Fire Public Safety
Regular MeetingWestmont, IL · May 15, 2025
Agenda
PUBLIC NOTICE
FIRE PUBLIC SAFETY COMMITTEE
Thursday, May 15, 2025 - 4:30 PM
Westmont Village Hall - 31 W. Quincy Street, Westmont, Illinois 60559
AGENDA
1. Call to Order
2. Roll Call
3. Pledge of Allegiance
4. Public Comment
5. Approval of Minutes
A. Minutes of September 5, 2024 and March 6, 2025 committee meetings.
6. Unfinished Business
A. Review of the Fire House tour and the options to move forward with the plans
for the Fire House.
7. New Business
A. Presentation of a service plaque
8. Reports
A. Committee Chair
B. Department Director
C. Division(s) Reports
9. Miscellaneous
10. Adjourn
Note: Any person who has a disability requiring a reasonable accommodation to
participate in the meeting should contact the ADA Compliance Officer, 9:00 A.M. to 4:00
P.M. Monday through Friday, Village of Westmont, Illinois, 60559; or telephone (630)
981-6210 voice, within a reasonable time before the meeting. Listen Everywhere, an
assistive listening, mobile app, is now available to visitors attending Board and
Commission Meetings held in the Village Hall Board Room.
https://westmont.illinois.gov/581/ADA-Listen-Everywhere
Packet
PUBLIC NOTICE
FIRE PUBLIC SAFETY COMMITTEE
Thursday, May 15, 2025 - 4:30 PM
Westmont Village Hall - 31 W. Quincy Street, Westmont, Illinois 60559
AGENDA
1. Call to Order
2. Roll Call
3. Pledge of Allegiance
4. Public Comment
5. Approval of Minutes
A. Minutes of September 5, 2024 and March 6, 2025 committee meetings.
6. Unfinished Business
A. Review of the Fire House tour and the options to move forward with the plans
for the Fire House.
7. New Business
A. Presentation of a service plaque
8. Reports
A. Committee Chair
B. Department Director
C. Division(s) Reports
9. Miscellaneous
10. Adjourn
Note: Any person who has a disability requiring a reasonable accommodation to
Page 1 of 71
participate in the meeting should contact the ADA Compliance Officer, 9:00 A.M. to 4:00
P.M. Monday through Friday, Village of Westmont, Illinois, 60559; or telephone (630)
981-6210 voice, within a reasonable time before the meeting. Listen Everywhere, an
assistive listening, mobile app, is now available to visitors attending Board and
Commission Meetings held in the Village Hall Board Room.
https://westmont.illinois.gov/581/ADA-Listen-Everywhere
Page 2 of 71
Village Board Fire Public Safety Committee
~ Regular Meeting ~
MINUTES
~ Thursday, September 5, 2024 ~
CALL TO ORDER
Trustee Guzzo called the meeting to order at 1630 hours.
PRESENT
Mayor Gunter, Clerk Szymski, Village Manager May, Assistant Village Manager Parker,
Trustee Barker, Trustee Guzzo, Trustee Liddle, Trustee Nero and Trustee Simonovich.
ALSO PRESENT
Fire Chief Riley, Deputy Chief Fitzgerald, Deputy Chief Frank, Chief Public Safety Officer
Gunther, Community Development Director Hennerfeind, Public Works Director Reis,
Human Resources Director Brainerd, Finance Director Altic, FPB Director Berkowitz, IT
Director Liljeberg, Community Development Deputy Director Vitell, Finance Supervisor
Buh and Administrative Assistant Saldivar.
ABSENT -Communications Director McIntyre.
PLEDGE OF ALLEGIANCE
The Pledge of Allegiance was recited by all in attendance.
PUBLIC COMMENT
No public comment was received.
APPROVAL OF JUNE 13, 2024 PUBLIC SAFETY COMMITTEE MINUTES
Trustee Liddle made a motion, seconded by Trustee Barker, to approve the June 13, 2024
Public Safety Committee Minutes as submitted. Motion carried unanimously.
NEW BUSINESS
Staffing Update and Call Volume
Deputy Chief Fitzgerald presented the 2024 Call Statistics and Staffing Report. (See attached.)
Deputy Chief Fitzgerald's 2024 Call Statistics and Staffing Report reveals challenges in
maintaining adequate staffing levels, particularly for paramedics. The "fourth person on a truck"
program, launched this past May, aims to improve service but faces hurdles, especially during
the summer months when open shifts are common. Ideally, the department needs 34-40
paramedics to ensure program success. Deputy Chief Fitzgerald is optimistic about their ability
to manage the schedule and fill shifts, despite the challenges of paramedic shortages.
Adding to these challenges, call volume is projected to reach 5,400 for 2024, a notable increase
Page 3 of 71
from last year's 5,100, despite a stable population. While mutual aid calls currently remain under
100 per year, Fire Chief Riley anticipates a surge in these calls over the next six months due to
evolving relationships with neighboring fire departments.
UNFINISHED BUSINESS
Fire Station Update RFQ
Public Works Director Reis and Deputy Chief Frank presented the Fire Department
Headquarters Update - RFQ Results 9-5-24. (See attached.)
This is a report on the selection process for a design firm to renovate or rebuild the fire
department headquarters. The current building is over 30 years old and no longer meets the
needs of the department. A team, consisting of Public Works Director Reis, Deputy Chief Frank,
Building Commissioner Vitell, Public Works Supervisor Viscuso, and Chief Public Safety Officer
Gunter, evaluated proposals based on criteria like building functionality, code compliance, and
sustainability. They visited fire stations designed by the firms and conducted interviews. A key
concern was incorporating "hot zones" for decontamination, per upcoming OSHA regulations.
After a thorough review process, including reference checks and site visits, they selected 845
Design Group, a small firm with a strong track record and collaborative approach. The next
steps involve finalizing the service agreement and exploring funding options, potentially
including grants.
MISCELLANEOUS
Golfview Hills
Chief discussed renewing the fire service contract with Golfview Hills, a fire protection district.
Golfview Hills is an unincorporated area that contracts with the Westmont Fire Department for
service, although they are geographically located within Hinsdale. They have been a satisfied
customer for over 27 years. The proposed 10-year contract is worth around $83,000 annually,
with potential for a 5% increase. In addition to emergency response, the fire department
provides public education and uses Golfview Hills' resources for training. The meeting also
briefly touched on other fire protection districts and special service areas served by the
Westmont Fire Department.
Stick Buildings
There was a discussion about potentially revising Westmont's building codes, specifically those
related to fire safety and construction materials.
Trustee Nero raised concerns that strict adherence to current codes, particularly the restrictions
on "stick building" (wood-frame construction), may be hindering economic development by
discouraging developers. Neighboring communities have more lenient regulations, potentially
making them more attractive for projects.
Fire Chief Riley, FPB Director Berkowitz, CD Director Hennerfeind, and Building Commissioner
Vitell provided insights into the fire code and local amendments. They emphasized that while
developers often complain about Westmont's codes, the fire department works closely with
them to find solutions that prioritize safety. They also highlighted the benefits of stricter codes in
terms of building longevity and resilience to water damage.
The discussion touched on several key points:
● Competitiveness:Westmont's stricter codes may bea disadvantage in attracting
development compared to neighboring towns.
● Developer perspectives:Developers frequently complainabout code restrictions, but
Page 4 of 71
they may still ultimately pursue projects in Westmont.
● Collaboration:The fire department and building departmentare willing to work with
developers to find solutions within the code framework.
● Economic impact:There is anecdotal evidence thatWestmont may have lost
development opportunities due to its codes, but concrete data is lacking.
● Municipal service impact fees:The current fees maybe too low to adequately offset
the increased demands on fire services from new developments.
The meeting concluded with a general consensus to further investigate the issue, including:
● Gathering data on projects lost due to code restrictions.
● Comparing Westmont's codes and fees to those of neighboring communities.
● Exploring ways to improve communication and collaboration with developers early in the
development process.
● Re-evaluating the municipal services impact fee structure.
There being no other business to discuss, Trustee Liddle motioned to adjourn, to which Trustee
Nero seconded. The meeting subsequently adjourned at 1736 hours.
Respectfully submitted,
Jacqueline Saldivar
Recording Secretary
Page 5 of 71
Call Statistics
Staffing
Page 6 of 71
Page 7 of 71
Page 8 of 71
EMS Only Aid Received
Page 9 of 71
Page 10 of 71
Page 11 of 71
Page 12 of 71
Fire Department
Headquarters Update
Page 13 of 71
Fire Department HQ Update- Background
This facility was constructed in 1991, making it approximately 33 years old.
Originally constructed for 4 fire personnel and 4 administration staff, most are
part-time.
The existing facility is 14,884 SF with space for 9 FFs at a minimum and 6
vehicles.
Page 14 of 71
RFQ 24-002 Fire Department Headquarters Facility
Evaluation
RFQ 24-002 Fire Department Headquarters Facility Evaluation released on May
24, 2024.
Eleven (11) responses were received on June 24, 2024.
Responses were scored and four (4) firms were shortlisted for an interview.
References were checked for the four shortlisted firms.
The selection committee toured five (5) fire department facilities that were
designed by the shortlisted firms.
Interviews were held on August 16, 2024.
Page 15 of 71
RFQ 24-002 Fire Department Headquarters Facility
Evaluation
Firms were scored based on the following criteria:
During the interview phase, the shortlisted firms were asked to go
into detail about parts of the scoring criteria and their project
approach.
Page 16 of 71
RFQ 24-002 Fire Department Headquarters Facility
Evaluation
Special emphasis was placed on the Outcomes to be Achieved.
Provide a Fire Department Headquarters building that:
● Is well maintained and functional;
● Meets or exceeds current building code requirements;
● Is efficient and sustainable to own and operate;
● Meets the needs of the Fire Department and the community;
● Will be adaptable to future conditions.
Page 17 of 71
Station visit observations
Staff toured Fire Stations in Western Springs, Tri-State, Huntley,
Aurora and Downers Grove. Standout observations include:
● Durable and low maintenance materials
● OSHA recommendations for clean and dirty areas of the station
● Living areas and bunk rooms that included FF privacy and mental
health
● Flexible spaces for training, meetings and community gatherings
Page 18 of 71
Interview Take-aways
Codes and Regulations:
● ADA Accessibility Code
● Energy Code
● Building Code- critical facilities
● OSHA 29 CFR 1910.156
Year to year cost escalations of 4-8%
How to determine the “tipping point” to build new vs. remodel/addition
Page 19 of 71
RFQ 24-002 Fire Department Headquarters Facility
Evaluation
Based on the results of the RFQ review, reference checks, station visits and interviews, 845
Design Group had the highest score and is the best-qualified firm to perform the work.
About 845 Design Group:
Small firm headquartered in LaGrange, IL.
Principles of the firm will be directly involved on the design team for the project.
Excellent references and example projects.
Many repeat clients.
The selection team really liked their collaborative approach and project communication
emphasis.
Page 20 of 71
Reference check What did you like best about working
with 845 Design Group?
observations ● “Jamie and Megan were great about
listening to our wants and finding
ways to incorporate them into their
design.”
● “Easy to work with, local business,
familiar with working with FD and
municipal governments.”
Was the company responsive and timely
in answering your questions?
● “Yes, Communication was
excellent.”
Page 21 of 71
RFQ 24-002 Fire Department Headquarters Facility
Evaluation
Staff has negotiated a Scope of Services and fee with 845 Design Group.
Approval of the Professional Services agreement is on tonight’s Village
Board agenda.
Questions & Answers
Page 22 of 71
Village Board Fire Public Safety Committee
~ Regular Meeting ~
MINUTES
~ Thursday, March 6, 2025 ~
CALL TO ORDER
Trustee Guzzo called the meeting to order at 1630 hours.
PRESENT
Mayor Gunter, Village Manager May, Assistant Village Manager Parker, Trustee Barker,
Trustee Guzzo, Trustee Liddle, Trustee Nero and Trustee Scales.
ALSO PRESENT
Fire Chief Riley, Deputy Chief Fitzgerald, Deputy Chief Frank, Chief Public Safety Officer
Gunther, Community Development Director Hennerfeind, Public Works Director Reis,
Human Resources Director Brainerd, Finance Director Altic, FPB Director Berkowitz,
Communications Director McIntyre, Supervisor of Administrative Services Mielcarski,
FPB Director Berkowitz and Administrative Assistant Saldivar.
ABSENT -Clerk Szymski and Trustee Barry.
GUESTS PRESENT
Megan Harte (845 Design Group), Leight McMillen (Leopardo Construction) and Jaime
Zaura (845 Design Group)
PLEDGE OF ALLEGIANCE
The Pledge of Allegiance was recited by all in attendance.
PUBLIC COMMENT
No public comment was received.
APPROVAL OF SEPTEMBER 5, 2024 PUBLIC SAFETY COMMITTEE MINUTES
The approval of the minutes from the September 5, 2024, meeting has been postponed until the
meeting scheduled for May 15, 2025.
NEW BUSINESS
Fire Headquarters presentation by the Administrative Staff and the 845 Design Group
Chief Steve Riley, Public Works Director Amy Reis, Deputy Chief Tom Frank, and Finance
Director Allen Altic, collaborating with Megan Harte and Jaime Zaura from 845 Design Group,
and Leigh McMillen from Leopardo Construction, jointly delivered a comprehensive presentation
titled "Fire Department Headquarters Update". Each individual took a specific section to present,
contributing their respective expertise and insights to cover the various aspects of the project,
Page 23 of 71
from its history and operational needs to design options and financial considerations. Clickhere
to view the entire presentation.
The next steps involve the Fire Public Safety Committee reviewing the presented information
and providing feedback, particularly regarding the community involvement process and their
preferred design option, during a special meeting scheduled for March 27th. The Chief was
asked to provide information on potential fire service relocation during construction. Village staff
will also work on compiling and distributing answers to any questions raised. Further down the
line, community engagement activities, potentially including an open house at the fire station,
will be organized. Ultimately, the Committee will need to decide on a design option, which will
then lead to a more detailed design phase and exploration of temporary facility needs during
potential construction. The Village will also continue to pursue grant funding opportunities and
finalize a financing plan, potentially involving a non-home rule sales tax increase.
MISCELLANEOUS
There being no other business to discuss, Trustee Liddle motioned to adjourn, to which Trustee
Nero seconded. The meeting subsequently adjourned at 1755 hours.
Respectfully submitted,
Jacqueline Saldivar
Recording Secretary
Page 24 of 71
Fire Department
Headquarters Update
March 6, 2025
Page 25 of 71
Overview
- Overview of History & Project
- Major Operational Considerations
- Scenarios & Construction Options
- Details of Financial Aspects
- Overview of Next Steps
Page 26 of 71
How did we get here?
- Property purchased in 1984
- Original building constructed in 1991 for 4 Firefighters and
4 administrative staff
- In 2015, 2018 and 2021, architects reviewed the existing
building.
There have been many known problems with the building for
over fifteen years.
Page 27 of 71
RFQ 24-002 Fire Department Headquarters Facility
Evaluation
RFQ 24-002 Fire Department Headquarters Facility Evaluation released on May
24, 2024.
Eleven (11) responses were received on June 24, 2024.
Responses were scored and four (4) firms were shortlisted for an interview.
References were checked with interviews and surveys for the four shortlisted
firms.
The selection committee toured five (5) fire department facilities that were
designed by the shortlisted firms.
Interviews were held on August 16, 2024.
Page 28 of 71
RFQ 24-002 Fire Department Headquarters Facility
Evaluation
Firms were scored based on the following criteria:
During the interview phase, the shortlisted firms were asked to go
into detail about parts of the scoring criteria and their project
approach.
Based on the results of the RFQ review, reference checks,
station visits and interviews, 845 Design Group had the highest
score and is the best-qualified firm to perform the work.
Page 29 of 71
RFQ 24-002 Fire Department Headquarters Facility
Evaluation
Special emphasis was placed on the Outcomes to be Achieved.
Provide a Fire Department Headquarters building that:
● Is well maintained and functional;
● Meets or exceeds current building code requirements;
● Is efficient and sustainable to own and operate;
● Meets the needs of the Fire Department and the community;
● Will be adaptable to future conditions.
Any project will also meet or exceed safety-related best practices.
Page 30 of 71
Project scope includes:
Evaluation of existing conditions
Space needs analysis
Development of alternatives
- Rehabilitation of existing building
- Rehabilitation of existing building with an addition
- Construction of a new building
Page 31 of 71
Early in the project, it was decided that utilizing the
existing site was preferable to avoid the costs and
delays associated with acquiring another site for the
project.
Property acquisition for an alternative site is
estimated in the $1M-$3M range.
A land swap with another entity could also be
considered.
Page 32 of 71
Examination of the Alternatives:
- Rehabilitation of existing building
- Rehabilitation of existing building with
an addition
- Construction of a new building
- Multiple scenarios
- 4 bays vs 5 bays
- Basement and no basement
- Second floor and no second
floor
Page 33 of 71
Safety Priorities:
● Firefighter safety, health and wellness
○ HVAC separation from living quarters
to bay floor
○ Decontamination zone
○ Bay floor bathroom for
decontamination
○ Separate laundry off bay floor for
contaminated clothing items
● Improve response times for the
community
Page 34 of 71
Important Decision Points to Consider:
- Meeting OSHA standards for decontamination zones
- Call volume is increasing, particularly for
ambulance calls
- Large number of assisted living and nursing
home facilities
- Adhering to modern building codes, including
ADA and energy efficiency
- Increase efficiency in response times
- While looking for ways to reduce costs, we want to be
sure we don't sacrifice long-term quality, utility and
sustainability.
- Costs go up every year, it will only get more
expensive to address this building.
Page 35 of 71
Continue exploring Value-Engineering options:
❏ Already reduced items:
✓ Reduced size of workout area
✓ Consolidated bunk room and locker rooms
✓ Reduced number of bunk rooms and bathrooms
✓ Multi-purpose room to combine community and training room functions
✓ Removed a small conference room
✓ Removed admin kitchen and replaced with a small coffee area
❏ Domestically sourced, readily available materials will be prioritized
❏ Functional and utilitarian
❏ Building it to last 50 yrs
❏ Each stage will be closely examined for potential cost savings & efficiencies
Page 36 of 71
Project Progress YOU
ARE
0% HERE 100%
Task 1: Information Task 2: Analysis and Task 3: Design
Gathering Programming Solutions
• Meet with • Staff Surveys • 3 Design Options
Stakeholders • Focus Group • Renovate in
• Field Survey Interviews current footprint
• Define Project • Workflow analysis • Renovate +
Goals (current and Addition
• Future future) • New
Recommendations • Space Programs Construction
• Facility Assessment
Due Diligence Report
Developed 7 Design Options with costing and reviewed with Staff.
Studied neighboring fire stations for comparison of call volume vs. station size
Discussed potential project savings/value engineering with Staff.
Shared ideas on how to engage the community in the design process with Staff.
Page 37 of 71
Space Programs Development
Space Programs
Architectural Document-
framework for design
phase/floor plans
Identifies types of spaces,
their quantities and size
Developed before design
begins
Resources
NFPA 1500:Standard on Fire
Department Occupational Safety,
Health, and Wellness Program
NFPA 1581: Standard on Fire
Department Infection Control Program
OSHA 29CFR1910.120 Hazardous Waste
Operations and Emergency Response
OSHA 29CFR1910.156 Fire Brigades
Best Practices
Fire Department Feedback
Page 38 of 71
Fire Station Comparison
Dept./District # of Approx. Approx. ISO Service Area # of sworn # of Ratio of
(within 5 mi. radius) Stations Total Station area # of Calls rating Personnel total station area
(sf) (2024) Bays to call
volume
Village of Westmont 2 24,820 sf 5,516 1 8.5 sq. miles 83 6 4.49
FD
Lisle-Woodridge FPD 5 59,879 sf 8,685 1 24 sq. miles 91 13 6.89
within a 5 mile radius
Village of Downers 4 58,642 sf 8,280 1 14 sq. miles 77 12 7.08
Grove FD
Darien- Woodridge 2* 35,900 sf 3,781 2 12 sq. miles 42 7 9.49
FPD
Tri-State FPD 4* 48,675 sf 6,550 2 27 sq. miles 54 15 7.43
Pleasantview FPD 3 40,796 sf 4,624 2 14 sq. miles 38 10 8.82
Village of Wheeling FD 3 38,000 sf 5,564 2 8.6 sq. miles 54 10 6.82
similar call
Bloomingdale FPD 2 38,210 sf 5,942 1 14.4 sq. miles 45 10 6.43
volume
*plus Training Facility Notes:
• Westmont Fire Department call volumes are greater than the majority of the other local municipalities (Downers Grove as the exception)
• Westmont Fire Department call volume is more aligned with Fire Protection Districts (not Departments) in the immediate area
• Westmont had more calls in 2024 than: Clarendon Hills (1,140), Hinsdale (2,707), La Grange (2,503) , La Grange Park (2,522), Oakbrook (3,304), Oakbrook
Terrace (1,641), Western Springs (1,437) and York Center (1,590) Page 39 of 71
Option 1 (Short-term solution, potential to re-visit
this process in 5-10 years)
Pros Cons
Least Expensive Option Will not address the lack of space issues in the
building (operational impacts)
Preserves nostalgia, history, tradition the most Community Room is small- limits uses
Least disruptive Option to FD operations Risk of not completely addressing water infiltration
issues
Provides proper decontamination zones Existing landscaping/ramp to Lower Level is still
needed (staff entry + natural light source). Code
compliant ramp, stairs, handrail will be required.
Existing site- no land purchase Will not address the safety issues in the bay
No parking variance needed No capacity for future growth
Larger contingency needed during construction for
Option 1 Renovate within existing greater chance of unforeseen conditions
Outdoor training capabilities are the same as they
footprint currently exist
Area 14,820 GSF Apparatus bays remain adjacent to residential
properties
# of Bays 3 (existing)
Existing apron is too short for longer equipment
Second Floor No
Lacks storage space for present and future needs
Basement Yes (existing)
Budget $10,184,373 No storm shelter (not required unless it is new
construction)
Page 40 of 71
Option 1 Floor Plans
Basement Plan
First Floor Plan Key
Apparatus Bay Living Quarters
Bay Support (existing bldg.) Public Space
Living Qtrs. (existing bldg.) Administration Page 41 of 71
Option 2
Pros Cons
Sustainable practice Risk of not completely addressing water
(building re-use) infiltration issues
New bay addition creates safer conditions around Larger contingency needed during construction
equipment for greater chance of unforeseen conditions
Longer apron for current and future equipment Inefficiencies abound due to working around
needs existing building skeleton (results in largest
footprint of all options)
Key Living quarters sized to accommodate current Travel distance to bay from bunk rooms is not
Apparatus Bay Living Quarters and future staffing models efficient (delayed response times)
Bay Support (existing bldg.) Public Space Administration workspaces accommodates No storm shelter (not required unless it is new
current and future staffing models construction)
Living Qtrs. (existing bldg.) Administration
Provides proper decontamination zones Apparatus Bays are directly adjacent to
residential neighbors (north)
Option 2 Demolish App Bay. Heavily Renovate
existing building + Bay Addition + Living Community Room New stair addition required to make existing
basement code compliant (egress)
Quarters addition with 2nd Floor
(Administration) Existing site- no land purchase Limited capacity for future equipment in bay
Area 34,003 GSF
Likely no parking variance needed Travel distance to bay from Community Room is
# of Bays 4 (addition- all new) not efficient (delayed response times)
Second Floor Yes Easier project phasing due to retaining of existing Phased project to keep Station 183 operational
admin/living quarters building during construction
Basement Yes (existing) Mezzanine not possible in apparatus bay
Budget $22,858,739
Page 42 of 71
Option 2 Floor Plans
Second Floor
Plan
Fitness
Room
Admin. Storage
Basement Plan (existing)
Key
Apparatus Bay Living Quarters
Bay Support (existing bldg.) Public Space
Living Qtrs. (existing bldg.) Administration
First Floor Plan Page 43 of 71
Decontamination Boundary
Option 2 Site Plan
Key
Apparatus Bay Living Quarters
Bay Support (existing bldg.) Public Space
Living Qtrs. (existing bldg.) Administration
Proposed Site Plan Page 44 of 71
Option 3
Pros Cons
Provides proper decontamination zones Limited capacity for future equipment in
bay
Creates safer conditions around No Basement
equipment in bay
Provides storage for current and future Challenging project phasing to keep
needs- has mezzanine in bay Station 183 operational during
construction
Key Properly sized apron for current and
Apparatus Bay Living Quarters future equipment
Bay Support Public Space Living quarters sized to accommodate
Administration current and future staffing models
Administration workspaces
Option 3 New Construction, 4 Bays with Second accommodates current and future
Floor, no Basement staffing models
Area 29,745 GSF Community Room
# of Bays 4
Provides parking closest to public entry
Second Floor Yes door
Basement No Living quarters serves as buffer between
bay and residential properties
Budget $22,142,575
Existing site- no land purchase
Storm Shelter
Page 45 of 71
Option 3 Floor Plans
Second Floor
Plan
Key
Apparatus Bay Living Quarters
Bay Support Public Space
Decontamination Administration
First Floor Plan Page 46 of 71
Boundary
Option 3 Site Plan
Key
Apparatus Bay Living Quarters
Bay Support Public Space
Administration
Proposed Site Plan Page 47 of 71
Option 3A
Pros Cons
Provides proper decontamination zones Limited capacity for future equipment in
bay
Creates safer conditions around Challenging project phasing to keep
equipment in bay Station 183 operational during
construction
Provides storage for current and future Variance needed for parking
needs- has mezzanine in bay
Properly sized apron for current and
Key future equipment
Apparatus Bay Living Quarters
Living quarters sized to accommodate
Bay Support Public Space current and future staffing models
Administration Administration workspaces
accommodates current and future
Option 3A New Construction, 4 Bays with Basement,
staffing models
No Second Floor
Basement
Area 29,513 GSF
# of Bays 4 Community Room
Second Floor No Living quarters serves as buffer between
Basement Yes bay and residential properties
Existing site- no land purchase
Budget $21,888,549
Storm Shelter
Page 48 of 71
Option 3A Floor Plans
Basement Floor Plan
Key
Apparatus Bay Living Quarters
Bay Support Public Space
Decontamination Administration
First Floor Plan Boundary Page 49 of 71
Option 3A Site Plan
Key
Apparatus Bay Living Quarters
Bay Support Public Space
Administration
Proposed Site Plan Page 50 of 71
Option 3B
Pros Cons
Provides proper decontamination zones Variance needed for parking
Creates safer conditions around equipment Challenging project phasing to keep Station
in bay 183 operational during construction
Provides storage for current and future Public parking is the farthest distance to
needs- has mezzanine in bay front door out of all options
Properly sized apron for current and future
Key equipment
Apparatus Bay Living Quarters Living quarters sized to accommodate
Bay Support Public Space current and future staffing models
Administration Administration workspaces accommodates
current and future staffing models
Option 3B New Construction, 5 Bays with Basement, Basement
No Second Floor
Area 31,594 GSF Community Room
# of Bays 5 Living quarters serves as buffer between bay
Second Floor No and residential properties
Existing site- no land purchase
Basement Yes
Budget $23,070,307 Apparatus Bay sized to handle future
equipment with ease
Storm Shelter
Page 51 of 71
Option 3B Floor Plans
Basement Floor Plan
Key
Apparatus Bay Living Quarters
Bay Support Public Space
Decontamination Administration
First Floor Plan Boundary Page 52 of 71
Option 3B Site Plan
Proposed Site Plan
Page 53 of 71
Option 3C
Pros Cons
Provides proper decontamination zones Variance needed for parking
Creates safer conditions around equipment in Challenging project phasing to keep Station 183
bay operational during construction
Provides storage for current and future needs- No Basement
has mezzanine in bay
Properly sized apron for current and future
equipment
Key
Apparatus Bay Living Quarters Living quarters sized to accommodate current
and future staffing models
Bay Support Public Space
Administration workspaces accommodates
Administration current and future staffing models
Community Room
Option 3C New Construction, 5 Bays, Second Floor,
No Basement Living quarters serves as buffer between bay and
residential properties
Area 30,912 GSF
Existing site- no land purchase
# of Bays 5
Second Floor Yes Apparatus Bay sized to handle future equipment
with ease
Basement No Storm Shelter
Budget $22,884,702
2-story Lobby Area at Entry
Page 54 of 71
Option 3C Floor Plans
Second Floor Plan
Key
Apparatus Bay Living Quarters
Bay Support Public Space
Decontamination Administration
First Floor Plan Boundary Page 55 of 71
Option 3C Site Plan
Proposed Site Plan
Page 56 of 71
Option 3D
Pros Cons
Provides proper decontamination zones Variance needed for parking
Creates safer conditions around equipment in Challenging project phasing to keep Station
bay 183 operational during construction
Provides storage for current and future needs- Most expensive option
has mezzanine in bay
Properly sized apron for current and future
equipment
Key
Apparatus Bay Living Quarters Living quarters sized to accommodate current
and future staffing models
Bay Support Public Space
Administration workspaces accommodates
Administration current and future staffing models
Community Room
Option 3D New Construction, 5 Bays with Basement
Basement
& Second Floor
Living quarters serves as buffer between bay
Area 33,741 GSF and residential properties
# of Bays 5 Existing site- no land purchase
Second Floor Yes Apparatus Bay sized to handle future
equipment with ease
Basement Yes Storm Shelter
Budget $24,915,818 2-story Lobby Area at Entry
Page 57 of 71
Option 3D Floor Plans
Second Floor Plan
Basement Plan
Key
Apparatus Bay Living Quarters
Bay Support Public Space
Decontamination Administration
First Floor Plan Boundary Page 58 of 71
Option 3D Site Plan
Proposed Site Plan
Page 59 of 71
14,820 GSF 29,745 GSF 29,513 GSF
Project Goals Matrix $10,184,373
3 Bays
34,003 GSF
$22,858,739
4 Bays
$22,142,575
4 Bays
$21,888,549
4 Bays
31,594 GSF
$23,070,307
5 Bays
30,912 GSF
$22,884,702
5 Bays
33,741 GSF
$24,915,818
5 Bays
Goal Option Option Option Option Option Option Option
1 2 3 3A 3B 3C 3D
1. Enhance Health and Safety x x x x x x x
2. Improve Operational Efficiency x x x
3. Optimize Staff Comfort and Privacy x x x x
4. Promote Training and Community Engagement x x x x
5. Facilitate Leadership and Administration x x x x
6. Incorporate Outdoor Training Capabilities
7. Celebrate Tradition X
8. Ensure Adequate Storage
Project Goal Description
Key 1. Enhance Health and Safety: Incorporate effective decontamination zones and ventilation systems to ensure the health and safety of
occupants and prevent cross-contamination.
Fully meets the intent of the goal 2. Improve Operational Efficiency: Maximize spacing and layout in the apparatus bay for safe equipment movement and maintenance
activities that are designed for the future, not just the present.
3. Optimize Staff Comfort and Privacy : Design spaces that enhance functionality, including a well-sized kitchen, dayroom, and designated
Partially meets the intent of the goal quiet zones for studying and computer work. Provide private living quarters, including bunk rooms, modern locker rooms, and accessible
shower and restroom facilities for fire station personnel. Important for staff recruitment and retention.
4. Promote Training and Community Engagement: Provide a multipurpose training room suitable for fire station needs and community
events. Create spaces that are designed for the future, not just the present.
Project Mission Statement 5. Facilitate Leadership and Administration: Create dedicated offices for senior staff and a fully equipped administrative suite with essential
Design a functional, comfortable, and amenities like a copy area, break room, and restrooms.
community-oriented fire station that prioritizes safety, 6. Incorporate Outdoor Training Capabilities: Include exterior training areas to support hands-on and scenario-based firefighting exercises.
efficiency, and camaraderie. 7. Celebrate Tradition: Integrate historic photographs and memorabilia into public-facing areas to honor and preserve the Page 60 of
station’s 71
legacy.
8. Ensure Adequate Storage: Include sufficient and well-organized storage solutions to meet the station’s current and future needs.
Preliminary Cost Estimate
Notes:
• Construction assumed to start in Spring 2026
• Excludes: Escalation due to tariffs, unsuitable soils, storm water detention, perimeter fencing, trailers/temp. facilities, hazardous material removal other
than $25k allowance included in demo, fuel tank removal, moving costs Page 61 of 71
Cost Considerations
Item Rough Order of Magnitude (ROM) Cost
One New Apparatus Bay $989,216
Removing the Second Story from one of $1,895,000
the 3 options
One New Bunk Room $30,530
Storm Shelter and Attached Restroom $360,420
(independent structure)
Note: Detailed value engineering takes place in subsequent design phases once a design option is selected.
Page 62 of 71
Financial Scenarios and Details
Grant Funding:
● State Fire Marshall Grant
○ $350,000 maximum
○ Received a letter of support from Rep. Casten’s office
○ Staff submitted grant application already in February 2025
● Sean Casten - Omnibus Government Funding Package
○ Staff has started conversations with Casten’s office
○ Community Funding Projects
Page 63 of 71
Financial
Scenarios
and Details
● #1
● #3
● #3D
★ 4% Rate
★ $1M=$75K
★ .25%=$30K
Page 64 of 71
Financial Scenarios and Details
Option 1 Option 2 Option 3D
Current New Building
Building Addition & - Basement &
Rehab Rehab Current 2nd Floor
# of Bays 3 4 5
Gross Square Feet 14,820 34,003 33,741
Project Value $10 Million $23 Million $25 Million
Annual Debt Service $ 0.8 Million $1.7 Million $1.8 Million
Page 65 of 71
Financial Scenarios and Details
● Approximate Menu For Significant Cuts
○ $1 Million - Cut 1 Bay
○ $2 Million - Cut Either Basement or 2nd Floor
Annual Debt
Option Description Project Value Service
Option 3 4 Bays; No Basement $22 Million $1.6 Million
Option 3 A 4 Bays; No 2nd Floor $22 Million $1.6 Million
Option 3 B 5 Bays; No 2nd Floor $23 Million $1.7 Million
Option 3 C 5 Bays; No Basement $23 Million $1.7 Million
Option 3 D 5 Bays; All Floors $25 Million $1.8 Million Page 66 of 71
Financial Scenarios and Details
Home Rule Sales Tax
Annual Projected Revenue $ 2.2 Million
Debt Service (3D) $ 1.8 Million
Remaining Available Revenue $ 400,000
● Debt service for 3D represents the most expensive new build option
● $29.7 million in future infrastructure projects related to Stormwater
Improvements, Alley Reconstruction, Road Resurfacing, Sidewalks, &
Street Lighting in the next five years (2026-2030)
Page 67 of 71
Potential Project Timeline:
3-6 months 12-18 months 1-2 months 16-20 months
Community Involvement Final Design Bidding Phase Construction
and Project Scoping
Prepare final design and Let the project for bid, Construction of the project
Construction of the project contract documents for review bids, recommend a is anticipated to take
is anticipated to take the chosen alternative that bid proposal for award, approximately 18 months.
approximately 18 months. are suitable for bidding. award the project at the
Village Board.
A Realistic Project Schedule: - Bid in Fall 2026 - Project Construction Starts in Spring 2027
- Project Construction Completed in Fall 2028 Page 68 of 71
Next Steps:
Feedback Tonight
❏ Any other questions/comments?
❏ Anything else you’d like to see on March 20th?
To Discuss On March 20
❏ Feedback on community involvement process
❏ Feedback on how to determine which Option
❏ Any other comments or ideas
Page 69 of 71
Next Steps:
Based On March 20th Feedback
❏ Identify communication plan
❏ Develop scope of work for the project
❏ Develop a preliminary schedule for implementation
❏ Solidify funding sources
Ongoing
❏ Solidify funding sources
Page 70 of 71
Questions?
Thank you for attending!
Page 71 of 71