City Council Planning Sessions
Regular MeetingWheaton, IL · June 28, 2021
Minutes
Monday, June 28, 2021
1. Call to Order
The Wheaton City Council Planning Session was called to order at 7:00 p.m. by Mayor Suess. The following
were:
Physically Present: Councilman Barbier
Councilman Brown
Councilwoman Fitch
Councilwoman Robbins
Mayor Suess
Councilman Weller
Councilwoman Bray-Parker
City Staff Physically Present: John Duguay, Assistant City Manager
Kristopher Dunn, Development Engineer
Joseph Tebrugge, Director of Engineering
Jim Kozik, Director of Economic Development
Vince Laoang, Director of Public Works
Daniel Peck, Public Relations Coordinator
City Staff Present by Video Conference: Nathan Plunkett, Streets Superintendent
2. Approval of June 14, 2021 Minutes
The Council approved the June 14, 2021 City Council Planning Session minutes.
3. Public Comment
There were no public comments.
4. Wheaton Place Parking Structure - Proposal for Consulting Services - APGS
Assistant City Manager Duguay stated that Walker Consultants would be presenting information about
different automated parking guidance system options for the Wheaton Place Parking Structure as part of
original design concepts for the Downtown Streetscape Project.
Assistant City Manager Duguay stated that City staff was seeking Council feedback on whether they should
continue to investigate an automated parking guidance system for the Wheaton Place Parking Structure.
Erik Nelson of Walker Consultants provided an overview of automated parking guidance systems (APGS).
An APGS is a digital information network that provides parking availability information and directional
guidance to motorists at key decision points on their way to and/or through a parking facility or facilities
while also tracking the number of free or occupied spaces for digital platforms including signage and mobile
applications.
1
JUNE 28, 2021 CITY COUNCIL PLANNING SESSION MINUTES
Mr. Nelson provided an overview of the types of automated parking guidance systems: facility count,
level/zone count, and single space count systems.
A facility count APGS is installed at entry and exit points of a parking structure and uses loop sensors,
ultrasonic, camera-based, or license plate recognition system vehicle detection methods to provide a total
number of available spaces within a facility or lot.
A level/zone count APGS is installed at entry and exit points, as well as at different parking levels, and often
requires a lane or stall delineation for reasonable accuracy. The system provides a total number of available
spaces in each level or zone, and total spaces within a facility or lot.
A single space count APGS utilizes overhead or pavement sensors installed at individual spaces using
ultrasonic, infrared, camera-based, LIDAR technology, or magnetic detection methods. The system provides
a total number of spaces by specific area, set of parking spaces, zones, levels, or total spaces within facility
or lot.
Mr. Nelson stated that hybrid APGS options include tracking subsets of unique spaces within a facility using
a single space count APGS and tracking the remainder of spaces using a level count APGS; utilizing a
combination of APGS’s and incorporating LED luminary sensors; and utilize counting as a secondary feature
with a license plate recognition system.
Mr. Nelson reviewed the communications methods that APGS data could be utilized with including
electronic signage, websites, mobile applications, and business intelligence systems.
Mr. Nelson reviewed the estimated costs for each type of APGS.
A facility count APGS using camera-based, LIDAR technology, or ultrasonic detection methods would cost
approximately $20,000-$25,000 per entry or exit point. Benefits include a lower cost than other APGS and
moderate accuracy. Challenges include having no method of counting by level or single space and would
require periodic count resyncing.
A level/zone count APGS using camera-based, LIDAR technology, or ultrasonic detection methods would
cost approximately $20,000-$25,000 per level or zone transition. Benefits include useful parking
information and moderate accuracy. Challenges include the requirement of frequent count resyncs and
potential installation of lane/stall delineation to attain reasonable accuracy.
A single space count APGS using pavement sensors would cost approximately $300-$400 per space.
Benefits include a flexible configuration, fewer count resyncs, and it provides an option without overhead
guidance lights. Challenges include battery maintenance of sensors, potential signage quality issues in
underground structures, and no advanced detection method features.
A single space count APGS using ultrasonic or LIDAR technology overhead sensors would cost
approximately $400-$600 per space. Benefits include a flexible configuration, fewer count resyncs, and it
provides an option with overhead guidance lights. Challenges include no advanced detection method
features.
2
JUNE 28, 2021 CITY COUNCIL PLANNING SESSION MINUTES
A single space count APGS using overhead camera sensors would cost approximately $500-$800 per space.
Benefits include a flexible configuration, fewer count resyncs, overhead guidance lights every 4-6 spaces,
and it supports advanced detection method features.
In response to questions from the Council, Director of Economic Development Kozik stated that the
Wheaton Place Parking Structure spaces are divided among 360 public spaces, private spaces for
condominium residents, and leased private spaces on the upper levels of the garage. He stated that there
are multiple access points for private users of the facility.
In response to questions from the Council, Mr. Nelson stated that the top level would need to utilize a level
count APGS because there would be no place to hang overhead sensors.
In response to questions from the Council, Mr. Nelson stated that an APGS could be designed to only count
spaces on the top level or bottom level if requested.
In response to questions from the Council, Mr. Nelson stated that due to newness of APGS technologies,
the City would need to manually count the vehicles within the structure daily to maintain accuracy if a
facility count or level count system was installed.
In response to questions from the Council, Assistant City Manager Duguay stated that City staff has only
investigated an APGS for the Wheaton Place Parking Structure and not other parking facilities and lots
within the City.
In response to questions from the Council, Mr. Nelson stated that the useful life of an APGS is
approximately 10 years.
In response to questions from the Council, Director of Economic Development Kozik stated that City staff
recently began tracking parking utilization in the CBD using LPR technology and a drone. He stated that
utilization was high in customer parking spaces, the City Hall north lot and the Wheaton Place garage on
June 4th, which was one of the dates data was collected. Staff will continue to gather data on how full the
Wheaton Place Parking Structure gets during other peak times.
In response to questions from the Council, Assistant City Manager Duguay stated that there were two types
of wayfinding signage that were incorporated into the streetscape project that currently direct visitors to
parking facilities.
City Council requested City staff postpone further investigation of automated parking guidance systems
(APGS) until additional utilization data is collected and the City’s comprehensive parking study has been
completed.
5. City Of Wheaton Flood Resiliency Investigation - Flood Protection Program Discussion Part 5 (Continued)
Assistant City Manager Duguay stated that this was a continuation of the discussion of developing a flood
protection program for the City of Wheaton.
City staff is reviewing Buyout/Floodproofing options and reviewing Capital Improvement Project to address
overland flooding and provide flood protection up to a 100-year storm in 15 specific flood-prone areas,
along with the associated costs and ancillary benefits. Ancillary benefits from capital improvement projects
include moving flood water further away from structures, decreasing or eliminating flooding of accessory
3
JUNE 28, 2021 CITY COUNCIL PLANNING SESSION MINUTES
structures and yards, decreasing City expenditure on emergency services, making streets more passable
during flood events, and not eliminating neighborhoods or portions of the City’s tax base.
City staff previously reviewed 10 of the 15 flood-prone areas during the June 14, 2021 City Council Planning
Session.
Director of Engineering Tebrugge reviewed the Williston Basin Flood Study, which showed 36 homes
receiving overland flooding and 14 homes receiving flooding over the top of the foundation. A
buyout/floodproofing program would cost approximately $4.2 million compared to a Capital Improvement
Project, which would cost approximately $7.7 million with no potential grants available. The Capital
Improvement Project consists of increasing the size of some storm sewers, floodproofing 10 structures, and
constructing new detention basins, which would require buying out 19 private properties. City staff
evaluated the Capital Improvement Project as having a very low ancillary benefit.
In response to questions from the Council, Director of Engineering Tebrugge stated that none of the
potential floodproofing solutions include the elevation of structures for any of the flood-prone areas.
The Wakeman and Cadillac Upland Depression Flood Study showed 10 homes receiving overland flooding
and 6 homes receiving flooding over the top of the foundation. A buyout/floodproofing program would
cost approximately $1.8 million compared to a Capital Improvement Project that would cost approximately
$2.2 million with no potential grants available. The Capital Improvement Project consists of constructing a
new storm sewer through Parkway Drive beginning at President Street and distributing stormwater into the
Winfield Creek located in the Turf, Countryside, and Ranch Flood Study area. City staff evaluated the Capital
Improvement Project as having a high ancillary benefit.
The Thomas Overland Flow Path Flood Study showed 8 homes receiving overland flooding and 5 homes
receiving flooding over the top of the foundation. A buyout/floodproofing program would cost
approximately $2 million.
Director of Engineering Tebrugge stated that the Wakeman and Cadillac Upland Depression Flood Study
Capital Improvement Project cost is combined with the Thomas Overland Flow Path Flood Study Capital
Improvement Project cost because it is required to be complete in order to proceed with the Thomas
Overland Study Capital Improvement Project. He stated that the two studies combined show 18 homes
receiving overland flooding and 11 homes receiving flooding over the top of the foundation. A
buyout/floodproofing program for both study areas would cost approximately $3.8 million compared to the
combined Capital Improvement Projects that would cost approximately $4.7 million with no potential
grants available. The Capital Improvement Project consists of completing the new storm sewer from the
Wakeman and Cadillac Upland Depression Flood Study, and constructing new detention basins, which
would require buying out 3 private properties. City staff evaluated the combined Capital Improvement
Projects as having a high ancillary benefit.
Director of Engineering Tebrugge stated that the Cherry Street Flood Study projects and the Harrison
Avenue Flood Study projects need to be combined as one project, as both are dependent on one another in
order to proceed.
The Cherry Street Flood Study showed 19 homes receiving overland flooding and 12 homes receiving
flooding over the top of the foundation. A buyout/floodproofing program would cost approximately $3.9
million.
4
JUNE 28, 2021 CITY COUNCIL PLANNING SESSION MINUTES
The Harrison Avenue Flood Study showed 25 homes receiving overland flooding and 14 homes receiving
flooding over the top of the foundation. A buyout/floodproofing program would cost approximately $5.5
million.
The combination of the Cherry Street Flood Study and the Harrison Avenue Flood Study showed 44 homes
receiving overland flooding and 26 homes receiving flooding over the top of the foundation. A
buyout/floodproofing program would cost approximately $9.4 million compared to combined Capital
Improvement Projects that would cost approximately $7.8 million and would cost approximately $1.9
million if a grant is awarded. The Cherry Street Capital Improvement Project consists of increasing the size
of some storm sewers and constructing a new detention basin, which would require buying out 6 private
properties. The Harrison Avenue Capital Improvement Project consists of constructing a new detention
basin on Wheaton College property and increasing the size of some storm sewers. City staff evaluated the
combined Capital Improvement Projects as having a high ancillary benefit.
Director of Engineering Tebrugge noted that the Harrison Avenue Study shows the Wheaton College
dormitories receiving overland flooding during a 10-year storm, but the study does not include any details
about buyouts or floodproofing.
In response to questions from Council, Director of Engineering Tebrugge stated that the combined Capital
Improvement Projects are viable for federal grant funding because of the high benefit cost analysis the
projects would provide.
Director of Engineering Tebrugge stated that the overall cost for the proposed flood protection program
would be approximately $49.8 million. The cost would decrease to approximately $31.7 million if the
potential grants available were awarded. He stated that the maximum change in the total cost of the
program if alternate projects are selected is estimated to be approximately $4.5 million.
Director of Engineering stated that the next steps in the process are to discuss funding options for the
program and to initiate meetings with the public.
In response to questions from Council, Director of Engineering Tebrugge stated that the Turf, Countryside,
and Ranch Capital Improvement Project, which consists of reconstructing streets, is not part of the City’s
annual road program because it requires specific permitting through DuPage County. He stated that it
could be part of the City’s annual program, but it would negate the opportunity of receiving a federal grant
that would pay 75% of the Capital Improvement Project.
In response to questions from Council, Director of Engineering Tebrugge stated that any properties bought
out using FEMA funding will not be able to have any form of development on the property, and the City
would need to maintain it going forward. He stated that multiple properties bought out using FEMA funds
could be developed into detention areas.
The Council requested that staff formulate a strategy to proceed with communicating the proposed flood
protection program to the public and prioritizing projects.
6. Sidewalk Snow Removal Requirement - Commercial Properties
Assistant City Manager Duguay stated that staff was asked to review establishing an ordinance requiring
commercial property owners to remove snow from adjacent public sidewalks. He stated that City staff was
5
JUNE 28, 2021 CITY COUNCIL PLANNING SESSION MINUTES
seeking Council direction on whether they should continue investigating developing a sidewalk clearing
program for certain areas or properties.
Assistant City Manager Duguay provided an overview of similar municipal programs that included
ordinances that were required either communitywide, in specific areas adjacent to public sidewalks, in
specific areas on private property, and in specific areas on public property. He stated that the City currently
requires property owners in specific areas (CBD) adjacent to public sidewalks to remove snow on
properties.
Assistant City Manager Duguay stated that some municipalities also include other items in their ordinances
that prohibit depositing snow on public streets and sidewalks, and also require property owners to remove
snow from public sidewalks.
Assistant City Manager Duguay provided an overview of how the City could define areas, such as by type of
property or by zoning classifications. He stated that the City has many areas that have a mixture of zoning
classifications, which would make classifying properties by zoning problematic.
Assistant City Manager Duguay reviewed the challenges of establishing a program, which include enforcing
an ordinance, dealing with snow piles from plows, defining a snow event, and the lack of available
resources from the Public Works Department to support clearing efforts.
The Council requested that staff continue investigating the requirements for an ordinance requiring
commercial property owners to remove snow from adjacent public sidewalks.
7. City Council/City Staff Comments
Mayor Suess encouraged community members to enjoy the weekend Independence Day celebrations. He
stated that fireworks would begin at 9 p.m. at Graf Park on Saturday, July 3 with activities beginning at 5:30
p.m.; and the Independence Day parade would begin at 11 a.m. July 4 on Main Street between Hawthorne
and Union Avenue.
8. Adjournment
The meeting was adjourned at 9:18 p.m.
Respectfully submitted,
Daniel J. Peck
6