55) 8.92 (50) 10.54 (64) 8.18 (75) 8.18 (75) Difference -1.15 2.19 -0.46 1.02 2.14 2.07 2.07 IM International Equity Developed Markets (SA+CF) Median 3.99 31.54 17.50 8.81 11.25 8.91 8.91 Fixed Income Garcia Int Fixed 1.47 (10) 8.07 (12) 5.11 (85) 1.32 (51) 2.61 (83) N/A 2.62 (87) 06/01/2018 Bloomberg Intermediate US Govt/Credit Idx 1.20 (69) 6.97 (75) 5.06 (87) 0.96 (90) 2.54 (91) 2.29 (91) 2.59 (90) Difference 0.28 1.10 0.05 0.37 0.07 N/A 0.03 IM U.S. Intermediate Duration (SA+CF) Median 1.24 7.26 5.47 1.33 2.90 2.61 2.89 Returns for periods greater than one year are annualized. Returns are expressed as percentages. Page 4 35 Comparative Performance Total Fund As of December 31, 2025 Inception QTR 1 YR 3 YR 5 YR 7 YR 10 YR Inception Date Non Core Fixed Income PIMCO Diversified (PDIIX) 2.27 (10) 10.52 (31) 9.05 (1) 2.31 (3) N/A N/A 2.31 (3) 01/01/2021 Blmbg. Global Credit (Hedged) 1.13 (15) 7.23 (78) 7.00 (15) 1.03 (18) 3.45 (4) 3.64 (2) 1.03 (18) Difference 1.14 3.29 2.05 1.28 N/A N/A 1.28 Global Bond Median 0.34 8.93 4.43 -1.97 0.99 1.60 -1.97 Real Estate American Strategic Value Realty Fund 0.64 (67) 3.09 (80) -3.12 (63) 3.64 (57) 4.44 (30) N/A 5.80 (16) 01/01/2017 NCREIF Fund Index-ODCE (VW) 0.91 (57) 3.79 (69) -3.45 (70) 3.40 (63) 3.35 (65) 4.80 (64) 4.36 (66) Difference -0.28 -0.70 0.32 0.24 1.08 N/A 1.44 IM U.S. Open End Private Real Estate (SA+CF) Median 1.13 5.11 -2.45 3.75 3.98 5.37 4.95 Returns for periods greater than one year are annualized. Returns are expressed as percentages. Page 5 36 Comparative Performance - IRR Total Fund As of December 31, 2025 Comparative Performance - IRR Inception QTD 1 YR 3 YR Inception Date Marathon 0.00 1.90 9.90 9.44 01/04/2021 Bloomfield Capital Income Fund V Series - D 1.97 N/A N/A 3.25 08/01/2025 Page 6 37 Disclosures Mariner Institutional compiled this report for the sole use of the client for which it was prepared. Mariner Institutional is responsible for evaluating the performance results of the Total Fund along with the investment advisors by comparing their performance with indices and other related peer universe data that is deemed appropriate. Mariner Institutional uses the results from this evaluation to make observations and recommendations to the client. Mariner Institutional uses time-weighted calculations which are founded on standards recommended by the CFA Institute. The calculations and values shown are based on information that is received from custodians. Mariner Institutional analyzes transactions as indicated on the custodian statements and reviews the custodial market values of the portfolio. As a result, this provides Mariner Institutional with a reasonable basis that the investment information presented is free from material misstatement. This methodology of evaluating and measuring performance provides Mariner Institutional with a practical foundation for our observations and recommendations. Nothing came to our attention that would cause Mariner Institutional to believe that the information presented is significantly misstated. This performance report is based on data obtained by the client’s custodian(s), investment fund administrator, or other sources believed to be reliable. While these sources are believed to be reliable, the data providers are responsible for the accuracy and completeness of their statements. Clients are encouraged to compare the records of their custodian(s) to ensure this report fairly and accurately reflects their various asset positions. The strategies listed may not be suitable for all investors. We believe the information provided here is reliable, but do not warrant or guarantee its accuracy or completeness. Past performance is not an indication of future performance. Any information contained in this report is for informational purposes only and should not be construed to be an offer to buy or sell any securities or any investment advisory services. Please note that Neuberger Berman (NB) owns a non-controlling minority stake in Mariner. Certain NB strategies may hold an allocation to the investment in Mariner. For specific impacted strategies, please reach out to your investment consultant or Mariner Institutional at institutionalcompliance@mariner.com Additional information included in this document may contain data provided by index databases, public economic sources, and the managers themselves. This document may contain data provided by Bloomberg. This document may contain data provided by Standard and Poor’s. Nothing contained within any document, advertisement or presentation from S&P Indices constitutes an offer of services in jurisdictions where S&P Indices does not have the necessary licenses. All information provided by S&P Indices is impersonal and is not tailored to the needs of any person, entity or group of persons. Any returns or performance provided within any document is provided for illustrative purposes only and does not demonstrate actual performance. Past performance is not a guarantee of future investment results. This document may contain data provided by MSCI, Inc. Copyright MSCI, 2017. Unpublished. All Rights Reserved. This information may only be used for your internal use, may not be reproduced or disseminated in any form and may not be used to create any financial instruments or products or any indices. This information is provided on an “as is” basis and the user of this information assumes the entire risk of any use it may make or permit to be made of this information. Neither MSCI, any of its affiliates or any other person involved in or related to compiling, computing or creating this information makes any express or implied warranties or representations with respect to such information or the results to be obtained by the use thereof, and MSCI, its affiliates and each such other person hereby expressly disclaim all warranties (including, without limitation, all warranties of originality, accuracy, completeness, timeliness, non-infringement, merchantability and fitness for a particular purpose) with respect to this information. Without limiting any of the foregoing, in no event shall MSCI, any of its affiliates or any other person involved in or related to compiling, computing or creating this information have any liability for any direct, indirect, special, incidental, punitive, consequential or any other damages (including, without limitation, lost profits) even if notified of, or if it might otherwise have anticipated, the possibility of such damages. This document may contain data provided by Russell Investment Group. Russell Investment Group is the source owner of the data contained or reflected in this material and all trademarks and copyrights related thereto. The material may contain confidential information and unauthorized use, disclosure, copying, dissemination or redistribution is strictly prohibited. This is a user presentation of the data. Russell Investment Group is not responsible for the formatting or configuration of this material or for any inaccuracy in presentation thereof. This document may contain data provided by Morningstar. All rights reserved. Use of this content requires expert knowledge. It is to be used by specialist institutions only. The information contained herein: (1) is proprietary to Morningstar and/or its content providers; (2) may not be copied, adapted or distributed; and (3) is not warranted to be accurate, complete or timely. Neither Morningstar nor its content providers are responsible for any damages or losses arising from any use of this information, except where such damages or losses cannot be limited or excluded by law in your jurisdiction. Past financial performance is not guarantee of future results. *IMPORTANT DISCLOSURE INFORMATION RE COALITION GREENWICH BEST INVESTMENT CONSULTANT AWARD (formerly known as the Greenwich Quality Leader Award): The awards are not indicative of any future performance. The awards or any other rankings and/or recognition by unaffiliated rating services and/or publications should not be construed as a guarantee that a client will experience a certain level of results or satisfaction, nor should it be construed as a current or past endorsement by any of our clients. No fee was paid to participate in this award survey. The 2024-25 award was issued in February 2025, based on data from February to September of 2024. The 2023 award was issued in April 2024, based on data from Feb to November of 2023. The 2022 award was issued in April 2023, based on data from Feb to November of 2022. The 2021 award was issued in April of 2022, based on data from July to October 2021. Data was collected via interviews conducted by Coalition Greenwich. The 2024 and 2023 awards were issued to Mariner Institutional (formerly AndCo Consulting). The 2021 and 2022 awards were issued to AndCo, prior to becoming Mariner Institutional. The methodology: For the 2024-25 Coalition Greenwich Best Investment Consultant Award for Overall U.S. Investment Consulting – Midsize Consultants – Between February and September 2024, Crisil Coalition Greenwich conducted interviews with 699 individuals from 563 of the largest tax-exempt funds in the United States. For the 2023 Greenwich Best Investment Consultant Award for Overall U.S. Investment Consulting – Midsize Consultants – Between February and November 2023, Coalition Greenwich conducted interviews with 708 individuals from 575 of the largest tax-exempt funds in the United States. For the 2022 Greenwich Best Investment Consultant Award for Overall U.S. Investment Consulting – Midsize Consultants – Between February and November 2022, Coalition Greenwich conducted interviews with 727 individuals from 590 of the largest tax- exempt funds in the United States. For the 2021 Greenwich Best Investment Consultant Award – Overall U.S. Investment Consulting – Midsize Consultants – Between July and October 2021, Coalition Greenwich conducted interviews with 811 individuals from 661 of the largest tax-exempt funds in the United States. These U.S.-based institutional investors are corporate, public, union, and endowment and foundation funds with either pension or investment pool assets greater than $150 million. Study participants were asked to provide quantitative and qualitative evaluations of their asset management and investment consulting providers, including qualitative assessments of those firms soliciting their business and detailed information on important market trends. 38 Page 7 Access to a wealth of knowledge and solutions. 39 RESOLUTION TO CONSENT TO ESTABLISH A LOCAL DEVELOPMENT FINANCE AUTHORITY BY AEROTROPOLIS DEVELOPMENT CORPORATION RESOLUTION_______________ MOTION BY:____________________________ SUPPORTED BY:_________________________ WHEREAS, MCL 125.4403 provides that the Detroit Aerotropolis Development Corporation (“Aerotropolis”) as a Next Michigan Development Corporation, may establish a Local Development Finance Authority (the “Authority”) located in one or more other municipalities located within the same county to establish an authority; and WHEREAS, the City of Taylor desires to consent to the Authority established by Aerotropolis, which also includes the City of Romulus and Charter Township of Van Buren for a portion of Ecorse Road; and THEREFORE, the City of Taylor resolves by this resolution its consent to the described Authority as provided above, which includes the following property in the City of Taylor as set forth in Exhibit A. FURTHER RESOLVED, the Aerotropolis has established a public hearing for the adoption of a proposed Tax Increment Finance and Development Plan for the Authority on March 5, 2026, at 2:30 p.m. at the Aerotropolis offices located at 11895 Wayne Road, Suite 101A, Romulus, Michigan 48174. Adopted: ___________________ Roll Call Vote: Ayes: _______________________________ Nays:________________________________ I, Cynthia Bower, Clerk for the City of Taylor, do hereby certify the foregoing to be a true copy of a resolution duly adopted by Romulus City Council at their meeting held on __________________, 2026. Cynthia Bower City Clerk 40 EXHIBIT A AEROTROPOLIS LDFA CITY OF TAYLOR LEGAL DESCRIPTION: Parcels of Land situated in Sections 6, 7, 18, 19 and 30, Town 3 South, Range 10 East, City of Taylor, Wayne County, Michigan described as beginning at the Southeast corner of said Section 30 also being the intersection of the centerline of Beech Daly Road and Eureka Road, thence North along the centerline of said Beech Daly Road (120' wide) the following 9 courses: 1) North 02°27'26" West, 2,636.85 feet along the East line of said Section 30 to the East 1/4 corner of said Section 30; 2) North 02°27'00" West, 2,635.70 feet along the East line of Said Section 30 to the Northeast corner of said section 30, (Southeast corner of said Section 19); 3) North 02°12'21" West, 2,639.85 feet along the East line of said Section 19 to the East 1/4 corner of said Section 19; 4) North 02°15'37" West, 2,639.61 feet along the East line of said Section 19 to the Northeast corner of said Section 19, (Southeast corner of said Section 18); 5) North 02°16'46" West, 2,635.63 feet along the East line of said Section 18 to the East 1/4 corner of said Section 18; 6) North 02°21'48" West, 2,629.04 feet along the East line of Said Section 18 to the Northeast corner of said section 18, (Southeast corner of said Section 7); 7) North 01°59'53" West, 2636.67 feet along the East line of said Section 7 to the East 1/4 corner of said Section 7; 8) North 02°09'04" West, 2632.26 feet along the East line of Said Section 7 to the Northeast corner of said section 7, (Southeast corner of said Section 6); 9) North 01°31'14" West, 2,682.90 feet along the East line of Said Section 6 to the East 1/4 corner of said section 6 and the centerline of Beverly Road (variable width); Thence West along the centerline of said Beverly Road the following 2 courses: 1) South 84°10'36" West, 2,636.44 feet along the East-West quarter line of Said Section 6 to the center corner of said section 6; 2) South 84°26'09" West, 2,613.39 feet along the East-West quarter line of Said Section 6 to the West 1/4 corner of said section 6 and the centerline of Inkster Road (variable width); Thence South along the centerline of said Inkster Road the following 16 courses: 1) South 02°02'09" East, 2,646.20 feet along the West line of said Section 6 to the Southwest corner of said Section 6, (Northwest corner of said Section 7); 2) South 02°18'31" East, 2,638.79 feet along the West line of said Section 7 to the West 1/4 corner of said Section 7 3) South 02°18'31" East, 4.92 feet along the West line of said Section 7 to the East 1/4 corner of section 12, T3S, R9E 4) South 02°05'42" East 2,627.10 feet along the West line of said Section 7 to the Southwest corner of said section 7, (Northwest corner of said Section 18); 5) South 02°05'42" East 2.83 feet along the West line of said Section 18 to the Southeast corner of section 12, T3S, R9E 41 6) South 02°10'23" East, 2,618.50 feet along the West line of said Section 18 to the West 1/4 corner of said Section 18; 7) South 02°10'23" East, 19.72 feet along the West line of said Section 18 to the East 1/4 corner of section 13, T3S, R9E 8) South 02°10'17" East, 2,598.23 feet along the West line of said Section 18 to the Southwest corner of said section 18, (Northwest corner of said Section 19); 9) South 02°10'17" East, 40.66 feet along the West line of said Section 19 to the Southeast corner of section 13, T3S, R9E 10) South 02°15'09" East, 2,584.63 feet along the West line of said Section 19 to the West 1/4 corner of said Section 19; 11) South 02°15'09" East, 59.60 feet along the West line of said Section 19 to the East 1/4 corner of section 24, T3S, R9E 12) South 02°11'58" East, 2,561.39 feet along the West line of said Section 19 to the Southwest corner of said section 19, (Northwest corner of said Section 30); 13) South 02°11'58" East, 80.14 feet along the West line of said Section 30 to the Southeast corner of section 24, T3S, R9E 14) South 02°03'49" East, 2565.23 feet along the West line of Said Section 30 to the West 1/4 corner of said section 30; 15) South 02°03'49" East, 89.30 feet along the West line of Said Section 30 to the East 1/4 corner of section 25, T3S, R9E 16) South 02°18'30" East, 2,550.68 feet along the West line of Said Section 30 to the Southwest corner of said section 30 and the centerline of Eureka Road (variable width) Thence East along the centerline of said Eureka Road the following 2 courses: 1) North 83°12'53" East, 2,631.64 feet along the South line of Said Section 30 to the South 1/4 corner of said section 30; 2) North 87°09'38" East, 2,620.22 feet along the South line of Said Section 30 to the Southeast corner of said section 30 and the Point of Beginning. Containing 2,837.18 acres of land more or less. 42 Founded in 1852 MICHIGAN by Sidney Davy Miller ILLINOIS NEW YORK OHIO WASHINGTON, D.C. CALIFORNIA JEFFREY S. ARONOFF Miller, Canfield, Paddock and Stone, P.L.C. CANADA TEL +1.313.496.7678 150 West Jefferson, Suite 2500 MEXICO FAX +1.313.496.7500 E-MAIL Aronoff@millercanfield.com Detroit, Michigan 48226 POLAND TEL (313) 963-6420 UKRAINE FAX (313) 496-7500 QATAR millercanfield.com November 6, 2025 Janay Jenkins, EDFP Tax Abatement Specialist Michigan Economic Development Corporation 300 N. Washington Square Lansing, MI 48913 Re: Aerotropolis LDFA Local Capture Match Dear Ms. Jenkins: The Local Development Finance Authority of Detroit Region Aerotropolis Development Corporation (the “LDFA”) is preparing a Tax Increment Finance and Development Plan (the “Plan”), a draft of which has been provided to the Michigan Economic Development Corporation for review. This letter is intended to confirm that the Plan meets the statutory requirement that the LDFA capture a percentage of local operating taxes at least equal to the percentage of school tax capture. The Plan provides for the capture of tax increment revenues within the Aerotropolis Development Area described in the Plan (the “Development Area”), which is located in the Charter Township of Van Buren (the “Township”), the City of Romulus and City of Taylor (the “Cities”). Tax increment revenues captured under the Plan will be used to support the various improvements described in the Plan. As you are aware, because the Aerotropolis Development Corporation is a Next Michigan development corporation, and the Development Area is a Next Michigan development area, the LDFA may, upon approval of the State Treasurer, capture up to 50% the state education tax and local school operating taxes for up to fifteen years pursuant to the Recodified Tax Increment Financing Act, Act 57, Michigan Public Acts of 2018 (“Act 57”).1 Pursuant to this authority, the Plan provides for the capture of 50% of the state education tax and taxes levied for school operating purposes by Van Buren Public Schools, Romulus Community Schools, and the Taylor School District (collectively “School Taxes”) within the Development Area. 1 See MCL 125.4402(jj)(ii)(C). 43 MILLER, CANFIELD, PADDOCK AND STONE, P.L.C. -2- November 6, 2025 The Act further requires that the percentage of school tax capture “shall not be greater than the percentage capture and use of taxes levied by a municipality or county for operating purposes” under the Plan and other tax increment finance plans that may be applicable to the Development Area.2 To comply with that requirement, the LDFA is capturing the operating millages of the Township and the Cities at the following rates (the “Local Operating Taxes”): • Romulus Operating Millage: 9.4 mills at 50% → 4.7 mills. • Taylor Operating Millage: 8.2 mills at 50% → 4.1 mills. • Van Buren Operating Millage: 0.89 mills at 50% → 0.45 mills. Act 57 further provides that tax increment revenues do not include “ad valorem property taxes or specific local taxes that are excluded from and not made part of the tax increment financing plan.”3 As such, tax increment revenues captured under the LDFA Plan include only the School Taxes and the Local Operating Taxes required to be captured under Act 57 and excludes all other taxes levied in the Development Area. Sincerely, Miller, Canfield, Paddock and Stone, P.L.C. By: Jeffrey S. Aronoff 2 See MCL 125.4412(3). 3 MCL 125.4402(jj)(iii)(A). 44 THE LOCAL DEVELOPMENT FINANCE AUTHORITY OF THE DETROIT REGION AEROTROPOLIS DEVELOPMENT CORPORATION (A NEXT MICHIGAN DEVELOPMENT CORPORATION) TAX INCREMENT FINANCE AND DEVELOPMENT PLAN RELATING TO VAN BUREN CHARTER TOWNSHIP, CITY OF ROMULUS AND CITY OF TAYLOR AEROTROPOLIS DEVELOPMENT AREA 45 Introduction The following Tax Increment Finance and Development Plan (the “Plan”) has been adopted by the Local Development Finance Authority of the Detroit Region Aerotropolis Development Corporation (the “LDFA”) and relates to the Aerotropolis Development Area described at Exhibits A and B to this Plan (the “Development Area”) in the Charter Township of Van Buren (the “Township”), and the Cities of Romulus and Taylor (the “Cities”) as more fully described hereinafter. The purpose the Plan is to enable the LDFA to capture certain tax increment revenues in the Development Area and provide those revenues to the Township and Cities to support the public facility and improvement payments described in this Plan. This is the LDFA’s second tax increment finance and development plan and its second development area. The first tax increment finance and development plan was adopted in 2017 in a Next Michigan development area in the City of Romulus within the LDFA district. The Development Area under this Plan does overlap with the 2017 Next Michigan development area, and while Act 57 (as defined herein) authorizes the Detroit Region Aerotropolis Development Corporation (the “Aerotropolis”) to establish only one LDFA, it does not prohibit the LDFA from establishing multiple tax increment finance and development plans or multiple Next Michigan development areas. I. Tax Increment Financing Plan The following sections describe aspects of the TIF Plan as required by MCL 125.4412. A. Statement of reasons that the plan will result in the creation of captured assessed value that could not otherwise be expected. Charter Township of Van Buren This northern portion of the Township, where Willow Run Airport (YIP) is located, is home to over 1,000 undeveloped acres. The two largest contiguous sites (390 acres and 440 acres) in Wayne County are in this portion of the Township. Over the last decade, working directly with the MEDC, Aerotropolis staff have submitted various combinations of the 1,000+ acres to well over two hundred business attraction and retention projects. None of these projects have come to fruition due to three constraining factors. First, this portion of Van Buren Township connects to the Rough Valley Sewage Disposal System, which serves 14 Wayne County communities and transports flow from parts of Oakland County to the Great Lakes Water Authority. The Wayne County Environmental Services Team has reviewed and determined, on multiple occasions, that the Rough Valley Sewage Disposal System is unable to convey anything more than the 5cfs the Township is currently allowed. In short, development of the 1,000+ acres in the Township are exceedingly difficult due to the lack of wastewater treatment facilities to accommodate the new flows. 1 46 Second, Beck Road cannot accommodate industrial traffic flows to I-94. The Township is reluctant to utilize Belleville Road for industrial traffic flows due to Belleville Road being the main retail thoroughfare for the Township. The 1,000+ undeveloped acres in Van Buren Township can be developed more easily by upgrading and connecting Beck Road to the I-94 Rawsonville interchange. Third, the Township acquired 190 acres from Ford Land in 2019 that is located on Tyler and Ecorse roads. There is a need for water main installation, sewer main installation, road construction, sidewalk construction and regional stormwater management to ensure the site is developed. City of Romulus The City of Romulus is home to Detroit Metropolitan Airport (DTW). DTW operates more than 1,100 flights per day to and from four continents. It is a vital cargo and general aviation facility that supports manufacturing, transportation, distribution, and logistics industry in Southeast Michigan. DTW also covers a significant portion of the City of Romulus, which has hindered its ability to collect property tax revenue for many decades. Over the last decade, working directly with the MEDC, the Detroit Region Aerotropolis Development Corporation staff have submitted various combinations of the 700+ acres to well over three hundred business attraction and retention projects. None of these projects have come to fruition due to the inability to generate the required funding to upgrade Ecorse Road and Inkster Road to Class A roads. The 700+ acres of undeveloped land in the City of Romulus is located north and east of DTW. Ecorse Road and Inkster Road, which parallel the north and east boundaries of DTW need to be upgraded to Class A roads to accommodate industrial traffic flow directly to and from I-94 and I-275. Ecorse Road traverses many major industrial thoroughfares such as I-94, I-275 and US- 24. It is home to a variety of multimodal and intermodal rail facilities throughout Wayne County. Inkster Road is the boundary between the City of Romulus and the City of Taylor in Wayne County, Michigan and it traverses the entire county. Ecorse and Inkster Road, if upgraded, could provide a critical link for many manufacturing, commercial, warehousing, and logistics and supply chain distribution facilities that support DTW operations and regional commerce coming from the new Gordie Howe International Bridge. Moreover, DTW recently welcomed a $423 Million capital investment from FedEx to build a new high-value cargo operation center that will create 380 new jobs. Our goal is to build on this recent economic development project with additional development opportunities on the 700+ acres of undeveloped land in the City of Romulus. City of Taylor Inkster Road is the boundary between the City of Romulus and the City of Taylor in Wayne County, and it traverses the entire county. It crosses the major east-west routes of I-94, US-14, and I-96. Inkster Road, if upgraded, could provide a critical link for many manufacturing, commercial, 2 47 warehousing, and logistics and supply chain distribution facilities that support DTW operations and regional commerce coming from the new Gordie Howe International Bridge. Over the last decade, working directly with the MEDC, Aerotropolis staff have submitted various combinations of the 100+ acres to well over one hundred business attraction and retention projects. None of these projects have come to fruition due to Inkster Road not being able to accommodate industrial traffic. The projects indicated in Chart 2 will catalyze the property value increases reflected in Chart 1, and the goal of the proposed LDFA is to accommodate this new economic development without exacerbating flows at wastewater treatment facilities, or congestion and traffic blockages by improving the surrounding infrastructure indicated in Chart 2. Investment in public facilities and improvements is a proven mechanism for generating private capital investment in the form of attraction, expansion, and retention of business investment. This Plan will encourage commercial and industrial development by simultaneously investing in surrounding infrastructure to accommodate this growth. Private investment, in turn, creates an increase in the tax base and assessed value that will be subject to capture by the LDFA and with which it will be able to pay for public facilities and improvements. B. Estimate of the captured assessed value for each year of the plan. Beginning with the July 2026 levy, the LDFA will capture all new and incremental growth as measured from the initial assessed (taxable) value, which shall be the 2025 taxable value. The estimated taxable values for each year of the TIF plan are shown in Charts 1A-U. C. Estimated tax increment revenues for each year of the plan. Charts 1A-U also presents current estimates of the tax increment revenues to be generated from the estimated taxable value for each year shown in the chart. D. Detailed explanation of tax increment procedure. Tax increment financing (“TIF”) allows a local government, through an authority such as a LDFA, to finance public improvements in a designated development area by capturing the property taxes (real and personal) levied on any increase in property values within that area. Under a TIF plan, a base year is established for the development area, resulting in an “initial assessed value” for the development area. In subsequent years, any increase in assessments above the base year level is referred to as the “captured assessed value.” Local property tax millages levied by taxing units within the development area on captured taxable value of all real and personal property within the area (less any debt service or other millages specified as exempt in the enabling statutes) is diverted, or “captured” to finance public improvements within the development area and to carry out the adopted development plan for the development area. 3 48 For the purposes of this Plan, the initial assessed value of all property in the Development Area shall be the 2025 taxable value. Increases in assessed values of properties within a development area that result in the generation of tax increment revenue, may be attributable to any of the following sources: • New construction occurring after the date established as the tax base year; • Improvements to existing properties occurring after the date established as the tax base year; and • Increases in property values that occur for any other reason. The procedure of authorizing or amending a TIF plan and a development plan includes a public hearing, disclosure to taxing jurisdictions impacted by the plans, and an approval process as outlined in sections 416 and 417 of Act 57, Michigan Public Acts of 2018, as amended (“Act 57”), including the following: 1. The LDFA must prepare a development plan and tax increment financing plan for a specific development area within the area. The development plan describes the location, character, and extent of the proposed development, and the tax increment financing plan outlines in detail how tax increments are to be spent, and over what period of time they are to be spent. 2. The municipality that has established the LDFA (in this case, the Aerotropolis) must hold a public hearing on the TIF plan with notice and disclosure to taxing jurisdictions to be impacted by the plan and must provide a reasonable opportunity to the taxing jurisdictions levying taxes subject to capture to express their views and recommendations regarding the TIF plan. Notice of the time and place of the public hearing must be published twice in a newspaper of general circulation in the city, with the first publication not less than 20 days before the date set for the hearing. The notice must contain all the information required in section 416(2) of Act 57. The LDFA must fully inform the taxing jurisdictions about the fiscal and economic implications of the proposed TIF plan. The taxing jurisdictions may present their recommendations at the public hearing on the TIF plan. At the public hearing, the Aerotropolis Board must provide an opportunity for interested persons to be heard and must receive and consider communications in writing with reference to the TIF plan and development plan. The Aerotropolis Board must make and preserve a record of the public hearing, including data presented at that time. 3. After the public hearing, the Aerotropolis Board is to determine whether the TIF plan and development plan each constitutes a public purpose, and then, by resolution, must approve, reject, or modify each plan. Unless contested in a court of competent jurisdiction within 60 days of adoption of the Aerotropolis Board’s resolution, the procedure, notice, and findings shall be conclusive. 4. Upon adoption of a development plan and a TIF plan by the Aerotropolis Board the assessed valuation of real and personal property at the last equalized tax roll is calculated. This is known as the “initial assessed value” of the development area. Each of the taxing jurisdictions will continue to receive its proportionate share of taxes collected on the initial assessed value of property in the development area as long as the TIF plan is in effect. 4 49 5. Development as outlined in the development plan may be financed by the LDFA through a variety of funding mechanisms. For example, tax increment bonds may be sold to raise capital, tax increment revenue may fund lease payments or other obligations, or annual tax increment revenues may be spent directly on public improvements in the development area as they are received. In this Plan, the LDFA’s tax increment revenue will be transferred to the Township and City to support the Township’s and City’s financial contribution on public improvements in the development area described in the Plan. 6. New taxes, or tax increments, will be derived from assessed value increases due to new development. The difference between the initial assessed value of real and personal property in the development area and each year’s current assessed value is the “captured assessed value.” Tax increment revenues based on the captured assessed value may be used for development plans and related activities. 7. The applicable local and county treasurers are required by law to transmit the taxes collected from all taxing units on captured assessed value of all real and personal property located in the development area (with exceptions as previously defined) to the LDFA. The taxes transmitted to the LDFA, known as “tax increment revenue,” must be deposited by the LDFA in the project fund established under the TIF plan. Act 57 authorizes a LDFA to use tax increment revenues to pay the cost of public facilities and improvements on a cash pay-as-you-go basis or to make payments on bonds issued by the Township, City, or LDFA to finance the facilities or improvements. The LDFA shall expend tax increment revenue only in accordance with the TIF plan. Surplus revenue shall be used to further the implementation of the development plan pursuant to a resolution of the LDFA—although no surplus revenue is expected given the nature of the LDFA’s expenditures under the Plan. All revenues not spent on specific projects will be allocated for other activities allowable under the Act. Within the district in which the LDFA may exercise its powers, the LDFA may establish a development area within which to capture a portion of the operating levies of all eligible local taxing units as provided by statute. Because the Aerotropolis is a Next Michigan development corporation, and the Development Area is a Next Michigan development area, this capture may, upon approval of the State Treasurer, include 50% the state education tax and local school operating taxes for up to 15 years pursuant to Section 402(jj)(ii)(C) of Act 57. In connection with the Development Area and the Plan, the capture of tax increment revenues will be limited to 50% of the local operating millage from each municipality, state education tax and taxes levied for school operating purposes by Van Buren Public Schools, Romulus Community Schools, and the Taylor School District (collectively “school taxes”). The LDFA is expected to capture available tax increment revenues from school taxes for the life of the Plan; however, to the extent that any school taxes are being captured by another tax increment finance entity within the Development Area pursuant to a tax increment finance and development plan or Brownfield plan in effect prior to this Plan, such school taxes will not be available for capture by the LDFA until they are no longer being captured pursuant to such existing tax increment finance and development plan or Brownfield plan. 5 50 The Plan may be amended upon approval of the Aerotropolis Board following the same notice and public hearing process as required for approval or rejection of an original plan except if amendment is for revisions in estimates for captured assessed value and tax increment revenue. When the Aerotropolis Board determines that the purpose for which the Plan was established has been achieved, it may abolish the plan. E. Maximum amount of note or bonded indebtedness to be incurred, if any. The LDFA will incur no bonded indebtedness of its own in connection with the Plan. The Township and Cities have paid or will pay for public facilities and improvements as described in this Plan in an amount not to exceed $75,000,000 to pay the cost of the improvements described in the Plan. The tax increment revenues of LDFA will be used to pay a portion of the cost of the improvements described in the Plan. F. Amount of operating and planning expenditures; amount of advances extended by the Aerotropolis and others to be paid by TIF revenue. The operating expenditures of the LDFA in connection with the Plan are expected not to exceed $30,000. Those expenditures will be advanced by the Aerotropolis, but ultimately reimbursed from proceeds of TIF revenue by the Township and Cities as discussed in the Plan. G. Costs of the plan are anticipated to be paid from TIF revenue as received. Charts 1A-U provide projections for tax increment revenue for the duration of the Plan. As the chart indicates, all tax increment revenue will be expended by the Township and Cities for eligible costs for 15 years. Charts 3A-C provide further details about public facilities and public improvement projects anticipated in the TIF and Development Plans. H. Duration of the development plan and the TIF plan. The anticipated duration of the Plan is 15 years. The Plan shall start on March 5, 2026; however, the first capture of tax increment revenues will take place in connection with the Township’s and City’s July 1, 2026 tax levy. The duration of such capture will be 15 years. I. Estimate of the impact of TIF on the revenues of all taxing jurisdictions in which eligible property is or is anticipated to be located. The anticipated impact on taxing jurisdictions within the Development Area (other than the State of Michigan), is a 50% capture of the local operating millage in each municipality along with the state education tax and local operating levy of the Van Buren Public Schools, Romulus Community Schools, and the Taylor School District. Pursuant to state law, the State of Michigan effectively absorbs the cost of the capture of both levies through the foundation allowance which provides funding for school districts statewide. 6 51 J. Legal description of the eligible property to which the TIF plan applies. The TIF plan applies to the Development Area boundaries, which are identified at Appendix B. K. Estimated number of jobs to be created as a result of TIF plan implementation. The project to be developed in the Development Area is estimated to create at least 5,500 new jobs. II. Development Plan The LDFA Board has determined that the preceding TIF plan is necessary for the achievement of the purposes of the LDFA Act. Therefore, the following development plan is determined to be necessary to accomplish the development program. The following sections describe aspects of the Development Plan as required by MCL 125.2165. The project contemplated by the development plan will be executed solely by the Township, City, and the LDFA’s role is limited to the provision of tax increment revenues in support of the project. A. Description of property (including legal description) to which plan applies; boundaries of Development Area. As described in section J of the accompanying TIF Plan, the Development Area has the boundaries and legal descriptions as set forth on Appendix B. B. Boundaries of property in relation to highways and streets. The map at Appendix A depicts the boundaries of Development Area, within which the development plan applies. C. Location and extent of existing streets and other public facilities in the vicinity of the property to which the plan applies; the location, character, and extent of the categories of public and private land uses then existing and proposed for the property to which the plan applies, including residential, commercial, industrial, educational, and other uses. In addition to the map at Appendix A and legal descriptions at Appendix B, the project description contained in Chart 2 describes existing streets and infrastructure. D. Description of public facilities to be acquired for the property; description of any repairs and alterations necessary to make those improvements; estimate of the time required for completion of the improvements. Chart 2 describes the property and improvements associated with the project. Construction of improvements is anticipated to take approximately 15 years to complete. 7 52 E. Location, extent, character, and estimated cost of the public facilities for the property to which the plan applies; estimate of the time required for completion. Chart 2 provides public facility and public improvement project information in a summary format. Construction of improvements is anticipated to take approximately 15 years to complete. F. Statement of the construction or stages of construction planned, and the estimated time of completion of each stage. This information is also provided in Chart 2. Construction of improvements is anticipated to take approximately 15 years to complete. G. Description of any portions of the property which the LDFA desires to sell, donate, exchange, or lease to or from the municipality and the proposed terms. None. H. Description of desired zoning changes and changes in streets, street levels, intersections, and utilities. No zoning changes are proposed. I. Estimate of the cost of the public facility or facilities, a statement of the proposed method of financing the public facility or facilities, and the ability of the authority to arrange the financing. Chart 2 summarizes the estimated costs and method of financing for each anticipated public facility and public improvement project. These projects have been or will be funded by the Township and/or Cities with the LDFA’s contribution limited to tax increment revenues generated within the Development Area over time. Chart 1 provides cash flow projections for the operation of the Development Area for its planned duration. The cash flow projections are of limited importance to the LDFA, as its contribution to the project is only a part of the overall financing package, which includes other funding sources including Wayne County contributions and financial support from real estate development firms. The Aerotropolis LDFA tax increment revenues will be contributing to project costs on a pay-go basis, not funding debt service on bonds. Neither the Aerotropolis nor the LDFA will be responsible for the overall cash flow associated with the project and the Development Area. J. Designation of the person or persons, natural or corporate, to whom all or a portion of the public facility or facilities are to be leased, sold, or conveyed and for whose benefit the project is being undertaken, if that information is available to the LDFA. There are no plans to lease, sell or convey public facilities, as defined by Section 402(ff) of Act 57, within the Development Area. It is anticipated that the developed areas within the Development Area will be privately owned. The Charter County of Wayne (the “County”) will 8 53 own the financed road infrastructure. Van Buren Township will own the financed wastewater/sanitary infrastructure. Residents of the Township, City of Romulus, and City of Taylor, and the County are among the beneficiaries of the Development Plan through the creation of new jobs and investment, economic growth, and long-term tax base enhancement. Companies with facilities located in Development Area will benefit from public improvements and the maintenance and operation of public facilities supported by the Development Plan. K. Procedures for transfer of public facilities not covered by agreements with persons identified in Section J. Not applicable as there are no plans to transfer public facilities. L. Description of residents on the property; displacement of families and individuals through property acquisition and clearance; description of local housing supply and market conditions if displacement of residents is planned. Not applicable as there are no residents on the property within the development area. M. Plan for establishing priority for relocation of persons displaced by the development. Not applicable as there are no residents on the property. N. Plan for covering the costs of relocating persons displaced by the development per federal laws. Not applicable as there are no residents on the property. O. Plan for compliance with Michigan laws relevant to relocation of residents. Not applicable as there are no residents on the property. P. Other material that the LDFA or the Aerotropolis considers pertinent. In order to accomplish the objectives described in the Plan, the LDFA will enter into an agreement with the Township and Cities setting forth the structure and conditions under which tax increment revenues will be transferred to the City or Township in support of its bonds to be issued to finance project costs. All tax increment revenues derived from capture within Van Buren Charter Township will be designated solely to Van Buren Charter Township public infrastructure improvements. All tax increment revenues derived from capture within the City of Romulus will be designated solely to City of Romulus public infrastructure improvements. All tax increment revenues derived from capture within the City of Taylor will be designated solely to City of Taylor public infrastructure improvements. 9 54 Van Buren Township Chart 1A: TIF Revenue to Be Captured – 73 Acre RACER Trust Property at Denton and Ecorse Roads 10 55 Chart 1B: TIF Revenue to Be Captured – 390 Acre Property on Beck and Ecorse Roads 11 56 Chart 1C: TIF Revenue to Be Captured – 440 Acre Parcel on Belleville and Ecorse Roads 12 57 Chart 1D: TIF Revenue to Be Captured – 42 Acre Property on Beck and Van Born Roads 13 58 Chart 1E: TIF Revenue to Be Captured – 38 Acre Property on Sheldon and Van Born Roads 14 59 Chart 1F: TIF Revenue to Be Captured – 56 Acre Property on Morton Taylor and Van Born Roads 15 60 Chart 1G: TIF Revenue to Be Captured – Ashely Capital Crossroads North Development at Ecorse Road ***The total estimated capture for Van Buren Township projects is $13,674,329.57. 16 61 City of Romulus Chart 1H: TIF Revenue to Be Captured – 202 Acre Site at Vining and Wick Roads 17 62 Chart 1I: TIF Revenue to Be Captured – 100 Acre Site at Ecorse and Henry Ruff Roads 18 63 Chart 1J: TIF Revenue to Be Captured – 535 Acre Site at Ecorse and Vining Roads 19 64 Chart 1K: TIF Revenue to Be Captured – 53 Acre Site at Vining and Wick Roads 20 65 Chart 1L: TIF Revenue to Be Captured – 50 Acre Site at Wick and Vining Roads 21 66 Chart 1M: TIF Revenue to Be Captured – 20 Acre Site at Goddard and Middlebelt Roads 22 67 Chart 1N: TIF Revenue to Be Captured – 20 Acre Site at Wick and Inkster Roads ***The total estimated capture for the City of Romulus projects is $7,376,662.04. 23 68 City of Taylor Chart 1O: TIF Revenue to Be Captured – 38 Acre Site at Inkster and Goddard Roads 24 69 Chart 1P: TIF Revenue to Be Captured – 23 Acre Site at 7965 Holland Road 25 70 Chart 1Q: TIF Revenue to Be Captured – 10 Acre Site at Wick and Inkster Roads 26 71 Chart 1R: TIF Revenue to Be Captured – 56 Acre Site at Brest and Inkster Roads 27 72 Chart 1S: TIF Revenue to Be Captured – 32 Acre Site at Northline and Inkster Roads 28 73 Chart 1T: TIF Revenue to Be Captured – 38 Acre Site at Northline and Inkster Roads 29 74 Chart 1U: TIF Revenue to Be Captured – 30 Acre Site at Eureka and Inkster Roads ***The total estimated capture for the City of Taylor projects is $4,389,266.44. 30 75 Chart 2: Development Plan Project Detail NARRATIVE AND COST OF IMPROVEMENTS Van Buren Township Wastewater Diversion $10,000,000 Van Buren Township would divert wastewater flows from Rough Valley Sewage Disposal System to the South Huron Valley Utility Authority (SHUVA) or the Ypsilanti Community Utility Authorities (YCUA). The Wayne County Environmental Services Team has reviewed and determined, on multiple occasions, that the Rough Valley Sewage Disposal System is unable to convey anything more than 5cfs Van Buren Township is currently allowed. This represents the total estimated cost to complete this wastewater diversion project. Project Management $500,000 Preliminary Engineering $500,000 Final Design $1,00,000 Construction and Construction Management $8,000,000 All of the LDFA’s $6,640,322.68 investment in the wastewater diversion project is allocable to the projects in Charts 1A, 1B and 1E. Beck Road Reconstruction $5,000,000 Beck Road cannot accommodate industrial traffic flows to I-94. The Township is reluctant to utilize Belleville Road for industrial traffic flows due to Belleville Road being the main retail thoroughfare for the Township. The 1,000+ undeveloped acres in Van Buren Township can be developed more easily by upgrading and connecting Beck Road to the I-94 Rawsonville interchange. This represents the total estimated cost to complete this road project. Engineering and Final Design $300,000 Multi-use Path $200,000 Road Replacement $4,000,000 Culvert Replacement $500,000 All of the LDFA’s $3,102,780.46 investment in the Beck Road construction is allocable to the project listed in Chart 1C. Morton Taylor Road – Class A Upgrade $7,000,000 Morton Taylor Road cannot accommodate industrial traffic flows from Willow Run Airport properties to I-94. The Township is reluctant to utilize Belleville Road for industrial traffic flows due to Belleville Road being the main retail thoroughfare for the Township. The 1,000+ undeveloped acres near Willow Run Airport in Van Buren Township can be developed more easily by upgrading and connecting Morton Taylor to the I-94 Rawsonville interchange. This represents the total estimated cost to complete this road project. 31 76 Engineering and Final Design $500,000 Multi-use Path $500,000 Road Replacement $5,500,000 Culvert Replacement $500,000 All of the LDFA’s $1,203,086.63 investment in the Morton Taylor Road construction is allocable to the project listed in Chart 1F. Ford Land Water and Sanitary $5,000,000 Van Buren Twp. acquired 190 acres from Ford Land in 2019 that is located on Tyler and Ecorse roads. There is a need for water main installation, sewer main installation, road construction, sidewalk construction and regional stormwater management to ensure the site is developed. Project Management $300,000 Preliminary Engineering $200,000 Final Design $500,000 Construction and Construction Management $4,000,000 All of the LDFA’s $1,522,657.08 investment in the Ford Land water and sanitary project is allocable to the projects in Chart 1D. Ecorse and Belleville Road Traffic Routing $8,000,000 Van Buren Twp. residential and commercial traffic flows through Belleville Road given it is the main retail thoroughfare for the Township. The 1,000+ undeveloped acres along Ecorse Road in Van Buren Township can be developed more easily by routing traffic industrial traffic to Beck and Morton Taylor Raods while maintaining retail and commercial traffic corridors along Belleville Road. This can be achieved with new roundabouts and slip lanes. Project Management $400,000 Preliminary Engineering $400,000 Final Design $600,000 Construction and Construction Management $6,600,000 All of the LDFA’s $1,205,480.72 investment in Ecorse and Belleville Road traffic routing project is allocable to the projects in Chart 1G. City of Romulus Ecorse Road Industrial Gateway Improvements $28,300,000 Ecorse Road parallels the north boundary of DTW. It needs to be upgraded to Class A roads to accommodate industrial traffic flow directly to and from I-94 and I-275. Ecorse Road traverses many major industrial thoroughfares such as I-94, I-275 and US-24. It is home to a variety of multimodal and intermodal rail facilities throughout Wayne County. Ecorse Road will provide a critical link for many manufacturing, commercial, warehousing, and logistics and supply chain distribution facilities that 32 77 support DTW operations and regional commerce coming from the new Gordie Howe International Bridge. This cost represents the total cost to complete the Ecorse Road project. Design and Engineering $5,600,000 Road Resurfacing and Replacement $21,000,000 Culvert Replacement $400,000 Traffic Signals $1,300,000 All of the LDFA’s $6,371,840.18 investment in the Ecorse Road Light Industrial Gateway Improvement is allocable to the projects in Charts 1H – 1L. Inkster Road Improvement $15,000,000 Inkster Road is the boundary between the City of Romulus and the City of Taylor in Wayne County, Michigan and it traverses the entire county. It crosses the major east-west routes of I-94, US-14, and I- 96. Inkster Road, if upgraded, could provide a critical link for many manufacturing, commercial, warehousing, and logistics and supply chain distribution facilities that support DTW operations and regional commerce coming from the new Gordie Howe International Bridge. This cost represents the total cost to complete the Inkster Road project. Design and Engineering $2,500,000 Road Resurfacing and Replacement $12,000,000 Traffic Signals $500,000 All of the LDFA’s $1,004,821.85 investment in the road project is allocable to the projects in Charts 1M -1N. City of Taylor Inkster Road Improvement $15,000,000 Inkster Road is the boundary between the City of Romulus and the City of Taylor in Wayne County, Michigan and it traverses the entire county. It crosses the major east-west routes of I-94, US-14, and I- 96. Inkster Road, if upgraded, could provide a critical link for many manufacturing, commercial, warehousing, and logistics and supply chain distribution facilities that support DTW operations and regional commerce coming from the new Gordie Howe International Bridge. This cost represents the total cost to complete the Inkster Road project. Design and Engineering $2,500,000 Road Resurfacing and Replacement $12,000,000 Traffic Signals $500,000 All of the LDFA’s $4,389,266.44 investment in the road project is allocable to the projects in Charts 1O -1U. 33 78 Charts 3A-C outline the cost breakdown per development plan project and how projected TIF revenues are allocated to each project. Chart 3A: Van Buren Township Allocation of TIF Revenues by Development Plan Project1 Sanitary Beck Road - Class Morton Taylor Water and Ecorse and Connection to A Upgrade Road - Class A Sanitary Ford Belleville Road SHUVA or YUCA Upgrade Land Road Traffic Routing Property Estimated Total Project $10,000,000 $5,000,000 $7,000,000 $5,000,000 $8,000,000 Cost Site 1 Estimated TIF $ 2,474,583.39 Revenue Revenue Allocated to $ 2,474,583.39 Project % Allocation to Total 25% Project Cost Site 2 Estimated TIF $ 3,233,664.84 Revenue Revenue Allocated to $ 3,233,664.84 Project % Allocation to Total 32% Project Cost Site 3 Estimated TIF $ 3,102,780.46 Revenue Revenue Allocated to $ 3,102,780.46 Project % Allocation to Total 62% Project Cost 1 See page 4 of Plan for discussion of use of surplus tax increment revenue. 34 79 Site 4 Estimated TIF $ 1,522,657.08 Revenue Revenue Allocated to $ 1,522,657.08 Project % Allocation to Total 30% Project Cost Site 5 Estimated TIF $ 932,074.45 Revenue Revenue Allocated to $ 932,074.45 Project % Allocation to Total 9% Project Cost Site 6 Estimated TIF $ 1,203,088.63 Revenue Revenue Allocated to $ 1,203,088.63 Project % Allocation to Total 17% Project Cost Site 7 Estimated TIF $ 1,205,480.72 Revenue Revenue Allocated to $ 1,205,480.72 Project % Allocation to Total 15% Project Cost Estimated TIF Capture $ 6,640,322.68 $ 3,102,780.46 $ 1,203,088.63 $ 1,522,657.08 $ 1,205,480.72 Allocation Percent of Project 66% 62% 17% 30% 15% Covered by TIF 35 80 Chart 3B: City of Romulus Allocation of TIF Revenues by Development Plan Project 2 Ecorse Road Inkster Road Improvement Improvement $28,300,000 $15,000,000 Site 1 Estimated TIF Revenue $ 2,316,811.20 Revenue Allocated to Project $ 2,316,811.20 % Allocation to Total Project Cost 8% Site 2 Estimated TIF Revenue $ 923,205.74 Revenue Allocated to Project $ 923,205.74 % Allocation to Total Project Cost 3% Site 3 Estimated TIF Revenue $ 1,727,336.06 Revenue Allocated to Project $ 1,727,336.06 % Allocation to Total Project Cost 6% Site 4 Estimated TIF Revenue $ 661,529.66 Revenue Allocated to Project $ 661,529.66 % Allocation to Total Project Cost 2% Site 5 Estimated TIF Revenue $ 742,957.52 Revenue Allocated to Project $ 742,957.52 % Allocation to Total Project Cost 3% Site 6 Estimated TIF Revenue $ 699,111.75 Revenue Allocated to Project $ 699,111.75 % Allocation to Total Project Cost 5% Site 7 Estimated TIF Revenue $ 305,710.11 Revenue Allocated to Project $ 305,710.11 % Allocation to Total Project Cost 2% Estimated TIF Capture Allocation $ 6,371,840.18 $ 1,004,821.85 Percent of Project Covered by TIF 23% 7% 2 See page 4 of Plan for discussion of use of surplus tax increment revenue. 36 81 Chart 3C: City of Taylor Allocation of TIF Revenues by Development Plan Project 3 Inkster Road Improvement $15,000,000 Site 1 Estimated TIF Revenue $ 780,711.94 Revenue Allocated to Project $ 780,711.94 % Allocation to Total Project Cost 5% Site 2 Estimated TIF Revenue $ 421,165.53 Revenue Allocated to Project $ 421,165.53 % Allocation to Total Project Cost 3% Site 3 Estimated TIF Revenue $ 145,245.01 Revenue Allocated to Project $ 145,245.01 % Allocation to Total Project Cost 1% Site 4 Estimated TIF Revenue $ 1,133,838.37 Revenue Allocated to Project $ 1,133,838.37 % Allocation to Total Project Cost 8% Site 5 Estimated TIF Revenue $ 376,907.50 Revenue Allocated to Project $ 376,907.50 % Allocation to Total Project Cost 3% Site 6 Estimated TIF Revenue $ 1,087,104.24 Revenue Allocated to Project $ 1,087,104.24 % Allocation to Total Project Cost 7% Site 7 Estimated TIF Revenue $ 444,293.85 Revenue Allocated to Project $ 444,293.85 % Allocation to Total Project Cost 3% Estimated TIF Capture Allocation $ 4,389,266.44 Percent of Project Covered by TIF 29% 3 See page 4 of Plan for discussion of use of surplus tax increment revenue. B-1 82 Appendix A1: Map of Aerotropolis Development Area – Van Buren Township B-2 83 Appendix A2: Map of Aerotropolis Development Area – City of Romulus B-3 84 Appendix A3: Map of Aerotropolis Development Area – City of Taylor B-4 85 Appendix B: Legal Description AEROTROPOLIS LDFA VAN BUREN TOWNSHIP LEGAL DESCRIPTION: Parcels of Land situated in Sections 1 through 18, Town 3 South, Range 8 East, Van Buren Township, Wayne County, Michigan described as beginning at the Southeast corner of said Section 13 and the centerline of Hannan Road (variable width); Thence North along the centerline of said Hannan Road the following 6 courses: 1) North 02°04'46" West, 2,656.74 feet along the East line of said Section 13 to the East 1/4 corner of said Section 13; 2) North 02°06'43" West, 2652.67 feet along the East line of Said Section 13 to the Northeast corner of said section 13, (Southeast corner of said Section 12); 3) North 01°57'47" West, 2,677.06 feet along the East line of said Section 12 to the East 1/4 corner of said Section 12; 4) North 02°10'49" West, 2,673.59 feet along the East line of said Section 12 to the Northeast corner of said Section 12, (Southeast corner of said Section 1); 5) North 02°13'44" West, 2,669.20 feet along the East line of said Section 1 to the East 1/4 corner of said Section 1; 6) North 04°51'48" West, 3226.09 feet along the East line of Said Section 1 to the Northeast corner of said section 1 and the centerline of Van Born Road (120’ wide); Thence West along the North line of Van Buren Township the following 12 courses: 1) South 87°15'01" West, 2,673.75 feet along the North line of Said Section 1 to the North 1/4 corner of said section 1; 2) South 87°17'26" West, 2,675.22 feet along the North line of Said Section 1 to the Northwest corner of said section 1, (Northeast corner of said Section 2); 3) South 87°39'08" West, 2,832.78 feet along the North line of Said Section 2 to the North 1/4 corner of said section 2; 4) South 87°15'32" West, 2,834.41 feet along the North line of Said Section 2 to the Northwest corner of said section 2, (Northeast corner of said Section 3); 5) South 87°54'16" West, 2,666.13 feet along the North line of Said Section 3 to the North 1/4 corner of said section 3; 6) South 87°57'19" West, 2,636.78 feet along the North line of Said Section 3 to the Northwest corner of said section 3, (Northeast corner of said Section 4); 7) South 87°22'45" West, 2,677.54 feet along the North line of Said Section 4 to the North 1/4 corner of said section 4; 8) South 87°20'59" West, 2,620.03 feet along the North line of Said Section 4 to the Northwest corner of said section 4, (Northeast corner of said Section 5); 9) South 87°17'58" West, 2,385.38 feet along the North line of Said Section 5 to the North 1/4 corner of said section 5; 10) South 87°36'58" West, 2,473.35 feet along the North line of Said Section 5 to the Northwest corner of said section 5, (Northeast corner of said Section 6); 11) South 87°33'25" West, 2,770.69 feet along the North line of Said Section 6 to the North 1/4 corner of said section 6; 12) South 87°41'55" West, 2,482.23 feet along the North line of Said Section 6 to the Northwest corner of said section 6 and the West line of Van Buren Township; Thence South along said West line the following 6 courses: 1) South 01°31'46" West, 2,939.03 feet along the West line of said Section 6 to the West 1/4 corner of said Section 6; B-5 86 2) South 01°41'40" West, 2,633.48 feet along the West line of said Section 6 to the Southwest corner of said Section 6, (Northwest corner of said Section 7); 3) South 00°32'13" East 2,681.35 feet along the West line of said Section 7 to the West 1/4 corner of said section 7; 4) South 01°57'24" East, 2,561.39 feet along the West line of said Section 7 to the Southwest corner of said section 7, (Northwest corner of said Section 18); 5) South 02°18'35" East, 2,651.37 feet along the West line of said Section 18 to the West 1/4 corner of said Section 18; 6) South 01°57'13" East, 2,621.93 feet along the West line of said Section 18 to the Southwest corner of said section 18 ; Thence East along the Southerly service drive of I-94 the following 12 courses: 1) North 88°57'12" East, 2,856.06 feet along the South line of Said Section 18 to the South 1/4 corner of said section 18; 2) North 88°40'13" East, 2,680.29 feet along the South line of Said Section 18 to the Southeast corner of said section 18, (Southwest corner of said Section 17); 3) North 88°06'18" East, 2,662.52 feet along the South line of Said Section 17 to the South 1/4 corner of said section 17; 4) North 87°44'50" East, 2,614.52 feet along the South line of Said Section 17 to the Southeast corner of said section 17, (Southwest corner of said Section 16); 5) North 88°11'39" East, 2,631.17 feet along the South line of Said Section 16 to the South 1/4 corner of said section 16; 6) North 88°00'16" East, 2,382.12 feet along the South line of Said Section 16 to the Southeast corner of said section 16, (Southwest corner of said Section 15); 7) North 87°41'07" East, 2,649.72 feet along the South line of Said Section 15 to the South 1/4 corner of said section 15; 8) North 87°43'33" East, 2,636.16 feet along the South line of Said Section 15 to the Southeast corner of said section 15, (Southwest corner of said Section 14); 9) North 88°11'13" East, 2,848.98 feet along the South line of Said Section 14 to the South 1/4 corner of said section 14; 10) North 88°18'56" East, 2,857.90 feet along the South line of Said Section 14 to the Southeast corner of said section 14, (Southwest corner of said Section 13); 11) North 87°43'49" East, 2,826.90 feet along the South line of Said Section 13 to the South 1/4 corner of said section 13; 12) South 88°58'39" East, 2,681.24 feet along the South line of Said Section 13 to the Southeast corner of said section 13 and the Point of Beginning. Containing 12,033.18 acres of land more or less. AEROTROPOLIS LDFA CITY OF ROMULUS LEGAL DESCRIPTION: Parcels of Land situated in Sections 1 through 13, 15 through 18, 24 and 25, Town 3 South, Range 9 East, City of Romulus, Wayne County, Michigan described as beginning at the Southeast corner of said Section 25 also being the intersection of the centerline of Eureka Road and Inkster Road, thence North along the centerline of said Inkster Road (variable width) the following 10 courses: 1) North 02°18'30" West, 2,587.34 feet along the East line of said Section 25 to the East 1/4 corner of said Section 25; 2) North 02°03'49" West, 2654.52 feet along the East line of Said Section 25 to the Northeast corner of said section 25, (Southeast corner of said Section 24); 3) North 02°11'58" West, 2,641.52 feet along the East line of said Section 24 to the East 1/4 corner of said Section 24; B-6 87 4) North 02°15'09" West, 2,644.23 feet along the East line of said Section 24 to the Northeast corner of said Section 24, (Southeast corner of said Section 13); 5) North 02°10'17" West, 2,638.89 feet along the East line of said Section 13 to the East 1/4 corner of said Section 13; 6) North 02°10'23" West, 2,638.22 feet along the East line of Said Section 13 to the Northeast corner of said section 13, (Southeast corner of said Section 12); 7) North 02°05'42" West 2,629.93 feet along the East line of said Section 12 to the East 1/4 corner of said Section 12; 8) North 02°18'31" West, 2,643.71 feet along the East line of Said Section 12 to the Northeast corner of said section 12, (Southeast corner of said Section 1); 9) North 02°02'09" West, 2,646.20 feet along the East line of Said Section 1 to the East 1/4 corner of said section 1; 10) North 02°08'08" West, 2,646.57 feet along the East line of Said Section 1 to the Northeast corner of said section 1 and the centerline of Van Born Road (120’ wide); Thence West along the centerline of said Van Born Road the following 12 courses: 1) South 87°43'49" West, 2,699.82 feet along the North line of Said Section 1 to the North 1/4 corner of said section 1; 2) South 87°43'35" West, 2,698.59 feet along the North line of Said Section 1 to the Northwest corner of said section 1, (Northeast corner of said Section 2); 3) South 87°45'06" West, 2,603.03 feet along the North line of Said Section 2 to the North 1/4 corner of said section 2; 4) South 87°50'51" West, 2,599.50 feet along the North line of Said Section 2 to the Northwest corner of said section 2, (Northeast corner of said Section 3); 5) South 87°32'32" West, 2,602.78 feet along the North line of Said Section 3 to the North 1/4 corner of said section 3; 6) South 87°33'21" West, 2,629.44 feet along the North line of Said Section 3 to the Northwest corner of said section 3, (Northeast corner of said Section 4); 7) South 87°43'27" West, 2,622.95 feet along the North line of Said Section 4 to the North 1/4 corner of said section 4; 8) South 87°49'47" West, 2,669.22 feet along the North line of Said Section 4 to the Northwest corner of said section 4, (Northeast corner of said Section 5); 9) South 87°45'08" West, 2,646.46 feet along the North line of Said Section 5 to the North 1/4 corner of said section 5; 10) South 87°52'30" West, 2,554.84 feet along the North line of Said Section 5 to the Northwest corner of said section 5, (Northeast corner of said Section 6); 11) South 87°50'15" West, 2,756.22 feet along the North line of Said Section 6 to the North 1/4 corner of said section 6; 12) South 87°48'39" West, 2,747.64 feet along the North line of Said Section 6 to the Northwest corner of said section 6 and the centerline of Hannan Road (variable width); Thence South along the centerline of said Hannan Road the following 12 courses: 1) South 00°05'57" East, 189.87 feet along the West line of Said Section 6 to the Northeast corner of section 1, T3S, R8E; 2) South 04°51'48" East, 2,475.54 feet along the West line of Said Section 6 to the West 1/4 corner of said section 6; 3) South 04°51'48" East, 750.54 feet along the West line of Said Section 6 to the East 1/4 corner of section 1, T3S, R8E; 4) South 02°13'44" East, 1,878.93 feet along the West line of Said Section 6 to the Southwest corner of said section 6, (Northwest corner of said Section 7); 5) South 02°13'44" East, 790.27 feet along the West line of Said Section 7 to the Southeast corner of section 1, T3S, R8E; B-7 88 6) South 02°10'49" East, 1,783.02 feet along the West line of Said Section 7 to the West 1/4 corner of said section 7; 7) South 02°10'49" East, 890.57 feet along the West line of Said Section 7 to the East 1/4 corner of section 12, T3S, R8E; 8) South 01°57'47" East, 1,685.94 feet along the West line of Said Section 7 to the Southwest corner of said section 7, (Northwest corner of said Section 18); 9) South 01°57'47" East, 991.12 feet along the West line of Said Section 18 to the Southeast corner of section 12, T3S, R8E; 10) South 02°06'43" East, 1,632.47 feet along the West line of Said Section 18 to the West 1/4 corner of said section 18; 11) South 02°06'43" East, 1,020.20 feet along the West line of Said Section 18 to the East 1/4 corner of section 13, T3S, R8E; 12) South 02°04'46" East, 1,597.60 feet along the West line of Said Section 18 to the Southwest corner of said section 18; Thence along the South line of Said Section 18, North 88°10'57" East, 2,606.75 feet to the South 1/4 corner of said section 18; Thence North 82°16'03" East, 2,631.05 feet to a point on the East line of said section 18, being 267.40 feet from the Southeast corner of said section 18. Thence North 70°54'24" East, 22,053.89 feet to a point on the West line of said section 12, and the centerline of Middlebelt Road (variable width) said point being 1141.85 feet from the West 1/4 corner of said section 12. Thence South along the centerline of said Middlebelt Road the following 7 courses: 1) South 02°37'37" East, 1,490.14 feet along the West line of said Section 12 to the Southwest corner of said Section 12, (Northwest corner of said Section 13); 2) South 02°10'01" East, 2,665.49 feet along the West line of said Section 13 to the West 1/4 corner of said Section 13; 3) South 02°06'37" East 2,610.65 feet along the West line of said Section 13 to the Southwest corner of said section 13, (Northwest corner of said Section 24); 4) South 02°46'09" East, 2,635.14 feet along the West line of said Section 24 to the West 1/4 corner of said Section 24; 5) South 02°48'01" East, 2,637.01 feet along the West line of said Section 24 to the Southwest corner of said section 24, (Northwest corner of said Section 25); 6) South 02°49'17" East, 2,636.03 feet along the West line of said Section 25 to the West 1/4 corner of said Section 25; 7) South 02°47'19" East, 2,630.60 feet along the West line of said Section 25 to the Southwest corner of said section 25 and the centerline of Eureka Road (variable width); Thence East along the centerline of said Eureka Road the following 2 courses: 1) North 87°49'38" East, 2,628.09 feet along the South line of Said Section 25 to the South 1/4 corner of said section 25; 2) North 87°47'25" East, 2,622.93 feet along the South line of Said Section 25 to the Southeast corner of said section 25 and the Point of Beginning. Containing 11,043.19 acres of land more or less. AEROTROPOLIS LDFA CITY OF TAYLOR LEGAL DESCRIPTION: Parcels of Land situated in Sections 6, 7, 18, 19 and 30, Town 3 South, Range 10 East, City of Taylor, Wayne County, Michigan described as beginning at the Southeast corner of said Section 30 also being the intersection of the centerline of Beech Daly Road and Eureka Road, thence North along the centerline of said Beech Daly Road (120’ wide) the following 9 courses: B-8 89 1) North 02°27'26" West, 2,636.85 feet along the East line of said Section 30 to the East 1/4 corner of said Section 30; 2) North 02°27'00" West, 2,635.70 feet along the East line of Said Section 30 to the Northeast corner of said section 30, (Southeast corner of said Section 19); 3) North 02°12'21" West, 2,639.85 feet along the East line of said Section 19 to the East 1/4 corner of said Section 19; 4) North 02°15'37" West, 2,639.61 feet along the East line of said Section 19 to the Northeast corner of said Section 19, (Southeast corner of said Section 18); 5) North 02°16'46" West, 2,635.63 feet along the East line of said Section 18 to the East 1/4 corner of said Section 18; 6) North 02°21'48" West, 2,629.04 feet along the East line of Said Section 18 to the Northeast corner of said section 18, (Southeast corner of said Section 7); 7) North 01°59'53" West, 2636.67 feet along the East line of said Section 7 to the East 1/4 corner of said Section 7; 8) North 02°09'04" West, 2632.26 feet along the East line of Said Section 7 to the Northeast corner of said section 7, (Southeast corner of said Section 6); 9) North 01°31'14" West, 2,682.90 feet along the East line of Said Section 6 to the East 1/4 corner of said section 6 and the centerline of Beverly Road (variable width); Thence West along the centerline of said Beverly Road the following 2 courses: 1) South 84°10'36" West, 2,636.44 feet along the East-West quarter line of Said Section 6 to the center corner of said section 6; 2) South 84°26'09" West, 2,613.39 feet along the East-West quarter line of Said Section 6 to the West 1/4 corner of said section 6 and the centerline of Inkster Road (variable width); Thence South along the centerline of said Inkster Road the following 16 courses: 1) South 02°02'09" East, 2,646.20 feet along the West line of said Section 6 to the Southwest corner of said Section 6, (Northwest corner of said Section 7); 2) South 02°18'31" East, 2,638.79 feet along the West line of said Section 7 to the West 1/4 corner of said Section 7 3) South 02°18'31" East, 4.92 feet along the West line of said Section 7 to the East 1/4 corner of section 12, T3S, R9E 4) South 02°05'42" East 2,627.10 feet along the West line of said Section 7 to the Southwest corner of said section 7, (Northwest corner of said Section 18); 5) South 02°05'42" East 2.83 feet along the West line of said Section 18 to the Southeast corner of section 12, T3S, R9E 6) South 02°10'23" East, 2,618.50 feet along the West line of said Section 18 to the West 1/4 corner of said Section 18; 7) South 02°10'23" East, 19.72 feet along the West line of said Section 18 to the East 1/4 corner of section 13, T3S, R9E 8) South 02°10'17" East, 2,598.23 feet along the West line of said Section 18 to the Southwest corner of said section 18, (Northwest corner of said Section 19); 9) South 02°10'17" East, 40.66 feet along the West line of said Section 19 to the Southeast corner of section 13, T3S, R9E 10) South 02°15'09" East, 2,584.63 feet along the West line of said Section 19 to the West 1/4 corner of said Section 19; 11) South 02°15'09" East, 59.60 feet along the West line of said Section 19 to the East 1/4 corner of section 24, T3S, R9E 12) South 02°11'58" East, 2,561.39 feet along the West line of said Section 19 to the Southwest corner of said section 19, (Northwest corner of said Section 30); 13) South 02°11'58" East, 80.14 feet along the West line of said Section 30 to the Southeast corner of section 24, T3S, R9E B-9 90 14) South 02°03'49" East, 2565.23 feet along the West line of Said Section 30 to the West 1/4 corner of said section 30; 15) South 02°03'49" East, 89.30 feet along the West line of Said Section 30 to the East 1/4 corner of section 25, T3S, R9E 16) South 02°18'30" East, 2,550.68 feet along the West line of Said Section 30 to the Southwest corner of said section 30 and the centerline of Eureka Road (variable width) Thence East along the centerline of said Eureka Road the following 2 courses: 1) North 83°12'53" East, 2,631.64 feet along the South line of Said Section 30 to the South 1/4 corner of said section 30; 2) North 87°09'38" East, 2,620.22 feet along the South line of Said Section 30 to the Southeast corner of said section 30 and the Point of Beginning. Containing 2,837.18 acres of land more or less. B-10 91 Appendix C: LDFA Board Adopting Resolution: TIF and Development Plans for Aerotropolis Development Area C-1 92 Appendix D: Aerotropolis Board Resolution Creating Aerotropolis LDFA and Designating its Boundaries E-1 93 Appendix E: Van Buren Charter Township Board of Trustees Approving Resolution E-1 94 Appendix F: City of Romulus City Council Approving Resolution E-1 95 Appendix G: City of Taylor City Council Approving Resolution E-1 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 December 1, 2025 Mr. Chris Gibbs City Engineer 25605 Northline Road Taylor, Michigan 48180 Subject: City of Taylor 2026 Water Main Rehabilitation- Future Water Main Replacement Program Dear Mr. Gibbs: Bidigare Contractors, Inc, has been the city’s water main replacement contractor since 2012 from a combination of both low bid contract awards and contract extensions from previous low bid awards. Most recently we have been awarded the Lang Park water main extension under our 2022 contract. Throughout the years Bidigare Contractors has maintained a very positive relationship working with the city on water infrastructure programs which have accumulated to over miles of new water distribution mains throughout the city. Additionally replacing numerous lead water services and correcting existing water service line locations has been successful. With the 2026 program under design. Bidigare Contractors has reviewed its current contract and would like to offer the city of Taylor its 2022 contract unit pricing for any future water main replacements that may occur within the city . Bidigare contractors believes that this could save the city significant time and money on the bidding process as well as significant cost savings from new unit prices. We value our relationship with the city, and we appreciate the work we have done. Thank you for giving us this opportunity to extend our contact and to continue to provide the city with clean, safe and reliable water. Should you have any questions please do not hesitate to contact us. Sincerely, Bidigare Contractors, Inc. Jordon Bidigare 939 S. Mill St, Plymouth, MI 48170 (248) 735-1113 phone (248) 735-1114 fax www.bidigarecontractors.com 125 WADE wvi TRIM Tabulation of Bids 2022 Water Main Rehabilitation City of Taylor December 21, 2022 TAY 3164-021 BASE BID ITEMS Item Bidigare Contractors, Inc. Lawrence M. Clarke, Inc. Pamar Enterprises, Inc. Description 1.ilt QuanlitV No. . Unit Price Amount Unit Price Amount Unit Price Amount 1 Concrete Pavement, Remove Syd 55 $ 20.00 $ 1,100.00 $ 30.00 $ 1,650.00 $ 18.00 $ 990.00 2 Bituminous Pavement, Remove Syd 100 $ 13.00 $ 1,300.00 $ 30.00 $ 3,000.00 $ 16.00 $ 1,600.00 3 Concrete Drive and Sidewalk, Remove SO 500 $ 12.00 $ 6,000.00 $ 15.00 $ 7,500.00 $ 1.00 $ 500.00 4 Concrete Curb and Gutter, Remove Lit 20 $ 18.00 $ 360.00 $ 20.00 $ 400.00 $ 17.00 $ 340.00 5 Gate Valve and Well, Remove Each 5 $ 750.00 $ 3,750.00 $ 3,500.00 $ 17,500.00 $ 900.00 $ 4,500.00 6 Tapping Sleeve, Valve and Well, Remove Each 1 $ 750.00 $ 750.00 $ 4,000.00 $ 4,000.00 $ 1,200.00 $ 1,200.00 7 Fire Hydrant, Remove Each 5 $ 500.00 $ 2,500.00 $ 1,250.00 $ 6,250.00 $ 900.00 $ 4,500.00 8 Adjust Structure Each 1 $ 600.00 5 600.00 $ 1,000.00 $ 1,000.00 $ 880.00 $ 880.00 9 Lft 4520 $ 170.00 $ 768,400.00 $ 250.00 $ 1,130,000.00 $ 305.25 $ 1,379,730.00 Water Main, 12 inch Fusible PVC, Pipe Burst Ex 8 Inch 10 Water Main, 8 Inch Fusible PVC, Pipe Burst Ex 8 inch Lft 165 $ 200.00 $ 33,000.00 $ 225.00 $ 37,125.00 $ 262.25 $ 43,271.25 11 Lft 15 $ 200.00 $ 3,000.00 $ 225.00 $ 3,375.00 $ 262.25 $ 3,933.75 Water Main. 8 inch Fusible PVC, Pipe Burst Ex 6 inch 12 Lft 580 $ 170.00 $ 98,600.00 $ 250.00 $ 145,000.00 $ 326.75 $ 189,515.00 Water Main, 12 inch, Fusible PVC. Directional Drill 13 Fire Hydrant Assembly Each 7 $ 9,500.00 $ 66,500.00 $ 8,080.00 $ 56,560.00 $ 11,850.00 $ 82,950.00 14 Gate Valve and Well, 12 Inch Each 9 $ 14,000.00 $ 126,000.00 5 12,500.00 $ 112,500.00 $ 11,250.00 $ 101,250.00 15 Gate Valve and Well, 8 inch Each 4 $ 10,000.00 $ 40,000.00 $ 11,500.00 $ 46,000.00 $ 10,100.00 $ 40,400.00 16 Watermaln, Abandon with Flowable Fill Cyd 13 $ 250.00 $ 3,250.00 $ 300.00 $ 3,900.00 $ 300.00 $ 3,900.00 17 Connection to Existing 8 Inch Water Main Each 5 $ 3,200.00 $ 16,000.00 $ 8,000.00 $ 40,000.00 $ 6,500.00 $ 32 500.00 18 Connection to Ex 6 inch WM w/ 8" x 6" Reducer Each 1 $ 2,750.00 $ 2,750.00 $ 8,000.00 $ 8,000.00 $ 5,500.00 $ 5,500.00 Connection to Ex 12 Inch WM w/12" Tee and Cutting 19 Each 1 $ 5,500.00 $ 5,500.00 $ 10,500.00 $ 10,500.00 $ 10,800.00 $ 10,800.00 In Sleeve Connection to Ex 16 Inch WM w/12" x 16" Cross, (1) 20 Each 1 $ 12,000.00 $ 12,000.00 $ 15,000.00 $ 15,000.00 $ 13,200.00 $ 13,200.00 12' x 8' Reducer and Culling In Sleeve 21 Repair 12-Inch Water Main LS 1 $ 12,500.00 $ 12,500.00 $ 15,000.00 $ 15,000.00 S 9,850.00 $ 9,850.00 22 Reconnect Existing Water Service Each 28 $ 1,250.00 $ 35,000.00 $ 1,350.00 $ 37,800.00 $ 850.00 $ 23,800.00 23 Water Service, HOPE, 1-Inch, Short Each 52 $ 1,450.00 $ 75,400.00 $ 3,000.00 $ 156,000.00 $ 1,250.00 $ 65,000.00 24 Curb Stop and Box, 1Inch Each 43 $ 400.00 $ 17,200.00 $ 750.00 $ 32,250.00 $ 450.00 $ 19,350.00 25 Aggregate Base Course, 21M Ton 42 $ 35.00 $ 1,470.00 $ 90.00 $ 3,780.00 5 77.00 $ 3,234.00 26 HMA, 3C Ton 35 $ 250.00 $ 8,750.00 $ 375.00 $ 13,125.00 $ 225.00 $ 7,875.00 27 HMA, 13A Ton 14 $ 250.00 $ 3,500.00 $ 375.00 $ 5,250.00 $ 225.00 S 3,150.00 28 Concrete Pavement, 8 Inch Syd 55 $ 125.00 $ 6,875.00 $ 250.00 5 13,750.00 $ 220.30 $ 12,116.50 29 Sidewalk, Concrete, 4-Inch with 4-Inch Subbase Sft 160 $ 8.00 $ 1,280.00 $ 16.00 $ 2,560.00 $ 9.75 $ 1,560.00 Concrete Drives and Sidewalk, 6-inch with 6-inch 30 Sft 340 $ 11.00 $ 3,740.00 $ 17.00 $ 5,780.00 $ 14.25 $ 4,845.00 Subbase Concrete Sidewalk Ramp, ADA, 6-inch with 6-inch 31 Sft 60 $ 20.00 $ 1,200.00 $ 50.00 $ 3,000.00 $ 14.25 $ 855.00 Subbase 32 Curb and Gutter, Cone, Del F5 Lft 20 $ 45.00 $ 900.00 $ 100.00 $ 2,000.00 $ 75.00 $ 1,500.00 33 Inlet Filter Each 27 $ 100.00 $ 2,700.00 $ 250.00 $ 6,750.00 $ 125.00 $ 3,375.00 34 Syd 1525 $ 20.00 $ 30,500.00 $ 18.00 $ 27,450.00 $ 21.50 $ 32,787.50 Restoration w/3" Topsoil, Seed, Fertilizer and Mulch 35 Traffic Maintenance and Control LS 1 $ 25,000.00 $ 25,000.00 $ 30,000.00 $ 30,000.00 $ 125,000.00 $ 125,000.00 36 Audio Video Route Suvey LS 1 $ 5,000.00 $ 5,000.00 $ 20,000.00 $ 20,000.00 $ 1,675.00 $ 1,675.00 37 SIDay $ 900.00 35 $ 31,500.00 40 $ 36,000.00 101 $ 90,900.00 Inspector Days (Contractor to Bid Number of Days) Total Base Bid (Items 1 through 37) $ 1,453,875.00 $ 2,059,755.00 5 2,328,333.00 ADDITIVE ALTERNATE NO I 38 Concrete Pavement, Remove Syd 105 $ 20.00 $ 2,100.00 $ 30.00 $ 3,150.00 $ 18.00 $ 1.890.00 39 Bituminous Pavement. Remove Syd 150 $ 13.00 $ 1,950.00 $ 30.00 $ 4,500.00 $ 16.00 $ 2,400.00 40 Concrete Drive and Sidewalk, Remove Sft 610 $ 12.00 $ 7,320.00 $ 15.00 $ 9,150.00 $ 1.00 $ 610.00 41 Fire Hydrant, Remove Each 2 $ 500.00 $ 1,000.00 $ 1,250.00 $ 2,500.00 $ 900.00 $ 1,800.00 42 Water Main, 8 inch, Fusible PVC, Directional Drill Lft 2300 $ 165.00 $ 379,500.00 $ 225.00 $ 517,500.00 $ 282.50 $ 649,750.00 43 Water Main, 8 inch. HOPE. Directional Drill Lit 495 $ 165.00 $ 81,675.00 $ 225.00 $ 111,375.00 $ 261.00 5 129.195.00 44 Fire Hydrant Assembly Each 4 $ 9.500.00 $ 38,000.00 $ 8,080.00 $ 32,320.00 5 10,900.00 $ 43,600.00 45 Gate Valve and Well, 8 inch Each 9 $ 11,000.00 $ 99,000.00 $ 11,500.00 5 103,500.00 $ 10,100.00 S 90,900.00 46 Connection to Existing 8 inch Water Main Each 4 $ 2,750.00 $ 11,000.00 $ 9,000.00 $ 36,000.00 $ 6,500.00 $ 26,000.00 Connection to Ex 8 inch WM w/8" x 8" Tee and Cutting 47 Each 4 $ 4,000.00 $ 16,000.00 $ 10,000.00 $ 40,000.00 $ 7,700.00 $ 30.800.00 In Sleeve Connection to Ex 8 inch WM w/8" 58' Tee and Cutting 48 Each 1 $ 4,000.00 $ 4,000.00 $ 10,000.00 $ 10,000.00 $ 7,700.00 $ 7,700.00 In Sleeve Connection to Ex 6 Inch WM w/8" x 8' Tee, (2) 8" x 6' 49 Each 2 $ 5.000.00 $ 10,000.00 $ 8,000.00 $ 16,000.00 $ 7,700.00 $ 15,400.00 Reducers and Cutting In Sleeve 50 Water Service, HOPE, 1-Inch, Short Each 6 $ 1,450.00 $ 8,700.00 $ 3,000.00 $ 18,000.00 $ 1,100.00 $ 6,600.00 51 Water Service, HOPE. 1-Inch, Long Each 2 $ 2.250.00 $ 4,500.00 $ 7,500.00 $ 15,000.00 $ 3,380.00 $ 6.760.00 52 Curb Stop and Box, 1 Inch Each 8 $ 400.00 $ 3,200.00 $ 750.00 $ 6,000.00 $ 450.00 $ 3,600.00 53 Water Service, Non-Standard, Abandon Each 7 $ 500.00 $ 3,500.00 $ 5,000.00 $ 35,000.00 $ 500.00 $ 3,500.00 Water Service (Beyond Properly Line), HOPE, 1Inch, 54 Lft 525 $ 50.00 $ 26,250.00 $ 50.00 $ 26,250.00 $ 85.00 $ 44,625.00 Directional Drilled 55 Water Service Connection to Water Meter Each 7 $ 700.00 $ 4,900.00 $ 8,000.00 $ 56,000.00 $ 3,800.00 $ 26,600.00 56 Aggregate Base Course, 21AA Ton 31 $ 35.00 $ 1,085.00 $ 90.00 $ 2,790.00 $ 77.00 S 2,387.00 57 HMA, 3C Ton 25 $ 250.00 $ 6,250.00 $ 375.00 $ 9,375.00 $ 225.00 $ 5,625.00 58 HMA, 13A Ton 10 $ 250.00 $ 2,500.00 $ 375.00 $ 3,750.00 $ 225.00 $ 2,250.00 59 Concrete Pavement, 7 inch Syd 90 $ 115.00 $ 10,350.00 $ 150.00 $ 13,500.00 $ 150.00 $ 13,500.00 60 Concrete Pavement with Integral Curb, 7 Inch Syd 25 $ 125.00 $ 3,125.00 $ 160.00 $ 4,000.00 $ 210.00 $ 5,250.00 61 Sidewalk, Concrete, 4-Inch with 4-inch Subbase Sit 610 $ 8.00 $ 4,880.00 $ 16.00 $ 9,760.00 $ 0.75 $ 5,947.50 62 Inlet Filter Each 10 $ 100.00 $ 1.000.00 $ 250.00 $ 2,500.00 $ 125.00 $ 1,250.00 63 Silt Fence Lft 400 5 3.00 5 1,200.00 5 10.00 $ 4,000.00 $ 5.00 $ 2,000.00 126 ie WADE Kw] TRIM Tabulation of Bids 2022 Water Main Rehabilitation City of Taylor December 21, 2022 TAY 3164-02T BASE BID ITEMS Item Bidigare Contractors, Inc. Lawrence M. Clarke, Inc. Pamar Enterprises, Inc. Unit Qty.itit Unit Price Amount No. 1::: "1 Unit Price Amount Unit Price Amount 64 Relocate Mailbox with New Post Each 1 $ 200.00 $ 200.00 $ 300.00 $ 300.00 $ 255.00 $ 255.00 65 Remove and Replace Guardrail L.S. 1 $ 3,500.00 $ 3,500.00 $ 10,000.00 $ 10,000.00 $ 2,000.00 $ 2.000.00 66 Remove and Replace Sign Each 1 $ 500.00 $ 500.00 $ 1,000.00 $ 1,000.00 $ 500.00 $ 500.00 67 Syd 850 $ 20.00 $ 17,000.00 $ 15.00 $ 12,750.00 $ 21.50 $ 18.275.00 Restoration w/3" Topsoil, Seed, Fertilizer and Mulch 68 Traffic Maintenance and Control LS 1 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 51,000.00 $ 51,000.00 69 $1Day $ 900.00 18 $ 16,200.00 30 $ 27,000.00 60 $ 54,000.00 Inspector Days (Contractor to Bid Number of Days) Total Additive Alternate Not (Items 38 through 69) $ 790,385.00 $ 1,162,970.00 $ 1,255,969.50 ADDITIVE ALTERNATE NO II 70 Concrete Pavement, Remove Syd 25 $ 25.00 $ 625.00 $ 30.00 5. 750.00 $ 18.00 $ 450.00 71 Concrete Drive and Sidewalk, Remove Sft 150 $ 14.00 $ 2,100.00 $ 30.00 $ 4,500.00 $ 1.00 $ 150.00 72 Concrete Curb and Gutter, Remove Lft 25 $ 18.00 $ 450.00 $ 20.00 $ 500.00 $ 17.00 $ 425.00 73 Gate Valve and Well, Remove Each 2 $ 750.00 $ 1,500.00 $ 3,500.00 $ 7,000.00 $ 900.00 $ 1,800.00 74 Fire Hydrant, Remove Each 2 $ 500.00 $ 1,000.00 $ 1,250.00 $ 2,500.00 $ 900.00 $ 1,800.00 76 Water Main, 8 inch Fusible PVC, Pipe Burst Ex 6 Inch Lft 670 $ 185.00 $ 123,950.00 $ 225.00 $ 150,750.00 $ 322.50 $ 216.075.00 76 Water Main, 8 Inch, Fusible PVC, Directional Drill Lft 1525 $ 185.00 $ 282,125.00 $ 225.00 $ 343,125.00 $ 320.00 $ 488,000.00 77 Fire Hydrant Assembly Each 5 $ 9,500.00 $ 47,500.00 $ 8.080.00 $ 40,400.00 $ 10,900.00 $ 54,500.00 78 Gate Valve and Well, 8 Inch Each 4 $ 11,000.00 $ 44,000.00 $ 11,500.00 $ 46,000.00 $ 10,100.00 $ 40,400.00 r 79 Connection to Existing 8 inch Water Main WI 22.5 de Each 1 $ 2,750.00 5 2,750.00 $ 8,000.00 $ 8,000.00 5 6,500.00 5 6,500.00 80 Connection to Ex 12 inch WM w/12* x 8 Tee and Cultir Each 1 $ 5,500.00 $ 5,500.00 $ 10,500.00 $ 10,500.00 $ 8,800.00 $ 8,800.00 81 Water Service, HOPE, 1-inch, Short Each 20 $ 1,450.00 $ 29,000.00 $ 3,000.00 $ 60,000.00 $ 1,100.00 $ 22,000.00 82 Water Service, HOPE, 1-inch. Long Each 13 $ 2,250.00 $ 29,250.00 $ 7,500.00 $ 97,500.00 $ 3,380.00 $ 43,940.00 83 Curb Stop and Box, 1 Inch Each 33 $ 400.00 $ 13,200.00 $ 750.00 $ 24,750.00 $ 450.00 $ 14,850.00 84 Water Service, Non-Standard, Abandon Each 33 $ 500.00 $ 16,500.00 5 5,000.00 $ 165,000.00 $ 500.00 $ 16,500.00 85 Water Service (Beyond Property Line), HOPE, 1 Inch, (Lit 2475 $ 35.00 $ 86,625.00 $ 50.00 $ 123,750.00 $ 85.00 $ 210,375.00 86 Water Service Connection to Water Meter Each 33 $ 700.00 $ 23,100.00 $ 8.000.00 $ 264,000.00 $ 3,800.00 $ 125,400.00 87 Aggregate Base Course, 21AA Ton 13 $ 35.00 $ 455.00 $ 90.00 $ 1,170.00 $ 77.00 $ 1,001.00 88 Concrete Pavement, 9 Inch Syd 25 $ 130.00 $ 3,250.00 $ 170.00 $ 4,250.00 $ 200.00 $ 5,000.00 89 Sidewalk, Concrete, 4-Inch with 4-inch Subbase Sft 50 $ 10.00 $ 500.00 $ 16.00 $ 800.00 $ 9.75 $ 487.50 90 Concrete Sidewalk Ramp, ADA, 6-inch with 6-inch Subi Sft 100 $ 20.00 $ 2,000.00 $ 50.00 $ 5,000.00 $ 14.25 $ 1,425.00 91 Curb and Gutter, Cons, Del F5 Lft 25 $ 45.00 $ 1,125.00 $ 100.00 $ 2,500.00 $ 75.00 $ 1,875.00 92 Inlet Filter Each 29 $ 100.00 $ 2,900.00 $ 250.00 $ 7,250.00 $ 125.00 $ 3.625.00 93 Sill Fence Lft 130 $ 3.00 $ 390.00 $ 10.00 $ 1,300.00 $ 5.00 $ 650.00 94 Restoration w/3" Topsoil, Seed, Fertilizer and Mulch Syd 420 $ 20.00 $ 8,400.00 $ 15.00 $ 6.300.00 $ 21.50 $ 9,030.00 95 Traffic Maintenance and Control LS 1 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 55,000.00 $ 55,000.00 96 Inspector Days (Contractor to Bid Number of Days) $fDay $ 900.00 17 $ 15,300.00 30 $ 27,000.00 85 5 76,500.00 Total Additive Alternate No Ii (Items 70 through 96) S 763,495.00 5 1,424,595.00 S 1,406,558.50 TOTAL ONTRACT PRICE (Items 1 hrough 96)) 63,007.755.00 5 4,647,320.00 $ 4,990,861.00 127 TIMOTHY WOOLLEY CITY COUNCIL Mayor City of Taylor DOUGLAS A. GEISS CYNTHIA A. BOWER Chairman City Clerk JILL BRANDANA MICHELLE TOCCO Chairwoman Pro-Tem Treasurer Council Members TINA DANIELS 23555 GODDARD ROAD CHARLEY JOHNSON Taylor, MI 48180 LINDSEY ROSE ANGIE WINTON PHONE: (734) 287-6550 www.cityoftaylor.com MINUTES The regular meeting of the Taylor City Council was held on Tuesday, October 7, 2025 at 6:30 p.m. in the Taylor Municipal Building at 23555 Goddard Road, Taylor, Michigan. Council Chairman Douglas A. Geiss called the meeting to order. Present: Charley Johnson, Angie Winton, Douglas Geiss, Jill Brandana, Tina Daniels, Lindsey Rose Also Present: Mayor Woolley, Deputy Clerk Sara El-Rifaai, Treasurer Michelle Tocco, Corporation Counsel Ed Plato, Council Secretary Tiarra Swain Excused: None Motion By: Jill Brandana Supported By: Angie Winton Ayes: Charley Johnson, Angie Winton, Jill Brandana, Douglas Geiss, Tina Daniels, Lindsey Rose Nays: None Resolved: To approve the Agenda with change to Item 6.1; separate Stephen Poloni’s appointments by boards 6.1A and 6.1B and correct Item 7.6 address to 26655. Unanimously carried CCR #: 10.449-25 Motion By: Angie Winton Supported By: Jill Brandana Ayes: Charley Johnson, Angie Winton, Jill Brandana, Douglas Geiss, Tina Daniels, Lindsey Rose Nays: None Resolved: To approve the acceptance of the minutes of the meeting held September 16, 2025 and dispense with oral reading. Unanimously carried CCR #: 10.450-25 Page: 1 128 Motion By: Angie Winton Supported By: Charley Johnson Ayes: Charley Johnson, Angie Winton, Jill Brandana, Douglas Geiss Nays: Lindsey Rose, Tina Daniels Resolved: To approve the new appointment of Stephen Poloni to the Compensation Commission to fulfill the term of Ben Clayton to expire on October 1, 2031. Roll Call Vote 4 – 2 Motion carried CCR #: 10.451-25 Motion By: Charley Johnson Supported By: Angie Winton Ayes: Charley Johnson, Angie Winton, Jill Brandana, Douglas Geiss, Tina Daniels, Lindsey Rose Nays: None Resolved: To approve the new appointment of Stephen Poloni to the Local Officers Pension Commission to fulfill the term of Ben Clayton to expire on October 1, 2031. Unanimously carried CCR #: 10.452-25 Motion By: Angie Winton Supported By: Charley Johnson Ayes: Charley Johnson, Angie Winton, Jill Brandana, Douglas Geiss, Tina Daniels, Lindsey Rose Nays: None Resolved: To approve the new appointment of Eric Chopjian to the Tax Increment Finance Authority for a four (4) year term to expire on October 7, 2029. Unanimously carried CCR #: 10.453-25 Motion By: Charley Johnson Supported By: Jill Brandana Ayes: Charley Johnson, Angie Winton, Jill Brandana, Douglas Geiss, Tina Daniels, Lindsey Rose Nays: None Resolved: To approve participation by the City Clerk’s Office in the Early Voting Grant opportunity through Michigan Department of State, Bureau of Elections for the 2025 election cycle. Unanimously carried CCR #: 10.454-25 Motion By: Tina Daniels Supported By: Charley Johnson Ayes: Charley Johnson, Angie Winton, Jill Brandana, Douglas Geiss, Tina Daniels, Lindsey Rose Nays: None Resolved: To approve three (3) members of the Fire Department to attend the Fire Inspector 1 Training for an amount not to exceed $3,075, funded through General Fund-Training and Transport. Unanimously carried CCR #: 10.455-25 Page: 2 129 Motion By: Charley Johnson Supported By: Tina Daniels Ayes: Charley Johnson, Angie Winton, Jill Brandana, Douglas Geiss, Tina Daniels, Lindsey Rose Nays: None Resolved: To receive & file sending one (1) member of the Fire Department to attend the Michigan Task Force 1 Canine Search Specialist Training (CSST). Unanimously carried CCR #: 10.456-25 Motion By: Lindsey Rose Supported By: Tina Daniels Ayes: Charley Johnson, Angie Winton, Jill Brandana, Douglas Geiss, Tina Daniels, Lindsey Rose Nays: None Resolved: To approve Regroup, low bid, for the purchase of a three (3) year mass notification subscription for an amount not to exceed $13,725, funded through General Fund Police IT. Unanimously carried CCR #: 10.457-25 Motion By: Angie Winton Supported By: Charley Johnson Ayes: Charley Johnson, Angie Winton, Jill Brandana, Douglas Geiss, Tina Daniels, Lindsey Rose Nays: None Resolved: To approve Genesis Chevrolet, low bid, for three (3) EV Blazers for an amount not to exceed $134,202, funded through the EECGB Grant and State Forfeiture Funds. Unanimously carried CCR #: 10.458-25 Motion By: Angie Winton Supported By: Charley Johnson Ayes: Charley Johnson, Angie Winton, Jill Brandana, Douglas Geiss, Tina Daniels, Lindsey Rose Nays: None Resolved: To approve the acceptance of the Industrial Development District designated "Aerotropolis-26655 Northline Rd. LLC District", as created by The Detroit Region Aerotropolis Development Corporation. Unanimously carried CCR #: 10.459-25 Motion By: Charley Johnson Supported By: Angie Winton Ayes: Charley Johnson, Angie Winton, Jill Brandana, Douglas Geiss, Tina Daniels, Lindsey Rose Nays: None Resolved: To amend Appendix A, City of Taylor, Michigan Code of Ordinances, regulating the development and use of land to rezone 26655 Northline, part of parcel #60-078-99-0001 - 706 of the NW 1/4 Section 30 T.3S., R.10E., City of Taylor, Wayne County, Michigan from O-1 (Office) to I-1 (light Industrial). The property is located on the southwest corner of Northline and Lange Roads. Interested Parties: M. Sousa Unanimously carried CCR #: 10.460-25 Page: 3 130 Motion By: Angie Winton Supported By: Charley Johnson Ayes: Charley Johnson, Angie Winton, Jill Brandana, Douglas Geiss Nays: Tina Daniels, Lindsey Rose Resolved: To approve authorizing the Mayor to sign the Purchase Agreement on behalf of the City of Taylor for the sale of Parcel ID number 60-032-02-0679-000 for an amount of $8,500, plus closing costs. Proceeds go to the General Fund. Roll Call Vote 4 – 2 Motion carried CCR #: 10.461-25 Motion By: Jill Brandana Supported By: Charley Johnson Ayes: Charley Johnson, Angie Winton, Jill Brandana, Douglas Geiss, Tina Daniels, Lindsey Rose Nays: None Resolved: To approve Authorizing the Mayor to sign and accept the Municipal and Community Credit Contract from SMART for the contract period of July 1, 2025, through June 30, 2026, in the amount of $186,699. Unanimously carried CCR #: 10.462-25 Motion By: Angie Winton Supported By: Charley Johnson Ayes: Charley Johnson, Angie Winton, Jill Brandana, Douglas Geiss, Tina Daniels, Lindsey Rose Nays: None Resolved: To approve Authorizing the Mayor to execute the attached Intergovernmental Agreement (IGA) with the Charter County of Wayne for Fiscal Year 2024–2025, in the amount of $30,000, as outlined in the attached document. Interested Parties: T. Katinski Unanimously carried CCR #: 10.463-25 Motion By: Lindsey Rose Supported By: Charley Johnson Ayes: Charley Johnson, Angie Winton, Jill Brandana, Douglas Geiss, Tina Daniels, Lindsey Rose Nays: None Resolved: To approve Authorizing the Mayor to execute the attached lease agreement between the City of Taylor and Taylor Dance Program, Inc., as outlined in the attached document. Unanimously carried CCR #: 10.464-25 Page: 4 131 Motion By: Charley Johnson Supported By: Lindsey Rose Ayes: Charley Johnson, Angie Winton, Douglas Geiss, Tina Daniels, Lindsey Rose Nays: Jill Brandana Resolved: To approve Decima LLC, low bid, to provide renovations to the Greenwald Historical House, located at Heritage Park, in the amount of $382,558, plus a 3% contingency, for a total project amount not to exceed $394,035. Funding to be provided through TBA Capital Outlay. Roll Call Vote 5 – 1 Motion carried CCR #: 10.465-25 Motion By: Angie Winton Supported By: Charley Johnson Ayes: Charley Johnson, Angie Winton, Jill Brandana, Tina Daniels, Lindsey Rose Nays: Douglas Geiss Resolved: To approve Any Moment Plumbing for emergency sanitary sewer repair for an amount not to exceed $4,200. Funded through Sewage Disposal Fund. Unanimously carried CCR #: 10.466-25 Motion By: Angie Winton Supported By: Charley Johnson Ayes: Charley Johnson, Angie Winton, Jill Brandana, Douglas Geiss, Tina Daniels Nays: None Resolved: To approve Macqueen, MI-Deal, the purchase of a 2025 Elgin Sweeper for the DPW in an amount not to exceed $311,810. Funded through DPW Vehicle Account. Unanimously carried CCR #: 10.467-25 Motion By: Angie Winton Supported By: Charley Johnson Ayes: Charley Johnson, Angie Winton, Jill Brandana, Douglas Geiss, Tina Daniels, Lindsey Rose Nays: None Resolved: To approve payment to the Southeastern Michigan Council of Governments (SEMCOG) for the City of Taylor’s 2025 Membership fees for an amount not to exceed $10,061. Funded through the Local Street Fund. Unanimously carried CCR #: 10.468-25 Motion By: Charley Johnson Supported By: Angie Winton Ayes: Charley Johnson, Angie Winton, Jill Brandana, Douglas Geiss, Tina Daniels, Lindsey Rose Nays: None Resolved: To approve Pipeline Management, current vendor, for the 2022 Sanitary Sewer Rehabilitation Cast in Place Pipe (CIPP) Program one (1) year contract extension for an amount not to exceed $1,000,000. Funded through Sewage Disposal Fund Michigan Economic Development Corporation Grant. Unanimously carried CCR #: 10.469-25 Page: 5 132 Motion By: Angie Winton Supported By: Jill Brandana Ayes: Charley Johnson, Angie Winton, Jill Brandana, Douglas Geiss, Tina Daniels, Lindsey Rose Nays: None Resolved: To approve a proclamation honoring Pregnancy and Infant Loss awareness month. Unanimously carried CCR #: 10.470-25 Motion By: Jill Brandana Supported By: Angie Winton Ayes: Charley Johnson, Angie Winton, Jill Brandana, Douglas Geiss, Tina Daniels, Lindsey Rose Nays: None Resolved: To approve adjournment at 7:35 p.m. Unanimously carried CCR #: 10.471-25 _____________________________________ ________________________________ Douglas A. Geiss, Chairman Cynthia A. Bower, City Clerk Page: 6 133 DECI MA LLC +1 (260)-243-0591 www.decimaai.com p alex.balochPdecimaai.com DEC. IMA Automate Your World DECIMA LLC 16870 Schaefer Hwy Detroit, MI, 48235 (313) 910 0797 BELL TO SHIP TO Guido Ulin Greenwald Historic Home Director, Parks & Recreation & 12111 Pardee Road, Taylor MI 48180 Building & Grounds City of Taylor ESTIMATE # DATE CO#1 02/13/2026 SNO. ITEM DESCRIPTION AMOUNT • Replace the existing main center duct and install new ductwork to provide supply air to each room, including 1 the bathroom, in accordance with applicable code $16,125.00 requirements. Scope includes all necessary labor, materials, and required permits. TOTAL $16,125.00 Accepted By: Accepted Date: 134 16870 Schaefer Hwy, Detroit, MI 48235 2023 CONCRETE PANEL REPLACEMENT CONTRACT BID TAB ALS Great Lakes ESTIMATED Al's Asphalt ASPHALT Contracting GREAT LAKES GV Cement GV CEMENT Hartwell Cement HARTWELL Audia Concrete AUDIA Description Unit of Measure QUANTITIES Paving PAVING Solutions CONTRACTING Contracting Co CONTRACTING Company CEMENT COMPANY Const. CONCRETE Prevailing Wage Yes/No Yes Yes Yes Yes Yes&No Pavt Repr, Rem, Modified SYD 10000 $16.00 $160,000.00 $15.50 $155,000.00 $10.00 $100,000.00 $18.00 $180,000.00 $9.00 $90,000.00 Pavt Repr, Nonreinf Conc, 7 inch, with Integral Curb, Modified SYD 50 $67.00 $3,350.00 $68.00 $3,400.00 $75.00 $3,750.00 $68.00 $3,400.00 $70.00 $3,500.00 Pavt Repr, Nonreinf Conc, 8 inch, with Integral Curb, Modified SYD 8250 $69.00 $569,250.00 $79.00 $651,750.00 $77.00 $635,250.00 $77.00 $635,250.00 $72.50 $598,125.00 Pavt Repr, Nonreinf Conc, 9 inch, with Integral Curb, Modified SYD 500 $71.00 $35,500.00 $85.00 $42,500.00 $79.00 $39,500.00 $90.00 $45,000.00 $75.00 $37,500.00 Pavt Repr, Nonreinf Conc, 7 inch, Modified SYD 50 $67.00 $3,350.00 $67.00 $3,350.00 $75.00 $3,750.00 $68.00 $3,400.00 $70.00 $3,500.00 Pavt Repr, Nonreinf Conc, 8 inch, Modified SYD 500 $69.00 $34,500.00 $81.00 $40,500.00 $77.00 $38,500.00 $77.00 $38,500.00 $72.50 $36,250.00 Pavt Repr, Nonreinf Conc, 9 inch, Modified SYD 500 $71.00 $35,500.00 $84.00 $42,000.00 $79.00 $39,500.00 $90.00 $45,000.00 $75.00 $37,500.00 Pavt Repr, Nonreinf Conc, 10 inch, Modified SYD 50 $75.00 $3,750.00 $89.00 $4,450.00 $81.00 $4,050.00 $100.00 $5,000.00 $85.00 $4,250.00 Pavt Repr, Nonreinf Conc, 11 inch, Modified SYD 50 $82.00 $4,100.00 $92.00 $4,600.00 $83.00 $4,150.00 $110.00 $5,500.00 $90.00 $4,500.00 Pavt Repr, Nonreinf Conc, 12 inch, Modified SYD 50 $86.00 $4,300.00 $95.00 $4,750.00 $85.00 $4,250.00 $125.00 $6,250.00 $95.00 $4,750.00 Lane Tie, Epoxy Coated, Modified EACH 4250 $28.00 $119,000.00 $12.00 $51,000.00 $3.00 $12,750.00 $6.00 $25,500.00 $4.00 $17,000.00 Subgrade Undercutting, Type II CYD 100 $38.00 $3,800.00 $60.00 $6,000.00 $35.00 $3,500.00 $10.00 $1,000.00 $29.00 $2,900.00 Curb, Rem LFT 0 $0.00 $0.00 $25.00 $0.00 $15.00 $0.00 $10.00 $0.00 $60.00 $0.00 Curb and Gutter, Rem LFT 500 $10.00 $5,000.00 $25.00 $12,500.00 $15.00 $7,500.00 $10.00 $5,000.00 $20.00 $10,000.00 Curb, Conc, Det E4, Modified LFT 50 $29.00 $1,450.00 $35.00 $1,750.00 $40.00 $2,000.00 $30.00 $1,500.00 $40.00 $2,000.00 Curb and Gutter, Conc, Det C5, Modified LFT 450 $30.00 $13,500.00 $40.00 $18,000.00 $40.00 $18,000.00 $30.00 $13,500.00 $25.00 $11,250.00 Sidewalk, Rem SYD 1000 $14.00 $14,000.00 $15.00 $15,000.00 $18.00 $18,000.00 $18.00 $18,000.00 $9.00 $9,000.00 Sidewalk, Conc, 4 inch SFT 6000 $7.50 $45,000.00 $8.50 $51,000.00 $10.00 $60,000.00 $7.00 $42,000.00 $9.00 $54,000.00 Sidewalk, Conc, 6 inch SFT 500 $8.50 $4,250.00 $9.50 $4,750.00 $12.00 $6,000.00 $9.00 $4,500.00 $10.00 $5,000.00 Sidewalk Ramp, ADA, 4 inch SFT 2000 $9.50 $19,000.00 $8.50 $17,000.00 $16.00 $32,000.00 $10.00 $20,000.00 $11.00 $22,000.00 Sidewalk Ramp, ADA, 6 inch SFT 500 $10.50 $5,250.00 $10.50 $5,250.00 $18.00 $9,000.00 $12.00 $6,000.00 $12.00 $6,000.00 Detectable Warning Surface LFT 200 $70.00 $14,000.00 $60.00 $12,000.00 $70.00 $14,000.00 $50.00 $10,000.00 $150.00 $30,000.00 Dr Structure Cover, Adj, Case 1, Modified EACH 40 $600.00 $24,000.00 $550.00 $22,000.00 $600.00 $24,000.00 $250.00 $10,000.00 $500.00 $20,000.00 Dr Structure Cover, Modified EACH 5 $600.00 $3,000.00 $650.00 $3,250.00 $650.00 $3,250.00 $800.00 $4,000.00 $700.00 $3,500.00 Dr Structure, Adj, Add Depth, Case 1, Modified VFT 5 $600.00 $3,000.00 $250.00 $1,250.00 $600.00 $3,000.00 $250.00 $1,250.00 $180.00 $900.00 Water Shutoff, Adj, Case 1, Modified EACH 2 $400.00 $800.00 $750.00 $1,500.00 $500.00 $1,000.00 $300.00 $600.00 $300.00 $600.00 Dr Structure Cover, Adj, Case 1, Modified, Utility EACH 5 $600.00 $3,000.00 $950.00 $4,750.00 $650.00 $3,250.00 $300.00 $1,500.00 $700.00 $3,500.00 Dr Structure, 24 Inch Dia EACH 2 $1,800.00 $3,600.00 $2,650.00 $5,300.00 $1,900.00 $3,800.00 $2,500.00 $5,000.00 $3,500.00 $7,000.00 Dr Structure, 48 Inch Dia EACH 2 $2,500.00 $5,000.00 $3,250.00 $6,500.00 $2,600.00 $5,200.00 $5,000.00 $10,000.00 $4,000.00 $8,000.00 Dr Structure, 60 Inch Dia EACH 0 $0.00 $0.00 $4,800.00 $0.00 $3,500.00 $0.00 $7,500.00 $0.00 $6,000.00 $0.00 Dr Structure, 72 Inch Dia EACH 0 $0.00 $0.00 $8,500.00 $0.00 $5,000.00 $0.00 $10,000.00 $0.00 $7,000.00 $0.00 Dr Structure, Adj, Add Depth of 24 Inch Dia, 8 Foot to 15 Foot VFT 1 $150.00 $150.00 $250.00 $250.00 $700.00 $700.00 $350.00 $350.00 $200.00 $200.00 Dr Structure, Adj, Add Depth of 48 Inch Dia, 8 Foot to 15 Foot VFT 1 $200.00 $200.00 $350.00 $350.00 $750.00 $750.00 $500.00 $500.00 $200.00 $200.00 Dr Structure, Adj, Add Depth of 60 Inch Dia, 8 Foot to 15 Foot VFT 0 $0.00 $0.00 $550.00 $0.00 $850.00 $0.00 $650.00 $0.00 $1,000.00 $0.00 Dr Structure, Adj, Add Depth of 72 Inch Dia, 8 Foot to 15 Foot VFT 0 $0.00 $0.00 $650.00 $0.00 $900.00 $0.00 $800.00 $0.00 $1,500.00 $0.00 Dr Structure, Rem EACH 4 $600.00 $2,400.00 $1,100.00 $4,400.00 $800.00 $3,200.00 $2,500.00 $10,000.00 $900.00 $3,600.00 12” Storm Drain Pipe LFT 35 $90.00 $3,150.00 $115.00 $4,025.00 $85.00 $2,975.00 $125.00 $4,375.00 $180.00 $6,300.00 Dr Structure Cleaning, Modified EACH 5 $300.00 $1,500.00 $350.00 $1,750.00 $500.00 $2,500.00 $1,000.00 $5,000.00 $900.00 $4,500.00 Dr Structure Lead, Cleaning, Modified LFT 5 $45.00 $225.00 $15.00 $75.00 $600.00 $3,000.00 $1,000.00 $5,000.00 $150.00 $750.00 Topsoil Surface, Furn, 4 inch, Modified SYD 2000 $9.00 $18,000.00 $15.00 $30,000.00 $9.00 $18,000.00 $5.00 $10,000.00 $8.00 $16,000.00 Topsoil Surface, Furn, 6 inch, Modified SYD 50 $10.00 $500.00 $18.00 $900.00 $11.00 $550.00 $7.00 $350.00 $9.00 $450.00 ADA Ramp Restoration SYD 50 $15.00 $750.00 $20.00 $1,000.00 $12.00 $600.00 $75.00 $3,750.00 $10.00 $500.00 Pavt Repr, 2.5 Foot, Re, Special SYD 50 $45.00 $2,250.00 $28.00 $1,400.00 $15.00 $750.00 $100.00 $5,000.00 $120.00 $6,000.00 Pavt Repr, 2.5 Foot, Nonreinf, 8 Inch, Special SYD 50 $80.00 $4,000.00 $75.00 $3,750.00 $85.00 $4,250.00 $100.00 $5,000.00 $140.00 $7,000.00 Joint Tied 2.5 Foot Special LFT 25 $20.00 $500.00 $24.00 $600.00 $12.00 $300.00 $50.00 $1,250.00 $50.00 $1,250.00 $1,173,875.00 $1,239,600.00 $1,136,525.00 $1,197,225.00 $1,079,275.00 (1) Audia Cement Construction, Inc. $1,079,275.00 (2) G.V. Cement $1,136,525.00 (3) Al's Asphalt Paving Company (Local Vendor 3%) $1,138,658.75 (4) Hartwell Cement Company $1,197,225.00 (5) Great Lakes Contracting $1,239,600.00 135 Budget & Finance Dept. Invitation for Bid Purchasing Manager: RM 23555 Goddard Road City of Taylor Taylor, MI 48180 734-643-9518 Bid Number: Bid Title: IFB-DG-2023-05-25-001 Concrete Panel Replacement Contract 2023 Date Issued: Project Manager: May 25th, 2023 Chris Gibbs Deadline for Questions: Telephone: Email: cgibbs@ci.taylor.mi.us June 2nd, 2023 @ 10:00AM 734-308-0096 Bid Submission Date and Time: Purchasing Agent: June 10th, 2023 @ 11:00AM dgrabowski@ci.taylor.mi.us Bid Opening Date and Time: Telephone: Email: June 10th, 2023 @ 11:00AM 734-643-9518 dgrabowski@ci.taylor.mi.us You are invited to participate in this Invitation for Bid. Please submit your bid response in conformance with the instructions specified herein. By submitting a bid response, the bidder agrees and promises to sell, furnish, and deliver to the City all commodities and services contained in this Invitation for Bid for which a contract is awarded by the City. The bidder shall fully perform the contract in accordance with the all specifications, terms and conditions, and requirements contained in the Invitation for Bid and shall comply with all applicable provisions of the City of Taylor, Purchasing Policies, made a part of the Invitation for Bid and contract by reference. Written acceptance of the bidder's bid response by the City, by issuance of a purchase order or contract, constitutes a binding contract made and entered into by and between the City of Taylor, acting through the Purchasing Department named above, and the bidder named below: Bidder Company Name: Street Address: P.O. Box: City: State: Zip Code: Toll Free Telephone: Telephone: Fax: Federal I.D. or Social Security No.: E-Mail: Type or Print Name of Person Signing: Title: Authorized Signature: Acceptance (For City Use Only) Bid response accepted and contract awarded. By____________________________________________Title_________________________________ Signature ______________________________________Date ________________________________ 1 136 Mailing Instructions Mail a completed and signed Invitation for Bid response in a sealed envelope to the address listed below. Bid responses received after the date and time specified on the cover sheet of this Invitation for Bid will be rejected. Address the envelope containing your response in the following manner: BID NUMBER - BID OPENING DATE - CITY OF TAYLOR CITY CLERK’S OFFICE 23555 GODDARD ROAD TAYLOR, MI 48180 Bidder Checklist. Have you remembered to 1. Review all instructions, terms, conditions, and specifications to ensure your bid response complies? 2. Prepare your price: products to be used and services to be rendered? 3. Indicate whether you can meet the delivery date indicated on the cover sheet? 4. Complete the “Cover Sheet”, sign and submit with bid package? 5. Complete the “Service Representative” section and submit with bid package? 6. Sign the “Accepts to comply with Insurance Requirements” document, submit with bid package? 7. Complete the “Project Specification” page, sign and submit three (3) copies with bid package? 8. Mark the envelope as indicated above? Bidder’s Instructions 1. Addition of Terms and Conditions. Additional terms and conditions submitted with a bid response are of no effect unless accepted in writing by the Purchasing Department. Bids with any additional terms and conditions may be rejected as non-responsive. 2. Assistance to Bidders with a Disability. Bidders with a disability that need an accommodation must contact the Purchasing Agent prior to the deadline for receipt of bids so that reasonable accommodation can be made. 3. Bid Held Firm. Bids are not awarded at the bid opening. Bid responses will be firm for 30 days, unless otherwise specified by the Purchasing Agent in writing. 4. Bid Opening. All bids received by the time and date of the bid opening will be publicly opened by the City Clerk’s Office, with the attendance of the Purchasing Agent at the location indicated on the cover sheet of this solicitation. Interested parties are invited to attend the bid opening. 5. Bid Results. Bidders desiring a copy of the bid results are instructed to include a self-addressed, stamped, envelope with their bid response. Bid results will be mailed when an award decision is made. Bidders may also obtain bid results or arrange to review the bid file by contacting the Purchasing Department. 6. Corrections. The bidder’s authorized representative must initial any corrections and alterations (i.e. erasures, whiteouts, correction tape, etc.) made to the bid response. Those bid responses with corrections and alterations that are not initialed are subject to confirmation by the Purchasing Agent. 2 137 7. Definitions:  Bidder Any person or firm submitting a competitive bid in response to a solicitation.  Bid Results A summary of all bid responses received and the award results  Bid Response The executed document submitted by a bidder in response to a solicitation.  Contractor Any person or firm having a contract with a governmental body.  Solicitation The process of notifying prospective bidders that the City wishes to receive bids for furnishing goods and services. 8. Facsimile Bids. Bid responses faxed to the City will be rejected. Bids may be faxed to a third party who will put it in a properly-addressed envelope and deliver it to the Purchasing Department before the date and time specified in the solicitation. 9. Late Bids. It is the bidder’s responsibility to ensure that a bid response is physically deposited with the City Clerk’s Office prior to the date and time specified for the opening. Late bid responses will not be opened and will be rejected regardless of the degree of lateness or the reason. 10. Multiple Bids. Bidders may submit more than one bid in response to this solicitation. Each bid submitted must comply in all aspects with the bid requirements and these instructions. 11. New Equipment and Materials. Unless otherwise indicated in the detailed specifications of this solicitation, all equipment and materials shall be new and under current production for use in the United States. 12. Packaging. All commodities and equipment are to be delivered and packaged strongly and securely according to accepted commercial practices. 13. Prices, Currency. All prices must be in United States currency, (USD). 14. Pricing (Unit and Total Prices). The unit price is to be according to the unit of measurement specified in the solicitation. In the event of mathematical differences between the unit price and extended total, the unit price will prevail. 15. Protests. An interested party may protest the solicitation within seven days before the bid opening or protest the Notice of Intent to Award within seven (7) days after receiving notice. Notice of award will be issued only to those bidders who submitted responses to this IFB seven calendar days after award or issuance of the Notice of Intent to Award. It will be assumed that all interested parties knew or should have known all the facts surrounding the award. 16. Questions and Clarifications. All questions and requests for clarification regarding this solicitation must be addressed to the Purchasing Agent referenced on the cover sheet of this document. The requirements of this solicitation can only be altered by written amendment of the solicitation. Verbal communications from whatever source are of no effect. Questions must be received by the deadline specified on the cover sheet to allow the Purchasing Agent to issue any needed amendments in sufficient time before the bid opening date. 17. Review of the Bids. After the bid opening, bids become subject to the State of Michigan public records laws. Interested parties may request public information and make arrangements to review the bid file by contacting the City Clerk’s Office during normal working hours, between 9:00 a.m. and 5:00 pm., Monday through Friday, excluding holidays. 18. Rejection. The City reserves the right to reject any and all bids in whole or in part. Bid responses will be rejected if:  The bid response is not legible.  The bid response is not completed as requested.  The bid response is faxed to the City.  The bid response is not responsive to the specifications or other requirements of the solicitation.  The bid response is received after the time and date specified.  The bidder was required to be registered as an approved vendor by the deadline for receipt of bids, and failed to do so. 3 138  The bidder is determined to be not responsible, in accordance with Section 3 of the City of Taylor, Purchasing Policy. 19. Signature. The bidder submitting the bid response or that bidder’s duly authorized agent or representative must sign the bid response manually in ink. The name and title of the person signing the bid response must be typed or printed below the signature. 20. Specifications, Brand Name or Equivalent. Unless otherwise indicated in the detailed specifications of this solicitation, the use of a specific brand name or make/model is for illustrative purposes only, and the City will consider equivalent products. If a commodity or service put forth by a bidder is rejected as not being equivalent, the Purchasing Agent will notify the bidder of the rejection. 21. Specifications, Compliance. All bids submitted in response to this Invitation for Bid must comply with the specifications contained herein, and the successful bidder will be held responsible. Noncompliance with specifications is grounds for rejection of the bid response. Bidders who desire to submit commodities or services that deviate from these specifications or have any objections to the specifications stated herein must contact the Purchasing Agent in writing as soon as possible, so the Purchasing Agent can determine whether the specifications need to be amended. 22. Taxes. The City does not pay sales tax or federal excise tax. The federal tax-free transaction number and City sales tax exemption number is 38-6006926. The Purchasing Department will furnish a tax exempt certificate upon request. 23. Withdrawal or changes to a bid response prior to the bid opening date and time. Before the bid opening date and time, the bidder’s authorized representative may withdraw or change a bid response by making a written request to the Purchasing Agent. 24. Withdrawals after the bid opening date and time. After the opening, no changes may be made to the bid response. The bidder may make a written request to withdraw the bid response, subject to approval by the Purchasing Department. Bidders repeatedly withdrawing bids after the opening date may be removed from the City bidders list. GENERAL CONTRACT TERMS AND CONDITIONS 1. Affirmative Action. The contractor will take affirmative action in complying with all Federal and State requirements concerning fair employment and employment of the handicapped, and concerning the treatment of all employees without regard to race, color, religion, sex, national origin or physical handicap. 2. Applicable Law and Venue. This contract is governed by and construed in accordance with the laws of the State of Michigan. Any action to enforce this contract must be brought in the District Court of Wayne County, Michigan. 3. Assignments and Subcontracts. The contractor may not assign or otherwise transfer or delegate any right or duty without the City’s express written consent. The contractor may enter into subcontracts provided that the City has provided written consent and any such subcontractor acknowledges the binding nature of this contract and incorporates this contract, including any attachments. The contractor is solely responsible for the performance of any subcontractor. The contractor shall not have the authority to contract for or incur obligations on behalf of the City. If the City refuses to approve a subcontractor, the original contract holder shall be responsible for any damages financial or otherwise for not fulfilling the contract obligations. 4. Binding Contract. The acceptance of a bid response in writing by the Purchasing Department or Entity constitutes a contract between the bidder and the City. Written acceptance from the Purchasing Department or Entity will be in the form of a purchase order, notification of award, or contract. Any oral agreement or arrangement by a bidder with a City employee or Purchasing Department or Entity will have no force or effect unless reduced to writing. 4 139 5. Compliance with Laws. The contractor must, in performance of work under this contract, fully comply with all applicable federal, state, or local laws, rules and regulations, including Title VI of the Civil Rights Act of 1964. Any subletting or subcontracting by the contractor subjects subcontractors to the same provision. 6. Compliance With Public Records Law. The contractor understands that, except for disclosures prohibited under state open records laws related to confidentiality, in MCL §Act 442 of 1976 et seq., the City must disclose to the public upon request any records it receives from contractor. The contractor further understands that any records which are obtained or generated by the contractor under this contract, except for records that are confidential under in MCL §Act 442 of 1976 et seq., may, under certain circumstances, be open to the public upon request under the Taylor open records law. The contractor agrees to contact the City immediately upon receiving a request for information under the open records law and to comply with the City’s instructions on how to respond to the request. Bid responses are exempt records until the time and date of the bid opening. 7. Confidentiality. The contractor agrees not to use or disclose any information it receives from the City under this contract that the City has previously identified as confidential or exempt from mandatory public disclosure except as necessary to carry out the purposes of this contract or as authorized in advance by the City. The City agrees not to disclose any information it receives from the contractor that has previously been identified as confidential and which the City determines in its sole discretion is protected from mandatory public disclosure under a specific exception to the State public records law, in MCL §Act 442 of 1976 et seq.. The duty of the City and the contractor to maintain confidentiality of information under this section continues beyond the term of this contract, or any extensions or renewals of it. 8. Contract Amendment. After a binding contract has been entered into, no changes (i.e. substitution of product or a price adjustment) may be made per City of Taylor Fiscal Year (Contract Year), unless prior written approval has been obtained from the Purchasing Department or Entity. A Mutual Agreement is required per the “Special Terms and Conditions – Contract Period” listed on page seven (7) of this document for any contract year percentage unit cost increases or select unit cost increases applicable to contract. 9. Inspection and investigations. The City reserves the right to conduct inspections and investigations related to the bidder and offered commodities or services, including but not limited to the firm, its facility, personnel, qualifications, and the commodities and/or services offered to make determinations regarding compliance with the bid requirements and responsibility of the bidder. 10. Material and Workmanship. All material and workmanship shall be subject to inspection and testing by the City either at: the point of manufacturer, place of storage, or upon receipt. 11. Payment Terms. Payment will normally be made within thirty days after delivery and acceptance of commodities or services under this contract and receipt of a correct invoice. The city issued purchase order number shall be the primary identification number utilized by the city in the tracking of orders and processing of payments. A vendor’s failure to comply with the following two actions could result in a delay of payment. (1) Vendors are required to visibly place the city issued purchase order number on the invoice, (2) Vendors are required to submit the invoice directly to Central Purchasing. 12. Termination for lack of funding or authority. This contract shall become null and void, in total or in part, should the City Council of the City of Taylor fail to appropriate funds for any or all departments, which are committed to the terms of this contract. Any such contract termination shall be at no cost to the City. 13. Termination of Contract a. Termination without Cause. This contract may be terminated by mutual consent of both parties, or by either party upon 30 days' written notice. b. Termination for Lack of Funding or Authority. The City may terminate this contract effective upon delivery of written notice to the contractor, or on any later date stated in the notice, under any of the following conditions: 5 140 1) If funding from federal, state, county, city, or other sources is not obtained and continued at levels sufficient to allow for purchase of the services or supplies in the indicated quantities or term. The contract may be modified by agreement of the parties in writing to accommodate a reduction in funds. 2) If federal, state or local laws or rules are modified or interpreted in a way that the services are no longer allowable or appropriate for purchase under this contract or are no longer eligible for the funding proposed for payments authorized by this contract. 3) If any license, permit or certificate required by law or rule, or by the terms of this contract, is for any reason denied, revoked, suspended or not renewed. Termination of this contract under this subsection is without prejudice to any obligations or liabilities of either party already accrued prior to termination. c. Termination for Cause. The City by written notice of default to the contractor may terminate the whole or any part of this contract: 1) Fails to begin the work within the time specified in the Contract; 2) Fails to perform the work with sufficient workers and equipment or with sufficient materials to assure the prompt completion of said work; 3) Fails to perform the work in accordance with contract requirements or refuses to remove and replace rejected materials or unacceptable work; 4) Discontinues the work; 5) Fails to resume work which has been discontinued within a reasonable time after notice to do so; 6) Becomes insolvent or is declared bankrupt or commits any act of bankruptcy or insolvency; 7) Allows any final judgment to remain unsatisfied for a period of 10 days; 8) Fails to comply with contract requirements regarding minimum wage payments; 9) Is a party to fraud; or 10) For any other cause whatsoever, fails to carry on the work in an acceptable manner. 11) Bidder subcontracts work without City Authorization d. Termination, Deliveries. If the contract is terminated for any reason, the contractor is responsible for delivery of all commodities and services ordered prior to the termination, unless those orders had been canceled by the Purchasing Department or Entity 6 141 SPECIAL TERMS AND CONDITIONS 1. Approved Bidder Registration. Every person or business entity that desires to bid on contracts for commodities and services must be an approved vendor in order to be placed on the bidders list. Bidders must comply with the vendor registration requirements related to approved bidder registration as set forth in this solicitation: Bidders Must Be Approved By Time Set For Bid Opening. Bids will only be accepted from those companies who have become approved vendors, in accordance with City Charter. Bidders that are not Approved Vendors for the City of Taylor at the time bids or proposals are opened may be rejected. Contact the Purchasing Department at 734.374.1459 to check whether your company is currently an approved vendor on the City’s Approved Vendor list. Bidder registration information and forms are available on the website. Placement on the approved vendor list does not guarantee a bidder will receive notice of every formal solicitation. Bidders must maintain current information by submitting a Notice of Change form to the City Purchasing Office (Fax 734-374-1344). 2. Award. Award will be made to two responsible bidders with the per unit pricing most advantageous to the City and is responsive to the specifications and all other requirements stated herein. The City of Taylor maintains the right to assign projects to each successful bidders based on availability of each contractor and available funding. 3. Bid Selection. The bid winner will be selected following the applicable process under Section 4.8.12, Bid Evaluation of the Purchasing Policy. 4. Pre-Qualification: In Compliance with Section 4.8.7 of the City Purchasing Policy Manual, the requesting department may require the prequalification of vendors for the Formal Bid. The prequalification process may add up to four weeks. 5. Bid Calculation: In the event that the bid is generated based on single unit price, the Bid Bond and Performance Bond will be defined by the Central Purchasing Department based on historical data. 6. Bid Surety, Type Of. Each bid response must include five thousand ($5,000) bid surety, either in the form of:  a certified check  a bank cashier's check  a money order  a corporate surety bond from a surety company authorized to do business in the City of Taylor Each bid response must also include a copy of the original bid bond as well as a self-addressed return envelope. Bid sureties of the non-successful bidders that are in the form of a certified check, bank cashier’s check or a money order will be returned upon determination of award. The bid surety of the successful bidder(s) will be returned upon the receipt of a completed contract bond and its approval by the City. 7. Performance Bond. Prior to the start of any project, the contractor will be required to furnish a performance bond in an amount equal to each individual project or the summation of projects per City of Taylor Fiscal Year (Contract Year) approved by the director of public works or his designee that will guarantee compliance with all terms of the bids and contract. 8. Contract Period. The contract or contracts issued as a result of this solicitation will be for a City of Taylor Fiscal Year (July 1, 2023 – June 30, 2024) inclusive, with the option to extend for additional City of Taylor Fiscal Year or renew the contract for a maximum of three (3) additional fiscal years, upon mutual agreement between both the City of Taylor & Contractor, as set forth in a written amendment to this contract. Any contract renewal/extension may include a mutually agreed percentage increase to all or selected unit costs listed in this contract. The mutual agreement and unit cost increases (if applicable) shall be in writing from the Contractor and approved by the City of Taylor Administration/City Council. 9. F.O.B. Point and Freight. Delivery and passage of title under this contract shall be as follows. Delivery will be F.O.B. Destination to the location specified on the cover page of the solicitation. The 7 142 freight is to be included in the price of the products. Title will pass to Purchasing Department or entity upon delivery to the specified destination. 10. Descriptive Literature. The bidder’s response must include descriptive literature or detailed manufacturer’s specifications for the specific equipment or commodities being offered. Bidders are instructed to clearly mark the literature information that demonstrates compliance with the specification. 11. Indemnification and Insurance Requirements. Bidders must review the attached Risk Management Appendix for indemnification and insurance requirements. The indemnification and insurance provisions are incorporated and made part of this solicitation and the resultant final contract. Objections to any of the provisions of the indemnification and insurance requirements must be made in writing to the attention of the Purchasing Agent by the time and date set for receipt of questions. No alteration of these provisions will be permitted without prior written approval from the Purchasing Department in consultation with the Taylor Risk Management Director. Upon receipt of the Notice of Award, the successful bidder must obtain the required insurance coverage and provide the Purchasing Agent with proof of coverage prior to contract approval. The coverage must be satisfactory to the Purchasing Department, in consultation with the Taylor Risk Management Director. A bidder’s failure to provide evidence of insurance coverage is a material breach and grounds for withdrawal of the award or termination of the contract. Please see ( http://www.cityoftaylor.com/rfp ) 12. Pricing. Pricing under this contract shall be as follows: Firm Fixed. The total bid price is to include all discounts and deductions, and is to be less federal and City taxes, for which exemption certificates will be furnished upon request. Pricing shall be firm for the period of the contract. If an extension of the contract occurs, prices may be adjusted to reflect the additional cost the vendor has incurred only if the vendor provides documentation to prove they have incurred additional costs. 13. Purchasing Cards. The Purchasing Department may place orders by issuance of a purchase order or may elect to place an order and make payment using a purchasing card. The contractor will accept a purchasing card without passing the processing fees for the purchase card back to the Purchasing Department or Entity. 14. Record of Sales. The contractor must maintain records of sales under the contract and furnish volume of sales information to the Purchasing Department within thirty (30) days upon written request of the Purchasing Department. 15. Reference Materials. The contractor will be required to furnish and distribute catalogs and price lists to all using entities. 16. Servicing of the contract. The contractor will be required to furnish not less than two (2) copies of catalogs, replacement data books, and price lists to using department. Also, the contractor will be required to provide qualified sales personnel to periodically visit using entities to provide assistance and guidance connected with contract item usage. 17. Service Representative. The contractor must provide a dedicated service representative to provide support for this contract. The contractor shall provide the name and contact information for the service provider. During the contract period, the contractor shall notify the Purchasing Agent in the event the contractor’s service representative changes. Name Of Service Representative: Address Of Service Rep: City & City & Zip Code Phone Number: Toll Free Number: Fax Number: E-Mail Address: 8 143 CONCRETE PAVEMENT REPAIR PROPOSAL The undersigned have made themselves familiar with the conditions under which it is to be constructed by examination of the details and specifications, all of which are understood and accepted as being sufficient for the purpose. The undersigned proposes to furnish of all labor, material, and equipment as specified and will accept in payment thereof the following unit rates, and the payments will be based on unit prices given in the proposal and quantities measured. If this proposal is accepted, the undersigned further agrees to perform the work according to a mutually agreed upon construction sequence and schedule to be determined at a Pre-Construction meeting held after all contracts and bonds have been submitted, and to complete all work, unless shortage of material or other causes beyond the Contractor’s control prohibit from doing so. Are wages paid to employees prevailing wages or higher? Yes______ No ______ BID ITEMS AND UNIT RATES Provide unit rates in words and numerals. Complete signature and information on Page 11. Description Unit of Estimated Unit Price ($) Unit Price (Written) Measure Quantity Pavt Repr, Rem, Modified SYD 10000 Pavt Repr, Nonreinf Conc, 7 inch, with SYD 50 Integral Curb, Modified Pavt Repr, Nonreinf Conc, 8 inch, with SYD 8250 Integral Curb, Modified Pavt Repr, Nonreinf Conc, 9 inch, with SYD 500 Integral Curb, Modified Pavt Repr, Nonreinf Conc, 7 inch, SYD 50 Modified Pavt Repr, Nonreinf Conc, 8 inch, SYD 500 Modified Pavt Repr, Nonreinf Conc, 9 inch, SYD 500 Modified Pavt Repr, Nonreinf Conc, 10 inch, SYD 50 Modified Pavt Repr, Nonreinf Conc, 11 inch, SYD 50 Modified Pavt Repr, Nonreinf Conc, 12 inch, SYD 50 Modified Lane Tie, Epoxy Coated, Modified EACH 4250 Subgrade Undercutting, Type II CYD 100 Curb, Rem LFT 0 Curb and Gutter, Rem LFT 500 Curb, Conc, Det E4, Modified LFT 50 9 144 Curb and Gutter, Conc, Det C5, LFT 450 Modified Sidewalk, Rem SYD 1000 Sidewalk, Conc, 4 inch SFT 6000 Sidewalk, Conc, 6 inch SFT 500 Sidewalk Ramp, ADA, 4 inch SFT 2000 Sidewalk Ramp, ADA, 6 inch SFT 500 Detectable Warning Surface LFT 200 Dr Structure Cover, Adj, Case 1, EACH 40 Modified Dr Structure Cover, Modified EACH 5 Dr Structure, Adj, Add Depth, Case 1, VFT 5 Modified Water Shutoff, Adj, Case 1, Modified EACH 2 Dr Structure Cover, Adj, Case 1, EACH 5 Modified, Utility Dr Structure, 24 Inch Dia EACH 2 Dr Structure, 48 Inch Dia EACH 2 Dr Structure, 60 Inch Dia EACH 0 Dr Structure, 72 Inch Dia EACH 0 Dr Structure, Adj, Add Depth of 24 VFT 1 Inch Dia, 8 Foot to 15 Foot Dr Structure, Adj, Add Depth of 48 VFT 1 Inch Dia, 8 Foot to 15 Foot Dr Structure, Adj, Add Depth of 60 VFT 0 Inch Dia, 8 Foot to 15 Foot Dr Structure, Adj, Add Depth of 72 VFT 0 Inch Dia, 8 Foot to 15 Foot Dr Structure, Rem EACH 4 12” Storm Drain Pipe LFT 35 Dr Structure Cleaning, Modified EACH 5 Dr Structure Lead, Cleaning, Modified LFT 5 Topsoil Surface, Furn, 4 inch, Modified SYD 2000 Topsoil Surface, Furn, 6 inch, Modified SYD 50 ADA Ramp Restoration SYD 50 Pavt Repr, 2.5 Foot, Re, Special SYD 50 Pavt Repr, 2.5 Foot, Nonreinf, 8 Inch, SYD 50 Special Joint Tied 2.5 Foot Special LFT 25 10 145 SIGNED: __________________________________________________________ BY: __________________________________________________________ (Printed Name and Title) COMPANY: _________________________________________________________ 11 146 CONCRETE STREET REPAIR GENERAL CONSTRUCTION PROCEDURES AND SCHEDULE GENERAL The work shall consist of, but not be limited to: (1) removing existing concrete street pavement in sections or partial and full width sections of various lengths and locations; (2) repairing miscellaneous areas of concrete pavement deterioration and restoration of utility repair areas; (3) preparing the subbase and replacing the concrete pavement; (4) adjusting and/or reconstructing drainage and other public utility structures; (5) sidewalk removal and replacement, including ADA crosswalks; (6) traffic control, restoration and clean-up; and, (7) storm structure and pipe cleaning. These Specifications also cover the repair of existing deteriorated concrete pavements, and the restoration of utility repair areas, including; the removal of temporary patching materials, replacement of existing concrete pavement, the repair and conditioning of the aggregate base, adjusting utility structures, concrete sidewalk, ADA ramp, and the restoration of concrete driveways and approaches. This work shall be performed and paid for in accordance with the Special Provisions provided in these Specifications. The locations of the repair and restoration work will assembled by the City of Taylor and presented to the Contractor. There may be repair or restoration locations considered “urgent” which may be assigned to the Contractor for immediate attention at any time during this Contract while the Contractor is performing work on this Contract.. PRECONSTRUCTION MEETING A meeting will be held in the City of Taylor Department of Public Services, 25605 Northline Road, following submittal of contract, bonds and insurance, between the Engineer and his representatives, and the successful bidder, and his subcontractors. The purpose of this meeting will be to review the specifications and work areas and to prepare a mutually agreeable construction schedule which will adhere to the time frames set forth herein. CONSTRUCTION TIME FRAMES The length of time from the first construction activity on a particular street to the final clean-up shall be no longer than thirty (30) calendar days. No construction debris shall be stored on the streets longer than two (2) days unless otherwise noted below or approved by the Engineer. Clean-up and disposal of concrete debris and spillage in the street or right-of-way shall be completed the same day as deposited. Miscellaneous concrete overspill behind the curb shall be removed, and any honeycombing or voids at back of curbs shall be parged smooth within seven (7) days of concrete placement. Service walks, sidewalks, ADA sidewalks and other concrete work shall be started and prosecuted regularly and uninterruptedly until that particular street is complete. Five (5) days after completion of finished concrete flat work on a particular street, the affected areas shall be backfilled and compacted, seeded, and clean up completed. Construction barricades, barrels, signage and notifications shall be removed from the work areas within two (2) days of the completion of backfill and restoration operations. 12 147 Storm sewer catch basins, manholes and pipe shall be cleaned after all restoration is complete. NOTIFICATION The Contractor shall provide notification to residents of pending concrete street, residential approach, and ADA sidewalk reconstruction activities a minimum of 48 hours in advance of such work. The notice, at a minimum, shall advise residents of the date work activity will start, the anticipated length of time the area will be worked on, notification of temporary loss of curbside or driveway access to property, and request that street be cleared of parked vehicles. Should construction activities cease, either due to weather or scheduling, for an anticipated time of five (5) days or more, any and all posted signage shall be removed. Once the work begins again, the Contractor shall re- notify as previously set forth. 13 148 SPECIAL PROVISIONS FOR TRAFFIC MAINTENANCE AND CONTROL GENERAL All traffic control devices as required for this project shall conform to the design, material, color, and fabrication requirements as specified on the plans or in the current edition of the Michigan Manual of Uniform Traffic Control Devices and the Michigan Department of Transportation 2012 Standard Specifications for Construction, Section 812. The contractor shall furnish, erect, maintain and remove upon completion of the work, all traffic control devices and barricade lights within the project and around the perimeter of the project for the safety of pedestrian and vehicular traffic. This includes, but is not limited to, advance, regulatory, and warning signs, barricades and channeling devices at intersecting streets on which traffic is to be maintained, barricades at the ends of the project and at right-of-way lines for intersecting streets which are to be partially closed or closed to traffic, along with barricades, signs, and lights at the intersection of these streets to be partially closed or closed with the first usable street on each side of the project. Traffic regulators, where required, are included. Barricades shall effectively bar vehicular traffic from driving onto the work site, barricades shall be used and maintained in good repair at all times during progress of the work and shall be opened only for construction purposes and public emergency. Barricades for all parts of the work shall be erected and maintained by the Contractor so as to prevent personal and property damages of all description. Any damages from traffic or other causes occurring previous to the official acceptance of the work shall be repaired by the contractor. The Contractor shall be responsible for the posting/signing of work areas to alert residents of up-coming work at a minimum of 48 hours in advance of the start of the work. The property owners, business customers and emergency vehicles shall be assured of access to all properties. At no time shall any street be closed down to local traffic (temporary or permanent) without prior approval from the City of Taylor. Moving of parked vehicles which interfere with the prosecution of work will be the responsibility of the Contractor. The City of Taylor may perform maintenance work within or adjacent to the streets being repaired. These maintenance crews will coordinate their operations with the designated City Representative to minimize the interference to the Contractor. No additional payment will be made to the Contractor for the joint use of the traffic control items. Provisions for the protection of pedestrians shall be maintained at all times. Walks, driveways and entrances to buildings shall not be unnecessarily blocked. Vehicular access shall be maintained to all commercial properties designated by the Engineer. Side streets shall not be closed to through traffic except as approved by the Engineer. Interference with traffic at all cross-streets must be held to a minimum during the time required for construction. MEASUREMENT AND PAYMENT “Traffic Maintenance and Control”, including all labor, traffic control devices, material and equipment required to provide construction traffic control per these Specifications will not be paid for separately, but shall be included in the unit rates of other work items. 14 149 SPECIAL PROVISIONS FOR EROSION AND SEDIMENTATION CONTROL GENERAL This Special Provision covers the protection of storm drainage structures and systems from the effects of erosion and sedimentation from construction activities entering into the system during the course of the work. MATERIAL Materials shall be as specified in Section 208.02 Materials of the 2012 MDOT Standard Specifications for Construction. CONSTRUCTION Erosion and sedimentation control shall be in accordance with Section 208.03.C.08 of the 2012 MDOT Standard Specifications for Construction, and as follows. Prior to starting work on a particular street or block, all drainage structure covers on that street or block, or those that the street being worked on drains to, shall be wrapped with a geotextile filter fabric. The fabric shall allow water to flow through, but shall prevent the passage of silts, dirt, clay stone and other construction debris. The fabric shall be wrapped over the top of the cover and extended under, such that when the cover is placed back in the frame, the fabric is around the entire perimeter between the frame and cover. During final clean-up of the area, the fabric shall be carefully removed, preventing any captured debris from falling into the drainage structure. The fabric shall be inspected daily and repaired immediately to insure the complete and consistent effectiveness of the erosion and sedimentation control. MEASUREMENT AND PAYMENT Payment for soil erosion and sedimentation control work will not be paid for separately but shall be included in other work item unit rates. 15 150 SPECIAL PROVISION FOR CONCRETE PAVEMENT REPAIR GENERAL This work shall be in accordance with the MDOT 2012 Standard Specifications for Construction Section 601. Portland Cement Concrete for Pavements, Section 602. Concrete Pavement Construction, Section 603. Concrete Pavement Restoration, MDOT Standard Plans R-39-K, R-41-H and R-44-F, and as set forth herein. The work shall consist of saw cutting as necessary for removal of existing concrete pavement, preparation of sub base, placing horizontal dowels, placing concrete, joints, finishing, curing and sealing. Sections of concrete pavement repair, with or without integral curb, may range from four (4) foot wide, partial or full street width, to sections over one hundred (100) feet long, partial or full street width. Where multi-lane patches are required, they shall be constructed on a lane-at-a-time basis so that traffic may be maintained. If directed by the Engineer, a “2.5 Foot Full Depth Concrete Centerline Repair” shall be constructed in accordance with the attached Special Provision 12RC603-A370-03 2.5 Foot Full Depth Concrete Centerline Repair. NOTIFICATION The contractor shall be responsible for notification of residents occupying dwellings and businesses along the line of the work. Forty eight (48) hours prior to the start of work, the Contractor shall give notice to each dwelling, business or address, in writing, of the work to be performed. This notification shall consist of; name of project; anticipated start date; estimated duration including final cleanup and restoration; brief explanation of work to be performed; explanation of and request for cooperation with respect to traffic flow and parking; company name, address, contact person and phone number; and thank you for cooperation. The Contractor shall also post the street in front of each dwelling or address where construction will take place the day prior to the start of such work. The notification shall: advise of impending work the following day; request to clear the street; notify of loss of access for period of time. CONCRETE Mix, mixing and delivery shall be in accordance with the 2012 MDOT Standard Specification Section 601 Portland Cement Concrete for Pavements. Material and construction methods shall conform to these requirements unless otherwise noted herein. Concrete Grade shall be MDOT P1, with a slump of four (4) inches, and having an entrained air content of not less than five and one half (5½) percent nor more than eight (8) percent. CONSTRUCTION When removing existing concrete pavement, the pavement shall be removed to an existing joint, or saw cut to a true line with a vertical face along the lines as marked or directed by the Engineer. The pavement shall be saw cut full depth into existing concrete, or as directed by the Engineer. Intermediate saw cuts shall be made as required by Section 603, referenced above. The removal shall be such that there will be no disturbance and/or damage to sections of pavement which are to remain in place. All damaged or undermined pavement caused by the Contractors operations shall be removed and replaced at the Contractor's expense. The use of a crane and ball type breaking equipment will not be allowed. Pavement removal shall be accomplished with a rubber-tired hydraulic ram or as specified in Section 603 of the MDOT Standard Specifications. 16 151 Where subgrade corrections are required due to undesirable or unstable soil conditions as determined by the Engineer, the removal of material and placement of fill shall be performed in accordance with MDOT Section 205, and paid for as Subgrade Undercutting, Type II. All replacement concrete pavement shall be doweled or anchored to the existing concrete pavement as set forth on MDOT Standard Plans R-39-K and R-44-F, except as modified herein. All longitudinal and transverse anchors shall be epoxy coated #5 deformed bars, 1’ – 6” long, spaced at 30” on center, grouted into 1” diameter holes. Manholes, inlets and other structures shall be set to grade and alignment prior to or during placement of concrete. All structures shall be cleaned thoroughly to permit adhesion of the concrete. All utility structures within the area to be paved shall have a filter fabric installed over and completely around the cover. All expansion, transverse and longitudinal joints shall be restored. Transverse joints within partial width cuts shall be restored to match the joint in adjacent lanes. Transverse joints in full street width repair sections shall be spaced a minimum of fifteen (15) feet on center. Longitudinal and transverse joints abutting and within the pavement repair sections shall be sealed by saw cutting and filling with hot poured rubber asphalt per MDOT Specification Section 602.03.S. and Section 603.03.D. Integral curb shall be constructed monolithic with the pavement slab. The curb material shall be placed before the pavement has started its initial set, and shall be of the same mix and shall conform in all respects to the requirements for concrete in the pavement. Unless otherwise approved by the Engineer, forms will be required when constructing integral curb. The curb concrete shall be vibrated sufficiently to eliminate all voids, and tamped to bring the mortar to the surface. The face and top of the curb shall be finished smooth and true to line, grade and cross section. No more troweling than necessary to obtain the desired result shall be done. Any visible areas of honeycomb or minor defects occurring on the back of the integral curb after forms are removed shall be filled with mortar, composed of one part Portland cement and two parts of fine aggregate from the same source as used in the pavement, applied with a wooden float. Immediate steps shall be taken by the Contractor to correct the conditions contributing to these defects. Curing shall comply with the 2012 MDOT Standard Specification 602.03.M. 17 152 MEASUREMENT AND PAYMENT All material, labor and equipment required for constructing concrete pavement repair as specified herein and marked by the Engineer shall be paid for under the unit rates bid for as follows: Pavt Repr, Rem, Modified, shall include all labor, equipment and material to perform the concrete pavement removal work, including all saw cutting and intermediate saw cuts. Pavt Repr, Nonreinf Conc, __ inch, with Integral Curb, Modified, shall include all labor, material and equipment to place the concrete pavement repair areas including integral curb, all joints, concrete material, finishing, curing and joint sealing. Pavt Repr, Nonreinf Conc, __ inch, Modified, shall include all labor, material and equipment to place the concrete pavement repair areas including all joints, concrete material, finishing, curing and joint sealing. Lane Tie, Epoxy Coated, Modified, shall include all labor, material and equipment to install longitudinal and transverse anchors. Pay Item Pay Unit Pavt Repr, Rem, Modified Square Yard Pavt Repr, Nonreinf Conc, 7 inch, with Integral Curb, Modified Square Yard Pavt Repr, Nonreinf Conc, 8 inch, with Integral Curb, Modified Square Yard Pavt Repr, Nonreinf Conc, 9 inch, with Integral Curb, Modified Square Yard Pavt Repr, Nonreinf Conc, 7 inch, Modified Square Yard Pavt Repr, Nonreinf Conc, 8 inch, Modified Square Yard Pavt Repr, Nonreinf Conc, 9,10,11,12 inch, Modified Square Yard Lane Tie, Epoxy Coated, Modified Each Subgrade Undercutting, Type II Cubic Yard 18 153 SPECIAL PROVISIONS FOR CONSTRUCTION OF CURB AND CURB AND GUTTER GENERAL The work consists of removing and replacing concrete curb and concrete curb and gutter in accordance with Section 204 and Section 802 of the 2012 MDOT Standard Specifications for Construction and as specified herein. MATERIALS All materials used in the construction of curb and curb and gutter shall be in accordance with Section 802.02 of the 2012 MDOT Standard Specifications for Construction and as specified herein. CONSTRUCTION This work consists of removing curb and integral curb and gutter, where the adjoining pavement or sidewalk remains. When the curb is integral with the pavement, saw cutting of pavement two and one half (2.5) feet from the back of the curb shall be required. Construct a separate type curb per MDOT Standard Plan R-30-G, Detail E4, with a top curve radius of 1”, and batter to match existing adjacent curb. No horizontal reinforcement or anchor shall be required. Construct concrete curb and gutter per MDOT Standard Plan R-30-G, Detail C5. Thickness shall match the thickness of the existing abutting pavement. No horizontal reinforcement shall be required. Curb and gutter shall be anchored to existing concrete pavement as specified in the Special Provisions For Concrete Pavement Repair and shall be paid for as Lane Tie, Epoxy Coated, Modified. Backfill base material removed with concrete curb or integral curb and gutter as specified in Section 204.03.C to the level necessary for new curb or curb and gutter. The cost of all backfill material or any other approved material is included in the unit price of the pay items for new curb or new curb and gutter, and will not be paid separately. Backfill other area around curb with material excavated from site only if approved by the Engineer. Selected excavated material, suitable for backfill, will be free from rubbish or debris, organic matter, large stones, concrete fragments, or other road material, lumber, tree roots, or branches. In general, selected excavated material to be suitable for backfill will be restricted to excavated topsoil, sand or crumbly clay. Blue clay is not considered a suitable backfill material. If there is not sufficient selected excavated material on the project, the contractor shall provide the needed fill material and no additional payment will be made for providing this backfill. Restore areas disturbed, to their original condition. Existing lawn areas shall be restored with like replacement. No separate payment will be made for such restoration but is considered part of work item. 19 154 MEASUREMENT AND PAYMENT The completed work as described herein for the removal and replacement of concrete curb and concrete curb and gutter will be measured by the foot. The contract unit price will be payment in full for furnishing all materials, labor and equipment necessary to remove and construct the curb or curb and gutter as specified. Pay Item Unit Curb, Rem Foot Curb and Gutter, Rem Foot Curb, Conc, Det E4, Modified Foot Curb and Gutter, Conc, Det C5, Modified Foot 20 155 SPECIAL PROVISIONS FOR SIDEWALKS AND DRIVEWAYS GENERAL This special provision covers the removal and replacement of sidewalks and driveways. CONSTRUCTION This item of work includes removing the concrete sidewalks and driveways, with or without HMA overlay, backfilling, compacting, and grading of the disturbed area, and construction of concrete sidewalk and driveway. The concrete sidewalk and driveway shall be removed in accordance with the MDOT Standard Specifications for Construction, Section 204, Removing Miscellaneous Structures and Materials. Concrete sidewalk and driveway, of the thickness specified, shall be constructed in accordance with Section 803 of the 2012 Michigan Department of Transportation Standard Specifications for Construction. Sidewalk cross slopes shall be between 1% and 2%, sloping towards the street. The contractor shall stamp all concrete with a legible stamp bearing the name of the company and the year of construction. The stamp shall be placed at the first and last flag of sidewalk placed. No sidewalk construction shall commence without a Contractor’s stamp on site. Restore lawn areas disturbed beyond sidewalk and driveway repair limits to its original conditions. No separate payment will be made for such restoration, but is considered part of the work item. MEASUREMENT AND PAYMENT “Sidewalk, Rem”, shall include all labor, equipment and material required for the removal of concrete sidewalks and driveways, regardless of the thickness, shall be measured in square yards. “Sidewalk, Conc, __ inch”, shall include all labor, equipment and material necessary to complete the installation of new concrete sidewalk or driveway and shall be measured in square feet. Pay Item Pay Unit Sidewalk, Rem Square Yard Sidewalk, Conc, 4 inch Square Feet Sidewalk, Conc, 6 inch Square Feet 21 156 SPECIAL PROVISIONS FOR SIDEWALK ADA RAMP AND DETECTABLE WARNING SURFACE GENERAL This special provision covers construction of ADA sidewalk ramp with detectable warning surface. The work consists of constructing ADA sidewalk ramp and/or retrofitting ramp with detectable warning surface in accordance with the applicable provisions of Section 803 of the 2012 MDOT Standard Specifications for Construction and the current MDOT Standard Plan (Special Detail) R-28-J. Complete this work in conformance with the American with Disability Act (ADA) provisions as applicable. MATERIAL The Detectable Warning Surface color shall be “safety yellow”, Federal Color Number 33538, unless otherwise approved by the Engineer. The color shall be homogeneous throughout the tile. The tile shall be manufactured by ADA Solutions, Inc., North Billerica, MA 01862, or approved equal. CONSTRUCTION Construct sidewalk ramp(s), landings flares and detectable warning surface according to MDOT Standard Plan (Special Detail) R-28-J, included in these Specifications. The Detectable Warning Surface installation shall also comply with the manufacturer’s instructions. The curb and gutter section at the bottom of the ramp (ramp opening) shall be a full depth curb with a minimum depth of 12 inches, and shall be 18 inches from the back of curb to abutting pavement. The curb shall be anchored to the existing concrete pavement as specified in the Special Provisions For Concrete Pavement Repair and shall be paid for as Lane Tie, Epoxy Coated, Modified. It is also the Contractor’s responsibility to incorporate any changes made to the ADA accessibility requirements that may take effect prior to the start date of actual construction. If the Contractor determines that any changes significantly alter the original bid cost, the Contractor may submit a written request to the Engineer or his representative for approval and compensation. Include a cost comparison between the original bid cost and the cost of the ADA required changes in the request. The contractor shall stamp all concrete sidewalk ramps with a legible stamp bearing the name of the company and the year of construction. The stamp shall be placed on the first and last flag of a length sidewalk ramp placed, except for the flag containing the warning surface. No sidewalk or ramp construction shall commence without a Contractor’s stamp on site. Restore lawn areas disturbed beyond sidewalk ramp repair limits to its original conditions where the change in grade is one (1) inch or less. No separate payment will be made for such restoration, but is considered part of the work item. Where grade changes are greater than one (1) inch, follow the restoration requirements as specified in the Special Provisions for Lawn Restoration. 22 157 Any ramps constructed under this Contract that do not meet the current MDOT Sidewalk Ramp Standard Plans and the latest ADA accessibility requirements will be removed and replaced by the Contractor, as directed by the Engineer or his representative, at the Contractor’s expense. MEASUREMENT AND PAYMENT The completed work as described herein for “Sidewalk Ramp, ADA __ inch” and “Detectable Warning Surface”, will be measured by as square feet and feet respectively. The contract unit price will be payment in full for furnishing all materials, labor and equipment necessary to construct the ADA ramp and curb and warning surface. Pay Item Pay Unit Sidewalk Ramp, ADA, 6 inch Square Feet Sidewalk Ramp, ADA, 4 inch Square Feet Detectable Warning Surface Feet 23 158 SPECIAL PROVISION FOR UTILITY STRUCTURE ADJUSTMENT, RECONSTRUCTING STRUCTURES AND COVER REPLACEMENT GENERAL The work consists of adjusting utility structures in accordance with the applicable provisions of Section 403 of the 2012 Michigan Department of Transportation (MDOT) Standard Specifications for Construction, except as modified herein. All storm and sanitary catch basin, inlet and manhole structures, and water gate wells and valve boxes within areas of pavement to be removed and replaced shall be adjusted, raised or lowered as required, so that the covers meet the new pavement elevations, and sealed as specified herein. MATERIALS Materials used in the adjustment and reconstruction of utility structures shall be as specified in Section 403. Drainage Structures, of the 2012 MDOT Standard Specifications for Construction, and as follows: “WrapidSeal Manhole Encapsulation System” as manufactured by CANUSA “Infi-Shield” as manufactured by Sealing Systems Incorporated “CS-212 Exterior Joint Wrap” as manufactured by Concrete Sealants, Inc. Or Approved Equals EJIW – 00104014 or 00104010 (as determined to with a cover) EJIW – 001040029 1040AGS Taylor Storm, bolting or no bolting EJIW – 001040028 1040AGS Taylor Sanitary, bolting or no bolting EJIW – 001040030 1040AGS Taylor Water EJIW – 00500074B01 Taylor CONSTRUCTION Existing structures and covers shall be adjusted to the proper elevation in accordance with Section 403 of the 2012 MDOT Standard Specifications for Construction, except as modified herein. Remove an area of pavement and curb around the structure. The frame and cover shall be carefully removed and the upper portion of the existing utility structure repaired as necessary and raised or lowered as required. The frame and cover shall then be reset on the adjusted structure so constructed as to hold them firmly in place and reset on a full mortar bed so as to fit the required new pavement grade and cross section. An external sealing system shall be installed adhering to the structure casting and the precast concrete, block or brick of the structure. Installation shall be in conformance with the manufactures specifications and procedures. The sealing system shall extend down and cover the top one (1) foot of the structure precast concrete, brick or block. Replace surrounding concrete pavement, curb, curb and gutter, or sidewalk to match existing grades or to the required new pavement grade and cross section. When the existing frames and covers are unacceptable for reuse as determined by the Engineer, new frames and covers shall be furnished and installed as specified herein. Any reusable frame and cover damaged by the Contractor shall be replaced by the Contractor at no cost to the City. The frames and covers that are not to be 24 159 used on the work shall become property of the Contractor and shall be promptly removed from the jobsite and properly disposed of. Where the structure is in need of repair, in excess of the adjustment limits set forth herein, the existing structure shall be broken down to solid structural material and rebuilt from that point up with new materials to the required new pavement elevations. MEASUREMENT AND PAYMENT The completed work as described for adjusting or reconstructing structure will be measured as units and will be paid for at the Contract Unit Price, which price will be payment in full for furnishing all materials, equipment and labor; excavation, backfilling, disposal of surplus material, removal of all debris and foreign material from the structure (including the sump); adjusting the structure and cover to the required new pavement grade and cross section, with the existing or new cover; sealing; and providing access to all structures for inspection, as directed by the Engineer. Removal and replacement of concrete pavement, curb, curb and gutter, and sidewalk shall be paid separately at the Contract Unit Rates for those items of work. Structure damage, due to the Contractors operations shall be repaired at the Contractors expense. “Dr Structure Cover, Adj. Case 1, Modified” shall include the above described work necessary to raise or lower the existing catch basin, manhole or gate well rim elevation involving adjustment, and including the repair or replacement of brick or block to a depth of less than or equal to twelve (12 inches, including mortar, regardless of whether or not it is necessary to remove a cone section to accommodate the rim elevation adjustment. “Dr Structure, Adj, Add Depth, Case 1, Modified” shall include the above described work necessary to repair or replace the existing catch basin, manhole or gate well structure of blocks or bricks in excess of twelve (12) inches below top of structure. Measurement shall be per foot of repair or replacement of brick or block exceeding twelve (12) inches. “Drainage Structure Cover, Modified” shall include the furnishing and installation of catch basin, gate well and manhole structure covers of the appropriate type. “Water Shutoff, Adj, Case __, Modified” shall include the above described work necessary to raise or lower the existing structure and cover of water shutoff boxes. Pay Item Pay Unit Dr Structure Cover, Adj, Case 1, Modified Each Drainage Structure Cover, Modified Each Dr Structure, Adj, Add Depth, Case 1, Modified Foot Water Shutoff, Adj, Case 1, Modified Each 25 160 SPECIAL PROVISIONS FOR CONSTRUCTION OF DRAINAGE STRUCTURES GENERAL The work shall consist of constructing manhole and catch basin structures to the size and type, as shown on the City of Taylor Standard Storm Water Detail Drawings ST-1 and ST-2, to the line and elevation of final grade, of Portland cement concrete block masonry, brick masonry or precast concrete units (with or without steel reinforcement as provided); furnishing and placing metal frames and covers; removal of existing drainage structures; installation of storm drainage pipe, and shall include complete restoration of any disturbed lawns or grassy areas. MATERIALS The materials used for constructing storm sewer manholes and catch basins shall conform to the requirements of the 2012 MDOT Standard Specifications Section 403.02 Materials, unless otherwise specified herein. Backfill for storm sewer manholes and catch basins shall be Class IIIA granular material as specified in Table 902.3 of the 2012 MDOT Standard Specifications. Pavement subgrade backfill shall be Class II or 21A aggregate and shall conform to the Michigan Department of Transportation 2012 Standard Specifications for Construction, Section 902.05 Gray Iron Castings shall be as specified in Section 908.05. Gray Iron Castings of the 2012 MDOT Standard Specifications for Construction, and as specified herein. The structure frames, covers and assemblies shall be as specified in the Special Provision for Utility Structure Adjustment, Reconstructing Structures and Cover Replacements. Drainage structure sealing shall be as specified in the Special Provision for Utility Structure Adjustment, Reconstructing Structures and Cover Replacements. Storm drainage pipe shall be as specified on the City of Taylor Standard Storm Water Detail Drawings ST-1 and ST-2. CONSTRUCTION Manholes and Catch Basins shall be constructed in accordance with Section 403.03 Construction, of the 2012 MDOT Standard Specifications, and the City of Taylor Standard Storm Water Detail Drawings ST-1 and ST-2 unless otherwise specified herein. The Contractor shall comply with all Federal, State, and local laws and regulations governing construction methods and the furnishing and use of all safeguards, safety devices, protective equipment, and pollution controls. It shall be the Contractor’s responsibility to protect, as reasonably necessary, the life and health of all personnel on the job, the safety and health of the public, and to protect property during the construction of the project. Pavement, curbs, sidewalks and driveways which are required to be removed, shall be removed as specified in the applicable sections of the 2012 MDOT Standard Specifications for Construction. Pavement, curbs, sidewalks and driveways shall be sawed in straight lines parallel or perpendicular to the line of work or removed to the nearest joint and shall be limited to the minimum area necessary to do the required underground work. Any broken or damaged walks or driveways shall not be patched but shall be entirely replaced. Excavation for constructing manholes and catch basins shall conform to Section 206.03.A of the 2012 MDOT Standard Specification for Construction unless otherwise specified herein. 26 161 Backfilling for structures shall be as specified in Section 401.03.D of the 2012 MDOT Standard Specifications. The Backfilling around structures shall not begin any sooner than 12 hours after the structure has been completed, except precast structures which may be backfilled immediately. Excavation shall be made in such a manner so as to protect the side walls from caving in, and so as not to incur damage to either private or public property. Excavated material shall be hauled away from the trench area continually as part of the trenching operation. Excavation beyond the minimum dimensions specified or shown on the Plans, when not so directed by the Engineer, will be deemed unauthorized, and the space of excess excavation shall be filled in the same manner as specified above at no increase in Contract Price. Adequate pumping equipment and drainage facilities shall be provided and maintained to dewater the work area, and water entering the work from whatever source shall be promptly removed and properly disposed of. All required pumping and drainage shall be done without damage to adjacent property or structures, or to the operations of other contractors, and without interference with the rights of public or private owners or pedestrian and vehicular traffic. Bottoms for structures may be of precast units or poured in place concrete and shall be supported by a compacted six (6) inch granular base. If the bottoms are poured in place, they shall be allowed to set for 24 hours before placing masonry or otherwise working on top of it. Manhole and catch basin base slabs shall have a nominal diameter and thickness, and be reinforced, as shown on the City of Taylor Standard Storm Water Detail Drawings ST-1 and ST-2. All ground surfaces shall be left by the Contractor in essentially as good condition as before manhole or catch basin removal or construction started and any pavements, sidewalks, trees, or other things damaged or destroyed on account of the removal or construction shall be repaired, replaced, or settled for at the Contractor’s expense unless otherwise noted. Where called for on the Plans or as directed by the Engineer, manholes and catch basins shall be removed, disposed of, and backfilled as specified in Section 203 Removing Drainage Structures, Culverts and Sewers of the 2012 MDOT Standard Specifications for Construction. The metal frames, covers, and grates on existing manholes and catch basins that are to be reused shall be carefully removed to prevent damage. Any reusable casting damaged by the Contractor shall be replaced with a new casting without additional cost to the City. All salvaged castings that are not to be used on the work shall become the property of the Contractor and shall be promptly removed from the job site. Storm water drainage piping shall be installed in accordance with the City of Taylor Standard Storm Water Detail Drawings ST-1 and ST-2. 27 162 MEASUREMENT AND PAYMENT The completed work as described for constructing new “Manholes”, “Catch Basins” and “Inlets” of the size and type specified will be measured as Drainage Structure units, and will be paid for at the Contract unit price per each. This price shall be full compensation for all labor, equipment, materials, excavation, including removal and disposal of all materials encountered, openings, and backfilling, required to complete the construction as specified herein. The unit price for Dr Structure, Add Depth, 8 foot to 15 foot, of the diameter required includes the cost of the drainage structure portions greater than 8 feet deep, but no greater than 15 feet deep. Drainage Structure Cover unit prices shall include the furnishing and installation of the manhole, catch basin and inlet covers of the appropriate type. Storm water drainage piping shall be installed as specified herein and shall be paid for at the Contract unit price per linear foot for all material, equipment and labor required to complete the installation of piping. Pavement removal and replacement, when required will be paid for separately. Pay Item Pay Unit Dr Structure, 24 inch dia, Each Dr Structure, 48 inch dia, Each Dr Structure, 60 inch dia, Each Dr Structure, 72 inch dia, Each Dr Structure, Add Depth of 24 inch dia, 8 foot to 15 foot Foot Dr Structure, Add Depth of 48 inch dia, 8 foot to 15 foot Foot Dr Structure, Add Depth of 60 inch dia, 8 foot to 15 foot Foot Dr Structure, Add Depth of 72 inch dia, 8 foot to 15 foot Foot Dr Structure Cover, Modified Each Dr Structure, Rem Each 12” Storm Drain Pipe Linear Foot 28 163 SPECIAL PROVISION FOR PRIVATE UTILITY STRUCTURE ADJUSTMENTS GENERAL All DTE, MICHCON and ATT utility structures, hand holes, and roadway valve boxes located in street pavement or sidewalk pavement being repaired, removed and replaced shall be adjusted as necessary by the Utility Owner, or their representative. The Contractor shall contact the specific Utility Owner thirty (30) days prior to concrete pavement or sidewalk placement to co-ordinate the adjustment required to the structure to meet the proposed grades. All DTE, MICHICON and ATT utility structures shall be adjusted and sealed as specified in the Special Provision for Utility Structure Adjustment, Reconstructing Structures and Cover Replacement. MEASUREMENT AND PAYMENT All material, labor and equipment required to adjust to grade DTE, MICHCON and ATT utility structures, hand holes, and roadway valve boxes located in street pavement or sidewalk pavement being repaired, removed and replaced shall be paid for under the unit rates bid for unless work is performed by the Utility Owner: Pay Item Pay Unit Dr Structure Cover, Adj, Case 1, Modified, Utility Each 29 164 SPECIAL PROVISIONS FOR DRAINAGE STRUCTURE CLEANING AND SEWER LEAD CLEANING GENERAL The work of drainage structure cleaning consists of cleaning existing catch basins and storm sewer manholes in the area of the project where directed by the Engineer. The work of storm sewer cleaning consists of cleaning storm sewer lines leading from catch basins and manholes. CONSTRUCTION When necessary and as directed by the Engineer, the work shall be performed in accordance with Section 403.03.G of the 2012 MDOT Standard Specifications for Construction and as modified herein. Cleaning shall be by high velocity hydro-cleaning (jetting). Mechanical cleaning shall only be used when authorized by the Engineer. Contractor shall take precautions to protect the sewer lines from damage. No debris shall be accumulated on site except in totally enclosed containers approved by the Engineer. All material deposits shall be removed from site and disposed of at an approved location. Some of the catch basins, manholes and storm sewers may be completely filled. The Engineer shall determine actual condition and necessity for cleaning prior to cleanout. Cleaning shall restore 90% of the pipe's carrying capacity. Jet and clean storm sewer lines from the catch basin or manhole a distance of twenty (20) feet. MEASUREMENT AND PAYMENT "Dr Structure Cleaning, Modified" will consist of cleaning catch basins and storm sewer manholes, and shall be paid for at the contract unit price each, and will include all equipment and labor necessary to clean each catch basin or manhole, including installation of bulkheads as necessary and hauling away and disposing of any waste and debris generated. "Dr Structure Lead, Cleaning, Modified" consists of cleaning storm sewer lines leading from catch basins and manholes, and shall be paid for at the contract unit price per foot which will include payment for furnishing all equipment and labor to clean storm sewer lines regardless of size, temporary bulkheads, and hauling away and disposing of any waste and debris generated. Pay Item Pay Unit Dr Structure Cleaning, Modified Each Dr Structure Lead, Cleaning, Modified Foot 30 165 SPECIAL PROVISIONS FOR LAWN RESTORATION GENERAL This shall apply when areas of concrete sidewalk or driveway pavement are to be removed but not replaced, and along new concrete ADA sidewalk replacement where the grade between the new concrete and the abutting lawn has been changed greater than one (1) inch. The work shall consist of furnishing and installing topsoil, permanent seeding, or hydroseeding, mulch and fertilizer in accordance with the requirements of Section 816 Turf Establishment and Section 917 Turf and Landscape Materials of the 2012 Michigan Department of Transportation Standard Specifications for Construction and as modified herein. MATERIAL For seeding, or hydroseeding, the seed mixture shall be THM (Turf Loamy to Heavy) as specified in Section 917, Table 917-1. The chemical fertilizer nutrient shall meet the requirements specified in Subsection 917.10.B.1, Class A Water Soluble Fertilizer. Mulching shall be straw mulch blankets per 917.15.B.2.b., with anchoring material in accordance with Section 917.15.C.5. CONSTRUCTION Restoration of lawn areas abutting the curb disturbed by concrete pavement or curb and gutter repair, and sidewalk or driveway replacement, shall follow these Specifications. Payment for this work shall be included in the work item unit rate and will not be paid for separately. Providing and placing topsoil shall be in accordance with Section 816.03.A. Seed shall be sown in accordance with Section 816.03.C.1 by broadcasting, or using the hydroseeding method, in accordance with Table 816.1. Fertilizer shall be applied as set forth in Section 816.03.B. Mulch blankets shall be installed and anchored in accordance with Section 816.03.H. Restore areas where concrete has been removed and will not be replaced with topsoil of the depth required to bring the area level with the surrounding grade, compact and seed, or hydroseed, in accordance with 2012 MDOT Standard Specification Section 816.03, unless otherwise specified herein. Before the topsoil is placed, the subsurface shall be cleaned of all miscellaneous concrete, stones or other debris. Trim areas of existing lawn to provide neat continuous areas of new planting. When ADA sidewalk ramps are constructed and the grade differential between the existing abutting lawn and new concrete ramp is greater than one (1) inch, the ground shall be cut and leveled creating a grade transition slope from the top of the new concrete ramp to undisturbed lawn. The grade transition shall be a minimum of sixteen (16) inches in width for up to a four (4) inch grade differential, to a maximum of thirty two (32) inches in width for grade differentials greater than four (4) inches. If during this re-grading, the existing material is determined to be unsuitable for planting growth, the material shall be removed to a depth of two (2) inches and topsoil shall be placed. Before the topsoil is placed, the 31 166 subsurface shall be cleaned of all miscellaneous concrete, stones or other debris. Trim areas of existing lawn to provide neat continuous areas of new planting. MEASUREMENT AND PAYMENT “Topsoil Surface, Furn, __ inch, Modified” shall be measured in place by area in square yards and will be paid for at the contract unit price per square yard which shall be payment in full for furnishing all labor, equipment, and materials, including grading, topsoil backfill, seed, mulch and chemical fertilizer nutrient, complete to restore the lawn as specified herein. “ADA Ramp Restoration” shall be measured in place by area in square yards and will be paid for at the contract unit price per square yard which shall be payment in full for furnishing all labor, equipment, and materials, including grading, topsoil backfill, seed, mulch and chemical fertilizer nutrient, complete to restore the lawn as specified herein. Pay Item Pay Unit Topsoil Surface, Furn, 4 inch, Modified Square Yards Topsoil Surface, Furn, 6 inch, Modified Square Yards ADA Ramp Restoration Square Yards 32 167 SPECIAL PROVISIONS FOR PROJECT CLEAN-UP GENERAL The Contractor shall provide cleaning/sweeping services on all street, sidewalk, alley and driveway surfaces of the work site, and on all adjoining streets, sidewalks, alleys, driveways within one hundred (100) feet of the work site, to remove all dust, dirt and other debris deposited on the surfaces as a result of the construction activity. The contractor shall remove all dirt and construction debris from the abutting lawn areas. This shall be performed on a weekly basis, or more frequently if conditions warrant. The sweeping of the street and alley surfaces shall be performed with a self-propelled sweeper equipped with pickup attachments and curb brushes. The equipment shall have a dust control filtration system in addition to utilizing water to control the dust and dirt. Upon completion of portions of work, and before final acceptance of the work, the Contractor shall remove all temporary buildings or other structures built by him, all false work, excavated material, surplus materials, and rubbish of all kinds from the grounds which he has occupied, and shall leave the line of work in a neat, clean condition satisfactory to the Engineer. The Contractor shall remove all machinery and equipment from the right-of-way. The Contractor shall replace, renew or restore; in an acceptable manner, all property, both public and private, which may have been damaged during the prosecution of the work. The Contractor shall replace fences, signs, mailboxes, sprinkler heads and/or lines, or other necessary appurtenances, which have been temporarily removed or damaged. The Contractor shall thoroughly clean all sewers, manholes, catch basins, and other structures affected by his operations whether within or outside of the limits of his work upon leaving that particular work site. The Contractor shall use a “vactor” or other similar equipment suited for this work, or subcontract with a contractor specializing in this work, to properly perform the work. A written report shall be submitted to the City upon completion of the cleaning containing, at a minimum, type of structure, location of structure and date of cleaning. MEASUREMENT AND PAYMENT Payment for project clean up will not be paid for separately but shall be included in other work item unit rates. 33 168 HOLD HARMLESS FOR SUPPLY CONTRACTS Bidder and/or supplier and/or contractor, agrees to indemnify, defend, and save harmless the City of Taylor, their employees, agents and consultants, from and against all loss and expense including, but not limited to, fees and charges of all kinds, including attorneys, and other professionals and court and arbitration costs if applicable by reason of any and all liability asserted or imposed upon the City of Taylor, their employees, agents and consultants for damages because of personal injury, including bodily injury, death at any time resulting there from, sustained by person or persons and/or on account of damage to property, including loss of use thereof, arising out of or in consequence of the performance of this work and/or supply of any materials, whether such injuries to persons or damage to property is due or claimed to be due, to negligence of the bidder and/or supplier and/or contractor, their subcontractors, their suppliers, the City of Taylor, and their employees, agents, and consultants, except only such injury or damage as shall be occasioned by the sole negligence of the City of Taylor, their employees, agents or consultants. Signed_________________________________________________________ Title___________________________________________________________ 34 169 EXHIBIT A INSURANCE REQUIREMENTS 35 170 36 171 EXHIBIT B 37 172 EXHIBIT B Title VI 38 173 39 174 40 175 EXHIBIT C MDOT R-28-I COT AMENDMENT 41 176 42 177 43 178 44 179 45 180 46 181 47 182 48 183 EXHIBIT D Standard Storm Sewer Details ST-1 and ST-2 49 184 50 185 51 186 187 2025 ASPHALT PAVEMENT RESURFACING CONTRACT "BID TAB" BIDNET RFP - 022825-001 (03-04-2025 TO 03-27-2027) Als' Asphalt Paving (#1) Ajax Paving Industries (#2) Florence Cement (#3) Proline Asphalt Paving (#4) R & R Asphalt (#5) Hutch Paving, Inc. (#6) Cadillac Asphalt (#7) Item # Description Unit of Measure Estimated Quantity Unit Price ($) Total Unit Price ($) Unit Price ($) Total Unit Price ($) Unit Price ($) Total Unit Price ($) Unit Price ($) Total Unit Price ($) Unit Price ($) Total Unit Price ($) Unit Price ($) Total Unit Price ($) Unit Price ($) Total Unit Price ($) 1 Cold Milling HMA Surface SYD 83850 $3.50 $293,475.00 $5.44 $456,144.00 $4.40 $368,940.00 $4.40 $368,940.00 $4.25 $356,362.50 $3.20 $268,320.00 $4.00 $335,400.00 2 Cold Milling HMA Surface, Modified SYD 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 3 Edge Trimming LFT 200 $0.25 $50.00 $10.00 $2,000.00 $8.00 $1,600.00 $10.00 $2,000.00 $5.00 $1,000.00 $1.00 $200.00 $5.00 $1,000.00 4 Conditioning Existing Pavement, Modified TON 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 5 Subgrade Undercutting, Type II CYD 100 $32.00 $3,200.00 $80.00 $8,000.00 $54.00 $5,400.00 $100.00 $10,000.00 $105.00 $10,500.00 $80.00 $8,000.00 $80.00 $8,000.00 6 HMA Leveling, 4E1 TON 8250 $106.00 $874,500.00 $109.25 $901,312.50 $116.50 $961,125.00 $113.00 $932,250.00 $116.00 $957,000.00 $136.00 $1,122,000.00 $130.00 $1,072,500.00 7 HMA Wearing, 5E1 TON 4950 $108.00 $534,600.00 $122.75 $607,612.50 $121.00 $598,950.00 $123.00 $608,850.00 $125.00 $618,750.00 $139.00 $688,050.00 $150.00 $742,500.00 8 HMA Shoulder, Modified TON 50 $110.00 $5,500.00 $175.00 $8,750.00 $115.00 $5,750.00 $350.00 $17,500.00 $200.00 $10,000.00 $160.00 $8,000.00 $177.00 $8,850.00 9 Repair Existing HMA Pavement SYD 20 $40.00 $800.00 $100.00 $2,000.00 $59.00 $1,180.00 $200.00 $4,000.00 $200.00 $4,000.00 $95.00 $1,900.00 $470.00 $9,400.00 10 Repair HMA Pavement, Utility Repair SYD 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 11 Repair HMA Pavement with Concrete Base, Utility Repair SYD 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 12 Repair HMA Driveway and Approach, Utility Repair SYD 20 $90.00 $1,800.00 $100.00 $2,000.00 $53.00 $1,060.00 $200.00 $4,000.00 $200.00 $4,000.00 $95.00 $1,900.00 $468.00 $9,360.00 13 Excavation, Earth CYD 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 14 Aggregate Base, 8 Inch TON 100 $20.00 $2,000.00 $50.00 $5,000.00 $34.50 $3,450.00 $100.00 $10,000.00 $52.00 $5,200.00 $41.00 $4,100.00 $40.00 $4,000.00 15 Aggregate Base, 1” x 3”, 4 Inch TON 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 16 HMA Parking Lot Leveling Course TON 3200 $101.00 $323,200.00 $107.25 $343,200.00 $126.00 $403,200.00 $110.00 $352,000.00 $121.00 $387,200.00 $130.00 $416,000.00 $183.00 $585,600.00 17 HMA Parking Lot Wearing Course TON 1975 $101.00 $199,475.00 $113.25 $223,668.75 $124.00 $244,900.00 $123.00 $242,925.00 $123.00 $242,925.00 $132.00 $260,700.00 $190.00 $375,250.00 18 HMA Parking Lot Repair, 3” Depth SYD 200 $32.00 $6,400.00 $70.00 $14,000.00 $41.00 $8,200.00 $70.00 $14,000.00 $75.00 $15,000.00 $60.00 $12,000.00 $146.00 $29,200.00 19 HMA Parking Lot Repair, Greater Than 3” Depth SYD 200 $36.00 $7,200.00 $130.00 $26,000.00 $56.00 $11,200.00 $100.00 $20,000.00 $150.00 $30,000.00 $60.00 $12,000.00 $153.00 $30,600.00 20 Curb Vertical, HMA, Modified LFT 200 $7.00 $1,400.00 $15.00 $3,000.00 $31.00 $6,200.00 $25.00 $5,000.00 $15.00 $3,000.00 $80.00 $16,000.00 $25.00 $5,000.00 21 Aggregate Base, 6 Inch TON 100 $20.00 $2,000.00 $50.00 $5,000.00 $29.00 $2,900.00 $100.00 $10,000.00 $52.00 $5,200.00 $48.00 $4,800.00 $39.00 $3,900.00 22 Aggregate Base, 1” x 3”, 4 Inch TON 50 $22.00 $1,100.00 $75.00 $3,750.00 $32.50 $1,625.00 $100.00 $5,000.00 $67.50 $3,375.00 $45.00 $2,250.00 $60.00 $3,000.00 23 HMA Path Leveling Course TON 200 $115.00 $23,000.00 $140.00 $28,000.00 $132.00 $26,400.00 $175.00 $35,000.00 $200.00 $40,000.00 $140.00 $28,000.00 $190.00 $38,000.00 24 HMA Path Wearing Course TON 125 $115.00 $14,375.00 $150.00 $18,750.00 $125.00 $15,625.00 $205.00 $25,625.00 $250.00 $31,250.00 $142.00 $17,750.00 $200.00 $25,000.00 25 Shoulder, Cl II TON 200 $26.00 $5,200.00 $65.00 $13,000.00 $37.50 $7,500.00 $80.00 $16,000.00 $65.00 $13,000.00 $150.00 $30,000.00 $90.00 $18,000.00 26 HMA, Path Repair, 3” Depth SYD 100 $29.00 $2,900.00 $50.00 $5,000.00 $64.00 $6,400.00 $100.00 $10,000.00 $100.00 $10,000.00 $0.00 $0.00 $146.00 $14,600.00 27 HMA, Path Repair, Greater Than 3” Depth SYD 100 $30.00 $3,000.00 $90.00 $9,000.00 $64.00 $6,400.00 $120.00 $12,000.00 $175.00 $17,500.00 $0.00 $0.00 $153.00 $15,300.00 28 Dr Structure Cover, Adj, Case 1, Modified EACH 30 $275.00 $8,250.00 $1,450.00 $43,500.00 $642.00 $19,260.00 $1,500.00 $45,000.00 $1,750.00 $52,500.00 $950.00 $28,500.00 $1,350.00 $40,500.00 29 Dr Structure, Adj, Add Depth, Case 1, Modified LFT 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 30 Water Shutoff, Adj, Case 1, Modified EACH 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 31 Dr Structure Cover, Adj, Case 1, Modified, Utility EACH 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 32 Dr Structure, 24 Inch Dia EACH 1 $2,500.00 $2,500.00 $3,100.00 $3,100.00 $2,053.00 $2,053.00 $3,500.00 $3,500.00 $3,250.00 $3,250.00 $5,500.00 $5,500.00 $3,000.00 $3,000.00 33 Dr Structure, 48 Inch Dia EACH 1 $4,000.00 $4,000.00 $3,600.00 $3,600.00 $3,635.00 $3,635.00 $4,000.00 $4,000.00 $6,250.00 $6,250.00 $6,500.00 $6,500.00 $4,150.00 $4,150.00 34 Dr Structure, 60 Inch Dia EACH 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 35 Dr Structure, 72 Inch Dia EACH 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 36 Dr Structure, Adj, Add Depth of 24 Inch Dia, 8 Foot to 15 Foot LFT 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 37 Dr Structure, Adj, Add Depth of 48 Inch Dia, 8 Foot to 15 Foot LFT 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 38 Dr Structure, Adj, Add Depth of 60 Inch Dia, 8 Foot to 15 Foot LFT 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 39 Dr Structure, Adj, Add Depth of 72 Inch Dia, 8 Foot to 15 Foot LFT 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 40 Dr Structure Cover, Modified EACH 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 41 Dr Structure, Rem EACH 2 $250.00 $500.00 $1,150.00 $2,300.00 $1,066.00 $2,132.00 $1,500.00 $3,000.00 $1,250.00 $2,500.00 $2,750.00 $5,500.00 $640.00 $1,280.00 42 12” Storm Drain Pipe LFT 100 $82.00 $8,200.00 $115.00 $11,500.00 $104.00 $10,400.00 $130.00 $13,000.00 $105.00 $10,500.00 $105.00 $10,500.00 $100.00 $10,000.00 43 Pavt Repr, Rem, Modified SYD 3700 $18.00 $66,600.00 $24.00 $88,800.00 $26.50 $98,050.00 $24.00 $88,800.00 $35.00 $129,500.00 $25.00 $92,500.00 $45.00 $166,500.00 44 Pavt Repr, Nonreinf Conc, 7 inch, with Integral Curb, Modified SYD 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 45 Pavt Repr, Nonreinf Conc, 8 inch, with Integral Curb, Modified SYD 3500 $70.00 $245,000.00 $54.00 $189,000.00 $57.00 $199,500.00 $54.00 $189,000.00 $80.00 $280,000.00 $98.00 $343,000.00 $52.00 $182,000.00 46 Pavt Repr, Nonreinf Conc, 7 inch, Modified SYD 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 47 Pavt Repr, Nonreinf Conc, 8 inch, Modified SYD 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 48 Pavt Repr, Nonreinf Conc, 9 inch, Modified SYD 200 $75.00 $15,000.00 $66.50 $13,300.00 $94.00 $18,800.00 $67.00 $13,400.00 $85.00 $17,000.00 $92.00 $18,400.00 $58.00 $11,600.00 49 Pavt Repr, Nonreinf Conc, 10 inch, Modified SYD 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 50 Pavt Repr, Nonreinf Conc, 11 inch, Modified SYD 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 51 Pavt Repr, Nonreinf Conc, 12 inch, Modified SYD 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 52 Lane Tie, Epoxy Coated, Modified EACH 350 $10.00 $3,500.00 $6.00 $2,100.00 $22.00 $7,700.00 $6.00 $2,100.00 $15.00 $5,250.00 $15.00 $5,250.00 $13.00 $4,550.00 53 Sidewalk, Rem SYD 150 $13.00 $1,950.00 $65.00 $9,750.00 $48.00 $7,200.00 $65.00 $9,750.00 $15.00 $2,250.00 $18.00 $2,700.00 $20.00 $3,000.00 54 Sidewalk, Conc, 4 inch SFT 900 $11.00 $9,900.00 $14.25 $12,825.00 $8.00 $7,200.00 $15.00 $13,500.00 $10.00 $9,000.00 $9.00 $8,100.00 $8.00 $7,200.00 55 Sidewalk, Conc, 6 inch SFT 200 $12.00 $2,400.00 $15.75 $3,150.00 $10.00 $2,000.00 $17.00 $3,400.00 $12.00 $2,400.00 $11.00 $2,200.00 $8.00 $1,600.00 56 Sidewalk Ramp, ADA, 4 inch SFT 100 $11.00 $1,100.00 $14.25 $1,425.00 $10.00 $1,000.00 $15.00 $1,500.00 $22.00 $2,200.00 $17.00 $1,700.00 $9.00 $900.00 57 Sidewalk Ramp, ADA, 6 inch SFT 50 $12.00 $600.00 $15.75 $787.50 $10.00 $500.00 $17.00 $850.00 $24.00 $1,200.00 $19.00 $950.00 $9.00 $450.00 58 Detectable Warning Surface LFT 150 $69.00 $10,350.00 $45.00 $6,750.00 $50.00 $7,500.00 $50.00 $7,500.00 $48.00 $7,200.00 $80.00 $12,000.00 $69.00 $10,350.00 59 Topsoil Surface, Furn, 4 inch, Modified SYD 200 $6.00 $1,200.00 $7.00 $1,400.00 $0.00 $0.00 $12.00 $2,400.00 $14.00 $2,800.00 $9.00 $1,800.00 $10.00 $2,000.00 60 Topsoil Surface, Furn, 6 inch, Modified SYD 3500 $7.00 $24,500.00 $5.00 $17,500.00 $10.00 $35,000.00 $11.00 $38,500.00 $18.00 $63,000.00 $11.00 $38,500.00 $10.00 $35,000.00 61 ADA Ramp Restoration SYD 50 $13.00 $650.00 $20.00 $1,000.00 $0.00 $0.00 $100.00 $5,000.00 $16.00 $800.00 $40.00 $2,000.00 $10.00 $500.00 62 Linear Feet - Crack and Joint Fill LFT 200 $0.70 $140.00 $4.50 $900.00 $11.50 $2,300.00 $30.00 $6,000.00 $2.00 $400.00 $0.75 $150.00 $6.00 $1,200.00 63 Square Feet - Seal Coat SFT 500 $0.09 $45.00 $3.00 $1,500.00 $1.00 $500.00 $12.00 $6,000.00 $2.00 $1,000.00 $0.20 $100.00 $10.00 $5,000.00 64 Pavt Makg, Waterborne 4-inch Yellow LFT 1000 $0.05 $50.00 $0.75 $750.00 $1.20 $1,200.00 $1.50 $1,500.00 $1.00 $1,000.00 $1.10 $1,100.00 $2.00 $2,000.00 65 Pavt Makg, Waterborne 4-inch White LFT 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 66 Pavt Makg, Waterborne 6-inch White LFT 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 67 Pavt Mrkg, Waterboard 24-inch Stop Bar LFT 200 $0.07 $14.00 $6.00 $1,200.00 $6.00 $1,200.00 $8.00 $1,600.00 $10.00 $2,000.00 $15.00 $3,000.00 $6.00 $1,200.00 $2,711,624.00 $3,101,325.25 $3,115,135.00 $3,164,390.00 $3,367,262.50 $3,491,920.00 $3,828,440.00 03-28-2025 CLG 188 Budget & Finance Dept. Invitation for Bid Purchasing Manager: RM 23555 Goddard Road City of Taylor Taylor, MI 48180 734-374-1459 Bid Number: Bid Title: RFP-022825-001 2025 Asphalt Pavement Resurfacing Program Date Issued: Project Manager: March 4, 2025 City Engineer. Christopher Gibbs, M.B.A., P.E. Deadline for Questions: Telephone: Email: cgibbs@ci.taylor.mi.us March 18, 2025 @ 10:00 AM 734-287-6500 Ext. #8 Bid Submission Date and Time: City Contact: March 27, 2025 @ 10:00 AM Christopher Gibbs, M.B.A., P.E Bid Opening Date and Time: Telephone: Email: cgibbs@ci.taylor.mi.us March 27, 2025 @ 10:00 AM 734-287-6500 Ext. #8 You are invited to participate in this Invitation for Bid. Please submit your bid response in conformance with the instructions specified herein. By submitting a bid response, the bidder agrees and promises to sell, furnish, and deliver to the City all commodities and services contained in this Invitation for Bid for which a contract is awarded by the City. The bidder shall fully perform the contract in accordance with the all specifications, terms and conditions, and requirements contained in the Invitation for Bid and shall comply with all applicable provisions of the City of Taylor, Purchasing Policies, made a part of the Invitation for Bid and contract by reference. Written acceptance of the bidder's bid response by the City, by issuance of a purchase order or contract, constitutes a binding contract made and entered into by and between the City of Taylor, acting through the Purchasing Department named above, and the bidder named below: Bidder Company Name: Street Address: P.O. Box: City: State: Zip Code: Toll Free Telephone: Telephone: Fax: Federal I.D. or Social Security No.: E-Mail: Type or Print Name of Person Signing: Title: Authorized Signature: Acceptance (For City Use Only) Bid response accepted and contract awarded. By____________________________________________Title_________________________________ Signature ______________________________________Date ________________________________ 1 189 Mailing Instructions Mail a completed and signed Invitation for Bid response in a sealed envelope to the address listed below. Bid responses received after the date and time specified on the cover sheet of this Invitation for Bid will be rejected. Address the envelope containing your response in the following manner: BID NUMBER - RFP-022825-001 BID OPENING DATE - 3/27/2025 CITY OF TAYLOR CITY CLERK’S OFFICE 23555 GODDARD ROAD TAYLOR, MI 48180 Bidder Checklist. Have you remembered to 1. Review all instructions, terms, conditions, and specifications to ensure your bid response complies? 2. Prepare your price: products to be used and services to be rendered? 3. Indicate whether you can meet the delivery date indicated on the cover sheet? 4. Complete the “Cover Sheet”, sign and submit with bid package? 5. Complete the “Service Representative” section and submit with bid package? 6. Sign the “Accepts to comply with Insurance Requirements” document, submit with bid package? 7. Complete the “Project Specification” page, sign and submit three (3) copies with bid package? 8. Mark the envelope as indicated above? Bidder’s Instructions 1. Addition of Terms and Conditions. Additional terms and conditions submitted with a bid response are of no effect unless accepted in writing by the Purchasing Department. Bids with any additional terms and conditions may be rejected as non-responsive. 2. Assistance to Bidders with a Disability. Bidders with a disability that need an accommodation must contact the Purchasing Agent prior to the deadline for receipt of bids so that reasonable accommodation can be made. 3. Bid Held Firm. Bids are not awarded at the bid opening. Bid responses will be firm for 30 days, unless otherwise specified by the Purchasing Agent in writing. 4. Bid Opening. All bids received by the time and date of the bid opening will be publicly opened by the City Clerk’s Office, with the attendance of the Purchasing Agent at the location indicated on the cover sheet of this solicitation. Interested parties are invited to attend the bid opening. 5. Bid Results. Bidders desiring a copy of the bid results are instructed to include a self-addressed, stamped, envelope with their bid response. Bid results will be mailed when an award decision is made. Bidders may also obtain bid results or arrange to review the bid file by contacting the Purchasing Department. 6. Corrections. The bidder’s authorized representative must initial any corrections and alterations (i.e. erasures, whiteouts, correction tape, etc.) made to the bid response. Those bid responses with corrections and alterations that are not initialed are subject to confirmation by the Purchasing Agent. 2 190 7. Definitions:  Bidder Any person or firm submitting a competitive bid in response to a solicitation.  Bid Results A summary of all bid responses received and the award results  Bid Response The executed document submitted by a bidder in response to a solicitation.  Contractor Any person or firm having a contract with a governmental body.  Solicitation The process of notifying prospective bidders that the City wishes to receive bids for furnishing goods and services. 8. Facsimile Bids. Bid responses faxed to the City will be rejected. Bids may be faxed to a third party who will put it in a properly-addressed envelope and deliver it to the Purchasing Department before the date and time specified in the solicitation. 9. Late Bids. It is the bidder’s responsibility to ensure that a bid response is physically deposited with the City Clerk’s Office prior to the date and time specified for the opening. Late bid responses will not be opened and will be rejected regardless of the degree of lateness or the reason. 10. Multiple Bids. Bidders may submit more than one bid in response to this solicitation. Each bid submitted must comply in all aspects with the bid requirements and these instructions. 11. New Equipment and Materials. Unless otherwise indicated in the detailed specifications of this solicitation, all equipment and materials shall be new and under current production for use in the United States. 12. Packaging. All commodities and equipment are to be delivered and packaged strongly and securely according to accepted commercial practices. 13. Prices, Currency. All prices must be in United States currency, (USD). 14. Pricing (Unit and Total Prices). The unit price is to be according to the unit of measurement specified in the solicitation. In the event of mathematical differences between the unit price and extended total, the unit price will prevail. 15. Protests. An interested party may protest the solicitation within seven days before the bid opening or protest the Notice of Intent to Award within seven (7) days after receiving notice. Notice of award will be issued only to those bidders who submitted responses to this IFB seven calendar days after award or issuance of the Notice of Intent to Award. It will be assumed that all interested parties knew or should have known all the facts surrounding the award. 16. Questions and Clarifications. All questions and requests for clarification regarding this solicitation must be addressed to the City Engineer (cgibbs@ci.taylor.mi.us) referenced on the cover sheet of this document. The requirements of this solicitation can only be altered by written amendment of the solicitation. Verbal communications from whatever source are of no effect. Questions must be received by the deadline specified on the cover sheet to allow the Purchasing Agent to issue any needed amendments in sufficient time before the bid opening date (if applicable). 17. Review of the Bids. After the bid opening, bids become subject to the State of Michigan public records laws. Interested parties may request public information and make arrangements to review the bid file by contacting the City Clerk’s Office during normal working hours, between 9:00 a.m. and 5:00 pm., Monday through Friday, excluding holidays. 18. Rejection. The City reserves the right to reject any and all bids in whole or in part. Bid responses will be rejected if:  The bid response is not legible.  The bid response is not completed as requested.  The bid response is faxed to the City.  The bid response is not responsive to the specifications or other requirements of the solicitation.  The bid response is received after the time and date specified.  The bidder was required to be registered as an approved vendor by the deadline for receipt of bids, and failed to do so. 3 191  The bidder is determined to be not responsible, in accordance with Section 3 of the City of Taylor, Purchasing Policy. 19. Signature. The bidder submitting the bid response or that bidder’s duly authorized agent or representative must sign the bid response manually in ink. The name and title of the person signing the bid response must be typed or printed below the signature. 20. Specifications, Brand Name or Equivalent. Unless otherwise indicated in the detailed specifications of this solicitation, the use of a specific brand name or make/model is for illustrative purposes only, and the City will consider equivalent products. If a commodity or service put forth by a bidder is rejected as not being equivalent, the Purchasing Agent will notify the bidder of the rejection. 21. Specifications, Compliance. All bids submitted in response to this Invitation for Bid must comply with the specifications contained herein, and the successful bidder will be held responsible. Noncompliance with specifications is grounds for rejection of the bid response. Bidders who desire to submit commodities or services that deviate from these specifications or have any objections to the specifications stated herein must contact the Purchasing Agent in writing as soon as possible, so the Purchasing Agent can determine whether the specifications need to be amended. 22. Taxes. The City does not pay sales tax or federal excise tax. The federal tax-free transaction number and City sales tax exemption number is 38-6006926. The Purchasing Department will furnish a tax exempt certificate upon request. 23. Withdrawal or changes to a bid response prior to the bid opening date and time. Before the bid opening date and time, the bidder’s authorized representative may withdraw or change a bid response by making a written request to the Purchasing Agent. 24. Withdrawals after the bid opening date and time. After the opening, no changes may be made to the bid response. The bidder may make a written request to withdraw the bid response, subject to approval by the Purchasing Department. Bidders repeatedly withdrawing bids after the opening date may be removed from the City bidders list. GENERAL CONTRACT TERMS AND CONDITIONS 1. Affirmative Action. The contractor will take affirmative action in complying with all Federal and State requirements concerning fair employment and employment of the handicapped, and concerning the treatment of all employees without regard to race, color, religion, sex, national origin or physical handicap. 2. Applicable Law and Venue. This contract is governed by and construed in accordance with the laws of the State of Michigan. Any action to enforce this contract must be brought in the District Court of Wayne County, Michigan. 3. Assignments and Subcontracts. The contractor may not assign or otherwise transfer or delegate any right or duty without the City’s express written consent. The contractor may enter into subcontracts provided that the City has provided written consent and any such subcontractor acknowledges the binding nature of this contract and incorporates this contract, including any attachments. The contractor is solely responsible for the performance of any subcontractor. The contractor shall not have the authority to contract for or incur obligations on behalf of the City. If the City refuses to approve a subcontractor, the original contract holder shall be responsible for any damages financial or otherwise for not fulfilling the contract obligations. 4. Binding Contract. The acceptance of a bid response in writing by the Purchasing Department or Entity constitutes a contract between the bidder and the City. Written acceptance from the Purchasing Department or Entity will be in the form of a purchase order, notification of award, or contract. Any oral agreement or arrangement by a bidder with a City employee or Purchasing Department or Entity will have no force or effect unless reduced to writing. 4 192 5. Compliance with Laws. The contractor must, in performance of work under this contract, fully comply with all applicable federal, state, or local laws, rules and regulations, including Title VI of the Civil Rights Act of 1964. Any subletting or subcontracting by the contractor subjects subcontractors to the same provision. 6. Compliance With Public Records Law. The contractor understands that, except for disclosures prohibited under state open records laws related to confidentiality, in MCL §Act 442 of 1976 et seq., the City must disclose to the public upon request any records it receives from contractor. The contractor further understands that any records which are obtained or generated by the contractor under this contract, except for records that are confidential under in MCL §Act 442 of 1976 et seq., may, under certain circumstances, be open to the public upon request under the Taylor open records law. The contractor agrees to contact the City immediately upon receiving a request for information under the open records law and to comply with the City’s instructions on how to respond to the request. Bid responses are exempt records until the time and date of the bid opening. 7. Confidentiality. The contractor agrees not to use or disclose any information it receives from the City under this contract that the City has previously identified as confidential or exempt from mandatory public disclosure except as necessary to carry out the purposes of this contract or as authorized in advance by the City. The City agrees not to disclose any information it receives from the contractor that has previously been identified as confidential and which the City determines in its sole discretion is protected from mandatory public disclosure under a specific exception to the State public records law, in MCL §Act 442 of 1976 et seq.. The duty of the City and the contractor to maintain confidentiality of information under this section continues beyond the term of this contract, or any extensions or renewals of it. 8. Contract Amendment. After a binding contract has been entered into, no changes (i.e. substitution of product or a price adjustment) may be made per City of Taylor Fiscal Year (Contract Year), unless prior written approval has been obtained from the Purchasing Department or Entity. A Mutual Agreement is required per the “Special Terms and Conditions - Contract Period” listed on page seven (7) of this document for any contract year percentage unit cost increases or select unit cost increases applicable to contract. 9. Inspection and investigations. The City reserves the right to conduct inspections and investigations related to the bidder and offered commodities or services, including but not limited to the firm, its facility, personnel, qualifications, and the commodities and/or services offered to make determinations regarding compliance with the bid requirements and responsibility of the bidder. 10. Material and Workmanship. All material and workmanship shall be subject to inspection and testing by the City either at: the point of manufacturer, place of storage, or upon receipt. 11. Payment Terms. Payment will normally be made within thirty days after delivery and acceptance of commodities or services under this contract and receipt of a correct invoice. The city issued purchase order number shall be the primary identification number utilized by the city in the tracking of orders and processing of payments. A vendor’s failure to comply with the following two actions could result in a delay of payment. (1) Vendors are required to visibly place the city issued purchase order number on the invoice, (2) Vendors are required to submit the invoice directly to Central Purchasing. 12. Termination for lack of funding or authority. This contract shall become null and void, in total or in part, should the City Council of the City of Taylor fail to appropriate funds for any or all departments, which are committed to the terms of this contract. Any such contract termination shall be at no cost to the City. 13. Termination of Contract a. Termination without Cause. This contract may be terminated by mutual consent of both parties, or by either party upon 30 days' written notice. b. Termination for Lack of Funding or Authority. The City may terminate this contract effective upon delivery of written notice to the contractor, or on any later date stated in the notice, under any of the following conditions: 5 193 1) If funding from federal, state, county, city, or other sources is not obtained and continued at levels sufficient to allow for purchase of the services or supplies in the indicated quantities or term. The contract may be modified by agreement of the parties in writing to accommodate a reduction in funds. 2) If federal, state or local laws or rules are modified or interpreted in a way that the services are no longer allowable or appropriate for purchase under this contract or are no longer eligible for the funding proposed for payments authorized by this contract. 3) If any license, permit or certificate required by law or rule, or by the terms of this contract, is for any reason denied, revoked, suspended or not renewed. Termination of this contract under this subsection is without prejudice to any obligations or liabilities of either party already accrued prior to termination. c. Termination for Cause. The City by written notice of default to the contractor may terminate the whole or any part of this contract: 1) Fails to begin the work within the time specified in the Contract; 2) Fails to perform the work with sufficient workers and equipment or with sufficient materials to assure the prompt completion of said work; 3) Fails to perform the work in accordance with contract requirements or refuses to remove and replace rejected materials or unacceptable work; 4) Discontinues the work; 5) Fails to resume work which has been discontinued within a reasonable time after notice to do so; 6) Becomes insolvent or is declared bankrupt or commits any act of bankruptcy or insolvency; 7) Allows any final judgment to remain unsatisfied for a period of 10 days; 8) Fails to comply with contract requirements regarding minimum wage payments; 9) Is a party to fraud; or 10) For any other cause whatsoever, fails to carry on the work in an acceptable manner. 11) Bidder subcontracts work without City Authorization d. Termination, Deliveries. If the contract is terminated for any reason, the contractor is responsible for delivery of all commodities and services ordered prior to the termination, unless those orders had been canceled by the Purchasing Department or Entity 6 194 SPECIAL TERMS AND CONDITIONS 1. Award. Award will be made to two responsible bidders with the per unit pricing most advantageous to the City and is responsive to the specifications and all other requirements stated herein. The City of Taylor maintains the right to assign projects to each successful bidders based on availability of each contractor and available funding 2. Bid Selection. The bid winner will be selected following the applicable process under Section 4.8.12, Bid Evaluation of the Purchasing Policy. 3. Pre-Qualification: In Compliance with Section 4.8.7 of the City Purchasing Policy Manual, the requesting department may require the prequalification of vendors for the Formal Bid. The prequalification process may add up to four weeks. 4. Bid Calculation: In the event that the bid is generated based on single unit price, the Bid Bond and Performance Bond will be defined by the Central Purchasing Department based on historical data. 5. Bid Surety, Type Of. Each bid response must include five thousand ($5,000) bid surety, either in the form of:  a certified check  a bank cashier's check  a money order  a corporate surety bond from a surety company authorized to do business in the City of Taylor Each bid response must also include a copy of the original bid bond as well as a self-addressed return envelope. Bid sureties of the non-successful bidders that are in the form of a certified check, bank cashier’s check or a money order will be returned upon determination of award. The bid surety of the successful bidder(s) will be returned upon the receipt of a completed contract bond and its approval by the City. 6. Performance Bond. Prior to the start of any project, the contractor will be required to furnish a performance bond in an amount equal to each individual project or the summation of projects per City of Taylor Fiscal Year (Contract Year) approved by the director of public works or his designee that will guarantee compliance with all terms of the bids and contract. 7. Contract Period. The contract or contracts issued as a result of this solicitation will be for a City of Taylor Fiscal Year (July 1, 2025 – June 30, 2026), inclusive, with the option to extend for additional City of Taylor Fiscal Year or renew the contract for a maximum of three (3) additional fiscal years, upon mutual agreement between both the City of Taylor & Contractor, as set forth in a written amendment to this contract. Any contract renewal/extension may include a mutually agreed percentage increase to all or selected unit costs listed in this contract. The mutual agreement and unit cost increases (if applicable) shall be in writing from the Contractor and approved by the City of Taylor Administration/City Council. 8. F.O.B. Point and Freight. Delivery and passage of title under this contract shall be as follows. Delivery will be F.O.B. Destination to the location specified on the cover page of the solicitation. The freight is to be included in the price of the products. Title will pass to Purchasing Department or entity upon delivery to the specified destination. 9. Descriptive Literature. The bidder’s response must include descriptive literature or detailed manufacturer’s specifications for the specific equipment or commodities being offered. Bidders are instructed to clearly mark the literature information that demonstrates compliance with the specification. 10. Indemnification and Insurance Requirements. Bidders must review the attached Risk Management Appendix for indemnification and insurance requirements. The indemnification and insurance provisions are incorporated and made part of this solicitation and the resultant final contract. Objections to any of the provisions of the indemnification and insurance requirements must be made in writing to the attention of the Purchasing Agent by the time and date set for receipt of questions. No alteration of these provisions will be permitted without prior written approval from the Purchasing Department in consultation with the Taylor Risk Management Director. Upon receipt of the Notice of Award, the successful bidder must obtain the required insurance coverage and provide the Purchasing Agent with proof of coverage prior to contract approval. The coverage must be satisfactory to the Purchasing 7 195 Department, in consultation with the Taylor Risk Management Director. A bidder’s failure to provide evidence of insurance coverage is a material breach and grounds for withdrawal of the award or termination of the contract. Please see ( http://www.cityoftaylor.com/rfp ) 11. Pricing. Pricing under this contract shall be as follows: Firm Fixed. The total bid price is to include all discounts and deductions, and is to be less federal and City taxes, for which exemption certificates will be furnished upon request. Pricing shall be firm for the period of the contract. If an extension of the contract occurs, prices may be adjusted to reflect the additional cost the vendor has incurred only if the vendor provides documentation to prove they have incurred additional costs. 12. Purchasing Cards. The Purchasing Department may place orders by issuance of a purchase order or may elect to place an order and make payment using a purchasing card. The contractor will accept a purchasing card without passing the processing fees for the purchase card back to the Purchasing Department or Entity. 13. Record of Sales. The contractor must maintain records of sales under the contract and furnish volume of sales information to the Purchasing Department within thirty (30) days upon written request of the Purchasing Department. 14. Reference Materials. The contractor will be required to furnish and distribute catalogs and price lists to all using entities. 15. Servicing of the contract. The contractor will be required to furnish not less than two (2) copies of catalogs, replacement data books, and price lists to using department. Also, the contractor will be required to provide qualified sales personnel to periodically visit using entities to provide assistance and guidance connected with contract item usage. 16. Service Representative. The contractor must provide a dedicated service representative to provide support for this contract. The contractor shall provide the name and contact information for the service provider. During the contract period, the contractor shall notify the Purchasing Agent in the event the contractor’s service representative changes. Name Of Service Representative: Address Of Service Rep: City & City & Zip Code Phone Number: Toll Free Number: Fax Number: E-Mail Address: 8 196 HMA STREET RESURFACING AND REPAIR PROPOSAL The undersigned have made themselves familiar with the conditions under which it is to be constructed by examination of the details and specifications, all of which are understood and accepted as being sufficient for the purpose. The undersigned proposes to furnish of all labor, material, and equipment as specified and will accept in payment thereof the following unit rates, and the payments will be based on unit prices given in the proposal and quantities measured. If this proposal is accepted, the undersigned further agrees to perform the work according to a mutually agreed upon construction sequence and schedule to be determined at a Pre-Construction meeting held after all contracts and bonds have been submitted, and to complete all work, unless shortage of material or other causes beyond the Contractor’s control prohibit from doing so. Are wages paid to employees prevailing wages or higher? Yes______ No ______ BID ITEMS AND UNIT RATES Provide unit rates in words and numerals. Complete signature and information on Page 11. Description Unit of Estimated Unit Price ($) Unit Price Measure Quantity (Written) Cold Milling HMA Surface SYD 83850.0 Cold Milling HMA Surface, Modified SYD 0.0 Edge Trimming LFT 200.0 Conditioning Existing Pavement, TON 0.0 Modified Subgrade Undercutting, Type II CYD 100.0 HMA Leveling, 4E1 TON 8250.0 HMA Wearing, 5E1 TON 4950.0 HMA Shoulder, Modified TON 50.0 Repair Existing HMA Pavement SYD 20.0 Repair HMA Pavement, Utility Repair SYD 0.0 Repair HMA Pavement with Concrete SYD 0.0 Base, Utility Repair Repair HMA Driveway and Approach, SYD 20.0 Utility Repair Excavation, Earth CYD 0.0 Aggregate Base, 8 Inch TON 100.0 Aggregate Base, 1” x 3”, 4 Inch TON 0.0 HMA Parking Lot Leveling Course TON 3200.0 HMA Parking Lot Wearing Course TON 1975.0 HMA Parking Lot Repair, 3” Depth SYD 200.0 HMA Parking Lot Repair, Greater Than SYD 200.0 3” Depth Curb Vertical, HMA, Modified LFT 200.0 9 197 Aggregate Base, 6 Inch TON 100.0 Aggregate Base, 1” x 3”, 4 Inch TON 50.0 HMA Path Leveling Course TON 200.0 HMA Path Wearing Course TON 125.0 Shoulder, Cl II TON 200.0 HMA, Path Repair, 3” Depth SYD 100.0 HMA, Path Repair, Greater Than 3” SYD 100.0 Depth Dr Structure Cover, Adj, Case 1, EACH 30.0 Modified Dr Structure, Adj, Add Depth, Case 1, LFT 0.0 Modified Water Shutoff, Adj, Case 1, Modified EACH 0.0 Dr Structure Cover, Adj, Case 1, EACH 0.0 Modified, Utility Dr Structure, 24 Inch Dia EACH 1.0 Dr Structure, 48 Inch Dia EACH 1.0 Dr Structure, 60 Inch Dia EACH 0.0 Dr Structure, 72 Inch Dia EACH 0.0 Dr Structure, Adj, Add Depth of 24 Inch LFT 0.0 Dia, 8 Foot to 15 Foot Dr Structure, Adj, Add Depth of 48 Inch LFT 0.0 Dia, 8 Foot to 15 Foot Dr Structure, Adj, Add Depth of 60 Inch LFT 0.0 Dia, 8 Foot to 15 Foot Dr Structure, Adj, Add Depth of 72 Inch LFT 0.0 Dia, 8 Foot to 15 Foot Dr Structure Cover, Modified EACH 0.0 Dr Structure, Rem EACH 2.0 12” Storm Drain Pipe LFT 100.0 Pavt Repr, Rem, Modified SYD 3700.0 Pavt Repr, Nonreinf Conc, 7 inch, with SYD 0.0 Integral Curb, Modified Pavt Repr, Nonreinf Conc, 8 inch, with SYD 3500.0 Integral Curb, Modified Pavt Repr, Nonreinf Conc, 7 inch, SYD 0.0 Modified Pavt Repr, Nonreinf Conc, 8 inch, SYD 0.0 Modified Pavt Repr, Nonreinf Conc, 9 inch, SYD 200.0 Modified Pavt Repr, Nonreinf Conc, 10 inch, SYD 0.0 Modified Pavt Repr, Nonreinf Conc, 11 inch, SYD 0.0 Modified 10 198 Pavt Repr, Nonreinf Conc, 12 inch, SYD 0.0 Modified Lane Tie, Epoxy Coated, Modified EACH 350.0 Sidewalk, Rem SYD 150.0 Sidewalk, Conc, 4 inch SFT 900.0 Sidewalk, Conc, 6 inch SFT 200.0 Sidewalk Ramp, ADA, 4 inch SFT 100.0 Sidewalk Ramp, ADA, 6 inch SFT 50.0 Detectable Warning Surface LFT 150.0 Topsoil Surface, Furn, 4 inch, Modified SYD 200.0 Topsoil Surface, Furn, 6 inch, Modified SYD 3500.0 ADA Ramp Restoration SYD 50.0 Linear Feet - Crack and Joint Fill LFT 200.0 Square Feet - Seal Coat SFT 500.0 Pavt Makg, Waterborne 4-inch Yellow LFT 1000.0 Pavt Makg, Waterborne 4-inch White LFT 0.0 Pavt Makg, Waterborne 6-inch White LFT 0.0 Pavt Mrkg, Waterboard 24-inch Stop LFT 200.0 Bar SIGNED: __________________________________________________________ BY: __________________________________________________________ (Printed Name and Title) COMPANY: _________________________________________________________ 11 199 HMA PAVEMENT RESURFACING AND REPAIR GENERAL CONSTRUCTION PROCEDURES AND SCHEDULE GENERAL The work shall be performed on HMA paved streets, parking lots and pathways in the City of Taylor and shall consist of, but not be limited to: (1) removing existing HMA pavements; (2) repairing miscellaneous areas of HMA pavement deterioration and restoration of utility repair areas; (3) preparing the existing HMA, concrete or aggregate base as specified herein; (4) constructing new, adjusting and/or reconstructing existing drainage and other public utility structures; (5) furnishing and constructing and repairing HMA pavement; (6) sidewalk removal and replacement, including ADA crosswalks ramps; (7) traffic control, restoration and clean-up. PRECONSTRUCTION MEETING A meeting will be held in the City of Taylor Department of Public Services, 25605 Northline Road, following submittal of contract, bonds and insurance, between the Engineer and his representatives, and the successful bidder, and his subcontractors. The purpose of this meeting will be to review the specifications and work areas and to prepare a mutually agreeable construction schedule which will adhere to the time frames set forth herein. CONSTRUCTION TIME FRAMES The length of time from the first construction activity on a particular street to the final clean-up shall be no longer than thirty (30) calendar days. No construction debris shall be stored on the streets longer than two (2) days unless otherwise noted below or approved by the Engineer. Cleanup and disposal of miscellaneous HMA millings, paving spillage or other construction debris shall be removed from streets, parking lots, pathways, sidewalks, driveways and lawn areas the same day as deposited. Miscellaneous concrete overspill from concrete street, curb, sidewalk or driveway construction shall be removed, and any honeycombing or voids at back of curbs shall be purged smooth within seven (7) days of concrete placement. Service walks, sidewalks, ADA ramps and other concrete work shall be started and prosecuted regularly and uninterruptedly until that particular street is complete. Five (5) days after completion of finished concrete flat work on a particular project area, the affected areas shall be backfilled and compacted, seeded, and clean up completed. Construction barricades, barrels, signage and notifications shall be removed from the work areas within two (2) days of the completion of backfill and restoration operations. NOTIFICATION The Contractor shall provide notification to residents of pending street resurfacing, residential approach, sidewalk and ADA ramp reconstruction activities a minimum of 48 hours in advance of such work. The notice, 12 200 SPECIAL PROVISIONS FOR Seal Coating and Crack Sealing Seal Coating Power clean and remove any debris caused by crack sealing operation. Power Clean and remove debris. Neutralize oil spots where necessary. Install 2 coats of latex modified coal tar emulsion. Three pounds of silica sand per gallon of emulsion. Coating to be installed by pressure truck. Crack Fill Remove all vegetation, moisture and debris by using hot compressed air lance. Power routing of cracks where needed. Seal cracks and joints with hot applied joint sealant. Sealant to perform to ASTM-D-6690-A Standards. Cracks to be sealed using over band method. Power clean and remove any debris caused by crack sealing operation. 13 201 SPECIAL PROVISIONS FOR TRAFFIC MAINTENANCE AND CONTROL GENERAL All traffic control devices as required for this project shall conform to the design, material, color, and fabrication requirements as specified on the plans or in the current edition of the Michigan Manual of Uniform Traffic Control Devices and the Michigan Department of Transportation 2012 Standard Specifications for Construction, Section 812. The Contractor shall furnish, erect, maintain and remove upon completion of the work, all traffic control devices, barricades and lights within the project and around the perimeter of the project for the safety of pedestrian and vehicular and pedestrian traffic. This includes, but is not limited to, advance, regulatory, and warning signs, barricades and channelizing devices at intersecting streets on which traffic is to be maintained, barricades at the ends of the project and at right-of-way lines for intersecting streets which are to be partially closed or closed to traffic, along with barricades, signs, and lights at the intersection of these streets to be partially closed or closed with the first usable street on each side of the project. Traffic regulators, where required, are included. Barricades shall effectively bar vehicular traffic from driving onto the work site, barricades shall be used and maintained in good repair at all times during progress of the work and shall be opened only for construction purposes and public emergency. Barricades for all parts of the work shall be erected and maintained by the Contractor so as to prevent personal and property damages of all description. Any damages from traffic or other causes occurring previous to the official acceptance of the work shall be repaired by the Contractor. The Contractor shall be responsible for the posting/signing of work areas to alert residents of up-coming work at a minimum of 48 hours in advance of the start of the work. The property owners, business customers and emergency vehicles shall be assured of access to all properties. At no time shall any street be closed down to local traffic (temporary or permanent) without prior approval from the City of Taylor. Moving of parked vehicles which interfere with the prosecution of work will be the responsibility of the Contractor. The City of Taylor may perform maintenance work within or adjacent to the streets being repaired. These maintenance crews will coordinate their operations with the City Engineer to minimize the interference to the Contractor. No additional payment will be made to the Contractor for the joint use of the traffic control items. Provisions for the protection of pedestrians shall be maintained at all times. Walks, driveways and entrances to buildings shall not be unnecessarily blocked. Vehicular access shall be maintained to all commercial properties designated by the Engineer. Side streets shall not be closed to through traffic except as approved by the Engineer. Interference with traffic at all cross-streets must be held to a minimum during the time required for construction. MEASUREMENT AND PAYMENT “Traffic Maintenance and Control”, including all labor, traffic control devices, material and equipment required to provide construction traffic control per these Specifications will not be paid for separately, but shall be included in the unit rates of other work items. 14 202 SPECIAL PROVISIONS FOR EROSION AND SEDIMENTATION CONTROL GENERAL This Special Provision covers the protection of storm drainage structures and systems from the effects of erosion and sedimentation from construction activities entering into the system during the course of the work. MATERIAL Materials shall be as specified in Section 208.02 Materials of the 2012 MDOT Standard Specifications for Construction. CONSTRUCTION Erosion and sedimentation control shall be in accordance with Section 208.03.C.08 of the 2012 MDOT Standard Specifications for Construction, and as follows. Prior to starting work on a particular project, all drainage structure covers on that parking lot, street or block, or those that the parking lot or street being worked on drains to, shall be wrapped with a geotextile filter fabric. The fabric shall allow water to flow through, but shall prevent the passage of silts, dirt, clay stone and other construction debris. The fabric shall be wrapped over the top of the cover and extended under, such that when the cover is placed back in the frame, the fabric is around the entire perimeter between the frame and cover. During final clean-up of the area, the fabric shall be carefully removed, preventing any captured debris from falling into the drainage structure. The fabric shall be inspected daily and repaired immediately to insure the complete and consistent effectiveness of the erosion and sedimentation control. MEASUREMENT AND PAYMENT Payment for soil erosion and sedimentation control work will not be paid for separately but shall be included in other work item unit rates. 15 203 UTILITY COORDINATION GENERAL The Contractor shall cooperate and coordinate construction activities with the owners of utilities as stated in Section 104.08 of the 2012 MDOT Standard Specifications for Construction. In addition, for the protections of underground utilities, the contractor shall follow the requirements in Section 107.12 of the 2012 MDOT Standard Specifications for Construction. Contractor delay claims, resulting from a utility, will be determined based upon Section 109.05.E of the 2012 MDOT Standard Specifications for Construction. For the protection of underground utilities and in conformance with Public Act 53, the Contractor shall call “Miss Dig” at 1-800-482-7171 a minimum of three (3) working days, excluding Saturdays, Sundays and Holidays, prior to beginning excavation or pavement removal activities. The Contractor shall be responsible for notifying utilities that may not be a part of the “Miss Dig” system. PUBLIC UTILITIES The following public utilities have facilities located within the City of Taylor Right-of-way: Utility Telephone Number City of Taylor - Water and Sewers 734-374-1373 DTE Energy 313-235-5632 DTE Energy (MichCon) 800-338-0178 AT&T 734-523-7797 Comcast 248-359-6582 Fiber Technologies Networks, LLC 800-497-5578 123.Net, Inc. 248-228-8243 Level 3 Communications, LLC 248-359-2527 16 204 SPECIAL PROVISION FOR HMA SURFACE REMOVAL GENERAL This work shall consist of removing HMA pavement surface by use of cold-milling equipment to prepare the foundation for HMA paving per Section 501.03 of the 2012 Michigan Department of Transportation (MDOT) Standard Specifications for Construction and as specified herein. CONSTRUCTION The Contractor shall schedule the cold-milling operation so that entire lane width of the roadway is cold milled between road terminus limits before switching over to other lane/side. This is required to avoid having a vehicle travel over milled surface on one side and normal pavement surface other side. The milling shall follow the street pavement width. The street HMA surface shall be milled to a minimum depth of four (4) inches. It will be the Contractor's responsibility to establish the finish or final grade on all streets milled and resurfaced to ensure a positive drainage to existing drainage structures and/or drainage ditches. The Contractor shall neatly cut the transverse joint at the limits of the milling at intersection shoulders and terminus limits smooth and vertical to form a neat, smooth and vertical surface to place the new HMA surface against. The limits will be established by the Engineer. At the end of the day, the Contractor shall place a wedge, a minimum of six (6) feet wide, the full length of all transverse joints at intersections to provide a smooth transition onto and off of the milled surface. MEASUREMENT AND PAYMENT The completed work for Cold Milling HMA Surface will be measured in square yards and paid for at the contract unit price for the contract pay item. The price shall be payment in full for all equipment, material and labor required for the removal of the HMA material, establishing finish or final grade for positive drainage, and wedging for longitudinal and transverse transition joints when required, to the depth specified herein, and for transportation and disposal of the removed material. The trimming of transverse joints at intersection limits of removal shall be paid for by the foot trimmed as per MDOT pay item “Edge Trimming”. Pay Item Pay Unit Cold Milling HMA Surface Square Yard Edge Trimming Foot 17 205 SPECIAL PROVISION FOR HMA OVERLAY SURFACE REMOVAL DESCRIPTION This work shall consist of removing HMA pavement surface over a concrete base by use of cold-milling equipment to prepare the foundation for HMA overlays per Section 501.03 of the 2012 Michigan Department of Transportation (MDOT) Standard Specifications for Construction and as specified herein. CONSTRUCTION The Contractor shall schedule the cold-milling operation so that entire lane width of the roadway is cold milled between road terminus limits before switching over to other lane/side. This is required to avoid having a vehicle travel over milled surface on one side and normal pavement surface other side. The street HMA surface shall be milled a minimum 3-1/2” deep to a maximum 5-1/2” deep, or to the the top of the existing concrete base. The Contractor shall neatly cut the transverse joint at the limits of the milling at intersection shoulders and terminis limits smooth and vertical to form a neat, smooth and vertical surface to place the new HMA surface against. The limits will be established by the Engineer. The milled surfaces shall be cleaned and swept including joints, cracks, shoulders, base courses and leveling courses. At the end of the day, the Contractor shall place a wedge, a minimum of 6 feet wide, the full length of all transverse and longitudinal joints at intersections where milling is greater than 2 inches in depth, to provide a smooth transition onto and off of the milled surface. MEASUREMENT AND PAYMENT The completed work for Cold Milling HMA Surface, Modified, will be measured in square yards and paid for at the contract unit price for the contract pay item. The price shall be payment in full for all equipment, material and labor required for the removal of the HMA material, pavement cleaning and wedging for longitudinal and transverse transition joints when required, to the depth specified herein and for transportation and disposal of the removed material. The trimming of transverse joints at intersection limits of removal shall be paid for by the foot trimmed as per MDOT pay item “Edge Trimming”. Pay Item Pay Unit Cold Milling HMA Surface, Modified Square Yard Edge Trimming Foot 18 206 SPECIAL PROVISION FOR CONDITIONING EXISTING HMA, CONCRETE PAVEMENT AND AGGREGATE BASE GENERAL This work covers the conditioning of existing HMA pavement to receive HMA paving, the repair of the aggregate base under the HMA surface, and the repair of existing concrete pavement bases to receive an HMA overlay. This work shall be in accordance with Subsection 501.03.C of the 2012 Michigan Department of Transportation Standard Specifications for Construction including Removing HMA Patches, Joint and Crack Clean Out, Hand Patching, and Repairing Pavement Joints and Cracks, Detail 7, and, shall include the application of bond coat as required. MATERIAL The HMA material shall be as specified in Section 501.02. HMA shall also be as set forth in the Special Provision for HMA Application. Subgrade fill material shall be as specified in Section 205.02, Granular Material Class II of the 2012 MDOT Standard Specifications for Construction. CONSTRUCTION Patch or repair the existing HMA base surface or concrete pavement base to receive HMA or HMA overlay in accordance with Subsection 501.03.C.9 of the 2012 Michigan Department of Transportation Standard Specifications for Construction, including Removing HMA Patches, Joint and Crack Clean Out, Hand Patching, and Repairing Pavement Joints and Cracks, Detail 7, and, shall include the application of bond coat as required. Where stone base subgrade corrections are required due to undesirable or unstable conditions as determined by the Engineer, the removal of material and placement of fill shall be performed in accordance with Section 205.03.E of the 2012 MDOT Standard Specifications for Construction. MEASUREMENT AND PAYMENT "Conditioning Existing Pavement, Modified" will be measured and paid for by the ton of HMA material placed. The contract price per ton will be payment in full for furnishing all labor, material and equipment required to remove deteriorated, loose or unstable HMA or concrete material, to clean the pavement surface and apply any bonding material needed, to clean and prep joints and cracks, and to furnish, place and compact the specified Pavement Conditioning Mixture to prepare the existing pavement for the HMA leveling and/or wearing course. HMA Patch, Remove; Joint and Crack, Cleanout; Hand Patching; and Pavement Joint and Crack, Repr, Det 7; will not be paid for separately but are included in this item of work. Full depth Pavement Joint and Crack Repair, Detail 8 is not included in the item of work. “Subgrade Undercutting, Type II” will be measured by cubic yard placed and the unit price will be payment in full for furnishing all labor, material and equipment required to remove and dispose of undesirable or unstable material, and place and compact specified fill. Pay Item Pay Unit Conditioning Existing Pavement, Modified Ton Subgrade Undercutting, Type II Cubic Yard 19 207 SPECIAL PROVISION FOR HMA APPLICATION DESCRIPTION This Specification covers the furnishing and placing of Hot Mixed Asphalt (HMA) in accordance with Section 501 of the 2012 MDOT Standard Specifications for Construction. MATERIAL HMA materials shall be as specified in Section 501.02. Performance Grade; PG 64-22. The aggregate wear index shall be 260. HMA Bond Coat shall meet the requirements specified in Section 904 of the 2012 MDOT Standard Specifications for Construction. CONSTRUCTION The HMA shall be produced and placed in accordance with Section 501.03 of the 2012 MDOT Standard Specifications for Construction. The HMA Leveling Surfacing Mixture 4E1 shall have a yield of 275 pounds per square yard with an estimated thickness of 2.5 inches. The HMA Wearing Surfacing Mixture 5E1 shall have a yield of 165 pounds per square yard with an estimated thickness of 1.5 inches. The material for HMA repair and restoration areas shall be a minimum 2.5 inches of HMA Mixture 4E1 for leveling, and minimum 1.5 inches of HMA Mixture 5E1 for wearing surface, having a total yield of 385 pounds per square yard. HMA Pavement Conditioning material shall be HMA Mixture 4E1, having a yield of 110 pounds per square yard, per inch of depth (or as directed by the Engineer). HMA Shoulder, Modified (Driveway/Approach) shall be HMA Mixture 5E1. On streets being resurfaced, place a minimum of 2.5 inches of HMA Leveling and 1.5 inches of HMA Wearing. Bond coat shall be applied uniformly at a rate of 0.10 gallons per square yard, or as directed by the Engineer, in accordance with Section 501.03.D of the MDOT Specifications. HMA Bond Coat shall be included in the HMA pay item MEASUREMENT AND PAYMENT The unit price bid shall be full compensation for all labor, equipment, and materials required to furnish and place the HMA as specified. Pay Item Pay Unit HMA Leveling, 4E1 Ton HMA Wearing, 5E1 Ton 20 208 SPECIAL PROVISION FOR DRIVEWAY APPROACHES GENERAL This work shall include the removal of the existing HMA surface on residential and commercial driveway approaches and the placement and compaction of HMA to provide a smooth transition and positive drainage from the existing approach surface to the new street surface or storm drain. MATERIAL The material used for residential and commercial driveways shall be as specified in the City of Taylor Special Provision for HMA Application. CONSTRUCTION The driveway approach shall be neatly cut, or shall be scraped clean of existing HMA overlay if any, thoroughly swept clean, and be free of moisture and debris before work is started. Bond coat material shall be SS-1h, meeting the requirements of Table 904-4 Anionic Emulsified Asphalts of the Michigan Department of Transportation 2012 Standard Specifications for Construction and shall be applied uniformly at a rate of 0.10 gallons per square yard to the driveway approach and terminate in a neat, straight line at the point indicated by the Engineer. The HMA shall be placed and compacted from the newly constructed pavement surface to a point in the drive which will provide a smooth transition and positive drainage from the driveway out to the street flow line or storm drain. This work shall be performed after the mainline paving work has cured. MEASUREMENT AND PAYMENT The removal and placement of HMA on residential and commercial driveway approaches will be measured by the weight of material placed in tons, and shall be paid for at the contract unit price per ton which shall be payment in full for furnishing all materials, labor and equipment, including bond coat, required to complete the work as specified. Pay Item Pay Unit HMA Shoulder, Modified Ton 21 209 SPECIAL PROVISION FOR REPAIRING AND RESTORING MISCELLANEOUS LOCATIONS OF STREET DETERIORATION AND UTILITY REPAIRS GENERAL This work covers the repair of existing deteriorated HMA surfaces, and the restoration of utility repair areas, including; the removal of temporary patching materials, replacement of existing concrete base pavement to receive HMA pavement, the repair and conditioning of the aggregate base under the HMA pavements, and placing HMA pavement; and the restoration of HMA driveways and approaches. The locations of the repair and restoration work will assembled by the City of Taylor and presented to the Contractor for work in a minimum of three (3) packages. The work packages will be assigned in April, July and October and are to be completed by the end of that month unless authorized by the City. There may be repair or restoration locations considered “urgent” which may be assigned to the Contractor for immediate attention at any time during this Contract while the Contractor is performing work on this Contract.. MATERIAL The HMA material shall be as specified in Section 501.02 of the 2012 MDOT Standard Specifications for Construction. HMA shall also be as set forth in the Special Provision for HMA Application. Mix, mixing and delivery shall be in accordance with the 2012 MDOT Standard Specification Section 601 Portland Cement Concrete for Pavements. Concrete Grade shall be MDOT P1, with a slump of four (4) inches, and having an entrained air content of not less than five (5) percent nor more than seven (7) percent. CONSTRUCTION Repair existing deteriorated HMA pavement street surfaces as marked by the Engineer. Remove the marked surface area by cold milling a minimum of four (4) inches in depth, in accordance with the Special Provision for HMA Surface Removal. Condition the existing base in accordance with the Special Provision for Conditioning Existing HMA, Concrete Pavement and Aggregate Base. Place a minimum two and one half ( 2.5) inches of HMA Mix 4E1 for the leveling course and one and one half (1.5) inches of HMA Mix 5E1 for the wearing or top course, including bond coat. Place the HMA courses in accordance with Section 501.03 of the 2012 MDOT Standard Specifications for Construction. Provide a repaired HMA surface flush with the surrounding existing HMA pavement surface and following the contour of the street. Restore utility repair areas on HMA pavement street surfaces. Remove the temporary HMA patch and/or aggregate fill to a depth equal to the bottom of the existing HMA pavement. Prepare the base aggregate. Place a minimum two and one half ( 2.5) inches of HMA Mix 4E1 for the leveling course and one and one half (1.5) inches of HMA Mix 5E1 for the wearing or top course, including bond coat. Place the HMA courses in accordance with Section 501.03 of the 2012 MDOT Standard Specifications for Construction. Provide a repaired HMA surface flush with the surrounding existing HMA pavement surface and following the contour of the street. Restore utility repair areas on HMA pavement overlays with concrete base. Remove the temporary HMA patch and/or aggregate fill to a depth equal to the bottom of the existing concrete base. Prepare the base and place a minimum of eight (8) inches of concrete, anchored to the existing abutting concrete base in accordance with the Special Provision for Concrete Base Pavement Repair Receiving HMA Overlay. Place a minimum two and one half ( 2.5) inches of HMA Mix 4E1 for the leveling course and one and one half (1.5) inches of HMA Mix 5E1 for the wearing or top course, including bond coat. Place the HMA courses in accordance with Section 501.03 22 210 of the 2012 MDOT Standard Specifications for Construction. Provide a repaired HMA surface flush with the surrounding existing HMA pavement surface and following the contour of the street. Restore utility repair areas on driveways and approaches with HMA pavement by removing the temporary HMA patch and/or aggregate fill to a depth equal to the bottom of the existing HMA pavement. Prepare the base aggregate. Place a minimum of four (4) inches of HMA Mix 5E1. Place the HMA in accordance with Section 501.03 of the 2012 MDOT Standard Specifications for Construction. Provide a repaired HMA surface flush with the surrounding existing HMA pavement surface and following the contour of the approach or driveway. Where stone base subgrade corrections are required due to undesirable or unstable conditions as determined by the Engineer, the removal of material and placement of fill shall be performed in accordance with Section 205.03.E of the 2012 MDOT Standard Specifications for Construction. MEASUREMENT AND PAYMENT “Repair Existing HMA Pavement” will be measured and paid for by square yards of HMA pavement removed and replaced. The contract unit price per square yard will be payment in full for furnishing all labor, material and equipment required to remove deteriorated HMA pavement, to clean and prepare the base surface, furnish and apply any bonding material needed, and to furnish, place and compact the specified HMA Mixture. “Restore HMA Pavement, Utility Repair” will be measured and paid for by square yards of HMA pavement replaced. The contract unit price per square yard will be payment in full for furnishing all labor, material and equipment required to remove temporary pavement material, clean and prepare the base surface, furnish and apply any bonding material needed, and to furnish, place and compact the specified HMA Mixtures. “Restore HMA Pavement with Concrete Base, Utility Repair” will be measured and paid for by square yards of HMA pavement replaced. The contract unit price per square yard will be payment in full for furnishing all labor, material and equipment required to remove temporary pavement material, clean and prepare the base surface, construct the concrete base, furnish and apply any bonding material needed, and to furnish, place and compact the specified HMA Mixtures. “Restore HMA Driveway and Approach, Utility Repair” will be measured and paid for by square yards of HMA pavement replaced. The contract unit price per square yard will be payment in full for furnishing all labor, material and equipment required to remove temporary pavement material, clean and prepare the base surface, furnish and apply any bonding material needed, and to furnish, place and compact the specified HMA Mixture to the depth required. Pay Item Pay Unit Repair Existing HMA Pavement Square Yard Restore HMA Pavement, Utility Repair Square Yard Restore HMA Pavement with Concrete Base, Utility Repair Square Yard Restore HMA Driveway and Approach, Utility Repair Square Yard 23 211 SPECIAL PROVISION FOR CONSTRUCTION AND REPAIR OF HOT MIXED ASPHALT PARKING LOTS GENERAL This Special Provision covers the excavation and construction of the aggregate base course for the construction of a Hot Mixed Asphalt (HMA) parking lots, the furnishing and placing of HMA for new construction of, or repair of existing, HMA parking lots. The work shall be performed in accordance with and Section 205 Roadway Earthwork, Section 302 Aggregate Base Course, Section 307 Aggregate Shoulders and Approaches, and Section 501 Plant Produced Hot Mixed Asphalt of the 2012 Michigan Department of Transportation Standard Specifications for Construction and as specified herein. MATERIAL Material for the aggregate base shall 21AA in accordance with Section 302.02. Material for the 1” x 3” aggregate base shall be limestone or crushed concrete. HMA materials shall be as specified in MDOT Section 501.02. The HMA Leveling Course shall be mix 13A and have a yield of 165 pounds per square yard per inch placed. The HMA Wearing Course shall be mix 1100T and shall have a yield of 165 pounds per square yard per inch placed. Performance Grade; PG 64-22. The aggregate wear index shall be 260. HMA Prime Coat and HMA Bond Coat shall be included in the HMA pay item and shall meet the requirements specified in Section 904 of the 2012 MDOT Standard Specifications for construction. CONSTRUCTION Earth excavation for the HMA parking lot shall be in accordance with Section 205.03 Construction, of the MDOT 2012 Standard Specifications and as follows. Excavate earth to accommodate an aggregate base one (1) foot wider than the limits of the proposed parking lot. Excavate the earth to a depth of eight (8) inches below the natural grade. Construct the subgrade in accordance with Section 205.03.N, and compact. If unstable soil conditions are present, excavate an additional four (4) inches below the aggregate base and place 1” x 3” aggregate or crushed concrete as directed by the City. All excavated material shall become the property of the Contractor, removed from the site and properly disposed of. Construct the eight (8) inch aggregate base course in accordance with Section 302.03. Construct the HMA parking lot pavement with 2.5” of HMA Leveling Course and 1.5” of HMA Wearing Course. The HMA shall be produced and placed in accordance with Section 501.03 of the 2012 MDOT Standard Specifications for Construction. 24 212 If storm drainage structures and storm sewer pipes are required, they shall be constructed and paid for in accordance with the Special Provision for Construction of Drainage Structures. Existing HMA parking lot repairs shall be saw cut neat and the HMA removed to the aggregate sub grade. The HMA material shall become the property of the Contractor and properly disposed of. The existing base material shall be prepared, compacted and graded level to receive the repair HMA in accordance with the Special Provision for Conditioning Existing HMA, Concrete Pavement and Aggregate Base. Replace the HMA pavement with the material specified herein. If the depth of the existing HMA is greater than three (3) inches, place the HMA in two (2) lifts consisting of a leveling course of two (2) inches and the balance to be wearing course material. MEASUREMENT AND PAYMENT The unit price bid shall be measured as set forth below and shall be full compensation for all labor, equipment, and materials required to perform the work as specified in this Special Provision. Pay Item Pay Unit Excavation, Earth Cubic Yard Aggregate Base, 8 inch Ton Aggregate Base, 1” x 3”, 4 inch Ton HMA Parking Lot Leveling Course Ton HMA Parking Lot Wearing Course Ton HMA, Parking Lot Repair, 3” Depth Square Yard HMA, Parking Lot Repair, Greater Than 3” Depth Square Yard 25 213 SPECIAL PROVISION FOR CONSTRUCTION AND REPAIR OF HOT MIXED ASPHALT PATHS GENERAL This Special Provision covers the excavation and construction of the aggregate base course for the construction of a Hot Mixed Asphalt path, the furnishing and placing of HMA for new construction of or repair of existing Hot Mixed Asphalt (HMA) paths, and the construction of aggregate shoulders as specified by the City. The work shall be performed in accordance with and Section 205 Roadway Earthwork, Section 302 Aggregate Base Course, Section 307 Aggregate Shoulders and Approaches, and Section 501 Plant Produced Hot Mixed Asphalt of the 2012 Michigan Department of Transportation Standard Specifications for Construction and as specified herein. MATERIAL Material for the aggregate base shall 21AA in accordance with Section 302.02. Material for the 1” x 3” aggregate base shall be limestone or crushed concrete. Material for subgrade undercutting shall be 3” x 1” limestone or crushed concrete. HMA materials shall be as specified in MDOT Section 501.02. The HMA Leveling Course shall be mix 13A and have a yield of 165 pounds per square yard per inch placed. The HMA Wearing Course shall be mix 1100T and shall have a yield of 165 pounds per square yard per inch placed. Performance Grade; PG 64-22. The aggregate wear index shall be 260. HMA Prime Coat and HMA Bond Coat shall be included in the HMA pay item and shall meet the requirements specified in Section 904 of the 2012 MDOT Standard Specifications for construction. The shoulder aggregate shall be 21AA as specified in Section 307.02. CONSTRUCTION Earth excavation for the path for HMA pavement shall be in accordance with Section 205.03 Construction, of the MDOT 2012 Standard Specifications and as follows. Excavate earth to accommodate an aggregate base two (2) foot wider than the width of the proposed path. Excavate the earth to a depth of six (6) inches below the natural grade. Construct the subgrade in accordance with Section 205.03.N, and compact. If unstable soil conditions are present, excavate an additional four (4) inches below the aggregate base and place 1” x 3” aggregate or crushed concrete as directed by the City. Perform subgrade undercutting per Section 205.03.E to remedy unstable soil conditions as directed by the Engineer. 26 214 All excavated material shall become the property of the Contractor, removed from the site and properly disposed of. Construct the aggregate base course in accordance with Section 302.03. Construct the path HMA pavement with 2” of HMA Leveling Course and 2” of HMA Wearing Course. The HMA shall be produced and placed in accordance with Section 501.03 of the 2012 MDOT Standard Specifications for Construction. The path shall be crowned with a maximum 1.5% slope from centerline to the edges of the HMA. The aggregate shoulders shall be constructed in accordance with Sections 307.03.B thru D of the MDOT Specifications and as specified by the City. The aggregate shoulders shall be compacted in place so that the top of the aggregate is a minimum four (4) inches deep, or equal to the depth of the HMA, and level with the top of the HMA surface. The shoulders shall be determined by the City and shall extend from the edge of the HMA path to the existing grade and be feathered to meet the existing grade. Existing HMA Path repairs shall be saw cut neat and the HMA removed to the aggregate sub grade. The HMA material shall become the property of the Contractor and properly disposed of. The existing base material shall be prepared, compacted and graded level to receive the repair HMA in accordance with the Special Provision for Conditioning Existing HMA, Concrete Pavement and Aggregate Base. Replace the HMA pavement with the material specified herein. If the depth of the existing HMA is greater than three (3) inches, place the HMA in two (2) lifts consisting of a leveling course of two (2) inches and the balance to be wearing course material. MEASUREMENT AND PAYMENT The unit price bid shall be measured as set forth below and shall be full compensation for all labor, equipment, and materials required to perform the work as specified in this Special Provision. Pay Item Pay Unit Excavation, Earth Cubic Yard Subgrade Undercutting, Type II Cubic Yard Aggregate Base, 6 inch Ton Aggregate Base, 1” x 3”, 4 inch Ton HMA Path Leveling Course Ton HMA Path Wearing Course Ton Shoulder, Cl II Ton HMA, Path Repair, 3” Depth Square Yard HMA, Path Repair, Greater Than 3” Depth Square Yard 27 215 SPECIAL PROVISION FOR HMA CURB GENERAL The work shall consist of constructing and repairing HMA curbs where directed by the City. MATERIALS HMA curb material shall be as specified in the Special Provision for HMA Application for HMA Wearing Surfacing Mixture 5E1. Bond Coat shall meet the requirements specified in Section 904 of the 2012 MDOT Standard Specifications for Construction. CONSTRUCTION Construction of HMA curbs shall comply with the 2012 Michigan Department of Transportation Standard Specifications for Construction Section 805.03 and as specified herein. Curb shall be a vertical curb with a height above the pavement of six (6) inches, a base width of six (6) inches and tapered to a top width of three (3) inches or approved equal. Bond coat shall be applied uniformly at a rate of 0.10 gallons per square yard in accordance with Section 501.03.D of the MDOT Specifications. Bond coat shall be included in the curb pay item. At a minimum of twenty four (24) hours after placing curb, backfill with topsoil and compact from top to new curb, two (2) foot wide, to existing grade and seed. Backfill and seed to be as specified in Special Provision for Restoration. MEASUREMENT AND PAYMENT Curb construction of the type specified will be measured as follows, and shall be paid for at the contract unit price which shall be payment in full for all labor, material and equipment to provide the HMA curb as specified herein. Pay Item Pay Unit Curb Vertical, HMA, Modified Foot 28 216 SPECIAL PROVISION FOR UTILITY STRUCTURE ADJUSTMENT, RECONSTRUCTING STRUCTURES AND COVER REPLACEMENT GENERAL The work consists of adjusting utility structures in accordance with the applicable provisions of Section 403 of the 2012 Michigan Department of Transportation (MDOT) Standard Specifications for Construction, except as modified herein. All storm and sanitary catch basin, inlet and manhole structures, and watergate wells and valve boxes within areas of pavement to be removed and replaced shall be adjusted, raised or lowered as required, so that the covers meet the new pavement elevations, and sealed as specified herein. MATERIALS Materials used in the adjustment and reconstruction of utility structures shall be as specified in Section 403. Drainage Structures, of the 2012 MDOT Standard Specifications for Construction, and as follows: ng: “WrapidSeal Manhole Encapsulation System” as manufactured by CANUSA “Infi-Shield” as manufactured by Sealing Systems Incorporated “CS-212 Exterior Joint Wrap” as manufactured by Concrete Sealants, Inc. Approved Equals EJIW – 00104014 or 00104010 (as determined to with a cover) EJIW – 001040029 1040AGS Taylor Storm, bolting or no bolting EJIW – 001040028 1040AGS Taylor Sanitary, bolting or no bolting EJIW – 001040030 1040AGS Taylor Water EJIW – 00500074B01 Taylor CONSTRUCTION Existing structures and covers shall be adjusted to the proper elevation in accordance with Section 403 of the 2012 MDOT Standard Specifications for Construction, except as modified herein. For concrete based streets receiving a HMA overlay, remove an area of pavement and curb around the structure. The frame and cover shall be carefully removed and the upper portion of the existing utility structure repaired as necessary and raised or lowered as required. The frame and cover shall then be reset on the adjusted structure so constructed as to hold them firmly in place and reset on a full mortar bed so as to fit the required new pavement grade and cross section. On an HMA based street, the frame and cover shall be carefully removed and the upper portion of the existing utility structure repaired as necessary and raised or lowered as required to provide positive drainage from the new street surface. The frame and cover shall then be reset on the adjusted structure so constructed as to hold them firmly in place and reset on a full mortar bed so as to fit the required new pavement grade and cross section. An external sealing system shall be installed adhering to the structure casting and the precast concrete, block or brick of the structure. Installation shall be in conformance with the manufactures specifications and procedures. The sealing system shall extend down and cover the top one (1) foot of the structure precast concrete, brick or block. 29 217 Replace surrounding HMA pavement, concrete pavement, curb, curb and gutter, or sidewalk to match existing grades or to the required new pavement grade and cross section. Where the structure is in need of repair, in excess of the adjustment limits set forth herein, the existing structure shall be broken down to solid structural material and rebuilt from that point up with new materials to the required new pavement elevations. MEASUREMENT AND PAYMENT The completed work as described for adjusting or reconstructing structure will be measured as units and will be paid for at the Contract Unit Price, which price will be payment in full for furnishing all materials, equipment and labor; excavation, backfilling, disposal of surplus material, removal of all debris and foreign material from the structure (including the sump); adjusting the structure and cover to the required new pavement grade and cross section, with the existing or new cover; sealing; and providing access to all structures for inspection, as directed by the Engineer. Removal and replacement of HMA pavement, concrete pavement, curb, curb and gutter, and sidewalk shall be paid separately at the Contract Unit Rates for those items of work. Structure damage, due to the Contractor’s operations shall be repaired at the Contractor’s expense. “Dr Structure Cover, Adj. Case 1, Modified” shall include the above described work necessary to raise or lower the existing catch basin, manhole or gate well rim elevation involving adjustment, and including the repair or replacement of brick or block to a depth of less than or equal to twelve (12) inches, including mortar, regardless of whether or not it is necessary to remove a cone section to accommodate the rim elevation adjustment. “Dr Structure, Adj, Add Depth, Case 1, Modified” shall include the above described work necessary to repair or replace the existing catch basin, manhole or gate well structure of blocks or bricks in excess of twelve (12) inches below top of structure. Measurement shall be per foot of repair or replacement of brick or block exceeding twelve (12) inches. “Water Shutoff, Adj, Case __, Modified” shall include the above described work necessary to raise or lower the existing structure and cover of water shutoff boxes. Pay Item Pay Unit Dr Structure Cover, Adj, Case 1, Modified Each Dr Structure, Adj, Add Depth, Case 1, Modified Foot Water Shutoff, Adj, Case 1, Modified Each 30 218 SPECIAL PROVISIONS FOR CONSTRUCTION OF DRAINAGE STRUCTURES GENERAL The work shall consist of constructing manhole and catch basin structures to the size and type, as shown on the City of Taylor Standard Storm Water Detail Drawings ST-1 and ST-2, to the line and elevation of final grade, of Portland cement concrete block masonry, brick masonry or precast concrete units (with or without steel reinforcement as provided); furnishing and placing metal frames and covers; removal of existing drainage structures; installation of storm drainage pipe, and shall include complete restoration of any disturbed lawns or grassy areas. MATERIALS The materials used for constructing storm sewer manholes and catch basins shall conform to the requirements of the 2012 MDOT Standard Specifications Section 403.02 Materials, unless otherwise specified herein. Backfill for storm sewer manholes and catch basins shall be Class IIIA granular material as specified in Table 902.3 of the 2012 MDOT Standard Specifications. Pavement subgrade backfill shall be Class II or 21A aggregate and shall conform to the Michigan Department of Transportation 2012 Standard Specifications for Construction, Section 902.05 Gray Iron Castings shall be as specified in Section 908.05. Gray Iron Castings of the 2012 MDOT Standard Specifications for Construction, and as specified herein. The structure frames, covers and assemblies shall be as specified in the Special Provision for Utility Structure Adjustment, Reconstructing Structures and Cover Replacements. Drainage structure sealing shall be as specified in the Special Provision for Utility Structure Adjustment, Reconstructing Structures and Cover Replacements. Storm drainage pipe shall be as specified on the City of Taylor Standard Storm Water Detail Drawings ST-1 and ST-2. CONSTRUCTION Manholes and Catch Basins shall be constructed in accordance with Section 403.03 Construction, of the 2012 MDOT Standard Specifications, and the City of Taylor Standard Storm Water Detail Drawings ST-1 and ST-2 unless otherwise specified herein. The Contractor shall comply with all Federal, State, and local laws and regulations governing construction methods and the furnishing and use of all safeguards, safety devices, protective equipment, and pollution controls. It shall be the Contractor’s responsibility to protect, as reasonably necessary, the life and health of all personnel on the job, the safety and health of the public, and to protect property during the construction of the project. Pavement, curbs, sidewalks and driveways which are required to be removed, shall be removed as specified in the applicable sections of the 2012 MDOT Standard Specifications for Construction. Pavement, curbs, sidewalks and driveways shall be sawed in straight lines parallel or perpendicular to the line of work or removed to the nearest joint and shall be limited to the minimum area necessary to do the required underground work. Any broken or damaged walks or driveways shall not be patched but shall be entirely replaced. Excavation for constructing manholes and catch basins shall conform to Section 206.03.A of the 2012 MDOT Standard Specification for Construction unless otherwise specified herein. 31 219 Backfilling for structures shall be as specified in Section 401.03.D of the 2012 MDOT Standard Specifications. The Backfilling around structures shall not begin any sooner than 12 hours after the structure has been completed, except precast structures which may be backfilled immediately. Excavation shall be made in such a manner so as to protect the side walls from caving in, and so as not to incur damage to either private or public property. Excavated material shall be hauled away from the trench area continually as part of the trenching operation. Excavation beyond the minimum dimensions specified or shown on the Plans, when not so directed by the Engineer, will be deemed unauthorized, and the space of excess excavation shall be filled in the same manner as specified above at no increase in Contract Price. Adequate pumping equipment and drainage facilities shall be provided and maintained to dewater the work area, and water entering the work from whatever source shall be promptly removed and properly disposed of. All required pumping and drainage shall be done without damage to adjacent property or structures, or to the operations of other contractors, and without interference with the rights of public or private owners or pedestrian and vehicular traffic. Bottoms for structures may be of precast units or poured in place concrete and shall be supported by a compacted six (6) inch granular base. If the bottoms are poured in place, they shall be allowed to set for 24 hours before placing masonry or otherwise working on top of it. Manhole and catch basin base slabs shall have a nominal diameter and thickness, and be reinforced, as shown on the City of Taylor Standard Storm Water Detail Drawings ST-1 and ST-2. All ground surfaces shall be left by the Contractor in essentially as good condition as before manhole or catch basin removal or construction started and any pavements, sidewalks, trees, or other things damaged or destroyed on account of the removal or construction shall be repaired, replaced, or settled for at the Contractor’s expense unless otherwise noted. Where called for on the Plans or as directed by the Engineer, manholes and catch basins shall be removed, disposed of, and backfilled as specified in Section 203 Removing Drainage Structures, Culverts and Sewers of the 2012 MDOT Standard Specifications for Construction. The metal frames, covers, and grates on existing manholes and catch basins that are to be reused shall be carefully removed to prevent damage. Any reusable casting damaged by the Contractor shall be replaced with a new casting without additional cost to the City. All salvaged castings that are not to be used on the work shall become the property of the Contractor and shall be promptly removed from the job site. Storm water drainage piping shall be installed in accordance with the City of Taylor Standard Storm Water Detail Drawings ST-1 and ST-2. 32 220 MEASUREMENT AND PAYMENT The completed work as described for constructing new “Manholes”, “Catch Basins” and “Inlets” of the size and type specified will be measured as Drainage Structure units, and will be paid for at the Contract unit price per each. This price shall be full compensation for all labor, equipment, materials, excavation, including removal and disposal of all materials encountered, openings, and backfilling, required to complete the construction as specified herein. The unit price for Dr Structure, Add Depth, 8 foot to 15 foot, of the diameter required includes the cost of the drainage structure portions greater than 8 feet deep, but no greater than 15 feet deep. Drainage Structure Cover unit prices shall include the furnishing and installation of the manhole, catch basin and inlet covers of the appropriate type. Storm water drainage piping shall be installed as specified herein and shall be paid for at the Contract unit price per linear foot for all material, equipment and labor required to complete the installation of piping. Pavement removal and replacement, when required will be paid for separately. Pay Item Pay Unit Dr Structure, 24 inch dia, Each Dr Structure, 48 inch dia, Each Dr Structure, 60 inch dia, Each Dr Structure, 72 inch dia, Each Dr Structure, Add Depth of 24 inch dia, 8 foot to 15 foot Foot Dr Structure, Add Depth of 48 inch dia, 8 foot to 15 foot Foot Dr Structure, Add Depth of 60 inch dia, 8 foot to 15 foot Foot Dr Structure, Add Depth of 72 inch dia, 8 foot to 15 foot Foot Dr Structure Cover, Modified Each Dr Structure, Rem Each 12” Storm Drain Pipe Linear Foot 33 221 SPECIAL PROVISION FOR PRIVATE UTILITY STRUCTURE ADJUSTMENTS GENERAL All DTE, MICHCON and AT&T utility structures, hand holes, and roadway valve boxes located in street pavement or sidewalk pavement being repaired, removed and replaced shall be adjusted as necessary by the Utility Owner, or their representative. The Contractor shall contact the specific Utility Owner thirty (30) days prior to HMA paving, concrete pavement or sidewalk placement to co-ordinate the adjustment required to the structure to meet the proposed grades. All DTE, MICHCON and AT&T utility structures shall be adjusted as specified in the Special Provision for Utility Structure Adjustment, Reconstructing Structures and Cover Replacement. MEASUREMENT AND PAYMENT All material, labor and equipment required to adjust to grade DTE, MICHCON and AT&T utility structures, hand holes, and roadway valve boxes located in street pavement or sidewalk pavement being repaired, removed and replaced shall be paid for under the unit rates bid for unless work is performed by the Utility Owner: Pay Item Pay Unit Dr Structure Cover, Adj, Case 1, Modified, Utility Each 34 222 SPECIAL PROVISION FOR CONCRETE BASE PAVEMENT REPAIR RECEIVING HMA OVERLAY GENERAL This work shall be in accordance with the MDOT 2012 Standard Specifications for Construction Section 601. Portland Cement Concrete for Pavements, Section 602. Concrete Pavement Construction, Section 603. Concrete Pavement Restoration, MDOT Standard Plans R-39-I, R-41-H and R-44-F, and as set forth herein. The work shall consist of saw cutting as necessary for removal of existing base concrete pavement, preparation of sub base, placing horizontal dowels, placing concrete, joints, finishing, and curing. Sections of concrete pavement repair, with or without integral curb, may range from four (4) foot wide to a full panel joint to joint length, and partial or full street width. Where multi-lane patches are required, they shall be constructed on a lane-at-a-time basis so that traffic may be maintained. CONCRETE Mix, mixing and delivery shall be in accordance with the 2012 MDOT Standard Specification Section 601 Portland Cement Concrete for Pavements. Material and construction methods shall conform to these requirements unless otherwise noted herein. Concrete Grade shall be MDOT P1, with a slump of four (4) inches, and having an entrained air content of not less than five (5) percent nor more than seven (7) percent. CONSTRUCTION When removing existing concrete base pavement, the pavement shall be removed to an existing joint, or saw cut to a true line with a vertical face along the lines as marked or directed by the Engineer. The pavement shall be saw cut full depth into existing concrete, or as directed by the Engineer. Intermediate saw cuts shall be made as required by Section 603, referenced above. The removal shall be such that there will be no disturbance and/or damage to sections of pavement which are to remain in place. All damaged or undermined pavement caused by the Contractor’s operations shall be removed and replaced at the Contractor's expense. The use of a crane and ball type breaking equipment will not be allowed. Pavement removal shall be accomplished with a rubber-tired hydraulic ram or as specified in Section 603 of the MDOT Standard Specifications. Where subgrade corrections are required due to undesirable or unstable soil conditions as determined by the Engineer, the removal of material and placement of fill shall be performed in accordance with MDOT Section 205, and paid for as Subgrade Undercutting, Type II. All replacement concrete pavement shall be doweled or anchored to the existing concrete pavement as set forth on MDOT Standard Plans R-39-I and R-44-F, except as modified herein. All longitudinal and transverse anchors shall be epoxy coated #5 deformed bars, 1’ – 6” long, spaced at 30” on center, grouted into 1” diameter holes. Manholes, inlets and other structures shall be set to grade and alignment prior to or during placement of concrete. All structures shall be cleaned thoroughly to permit adhesion of the concrete. All utility structures within the area to be paved shall have a filter fabric installed over and completely around the cover. All expansion, transverse and longitudinal joints shall be restored. Transverse joints within partial width cuts shall be restored to match the joint in adjacent lanes. Transverse joints in full street width repair sections shall be spaced a minimum of fifteen (15) feet on center. Longitudinal and transverse joints abutting and within the 35 223 pavement repair sections shall be sealed by saw cutting and filling with hot poured rubber asphalt per MDOT Specification Section 602.03.S. and Section 603.03.D. Integral curb shall be constructed monolithic with the pavement slab. The curb material shall be placed before the pavement has started its initial set, and shall be of the same mix and shall conform in all respects to the requirements for concrete in the pavement. Unless otherwise approved by the Engineer, forms will be required when constructing integral curb. The curb concrete shall be vibrated sufficiently to eliminate all voids, and tamped to bring the mortar to the surface. The face and top of the curb shall be finished smooth and true to line, grade and cross section. No more troweling than necessary to obtain the desired result shall be done. Any visible areas of honeycomb or minor defects occurring on the back of the integral curb after forms are removed shall be filled with mortar, composed of one part Portland cement and two parts of fine aggregate from the same source as used in the pavement, applied with a wooden float. Immediate steps shall be taken by the Contractor to correct the conditions contributing to these defects. Curing shall comply with the 2012 MDOT Standard Specification 602.03.M. MEASUREMENT AND PAYMENT All material, labor and equipment required for constructing concrete base pavement repair as specified herein and directed by the Engineer shall be paid for under the unit rates bid for as follows: Pavt Repr, Rem, Modified, shall include all labor, equipment and material to perform the concrete base pavement removal work, including all saw cutting and intermediate saw cuts. Pavt Repr, Nonreinf Conc, __ inch, with Integral Curb, Modified, shall include all labor, material and equipment to place the concrete base pavement repair areas including integral curb, all joints, concrete material, finishing, and curing. Pavt Repr, Nonreinf Conc, __ inch, Modified, shall include all labor, material and equipment to place the concrete base pavement repair areas including all joints, concrete material, finishing, and curing. Lane Tie, Epoxy Coated, Modified, shall include all labor, material and equipment to install longitudinal and transverse anchors. Pay Item Pay Unit Pavt Repr, Rem, Modified Square Yard Pavt Repr, Nonreinf Conc, 7 inch, with Integral Curb, Modified Square Yard Pavt Repr, Nonreinf Conc, 8 inch, with Integral Curb, Modified Square Yard Pavt Repr, Nonreinf Conc, 7 inch, Modified Square Yard Pavt Repr, Nonreinf Conc, 8 inch, Modified Square Yard Lane Tie, Epoxy Coated, Modified Each Subgrade Undercutting, Type II Cubic Yard 36 224 SPECIAL PROVISIONS FOR CONCRETE SIDEWALKS AND DRIVEWAYS GENERAL This special provision covers the removal and replacement of concrete sidewalks and driveways. CONSTRUCTION This item of work includes removing the concrete sidewalks and driveways, with or without HMA overlay, backfilling, compacting, and grading of the disturbed area, and construction of concrete sidewalk and driveway. The concrete sidewalk and driveway shall be removed in accordance with the MDOT Standard Specifications for Construction, Section 204, Removing Miscellaneous Structures and Materials. Concrete sidewalk and driveway, of the thickness specified, shall be constructed in accordance with Section 803 of the 2012 Michigan Department of Transportation Standard Specifications for Construction. Sidewalk cross slopes shall be between 1% and 2%, sloping towards the street. The contractor shall stamp all concrete with a legible stamp bearing the name of the company and the year of construction. The stamp shall be placed at the first and last flag of sidewalk placed. No sidewalk construction shall commence without a Contractor’s stamp on site. Restore lawn areas disturbed beyond sidewalk and driveway repair limits to its original conditions. No separate payment will be made for such restoration, but is considered part of the work item. MEASUREMENT AND PAYMENT “Sidewalk, Rem”, shall include all labor, equipment and material required for the removal of concrete sidewalks and driveways, regardless of the thickness, shall be measured in square yards. “Sidewalk, Conc, __ inch”, shall include all labor, equipment and material necessary to complete the installation of new concrete sidewalk or driveway and shall be measured in square feet. Pay Item Pay Unit Sidewalk, Rem Square Yard Sidewalk, Conc, 4 inch Square Feet Sidewalk, Conc, 6 inch Square Feet 37 225 SPECIAL PROVISIONS FOR SIDEWALK ADA RAMP AND DETECTABLE WARNING SURFACE GENERAL This special provision covers construction of ADA sidewalk ramp with detectable warning surface. The work consist of constructing ADA sidewalk ramp and/or retrofitting ramp with detectable warning surface in accordance with the applicable provisions of Section 803 of the 2012 MDOT Standard Specifications for Construction and the current MDOT Standard Plan R-28-I, as modified by the City of Taylor. Complete this work in conformance with the American with Disability Act (ADA) provisions as applicable. MATERIAL The Detectable Warning Surface color shall be “safety yellow”, Federal Color Number 33538, unless otherwise approved by the Engineer. The color shall be homogeneous throughout the tile. The tile shall be manufactured by ADA Solutions, Inc., North Billerica, MA 01862, or approved equal. CONSTRUCTION Construct sidewalk ramp(s), landings flares and detectable warning surface according to MDOT Standard Plan R-28-I, as modified by the City of Taylor, included in these Specifications. The Detectable Warning Surface installation shall also comply with the manufacturer’s instructions. The curb and gutter section at the bottom of the ramp (ramp opening) shall be a full depth curb with a minimum depth of 12 inches, and shall be 18 inches from the back of curb to abutting pavement. The curb shall be anchored to the existing concrete pavement as specified in the Special Provisions For Concrete Pavement Repair and shall be paid for as Lane Tie, Epoxy Coated, Modified. It is also the Contractor’s responsibility to incorporate any changes made to the ADA accessibility requirements that may take effect prior to the start date of actual construction. If the Contractor determines that any changes significantly alter the original bid cost, the Contractor may submit a written request to the Engineer or his representative for approval and compensation. Include a cost comparison between the original bid cost and the cost of the ADA required changes in the request. The contractor shall stamp all concrete sidewalk ramps with a legible stamp bearing the name of the company and the year of construction. The stamp shall be placed on the first and last flag of a length sidewalk ramp placed, except for the flag containing the warning surface. No sidewalk or ramp construction shall commence without a Contractor’s stamp on site. Restore lawn areas disturbed beyond sidewalk ramp repair limits to its original conditions where the change in grade is one (1) inch or less. No separate payment will be made for such restoration, but is considered part of the work item. Where grade changes are greater than one (1) inch, follow the restoration requirements as specified in the Special Provisions for Lawn Restoration. 38 226 Any ramps constructed under this Contract that do not meet the current MDOT Sidewalk Ramp Standard Plans and the latest ADA accessibility requirements will be removed and replaced by the Contractor, as directed by the Engineer or his representative, at the Contractor’s expense. MEASUREMENT AND PAYMENT The completed work as described herein for “Sidewalk Ramp, ADA __ inch” and “Detectable Warning Surface”, will be measured by as square feet and feet respectively. The contract unit price will be payment in full for furnishing all materials, labor and equipment necessary to construct the ADA ramp and curb and warning surface. Pay Item Pay Unit Sidewalk Ramp, ADA, 6 inch Square Feet Sidewalk Ramp, ADA, 4 inch Square Feet Detectable Warning Surface Feet 39 227 SPECIAL PROVISIONS FOR PROJECT CLEAN-UP GENERAL The Contractor shall provide cleaning/sweeping services on all parking lots, street, sidewalk and paths, alley and driveway surfaces of the work site, and on all adjoining parking lots, streets, sidewalks and paths, alleys, driveways within one hundred (100) feet of the work site, to remove all dust, dirt and other debris deposited on the surfaces as a result of the construction activity. The contractor shall remove all dirt and construction debris from the abutting lawn areas. This shall be performed on a weekly basis, or more frequently if conditions warrant. The sweeping of the paved surfaces shall be performed with a self-propelled sweeper equipped with pickup attachments and curb brushes. The equipment shall have a dust control filtration system in addition to utilizing water to control the dust and dirt. Upon completion of portions of work, and before final acceptance of the work, the Contractor shall remove all temporary buildings or other structures built by him, all false work, excavated material, surplus materials, and rubbish of all kinds from the grounds which he has occupied, and shall leave the line of work in a neat, clean condition satisfactory to the Engineer. The Contractor shall remove all machinery and equipment from the right-of-way. The Contractor shall replace, renew or restore; in an acceptable manner, all property, both public and private, which may have been damaged during the prosecution of the work. The Contractor shall replace fences, signs, mailboxes or other necessary appurtenances, which have been temporarily removed. The Contractor shall thoroughly clean all sewers, manholes, catch basins, and other structures affected by his operations whether within or outside of the limits of his work upon leaving that particular work site. The Contractor shall use a “vactor” or other similar equipment suited for this work, or subcontract with a contractor specializing in this work, to properly perform the work. A written report shall be submitted to the City upon completion of the cleaning containing, at a minimum, type of structure, location of structure and date of cleaning. MEASUREMENT AND PAYMENT Payment for project cleanup will not be paid for separately but shall be included in other work item unit rates. 40 228 HOLD HARMLESS FOR SUPPLY CONTRACTS Bidder and/or supplier and/or contractor, agrees to indemnify, defend, and save harmless the City of Taylor, their employees, agents and consultants, from and against all loss and expense including, but not limited to, fees and charges of all kinds, including attorneys, and other professionals and court and arbitration costs if applicable by reason of any and all liability asserted or imposed upon the City of Taylor, their employees, agents and consultants for damages because of personal injury, including bodily injury, death at any time resulting there from, sustained by person or persons and/or on account of damage to property, including loss of use thereof, arising out of or in consequence of the performance of this work and/or supply of any materials, whether such injuries to persons or damage to property is due or claimed to be due, to negligence of the bidder and/or supplier and/or contractor, their subcontractors, their suppliers, the City of Taylor, and their employees, agents, and consultants, except only such injury or damage as shall be occasioned by the sole negligence of the City of Taylor, their employees, agents or consultants. Signed_________________________________________________________ Title___________________________________________________________ 41 229 EXHIBIT A INSURANCE REQUIREMENTS 42 230 43 231 EXHIBIT B Title VI 44 232 EXHIBIT B Title VI 45 233 46 234 47 235 EXHIBIT C MDOT R-28-I COT AMENDMENT 48 236 49 237 50 238 51 239 52 240 53 241 54 242 55 243 EXHIBIT D Standard Storm Sewer Details ST-1 and ST-2 56 244 57 245 58 246 247 Wade Trim Associates, Inc. 25251 Northline Road • Taylor, MI 48180 734.947.9700 • www.wadetrim.com February 20, 2026 City of Taylor 25605 Northline Road Taylor, MI 48180 Attention: Christopher Gibbs, PE City Engineer Re: 2025 Water Main Rehabilitation Project – Design Amendment Proposed Design Services for Wick, Weddel, Ziegler, Leroy, and Ecorse Streets Dear Christopher: Wade Trim is pleased to submit this letter proposal to provide design assistance for the water main design on Wick Road, Weddel Street, Ziegler Street, Leroy Street, Ecorse Road from Beech Daly to Telegraph Road as well as the dead end lines on Oldham, Janet and Wilkie, and various cross overs identified by the City, to be included in the 2025 Water Main Rehabilitation Project. Our proposal outlines our understanding of the scope of work, associated schedule, and associated proposed fee to complete. Our submittal format outlines proposed services for the coordination and preparation of design plans and outside agency permitting for the project scheduled for construction through the 2026 and 2027 construction seasons. PROJECT UNDERSTANDING/SUMMARY Wade Trim understands that the City of Taylor would like to increase water main rehabilitation locations from identified areas currently under design by our office. These additional areas are in line with the “Water Distribution System Master Plan”, areas identified during field activities undertaken by the Department of Public Works (DPW) and a desire to expand locations to include cross overs in an effort to minimize impact to adjacent intersections in the future. Wade Trim further understands the intent is to continue design and permitting during the early part of 2026 to facilitate phased construction over the 2026 and 2027 construction seasons. Local funding is anticipated for both the design and construction phases of all improvements. PROJECT SCOPE OF WORK The selected water main rehabilitation locations are primarily in line with prioritized improvements identified in the 2020 “Water Distribution System Master Plan” as well as concerns of improvements that are under design now, that could be expanded to minimize future impacts to adjacent streets ad intersections. The proposed locations are summarized below, understanding most of the improvements are anticipated to be completed through trenchless technologies including pipe bursting and directional drilling (proposed looping areas), to minimize impact to residents and existing road infrastructure. Like previous water main rehabilitation projects, we understand the intent is to replace hydrants and gate valves and to further include call outs and quantities to replace all service lines to stop boxes with additional provision to replace the stop boxes. In areas where lead service lines are identified during construction, the service leads will be required to be replaced up to the meter. An estimated quantity for lead service line replacements will be 248 City of Taylor February 20, 2026 Page 2 determined through coordination with the City. It is important to note some areas may require open trench construction where trenchless technology may not be a feasible option, AREA 1 (WEDDEL, ZIEGLER, and LEROY STREETS) Weddel (Pennsylvania to Leroy; six-inch cast iron to eight-inch HDPE) Ziegler (Pennsylvania to Leroy; six-inch cast iron to eight-inch HDPE) Leroy (Allen to Weddel; eight-inch cast iron to eight-inch HDPE) AREA 2 (Wick Road) Proposed 12-inch on the north side of Wick Road from West of Telegraph Road to East of Monroe; this is a continuation of a previous project on Wick Road. It is important to note this area has been prioritized as a portion of this segment is proposed to be repaved in 2028 in conjunction with the Wayne County Federal Aid Committee Program. The intent is to replace the water main in conjunction with the recommendations of the Water Master Plan prior to pavement replacement. AREA 3 (ECORSE ROAD AND CROSS OVERS) Proposed eight-inch on the north side of Ecorse Road from Beech Daly to Telegraph Road. Replace the existing 6” cast iron main on Oldham Replace existing 8” cast iron on Janet, noting the portion of main along Janet that is currently identified as ductile iron (replaced in 2006) will remain. Replace 6” cast iron main on Wilkie. Replace/potentially modify the existing water main within the Ecorse and Beech Daly intersection. Replace the existing cross overs from the north side to the south side of Ecorse Road between Beech Daly and Telegraph. AREA 4 (WICK ROAD CROSSOVERS) Proposed eight-inch on the North side of Ecorse Road from Beech Daly to Telegraph Road. Replacing the existing 6” cast on Oldham 8” Cast on Janet. A portion of Janet is already Ductile that was replaced in 2006 6” Cast on Wilkie. Existing water main in the Ecorse and Beech Daly intersection All of the cross over from the north side of Ecorse to the south between Beech Daly and Telegraph. DESIGN, PERMITTING, AND CONTRACT AWARD Based on the above understanding, improvement methodology, and approach as described, Wade Trim proposes providing the following professional design engineering services for this Project: Contact utility companies serving the above-defined areas to obtain information on their facilities that may potentially be impacted by the Project. Wade Trim understands this project will require the following permits/permit application effort: A. A State of Michigan Act 399 Permit for construction of the proposed water main rehabilitation work. B. Permits from Wayne County to proceed with the improvements within their road right-of-way and for work within Wayne County Drain Easements. C. A permit from the Michigan Department of Transportation (MDOT) for work within the Telegraph Road right-of-way. D. Proposed alignments do not appear within identified wetland areas. 249 City of Taylor February 20, 2026 Page 3 E. Our office will assist in preparing the permit application packages and submittals to the respective agencies. It is anticipated that any associated outside review agency fees will be covered directly by the City (typically realized during the construction phase for Wayne County permitting fees). Obtain full-width or partial-width topographical survey information within the limits described above (extending approximately 10 feet beyond the right-of-way limits). This work will be supplemented with information available through aerials and GIS. Field assistance may be required from the City to verify existing utility alignments, depths, and service lead locations. Prepare plans as detailed above illustrating the proposed alignment, construction limitations, valve and hydrant locations, construction methodology, pipe diameter, and type of pipe (both existing and proposed). All applicable notes, details, and standard details as required by the City, Wayne County, MDOT and EGLE will be included in the plan set for permitting, construction award and construction purposes. Prepare a Soil Erosion and Sedimentation Control (SESC) Plan as required under Part 91, SESC, of the Natural Resources and Environmental Protection Act, 1994 Public Act 451, as amended (NREPA). It is understood all work is to occur within the limits of the existing public road right-of-way and/or City of Taylor Property. We do not anticipate the need to obtain temporary construction easements throughout the project limits. Include typical details for standard traffic control measures (both Wayne County and MDOT as applicable). Preparation of detailed Maintenance of Traffic (MOT) plans is not anticipated to be necessary. Six meetings are anticipated with the City of Taylor and/or outside permitting agencies. Preparation of a detailed Engineer’s Opinion of Probable Cost. It is understood the City is currently discussing the potential to lock in construction pricing currently being offered. As such, construction award may be made via change order, negating the need to prepare bid documents. Project Management to assist in managing the project team, budget, schedule, and coordination with permitting agencies. Please note this Proposal does not include effort to provide assistance with pavement cores. Should services beyond those identified in the above scope be required, Wade Trim will provide those services on a time and material basis in accordance with our current rate schedule upon receiving approval from the City. Wade Trim proposes providing the professional design engineering services for the effort as outlined above for a Lump Sum Fee in the amount of $600,000. We anticipate preparing a separate scope of services for the associated construction phases (i.e., inspection, construction engineering, and construction administration) for consideration concurrent with the recommendation of construction award. 250 City of Taylor February 20, 2026 Page 4 Please feel free to contact our office if you have any questions or require further information related to this proposal. Our office is prepared to begin work immediately upon receiving authorization to proceed under our Continuing Services Agreement. Wade Trim appreciates the opportunity to submit this Proposal and looks forward to continuing to work alongside the City of Taylor in this tremendous endeavor. Very truly yours, Wade Trim Associates, Inc. Kelly McRobb-Ackland, PE Vaughn Martin, PE Senior Project Manager Senior Project Manager KMA:VM:rjb BDXTAY 20260211_Gibbs_2025 WM Design Phase Proposal-Ltr – Additional Area.docx cc: Ralph Richard, DPW Director 251 Wade Trim Associates, Inc. 25251 Northline Road • Taylor, MI 48180 734.947.9700 • www.wadetrim.com May 22, 2025 City of Taylor 25605 Northline Road Taylor, MI 48180 Attention: Christopher Gibbs, PE City Engineer Re: 2025 Water Main Rehabilitation Project Proposed Design Services Dear Christopher: We are pleased to submit this letter proposal to provide design assistance for the 2025 Water Main Rehabilitation Project. Our proposal outlines our understanding of the scope of work, associated schedule, and associated proposed fee to complete. Our submittal format outlines proposed services for the coordination and preparation of contract documents for the project scheduled for construction through the 2026 and 2027 construction seasons. PROJECT UNDERSTANDING/SUMMARY We understand the City of Taylor has an allocated budget during the 2024/2025 fiscal year for the design of water main rehabilitation effort in line with the “Water Distribution System Master Plan”. We further understand the intent is to finalize the design and permitting during 2025 to facilitate construction over the 2026 and 2027 construction seasons. Local funding is anticipated for both the design and construction phases of the improvements. PROJECT SCOPE OF WORK The selected water main rehabilitation locations are primarily in line with prioritized improvements identified in the 2020 “Water Distribution System Master Plan” combined with additional needs identified more recently by the Department of Public Works. The proposed locations are summarized below, understanding the majority of the improvements are anticipated to be completed through trenchless technologies including pipe bursting and directional drilling (proposed looping areas), in an effort to minimize impact to residents and existing road infrastructure. Similar to previous water main rehabilitation projects, we understand the intent is to replace hydrants and gate valves and to further include call outs and quantities to replace all service lines to the stop boxes with additional provision to replace the stop boxes. In areas where lead service lines are revealed during construction, the service leads will be required to be replaced up to the meter. An estimated quantity for lead service line replacements will be determined through coordination with the City. It is important to note some areas may require open trench construction where trenchless technology may not be a feasible option: AREA 1 (HAND STATION BUSINESS CENTER & TAYLOR HEIGHTS SUBDIVISION) • Beverly (Troy to Telegraph; eight inches to eight inches) • Troy (Beverly to Cypress; eight inches to eight inches) • Troy (south of Taylor Meadows to Ecorse; six inches to eight inches) 252 City of Taylor May 22, 2025 Page 2 • Bailey (Beverly to Ames; six inches to eight inches) • Burr (south of Beverly to Ames; six inches to eight inches) • Buck (Beverly to Ames; six inches to eight inches) • Banner (Beverly to Ames; six inches to eight inches) • Cooper (Beverly to Ames; six inches to eight inches) • Ames (Troy to Telegraph; six inches to eight inches) • New loop along Beverly from Bailey to Burr (eight inches); assumed within existing right-of-way • New loop along Burr from Beverly to dead end (eight inches); assumed within existing right-of-way • New loop along Cypress from Troy to Bailey (eight inches); assumed within existing right-of-way • New loop along Newcastle from Bailey to Troy (eight inches); assumed within existing right-of-way AREA 2 (GULLEY AND TAYLOR MEADOWS LOOP) • Proposed eight-inch loop along Gulley Street north of Ecorse Road to the existing main along Wilkie Street (final route to be determined understanding an easement may be required if there are conflicts with the existing enclosed 72-inch Wayne County Drain). Improvements are anticipated to further include a new looped connection to the fire hydrant lead within the Lakes of Taylor parking lot fronting the clubhouse as well as replacement of City-identified lead service lines along Gulley. Agreements and easements with the Wayne County Drain office are anticipated to be required due to proximity of the improvements to the Schloff Drain and the finalized water main alignment. AREA 3 (LIDDELL CHAMBLIN ESTATE SUBDIVISION) • West/East cross-over loops (final alignment to be determined during design) DESIGN, PERMITTING AND BIDDING Based on the above understanding, improvement methodology, and approach as described, we propose to provide the following professional design engineering services for this Project: • Contact utility companies serving the above-defined areas to obtain information on their facilities that may potentially be impacted by the Project. • We understand this project will require the following permits/permit application effort: A. A State of Michigan Act 399 Permit for construction of the proposed water main rehabilitation work. B. Permits from Wayne County to proceed with the improvements within their road right-of-way and for work within the Schloff County Drain Easement. C. A permit from the Michigan Department of Transportation (MDOT) for work within the Telegraph Road right-of-way (connection points at Beverly/I-94 and Ames Highway). D. It is understood a permit for work within the floodplain is not required for subgrade improvements whereby restoration will be to existing grades. No above grade alterations are proposed within identified floodplain areas. E. Proposed alignments do not appear within identified wetland areas. F. Our office will assist in preparing the permit application packages and submittals to the respective agencies. It is anticipated that any associated outside review agency fees will be covered directly by the City (typically realized during the construction phase for Wayne County permitting fees). • Obtain full-width topographical survey information within the limits described above (extending approximately 10 feet beyond the right-of-way limits). This work will be supplemented with 253 City of Taylor May 22, 2025 Page 3 information available through aerials and GIS. Field assistance may be required from the City to verify existing utility alignments, depths and service lead locations. • Prepare plans as detailed above illustrating the proposed alignment, construction limitations, valve and hydrant locations, construction methodology, pipe diameter, and type of pipe (both existing and proposed). All applicable notes, details, and standard details as required by the City, Wayne County, MDOT and EGLE will be included in the plan set for permitting, bidding and construction purposes. • Prepare a Soil Erosion and Sedimentation Control (SESC) Plan as required under Part 91, SESC, of the Natural Resources and Environmental Protection Act, 1994 Public Act 451, as amended (NREPA). • It is understood all work is to occur within the limits of the existing public road right-of-way and/or City of Taylor Property. We do not anticipate the need to obtain temporary construction easements throughout the project limits. Please note we have included effort to prepare permanent easement exhibits for work within the Gulley Street area should conflicts arise with the existing 72-inch enclosed Drain. Should this effort be required, we anticipate the standard Water Main Easement document currently used by the City would apply and the City would further be responsible for getting those easement document(s) executed by the property owner. We have further included effort for this area to prepare easement exhibits for “Utility Crossing Agreements” with Wayne County. Similarly, effort pertaining to the agreement itself is assumed to lie with the City directly. • Include typical details for standard traffic control measures (both Wayne County and MDOT as applicable). Preparation of detailed Maintenance of Traffic (MOT) plans are not anticipated to be necessary. • Six meetings are anticipated with the City of Taylor and/or outside permitting agencies. • Preparation of a detailed Engineer’s Opinion of Probable Cost. • Preparation of one set of bid documents including the contract documents, technical specifications, and standard details for use in bidding the Project. Electronic bidding is anticipated to be utilized for this Project. It is understood one bid document will be prepared that may include up to two construction phases. • Assist the City of Taylor in bidding the project including preparing and issuing the bid advertisement through QuestCDN, issuing the bid documents, preparing and issuing clarification addenda that may be required, tabulating the bids, and issuing a recommendation of award. • Project Management to assist in managing the project team, budget, schedule and coordination with permitting agencies. • Inclusion of a $20,000 allowance to obtain soil borings as needed throughout the project areas. • Please note this Proposal does not include effort to provide assistance with pavement cores, environmental assessments and/or permitting or wetland services including determination, delineation, permitting and/or mitigation. Should services beyond those identified in the above scope be required, Wade Trim will provide those services on a time and material basis in accordance with our current rate schedule upon receiving approval from the City. We propose to provide the professional design engineering services for the effort as outlined above for a Lump Sum Fee in the amount of $695,000. We anticipate preparing a separate scope of services for the associated construction phases (i.e., inspection, construction engineering, and construction administration) for Board consideration concurrent with the recommendation of construction award. 254 City of Taylor May 22, 2025 Page 4 Please feel free to contact our office if you have any questions or require further information relative to this proposal. Our office is prepared to begin work immediately upon receiving authorization to proceed under our Continuing Services Agreement. We appreciate the opportunity to submit this Proposal and look forward to continuing to work alongside the City of Taylor in this tremendous endeavor. Very truly yours, Wade Trim Associates, Inc. Kelly McRobb-Ackland, PE Brian Sousa, PE Senior Project Manager Vice President KMA:BS:kmk BDXTAY 20250522_Gibbs_2025 WM Design Phase Proposal-Ltr - Final.docx cc: Ralph Richard, DPW Director 255 256 257 258 259 260 261 262 Docusign Envelope ID: 30BD3153-FD30-4DAE-909D-9B5308AC9FF7 2025 First Ave, Suite 800S Sales 800-670-8777 Seattle, WA 98121 Service 800-792-0329 206-441-3346 Fax 206-441-7965 Order Form Customer: City of Taylor Prepared By: Ryan Smith Contact: Ethan Davis Phone Number: 503-713-3697 Ship To: City of Taylor Bill To: City of Taylor 25505 Northline Rd 25505 Northline Rd Taylor, Michigan 48180 Taylor, Michigan 48180 United States United States Term Start Date: 12/31/2025 Bill to Email: ethan.davis@skynetinnovations.com Term End Date 12/30/2026 Payment Terms: Net 30 Notes: Billing One-Time Fees Order Quantity Unit Type Unit Price Total Price1 Frequency Porting Single Numbers - each1 One-time 0 Each $15.00 $0.00 Porting 10 Consecutive Numbers - each1 One-time 0 Each $15.00 $0.00 Professional Services - FAXCOM Hybrid One-time 1 Each $0.00 $0.00 Implementation5 Subtotal: $0.00 Billing Order Monthly Price Usage-Based Fees Unit Type Unit Price Frequency Estimate2 Estimate3 Account with Local Fax Number (DID) Monthly 18 Line $2.50 $45.00 Account with Toll-Free Fax Number (TF) Monthly 2 Line $2.50 $5.00 Account for Sending Faxes only Monthly 0 Each $2.00 $0.00 Outbound faxes (Contiguous USA) - per Monthly 1,640 Page $0.067 $109.88 page Outbound faxes (Canada) - per page Monthly 0 Page $0.067 $0.00 Inbound faxes to Local DID - per page Monthly 825 Page $0.067 $55.28 Inbound faxes to Toll-free - per page Monthly 0 Page $0.067 $0.00 Subtotal: $215.16 Billing Subscription Fees Term Quantity Unit Type Monthly Price Frequency FAXCOM Hybrid Fax Suite (Subscription)5 Includes: Biscom Fax REST API, Biscom Fax Outlook Plug-In, Monthly 1 Each $325.00 Biscom Fax Multi-Functional Device SMTP Plug In, Biscom Fax Active Directory Connector, Biscom Fax SSO Connection System Monitoring & Management Application License5 Annual 1 Each $0.00 7x24 Support Subscription5 Annual 1 Each $0.00 Subtotal: $325.00 1. Porting fees are nonrecurring and charged to the Customer each time a number 6. Fee Type Price3 is ported into or away from Concord. The Customer shall not be charged any One-Time Fees: $0.00 fees for numbers ported in the first 180 days after the execution of this Sales Order. Monthly Usage-Based Fees $215.16 2. Quantity displayed is an estimate, billing will reflect the monthly total actual Estimate: usage for the Customer Monthly Subscription Fees: $325.00 3. Actual Price is determined by the Customer’s usage of the Services and may be Total Estimated Monthly Fees: $540.16 1 263 Docusign Envelope ID: 30BD3153-FD30-4DAE-909D-9B5308AC9FF7 2025 First Ave, Suite 800S Sales 800-670-8777 Seattle, WA 98121 Service 800-792-0329 206-441-3346 Fax 206-441-7965 higher or lower than the Monthly Estimate Total Term Fee (including One-Time): $6,481.86 4. Features included in the NEXTSTEP Bundle selected by Customer can be found at: https://concord.net/detailed-bundle-information 5. Invoices for FAXCOM and Secure File Transfer (SFT) Products and Services may Term Total (Months): 12 be sent from, and be payable to, Biscom Inc., Concord’s wholly owned subsidiary 2 264 Docusign Envelope ID: 30BD3153-FD30-4DAE-909D-9B5308AC9FF7 2025 First Ave, Suite 800S Sales 800-670-8777 Seattle, WA 98121 Service 800-792-0329 206-441-3346 Fax 206-441-7965 Terms: This Order Form, together with the Master Services Agreement (https://concord.net/master-services-agreement), including all Schedules, constitute the entire agreement between Concord and the Customer (Agreement) governing the Products and Services referenced above. NOTWITHSTANDING ANY LANGUAGE TO THE CONTRARY, ANY TERMS OR CONDITIONS CONTAINED IN A PURCHASE ORDER, ACKNOWLEDGMENT, OR SIMILAR DOCUMENT ISSUED BY CUSTOMER SHALL BE OF NO EFFECT. Standard Order Conditions: 1. There is a $100.00 Minimum Monthly Usage requirement for Digital Fax Usage Based Services. The higher of the sum of the actual accrued Monthly Recurring Charges and Usage Charges or Minimum Monthly Usage requirement will be billed to the Customer monthly. The subscription charge for customers using Subscription Services is the Customer’s Minimum Commitment for Subscription Services and does not apply to the Usage Services Minimum Monthly Usage requirement. 2. This Order Form is effective on the Term Start Date and shall continue for the Term Length defined above. Thereafter, the Order Form will automatically renew for additional 12-month Terms until either party terminates this Order Form by providing the other party with at least 60 days written notice prior to the end of the then-current term. 3. Payment for all invoices is due per the Payment Terms on this Order Form or will accrue late payment penalties as defined in the Concord Technologies MSA. The subscription charge for customers using Subscription Services will be applied the month immediately following the execution of this Order. 4. Pricing for Concord Products and Services is defined in this Order Form. Pricing excludes any and all applicable local, state, and federal taxes or fees (however designated) and any surcharges or regulatory fees incident to the use, provision, or sale of services to Customer. If your company is tax exempt send a PDF copy of your Tax Exempt Certificate to: billing@concord.net. 5. Rates for the delivery of faxes to Hawaii, Alaska and international destinations are defined in the Concord International Rates Schedule available at: https://concordfax.com/international-rates-and-billing. International rates are subject to change without prior notice. 6. Customer is responsible for confirming all retention settings applicable to the Services and features it uses. Concord’s default settings will apply if Customer takes no action to reset its retention settings. Document storage charges as defined in this order may apply. Concord and Customer have caused this Order to be signed and effective, as of the last date signed below, by their duly authorized representatives (“Order Effective Date”). Company: Concord III, LLC Customer: City of Taylor Name: Name: Ty Dolin Title: Title: Date: Date: Signed: Signed: 3 265 Did you know...... In addition to the software you're renewing, Ricoh offers a wide range of document management services and workflow automation solutions to help streamline your operations. And don’t forget our award-winning color and black-and-white office printers are here to support your productivity every step of the way. Ricoh Renewal Quote Ricoh Software Renewals Desk Email: SoftwareRenewals@ricoh-usa.com or Call: 855-276-6435 For Tech Support: 888-424-1573 Bill to Customer: CITY OF TAYLOR Ship to Customer: CITY OF TAYLOR Address: 23555 Goddard RD Address: 23555 GODDARD RD 2nd FL IT Suite, City Hall City: Taylor State: MI Zip: 48180 City: TAYLOR State: MI Zip: 48180 Customer Contact: Reference Number: Phone: Email: Ryan Moore 3909162 (Contract #: 4836870) TUNGSTEN AUTOMATION (FORMERLY KOFAX) - OFFICE PRINT SOLNS & SVCS OTHER VPN Qty Price Ext. Price Co-Term Dates Key/Serial Description 07AS020M4M1-PS1 12 $180.60 $2,167.20 INV-90518-Z3Q6C7 File Import License (60K pages/Yr pack) (12+ tier) Maintenance 07AS001M3M1-PS1 26 $203.49 $5,290.74 INV-90518-Z3Q6C7 AS Device License (25 to 49 tier) Maintenance 07AS018M1M1-PS1 1 $99.75 $99.75 INV-90518-Z3Q6C7 Quick Capture SnapIt add-on Maintenance 07AS025M1M1-PS1 1 $498.75 $498.75 INV-90518-Z3Q6C7 Additional OCR Engine Maintenance 07AS017M1M1-PS1 1 $254.39 $254.39 INV-90518-Z3Q6C7 Quick Capture Device License (1 to 9 tier) Maintenance 07BU003M1M1-PS1 2 $254.39 $508.78 INV-90734-N4G8S7/956615, INV-90734-N4G8S7, User Client Bundle (AutoCapture, WebCapture/Mobile, OM Desktop) (20 INV-90734-N4G8S7, 956615 pack) Maintenance 07BU003M1M1-PS1 2 $254.39 $508.78 INV-90734-N4G8S7/956615, 956615, INV-90734- User Client Bundle (AutoCapture, WebCapture/Mobile, OM Desktop) (20 N4G8S7, INV-90734-N4G8S7 pack) Maintenance 07AS001M3M1-PS1 4 $203.49 $813.96 INV-122521-K7L2V1 AS Device License (25 to 49 tier) Maintenance Previous PO: PO24201 NOTE: LATE FEE WILL APPLY IF SIGNED FORM IS RECEIVED ON OR AFTER START DATE OF COVERAGE TOTAL: $10,142.35 *Applicable Taxes Are Not Included* Total: Terms of Agreement(Months): Start Date of Coverage: Last Date of Coverage: $10,142.35 12 1/31/2026 1/30/2027 266 Customer Signature: _______________________________ Primary Email: _____________________________________ Print Name: ______________________________________ Primary Phone: _______________________________________ Print Title: _______________________________________ IT Contact: ______________________________________ Date: ________________ IT Phone#/Email: ____________________________________ Please Note: Support Pricing is NON-REFUNDABLE. After the expiration date any future quotes may increase due to vendor cost changes or internal updates. Quote Expiration Date: 1/30/2026 Quote Creation Date: 09/08/2025 Type of Renewal: Regular 267 268 Quote Document for CITY OF TAYLOR Date: January 26,2026 Quantity Item Description Ext Selling Price 150 [OOD]TUNGSTEN POWER PDF 5 - $18,000.00 GOVERNMENT (100-199 USERS) INCLUDES LICENSE SERVER LEVEL D 150 [OOD]TUNGSTEN POWER PDF 5 - $3,576.00 GOVERNMENT (100-199 USERS) INCLUDES LICENSE SERVER 1 YEAR INITIAL M&S LEVEL D INC1YR Sub Total: $21,576.00 Reservation of Rights—This quote is based upon the information provided by you, and the assumptions made by us in preparing the information contained herein. While care has been taken to ensure the accuracy of this quote, we make no representations or warranties about the accuracy, completeness or adequacy of the information contained herein, and shall not be liable for any errors or omissions. We recognize your right to negotiate and approve the terms of any resulting contract and we reserve the same right.We also acknowledge that all contract terms and conditions must be mutually agreed upon by both of us.THIS QUOTE IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY AND IS NOT,NOR SHOULD IT BE CONSTRUED AS, AN OFFER TO SELL/LEASE THE GOODS OR SERVICES LISTED HEREIN. Rev. 04/13 Quote Number 36365393 Expires on February 28,2026 269 Data Capture Group Price Quotation Prepared for: City of Taylor Michigan Attention: Ethan Davis For Additional Information Contact: Stephen Glynn PH: 603-552-5203 FAX:603-432-6219 37 Rolling Ridge Road Date: 01/30/2026 Londonderry, NH 03053 Quote #: 24083 Part Number Description Qty. Unit Price Total PPDPER0393-D Tungsten Power PDF 5 - Business, Government Level D 150 $140.18 $21,027.00 (100-199 Users) MNT-PPDPER0393-D1 Tungsten PDF 5 - Business, Government Level D 150 $28.04 $4,206.00 One Year Maintenance and Support *Enterprise Level Tech Support *Minor / Major releases of Power PDF Total $25,233.00 Terms: Net 30 Shipping: Electronic Delivery All sales of Power PDF Advanced licenses are final. 270 Motion to approve to direct Corporation Counsel to draft a ballot proposal to amend the City of Taylor Charter, Chapter 4, Section 4.5 Filling Vacancies in Elective Office Current: If a vacancy occurs in any elective office, then the Council by a majority vote of its members elect, shall fill such vacancy except as otherwise provided by this Charter for the unexpired term of such office. Added intent: If the Council members fail to fill any vacant Council position after six regular Council meetings, at the next and subsequent regular Council meetings the City Clerk will vote along with the Council to attempt to fill any vacant Council positions only. • Key factors: o The Council will have six regular meeting to fill the Council (only) vacancy o The City Clerk will have a vote, only to vote on filling the vacant position, along with the Council after six regular meetings, until the position is filled. 271 Motion to approve to direct Corporation Counsel to draft a ballot proposal to amend the City of Taylor Charter, Chapter 15, Section 15.2, Section 15.3, and Section 15.4 (a) changing each “limit” from $2,000 to $5,000, per the attached document. Attached documentation: ATTACHED “Threshold Recommendations.docx” Section 15.2. Material Purchases. No contract shall be entered into by the City for the purchase of any material, tools, apparatus or any other thing or things, the consideration or cost of which shall exceed Two Thousand ($2,000.00) Five Thousand ($5,000.00) Dollars until after an opportunity for competitive bidding; the City shall have the right to reject any or all proposals. Section 15.3. Specifications. No public improvement costing more than Two Thousand ($2,000.00) Five Thousand ($5,000.00) Dollars shall be contracted for/or commenced until drawings, profiles and estimates for the same shall have been submitted to the Council and approved by it; and a copy thereof shall thereafter remain on file in the office of the Clerk subject to inspection by the public. Section 15.4. Approval of Contract: Review: Appropriation. (a) No contract shall be entered into by the City for the making of any public improvement or for the purchase of any materials, tools, apparatus, or any other thing or things, the consideration or cost of which shall exceed Two Thousand ($2,000.00) Five Thousand ($5,000.00) Dollars until the same shall have been approved by a majority of the Council elect. All contracts prior to submission to the Council shall be reviewed by the Mayor. No bids shall be received unless accompanied by a bid bond in the sum of five percent (5%) of the bid nor shall any contract be entered into unless accompanied by a performance and material bond in the amount of the contract. (b) No contract shall be made with any person who is in default to the City. (c) No public work or improvement shall be commenced, nor any contract therefor be let or made, until a valid specific appropriation to pay the cost thereof shall have been made by the Council from funds on hand and legally available for such purpose, or until a tax or assessment shall have been levied or bonds authorized and sold to pay the cost and expense thereof. 272
City Council — Taylor, MI